SlideShare a Scribd company logo
1 of 7
RESUME:
Engr. Wyden S. Sagun BSECE
Home Address: House No. 1, Block 14, Lot 1, Lanzones corner Lauan Sts.,
Calendola Village, San Pedro City, Laguna, Philippines, 4023
Home Tel. No.: +63 2 808 1518
Mobile No.: +63 908 881 6710 (till end of April 2015 only)
Email Address: wyden.sagun@gmail.com
wydensagun@yahoo.com
OBJECTIVES:
- To obtain a challenging position in a company that will fully utilize my experience and
qualifications, increase my knowledge and further develop my skills – preferably a position as a technical
resource for service delivery in Project Implementation and/or Engineering
SUMMARY OF WORK EXPERIENCE:
- Almost 20 years of experience in working with system integration with Ericsson RAN
products for various Projects for different customers, domestic and international
TIMELINE/DETAILED WORK EXPERIENCE:
Period: June 4, 2012 to April 30, 2015
Position: Services Engineer - Experienced
Company: ERICSSON Telecommunications Philippines
Dept/Division: Operations / RASO CDRAN Integration
Functions/Responsibilities:
BSS integration for GSM Systems (900/1800 Band) for GLOBE Telecoms Expansion Project (Phase 16 and 17)
and then for SMART Modernization Project (starting Phase 1 to present)
1. Start-up implementation, hardware and software verification, testing and troubleshooting of
AXE10 BSCs (in BYB 810 hardware platform such as High-Density BSCs and EVO 8100) and
integration towards customer’s GSM Network including commissioning,
2. Implementation of hardware expansion (RP Bus, Transcoders, PGW, AGW, TRH, CSMs, etc.) and
subsequent integration to live traffic in customer’s network,
3. Implementation, Activation, Testing and Customer Acceptance of Optional BSC Features (VAMOS
for Digicell Papua New Guinea, Abis Over IP Migration for Indosat Indonesia, etc)
4. Major Software Upgrades for BSCs and BTS (R12 to 08B).
5. Major Hardware Upgrades for BSCs (High-Density to All-IP Adaptations),
6. Data Transcript creation based on CDDs, integration, testing and troubleshooting of RBS
2000/6000 towards GSM network,
7. Migration of individual or clustered BTS (reparenting),
8. Rehoming/Reparenting of BSCs as per customer’s network plan,
9. Undertake any FNI (first node implementation) of verified new element or functionality, whilst
under the guidance of the appropriate supporting organization,
10. If requested, assist/support during contract/commercial negotiations, in the technical scoping of
the Integration service delivery.
11. Involvement in Interoperability/Verification activities for competence build-up with or at GSDC /
PDU.
12. Has also done knowledge transfer sessions to customers (for SMART, 2013), as requested.
Period: January 1, 2009 to June 3, 2012
Position: Team Leader - Network Integration / Senior Integration Engineer
Company: ERICSSON Telecommunications Philippines
Dept/Division: Network Rollout/Services
Functions/Responsibilities:
Line Functions:
1. Assist the Line Manager (LM) in generating strategies and objectives (rollout plans,
dimensioning, resource planning, competence development, attend meetings on Integration
issues etc) for the Section
2. Ensure that the group is within the competence level required by looking into future trainings
available that can be attended within budget, based on future Project, New products and
market requirements
3. Provide Application Programs, Instruments, Reference Documentation and Equipment required
for NIs.
4. Track/create database for Network Integrators, their current assignments, assignment
durations, feedback on performance, KPIs (quality, efficiency, and productivity).
5. Resolution of Technical issues (meetings with Project Managers/NIs, Knowledge Sharing, etc.)
6. Interpretation of network rollout/integration plans into detailed level activity schedule for on-
site activities.
7. Plan, Provide and Allocate Network Integrator/s to Projects based on forecasts, availability and
competence required
8. With the LM, coordinate with Project Office (PO) on their future requirements/forecasts
9. Provide regular Section Reports and work with the LM in generating RAN reports/data required
by NRO (e.g. manpower projections, utilization, competence management requirements)
10. Assist the ARP in managing needs (resource planning) of project based NIs.
Project Function:
BSS integration for GSM Systems (900/1800 Band) for GLOBE Telecoms Expansion Project (Phase
13, 14 and 15)
13. Start-up implementation, hardware and software verification, testing and troubleshooting of
AXE10 BSCs (in BYB 810 hardware platform) and integration towards customer’s GSM Network
including commissioning,
14. Implementation of hardware expansion (RP Bus, Transcoders, etc.) and subsequent integration to
live traffic in customer’s network,
15. Major Software Upgrades for BSCs and BTS (R10 to R12, R12 to 08B).
16. Major Hardware Upgrades for BSCs (IOG20 to APG40 Swapout, BSC Relocation),
17. Data Transcript creation based on CDDs, integration, testing and troubleshooting of RBS 2000
towards GSM network,
18. Migration of individual or clustered BTS (reparenting),
19. Rehoming/Reparenting of BSCs as per customer’s network plan,
20. Undertake any FNI (first node implementation) of verified new element or functionality, whilst
under the guidance of the appropriate supporting organization,
21. If requested, assist/support during contract/commercial negotiations, in the technical scoping of
the Integration service delivery.
22. Involvement in Interoperability/Verification activities for competence build-up with or at GSDC /
PDU.
Period: March 2, 2006 to December 31, 2008
Position: Senior Network Integration Engineer
Company: ERICSSON Telecommunications Philippines
Dept/Division: Operations/Network Integration
Functions/Responsibilities:
BSS integration for GSM Systems (900/1800 Band) for GLOBE Telecoms Expansion Project (Phase 11 and 12)
1. Start-up implementation, hardware and software verification, testing and troubleshooting of
AXE10 BSCs (in BYB 810 hardware platform) and integration towards customer’s GSM Network
including commissioning,
2. Implementation of hardware expansions (RP Bus, Transcoders, etc.) and subsequent integration
to live traffic in customer’s network,
3. Data Transcript creation based on CDDs, integration, testing and troubleshooting of RBS 2000
towards GSM network,
4. TRU Reconfiguration, BTS Software upgrades and EDGE activation of RBS 2000
5. Migration of individual or clustered BTS (reparenting) and rehoming of R-BSCs as per customer’s
network plan.
Period: March 1, 2003 to March 1, 2006
Position: Network Integration Engineer
Company: ERICSSON Telecommunications Philippines
Dept/Division: Operations/Network Integration
Functions/Responsibilities:
BSS integration for GSM Systems (900/1800 Band) for GLOBE Telecoms Expansion Project (Phase 8A ,8B, 9
and 10)
1. Start-up implementation, hardware and software verification, testing and troubleshooting of
AXE10 BSCs (in BYB 501 hardware platform) and integration towards customer’s GSM Network
including commissioning and acceptance,
2. Implementation of expansion (RP Bus, Transcoders, etc.) and subsequent integration to live traffic
in customer’s network,
3. Data Transcript creation based on CDDs, integration, testing and troubleshooting of RBS 2000
towards GSM network,
4. TRU Reconfiguration, BTS Software upgrades and EDGE activation of RBS 2000
5. Migration of individual or clustered BTS (reparenting) and rehoming of R-BSCs as per customer’s
network plan.
Period: March 1, 2000 to February 28, 2003
Position: ELS (Ericsson Local Support) Engineer
Company: ERICSSON Telecommunications Philippines
Dept/Division: Ericsson Local Support
Functions/Responsibilities:
Providing first line system support to customers for products that are available in the customer network and
in commercial operation via Customer Service Requests. Responsible for support for AXE10 in BYB202 and BYB501
hardware platform of Wireline networks (PSTN), OTN (Operator Terminal Network) and ISDN V5.2 such as:
1. Emergency Support Handling,
2. Customer Service Request Handling,
3. Consultation Support,
4. Disturbance Investigation,
5. Correction Handling,
6. Advanced Trouble Shooting.
BSS integration for GSM Systems (900/1800 Band) for GLOBE Telecoms Expansion Project (Phase 6 and 7):
1. Start-up implementation, hardware and software verification, testing and troubleshooting of
AXE10 BSCs (in BYB 501 hardware platform) and integration towards customer’s GSM Network
including commissioning,
2. Implementation of expansion (RP Bus, Transcoders, etc.) and subsequent integration to live traffic
in customer’s network,
3. Data Transcript creation based on CDDs, integration, testing and troubleshooting of RBS 2000
towards GSM network,
4. TRU Reconfiguration of implemented RBS 2000 and BTS software upgrades,
5. Migration of individual or clustered BTS (reparenting) and rehoming of R-BSCs as per customer’s
network plan.
Period: October 1, 1997 to February 28, 2000
Position: Switching Engineer 1 – Inside Plant
Company: ERICSSON Telecommunications Philippines
Dept/Division: DIGITEL Project – Switching Testing
Functions/Responsibilities:
Testing and Commissioning of AXE10 switches for Wireline networks for DIGITEL South Luzon PSTN
Expansion Project
1. Start-up implementation, hardware and software verification, testing and troubleshooting of
AXE10 MSUs, RSUs and RSSs (in BYB 501 hardware platform) and integration towards customer’s
network including commissioning.
2. Implementation of hardware expansions (RP Bus, ETC rack, etc.) and subsequent integration to
live traffic in customer’s PSTN network
Period: February 15, 1997 to September 30, 1997
Position: Switching Technician 2 – Inside Plant
Company: ERICSSON Telecommunications Philippines
Dept/Division: Switching Department - DIGITEL Project
Functions/Responsibilities:
Testing and Commissioning of AXE10 switches for Wireline networks for DIGITEL South Luzon PSTN
Expansion Project
1. Start-up implementation, hardware and software verification, testing and troubleshooting of
AXE10 MSUs, RSUs and RSSs (in BYB 202 hardware platform) and integration towards customer’s
network including commissioning.
2. Implementation of hardware expansions (RP Bus, ETC rack, etc.) and subsequent integration to
live traffic in customer’s PSTN network
Period: May 20, 1996 to February 14, 1997
Position: Switching Technician 1 – Inside Plant
Company: ERICSSON Telecommunications Philippines
Dept/Division: Switching Department - DIGITEL Project
Functions/Responsibilities:
Installation of AXE10 switches for Wireline networks for DIGITEL South Luzon PSTN Expansion Project
1. Installation of AXE10 MSUs, and RSUs (in BYB 202 hardware platform) by following construction
manuals and installation documents; from assembly of cabling mechanics, to signal and traffic
cables’ wiring terminations, to assembly of the cabinets, etc.
SEMINARS AND TRAININGS ATTENDED:
Leadership Assessment Course (LAC)
April 14-15, 2010
Human Dynamic.
Ericsson Shared Services Center – Manila, Unit 5A, One World Square Building, Upper McKinley Town Center, Fort
Bonifacio, Taguig, Metro Manila, Philippines
AXE Testing 2
April 20-30, 2009
Ericsson Education Philippines.
21st
Floor, Net Square Building, 3rd
Ave. corner 28th
Streets, Crescent Park West, Bonifacio Global City, 1634, Taguig,
Philippines.
WCDMA RBS 3106/3206
March 3-7, 2006
Ericsson Education Philippines.
21st
Floor, Net Square Building, 3rd
Ave. corner 28th
Streets, Crescent Park West, Bonifacio Global City, 1634, Taguig,
Philippines.
WCDMA RAN Configuration
October 28-29, November 1 and 3, 2004
Ericsson Education Australia.
Corner of Maldon and Riggall Streets, Broadmeadows, Victoria, Australia, 3047
WCDMA RAN Operation
October 25-27, 2004
Ericsson Education Australia.
Corner of Maldon and Riggall Streets, Broadmeadows, Victoria, Australia, 3047
WCDMA System Overview
August 18, 2004
Ericsson Education Philippines.
6th
Fl., Octagon Bldg., San Miguel Ave., Ortigas Complex, Pasig City, Philippines.
APG 40 Operation and Maintenance
May 3-4 and 12, 2004
Ericsson Education Philippines.
6th
Fl., Octagon Bldg., San Miguel Ave., Ortigas Complex, Pasig City, Philippines.
AXE 810 Hands-On Customized Course
February 19-20, 2004
Ericsson Education Philippines.
6th
Fl., Octagon Bldg., San Miguel Ave., Ortigas Complex, Pasig City, Philippines.
Quality Awareness Seminar on Telecom
April 26, 2002
Ericsson Services Philippines.
6th
Fl., Octagon Bldg., San Miguel Ave., Ortigas Complex, Pasig City, Philippines.
Fundamentals of Solaris EU118
March 5-9, 2001
Sun Microsystems Inc.
Makati City, Philippines.
RBS 2000 Basics
September 8, 2000
Ericsson Training Centre - Philippines.
6th
Fl., Octagon Bldg., San Miguel Ave., Ortigas Complex, Pasig City, Philippines.
WAP System Course
June 15-16, 2000
Ericsson Training Centre - Philippines.
6th
Fl., Octagon Bldg., San Miguel Ave., Ortigas Complex, Pasig City, Philippines.
UMTS Transmission Overview
June 9, 2000
Ericsson Training Centre - Philippines.
6th
Fl., Octagon Bldg., San Miguel Ave., Ortigas Complex, Pasig City, Philippines.
AXE 10 Hardware Maintenance (BYB 501)
April 24 - May 5, 2000
Ericsson Academy (Malaysia) Sdn Bhd
AXE 10 Operation Handling (BYB 501)
April 17-21 , 2000
Ericsson Academy (Malaysia) Sdn Bhd
Datacoms 2
February 8-11, 2000
Ericsson Training Centre - Philippines.
6th
Fl., Octagon Bldg., San Miguel Ave., Ortigas Complex, Pasig City, Philippines.
TCP / IP
July 1, 1999
Ericsson Training Centre - Philippines.
6th
Fl., Octagon Bldg., San Miguel Ave., Ortigas Complex, Pasig City, Philippines.
CME 20 MSC Operation and Maintenance (via Distance Learning)
May 24 - May 28, 1999
By Ericsson Academy (Malaysia) Sdn Bhd
Held in Ericsson Training Centre - Philippines.
6th
Fl., Octagon Bldg., San Miguel Ave., Ortigas Complex, Pasig City, Philippines.
CME 20 System Survey
March 23-25, 1999
Ericsson Training Centre - Philippines.
6th
Fl., Octagon Bldg., San Miguel Ave., Ortigas Complex, Pasig City, Philippines.
SCHOLASTICS BACKGROUND:
College: Bachelor of Science in Electronics and Communications Engineering
June 1990 – March 1995
Mapua Institute of Technology
Muralla St., Intramuros, Metro Manila, Philippines
ECE Board Passer, PRC License Number 0012469
Secondary / Primary: Graduated
June 1980 – March 1990
Colegio San Antonio (formerly Saint Anthony School of Binan, Laguna)
Binan, Laguna, Philippines
PERSONAL INFORMATION:
Male, 42 years old, born February 9, 1973 in Mandaluyong City, Metro Manila, Philippines. Married. With
one child – a son, Zachary Gabriel.
Hard-working, eager, easy to learn, with initiative, and with excellent communication skills.
REFERENCES:
Abel Cabuso
Ericsson Telecommunications Philippines
CDRAN Head
abel.cabuso.jr@ericsson.com
+639985412615
Joel Pena
Ericsson Telecommunications Philippines
Customer Project Manager - Experienced
joel.pena@ericsson.com
+639285205850
Frederick Mercado
Ericsson Telecommunications Philippines
Customer Project Manager
frederick.mercado@ericsson.com
+639285052290

More Related Content

What's hot (20)

Pravin Naidu CV
Pravin Naidu CVPravin Naidu CV
Pravin Naidu CV
 
CV - Saif ul amIn-Mgmt
CV - Saif ul amIn-MgmtCV - Saif ul amIn-Mgmt
CV - Saif ul amIn-Mgmt
 
Bhagwan_S._Sharma_CV
Bhagwan_S._Sharma_CVBhagwan_S._Sharma_CV
Bhagwan_S._Sharma_CV
 
AlaaEldin-Ahmed CV
AlaaEldin-Ahmed CVAlaaEldin-Ahmed CV
AlaaEldin-Ahmed CV
 
CV - Rashid
CV - RashidCV - Rashid
CV - Rashid
 
Himani_Yadav
Himani_YadavHimani_Yadav
Himani_Yadav
 
AlaaEldin-Ahmed CV
AlaaEldin-Ahmed CVAlaaEldin-Ahmed CV
AlaaEldin-Ahmed CV
 
Alia khan1
Alia khan1Alia khan1
Alia khan1
 
Derrick Washington Resume 2016 - Copy
Derrick Washington Resume 2016 - CopyDerrick Washington Resume 2016 - Copy
Derrick Washington Resume 2016 - Copy
 
Rabia Mokeddem Resume 2
Rabia Mokeddem Resume 2Rabia Mokeddem Resume 2
Rabia Mokeddem Resume 2
 
CV Md Shahabuddin
CV Md ShahabuddinCV Md Shahabuddin
CV Md Shahabuddin
 
Wilmar Sibayan CV
Wilmar Sibayan CVWilmar Sibayan CV
Wilmar Sibayan CV
 
DILLIBABU CV
DILLIBABU CVDILLIBABU CV
DILLIBABU CV
 
Jeffin_BSS_CV
Jeffin_BSS_CVJeffin_BSS_CV
Jeffin_BSS_CV
 
Yan Zhang resume
Yan Zhang resumeYan Zhang resume
Yan Zhang resume
 
TeleResources Corporate Presentation
TeleResources Corporate PresentationTeleResources Corporate Presentation
TeleResources Corporate Presentation
 
Mohammed Abu Aqel Cv 11 10 2012
Mohammed Abu Aqel Cv 11 10 2012Mohammed Abu Aqel Cv 11 10 2012
Mohammed Abu Aqel Cv 11 10 2012
 
Kirk OHagan Resume 2016
Kirk OHagan Resume 2016Kirk OHagan Resume 2016
Kirk OHagan Resume 2016
 
Arshad Masih -Resume
Arshad Masih -ResumeArshad Masih -Resume
Arshad Masih -Resume
 
MANISH KUMAR GUPTA.docx
MANISH KUMAR GUPTA.docxMANISH KUMAR GUPTA.docx
MANISH KUMAR GUPTA.docx
 

Viewers also liked

Blogs como herramienta de explicitación de conocimiento
Blogs como herramienta de explicitación de conocimientoBlogs como herramienta de explicitación de conocimiento
Blogs como herramienta de explicitación de conocimientosebastian espinosa
 
CvLTETimeLine_quandt
CvLTETimeLine_quandtCvLTETimeLine_quandt
CvLTETimeLine_quandtQuân Trung
 
Es145 01-Especial perfumes-top expresiones de compra
Es145 01-Especial perfumes-top expresiones de compraEs145 01-Especial perfumes-top expresiones de compra
Es145 01-Especial perfumes-top expresiones de compraBint
 
Akmos treinamento-vendas-e-recrutamento
Akmos treinamento-vendas-e-recrutamentoAkmos treinamento-vendas-e-recrutamento
Akmos treinamento-vendas-e-recrutamentoJessyka456
 
Skillset job roles_in_the_games_industry
Skillset job roles_in_the_games_industrySkillset job roles_in_the_games_industry
Skillset job roles_in_the_games_industrydontaskwhy555
 
CHAMPS_ELYSEES_CAT_LD
CHAMPS_ELYSEES_CAT_LDCHAMPS_ELYSEES_CAT_LD
CHAMPS_ELYSEES_CAT_LDSeb Duncan
 
Facebook jefe saludos del año nuevo lunar y felices de responder a los coment...
Facebook jefe saludos del año nuevo lunar y felices de responder a los coment...Facebook jefe saludos del año nuevo lunar y felices de responder a los coment...
Facebook jefe saludos del año nuevo lunar y felices de responder a los coment...Hanoi, Vietnam
 
500 Demo Day Batch 19: Ambience Data
500 Demo Day Batch 19: Ambience Data500 Demo Day Batch 19: Ambience Data
500 Demo Day Batch 19: Ambience Data500 Startups
 
500’s Demo Day Batch 14 >> Village Defense
500’s Demo Day Batch 14 >> Village Defense500’s Demo Day Batch 14 >> Village Defense
500’s Demo Day Batch 14 >> Village Defense500 Startups
 
500 Demo Day Batch 19: We Are Onyx
500 Demo Day Batch 19: We Are Onyx500 Demo Day Batch 19: We Are Onyx
500 Demo Day Batch 19: We Are Onyx500 Startups
 

Viewers also liked (15)

Blogs como herramienta de explicitación de conocimiento
Blogs como herramienta de explicitación de conocimientoBlogs como herramienta de explicitación de conocimiento
Blogs como herramienta de explicitación de conocimiento
 
Tshirt Version 2.psd
Tshirt Version 2.psdTshirt Version 2.psd
Tshirt Version 2.psd
 
ALAYANDE SAMSON
ALAYANDE SAMSONALAYANDE SAMSON
ALAYANDE SAMSON
 
CvLTETimeLine_quandt
CvLTETimeLine_quandtCvLTETimeLine_quandt
CvLTETimeLine_quandt
 
Es145 01-Especial perfumes-top expresiones de compra
Es145 01-Especial perfumes-top expresiones de compraEs145 01-Especial perfumes-top expresiones de compra
Es145 01-Especial perfumes-top expresiones de compra
 
Informatica
InformaticaInformatica
Informatica
 
Akmos treinamento-vendas-e-recrutamento
Akmos treinamento-vendas-e-recrutamentoAkmos treinamento-vendas-e-recrutamento
Akmos treinamento-vendas-e-recrutamento
 
Skillset job roles_in_the_games_industry
Skillset job roles_in_the_games_industrySkillset job roles_in_the_games_industry
Skillset job roles_in_the_games_industry
 
CHAMPS_ELYSEES_CAT_LD
CHAMPS_ELYSEES_CAT_LDCHAMPS_ELYSEES_CAT_LD
CHAMPS_ELYSEES_CAT_LD
 
Piaoyongfeng
PiaoyongfengPiaoyongfeng
Piaoyongfeng
 
Facebook jefe saludos del año nuevo lunar y felices de responder a los coment...
Facebook jefe saludos del año nuevo lunar y felices de responder a los coment...Facebook jefe saludos del año nuevo lunar y felices de responder a los coment...
Facebook jefe saludos del año nuevo lunar y felices de responder a los coment...
 
ACTIVIDAD 2 BLOQUE I
ACTIVIDAD 2 BLOQUE IACTIVIDAD 2 BLOQUE I
ACTIVIDAD 2 BLOQUE I
 
500 Demo Day Batch 19: Ambience Data
500 Demo Day Batch 19: Ambience Data500 Demo Day Batch 19: Ambience Data
500 Demo Day Batch 19: Ambience Data
 
500’s Demo Day Batch 14 >> Village Defense
500’s Demo Day Batch 14 >> Village Defense500’s Demo Day Batch 14 >> Village Defense
500’s Demo Day Batch 14 >> Village Defense
 
500 Demo Day Batch 19: We Are Onyx
500 Demo Day Batch 19: We Are Onyx500 Demo Day Batch 19: We Are Onyx
500 Demo Day Batch 19: We Are Onyx
 

Similar to Wyden Sagun's CV (20)

CV-Trivinder
CV-TrivinderCV-Trivinder
CV-Trivinder
 
Stanley marius RESUME
Stanley marius RESUMEStanley marius RESUME
Stanley marius RESUME
 
CV_VIKAS RAJPUROHIT
CV_VIKAS RAJPUROHITCV_VIKAS RAJPUROHIT
CV_VIKAS RAJPUROHIT
 
Resume_Pavan
Resume_PavanResume_Pavan
Resume_Pavan
 
Waqas_Abbasi
Waqas_AbbasiWaqas_Abbasi
Waqas_Abbasi
 
CV - S.Saravanan Mudaliar (Network Planning & GIS)
CV - S.Saravanan Mudaliar (Network Planning & GIS)CV - S.Saravanan Mudaliar (Network Planning & GIS)
CV - S.Saravanan Mudaliar (Network Planning & GIS)
 
Rizwan Ahmad (f)
Rizwan Ahmad (f)Rizwan Ahmad (f)
Rizwan Ahmad (f)
 
CV HARRAK Yasser_EN
CV HARRAK Yasser_ENCV HARRAK Yasser_EN
CV HARRAK Yasser_EN
 
Sandeep Kumar
Sandeep KumarSandeep Kumar
Sandeep Kumar
 
Sandeep Kumar
Sandeep KumarSandeep Kumar
Sandeep Kumar
 
Sandeep Kumar
Sandeep KumarSandeep Kumar
Sandeep Kumar
 
CV_SUELY TORIGOE_2016_EN_v2
CV_SUELY TORIGOE_2016_EN_v2CV_SUELY TORIGOE_2016_EN_v2
CV_SUELY TORIGOE_2016_EN_v2
 
AMIT MODI
AMIT MODIAMIT MODI
AMIT MODI
 
AMIT MODI
AMIT MODIAMIT MODI
AMIT MODI
 
LOKESH YADAV RESUME
LOKESH YADAV  RESUMELOKESH YADAV  RESUME
LOKESH YADAV RESUME
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
Mohd_Noor_Azman_CV2015
Mohd_Noor_Azman_CV2015Mohd_Noor_Azman_CV2015
Mohd_Noor_Azman_CV2015
 
Mohammad Bannob Resume
Mohammad Bannob ResumeMohammad Bannob Resume
Mohammad Bannob Resume
 
Tushar_Vaidya1
Tushar_Vaidya1Tushar_Vaidya1
Tushar_Vaidya1
 

Wyden Sagun's CV

  • 1. RESUME: Engr. Wyden S. Sagun BSECE Home Address: House No. 1, Block 14, Lot 1, Lanzones corner Lauan Sts., Calendola Village, San Pedro City, Laguna, Philippines, 4023 Home Tel. No.: +63 2 808 1518 Mobile No.: +63 908 881 6710 (till end of April 2015 only) Email Address: wyden.sagun@gmail.com wydensagun@yahoo.com OBJECTIVES: - To obtain a challenging position in a company that will fully utilize my experience and qualifications, increase my knowledge and further develop my skills – preferably a position as a technical resource for service delivery in Project Implementation and/or Engineering SUMMARY OF WORK EXPERIENCE: - Almost 20 years of experience in working with system integration with Ericsson RAN products for various Projects for different customers, domestic and international TIMELINE/DETAILED WORK EXPERIENCE: Period: June 4, 2012 to April 30, 2015 Position: Services Engineer - Experienced Company: ERICSSON Telecommunications Philippines Dept/Division: Operations / RASO CDRAN Integration Functions/Responsibilities: BSS integration for GSM Systems (900/1800 Band) for GLOBE Telecoms Expansion Project (Phase 16 and 17) and then for SMART Modernization Project (starting Phase 1 to present) 1. Start-up implementation, hardware and software verification, testing and troubleshooting of AXE10 BSCs (in BYB 810 hardware platform such as High-Density BSCs and EVO 8100) and integration towards customer’s GSM Network including commissioning, 2. Implementation of hardware expansion (RP Bus, Transcoders, PGW, AGW, TRH, CSMs, etc.) and subsequent integration to live traffic in customer’s network, 3. Implementation, Activation, Testing and Customer Acceptance of Optional BSC Features (VAMOS for Digicell Papua New Guinea, Abis Over IP Migration for Indosat Indonesia, etc) 4. Major Software Upgrades for BSCs and BTS (R12 to 08B). 5. Major Hardware Upgrades for BSCs (High-Density to All-IP Adaptations),
  • 2. 6. Data Transcript creation based on CDDs, integration, testing and troubleshooting of RBS 2000/6000 towards GSM network, 7. Migration of individual or clustered BTS (reparenting), 8. Rehoming/Reparenting of BSCs as per customer’s network plan, 9. Undertake any FNI (first node implementation) of verified new element or functionality, whilst under the guidance of the appropriate supporting organization, 10. If requested, assist/support during contract/commercial negotiations, in the technical scoping of the Integration service delivery. 11. Involvement in Interoperability/Verification activities for competence build-up with or at GSDC / PDU. 12. Has also done knowledge transfer sessions to customers (for SMART, 2013), as requested. Period: January 1, 2009 to June 3, 2012 Position: Team Leader - Network Integration / Senior Integration Engineer Company: ERICSSON Telecommunications Philippines Dept/Division: Network Rollout/Services Functions/Responsibilities: Line Functions: 1. Assist the Line Manager (LM) in generating strategies and objectives (rollout plans, dimensioning, resource planning, competence development, attend meetings on Integration issues etc) for the Section 2. Ensure that the group is within the competence level required by looking into future trainings available that can be attended within budget, based on future Project, New products and market requirements 3. Provide Application Programs, Instruments, Reference Documentation and Equipment required for NIs. 4. Track/create database for Network Integrators, their current assignments, assignment durations, feedback on performance, KPIs (quality, efficiency, and productivity). 5. Resolution of Technical issues (meetings with Project Managers/NIs, Knowledge Sharing, etc.) 6. Interpretation of network rollout/integration plans into detailed level activity schedule for on- site activities. 7. Plan, Provide and Allocate Network Integrator/s to Projects based on forecasts, availability and competence required 8. With the LM, coordinate with Project Office (PO) on their future requirements/forecasts 9. Provide regular Section Reports and work with the LM in generating RAN reports/data required by NRO (e.g. manpower projections, utilization, competence management requirements) 10. Assist the ARP in managing needs (resource planning) of project based NIs. Project Function: BSS integration for GSM Systems (900/1800 Band) for GLOBE Telecoms Expansion Project (Phase 13, 14 and 15) 13. Start-up implementation, hardware and software verification, testing and troubleshooting of AXE10 BSCs (in BYB 810 hardware platform) and integration towards customer’s GSM Network including commissioning, 14. Implementation of hardware expansion (RP Bus, Transcoders, etc.) and subsequent integration to live traffic in customer’s network, 15. Major Software Upgrades for BSCs and BTS (R10 to R12, R12 to 08B). 16. Major Hardware Upgrades for BSCs (IOG20 to APG40 Swapout, BSC Relocation), 17. Data Transcript creation based on CDDs, integration, testing and troubleshooting of RBS 2000 towards GSM network, 18. Migration of individual or clustered BTS (reparenting), 19. Rehoming/Reparenting of BSCs as per customer’s network plan, 20. Undertake any FNI (first node implementation) of verified new element or functionality, whilst under the guidance of the appropriate supporting organization, 21. If requested, assist/support during contract/commercial negotiations, in the technical scoping of the Integration service delivery.
  • 3. 22. Involvement in Interoperability/Verification activities for competence build-up with or at GSDC / PDU. Period: March 2, 2006 to December 31, 2008 Position: Senior Network Integration Engineer Company: ERICSSON Telecommunications Philippines Dept/Division: Operations/Network Integration Functions/Responsibilities: BSS integration for GSM Systems (900/1800 Band) for GLOBE Telecoms Expansion Project (Phase 11 and 12) 1. Start-up implementation, hardware and software verification, testing and troubleshooting of AXE10 BSCs (in BYB 810 hardware platform) and integration towards customer’s GSM Network including commissioning, 2. Implementation of hardware expansions (RP Bus, Transcoders, etc.) and subsequent integration to live traffic in customer’s network, 3. Data Transcript creation based on CDDs, integration, testing and troubleshooting of RBS 2000 towards GSM network, 4. TRU Reconfiguration, BTS Software upgrades and EDGE activation of RBS 2000 5. Migration of individual or clustered BTS (reparenting) and rehoming of R-BSCs as per customer’s network plan. Period: March 1, 2003 to March 1, 2006 Position: Network Integration Engineer Company: ERICSSON Telecommunications Philippines Dept/Division: Operations/Network Integration Functions/Responsibilities: BSS integration for GSM Systems (900/1800 Band) for GLOBE Telecoms Expansion Project (Phase 8A ,8B, 9 and 10) 1. Start-up implementation, hardware and software verification, testing and troubleshooting of AXE10 BSCs (in BYB 501 hardware platform) and integration towards customer’s GSM Network including commissioning and acceptance, 2. Implementation of expansion (RP Bus, Transcoders, etc.) and subsequent integration to live traffic in customer’s network, 3. Data Transcript creation based on CDDs, integration, testing and troubleshooting of RBS 2000 towards GSM network, 4. TRU Reconfiguration, BTS Software upgrades and EDGE activation of RBS 2000 5. Migration of individual or clustered BTS (reparenting) and rehoming of R-BSCs as per customer’s network plan. Period: March 1, 2000 to February 28, 2003 Position: ELS (Ericsson Local Support) Engineer Company: ERICSSON Telecommunications Philippines Dept/Division: Ericsson Local Support Functions/Responsibilities: Providing first line system support to customers for products that are available in the customer network and in commercial operation via Customer Service Requests. Responsible for support for AXE10 in BYB202 and BYB501 hardware platform of Wireline networks (PSTN), OTN (Operator Terminal Network) and ISDN V5.2 such as: 1. Emergency Support Handling, 2. Customer Service Request Handling, 3. Consultation Support, 4. Disturbance Investigation, 5. Correction Handling, 6. Advanced Trouble Shooting.
  • 4. BSS integration for GSM Systems (900/1800 Band) for GLOBE Telecoms Expansion Project (Phase 6 and 7): 1. Start-up implementation, hardware and software verification, testing and troubleshooting of AXE10 BSCs (in BYB 501 hardware platform) and integration towards customer’s GSM Network including commissioning, 2. Implementation of expansion (RP Bus, Transcoders, etc.) and subsequent integration to live traffic in customer’s network, 3. Data Transcript creation based on CDDs, integration, testing and troubleshooting of RBS 2000 towards GSM network, 4. TRU Reconfiguration of implemented RBS 2000 and BTS software upgrades, 5. Migration of individual or clustered BTS (reparenting) and rehoming of R-BSCs as per customer’s network plan. Period: October 1, 1997 to February 28, 2000 Position: Switching Engineer 1 – Inside Plant Company: ERICSSON Telecommunications Philippines Dept/Division: DIGITEL Project – Switching Testing Functions/Responsibilities: Testing and Commissioning of AXE10 switches for Wireline networks for DIGITEL South Luzon PSTN Expansion Project 1. Start-up implementation, hardware and software verification, testing and troubleshooting of AXE10 MSUs, RSUs and RSSs (in BYB 501 hardware platform) and integration towards customer’s network including commissioning. 2. Implementation of hardware expansions (RP Bus, ETC rack, etc.) and subsequent integration to live traffic in customer’s PSTN network Period: February 15, 1997 to September 30, 1997 Position: Switching Technician 2 – Inside Plant Company: ERICSSON Telecommunications Philippines Dept/Division: Switching Department - DIGITEL Project Functions/Responsibilities: Testing and Commissioning of AXE10 switches for Wireline networks for DIGITEL South Luzon PSTN Expansion Project 1. Start-up implementation, hardware and software verification, testing and troubleshooting of AXE10 MSUs, RSUs and RSSs (in BYB 202 hardware platform) and integration towards customer’s network including commissioning. 2. Implementation of hardware expansions (RP Bus, ETC rack, etc.) and subsequent integration to live traffic in customer’s PSTN network Period: May 20, 1996 to February 14, 1997 Position: Switching Technician 1 – Inside Plant Company: ERICSSON Telecommunications Philippines Dept/Division: Switching Department - DIGITEL Project Functions/Responsibilities: Installation of AXE10 switches for Wireline networks for DIGITEL South Luzon PSTN Expansion Project 1. Installation of AXE10 MSUs, and RSUs (in BYB 202 hardware platform) by following construction manuals and installation documents; from assembly of cabling mechanics, to signal and traffic cables’ wiring terminations, to assembly of the cabinets, etc.
  • 5. SEMINARS AND TRAININGS ATTENDED: Leadership Assessment Course (LAC) April 14-15, 2010 Human Dynamic. Ericsson Shared Services Center – Manila, Unit 5A, One World Square Building, Upper McKinley Town Center, Fort Bonifacio, Taguig, Metro Manila, Philippines AXE Testing 2 April 20-30, 2009 Ericsson Education Philippines. 21st Floor, Net Square Building, 3rd Ave. corner 28th Streets, Crescent Park West, Bonifacio Global City, 1634, Taguig, Philippines. WCDMA RBS 3106/3206 March 3-7, 2006 Ericsson Education Philippines. 21st Floor, Net Square Building, 3rd Ave. corner 28th Streets, Crescent Park West, Bonifacio Global City, 1634, Taguig, Philippines. WCDMA RAN Configuration October 28-29, November 1 and 3, 2004 Ericsson Education Australia. Corner of Maldon and Riggall Streets, Broadmeadows, Victoria, Australia, 3047 WCDMA RAN Operation October 25-27, 2004 Ericsson Education Australia. Corner of Maldon and Riggall Streets, Broadmeadows, Victoria, Australia, 3047 WCDMA System Overview August 18, 2004 Ericsson Education Philippines. 6th Fl., Octagon Bldg., San Miguel Ave., Ortigas Complex, Pasig City, Philippines. APG 40 Operation and Maintenance May 3-4 and 12, 2004 Ericsson Education Philippines. 6th Fl., Octagon Bldg., San Miguel Ave., Ortigas Complex, Pasig City, Philippines. AXE 810 Hands-On Customized Course February 19-20, 2004 Ericsson Education Philippines. 6th Fl., Octagon Bldg., San Miguel Ave., Ortigas Complex, Pasig City, Philippines. Quality Awareness Seminar on Telecom April 26, 2002 Ericsson Services Philippines.
  • 6. 6th Fl., Octagon Bldg., San Miguel Ave., Ortigas Complex, Pasig City, Philippines. Fundamentals of Solaris EU118 March 5-9, 2001 Sun Microsystems Inc. Makati City, Philippines. RBS 2000 Basics September 8, 2000 Ericsson Training Centre - Philippines. 6th Fl., Octagon Bldg., San Miguel Ave., Ortigas Complex, Pasig City, Philippines. WAP System Course June 15-16, 2000 Ericsson Training Centre - Philippines. 6th Fl., Octagon Bldg., San Miguel Ave., Ortigas Complex, Pasig City, Philippines. UMTS Transmission Overview June 9, 2000 Ericsson Training Centre - Philippines. 6th Fl., Octagon Bldg., San Miguel Ave., Ortigas Complex, Pasig City, Philippines. AXE 10 Hardware Maintenance (BYB 501) April 24 - May 5, 2000 Ericsson Academy (Malaysia) Sdn Bhd AXE 10 Operation Handling (BYB 501) April 17-21 , 2000 Ericsson Academy (Malaysia) Sdn Bhd Datacoms 2 February 8-11, 2000 Ericsson Training Centre - Philippines. 6th Fl., Octagon Bldg., San Miguel Ave., Ortigas Complex, Pasig City, Philippines. TCP / IP July 1, 1999 Ericsson Training Centre - Philippines. 6th Fl., Octagon Bldg., San Miguel Ave., Ortigas Complex, Pasig City, Philippines. CME 20 MSC Operation and Maintenance (via Distance Learning) May 24 - May 28, 1999 By Ericsson Academy (Malaysia) Sdn Bhd Held in Ericsson Training Centre - Philippines. 6th Fl., Octagon Bldg., San Miguel Ave., Ortigas Complex, Pasig City, Philippines.
  • 7. CME 20 System Survey March 23-25, 1999 Ericsson Training Centre - Philippines. 6th Fl., Octagon Bldg., San Miguel Ave., Ortigas Complex, Pasig City, Philippines. SCHOLASTICS BACKGROUND: College: Bachelor of Science in Electronics and Communications Engineering June 1990 – March 1995 Mapua Institute of Technology Muralla St., Intramuros, Metro Manila, Philippines ECE Board Passer, PRC License Number 0012469 Secondary / Primary: Graduated June 1980 – March 1990 Colegio San Antonio (formerly Saint Anthony School of Binan, Laguna) Binan, Laguna, Philippines PERSONAL INFORMATION: Male, 42 years old, born February 9, 1973 in Mandaluyong City, Metro Manila, Philippines. Married. With one child – a son, Zachary Gabriel. Hard-working, eager, easy to learn, with initiative, and with excellent communication skills. REFERENCES: Abel Cabuso Ericsson Telecommunications Philippines CDRAN Head abel.cabuso.jr@ericsson.com +639985412615 Joel Pena Ericsson Telecommunications Philippines Customer Project Manager - Experienced joel.pena@ericsson.com +639285205850 Frederick Mercado Ericsson Telecommunications Philippines Customer Project Manager frederick.mercado@ericsson.com +639285052290