Achievements of a
New State Under HP-II
 Location
North latitudes 300
22’ - 330
12’
East longitudes 750
45’ - 790
04’
• Geographical Area: 55,673 sq.km
• Capital : Shimla
• No. of District : 12
• Total Population : 68,64,602
(2011 census)
• Population Density: 123 person
/sq.km
• Bounded by
North : Jammu & Kashmir
Northeast : China(Tibet)
Southeast : Uttrakhand
South : Haryana
Himachal Pradesh at a Glance
Physiography
• Outer
Himalayas/Siwaliks
(350 m to 1500 m amsl)
• The Lesser Himalayan
Range
(1500-5000 m amsl)
• The Great Himalayan
Range
(5000 – 6000 m amsl)
• Zanskar Range
(>6000 m amsl)
Hydrometerology
Drainage System
The drainage system is composed of rivers and glaciers.
The drainage systems of the region are the Chandra Bhaga or the Chenab,
the Ravi, the Beas, the Sutlej and the Yamuna.
 No systematic mechanism for collection , processing, analysis,
storage and dissemination of hydrological data.
 Number of data collector agencies working in water tight
compartments, resulting in:
* inadequate network
* protocol not followed
* data available in piecemeal
* no validation
* less reliable thus of limited use
* duplicity of stations
 Adverse effect on planning of water resource sector projects due
to lack of reliable and easily accessible data.
1. HP-IPH 13. HP Agriculture Deptt.
2. HP-Horticulture University 14. HP Tourism Deptt.
3. HP-Agriculture University 15. HP Town & Country
Planning deptt.
4. HP.PWD 16. HP Him Urja deptt.
5. HP-Science & Technology 17. HP Envir. & Pollution
council Control Board
6. HP-Forest Department 18. HP RDD
7. BBMB 19. CGWB
8. HP Revenue deptt. 20. IMD
9. HP Health deptt. 21. Professional Institutes
10. HP Fishery deptt. 22. NGOs / KVS/WUA
11. HP Industry deptt. 23. CWC
12. HP Horticulture deptt. 24. Urban Local Bodies
Preparatory work Year 2004-2005
 Series of interactive workshops, meetings and
seminars
 Interaction with resource persons from MoWR
 Notification of HP,IPH Department as Nodal
Agency
 Extensive interaction with other stakeholder
organizations in the State
 Rounds of discussion within the Agency
 Need Assessment done by :
* Collection of baseline information-existing network of
various organizations, data collection, analysis, storage &
dissemination mechanism….
* Literature study-WMO Manuals, HP Resource CD, WQ lab
manual ….
* Consultation with Central Expert Agencies CWC,CGWB,
CPCB
* Help from HP-I states
* World Bank’s assistance to envisage provision for various
activities, estimated unit cost based on HP-I experience.
 Resulted in comprehensive Project Proposal that required only
marginal adjustments till date.
Project Development Objective
To Improve and Develop an Integrated
and Comprehensive Hydrological Data
Collection and Information System for
Improved Productivity and Cost
Effectiveness of Water Related
Investments in the Country.
Hydrology Project Phase-II
World Bank approved a credit of US$ 104.98 Million to the
Govt. of India for the Hydrology Project-II. (IBRD Ln. No
4749-IN). The total cost of the Project is US$ 135.01 Million
Himachal Pradesh is one of the four new States
participating in this Project.
A/A & E/S was accorded by the Govt. of H.P. in March,
2006 for Rs.49.5038 crore.
The Project was originally proposed to be implemented
over a period of six years starting April 5, 2006.
Project period was extended by 23 months in 2012 and
the revised closing date of the project is May 31st
, 2014.
Total sanctioned Cost of Project for Himachal Pradesh was
Rs.49.50 Crore. The Cost table was revised in Dec., 2013 for
Rs. 58.33 Crore .
 Institutional Strengthening:
 Awareness Raising, Dissemination And Knowledge Sharing.
 Implementation Support
 Horizontal Expansion:
 Upgrading/Establishment of Data Collection Network.
 Establishment of Data Processing and Management Systems.
 Purpose-driven Studies.
 Training.
 Recurrent Cost :
 Staff & Network O & M Cost.
The Project has three main components:
For overall administrative, financial and
management coordination:
 State level Hydrological Information System
Steering Committee
 headed by Chief Secretary, GoHP
 State level Hydrological Information System
Coordination Committee
 headed by Additional Chief Secretary/Principal
Secretary(IPH), GoHP
Institutional Set Up
Expert
Group
(PDS)
Project Coordinator
Expert
Group
(SW)
Expert
Group
(GW)
Expert
group
(WQ)
Hydrology Cell
Hydrology
C&M Divn.
Expert
Group
(Met)
Expert
group
(DC)
Sub Div.
Mandi
Sub Div.
Shimla
Sub Div.
Nahan
Sub Div.
Palampur
Sub Div.
santokgarh
Sub Div.
Nurpur
Financial Status
(All figures Rs. in Lakh)
Sr.
No
Financial
Year
Expenditure Claim filed
Gross amt.
Claim filed
Net amount
Claim
received
1 2006-07 218.59 77.03 61.44 14.06
2 2007-08 303.68 235.18 189.17 216.25
3 2008-09 459.16 432.43 342.29 327.12
4 2009-10 589.71 625.23 513.59 480.59
5 2010-11 823.26 587.23 486.36 437.93
6 2011-12 850.05 915.18 777.08 858.71
7 2012-13 965.62 865.42 713.99 749.26
8 2013-14
(upto Dec.,
2013)
589.427 742.91 640.29 640.27
Total up to 12/2013 4799.497 4480.61 3724.21 3724.19
Physical ProvisionsPhysical Provisions
and Statusand Status
Ground Water Component
Activities Provision Status
Deep wells
(piezometers borewells)
80 80 borewells installed
Digital Water Level Recorders
(DWLRs)
80 10 DWLRs installed in 2010.
Installation work of balance 70
nos. in progress & 65 have been
installed. Data being compiled in
State Data Centre, Mandi.
Submersible pump/GW
Sampler pump
3 Procurement completed. Pumps
being used for GW sampling.
Field equipment (Vehicle
mounted Bore hole logger)
1 Tender awarded .
Location of Piezometers
in District Kangra
Location of Piezometers
in District Una
Location of Piezometers
in District Kullu
Data Retrieval from DWLR at Haroli & Amb
Activities Provision Status Remarks
Standard Rain Gauge
(SRG)
101 Installation completed Data for 69 being
received .
Data flow started in
Nov., 2010
Automatic RG
(Automatic &
Autographic)
85 13 Automatic RG (Tipping Bucket
Type) and 22 Autographic RG installed
and commissioned in first phase.
50 ARG with telemetry , approved by
World bank as additional activity in
April, 2012 also installed and
commissioned .
Data being
received .
Fully Climatic Stations
(Manual )
4 Commissioned Data being received
from Jan., 2011.
Automatic Weather
station
4 2 stations installed . 2 additional
stations approved in April, 2012 under
installation.
Data for 2 stations
being received.
Standard snow gauge 16 Tender has been awarded and material likely to be
received in Feb,. 2014.
Location of Rain gauges
installed under
Hydrology Project-II, Himachal
Pradesh
Standard Rain Gauge
(SRG)
Autographic Rain
Gauge (ARG)
FCS Narkanda
FCS Rajgarh
AWS & ARG Demonstration
Jogindernagar Una
Surface Water Component
Activities Provision Status
New River Gauge stations
(Standard Gauge)
35 Work complete.
New RG stations (Automatic
Water Level Recorder – Cable
bubbler)
25 Installation completed. Work in progress for
additional work required to protect bubbler
tube of 25 nos. AWLR.
Bank Operated Cable way
(BOC)
8 Installation Work in progress.
Site stores 17 16 completed and work is in progress for
remaining 1 store.
Current meter (propeller) 8 Procurement completed.
Current meter (standard) 70 Procurement completed.
Current meter (pigmy) 24 Procurement completed.
Frame winch Bridge outfit 9 Procurement completed.
Discharge measuring weirs 1 Work completed.
5
3
0
1
4 4
0 0
1
0 0 0
11
4
2
0
0
2
4
6
8
10
12
Beas
Basin
Satluj
Basin
Ravi
Basin
Chenab
Basin
Bridge outfits
Bankoperated
Cableways
Headweirs
Manualsites
35 Gauge and Discharge (G&D) Sites including 25 sites with Automatic Cable
bubbler have been proposed in the State except area covered under Yamuna
Basin
Nauti khad, Shimla Distt. Swan khad, Una Distt.
Surgan, Chamba Distt.
Field demo of
Bridge outfits
Field Demonstration of Current
Meter
Activities Provision Status
Level 1 lab
buildings
6 Work completed.
Level 2 lab
buildings
2 Completed
CW Level 2+ lab
building
1 Completed.
Level 1 lab
equipment
12 Procured. Labs are functional.
Level 2 lab
equipment
2 Procured. Labs are functional at Mandi &
Dharamshala.
Level 2+ lab
equipment
1 Part equipment likely to be received shortly.
Procurement of AAS, GC, TOC analyser under
process.
Activities Provision Status
State - Data centres (SDC) 1 Completed. State Data
Center, Mandi made
functional in May, 2012.
Divisional office Data centre
buildings (DDC)
4 Completed.
Sub-divisional Office Data
centre (SDDC)buildings
12 Completed.
Section Office buildings 42 Completed.
State Data Centre, Mandi
Divisional Data Center, GWO, Una
DDC/SDDC Buildings
1. Impact of Sewerage Effluent on Drinking Water Sources of
Shimla City & Suggesting Ameliorative Measures.
 Study was conducted by NIH, Roorkee and IPH Deptt. jointly.
 Data collection, sampling, testing and analysis was done by NIH, Roorkee.
 2 trainings on Water Quality convened at HIPA under the study.
 The final report has been received and IPH Deptt. has initiated action on its
recommendation.
2. Study on Ground Water Quality Characteristic In Industrial
Predominant Areas Of H.P.
 PEC, University of Technology engaged as consultant for carrying out the
study.
 20 additional borewells were drilled to observe GW quality in study area.
 Testing of water samples and analysis has been completed and draft final
report is expected in first week of Feb., 2014
Purpose Driven Studies (PDS)
3. Study of Impact of River / Khad Bed Mining on Water
Sources (Water Winning Structures) & Evolution of Policy &
Guidelines To Prevent Adverse Impact.
 Department of Hydrology, IIT, Roorkee has been engaged as
Consultant for this study.
 Primary and secondary data collection has been completed except for
satellite imageries , delivery of which is expected shortly.
 Last round of water sample analysis is in progress.
 NIH, Roorkee conducted PDS on Impact of Sewage Effluent on Drinking Water Sources of
Shimla City and suggesting Ameliorative Measure's as some cases of Jaundice were reported from
parts of Shimla City in the year 2006-07.
Final report was received in May, 2013.
NIH recommended measures, like installation of ultra filtration membrane or ozone treatment,
to improve the performance of Water Treatment Plant
 Performance study of Sewage Treatment Plant was also recommended.
Taking note of non seasonal jaundice cases, an Inter departmental Sub-Group was constituted in
March, 2013 to investigate its cause.
The findings of this Sub Group were discussed in the meetings held under the Chairmanship of
Additional Chief Secretary (IPH) to the Govt. of H.P.
Considering the recommendations of NIH it was decided that Techno Commercial proposal be
prepared for installing Ultra filtration membrane and ozone treatment system at WTP. It also
decided to have the performance of STP validated by engaging appropriate agency.
The I&PH Department is accordingly working on there proposals and it is expected that the study
recommendation would soon transform into reality.
MoU for Data Sharing
Purpose.
Comprehensive data collection and information system
Synergy in system
Optimum utilization of resources
Uniform Protocol
One shop stop for Hydrological data
MoU Signatory Agencies
Satluj Jal Vidyut Nigam(Previous Nathpa Jhakri
Power Corpn. Ltd)
H.P.,State Electricity Board
H.P.,Power Corporation Limited
Youngthang Power Ventures limited
Jai Prakash Hydro Power Ltd.
Jaypee Karcham Hydro Power Ltd.
Himachal Sorang power Pvt. Ltd.
Bhakra Beas Management Board.
National Hydro Power Corporation
National Thermal Power Corporation.
Dr.Y.S.Parmar UHF, Nauni
CSK HPKV, Palampur
Trainings
 So far 650 officers/ officials have undergone various training under Hydrology
Project-II.
 4 Officers have attended International training course at IHE Netherlands.
 Institutes associated with the Trainings:
 National Institute of Hydrology, Roorkee and Belgaum.
 National Water academy, Pune.
 Administrative Staff College of India, Hyderabad.
 Engineering Staff College of India, Hyderabad.
 IMD Training Institute New Delhi and Pune.
 Rajiv Gandhi National Ground Water Training and Research Institute,
Raipur, Chattisgarh.
 CGWB Training Institute, Faridabad.
 CPCB.
 HIPA.
 Courses on Water Quality organized at HIPA with NIH, Roorkee.
 Programs on computer skill regarding data handling over
internet organized at HIPA.
 Courses on GIS organized at HIPA.
 Courses on SWDES organized at HIPA with NIH,Roorkee.
 Courses on Method of Measurement of Discharge on the G&D
stations over rivers organized at HIPA and IPH training Centre,
Mandi with CWC.
 Course on ‘ Hydromet Observer’s organized at HIPA with IMD.
 Officers / Officials nominated to attend training courses at NIH
Roorkee, Kakinada, NWA Pune, IMD Delhi ,IMD Pune, CGWB
Faridabad,Raipur and CPCB Delhi, Bangluru.
 Conceptual Workshop on Hydrology Project Phase – II held at
Shimla in Aug., 2006
 One Day Workshop for Financial Management Reporting held at
Shimla in Nov., 2007.
 Awareness Raising Workshop held at Shimla in Feb., 2008. 
 Awareness Raising Workshop held at Dharamshala in Jan. 2009. 
 Awareness raising workshop held at Amb, Distt. Una in March,
2012.
 Awareness raising workshop held at SDC, Mandi, in April, 2012.
 Awareness raising workshop held at Palampure, Distt. Kangra, in
May, 2012.
 Awareness raising workshop held at State Data Centre , Mandi, in
November, 2013.
 Study tour for Senior and Middle level officers for
Gujarat and Maharashtra organised in 2007.
 Study tour for Middle & Junior level officers for
Karnataka & Andhra Pradesh organised in 2008.
 Study tour for Senior and Middle level officers for
Karnataka, Goa and Kerela convened in 2009.
 Study tour for Middle & Junior level officers for
Maharashtra & Goa organised in 2013.
Activities at State Data Centre
 Data Processing
 Analysis & Reporting
Data Storage & Data Dissemination
 Data Processing is a broad term covering all activities from
receiving observed records to making them available in usable
form.
 The raw data is passed through series of operation, as:
Data entry
Making necessary validation checks
In-filling missing values in a data series
Processing of raw data to estimate required variables
Compilation of data in different forms and
Analysis of data for commonly required statistics etc.
Data recording / collection
Type Type of
measurement
Collection/
Recording
Form of
data
Receipt of
data
SRG Daily Daily
(Handwritten)
Hard &
soft
Fortnightly
ARG Hourly Daily (Graphs ) Hard &
soft
Fortnightly
TBR Hourly Monthly
(Digital)
Digital Monthly
FCS Daily, twice daily,
Hourly
Daily
(Handwritten &
graphs)
Hard &
soft
Fortnightly
AWS Hourly Monthly
(Digital)
Digital Monthly
Pieozometer
(Manual)
Pre & post
Monsoon
Manual in May
& November
Hard &
soft
In June &
Nov.
DWLR 6 Hourly Daily (Digital) Digital Telemetric
Types Of Data Entry At State Data Centre
Hydrometerologi
cal Data
• Daily Rainfall Data
• Hourly Rainfall data
• Climatic data
• Temperature
• Relative Humidity
• Evaporation
• Sunshine
• Wind direction
• Wind velocity
Surface Water
Data
• Flow measurement
data
• Water Level Data
Ground Water
Data
• DWLR Data of
Piezometers
• Manual Data of
Piezometers
 SWDES
 EXCEL
 SWDES
 EXCEL
 EXCEL
Example :- Screening of single year ( 2011) SRG Stations daily
rainfall data
VALIDATION (SWDES)
VALIDATION (SWDES)
Example :- Graphical Comparison of SRG daily rainfall data and
ARG hourly rainfall data of Chailchowk Station, Distt. Mandi
( Date :- 07 July 2012)
Example :- Graphical Comparison of 3 SRG Stations daily
rainfall data for the year 2011 in Distt. Mandi
VALIDATION (SWDES)
Example :- Comparison of climatic data ( Temperature) of 4 FCS
stations
VALIDATION (SWDES)
GROUND WATER ENTRY & MONITORING IN EXCEL
GROUND WATER ENTRY & MONITORING IN EXCEL
HISTORICAL DATA ENTRY / AVAILABILITY
STATUS
Sr. No. Agency Stations Period Remarks
From To
1 REVENUE 130 1956 2005 Partly available
2 IMD 79 2008 2010
Partly available
3 BBMB 12 1965 April 2013
Partly available
4 Forest 2 2006 2009
Partly available
5 UHF Nauni 1 1-1-2011 31-12-2012
6
CSKVHPKV
Palampur 6 1970 March 2013
Partly available
Daily Rainfall Data:-
Surface Water Data:-
Discharge data from BBMB,NHPC,SJVNL ,
HPPCL and other 13 private hydro
developers received in hard copies and is
being computerized
Sr. No. Agency Stations Period Remarks
From To
1 BBMB 12 1962 April 2013 Partly available
2 NHPC 6 July 2010 December
2012
3 HPPCL 8 1976 2011 Partly available
4 SJVNL 3 2005 July 2012 Partly available
CURRENT DATA ENTRY / AVAILABILITY STATUS
FOR HP-II NETWORK
I &PH Department Stations
 Daily Rainfall Data (SRG) 69 stations from Nov-2010 onwards
 Hourly Rainfall Data (ARG) 23 Stations from April- 2011 onwards
 Hourly Rainfall Data (ARG T.B.) 12 Stations from June -2012 onwards
 Climatic Data (FCS) 04 stations from April-2011 onwards
 Weather Data (AWS) 02 stations from June-2012 onwards
IMD Stations
 Daily Rainfall Data 79 stations from June- 2012 onwards
A. HYDROMETEROLOGICAL DATA
I &PH Department
Piezometer Wells 70 stations from Jan- 2010 onwards
10 stations from Jan-2011 onwards
Piezometer (DWLR Data) 10 stations from Jan- 2010 onwards
B. GROUND WATER DATA
Data Dissemination Policy
 As decided in the State Level Steering Committee, Data Dissemination
Policy for ground water domain has been notified in July, 2011.
Ground water data rates:
Details available on IPH website, Hydrology Project – II link.
 Draft policy prepared for surface water(meteorological) data
dissemination.
Item Rate in (Rs.)
1. Water Level Data
a) 4 times data of one year of one Station- complete
record
500/ + Media & Postal Cost
a) High frequency water level data (6 Hourly data)- One
Station per month -
500/ + Media & Postal Cost
1. Water Quality Data
a) Base line Parameters
(Temp., EC,PH,NO2, NO3, Total P,K,Na,Ca,
Mg,CO3,HCO3,Cl, SO4,CoD,SiO2,F,B)
one complete record
500/ + Media & Postal Cost
a) Trend cum Surveillance
(F,Fe,As,Cd,Hg,Zn,Na,K,Ca,Mg,CO3,HC03, Cl,SO4,Total &
Faecal Coliforms)
one complete record
500/ + Media & Postal Cost
Surface water data rates
•Single agency for surface and ground water.
•Keen Interest and quick decisions by State level Steering
and Coordination Committees.
•Continuity of key officers.
•Support from PCS, TAMC and Central Expert Agencies,
especially their Officers posted in State.
•Guidance from World Bank.
•Strong Liaison with other State Departments, Boards,
Corporations & Educational organizations
Weakness
•‘Off the league’ with the routine departmental
works causes general apprehension.
•Not many people interested for posting or
continuing.
• On completion people eager to move out of the
project due to uncertainty of further postings.
•Small works spread over the entire State lead to
higher operational difficulties.
HP Hydrology Project Achievements Under 40
HP Hydrology Project Achievements Under 40

More Related Content

What's hot

Introduction to human settlement and housing
Introduction to human settlement and housingIntroduction to human settlement and housing
Introduction to human settlement and housingty0385
 
Public Participation in Urban Design and Planning
Public Participation in Urban Design and PlanningPublic Participation in Urban Design and Planning
Public Participation in Urban Design and PlanningNicholas Socrates
 
Fina ldoxidas
Fina ldoxidasFina ldoxidas
Fina ldoxidasAmy Arora
 
Determinants or Urban Form urban morphology
Determinants or Urban Form urban morphologyDeterminants or Urban Form urban morphology
Determinants or Urban Form urban morphologySomesh Siddharth
 
Sir patrick geddes
Sir patrick geddesSir patrick geddes
Sir patrick geddesRavi Sharma
 
Socio economic-cultural aspects of urban realm
Socio economic-cultural aspects of urban realmSocio economic-cultural aspects of urban realm
Socio economic-cultural aspects of urban realmMoksha Bhatia
 
Neighbourhood-Planning--Design-Standards-combined-June-2015
Neighbourhood-Planning--Design-Standards-combined-June-2015Neighbourhood-Planning--Design-Standards-combined-June-2015
Neighbourhood-Planning--Design-Standards-combined-June-2015Kim Fowler, MCIP, RPP
 
AS Geography - Urban morphology and model
AS Geography - Urban morphology and modelAS Geography - Urban morphology and model
AS Geography - Urban morphology and modelDavid Drake
 
History of Town Planning_Building and Town Planning
History of Town Planning_Building and Town PlanningHistory of Town Planning_Building and Town Planning
History of Town Planning_Building and Town PlanningA Makwana
 
Theories and Concepts of town planning
Theories and Concepts of town planningTheories and Concepts of town planning
Theories and Concepts of town planningSrishti Mehta
 
Urban Design at different levels of Planning
Urban Design at different levels of PlanningUrban Design at different levels of Planning
Urban Design at different levels of PlanningYajush Sonar
 
Doxiadis : Ekistics the science of human settlement
Doxiadis : Ekistics the science of human settlementDoxiadis : Ekistics the science of human settlement
Doxiadis : Ekistics the science of human settlementHemant Mishra
 
Good city form
Good city formGood city form
Good city formAjay Hooda
 
Landscape urbanism 02
Landscape urbanism 02Landscape urbanism 02
Landscape urbanism 02Joshua Singer
 

What's hot (20)

image of a city
image of a cityimage of a city
image of a city
 
Introduction to human settlement and housing
Introduction to human settlement and housingIntroduction to human settlement and housing
Introduction to human settlement and housing
 
Public Participation in Urban Design and Planning
Public Participation in Urban Design and PlanningPublic Participation in Urban Design and Planning
Public Participation in Urban Design and Planning
 
Fina ldoxidas
Fina ldoxidasFina ldoxidas
Fina ldoxidas
 
Ebenezer howard
Ebenezer howardEbenezer howard
Ebenezer howard
 
Broadacre city
Broadacre cityBroadacre city
Broadacre city
 
Neighbourhood Planning
Neighbourhood PlanningNeighbourhood Planning
Neighbourhood Planning
 
Determinants or Urban Form urban morphology
Determinants or Urban Form urban morphologyDeterminants or Urban Form urban morphology
Determinants or Urban Form urban morphology
 
Compact City
Compact CityCompact City
Compact City
 
Sir patrick geddes
Sir patrick geddesSir patrick geddes
Sir patrick geddes
 
Socio economic-cultural aspects of urban realm
Socio economic-cultural aspects of urban realmSocio economic-cultural aspects of urban realm
Socio economic-cultural aspects of urban realm
 
Neighbourhood-Planning--Design-Standards-combined-June-2015
Neighbourhood-Planning--Design-Standards-combined-June-2015Neighbourhood-Planning--Design-Standards-combined-June-2015
Neighbourhood-Planning--Design-Standards-combined-June-2015
 
AS Geography - Urban morphology and model
AS Geography - Urban morphology and modelAS Geography - Urban morphology and model
AS Geography - Urban morphology and model
 
History of Town Planning_Building and Town Planning
History of Town Planning_Building and Town PlanningHistory of Town Planning_Building and Town Planning
History of Town Planning_Building and Town Planning
 
Theories and Concepts of town planning
Theories and Concepts of town planningTheories and Concepts of town planning
Theories and Concepts of town planning
 
Urban Design at different levels of Planning
Urban Design at different levels of PlanningUrban Design at different levels of Planning
Urban Design at different levels of Planning
 
Doxiadis : Ekistics the science of human settlement
Doxiadis : Ekistics the science of human settlementDoxiadis : Ekistics the science of human settlement
Doxiadis : Ekistics the science of human settlement
 
Good city form
Good city formGood city form
Good city form
 
Radiant city
Radiant cityRadiant city
Radiant city
 
Landscape urbanism 02
Landscape urbanism 02Landscape urbanism 02
Landscape urbanism 02
 

Similar to HP Hydrology Project Achievements Under 40

Mh sw optimisation of g&d stations network of maharashtra
Mh sw optimisation of g&d stations network of maharashtraMh sw optimisation of g&d stations network of maharashtra
Mh sw optimisation of g&d stations network of maharashtrahydrologyproject0
 
Andhra pradesh surface water
Andhra pradesh surface waterAndhra pradesh surface water
Andhra pradesh surface waterhydrologywebsite1
 
Odisha (gw) meeting-07-05-2014
Odisha (gw) meeting-07-05-2014Odisha (gw) meeting-07-05-2014
Odisha (gw) meeting-07-05-2014hydrologyproject0
 
Upgrading a conventional his an indian example
Upgrading a conventional his   an indian exampleUpgrading a conventional his   an indian example
Upgrading a conventional his an indian examplehydrologywebsite1
 
2 - MoWR - HP-III presentation-16th Sep
2 - MoWR - HP-III presentation-16th Sep2 - MoWR - HP-III presentation-16th Sep
2 - MoWR - HP-III presentation-16th Sepindiawrm
 
1. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 70520141. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 7052014hydrologywebsite1
 
Download-manuals-general-final report
 Download-manuals-general-final report Download-manuals-general-final report
Download-manuals-general-final reporthydrologywebsite1
 
WB_CAP_Watershed Management Report_Annexure Report_03-09-15
WB_CAP_Watershed Management Report_Annexure Report_03-09-15WB_CAP_Watershed Management Report_Annexure Report_03-09-15
WB_CAP_Watershed Management Report_Annexure Report_03-09-15David Gandhi
 
Chyangba Water Project ( Pem Dorjee Sherpa)
Chyangba Water Project ( Pem Dorjee Sherpa)Chyangba Water Project ( Pem Dorjee Sherpa)
Chyangba Water Project ( Pem Dorjee Sherpa)Himalayan
 
1 - MoWR - Overview of HP-III Workshop-15th Sep 2014
1 - MoWR - Overview of HP-III Workshop-15th Sep 20141 - MoWR - Overview of HP-III Workshop-15th Sep 2014
1 - MoWR - Overview of HP-III Workshop-15th Sep 2014indiawrm
 
WB_CAP_Watershed Management Summary Report_ES_03-09-15
WB_CAP_Watershed Management Summary Report_ES_03-09-15WB_CAP_Watershed Management Summary Report_ES_03-09-15
WB_CAP_Watershed Management Summary Report_ES_03-09-15David Gandhi
 

Similar to HP Hydrology Project Achievements Under 40 (20)

Himachal may, 2014
Himachal  may, 2014Himachal  may, 2014
Himachal may, 2014
 
Mh sw optimisation of g&d stations network of maharashtra
Mh sw optimisation of g&d stations network of maharashtraMh sw optimisation of g&d stations network of maharashtra
Mh sw optimisation of g&d stations network of maharashtra
 
Andhra pradesh surface water
Andhra pradesh surface waterAndhra pradesh surface water
Andhra pradesh surface water
 
Odisha (gw) meeting-07-05-2014
Odisha (gw) meeting-07-05-2014Odisha (gw) meeting-07-05-2014
Odisha (gw) meeting-07-05-2014
 
Upgrading a conventional his an indian example
Upgrading a conventional his   an indian exampleUpgrading a conventional his   an indian example
Upgrading a conventional his an indian example
 
Puducherry
Puducherry Puducherry
Puducherry
 
Odisha sw wb mission-may14
Odisha sw wb mission-may14Odisha sw wb mission-may14
Odisha sw wb mission-may14
 
2 - MoWR - HP-III presentation-16th Sep
2 - MoWR - HP-III presentation-16th Sep2 - MoWR - HP-III presentation-16th Sep
2 - MoWR - HP-III presentation-16th Sep
 
1. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 70520141. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 7052014
 
Download-manuals-general-final report
 Download-manuals-general-final report Download-manuals-general-final report
Download-manuals-general-final report
 
Chhattisgarh
ChhattisgarhChhattisgarh
Chhattisgarh
 
Background Material
Background MaterialBackground Material
Background Material
 
WB_CAP_Watershed Management Report_Annexure Report_03-09-15
WB_CAP_Watershed Management Report_Annexure Report_03-09-15WB_CAP_Watershed Management Report_Annexure Report_03-09-15
WB_CAP_Watershed Management Report_Annexure Report_03-09-15
 
Nih
NihNih
Nih
 
Overview of workshop
Overview of workshopOverview of workshop
Overview of workshop
 
Punjab 8.4.14 edt
Punjab 8.4.14 edtPunjab 8.4.14 edt
Punjab 8.4.14 edt
 
Cwc
CwcCwc
Cwc
 
Chyangba Water Project ( Pem Dorjee Sherpa)
Chyangba Water Project ( Pem Dorjee Sherpa)Chyangba Water Project ( Pem Dorjee Sherpa)
Chyangba Water Project ( Pem Dorjee Sherpa)
 
1 - MoWR - Overview of HP-III Workshop-15th Sep 2014
1 - MoWR - Overview of HP-III Workshop-15th Sep 20141 - MoWR - Overview of HP-III Workshop-15th Sep 2014
1 - MoWR - Overview of HP-III Workshop-15th Sep 2014
 
WB_CAP_Watershed Management Summary Report_ES_03-09-15
WB_CAP_Watershed Management Summary Report_ES_03-09-15WB_CAP_Watershed Management Summary Report_ES_03-09-15
WB_CAP_Watershed Management Summary Report_ES_03-09-15
 

More from hydrologywebsite1

Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission hydrologywebsite1
 
Download-manuals-surface water-manual-surfacewatero&m-norms
 Download-manuals-surface water-manual-surfacewatero&m-norms Download-manuals-surface water-manual-surfacewatero&m-norms
Download-manuals-surface water-manual-surfacewatero&m-normshydrologywebsite1
 
Download-manuals-surface water-manual-illustrations-hydrologicalobservations
 Download-manuals-surface water-manual-illustrations-hydrologicalobservations Download-manuals-surface water-manual-illustrations-hydrologicalobservations
Download-manuals-surface water-manual-illustrations-hydrologicalobservationshydrologywebsite1
 
Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks
 Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks
Download-manuals-surface water-manual-45howtoreviewmonitoringnetworkshydrologywebsite1
 
Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec...
 Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec... Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec...
Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec...hydrologywebsite1
 
Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr...
 Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr... Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr...
Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr...hydrologywebsite1
 
Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...
 Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing... Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...
Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...hydrologywebsite1
 
Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
 Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya... Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...hydrologywebsite1
 
Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal...
 Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal... Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal...
Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal...hydrologywebsite1
 
Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
 Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa... Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...hydrologywebsite1
 
Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
 Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys... Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...hydrologywebsite1
 
Download-manuals-surface water-manual-sw-volume10dataentryforms
 Download-manuals-surface water-manual-sw-volume10dataentryforms Download-manuals-surface water-manual-sw-volume10dataentryforms
Download-manuals-surface water-manual-sw-volume10dataentryformshydrologywebsite1
 

More from hydrologywebsite1 (20)

Pcs 070514
Pcs 070514Pcs 070514
Pcs 070514
 
Mp surface water
Mp surface waterMp surface water
Mp surface water
 
Maharashtra sw_ce_050514
Maharashtra  sw_ce_050514Maharashtra  sw_ce_050514
Maharashtra sw_ce_050514
 
Kerala ground water
Kerala ground waterKerala ground water
Kerala ground water
 
Goa
GoaGoa
Goa
 
Gujarat surface water
Gujarat surface waterGujarat surface water
Gujarat surface water
 
Cwprs
CwprsCwprs
Cwprs
 
Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission
 
Bbmb
BbmbBbmb
Bbmb
 
Download-manuals-surface water-manual-surfacewatero&m-norms
 Download-manuals-surface water-manual-surfacewatero&m-norms Download-manuals-surface water-manual-surfacewatero&m-norms
Download-manuals-surface water-manual-surfacewatero&m-norms
 
Download-manuals-surface water-manual-illustrations-hydrologicalobservations
 Download-manuals-surface water-manual-illustrations-hydrologicalobservations Download-manuals-surface water-manual-illustrations-hydrologicalobservations
Download-manuals-surface water-manual-illustrations-hydrologicalobservations
 
Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks
 Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks
Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks
 
Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec...
 Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec... Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec...
Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec...
 
Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr...
 Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr... Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr...
Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr...
 
Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...
 Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing... Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...
Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...
 
Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
 Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya... Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
 
Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal...
 Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal... Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal...
Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal...
 
Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
 Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa... Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
 
Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
 Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys... Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
 
Download-manuals-surface water-manual-sw-volume10dataentryforms
 Download-manuals-surface water-manual-sw-volume10dataentryforms Download-manuals-surface water-manual-sw-volume10dataentryforms
Download-manuals-surface water-manual-sw-volume10dataentryforms
 

Recently uploaded

WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024The Digital Insurer
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 

Recently uploaded (20)

WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 

HP Hydrology Project Achievements Under 40

  • 1.
  • 2. Presentation By: Executive Engineer, Hydrology Cell H.P, I&P.H. Department Achievements of a New State Under HP-II
  • 3.  Location North latitudes 300 22’ - 330 12’ East longitudes 750 45’ - 790 04’ • Geographical Area: 55,673 sq.km • Capital : Shimla • No. of District : 12 • Total Population : 68,64,602 (2011 census) • Population Density: 123 person /sq.km • Bounded by North : Jammu & Kashmir Northeast : China(Tibet) Southeast : Uttrakhand South : Haryana Himachal Pradesh at a Glance
  • 4. Physiography • Outer Himalayas/Siwaliks (350 m to 1500 m amsl) • The Lesser Himalayan Range (1500-5000 m amsl) • The Great Himalayan Range (5000 – 6000 m amsl) • Zanskar Range (>6000 m amsl)
  • 6. Drainage System The drainage system is composed of rivers and glaciers. The drainage systems of the region are the Chandra Bhaga or the Chenab, the Ravi, the Beas, the Sutlej and the Yamuna.
  • 7.  No systematic mechanism for collection , processing, analysis, storage and dissemination of hydrological data.  Number of data collector agencies working in water tight compartments, resulting in: * inadequate network * protocol not followed * data available in piecemeal * no validation * less reliable thus of limited use * duplicity of stations  Adverse effect on planning of water resource sector projects due to lack of reliable and easily accessible data.
  • 8. 1. HP-IPH 13. HP Agriculture Deptt. 2. HP-Horticulture University 14. HP Tourism Deptt. 3. HP-Agriculture University 15. HP Town & Country Planning deptt. 4. HP.PWD 16. HP Him Urja deptt. 5. HP-Science & Technology 17. HP Envir. & Pollution council Control Board 6. HP-Forest Department 18. HP RDD 7. BBMB 19. CGWB 8. HP Revenue deptt. 20. IMD 9. HP Health deptt. 21. Professional Institutes 10. HP Fishery deptt. 22. NGOs / KVS/WUA 11. HP Industry deptt. 23. CWC 12. HP Horticulture deptt. 24. Urban Local Bodies
  • 9. Preparatory work Year 2004-2005  Series of interactive workshops, meetings and seminars  Interaction with resource persons from MoWR  Notification of HP,IPH Department as Nodal Agency  Extensive interaction with other stakeholder organizations in the State  Rounds of discussion within the Agency
  • 10.  Need Assessment done by : * Collection of baseline information-existing network of various organizations, data collection, analysis, storage & dissemination mechanism…. * Literature study-WMO Manuals, HP Resource CD, WQ lab manual …. * Consultation with Central Expert Agencies CWC,CGWB, CPCB * Help from HP-I states * World Bank’s assistance to envisage provision for various activities, estimated unit cost based on HP-I experience.  Resulted in comprehensive Project Proposal that required only marginal adjustments till date.
  • 11. Project Development Objective To Improve and Develop an Integrated and Comprehensive Hydrological Data Collection and Information System for Improved Productivity and Cost Effectiveness of Water Related Investments in the Country.
  • 12. Hydrology Project Phase-II World Bank approved a credit of US$ 104.98 Million to the Govt. of India for the Hydrology Project-II. (IBRD Ln. No 4749-IN). The total cost of the Project is US$ 135.01 Million Himachal Pradesh is one of the four new States participating in this Project. A/A & E/S was accorded by the Govt. of H.P. in March, 2006 for Rs.49.5038 crore. The Project was originally proposed to be implemented over a period of six years starting April 5, 2006. Project period was extended by 23 months in 2012 and the revised closing date of the project is May 31st , 2014.
  • 13. Total sanctioned Cost of Project for Himachal Pradesh was Rs.49.50 Crore. The Cost table was revised in Dec., 2013 for Rs. 58.33 Crore .  Institutional Strengthening:  Awareness Raising, Dissemination And Knowledge Sharing.  Implementation Support  Horizontal Expansion:  Upgrading/Establishment of Data Collection Network.  Establishment of Data Processing and Management Systems.  Purpose-driven Studies.  Training.  Recurrent Cost :  Staff & Network O & M Cost. The Project has three main components:
  • 14. For overall administrative, financial and management coordination:  State level Hydrological Information System Steering Committee  headed by Chief Secretary, GoHP  State level Hydrological Information System Coordination Committee  headed by Additional Chief Secretary/Principal Secretary(IPH), GoHP
  • 15. Institutional Set Up Expert Group (PDS) Project Coordinator Expert Group (SW) Expert Group (GW) Expert group (WQ) Hydrology Cell Hydrology C&M Divn. Expert Group (Met) Expert group (DC) Sub Div. Mandi Sub Div. Shimla Sub Div. Nahan Sub Div. Palampur Sub Div. santokgarh Sub Div. Nurpur
  • 16. Financial Status (All figures Rs. in Lakh) Sr. No Financial Year Expenditure Claim filed Gross amt. Claim filed Net amount Claim received 1 2006-07 218.59 77.03 61.44 14.06 2 2007-08 303.68 235.18 189.17 216.25 3 2008-09 459.16 432.43 342.29 327.12 4 2009-10 589.71 625.23 513.59 480.59 5 2010-11 823.26 587.23 486.36 437.93 6 2011-12 850.05 915.18 777.08 858.71 7 2012-13 965.62 865.42 713.99 749.26 8 2013-14 (upto Dec., 2013) 589.427 742.91 640.29 640.27 Total up to 12/2013 4799.497 4480.61 3724.21 3724.19
  • 18. Ground Water Component Activities Provision Status Deep wells (piezometers borewells) 80 80 borewells installed Digital Water Level Recorders (DWLRs) 80 10 DWLRs installed in 2010. Installation work of balance 70 nos. in progress & 65 have been installed. Data being compiled in State Data Centre, Mandi. Submersible pump/GW Sampler pump 3 Procurement completed. Pumps being used for GW sampling. Field equipment (Vehicle mounted Bore hole logger) 1 Tender awarded .
  • 19.
  • 20. Location of Piezometers in District Kangra
  • 22. Location of Piezometers in District Kullu
  • 23. Data Retrieval from DWLR at Haroli & Amb
  • 24.
  • 25. Activities Provision Status Remarks Standard Rain Gauge (SRG) 101 Installation completed Data for 69 being received . Data flow started in Nov., 2010 Automatic RG (Automatic & Autographic) 85 13 Automatic RG (Tipping Bucket Type) and 22 Autographic RG installed and commissioned in first phase. 50 ARG with telemetry , approved by World bank as additional activity in April, 2012 also installed and commissioned . Data being received . Fully Climatic Stations (Manual ) 4 Commissioned Data being received from Jan., 2011. Automatic Weather station 4 2 stations installed . 2 additional stations approved in April, 2012 under installation. Data for 2 stations being received. Standard snow gauge 16 Tender has been awarded and material likely to be received in Feb,. 2014.
  • 26.
  • 27. Location of Rain gauges installed under Hydrology Project-II, Himachal Pradesh
  • 28.
  • 29.
  • 31.
  • 32.
  • 34.
  • 35.
  • 37. AWS & ARG Demonstration Jogindernagar Una
  • 38. Surface Water Component Activities Provision Status New River Gauge stations (Standard Gauge) 35 Work complete. New RG stations (Automatic Water Level Recorder – Cable bubbler) 25 Installation completed. Work in progress for additional work required to protect bubbler tube of 25 nos. AWLR. Bank Operated Cable way (BOC) 8 Installation Work in progress. Site stores 17 16 completed and work is in progress for remaining 1 store. Current meter (propeller) 8 Procurement completed. Current meter (standard) 70 Procurement completed. Current meter (pigmy) 24 Procurement completed. Frame winch Bridge outfit 9 Procurement completed. Discharge measuring weirs 1 Work completed.
  • 39. 5 3 0 1 4 4 0 0 1 0 0 0 11 4 2 0 0 2 4 6 8 10 12 Beas Basin Satluj Basin Ravi Basin Chenab Basin Bridge outfits Bankoperated Cableways Headweirs Manualsites 35 Gauge and Discharge (G&D) Sites including 25 sites with Automatic Cable bubbler have been proposed in the State except area covered under Yamuna Basin
  • 40.
  • 41.
  • 42. Nauti khad, Shimla Distt. Swan khad, Una Distt.
  • 44.
  • 45.
  • 46.
  • 48. Field Demonstration of Current Meter
  • 49. Activities Provision Status Level 1 lab buildings 6 Work completed. Level 2 lab buildings 2 Completed CW Level 2+ lab building 1 Completed. Level 1 lab equipment 12 Procured. Labs are functional. Level 2 lab equipment 2 Procured. Labs are functional at Mandi & Dharamshala. Level 2+ lab equipment 1 Part equipment likely to be received shortly. Procurement of AAS, GC, TOC analyser under process.
  • 50.
  • 51.
  • 52. Activities Provision Status State - Data centres (SDC) 1 Completed. State Data Center, Mandi made functional in May, 2012. Divisional office Data centre buildings (DDC) 4 Completed. Sub-divisional Office Data centre (SDDC)buildings 12 Completed. Section Office buildings 42 Completed.
  • 56. 1. Impact of Sewerage Effluent on Drinking Water Sources of Shimla City & Suggesting Ameliorative Measures.  Study was conducted by NIH, Roorkee and IPH Deptt. jointly.  Data collection, sampling, testing and analysis was done by NIH, Roorkee.  2 trainings on Water Quality convened at HIPA under the study.  The final report has been received and IPH Deptt. has initiated action on its recommendation. 2. Study on Ground Water Quality Characteristic In Industrial Predominant Areas Of H.P.  PEC, University of Technology engaged as consultant for carrying out the study.  20 additional borewells were drilled to observe GW quality in study area.  Testing of water samples and analysis has been completed and draft final report is expected in first week of Feb., 2014 Purpose Driven Studies (PDS)
  • 57. 3. Study of Impact of River / Khad Bed Mining on Water Sources (Water Winning Structures) & Evolution of Policy & Guidelines To Prevent Adverse Impact.  Department of Hydrology, IIT, Roorkee has been engaged as Consultant for this study.  Primary and secondary data collection has been completed except for satellite imageries , delivery of which is expected shortly.  Last round of water sample analysis is in progress.
  • 58.  NIH, Roorkee conducted PDS on Impact of Sewage Effluent on Drinking Water Sources of Shimla City and suggesting Ameliorative Measure's as some cases of Jaundice were reported from parts of Shimla City in the year 2006-07. Final report was received in May, 2013. NIH recommended measures, like installation of ultra filtration membrane or ozone treatment, to improve the performance of Water Treatment Plant  Performance study of Sewage Treatment Plant was also recommended. Taking note of non seasonal jaundice cases, an Inter departmental Sub-Group was constituted in March, 2013 to investigate its cause. The findings of this Sub Group were discussed in the meetings held under the Chairmanship of Additional Chief Secretary (IPH) to the Govt. of H.P. Considering the recommendations of NIH it was decided that Techno Commercial proposal be prepared for installing Ultra filtration membrane and ozone treatment system at WTP. It also decided to have the performance of STP validated by engaging appropriate agency. The I&PH Department is accordingly working on there proposals and it is expected that the study recommendation would soon transform into reality.
  • 59. MoU for Data Sharing Purpose. Comprehensive data collection and information system Synergy in system Optimum utilization of resources Uniform Protocol One shop stop for Hydrological data
  • 60.
  • 61. MoU Signatory Agencies Satluj Jal Vidyut Nigam(Previous Nathpa Jhakri Power Corpn. Ltd) H.P.,State Electricity Board H.P.,Power Corporation Limited Youngthang Power Ventures limited Jai Prakash Hydro Power Ltd. Jaypee Karcham Hydro Power Ltd. Himachal Sorang power Pvt. Ltd. Bhakra Beas Management Board. National Hydro Power Corporation National Thermal Power Corporation. Dr.Y.S.Parmar UHF, Nauni CSK HPKV, Palampur
  • 62. Trainings  So far 650 officers/ officials have undergone various training under Hydrology Project-II.  4 Officers have attended International training course at IHE Netherlands.  Institutes associated with the Trainings:  National Institute of Hydrology, Roorkee and Belgaum.  National Water academy, Pune.  Administrative Staff College of India, Hyderabad.  Engineering Staff College of India, Hyderabad.  IMD Training Institute New Delhi and Pune.  Rajiv Gandhi National Ground Water Training and Research Institute, Raipur, Chattisgarh.  CGWB Training Institute, Faridabad.  CPCB.  HIPA.
  • 63.  Courses on Water Quality organized at HIPA with NIH, Roorkee.  Programs on computer skill regarding data handling over internet organized at HIPA.  Courses on GIS organized at HIPA.  Courses on SWDES organized at HIPA with NIH,Roorkee.  Courses on Method of Measurement of Discharge on the G&D stations over rivers organized at HIPA and IPH training Centre, Mandi with CWC.  Course on ‘ Hydromet Observer’s organized at HIPA with IMD.  Officers / Officials nominated to attend training courses at NIH Roorkee, Kakinada, NWA Pune, IMD Delhi ,IMD Pune, CGWB Faridabad,Raipur and CPCB Delhi, Bangluru.
  • 64.  Conceptual Workshop on Hydrology Project Phase – II held at Shimla in Aug., 2006  One Day Workshop for Financial Management Reporting held at Shimla in Nov., 2007.  Awareness Raising Workshop held at Shimla in Feb., 2008.   Awareness Raising Workshop held at Dharamshala in Jan. 2009.   Awareness raising workshop held at Amb, Distt. Una in March, 2012.  Awareness raising workshop held at SDC, Mandi, in April, 2012.  Awareness raising workshop held at Palampure, Distt. Kangra, in May, 2012.  Awareness raising workshop held at State Data Centre , Mandi, in November, 2013.
  • 65.
  • 66.  Study tour for Senior and Middle level officers for Gujarat and Maharashtra organised in 2007.  Study tour for Middle & Junior level officers for Karnataka & Andhra Pradesh organised in 2008.  Study tour for Senior and Middle level officers for Karnataka, Goa and Kerela convened in 2009.  Study tour for Middle & Junior level officers for Maharashtra & Goa organised in 2013.
  • 67.
  • 68.
  • 69.
  • 70. Activities at State Data Centre  Data Processing  Analysis & Reporting Data Storage & Data Dissemination  Data Processing is a broad term covering all activities from receiving observed records to making them available in usable form.  The raw data is passed through series of operation, as: Data entry Making necessary validation checks In-filling missing values in a data series Processing of raw data to estimate required variables Compilation of data in different forms and Analysis of data for commonly required statistics etc.
  • 71. Data recording / collection Type Type of measurement Collection/ Recording Form of data Receipt of data SRG Daily Daily (Handwritten) Hard & soft Fortnightly ARG Hourly Daily (Graphs ) Hard & soft Fortnightly TBR Hourly Monthly (Digital) Digital Monthly FCS Daily, twice daily, Hourly Daily (Handwritten & graphs) Hard & soft Fortnightly AWS Hourly Monthly (Digital) Digital Monthly Pieozometer (Manual) Pre & post Monsoon Manual in May & November Hard & soft In June & Nov. DWLR 6 Hourly Daily (Digital) Digital Telemetric
  • 72. Types Of Data Entry At State Data Centre Hydrometerologi cal Data • Daily Rainfall Data • Hourly Rainfall data • Climatic data • Temperature • Relative Humidity • Evaporation • Sunshine • Wind direction • Wind velocity Surface Water Data • Flow measurement data • Water Level Data Ground Water Data • DWLR Data of Piezometers • Manual Data of Piezometers  SWDES  EXCEL  SWDES  EXCEL  EXCEL
  • 73. Example :- Screening of single year ( 2011) SRG Stations daily rainfall data VALIDATION (SWDES)
  • 74. VALIDATION (SWDES) Example :- Graphical Comparison of SRG daily rainfall data and ARG hourly rainfall data of Chailchowk Station, Distt. Mandi ( Date :- 07 July 2012)
  • 75. Example :- Graphical Comparison of 3 SRG Stations daily rainfall data for the year 2011 in Distt. Mandi VALIDATION (SWDES)
  • 76. Example :- Comparison of climatic data ( Temperature) of 4 FCS stations VALIDATION (SWDES)
  • 77. GROUND WATER ENTRY & MONITORING IN EXCEL
  • 78. GROUND WATER ENTRY & MONITORING IN EXCEL
  • 79. HISTORICAL DATA ENTRY / AVAILABILITY STATUS Sr. No. Agency Stations Period Remarks From To 1 REVENUE 130 1956 2005 Partly available 2 IMD 79 2008 2010 Partly available 3 BBMB 12 1965 April 2013 Partly available 4 Forest 2 2006 2009 Partly available 5 UHF Nauni 1 1-1-2011 31-12-2012 6 CSKVHPKV Palampur 6 1970 March 2013 Partly available Daily Rainfall Data:-
  • 80. Surface Water Data:- Discharge data from BBMB,NHPC,SJVNL , HPPCL and other 13 private hydro developers received in hard copies and is being computerized Sr. No. Agency Stations Period Remarks From To 1 BBMB 12 1962 April 2013 Partly available 2 NHPC 6 July 2010 December 2012 3 HPPCL 8 1976 2011 Partly available 4 SJVNL 3 2005 July 2012 Partly available
  • 81. CURRENT DATA ENTRY / AVAILABILITY STATUS FOR HP-II NETWORK I &PH Department Stations  Daily Rainfall Data (SRG) 69 stations from Nov-2010 onwards  Hourly Rainfall Data (ARG) 23 Stations from April- 2011 onwards  Hourly Rainfall Data (ARG T.B.) 12 Stations from June -2012 onwards  Climatic Data (FCS) 04 stations from April-2011 onwards  Weather Data (AWS) 02 stations from June-2012 onwards IMD Stations  Daily Rainfall Data 79 stations from June- 2012 onwards A. HYDROMETEROLOGICAL DATA I &PH Department Piezometer Wells 70 stations from Jan- 2010 onwards 10 stations from Jan-2011 onwards Piezometer (DWLR Data) 10 stations from Jan- 2010 onwards B. GROUND WATER DATA
  • 82. Data Dissemination Policy  As decided in the State Level Steering Committee, Data Dissemination Policy for ground water domain has been notified in July, 2011. Ground water data rates: Details available on IPH website, Hydrology Project – II link.  Draft policy prepared for surface water(meteorological) data dissemination. Item Rate in (Rs.) 1. Water Level Data a) 4 times data of one year of one Station- complete record 500/ + Media & Postal Cost a) High frequency water level data (6 Hourly data)- One Station per month - 500/ + Media & Postal Cost 1. Water Quality Data a) Base line Parameters (Temp., EC,PH,NO2, NO3, Total P,K,Na,Ca, Mg,CO3,HCO3,Cl, SO4,CoD,SiO2,F,B) one complete record 500/ + Media & Postal Cost a) Trend cum Surveillance (F,Fe,As,Cd,Hg,Zn,Na,K,Ca,Mg,CO3,HC03, Cl,SO4,Total & Faecal Coliforms) one complete record 500/ + Media & Postal Cost
  • 84. •Single agency for surface and ground water. •Keen Interest and quick decisions by State level Steering and Coordination Committees. •Continuity of key officers. •Support from PCS, TAMC and Central Expert Agencies, especially their Officers posted in State. •Guidance from World Bank. •Strong Liaison with other State Departments, Boards, Corporations & Educational organizations
  • 85. Weakness •‘Off the league’ with the routine departmental works causes general apprehension. •Not many people interested for posting or continuing. • On completion people eager to move out of the project due to uncertainty of further postings. •Small works spread over the entire State lead to higher operational difficulties.