RenovAr	
  Program	
  	
  	
  
	
  
	
  
Round	
  1	
  	
  
First	
  Public	
  Call	
  for	
  Tenders	
  for	
  Renewable	
  Energy	
  Supply	
  
July	
  2016	
  
	
  
Undersecretariat	
  of	
  Renewable	
  Energy	
  
Ministry	
  of	
  Energy	
  and	
  Mining	
  	
  -­‐	
  MINEM	
  
Argen=ne	
  Republic	
  
Renewables	
  will	
  shape	
  Argen=na’s	
  new	
  energy	
  
matrix	
  
ArgenAna	
  has	
  a	
  clear	
  mandate	
  to	
  
reduce	
  CO2	
  emissions	
  and	
  
modernize	
  its	
  generaAon	
  mix	
  by	
  
using	
  renewable	
  energy	
  sources…	
  
1.	
  CLEAR	
  MANDATE	
  
	
  
…leveraging	
  on	
  its	
  wide	
  availability	
  
of	
  resources	
  to	
  develop	
  world-­‐
class	
  renewable	
  energy	
  assets…	
  
2.	
  AMPLIA	
  DISPONIBILIDAD	
  
DE	
  RECURSOS	
  
…capturing	
  key	
  strategic	
  benefits	
  for	
  
the	
  country	
  based	
  on	
  recent	
  market	
  
trends	
  
4.	
  STRATEGIC	
  DRIVERS	
  
	
  
…and	
  offering	
  an	
  aMracAve	
  legal	
  
framework	
  and	
  tax	
  incenAves	
  to	
  
investors	
  
3.	
  ATTRACTIVE	
  	
  
FRAMEWORK	
  
Renewables
Development
in Argentina
Argen=na’s	
  Renewable	
  Energy	
  targets	
  
•  Law	
  27.191	
  recently	
  approved	
  with	
  high	
  degree	
  of	
  support	
  from	
  all	
  poliAcal	
  parAes	
  
⁻  Had	
  >80%	
  approval	
  in	
  both	
  Senate	
  and	
  Lower	
  Chamber	
  of	
  Congress	
  
•  Target	
  of	
  20%	
  of	
  power	
  demand	
  in	
  2025	
  (from	
  8%	
  in	
  previous	
  law,	
  and	
  1.9%	
  in	
  2015)	
  
20%	
  RE	
  	
  	
  	
  	
  →	
  	
  	
  10	
  GW	
  2025	
  
ENERGY	
  MATRIX	
  TARGET	
   	
  	
  	
  	
  	
  	
  	
  	
  ADDITIONAL	
  CAPACITY	
  
%	
  of	
  Power	
  Consumed	
  
*	
  Es%mated	
  Addi%onal	
  Capacity.	
  Source:	
  AITPA	
  based	
  on	
  Ministry	
  of	
  Energy	
  and	
  Mines	
  
Capacity,	
  GW	
   RE,	
  Target	
  %	
  
Renewable	
  Energy	
  Program	
  2016-­‐2025	
  
Regulatory	
  Framework	
  Elements	
  
	
  
Ley	
  27.191	
   D.R.	
  531	
   Res.	
  71	
  y	
  72	
   RenovAr	
  
Round	
  1	
  
Senate	
  -­‐>	
  4Q’14	
  
Lower	
  Chamber	
  -­‐>	
  4Q’15	
  
Presiden=al	
  Decree	
  
-­‐>	
  1Q’16	
  
Ministry	
  
	
  of	
  E&M-­‐>	
  2Q’16	
  
CAMMESA	
  -­‐>	
  	
  2Q’16	
  
RE	
  Regulatory	
  Framework	
  
Mandatory	
  Targets	
  	
  
8%	
  @	
  2017-­‐18	
  
20%	
  @	
  2025	
  
Resource	
  
Diversifica=on	
  
Geographical	
  and	
  	
  	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  Technological	
  
Generous	
  Fiscal	
  
Incen=ves	
  
IPP	
  and	
  Local	
  Manufacturing	
  
FODER	
  	
  
Support	
  Trust	
  Fund	
  for	
  
Guarantees	
  and	
  Financing	
  
New	
  RE	
  Framework	
  
Act	
  27.191	
  
RE	
  Markets	
  (Contrac=ng	
  Mechanisms)	
  
100%	
  of	
  Renewable	
  Energy	
  Goals	
  
Private	
  PPAs	
  with	
  	
  
Major	
  Users*	
  
Opt-­‐Out	
  
Self-­‐GeneraAon	
  
Opt-­‐Out	
  
*	
  With	
  Private	
  Generators,	
  Power	
  Distributors	
  or	
  Commercializers	
  
100%	
  of	
  the	
  300	
  kW-­‐or-­‐less	
  demand	
  and	
  Major	
  Users	
  
who	
  do	
  not	
  opt-­‐out.	
  
Price	
  determined	
  through	
  Tenders	
  
Major	
  Users	
  	
  >300	
  kW	
  who	
  exercise	
  their	
  right	
  
to	
  opt-­‐out.	
  
Annual	
  Goals	
  subject	
  to	
  penal8es.	
  
Privately-­‐nego8ated	
  Price	
  and	
  T&C	
  
PPAs	
  Tenders	
  
The Incentives are larger on the first stage as
means of encouraging the Projects to
expedite COD
Act	
  N°	
  27	
  191	
  –	
  Fiscal	
  Incen=ves	
  
•  Exemp=on	
  of	
  Import	
  Du=es	
  for	
  all	
  projects	
  starAng	
  construcAon	
  prior	
  to	
  12/31/2017	
  
•  Accelerated	
  Fiscal	
  Deprecia=on	
  of	
  applicable	
  assets	
  
•  Advance	
  VAT	
  Reimbursement	
  paid	
  on	
  pre-­‐COD	
  purchases	
  
•  Exemp=on	
  of	
  Minimum	
  Presumed	
  Income	
  Tax	
  
•  Exemp=on	
  of	
  Dividend	
  Tax	
  (subject	
  to	
  re-­‐investment	
  in	
  infrastructure)	
  
•  Extension	
  of	
  Income	
  Tax	
  Loss	
  Carry	
  Forwards	
  to	
  10	
  years	
  (standard	
  	
  5)	
  
•  Tax	
  deduc=on	
  of	
  all	
  financial	
  expenses	
  
•  Tax	
  Credit	
  on	
  locally	
  supplied	
  CAPEX	
  (transferable	
  to	
  third	
  party)	
  
	
  
MINEM will evaluate and approve the Access
of the Project to the Incentives Regime
To increase certainty regarding benefit allocation, technology global quotas and maximum
amounts per MW have been established, reassuring benefit availability.
Call	
  for	
  Tenders	
  
RenovAr	
  –	
  ROUND	
  1	
  
ObjecAves	
  &	
  Benefits	
  
*	
  Hydro	
  projects	
  up	
  to	
  50	
  MW	
  are	
  considered	
  RE.	
  
Expected	
  Benefits	
  
First	
  Step	
  towards	
  the	
  
fulfillment	
  of	
  the	
  8%	
  goal	
  
1,8%	
  =>	
  4,5%	
  	
  
Emission	
  Control	
  
2	
  million	
  ton	
  CO2/year	
  	
  
(~	
  900.000	
  cars)	
  
New	
  Jobs	
  
5000	
  -­‐	
  8000	
  
Annual	
  Savings	
  on	
  Imported	
  	
  
Fuels	
  for	
  Power	
  GeneraAon	
  
300	
  million	
  US$	
  
Direct	
  Investment	
  
1,5	
  /	
  1,8	
  Billion	
  USD	
  
RenovAr	
  
Round	
  1	
  
1.000	
  MW	
  
FODER	
  Trust	
  Fund	
  Structure	
  
Project	
  Finance	
  
Account	
  
•  Treasury	
  Funds	
  
•  Public	
  Offerings	
  
•  ANSES	
  	
  (Pension	
  Fund)	
  
•  Mul=laterals	
  /	
  Climate	
  
Funds	
  
•  Long	
  Term	
  Project	
  Loans	
  
•  Loan	
  Guarantees	
  
•  Interest	
  Rate	
  Subsidies	
  
•  Equity	
  Contribu=ons	
  
Payment	
  
Guarantee	
  Account	
  
•  Treasury	
  Funds	
  
•  Specific	
  Charge	
  	
  
to	
  Consumers	
  
•  Sovereign	
  Guarantees	
  
•  Payment	
  Guarantee	
  	
  
(for	
  all	
  tendered	
  PPAs)	
  
•  Termina=on	
  Payment	
  
FODER	
  
Guarantee	
  Mechanism	
  –	
  3	
  levels	
  
	
  
FODER	
  
Guarantee	
  
Sovereign	
  
Guarantee	
  
World	
  Bank	
  
Guarantee	
  
Energy	
  Payment	
  
Termina=on	
  payment	
  1	
  
Termina=on	
  payment	
  2	
  
1	
  
2	
  
3	
  
Tendered	
  PPAs	
  
Energy	
  Payment	
  Guarantee	
  
(*)	
  To	
  replenish	
  FODER	
  so	
  that	
  it	
  always	
  holds	
  12	
  months	
  worth	
  of	
  elegible	
  PPA	
  payments	
  as	
  liquid	
  reserve	
  
Payments	
  
Physical	
  Flow	
  
Guarantees	
  
	
  
PPA	
  
CAMMESA	
  
(Off-­‐taker)	
  
4.	
  CAMMESA	
  
pays	
  IPP	
  on	
  a	
  
monthly	
  basis	
  
	
  under	
  PPA	
  
	
  
2.	
  CAMMESA	
  bills	
  End	
  
Consumers	
  	
  on	
  a	
  monthly	
  
basis	
  to	
  through	
  DistCos	
   Electricity	
  	
  
End	
  Consumers	
  
1.	
  IPP	
  Injects	
  Renewable	
  Electricity	
  into	
  Na=onal	
  Grid	
  
3.	
  Consumers	
  pay	
  on	
  a	
  monthly	
  basis	
  through	
  DistCos	
  
Renewable	
  Energy	
  
	
  Trust	
  Fund	
  
(FODER)	
  6.	
  FODER	
  pays	
  IPP	
  under	
  
Energy	
  Payment	
  Guarantee	
  
IPP	
  (Seller)	
  
5.	
  IPP	
  Issues	
  a	
  claim	
  to	
  FODER	
  for	
  late	
  or	
  
non-­‐payment	
  of	
  Energy	
  under	
  PPA	
  
	
  
8.	
  Ministry	
  of	
  	
  
Energy	
  &	
  Mining	
  increases	
  
Guarantee	
  Charge	
  (*)	
  
	
  
7.	
  FODER	
  seeks	
  repayment	
  from	
  CAMMESA	
  aoer	
  having	
  made	
  a	
  Energy	
  Guarantee	
  Payment	
  on	
  its	
  behalf	
  
1
Tendered	
  PPAs	
  	
  
TerminaAon	
  Payment	
  Guarantee	
  
.	
  	
  
(*)	
  The	
  FODER	
  	
  grants	
  individuals	
  and	
  legal	
  en%%es	
  which	
  have	
  issued	
  projects	
  the	
  irrevocable	
  right	
  to	
  directly	
  submit	
  claims	
  before	
  the	
  World	
  
Bank	
  in	
  certain	
  cases	
  	
  and	
  to	
  receive	
  payments	
  from	
  the	
  World	
  Bank.	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  
	
  
MINEM	
  /	
  MINHYF	
  
Representa=ves	
  of	
  the	
  Na=onal	
  State	
  
IPP	
  (Seller)	
  
Renewable	
  Energy	
  	
  
Trust	
  Fund	
  (FODER)	
  
(Trustee:	
  BICE)	
  
CAMMESA	
  
(Oraker)	
  
4.	
  IPP	
  submits	
  the	
  claim	
  for	
  
payment	
  of	
  the	
  Project	
  Sale	
  
Price	
  (#)	
  to	
  the	
  FODER	
  
5.	
  The	
  FODER	
  submits	
  a	
  claim	
  for	
  
needed	
  budget	
  to	
  the	
  Ministry	
  of	
  
Energy	
  and	
  Mining	
  /	
  Ministry	
  of	
  
Finance	
  and	
  Treasury	
  in	
  exchange	
  of	
  
the	
  treasury	
  bills,	
  kept	
  in	
  guarantee.	
  
7.	
  The	
  FODER	
  	
  does	
  not	
  pay	
  to	
  the	
  
IPP	
  the	
  Project	
  Sales	
  Price	
  (#)	
  
	
  
1.	
  Cause	
  for	
  termina=on	
  or	
  
sale	
  of	
  the	
  project	
  occurs	
  
2.	
  IPP	
  submits	
  the	
  
claim	
  to	
  CAMMESA	
  
3.	
  CAMMESA	
  	
  does	
  
not	
  pay	
  to	
  the	
  IPP	
  
	
  
8.	
  IPP	
  submits	
  the	
  
claim	
  to	
  the	
  WB	
  (*)	
  
9.	
  The	
  WB	
  pays	
  the	
  
eligible	
  amount	
  to	
  
the	
  IPP	
  (*)	
  
	
  
11.	
  Na=onal	
  
State	
  pays	
  to	
  
the	
  WB	
  the	
  
amount	
  due	
  
	
  
6.	
  MINEM	
  /	
  MINHYF	
  
does	
  not	
  have	
  the	
  funds	
  
	
  
10.	
  IPP	
  claims	
  for	
  the	
  balance	
  to	
  
the	
  FODER	
  Trustor	
  
2	
   3	
  
Preliminary	
  Schedule	
  
Transmission	
  Grid	
  and	
  Interconnec=on	
  Capacity	
  
5	
  
1	
  
4	
  
3	
  
2	
  
6	
  
8	
  
7	
  
500	
  kV	
  	
  
330	
  kV	
  	
  
220	
  kV	
  	
  
150	
  kV	
  	
  
132	
  kV	
  	
  
*To	
  be	
  confirmed	
  in	
  definite	
  version	
  of	
  bid	
  documents.	
  
CORRIDOR	
  
LIMITING	
  
CAPACITY	
  (*)	
  
MAIN	
  INTERCONECTION	
  
NODES	
  
(Tension	
  in	
  kV)	
  
Max	
  	
  
(MW)*	
  
NOA	
  
La	
  Rioja	
  (132)	
   120	
  
La	
  Rioja	
  Sur	
  (132)	
   100	
  
Villa	
  Quinteros	
  (132)	
   100	
  
ET	
  Cobos	
  (345)	
   400	
  
El	
  Bracho	
  (220)	
   200	
  
BUE-­‐LITORAL-­‐NEA	
  
Cañada	
  de	
  Gomez	
  (132)	
   100	
  
Rojas	
  (132)	
   150	
  
Puerto	
  Mineral	
  (132)	
   100	
  
CENTRO	
   Villa	
  Mercedes	
  -­‐	
  Rio	
  IV	
  (132)	
   130	
  
San	
  Luis	
  (132)	
   100	
  
CUYO	
  
Cruz	
  de	
  Piedra	
  (132)	
   100	
  
Jachal	
  -­‐	
  Punta	
  de	
  Rieles	
  (132)	
   80	
  
El	
  Sosneado	
  (132)	
   60	
  
Cañada	
  Honda	
  (132)	
   100	
  
COMAHUE	
   600	
  MW	
  
ET	
  Chocon	
  (500)	
   300	
  
Alicurá	
  (132)	
   30	
  
Puelches	
  (132)	
   30	
  
Bahia	
  Blanca	
  (132)	
   300	
  
PATAGONIA	
   400	
  MW	
  
Santa	
  Cruz	
  Norte	
  (132)	
   130	
  
Rio	
  Santa	
  Cruz	
  (132)	
   50	
  
Puerto	
  Madryn	
  (132)	
   50	
  
Futaleufú	
  –	
  Madryn	
  (330)	
   180	
  
1	
  
3	
  
2	
  
7	
  
6	
  
5	
  
4	
  
8	
  
Bidder	
  Qualifica=on	
  Criteria	
  
•  Bidders	
  can	
  be	
  individuals	
  or	
  consorAa	
  who	
  are	
  either	
  shareholders	
  or	
  have	
  
irrevocable	
  rights	
  over	
  the	
  Project´s	
  SPV.	
  	
  
•  Bidders	
  must	
  provide	
  documents	
  availing	
  (individually	
  or	
  collecAvely)	
  for	
  a	
  minimum	
  
of	
  250.000	
  US$	
  Equity	
  per	
  MW	
  of	
  Offered	
  Power	
  Capacity	
  (OPC)	
  
•  Bidders	
  must	
  provide	
  sufficient	
  and	
  acceptable	
  guarantees:	
  
–  Bid	
  Bond:	
  35.000	
  US$	
  per	
  MW	
  of	
  OPC	
  
–  Performance	
  Bond:	
  250.000	
  US$	
  per	
  MW	
  of	
  OPC	
  
•  Bidders	
  must	
  register	
  and	
  purchase	
  the	
  Request	
  for	
  Proposals	
  (RfP)	
  from	
  CAMMESA	
  
(cost	
  150.000	
  AR$).	
  The	
  cost	
  is	
  100%	
  reimbursable	
  in	
  the	
  event	
  of	
  “B”	
  Envelope	
  
(Economic	
  Bid)	
  disqualificaAon.	
  
Project	
  Qualifica=on	
  Criteria	
  
•  Projects	
  must	
  be	
  structured	
  as	
  independent	
  SPVs	
  	
  
•  As	
  of	
  the	
  date	
  of	
  Bid	
  Submission	
  they	
  must	
  prove	
  that	
  they	
  have:	
  	
  
–  Approved	
  Environmental	
  Impact	
  Study	
  
–  Real,	
  verifiable	
  rights	
  over	
  the	
  Project	
  site	
  
–  Acceptable	
  and	
  cerAfied	
  resource	
  assessment	
  (A	
  minimum	
  of	
  12	
  months	
  worth	
  of	
  
resource	
  measurement	
  for	
  Wind	
  projects)	
  
–  Energy	
  producAon	
  esAmates	
  (In	
  accordance	
  to	
  the	
  bidden	
  generaAon	
  equipment)	
  
–  Having	
  had	
  iniAated	
  the	
  request	
  for	
  permission	
  to	
  operate	
  as	
  wholesale	
  power	
  
market	
  agent	
  (“Agente	
  MEM”)	
  at	
  	
  MINEM	
  
–  StaAc	
  and	
  Dynamic	
  electrical	
  studies	
  (PT1	
  -­‐	
  technical	
  interconnecAon	
  studies)	
  
•  All	
  legal	
  &	
  technical	
  project	
  documents,	
  as	
  well	
  as	
  the	
  appropriate	
  documentaAon	
  
requesAng	
  the	
  applicable	
  fiscal	
  benefits	
  must	
  be	
  submiMed	
  in	
  the	
  “A”	
  Envelope	
  (Legal	
  &	
  
Technical).	
  
Renewable	
  Power	
  Purchase	
  Agreement	
  (RPPA)	
  
Annual	
  Price	
  Adjustment	
  and	
  IncenAve	
  Factor	
  
•  The	
  power	
  prices	
  will	
  be	
  adjusted	
  on	
  an	
  annual	
  basis	
  (as	
  pre-­‐set	
  in	
  annex	
  to	
  PPA)	
  
•  In	
  addiAon,	
  an	
  “IncenAve	
  Factor”	
  will	
  be	
  applied	
  on	
  a	
  calendar	
  year	
  basis	
  as	
  a	
  way	
  to	
  
incenAvize	
  early	
  COD.	
  
Thank	
  you	
  
	
  
Undersecretariat	
  of	
  Renewable	
  Energy	
  
Ministry	
  of	
  Energy	
  and	
  Mining	
  
Paseo	
  Colón	
  171	
  Piso	
  8	
  Oficina	
  812	
  
+54.11.4349-­‐8033/8186	
  
privadarenovables@minem.gob.ar	
  
Documents	
  available	
  at:	
  www.cammesa.com.ar	
  and	
  www.minem.gob.ar	
  	
  
	
  	
  

Renewables will shape Argentina’s new energy matrix

  • 1.
    RenovAr  Program           Round  1     First  Public  Call  for  Tenders  for  Renewable  Energy  Supply   July  2016     Undersecretariat  of  Renewable  Energy   Ministry  of  Energy  and  Mining    -­‐  MINEM   Argen=ne  Republic  
  • 2.
    Renewables  will  shape  Argen=na’s  new  energy   matrix   ArgenAna  has  a  clear  mandate  to   reduce  CO2  emissions  and   modernize  its  generaAon  mix  by   using  renewable  energy  sources…   1.  CLEAR  MANDATE     …leveraging  on  its  wide  availability   of  resources  to  develop  world-­‐ class  renewable  energy  assets…   2.  AMPLIA  DISPONIBILIDAD   DE  RECURSOS   …capturing  key  strategic  benefits  for   the  country  based  on  recent  market   trends   4.  STRATEGIC  DRIVERS     …and  offering  an  aMracAve  legal   framework  and  tax  incenAves  to   investors   3.  ATTRACTIVE     FRAMEWORK   Renewables Development in Argentina
  • 3.
    Argen=na’s  Renewable  Energy  targets   •  Law  27.191  recently  approved  with  high  degree  of  support  from  all  poliAcal  parAes   ⁻  Had  >80%  approval  in  both  Senate  and  Lower  Chamber  of  Congress   •  Target  of  20%  of  power  demand  in  2025  (from  8%  in  previous  law,  and  1.9%  in  2015)   20%  RE          →      10  GW  2025   ENERGY  MATRIX  TARGET                  ADDITIONAL  CAPACITY   %  of  Power  Consumed   *  Es%mated  Addi%onal  Capacity.  Source:  AITPA  based  on  Ministry  of  Energy  and  Mines   Capacity,  GW   RE,  Target  %  
  • 4.
    Renewable  Energy  Program  2016-­‐2025   Regulatory  Framework  Elements     Ley  27.191   D.R.  531   Res.  71  y  72   RenovAr   Round  1   Senate  -­‐>  4Q’14   Lower  Chamber  -­‐>  4Q’15   Presiden=al  Decree   -­‐>  1Q’16   Ministry    of  E&M-­‐>  2Q’16   CAMMESA  -­‐>    2Q’16  
  • 5.
    RE  Regulatory  Framework   Mandatory  Targets     8%  @  2017-­‐18   20%  @  2025   Resource   Diversifica=on   Geographical  and                                            Technological   Generous  Fiscal   Incen=ves   IPP  and  Local  Manufacturing   FODER     Support  Trust  Fund  for   Guarantees  and  Financing   New  RE  Framework   Act  27.191  
  • 6.
    RE  Markets  (Contrac=ng  Mechanisms)   100%  of  Renewable  Energy  Goals   Private  PPAs  with     Major  Users*   Opt-­‐Out   Self-­‐GeneraAon   Opt-­‐Out   *  With  Private  Generators,  Power  Distributors  or  Commercializers   100%  of  the  300  kW-­‐or-­‐less  demand  and  Major  Users   who  do  not  opt-­‐out.   Price  determined  through  Tenders   Major  Users    >300  kW  who  exercise  their  right   to  opt-­‐out.   Annual  Goals  subject  to  penal8es.   Privately-­‐nego8ated  Price  and  T&C   PPAs  Tenders  
  • 7.
    The Incentives arelarger on the first stage as means of encouraging the Projects to expedite COD Act  N°  27  191  –  Fiscal  Incen=ves   •  Exemp=on  of  Import  Du=es  for  all  projects  starAng  construcAon  prior  to  12/31/2017   •  Accelerated  Fiscal  Deprecia=on  of  applicable  assets   •  Advance  VAT  Reimbursement  paid  on  pre-­‐COD  purchases   •  Exemp=on  of  Minimum  Presumed  Income  Tax   •  Exemp=on  of  Dividend  Tax  (subject  to  re-­‐investment  in  infrastructure)   •  Extension  of  Income  Tax  Loss  Carry  Forwards  to  10  years  (standard    5)   •  Tax  deduc=on  of  all  financial  expenses   •  Tax  Credit  on  locally  supplied  CAPEX  (transferable  to  third  party)     MINEM will evaluate and approve the Access of the Project to the Incentives Regime To increase certainty regarding benefit allocation, technology global quotas and maximum amounts per MW have been established, reassuring benefit availability.
  • 8.
    Call  for  Tenders   RenovAr  –  ROUND  1  
  • 9.
    ObjecAves  &  Benefits   *  Hydro  projects  up  to  50  MW  are  considered  RE.   Expected  Benefits   First  Step  towards  the   fulfillment  of  the  8%  goal   1,8%  =>  4,5%     Emission  Control   2  million  ton  CO2/year     (~  900.000  cars)   New  Jobs   5000  -­‐  8000   Annual  Savings  on  Imported     Fuels  for  Power  GeneraAon   300  million  US$   Direct  Investment   1,5  /  1,8  Billion  USD   RenovAr   Round  1   1.000  MW  
  • 10.
    FODER  Trust  Fund  Structure   Project  Finance   Account   •  Treasury  Funds   •  Public  Offerings   •  ANSES    (Pension  Fund)   •  Mul=laterals  /  Climate   Funds   •  Long  Term  Project  Loans   •  Loan  Guarantees   •  Interest  Rate  Subsidies   •  Equity  Contribu=ons   Payment   Guarantee  Account   •  Treasury  Funds   •  Specific  Charge     to  Consumers   •  Sovereign  Guarantees   •  Payment  Guarantee     (for  all  tendered  PPAs)   •  Termina=on  Payment   FODER  
  • 11.
    Guarantee  Mechanism  –  3  levels     FODER   Guarantee   Sovereign   Guarantee   World  Bank   Guarantee   Energy  Payment   Termina=on  payment  1   Termina=on  payment  2   1   2   3  
  • 12.
    Tendered  PPAs   Energy  Payment  Guarantee   (*)  To  replenish  FODER  so  that  it  always  holds  12  months  worth  of  elegible  PPA  payments  as  liquid  reserve   Payments   Physical  Flow   Guarantees     PPA   CAMMESA   (Off-­‐taker)   4.  CAMMESA   pays  IPP  on  a   monthly  basis    under  PPA     2.  CAMMESA  bills  End   Consumers    on  a  monthly   basis  to  through  DistCos   Electricity     End  Consumers   1.  IPP  Injects  Renewable  Electricity  into  Na=onal  Grid   3.  Consumers  pay  on  a  monthly  basis  through  DistCos   Renewable  Energy    Trust  Fund   (FODER)  6.  FODER  pays  IPP  under   Energy  Payment  Guarantee   IPP  (Seller)   5.  IPP  Issues  a  claim  to  FODER  for  late  or   non-­‐payment  of  Energy  under  PPA     8.  Ministry  of     Energy  &  Mining  increases   Guarantee  Charge  (*)     7.  FODER  seeks  repayment  from  CAMMESA  aoer  having  made  a  Energy  Guarantee  Payment  on  its  behalf   1
  • 13.
    Tendered  PPAs     TerminaAon  Payment  Guarantee   .     (*)  The  FODER    grants  individuals  and  legal  en%%es  which  have  issued  projects  the  irrevocable  right  to  directly  submit  claims  before  the  World   Bank  in  certain  cases    and  to  receive  payments  from  the  World  Bank.                                                                                                                               MINEM  /  MINHYF   Representa=ves  of  the  Na=onal  State   IPP  (Seller)   Renewable  Energy     Trust  Fund  (FODER)   (Trustee:  BICE)   CAMMESA   (Oraker)   4.  IPP  submits  the  claim  for   payment  of  the  Project  Sale   Price  (#)  to  the  FODER   5.  The  FODER  submits  a  claim  for   needed  budget  to  the  Ministry  of   Energy  and  Mining  /  Ministry  of   Finance  and  Treasury  in  exchange  of   the  treasury  bills,  kept  in  guarantee.   7.  The  FODER    does  not  pay  to  the   IPP  the  Project  Sales  Price  (#)     1.  Cause  for  termina=on  or   sale  of  the  project  occurs   2.  IPP  submits  the   claim  to  CAMMESA   3.  CAMMESA    does   not  pay  to  the  IPP     8.  IPP  submits  the   claim  to  the  WB  (*)   9.  The  WB  pays  the   eligible  amount  to   the  IPP  (*)     11.  Na=onal   State  pays  to   the  WB  the   amount  due     6.  MINEM  /  MINHYF   does  not  have  the  funds     10.  IPP  claims  for  the  balance  to   the  FODER  Trustor   2   3  
  • 14.
  • 15.
    Transmission  Grid  and  Interconnec=on  Capacity   5   1   4   3   2   6   8   7   500  kV     330  kV     220  kV     150  kV     132  kV     *To  be  confirmed  in  definite  version  of  bid  documents.   CORRIDOR   LIMITING   CAPACITY  (*)   MAIN  INTERCONECTION   NODES   (Tension  in  kV)   Max     (MW)*   NOA   La  Rioja  (132)   120   La  Rioja  Sur  (132)   100   Villa  Quinteros  (132)   100   ET  Cobos  (345)   400   El  Bracho  (220)   200   BUE-­‐LITORAL-­‐NEA   Cañada  de  Gomez  (132)   100   Rojas  (132)   150   Puerto  Mineral  (132)   100   CENTRO   Villa  Mercedes  -­‐  Rio  IV  (132)   130   San  Luis  (132)   100   CUYO   Cruz  de  Piedra  (132)   100   Jachal  -­‐  Punta  de  Rieles  (132)   80   El  Sosneado  (132)   60   Cañada  Honda  (132)   100   COMAHUE   600  MW   ET  Chocon  (500)   300   Alicurá  (132)   30   Puelches  (132)   30   Bahia  Blanca  (132)   300   PATAGONIA   400  MW   Santa  Cruz  Norte  (132)   130   Rio  Santa  Cruz  (132)   50   Puerto  Madryn  (132)   50   Futaleufú  –  Madryn  (330)   180   1   3   2   7   6   5   4   8  
  • 16.
    Bidder  Qualifica=on  Criteria   •  Bidders  can  be  individuals  or  consorAa  who  are  either  shareholders  or  have   irrevocable  rights  over  the  Project´s  SPV.     •  Bidders  must  provide  documents  availing  (individually  or  collecAvely)  for  a  minimum   of  250.000  US$  Equity  per  MW  of  Offered  Power  Capacity  (OPC)   •  Bidders  must  provide  sufficient  and  acceptable  guarantees:   –  Bid  Bond:  35.000  US$  per  MW  of  OPC   –  Performance  Bond:  250.000  US$  per  MW  of  OPC   •  Bidders  must  register  and  purchase  the  Request  for  Proposals  (RfP)  from  CAMMESA   (cost  150.000  AR$).  The  cost  is  100%  reimbursable  in  the  event  of  “B”  Envelope   (Economic  Bid)  disqualificaAon.  
  • 17.
    Project  Qualifica=on  Criteria   •  Projects  must  be  structured  as  independent  SPVs     •  As  of  the  date  of  Bid  Submission  they  must  prove  that  they  have:     –  Approved  Environmental  Impact  Study   –  Real,  verifiable  rights  over  the  Project  site   –  Acceptable  and  cerAfied  resource  assessment  (A  minimum  of  12  months  worth  of   resource  measurement  for  Wind  projects)   –  Energy  producAon  esAmates  (In  accordance  to  the  bidden  generaAon  equipment)   –  Having  had  iniAated  the  request  for  permission  to  operate  as  wholesale  power   market  agent  (“Agente  MEM”)  at    MINEM   –  StaAc  and  Dynamic  electrical  studies  (PT1  -­‐  technical  interconnecAon  studies)   •  All  legal  &  technical  project  documents,  as  well  as  the  appropriate  documentaAon   requesAng  the  applicable  fiscal  benefits  must  be  submiMed  in  the  “A”  Envelope  (Legal  &   Technical).  
  • 18.
    Renewable  Power  Purchase  Agreement  (RPPA)   Annual  Price  Adjustment  and  IncenAve  Factor   •  The  power  prices  will  be  adjusted  on  an  annual  basis  (as  pre-­‐set  in  annex  to  PPA)   •  In  addiAon,  an  “IncenAve  Factor”  will  be  applied  on  a  calendar  year  basis  as  a  way  to   incenAvize  early  COD.  
  • 19.
    Thank  you     Undersecretariat  of  Renewable  Energy   Ministry  of  Energy  and  Mining   Paseo  Colón  171  Piso  8  Oficina  812   +54.11.4349-­‐8033/8186   privadarenovables@minem.gob.ar   Documents  available  at:  www.cammesa.com.ar  and  www.minem.gob.ar