SlideShare a Scribd company logo
1 of 7
MOHIT S PANWAR
mohit_dehradun_dit@yahoo.co.in
+91-9999579131
PROFILE
Total 9 years of experience in Telecom for support(l2), installation & commissioning ,Planning, Solution,
Operation & Maintenance in packet Core Networks.
OBJECTIVE
To excels in field of telecommunication/networking and to enhance my technical, professional and
leadership skills and to apply same for the organization.
TECHNICAL SKILLS
 Strong working knowledge on (LTE) EPC nodes e.g. MME, SGW, PGW, HSS.
 Strong Working Knowledge on SGSN, GGSN,PCRF,DNS.
 Experience in testing of Gn, Gi, Gx/Gy, Sp, S11, S5/S8, S1 interfaces
 Experience in testing of Diameter protocol ,radius , GTP.
 Integration & Troubleshooting of Packet Core Nodes SGSN, GGSN , PCRF,MME, SG-W, P-GW,
HSS.
 Experience and knowledge of 2G/3G/EPC network setup, routing and all type of signaling and
call flow concept with all PS core nodes like Gb, Gr, Gn, Gi, Gx, Gy, S5, S8, S11,S6a, S10, S9.
 Providing technical support for PCRF and PCEF solutions.
 Rich practical exp on DPI (Deep Packet Inspection) implementation and testing.
 Analyze diameter traces over Gx ,S6a and Gy interface.
 Designing of PCRF solutions e.g. policy writing, Network architecture.
WORK EXPERIENCE
Ericsson Global India Ltd (Jan’13 to till date)
Ericsson – Customer Support: Working as an Senior Engineer – Customer Support in Gurgaon,
providing 2nd
level support on Ericsson Packet core solution (2G,3G & 4G) to various operators in
India,Bhutan,Africa,Europe since Jan 2013 and is responsible for:
• CSR handling for RINA T1C
• Perform software upgrades and updates of SGSN, GGSN, SASN and SAPC (PCRF) of Ericsson
and keeping the packet core nodes at the latest level of software
• Successfully performed SWDP for SGSN and GGSN .
• Providing resolution for various customer problems by referring 3GPP spec in case required.
• Perform GPRS troubleshooting, configuration related to packet Core network nodes: SGSN,
GGSN, SASN, SAPC (PCRF), MPG and SSR.
• Taking and analyzing traces for GPRS interfaces (like Gb, Gr, Gn, Gi, Gx, Gy,S1, S5, S8, S11,S6a,
S10)
• Actively handling cases & emergency for problem resolution & reducing service and revenue
outage.
• Remote support for the planned activities across packet core network
• Generate RCA report for customer after the problem identification and resolution.
• Onsite/remote execution & support for planned activities for SGSN, GGSN, SASN, SAPC
(PCRF) upgrades, hardware replacement and configuration
• RINA(India) CSR and Emergency Support: Jan 2013 till July 2014
Page 1 of 6
 Working on region India (RINA) T1C CSR support and emergency handling on/when
required for packet core nodes.
 CSR handling on SMS tool as per CSR guidelines.
 Maintaing CSR Turn around Time as per service level agreements with the operators.
 Working as ROTA expert for RINA T1C emergency handling(ERT)
 CSR handling with use of Metis , MHWEB, ClearQuest
 Knowledge sharing on Ericol and team.
 Providing RCA for Emergencies & Hot issues.
 Supporting Tier2 on HOT FTS
 Supporting CNS on critical issues and configurations
 Performing software installation, updates and upgrades network and service
configuration, WPP-SGSN 2010A/2011A/2011B, on Mkvi, Mkvi+ and Mkviii hardware.
• RSSA(Africa) T1C CSR Support: August 2014 – September 2014
 Supporting RSSA CSR for SGSN/GGSN/SASN/SAPC
• RWCE(Europe) T1C Support (October 2015 till date)
 Supporting RSSA CSR for SGSN/GGSN/SASN/SAPC
• LTE Support for Bharti India
 Provided second line support for LTE implementation and launch.
• LTE support for Bharti Africa
 Provided second line support for LTE implementation and launch.
Activities and Project undertaken:
• CNS LTE support for Wataniya Kuwait: 25th
Augs -26th
sept 2013/9th
Feb14-10th
April
2014
 SGSN/MME, GGSN/PGW/SGW, Radius , DNS support were provided to Wataniya for
day to day requirements.
 Emergency and CSR support for SGSN/MME and PGW/GGSN
 SACC/APN configuration for DPI and traffic classification in GGSN
 SGSN/MME configuration support for new requirements and issues.
 Remote on-call support to ensure smooth execution of activity.
 Supporting Tier2 on HOT FTS
 Customer discussion for long pending issues and providing closure.
 Resolving CSR escalated within SLA ,maintaining Zero escalation to tier2
 Meeting with other vendors(Huawei etc) and discuss inter vendor compatibility work
around within 3gpp scope
 Supported MME Integration project
 UAT support for MME
• SACC(DPI) Project support for Airtel RSSA(Africa): June 2014 – Augst 2014
 Working as Solution Architect, designing and implementing SACC(DPI) solution.
 DLD preparation for Burkina Fasso Gi firewall migration for APNs.
 CDR Format change to 7 from 6
 Done Successful SACC cutover for Airtel CHAD
Page 2 of 6
 Gx & Esy implementation for Malawi
 Troubleshooted Free browsing during UAT test
 Troubleshooted Esy for Gabon on SAPC & GGSN
 Implemented SACC(SPI/DPI)
 Troubleshooting sacc issues
• Argentina HSS-MME integration and support
 Remote support for platform and application installation
 Acceptance test procedure and validation for HSS
• T-mobile Poland HSS integration and Designing.
 Initial HSS geo-redundancy integration along with MME configuration, ATP conducted.
 Low level IP Planning & Design
• Vodafone India SGSN Upgrades/Updates:
 Performing software installation, updates and upgrades network and service
configuration, WPP-SGSN 2010A/2011A/2011B, on Mkvi, Mkvi+ and Mkviii hardware.
 Supporting for software updates/upgrades activities and smooth execution of planned
activities and provide emergency support during the same for SGSN-MME 2011A,
2012A WPP-MKVI+.
• BSNL India SGSN/GGSN Upgrades/Updates:
Performed the packet core nodes activities including the following:
 Performed Software installation, updates/upgrades, EP installation in BSNL packet
core networks.
 Supported installation, commissioning for Ericsson WPP-MKVI+ MME, Juniper M120.
 Remote support for the planned activities across packet core network.
• T1C handover from Hungary for RWCE
 Went to Hungary to get T1C handover for Paco nodes
Huawei India Telecommunication Pvt. Ltd.( July, 2008 to till 27 dec 2012)
Worked as Technical Assistant Centre Lead & SME in Gurgaon, providing support on Huawei
Packet core solution (2G, 3G & 4G) to various operators Bharti, BSNL, Loop, Uninor, Aircel.
• Providing Analysis & solution for L2 escalation.
• On site project support for installation & commissioning.
• Critical incident handling within SLA period.
• Solution review for Pan india PACO issues.
• Maintenance & solution implementation of Huawei GGSN(9811), SGSN(9810),
MME(USN9810), PCRF(UPCC) SGW/ PGW, DNS, CG, MSS(MSOFT3000), MGW
• Health checkup for all Nodes
• Maintenance and optimization of PACO KPIs.
• Network optimization
• Maintaining team SLA for tickets assigned.
Page 3 of 6
• Optimization of PCRF Plans, policy, conditions.
• Migration and expansion planning for GB/IU/GN.
• MOP validation PACO nodes.
• L3/L2 LAN switches, firewall support & policy implementing for BSNL and Reliance.
Activities and Project undertaken:
• AIRTEL LTE
 Integration commissioning of MME USN/SGW/PGW
 Test case preparation and Validation.
 Configuration and verification of business Plans in PCRF.
 Tested the EPC node GR for MME, SGW, PGW and PCRF.
 O&M /TAC support for one year
• UNINOR
 Integration commissioning of SGSN R9
 Integration of GGSN R9 & its Troubleshooting
 Integration of RNC with SGSN thus enabling the Launch of 3G with HSDPA-2
 Enabled online charging ( Gy ) in prepaid roaming ( non cap3 enabled region).
 Implementation of Gb-IP Solution for the Customer
 Successfully tested all the DPI and non DPI test cases provided by Uninor
 Integration and testing done for GX interface.
• Projects undertaken for Huawei Circuit Core:-
 Installation & Commissioning of Huawei MSoft3000 UMTS compatible Soft Switch,
MGW & Soft HLR.
 Worked on Installation of Huawei MSoft3000 Soft switch, HLR, MGW, and interfacing
the same with other GSM network entities such as BSC, IN, SMSC & CRBT systems.
 Installation Commissioning &Testing of Huawei MSoft3000 in BOMBAY MTNL
 Installation Commissioning &Testing of Huawei MSoft3000 in SPICE TELECOM
 Installation Commissioning &Testing of Huawei MSoft3000 & MGW in RELIANCE
 Installation Commissioning &Testing of Huawei MSoft3000 & MGW in BSNL 3G
 MGW Installation Commissioning of Huawei MGW in Vodafone
 MGW Installation Commissioning of Huawei MGW in Idea
ERICSSON INDIA PVT LTD ( September, 2007 to June, 2008)
Circuit Core Engineer – TAC: Working as an Engineer –Back Office in Gurgaon, providing
support for Ericsson circuit core nodes MSC, MGW and HLR to Bharti.
SPICE COMMUNICATIONS PVT LTD(August, 2006 to August, 2007)
Page 4 of 6
Engineer- Circuit Core: Worked as NSS (Switch) Engineer support activities and configuration
changes for different circuit core nodes as and when required in Bangalore.
• Operation & Maintenance of Mobile Switching Center, HLR & CRBT.
• Database creation for new Offices (i.e. MSC’s, BSC’s, POI )
• Database Creation & IR testing for Prepaid & Postpaid roaming Tie-ups
• Creation of routes & destination to other exchanges to ensure proper routing of calls.
• Traffic report management, analysis & load optimization.
• Providing technical help for other departments.
• Giving technical support to customer care & solving escalations
PS Erector May 2006 - August 2006
Worked as Installation Engineer for MSS /MGW.
Achievements:-
Appreciated by customer for work delivered along with recommendation & appreciation
token(gift).
Award for resolving highly escalated 15 days old LTE issue within 1 half an hour.
Awarded for resolving Bhutan Telecommunication SS7 /Camel issue.
Awarded for Technical competence for delivering BNSL 3G project.
PROFESSIONAL TRAINING and CERTIFICATIONS
Ericsson Global India Ltd
• 4 days training on GGSN 2010 Network Engineer
• 3 days training on GPRS Overview
• 3 days training on SGSN Overview
• 3 days training on SGSN Configuration
• 2 days training on SGSN Troubleshooting
• 4 days training on IP and networking
• 5 day SGSN-MME ILT training.
• 3 days IP networking ILT training.
• 5 days SSR Advanced troubleshooting ILT training.
• Hungary OJT for Packet Core
Huawei India Pvt Ltd
• In Shenzhen, China for 2G, 3G and 4G Packet core nodes (SGSN/GGSN).
• In Xian, China for Policy Control Resource Function (PCRF).
• In Shenzhen, China for ATCA based MSC, MGW & HLR.
Page 5 of 6
ACADEMIC QUALIFICATION
• Pursued Bachelor of Engineering (Electronics & Communication) from Dehradun Institute of
Technology, Uttaranchal.
• Passed Diploma from Govt. Polytechnic Dehradun under UPTEC.
• Passed 10th
standard from Brightlands School, Dehradun under ICSC Board.
PERSONAL DETAILS
Name : Mohit Singh Panwar
Date of Birth : 23th
March 1983
Contact Number : +91-9999579131
E-mail ID : mohit_dehradun_dit@yahoo.co.in
Sex : Male
Marital Status : Single
Languages Known : English & Hindi
Page 6 of 6
ACADEMIC QUALIFICATION
• Pursued Bachelor of Engineering (Electronics & Communication) from Dehradun Institute of
Technology, Uttaranchal.
• Passed Diploma from Govt. Polytechnic Dehradun under UPTEC.
• Passed 10th
standard from Brightlands School, Dehradun under ICSC Board.
PERSONAL DETAILS
Name : Mohit Singh Panwar
Date of Birth : 23th
March 1983
Contact Number : +91-9999579131
E-mail ID : mohit_dehradun_dit@yahoo.co.in
Sex : Male
Marital Status : Single
Languages Known : English & Hindi
Page 6 of 6

More Related Content

What's hot (19)

AlaaEldin-Ahmed CV
AlaaEldin-Ahmed CVAlaaEldin-Ahmed CV
AlaaEldin-Ahmed CV
 
Vivek Rai
Vivek RaiVivek Rai
Vivek Rai
 
Resume of Saddam Hossain Robin
Resume of Saddam Hossain RobinResume of Saddam Hossain Robin
Resume of Saddam Hossain Robin
 
Resume
ResumeResume
Resume
 
Resume_Dayasant (1)
Resume_Dayasant (1)Resume_Dayasant (1)
Resume_Dayasant (1)
 
CV-Trivinder
CV-TrivinderCV-Trivinder
CV-Trivinder
 
CV of Saad
CV of SaadCV of Saad
CV of Saad
 
AMIT MODI
AMIT MODIAMIT MODI
AMIT MODI
 
Telecom Engineer
Telecom EngineerTelecom Engineer
Telecom Engineer
 
Alpesh Joshi Optical Expert
Alpesh Joshi Optical ExpertAlpesh Joshi Optical Expert
Alpesh Joshi Optical Expert
 
CV AMIT KUMAR FOR ERICSSON COMPANY
CV AMIT KUMAR FOR ERICSSON COMPANYCV AMIT KUMAR FOR ERICSSON COMPANY
CV AMIT KUMAR FOR ERICSSON COMPANY
 
Resume Deepak Pandey Ericsson
Resume  Deepak Pandey EricssonResume  Deepak Pandey Ericsson
Resume Deepak Pandey Ericsson
 
Sukanta_CV
Sukanta_CVSukanta_CV
Sukanta_CV
 
CV-Chirag Dani-12-12-14
CV-Chirag Dani-12-12-14CV-Chirag Dani-12-12-14
CV-Chirag Dani-12-12-14
 
Sanjay_Sharma _resume_Telecom IMS LTE
Sanjay_Sharma _resume_Telecom IMS LTESanjay_Sharma _resume_Telecom IMS LTE
Sanjay_Sharma _resume_Telecom IMS LTE
 
Divaker resume updated
Divaker resume updatedDivaker resume updated
Divaker resume updated
 
DILLIBABU CV
DILLIBABU CVDILLIBABU CV
DILLIBABU CV
 
Arpit resume new
Arpit resume newArpit resume new
Arpit resume new
 
CV - Saif ul amIn-Mgmt
CV - Saif ul amIn-MgmtCV - Saif ul amIn-Mgmt
CV - Saif ul amIn-Mgmt
 

Similar to Resume_Mohit_Panwar

Similar to Resume_Mohit_Panwar (20)

Shashikant_Sharma
Shashikant_SharmaShashikant_Sharma
Shashikant_Sharma
 
Bhavesh Patel
Bhavesh PatelBhavesh Patel
Bhavesh Patel
 
AMIT MODI
AMIT MODIAMIT MODI
AMIT MODI
 
Sanjay_Sharma _resume_Telecom IMS LTE
Sanjay_Sharma _resume_Telecom IMS LTESanjay_Sharma _resume_Telecom IMS LTE
Sanjay_Sharma _resume_Telecom IMS LTE
 
Arshad Masih -Resume
Arshad Masih -ResumeArshad Masih -Resume
Arshad Masih -Resume
 
Resume_Laxmidhar
Resume_LaxmidharResume_Laxmidhar
Resume_Laxmidhar
 
CV_Anuj Nagar_V4
CV_Anuj Nagar_V4CV_Anuj Nagar_V4
CV_Anuj Nagar_V4
 
Pradeep Jain-Resume-2016
Pradeep Jain-Resume-2016Pradeep Jain-Resume-2016
Pradeep Jain-Resume-2016
 
Fawad Tanveer Butt CV
Fawad Tanveer Butt CVFawad Tanveer Butt CV
Fawad Tanveer Butt CV
 
Resume Ganesh
Resume GaneshResume Ganesh
Resume Ganesh
 
CURRICULUM_VITAE_AATIF
CURRICULUM_VITAE_AATIFCURRICULUM_VITAE_AATIF
CURRICULUM_VITAE_AATIF
 
TUSHAR_SRIVASTAVA_April_2016
TUSHAR_SRIVASTAVA_April_2016TUSHAR_SRIVASTAVA_April_2016
TUSHAR_SRIVASTAVA_April_2016
 
Puneet
PuneetPuneet
Puneet
 
Syed Idris (1)
Syed Idris (1)Syed Idris (1)
Syed Idris (1)
 
Partha cv111 latest
Partha cv111 latestPartha cv111 latest
Partha cv111 latest
 
Resume suvendra mohapatra
Resume   suvendra mohapatraResume   suvendra mohapatra
Resume suvendra mohapatra
 
CV Vishal
CV VishalCV Vishal
CV Vishal
 
Raman-Network Engineer
Raman-Network EngineerRaman-Network Engineer
Raman-Network Engineer
 
Tabish resume
Tabish resumeTabish resume
Tabish resume
 
Yan zhang resume
Yan zhang resumeYan zhang resume
Yan zhang resume
 

Resume_Mohit_Panwar

  • 1. MOHIT S PANWAR mohit_dehradun_dit@yahoo.co.in +91-9999579131 PROFILE Total 9 years of experience in Telecom for support(l2), installation & commissioning ,Planning, Solution, Operation & Maintenance in packet Core Networks. OBJECTIVE To excels in field of telecommunication/networking and to enhance my technical, professional and leadership skills and to apply same for the organization. TECHNICAL SKILLS  Strong working knowledge on (LTE) EPC nodes e.g. MME, SGW, PGW, HSS.  Strong Working Knowledge on SGSN, GGSN,PCRF,DNS.  Experience in testing of Gn, Gi, Gx/Gy, Sp, S11, S5/S8, S1 interfaces  Experience in testing of Diameter protocol ,radius , GTP.  Integration & Troubleshooting of Packet Core Nodes SGSN, GGSN , PCRF,MME, SG-W, P-GW, HSS.  Experience and knowledge of 2G/3G/EPC network setup, routing and all type of signaling and call flow concept with all PS core nodes like Gb, Gr, Gn, Gi, Gx, Gy, S5, S8, S11,S6a, S10, S9.  Providing technical support for PCRF and PCEF solutions.  Rich practical exp on DPI (Deep Packet Inspection) implementation and testing.  Analyze diameter traces over Gx ,S6a and Gy interface.  Designing of PCRF solutions e.g. policy writing, Network architecture. WORK EXPERIENCE Ericsson Global India Ltd (Jan’13 to till date) Ericsson – Customer Support: Working as an Senior Engineer – Customer Support in Gurgaon, providing 2nd level support on Ericsson Packet core solution (2G,3G & 4G) to various operators in India,Bhutan,Africa,Europe since Jan 2013 and is responsible for: • CSR handling for RINA T1C • Perform software upgrades and updates of SGSN, GGSN, SASN and SAPC (PCRF) of Ericsson and keeping the packet core nodes at the latest level of software • Successfully performed SWDP for SGSN and GGSN . • Providing resolution for various customer problems by referring 3GPP spec in case required. • Perform GPRS troubleshooting, configuration related to packet Core network nodes: SGSN, GGSN, SASN, SAPC (PCRF), MPG and SSR. • Taking and analyzing traces for GPRS interfaces (like Gb, Gr, Gn, Gi, Gx, Gy,S1, S5, S8, S11,S6a, S10) • Actively handling cases & emergency for problem resolution & reducing service and revenue outage. • Remote support for the planned activities across packet core network • Generate RCA report for customer after the problem identification and resolution. • Onsite/remote execution & support for planned activities for SGSN, GGSN, SASN, SAPC (PCRF) upgrades, hardware replacement and configuration • RINA(India) CSR and Emergency Support: Jan 2013 till July 2014 Page 1 of 6
  • 2.  Working on region India (RINA) T1C CSR support and emergency handling on/when required for packet core nodes.  CSR handling on SMS tool as per CSR guidelines.  Maintaing CSR Turn around Time as per service level agreements with the operators.  Working as ROTA expert for RINA T1C emergency handling(ERT)  CSR handling with use of Metis , MHWEB, ClearQuest  Knowledge sharing on Ericol and team.  Providing RCA for Emergencies & Hot issues.  Supporting Tier2 on HOT FTS  Supporting CNS on critical issues and configurations  Performing software installation, updates and upgrades network and service configuration, WPP-SGSN 2010A/2011A/2011B, on Mkvi, Mkvi+ and Mkviii hardware. • RSSA(Africa) T1C CSR Support: August 2014 – September 2014  Supporting RSSA CSR for SGSN/GGSN/SASN/SAPC • RWCE(Europe) T1C Support (October 2015 till date)  Supporting RSSA CSR for SGSN/GGSN/SASN/SAPC • LTE Support for Bharti India  Provided second line support for LTE implementation and launch. • LTE support for Bharti Africa  Provided second line support for LTE implementation and launch. Activities and Project undertaken: • CNS LTE support for Wataniya Kuwait: 25th Augs -26th sept 2013/9th Feb14-10th April 2014  SGSN/MME, GGSN/PGW/SGW, Radius , DNS support were provided to Wataniya for day to day requirements.  Emergency and CSR support for SGSN/MME and PGW/GGSN  SACC/APN configuration for DPI and traffic classification in GGSN  SGSN/MME configuration support for new requirements and issues.  Remote on-call support to ensure smooth execution of activity.  Supporting Tier2 on HOT FTS  Customer discussion for long pending issues and providing closure.  Resolving CSR escalated within SLA ,maintaining Zero escalation to tier2  Meeting with other vendors(Huawei etc) and discuss inter vendor compatibility work around within 3gpp scope  Supported MME Integration project  UAT support for MME • SACC(DPI) Project support for Airtel RSSA(Africa): June 2014 – Augst 2014  Working as Solution Architect, designing and implementing SACC(DPI) solution.  DLD preparation for Burkina Fasso Gi firewall migration for APNs.  CDR Format change to 7 from 6  Done Successful SACC cutover for Airtel CHAD Page 2 of 6
  • 3.  Gx & Esy implementation for Malawi  Troubleshooted Free browsing during UAT test  Troubleshooted Esy for Gabon on SAPC & GGSN  Implemented SACC(SPI/DPI)  Troubleshooting sacc issues • Argentina HSS-MME integration and support  Remote support for platform and application installation  Acceptance test procedure and validation for HSS • T-mobile Poland HSS integration and Designing.  Initial HSS geo-redundancy integration along with MME configuration, ATP conducted.  Low level IP Planning & Design • Vodafone India SGSN Upgrades/Updates:  Performing software installation, updates and upgrades network and service configuration, WPP-SGSN 2010A/2011A/2011B, on Mkvi, Mkvi+ and Mkviii hardware.  Supporting for software updates/upgrades activities and smooth execution of planned activities and provide emergency support during the same for SGSN-MME 2011A, 2012A WPP-MKVI+. • BSNL India SGSN/GGSN Upgrades/Updates: Performed the packet core nodes activities including the following:  Performed Software installation, updates/upgrades, EP installation in BSNL packet core networks.  Supported installation, commissioning for Ericsson WPP-MKVI+ MME, Juniper M120.  Remote support for the planned activities across packet core network. • T1C handover from Hungary for RWCE  Went to Hungary to get T1C handover for Paco nodes Huawei India Telecommunication Pvt. Ltd.( July, 2008 to till 27 dec 2012) Worked as Technical Assistant Centre Lead & SME in Gurgaon, providing support on Huawei Packet core solution (2G, 3G & 4G) to various operators Bharti, BSNL, Loop, Uninor, Aircel. • Providing Analysis & solution for L2 escalation. • On site project support for installation & commissioning. • Critical incident handling within SLA period. • Solution review for Pan india PACO issues. • Maintenance & solution implementation of Huawei GGSN(9811), SGSN(9810), MME(USN9810), PCRF(UPCC) SGW/ PGW, DNS, CG, MSS(MSOFT3000), MGW • Health checkup for all Nodes • Maintenance and optimization of PACO KPIs. • Network optimization • Maintaining team SLA for tickets assigned. Page 3 of 6
  • 4. • Optimization of PCRF Plans, policy, conditions. • Migration and expansion planning for GB/IU/GN. • MOP validation PACO nodes. • L3/L2 LAN switches, firewall support & policy implementing for BSNL and Reliance. Activities and Project undertaken: • AIRTEL LTE  Integration commissioning of MME USN/SGW/PGW  Test case preparation and Validation.  Configuration and verification of business Plans in PCRF.  Tested the EPC node GR for MME, SGW, PGW and PCRF.  O&M /TAC support for one year • UNINOR  Integration commissioning of SGSN R9  Integration of GGSN R9 & its Troubleshooting  Integration of RNC with SGSN thus enabling the Launch of 3G with HSDPA-2  Enabled online charging ( Gy ) in prepaid roaming ( non cap3 enabled region).  Implementation of Gb-IP Solution for the Customer  Successfully tested all the DPI and non DPI test cases provided by Uninor  Integration and testing done for GX interface. • Projects undertaken for Huawei Circuit Core:-  Installation & Commissioning of Huawei MSoft3000 UMTS compatible Soft Switch, MGW & Soft HLR.  Worked on Installation of Huawei MSoft3000 Soft switch, HLR, MGW, and interfacing the same with other GSM network entities such as BSC, IN, SMSC & CRBT systems.  Installation Commissioning &Testing of Huawei MSoft3000 in BOMBAY MTNL  Installation Commissioning &Testing of Huawei MSoft3000 in SPICE TELECOM  Installation Commissioning &Testing of Huawei MSoft3000 & MGW in RELIANCE  Installation Commissioning &Testing of Huawei MSoft3000 & MGW in BSNL 3G  MGW Installation Commissioning of Huawei MGW in Vodafone  MGW Installation Commissioning of Huawei MGW in Idea ERICSSON INDIA PVT LTD ( September, 2007 to June, 2008) Circuit Core Engineer – TAC: Working as an Engineer –Back Office in Gurgaon, providing support for Ericsson circuit core nodes MSC, MGW and HLR to Bharti. SPICE COMMUNICATIONS PVT LTD(August, 2006 to August, 2007) Page 4 of 6
  • 5. Engineer- Circuit Core: Worked as NSS (Switch) Engineer support activities and configuration changes for different circuit core nodes as and when required in Bangalore. • Operation & Maintenance of Mobile Switching Center, HLR & CRBT. • Database creation for new Offices (i.e. MSC’s, BSC’s, POI ) • Database Creation & IR testing for Prepaid & Postpaid roaming Tie-ups • Creation of routes & destination to other exchanges to ensure proper routing of calls. • Traffic report management, analysis & load optimization. • Providing technical help for other departments. • Giving technical support to customer care & solving escalations PS Erector May 2006 - August 2006 Worked as Installation Engineer for MSS /MGW. Achievements:- Appreciated by customer for work delivered along with recommendation & appreciation token(gift). Award for resolving highly escalated 15 days old LTE issue within 1 half an hour. Awarded for resolving Bhutan Telecommunication SS7 /Camel issue. Awarded for Technical competence for delivering BNSL 3G project. PROFESSIONAL TRAINING and CERTIFICATIONS Ericsson Global India Ltd • 4 days training on GGSN 2010 Network Engineer • 3 days training on GPRS Overview • 3 days training on SGSN Overview • 3 days training on SGSN Configuration • 2 days training on SGSN Troubleshooting • 4 days training on IP and networking • 5 day SGSN-MME ILT training. • 3 days IP networking ILT training. • 5 days SSR Advanced troubleshooting ILT training. • Hungary OJT for Packet Core Huawei India Pvt Ltd • In Shenzhen, China for 2G, 3G and 4G Packet core nodes (SGSN/GGSN). • In Xian, China for Policy Control Resource Function (PCRF). • In Shenzhen, China for ATCA based MSC, MGW & HLR. Page 5 of 6
  • 6. ACADEMIC QUALIFICATION • Pursued Bachelor of Engineering (Electronics & Communication) from Dehradun Institute of Technology, Uttaranchal. • Passed Diploma from Govt. Polytechnic Dehradun under UPTEC. • Passed 10th standard from Brightlands School, Dehradun under ICSC Board. PERSONAL DETAILS Name : Mohit Singh Panwar Date of Birth : 23th March 1983 Contact Number : +91-9999579131 E-mail ID : mohit_dehradun_dit@yahoo.co.in Sex : Male Marital Status : Single Languages Known : English & Hindi Page 6 of 6
  • 7. ACADEMIC QUALIFICATION • Pursued Bachelor of Engineering (Electronics & Communication) from Dehradun Institute of Technology, Uttaranchal. • Passed Diploma from Govt. Polytechnic Dehradun under UPTEC. • Passed 10th standard from Brightlands School, Dehradun under ICSC Board. PERSONAL DETAILS Name : Mohit Singh Panwar Date of Birth : 23th March 1983 Contact Number : +91-9999579131 E-mail ID : mohit_dehradun_dit@yahoo.co.in Sex : Male Marital Status : Single Languages Known : English & Hindi Page 6 of 6