INTRODUCTIONTOTHECASE
• Dabhol Power Project - considered as one of the MOST CONTROVERSIAL
projects undertaken in India with the help of foreign investment, after the
economic liberalization of the early 90’s
• Promoted by EnronCorp,USA
• Envisioned as2 phases (1st of 695MW and 2nd of 1320MW)in Maharashtra
• Mired in controversy, right from inception to closure
• ‘Victim’ ofpolitical one-upmanship
• Finally shut down in 2001
POWERSCENARIOIN INDIAPRIORTOENRON
• Energy deficit of 18% recorded in 8th FiveYearPlan in 1992
• Monopoly of government and state electricity boards (SEB’s) in power
generation– only 4.5% in private sector
• Majority of SEB’s nearing bankruptcy at the time – cumulative losses of
more than2800 Crores
• Reasons for poor performance of SEB’s – erratic fuel (coal) supply, low
capacity utilization, old equipment and poor maintenance, huge
transmission & distributionlosses (T&D)
• Availability of power expected to be ahuge constraint on industrial and
agricultural growth
POWERREFORMS& ENRON’SINTERESTIN
INDIA
• Economic liberalization of 1991-92 brought changes in power policy:
relaxation of financial regulations & governmental red-tape – single window
clearance, up to 100% FDI, import customs duty reduction, 5 year tax
holidays, reforms in power tariffs (fixed tariffs for all fixed costs, and
variable tariffs for fuel andO&M costs)
• Enron executives met with designated officer in-charge in USAin May1992
to discuss possibilities of alarge scalegas-fired thermal power project
• Enron had major contracts with Middle-East suppliers for natural gas supply,
and envisioned Dabhol as a major customer of this gas, possible hub for
future gaspipeline network in India
ENRON/DABHOL–BACKGROUNDCHECK
• Enron –leading multinational corporation in the oil & natural gas industry,
$8billion in revenue in 1993
• Enron (as Enron Development Corporation, EDC) formed Dabhol Power
Company (DPC)with followingpartners:
• Bechtel –Engineering& construction conglomerate, $8billion in salesin 1992
• GE–Engineering,technology & manufacturing giant, $61billion in revenue in 1993
• Holding pattern of DPC:EDC80%, Bechtel 10%,GE10%.
EVENTCHRONOLOGYUPTO1995
Month &Year Sequenceof events
May 1992 Discussionbetween Enron officials and designated Indian officials in USA
Jun1992
MoU signed by Enron, Bechtel and GE with MSEB (Maharashtra State Electricity
Board); MSEBchosen asit was a profit generating SEB,large power demand existed
in Maharashtra, and Dabhol was close to seacoast (easier to transport fuel)
Jun1992 –Dec1993 Negotiations underway, necessarygovernmental clearances obtained by DPC
Dec1993
MSEB and DPC sign Power Purchase Agreement (PPA); MSEB to guarantee
purchase of 90% power generated by DPC at all times. Penalties/ payment
guarantees applicable in caseof breach of agreement on part of either
1994 –early1995
Enron obtains financing for DPC; opposition parties (BJP and Shiv Sena) campaign
against ruling Congress government, promising to “throw Enron into the Arabian
Sea”
Jan1995 Loan agreements signed byEnron
Mar 1995 Opposition alliance wins Maharashtra state elections, acts on its promise
INVESTIGATIONOFDPC& PROJECTSCRAPPING
• Sustained opposition from locals and environmental
groups, adverse mediacoverage
• New Maharashtra government (GOM) appointed
Committee to look into the project
• Committee cameout with ahighly critical report:
• MoU ‘rushed’, ‘one-sided’, absenceof competitive bidding
• Only Enron’sconcernsaddressedin MoU,PPA
• Capital costs of the project inflated, power purchase rate
higher thanjustifiable
• Government scrapped the project inAugust 1995
• Enronimmediately suedGOMfor compensation
POLITICALFLIP-FLOPS,PROJECTCLOSURE
• Topbossesof Enronmet with GOM,including ShivSena supremoBalThackerayinNov1995
• Negotiations commenced immediately, and in Jan 1996 revised agreement was announced, and accepted in Feb
1996itself
• Revised agreement expanded 1stphase from 695MW to 740MW, committed MSEB to purchase 90% power from
2nd phaseof 1320MWalso
• Agreement criticised widely for only minor revisions, and increasing risk of GOM; public opposition to project
continued
• Phase 1 operationalised in May 1999, phase 2
• MSEB stopped bill payments in 2001, and sought
• cancellation ofPPA
• Enron stopped power production & construction of Phase2, entered arbitrationproceedings
• PROJECTSHUTDOWN
constructioncommenced
INTRODUCTIONTOOURPROBLEM
• Issues& challenges faced by Enronin implementing the DPCproject:
• Alleged lackof transparencyin bidding process
• Corruption allegations???
• Extremely high return on investment of shareholders
• High risk on the part of MSEBdue to guaranteed 90% power purchase, high cost of power
generation
• Losses to GOM and GOI due to any breach on MSEB’s part, on account of counter
guarantees aspercontract
• Concernson substantial foreign exchangeoutflow
• Opposition from locals and environmental groups, and their harassment by Enron/ local
governmentmachinery
ISSUES& CHALLENGESFACED
• Alleged lack of transparency in bidding process?
• No competitive bidding procedures followed
• MoU preparation and signing in a ‘rushed’ and ‘one-
sided’ manner, withundue haste
• “Enron came, saw and conquered”: Manohar Joshi,
BJP-ShivSenaGovernment (GOM)CM
• Corruption allegations?
• Speed with which MoU was signed, with some
clearances being ignored citing ‘fast-track’ nature of
project
• Renegotiation of contract cancelled earlier by GOM
took only 12 days, after meeting between leadership
of EnronandShivSena
ISSUES& CHALLENGESFACED(contd.)
• Extremely high return on investment for shareholders?
• Return pegged at 16% in contract, but calculations showed that it would go up to 58% in
20th year of operation
• High risk on the part of MSEB?
• MSEBcontracted to purchase90%of power generated by DPC,regardless of demand
• Could force MSEBto shut down other state-owned plants, which generated power at 25%
of DPC’scost;
• World Bank, in 1993, advised Indian Government (GOI)that DPCwould generate too much
power for Maharashtraat too high aprice
• State firms could producepower at 50%of the rate claimed by DPC
• In 2001, power from Dabhol 4 times asexpensive asother domestic plants, while only 10-
20%of produced power wasbeing purchased
ISSUES& CHALLENGESFACED(contd.)• Lossesto GOM andGOI?
• Breach of contract by MSEB would mean payments to
DPC were to be guaranteed by GOM, and these in turn
were to be guaranteed byGOI
• Severe penalties mentioned in PPAfor any suchbreaches
• Continued power purchases could lead to annual losses of
2000 Crores to MSEB, eventually rendering it, and
consequently, GOM,bankrupt
• Concerns on substantial foreignexchange outflow?
• Annual forex outflow asaresult of power purchase payments calculated as45000Crores
• Opposition from locals andenvironmental groups?
• Fierce opposition fromlocals
• Land for project allegedly seized without compensation
• Decrease in fresh water availability in surrounding communities reported
• Non-violent protests reportedly put down by force –arbitrary arrests/ detentions, tear gas
usage harassment, etc. reported by Human RightsWatch,Amnesty International
POSSIBLERECOMMENDATIONS
• Always adopt competitive bidding, at least to avoid cries of ‘one-sidedness’
• Detailed study of financial capability of power purchaser (in this case MSEB)
before entering into PPA’s of such nature, with stringent conditions as per
international standards
• Adoption of economical fuel for the power production
• Better networking and building of trust with all concerned parties – political
leaders, affected locals (through proper compensation policies),
environmental and other organisations working at the grassroots level
Thank Youverymuch….

More Related Content

What's hot

Bangladesh Energy Crisis Solutions
Bangladesh Energy Crisis SolutionsBangladesh Energy Crisis Solutions
Bangladesh Energy Crisis Solutions
shawkat haider
 
Tata power
Tata powerTata power
Tata power
raulpin101
 
The hutchison essar acquisition
The hutchison essar acquisitionThe hutchison essar acquisition
The hutchison essar acquisition
Udayan Sikdar
 
Project & Infrastructure Financing- SPV for Solar Park
Project & Infrastructure Financing- SPV for Solar Park Project & Infrastructure Financing- SPV for Solar Park
Project & Infrastructure Financing- SPV for Solar Park
Akhilesh Upadhyay
 
Current power scenario in india
Current power scenario in indiaCurrent power scenario in india
Current power scenario in india
Aneeshan Sain
 
Hydro policies of india
Hydro policies of indiaHydro policies of india
Hydro policies of india
Rohil Kumar
 
Tariff-based Competitive Bidding in the Power Sector
Tariff-based Competitive Bidding in the Power SectorTariff-based Competitive Bidding in the Power Sector
Tariff-based Competitive Bidding in the Power Sector
IPPAI
 
Bp Amoco (case study)
Bp Amoco (case study)Bp Amoco (case study)
Bp Amoco (case study)
Abhik Tushar Das
 
Coal scam
Coal scamCoal scam
Coal scam
Janvi Dhorajiya
 
ONGC
ONGCONGC
EPL_konverents.pdf
EPL_konverents.pdfEPL_konverents.pdf
EPL_konverents.pdf
Timo Tatar
 
Australia – Japan Cable
Australia – Japan CableAustralia – Japan Cable
Australia – Japan Cable
Praful Anchaliya
 
Industrial Analysis on power Industry
Industrial Analysis on power IndustryIndustrial Analysis on power Industry
Industrial Analysis on power Industry
Siva Konduri
 
Vedanta Acquired Cairn
Vedanta Acquired Cairn Vedanta Acquired Cairn
Vedanta Acquired Cairn
Saravanan rulez
 
Enron Case Study 971103 [Compatibility Mode]
Enron Case Study 971103 [Compatibility Mode]Enron Case Study 971103 [Compatibility Mode]
Enron Case Study 971103 [Compatibility Mode]
MBA_Community
 
Power Sector In Bangladesh
Power Sector In BangladeshPower Sector In Bangladesh
Power Sector In Bangladesh
Sayanton Vhaduri
 
Energy Security in Pakistan
Energy Security in PakistanEnergy Security in Pakistan
Energy Security in Pakistan
Procorre
 
Bhel 091117052724-phpapp02
Bhel 091117052724-phpapp02Bhel 091117052724-phpapp02
Bhel 091117052724-phpapp02
9988785446
 
Ben & Jerry's Homemade Ice Cream, Inc: A Period of Transition Case Study
Ben & Jerry's Homemade Ice Cream, Inc: A Period of Transition Case StudyBen & Jerry's Homemade Ice Cream, Inc: A Period of Transition Case Study
Ben & Jerry's Homemade Ice Cream, Inc: A Period of Transition Case Study
Thomas O'Brien
 
Bharat petroleum corporation limited
Bharat petroleum corporation limitedBharat petroleum corporation limited
Bharat petroleum corporation limited
Usha Ravichandran
 

What's hot (20)

Bangladesh Energy Crisis Solutions
Bangladesh Energy Crisis SolutionsBangladesh Energy Crisis Solutions
Bangladesh Energy Crisis Solutions
 
Tata power
Tata powerTata power
Tata power
 
The hutchison essar acquisition
The hutchison essar acquisitionThe hutchison essar acquisition
The hutchison essar acquisition
 
Project & Infrastructure Financing- SPV for Solar Park
Project & Infrastructure Financing- SPV for Solar Park Project & Infrastructure Financing- SPV for Solar Park
Project & Infrastructure Financing- SPV for Solar Park
 
Current power scenario in india
Current power scenario in indiaCurrent power scenario in india
Current power scenario in india
 
Hydro policies of india
Hydro policies of indiaHydro policies of india
Hydro policies of india
 
Tariff-based Competitive Bidding in the Power Sector
Tariff-based Competitive Bidding in the Power SectorTariff-based Competitive Bidding in the Power Sector
Tariff-based Competitive Bidding in the Power Sector
 
Bp Amoco (case study)
Bp Amoco (case study)Bp Amoco (case study)
Bp Amoco (case study)
 
Coal scam
Coal scamCoal scam
Coal scam
 
ONGC
ONGCONGC
ONGC
 
EPL_konverents.pdf
EPL_konverents.pdfEPL_konverents.pdf
EPL_konverents.pdf
 
Australia – Japan Cable
Australia – Japan CableAustralia – Japan Cable
Australia – Japan Cable
 
Industrial Analysis on power Industry
Industrial Analysis on power IndustryIndustrial Analysis on power Industry
Industrial Analysis on power Industry
 
Vedanta Acquired Cairn
Vedanta Acquired Cairn Vedanta Acquired Cairn
Vedanta Acquired Cairn
 
Enron Case Study 971103 [Compatibility Mode]
Enron Case Study 971103 [Compatibility Mode]Enron Case Study 971103 [Compatibility Mode]
Enron Case Study 971103 [Compatibility Mode]
 
Power Sector In Bangladesh
Power Sector In BangladeshPower Sector In Bangladesh
Power Sector In Bangladesh
 
Energy Security in Pakistan
Energy Security in PakistanEnergy Security in Pakistan
Energy Security in Pakistan
 
Bhel 091117052724-phpapp02
Bhel 091117052724-phpapp02Bhel 091117052724-phpapp02
Bhel 091117052724-phpapp02
 
Ben & Jerry's Homemade Ice Cream, Inc: A Period of Transition Case Study
Ben & Jerry's Homemade Ice Cream, Inc: A Period of Transition Case StudyBen & Jerry's Homemade Ice Cream, Inc: A Period of Transition Case Study
Ben & Jerry's Homemade Ice Cream, Inc: A Period of Transition Case Study
 
Bharat petroleum corporation limited
Bharat petroleum corporation limitedBharat petroleum corporation limited
Bharat petroleum corporation limited
 

Similar to Dabhol power project

Dabhol-Power-Company PF,M.pptx
Dabhol-Power-Company PF,M.pptxDabhol-Power-Company PF,M.pptx
Dabhol-Power-Company PF,M.pptx
NIHALTYAGI5
 
Epira Law and EC's
Epira Law and EC's Epira Law and EC's
Epira Law and EC's
Ariel Pareno Anghay, MDMG,DPA
 
Department of Energy Building Envelope RD
Department of Energy Building Envelope RDDepartment of Energy Building Envelope RD
Department of Energy Building Envelope RD
Palo Alto Net Zero
 
PESTEL analyses on offshore wind in USA
PESTEL analyses on offshore wind in USAPESTEL analyses on offshore wind in USA
PESTEL analyses on offshore wind in USA
NunoVendeirinho
 
DABHOL POWER PLANT.pdf
DABHOL POWER PLANT.pdfDABHOL POWER PLANT.pdf
DABHOL POWER PLANT.pdf
NamanShah588560
 
Energycrisesinpakistanbuttpresentation 120602154635-phpapp02
Energycrisesinpakistanbuttpresentation 120602154635-phpapp02Energycrisesinpakistanbuttpresentation 120602154635-phpapp02
Energycrisesinpakistanbuttpresentation 120602154635-phpapp02
Ahmer Khan
 
Renewables will shape Argentina’s new energy matrix
Renewables will shape Argentina’s new	energy matrixRenewables will shape Argentina’s new	energy matrix
Renewables will shape Argentina’s new energy matrix
Doris Capurro
 
Energy crises in pakistan butt presentation
Energy crises in pakistan butt presentationEnergy crises in pakistan butt presentation
Energy crises in pakistan butt presentation
goodamazing
 
Omass - Vietnam Energy Future - PDP 8
Omass - Vietnam Energy Future - PDP 8 Omass - Vietnam Energy Future - PDP 8
Omass - Vietnam Energy Future - PDP 8
Dr. Oliver Massmann
 
Intergen and quezon project rgipt group7
Intergen and quezon project rgipt group7Intergen and quezon project rgipt group7
Intergen and quezon project rgipt group7
Prashant Chaubey
 
Final project jrrm
Final project jrrm Final project jrrm
Final project jrrm
JosRaulRujanoMaldona
 
The MEED view of the Saudi utilities market 2010
The MEED view of the Saudi utilities market 2010The MEED view of the Saudi utilities market 2010
The MEED view of the Saudi utilities market 2010
MEED
 
T.Chirica - Forum Invest Financing Crisis And Nuclear
T.Chirica - Forum Invest Financing Crisis And NuclearT.Chirica - Forum Invest Financing Crisis And Nuclear
T.Chirica - Forum Invest Financing Crisis And Nuclear
NuclearSafetyGroup
 
Geronimo Wind Development Model
Geronimo Wind Development ModelGeronimo Wind Development Model
Geronimo Wind Development Model
University of Minnesota
 
Geronimo Wind Development Model
Geronimo Wind Development ModelGeronimo Wind Development Model
Geronimo Wind Development Model
University of Minnesota
 
Power sector ,devlopment
Power sector ,devlopmentPower sector ,devlopment
Power sector ,devlopment
Bhakti Parida
 
Shropshire Hills Aonb Presentation 21st October 2008
Shropshire Hills Aonb Presentation 21st October 2008Shropshire Hills Aonb Presentation 21st October 2008
Shropshire Hills Aonb Presentation 21st October 2008
Marches Energy Agency
 
No to BNPP Revival Power Issues
No to BNPP Revival Power IssuesNo to BNPP Revival Power Issues
No to BNPP Revival Power Issues
gtapang
 
India Biomass Power Sector
India Biomass Power SectorIndia Biomass Power Sector
India Biomass Power Sector
guest067b99
 
DOUGLAS MCILDOON - CBI Annual Energy Forum 2009
DOUGLAS MCILDOON - CBI Annual Energy Forum 2009DOUGLAS MCILDOON - CBI Annual Energy Forum 2009
DOUGLAS MCILDOON - CBI Annual Energy Forum 2009
AJCBI
 

Similar to Dabhol power project (20)

Dabhol-Power-Company PF,M.pptx
Dabhol-Power-Company PF,M.pptxDabhol-Power-Company PF,M.pptx
Dabhol-Power-Company PF,M.pptx
 
Epira Law and EC's
Epira Law and EC's Epira Law and EC's
Epira Law and EC's
 
Department of Energy Building Envelope RD
Department of Energy Building Envelope RDDepartment of Energy Building Envelope RD
Department of Energy Building Envelope RD
 
PESTEL analyses on offshore wind in USA
PESTEL analyses on offshore wind in USAPESTEL analyses on offshore wind in USA
PESTEL analyses on offshore wind in USA
 
DABHOL POWER PLANT.pdf
DABHOL POWER PLANT.pdfDABHOL POWER PLANT.pdf
DABHOL POWER PLANT.pdf
 
Energycrisesinpakistanbuttpresentation 120602154635-phpapp02
Energycrisesinpakistanbuttpresentation 120602154635-phpapp02Energycrisesinpakistanbuttpresentation 120602154635-phpapp02
Energycrisesinpakistanbuttpresentation 120602154635-phpapp02
 
Renewables will shape Argentina’s new energy matrix
Renewables will shape Argentina’s new	energy matrixRenewables will shape Argentina’s new	energy matrix
Renewables will shape Argentina’s new energy matrix
 
Energy crises in pakistan butt presentation
Energy crises in pakistan butt presentationEnergy crises in pakistan butt presentation
Energy crises in pakistan butt presentation
 
Omass - Vietnam Energy Future - PDP 8
Omass - Vietnam Energy Future - PDP 8 Omass - Vietnam Energy Future - PDP 8
Omass - Vietnam Energy Future - PDP 8
 
Intergen and quezon project rgipt group7
Intergen and quezon project rgipt group7Intergen and quezon project rgipt group7
Intergen and quezon project rgipt group7
 
Final project jrrm
Final project jrrm Final project jrrm
Final project jrrm
 
The MEED view of the Saudi utilities market 2010
The MEED view of the Saudi utilities market 2010The MEED view of the Saudi utilities market 2010
The MEED view of the Saudi utilities market 2010
 
T.Chirica - Forum Invest Financing Crisis And Nuclear
T.Chirica - Forum Invest Financing Crisis And NuclearT.Chirica - Forum Invest Financing Crisis And Nuclear
T.Chirica - Forum Invest Financing Crisis And Nuclear
 
Geronimo Wind Development Model
Geronimo Wind Development ModelGeronimo Wind Development Model
Geronimo Wind Development Model
 
Geronimo Wind Development Model
Geronimo Wind Development ModelGeronimo Wind Development Model
Geronimo Wind Development Model
 
Power sector ,devlopment
Power sector ,devlopmentPower sector ,devlopment
Power sector ,devlopment
 
Shropshire Hills Aonb Presentation 21st October 2008
Shropshire Hills Aonb Presentation 21st October 2008Shropshire Hills Aonb Presentation 21st October 2008
Shropshire Hills Aonb Presentation 21st October 2008
 
No to BNPP Revival Power Issues
No to BNPP Revival Power IssuesNo to BNPP Revival Power Issues
No to BNPP Revival Power Issues
 
India Biomass Power Sector
India Biomass Power SectorIndia Biomass Power Sector
India Biomass Power Sector
 
DOUGLAS MCILDOON - CBI Annual Energy Forum 2009
DOUGLAS MCILDOON - CBI Annual Energy Forum 2009DOUGLAS MCILDOON - CBI Annual Energy Forum 2009
DOUGLAS MCILDOON - CBI Annual Energy Forum 2009
 

Recently uploaded

Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
TechSoup
 
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
Nguyen Thanh Tu Collection
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
heathfieldcps1
 
B. Ed Syllabus for babasaheb ambedkar education university.pdf
B. Ed Syllabus for babasaheb ambedkar education university.pdfB. Ed Syllabus for babasaheb ambedkar education university.pdf
B. Ed Syllabus for babasaheb ambedkar education university.pdf
BoudhayanBhattachari
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
History of Stoke Newington
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
Colégio Santa Teresinha
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
PECB
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
eBook.com.bd (প্রয়োজনীয় বাংলা বই)
 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
iammrhaywood
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
Nicholas Montgomery
 
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
Nguyen Thanh Tu Collection
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
WaniBasim
 
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skillsspot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
haiqairshad
 
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) CurriculumPhilippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
MJDuyan
 
clinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdfclinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdf
Priyankaranawat4
 
Solutons Maths Escape Room Spatial .pptx
Solutons Maths Escape Room Spatial .pptxSolutons Maths Escape Room Spatial .pptx
Solutons Maths Escape Room Spatial .pptx
spdendr
 
How to deliver Powerpoint Presentations.pptx
How to deliver Powerpoint  Presentations.pptxHow to deliver Powerpoint  Presentations.pptx
How to deliver Powerpoint Presentations.pptx
HajraNaeem15
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
Jyoti Chand
 
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptxPrésentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
siemaillard
 
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptxBeyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
EduSkills OECD
 

Recently uploaded (20)

Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
 
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
 
B. Ed Syllabus for babasaheb ambedkar education university.pdf
B. Ed Syllabus for babasaheb ambedkar education university.pdfB. Ed Syllabus for babasaheb ambedkar education university.pdf
B. Ed Syllabus for babasaheb ambedkar education university.pdf
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
 
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
 
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skillsspot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
 
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) CurriculumPhilippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
 
clinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdfclinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdf
 
Solutons Maths Escape Room Spatial .pptx
Solutons Maths Escape Room Spatial .pptxSolutons Maths Escape Room Spatial .pptx
Solutons Maths Escape Room Spatial .pptx
 
How to deliver Powerpoint Presentations.pptx
How to deliver Powerpoint  Presentations.pptxHow to deliver Powerpoint  Presentations.pptx
How to deliver Powerpoint Presentations.pptx
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
 
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptxPrésentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
 
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptxBeyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
 

Dabhol power project

  • 1. Dabhol PowerProject Submitted By: Sourabh Morey AH19155 Neeraj Namdev AH19158 Deepam Patidar AH19169 Rahul Vishwakarma AH19188 Rajat Rguwanshi AH19192
  • 2. INTRODUCTIONTOTHECASE • Dabhol Power Project - considered as one of the MOST CONTROVERSIAL projects undertaken in India with the help of foreign investment, after the economic liberalization of the early 90’s • Promoted by EnronCorp,USA • Envisioned as2 phases (1st of 695MW and 2nd of 1320MW)in Maharashtra • Mired in controversy, right from inception to closure • ‘Victim’ ofpolitical one-upmanship • Finally shut down in 2001
  • 3. POWERSCENARIOIN INDIAPRIORTOENRON • Energy deficit of 18% recorded in 8th FiveYearPlan in 1992 • Monopoly of government and state electricity boards (SEB’s) in power generation– only 4.5% in private sector • Majority of SEB’s nearing bankruptcy at the time – cumulative losses of more than2800 Crores • Reasons for poor performance of SEB’s – erratic fuel (coal) supply, low capacity utilization, old equipment and poor maintenance, huge transmission & distributionlosses (T&D) • Availability of power expected to be ahuge constraint on industrial and agricultural growth
  • 4. POWERREFORMS& ENRON’SINTERESTIN INDIA • Economic liberalization of 1991-92 brought changes in power policy: relaxation of financial regulations & governmental red-tape – single window clearance, up to 100% FDI, import customs duty reduction, 5 year tax holidays, reforms in power tariffs (fixed tariffs for all fixed costs, and variable tariffs for fuel andO&M costs) • Enron executives met with designated officer in-charge in USAin May1992 to discuss possibilities of alarge scalegas-fired thermal power project • Enron had major contracts with Middle-East suppliers for natural gas supply, and envisioned Dabhol as a major customer of this gas, possible hub for future gaspipeline network in India
  • 5. ENRON/DABHOL–BACKGROUNDCHECK • Enron –leading multinational corporation in the oil & natural gas industry, $8billion in revenue in 1993 • Enron (as Enron Development Corporation, EDC) formed Dabhol Power Company (DPC)with followingpartners: • Bechtel –Engineering& construction conglomerate, $8billion in salesin 1992 • GE–Engineering,technology & manufacturing giant, $61billion in revenue in 1993 • Holding pattern of DPC:EDC80%, Bechtel 10%,GE10%.
  • 6. EVENTCHRONOLOGYUPTO1995 Month &Year Sequenceof events May 1992 Discussionbetween Enron officials and designated Indian officials in USA Jun1992 MoU signed by Enron, Bechtel and GE with MSEB (Maharashtra State Electricity Board); MSEBchosen asit was a profit generating SEB,large power demand existed in Maharashtra, and Dabhol was close to seacoast (easier to transport fuel) Jun1992 –Dec1993 Negotiations underway, necessarygovernmental clearances obtained by DPC Dec1993 MSEB and DPC sign Power Purchase Agreement (PPA); MSEB to guarantee purchase of 90% power generated by DPC at all times. Penalties/ payment guarantees applicable in caseof breach of agreement on part of either 1994 –early1995 Enron obtains financing for DPC; opposition parties (BJP and Shiv Sena) campaign against ruling Congress government, promising to “throw Enron into the Arabian Sea” Jan1995 Loan agreements signed byEnron Mar 1995 Opposition alliance wins Maharashtra state elections, acts on its promise
  • 7. INVESTIGATIONOFDPC& PROJECTSCRAPPING • Sustained opposition from locals and environmental groups, adverse mediacoverage • New Maharashtra government (GOM) appointed Committee to look into the project • Committee cameout with ahighly critical report: • MoU ‘rushed’, ‘one-sided’, absenceof competitive bidding • Only Enron’sconcernsaddressedin MoU,PPA • Capital costs of the project inflated, power purchase rate higher thanjustifiable • Government scrapped the project inAugust 1995 • Enronimmediately suedGOMfor compensation
  • 8. POLITICALFLIP-FLOPS,PROJECTCLOSURE • Topbossesof Enronmet with GOM,including ShivSena supremoBalThackerayinNov1995 • Negotiations commenced immediately, and in Jan 1996 revised agreement was announced, and accepted in Feb 1996itself • Revised agreement expanded 1stphase from 695MW to 740MW, committed MSEB to purchase 90% power from 2nd phaseof 1320MWalso • Agreement criticised widely for only minor revisions, and increasing risk of GOM; public opposition to project continued • Phase 1 operationalised in May 1999, phase 2 • MSEB stopped bill payments in 2001, and sought • cancellation ofPPA • Enron stopped power production & construction of Phase2, entered arbitrationproceedings • PROJECTSHUTDOWN constructioncommenced
  • 9. INTRODUCTIONTOOURPROBLEM • Issues& challenges faced by Enronin implementing the DPCproject: • Alleged lackof transparencyin bidding process • Corruption allegations??? • Extremely high return on investment of shareholders • High risk on the part of MSEBdue to guaranteed 90% power purchase, high cost of power generation • Losses to GOM and GOI due to any breach on MSEB’s part, on account of counter guarantees aspercontract • Concernson substantial foreign exchangeoutflow • Opposition from locals and environmental groups, and their harassment by Enron/ local governmentmachinery
  • 10. ISSUES& CHALLENGESFACED • Alleged lack of transparency in bidding process? • No competitive bidding procedures followed • MoU preparation and signing in a ‘rushed’ and ‘one- sided’ manner, withundue haste • “Enron came, saw and conquered”: Manohar Joshi, BJP-ShivSenaGovernment (GOM)CM • Corruption allegations? • Speed with which MoU was signed, with some clearances being ignored citing ‘fast-track’ nature of project • Renegotiation of contract cancelled earlier by GOM took only 12 days, after meeting between leadership of EnronandShivSena
  • 11. ISSUES& CHALLENGESFACED(contd.) • Extremely high return on investment for shareholders? • Return pegged at 16% in contract, but calculations showed that it would go up to 58% in 20th year of operation • High risk on the part of MSEB? • MSEBcontracted to purchase90%of power generated by DPC,regardless of demand • Could force MSEBto shut down other state-owned plants, which generated power at 25% of DPC’scost; • World Bank, in 1993, advised Indian Government (GOI)that DPCwould generate too much power for Maharashtraat too high aprice • State firms could producepower at 50%of the rate claimed by DPC • In 2001, power from Dabhol 4 times asexpensive asother domestic plants, while only 10- 20%of produced power wasbeing purchased
  • 12. ISSUES& CHALLENGESFACED(contd.)• Lossesto GOM andGOI? • Breach of contract by MSEB would mean payments to DPC were to be guaranteed by GOM, and these in turn were to be guaranteed byGOI • Severe penalties mentioned in PPAfor any suchbreaches • Continued power purchases could lead to annual losses of 2000 Crores to MSEB, eventually rendering it, and consequently, GOM,bankrupt • Concerns on substantial foreignexchange outflow? • Annual forex outflow asaresult of power purchase payments calculated as45000Crores • Opposition from locals andenvironmental groups? • Fierce opposition fromlocals • Land for project allegedly seized without compensation • Decrease in fresh water availability in surrounding communities reported • Non-violent protests reportedly put down by force –arbitrary arrests/ detentions, tear gas usage harassment, etc. reported by Human RightsWatch,Amnesty International
  • 13. POSSIBLERECOMMENDATIONS • Always adopt competitive bidding, at least to avoid cries of ‘one-sidedness’ • Detailed study of financial capability of power purchaser (in this case MSEB) before entering into PPA’s of such nature, with stringent conditions as per international standards • Adoption of economical fuel for the power production • Better networking and building of trust with all concerned parties – political leaders, affected locals (through proper compensation policies), environmental and other organisations working at the grassroots level