RACHMAD ARIF
ELECTRICAL ENGINEER
Date of Birth : June 11th
, 1981
Nationality : Indonesian
Education : Electrical
Engineering
Bandung Institute of Technology
Mobile no. : +62 811-929554
Email : rachmad.arif@gmail.com
Summary of Experience:
Eleven (11) years’ experience as Electrical Engineer in Engineering, Procurement and
Construction Project at Oil and Gas also Power Utility.
Responsibility including prepares & supervises of engineering data for Electrical basic and
detail engineering also support Construction at site for Engineering such as:
 Electrical Specification, Data Sheets, Vendor Drawing Review, Material Take Off
(MTO), Requisition for Quotation (RFQ), and Technical Bid Evaluation (TBE) for
Electrical Equipment (HV and LV Switchgear/MCC, Power Transformer, ECMS,
Electrical Cables, UPS, Motor, Generator)
 Electrical Load List and Load Summary Balance, Electrical Equipment sizing, Electrical
Cable Sizing Calculation and Electrical Cable Schedule
 Power System Study Short Circuit, Load Flow, Motor Starting by using ETAP,
 Electrical Drawing, Single Line Diagram, Protection and Metering Diagram, Schematic
Diagram, Electrical Equipment Substation Layouts, and Typical Detail Installation
 Interfacing with other contractor, other Discipline, and other department,
Correspondence with Client & Vendor,
 Do some inspection for Electrical Equipment (HV and LV Switchgear/MCC, Power
Transformer, ECMS, Electrical Cables, UPS, Motor, Generator)
 Site visit to support construction for various projects such as Oil and Gas projects,
Mining, and Transmission Project
 Support Construction at Site for Engineering, Site Acceptance Test, Mechanical
Completion, Pre Commissioning, Commissioning and Energize for Electrical Equipment
(HV and LV Switchgear/MCC, Power Transformer, ECMS, Electrical Cables, UPS,
Motor, Generator)
Career Resume
Page 2 of5
Language
Speak Read Write
Indonesia Fluent Fluent Fluent
English Good Good Good
Employment History (Summary) :
PT. TRIPATRA ENGINEERING,Jakarta – Indonesia 2014 - Present
PT. JGC INDONESIA, Jakarta – Indonesia 2010 - 2014
PT. SIEMENS INDONESIA, Jakarta – Indonesia 2007 - 2010
PT. ABB TRANSMISSON & DISTRIBUTION, Jakarta – Indonesia 2006 - 2007
PT. METAEPI, Jakarta – Indonesia 2005 - 2006
Career Highlights:
Employer : PT. Tripatra Engineering
Period : December 2014 - Present
Position held : Senior Electrical Engineer
Project Done at PT. Tripatra
1. Period : December 2015 – Now (1 year)
Project : JANGKRIK COMPLEXPROJECT FLOATINGPRODUCTION UNIT
Location : SULAWESI, INDONESIA
Plant Owner : ENI MUARA BAKAU
Position Held : Field Electrical Engineer
Responsible for :
• Review Vendor Drawing document HV and LV Switchgear/MCC, Power Transformer,
EMS, UPS, Lighting and Small Power Distribution
• Preparing and Review Interconnection Diagram LV Switchgear, HV switchgear, UPS,
EMS, Lighting and Small Power Distribution Board
• Support Construction at Yard/Site for Engineering, Redline Marked Up Drawing,
Closing punch list, Site Acceptance Test, Mechanical Completion, Pre Commissioning,
Commissioning and Energize for Electrical Equipment (HV and LV Switchgear/MCC,
Power Transformer, ECMS, Electrical Cables, UPS, Motor, Generator)
2. Period : January 2015 – December 2015 (1 year)
Project : TANGGUH EXPANSION PROJECT – LNGFEED
Location : PAPUA, INDONESIA
Plant Owner : BP TANGGUH LNG
Position Held : Electrical Engineer
Responsible for :
• Preparing Electrical Single line diagram, Protection and Metering Diagram and
Electrical equipment Substation Layout
• Preparing Power Management System (PMS), Single Line Diagram PMS, Network
System Principle Scheme PMS, PMS Fiber Optic Block Diagram
• Preparing P roject specification and Datasheet for Power Transformer, LV
Switchgear/MCC, HV Switchgear/MCC, DC Battery Charger , AC UPS, Motor,
Distribution Panel
• Preparing Technical Bid Evaluation Vendor Package Electrical Substation Building
complete with PMS, 33kV Switchgear, 6.6kV Switchgear, 380V Switchgear,
Transformer, Battery Charger and Distribution panel
• Preparing Electrical Tie In List and Site Survey at Tangguh LNG Papua, Preparing
Lighting System Typical Drawing, Preparing MTO for Lighting, Checking Cable
Sizing Calculation and Electrical Cable Schedule
Career Resume
Page 3 of5
Previous Company
Period : November 2010 - December 2014 (4 years)
Employer : PT. JGC INDONESIA
Project Done at PT. JGC Indonesia – Jakarta
1. Period : March 2013 - August 2014 (1.5 years)
Project : FLNG FEED – ABADI GAS FIELD DEVELOPMENT
Location : MALUKU SELATAN, INDONESIA
Plant Owner : INPEX MASELA
Position Held : Electrical Engineer Responsible for :
• Prepare ElectricalLoad list Calculation, Electrical Load Summary, Electrical
Equipment Sizing, Electrical Cable sizing and Illumination level calculation for lighting.
• Preparing Electrical Single line diagram, Protection and Metering Diagram and
Electrical equipment layout.
• Preparing P roject specification and Datasheet for Transformer, LV Switchgear/MCC,
HV Switchgear/MCC,DC Battery Charger ,AC UPS,Motor
2. Period : November 2012 - February 2013 (4 months)
Project : ASC PHASE V EXPANSION
Location : CILEGON,INDONESIA
Plant Owner : PT. ASAHIMAS
Position Held : Field Engineer
Responsible for :
• Perform Site Acceptance Test, Pre commissioning, commissioning and energizing
Motor, LV Switchgear,LV MCC, MV Switchgear,MV MCC,Transformer, AC UPS,
DC Battery Charger, Lighting Panel, and Distribution Board.
3. Period : July 2012 - October 2012 (4 months)
Project : DONGGI-SENORO LNG PROJECT
Location : LUWUK SULAWESI, INDONESIA
Plant Owner : PT. Donggi Senoro LNG
Position Held : Electrical Engineer and Electrical Inspector
Responsible for:
• Prepare Connection Diagram
• Inspect fabrication and Factory Acceptance Test for ElectricalEquipment, LV
Switchgear, LV MCC,MV Switchgear, MV MCC, Busduct & Power Cable.
4. Period : March 2012 - May 2012 (3 months)
Project : JGC COAL FUEL PROJECT
Location : KARAWANG, INDONESIA
Plant Owner : JGC Coal Fuel (JCF)
Position Held : Electrical Inspector and Field Engineer
Responsible for :
• Factory Acceptance Test for 20kV Switchgear
• Site Acceptance Test at Site,including supervision electrical installation, supervision
electrical commissioning Transformer and 20kV Switchgear
Career Resume
Page 4 of5
5. Period : October 2011 - March 2012 (6 months)
Project : LNG PNG PROJECT
Location : PAPUA NEW GUINEA, AUSTRALIA
Plant Owner : EXXON MOBIL
Position Held : Electrical Inspector
Responsible for :
• FAT at Siemens Factory, Jakarta for LV and MV Switchgear
• Factory Acceptance Test at Siemens Singapore, Factory Batam,Indonesia for Electrical
Packaged Substation Room Module, consist of LV MCC/Swithcgear,MV
MCC/Switchgear,Electrical Control and Monitoring System (ECMS), Instrument
IRP Instrument Panel,PCS Instrument Panel, HVAC Panel, Battery Charger, AC
UPS,Lighting Panel,LV Distribution Board.
6. Period : August 2011 - November 2011 (4 months)
Project : NIPPON OIL LUBRICANTS INDONESIA
Location : CIBITUNG, WEST JAVA, INDONESIA
Plant Owner : PT. JX NIPPON OIL & ENERGY LUBRICANT INDONESIA
Position Held : Electrical Inspector
Responsible for :
• Inspect fabrication for LV and MV Switchgear at PT. Bina Control Power (Eaton)
• Factory Acceptance Test at Bina Control Power (Eaton) for LV and MV Switchgear
7. Period : January 2011 - November 2011 (1.5 years)
Project : FEED AND CONSTRUCTABILITY REVAMPING RU-III FCCU
Location : PLAJU, SOUTH SUMATERA, INDONESIA
Plant Owner : PT.PERTAMINA RU-III
Position Held : Electrical Engineer
Responsible for :
• Electrical Load list Calculation, Short circuit calculation, Load flow calculation,
Load shedding, Cable sizing and Illumination level calculation for lighting.
• Preparing single line diagram, schematic, power layout, grounding layout, cable
route, lighting layout.
• Preparing project specification general, package, electrical building, motor,
switchgear, MCC, transformer and cable.
• Preparing Bill Material and Bill Quantity.
Career Resume
Page 5 of5
Period : February 2007 - November 2010 (4 years)
Employer : PT. SIEMENS INDONESIA
Position : Electrical Design Engineer
Responsible :
• Performing ratification engineering between Scope of Supply with Detail Technical
Specification Customer
• Prepare Primary Drawing, Single Line Diagram, General Arrangement, Floor Cutout,
Section Drawing, Secondary Drawing, Schematic, Terminal List Diagram and
Component List for Medium Voltage Switchgear
• Performing Electrical System analysis such as CT Calculation, Heat Dissipation, and
Power Consumption for Medium Voltage Switchgear
• Support and Assist Quality Control for witness Factory Acceptance MV Switchgear
with client
Period : February 2006 - February 2007 (1 year)
Employer : PT. ABB Transmission and Distribution
Position : Project Engineer
Responsible :
• Execute project for Power Product ABB (i.e. Transformer,Switchgear,Motor)
• Conduct witness for Factory Acceptance Test (FAT) with client at ABB Factory
Period : November 2005 - February 2006 (1 year)
Employer : PT. METAEPSI
Position : Electrical Engineer
Responsible :
• Preparing Single Line Diagram 150kV Substation and 20kV Substation
• Working with designers in preparing Electrical Power Layout, Substation Equipment
Layout, Lighting Layout, Lighting PanelSchedule, Connection Diagram, transformer
control schematic diagram, Cable Schedule.

More Related Content

What's hot

Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of exp
Subhash +966535838322
 
Rita Thakur Resume
Rita Thakur ResumeRita Thakur Resume
Rita Thakur ResumeRita Thakur
 
Sanjeev Randev Resume Electrical Engineer MBA-2014
Sanjeev Randev Resume Electrical Engineer MBA-2014Sanjeev Randev Resume Electrical Engineer MBA-2014
Sanjeev Randev Resume Electrical Engineer MBA-2014Srandev2014
 
RAHUL_CV-2015
RAHUL_CV-2015RAHUL_CV-2015
RAHUL_CV-2015RAHUL P
 
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERINGRESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERINGpappu kumar
 
d premanatha reddy_original (2)
d premanatha reddy_original (2)d premanatha reddy_original (2)
d premanatha reddy_original (2)Reddy Premnath
 
CV Raza_Ali_Saleem
CV Raza_Ali_SaleemCV Raza_Ali_Saleem
CV Raza_Ali_SaleemRaza Khan
 
Sam res (houston) oil and gas
Sam res (houston) oil and gasSam res (houston) oil and gas
Sam res (houston) oil and gas
Sam Mehta
 
Sam res (houston) O &G
Sam res (houston) O &GSam res (houston) O &G
Sam res (houston) O &G
Sam Mehta
 
HARTEK POWER - POWER SYSTEM PROFILE
HARTEK POWER - POWER SYSTEM PROFILEHARTEK POWER - POWER SYSTEM PROFILE
HARTEK POWER - POWER SYSTEM PROFILE
HARTEK POWER
 
cv_amitava_updated
cv_amitava_updatedcv_amitava_updated
cv_amitava_updatedAMITAVA DAS
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
Abdul Rahiman
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
Subhash +966535838322
 

What's hot (20)

G K M Jafar_UAE
G K M Jafar_UAEG K M Jafar_UAE
G K M Jafar_UAE
 
Jose_Transmission_Engineer
Jose_Transmission_EngineerJose_Transmission_Engineer
Jose_Transmission_Engineer
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of exp
 
khalid obaidullah resume
khalid obaidullah resumekhalid obaidullah resume
khalid obaidullah resume
 
Rita Thakur Resume
Rita Thakur ResumeRita Thakur Resume
Rita Thakur Resume
 
cv umar
cv umarcv umar
cv umar
 
Sanjeev Randev Resume Electrical Engineer MBA-2014
Sanjeev Randev Resume Electrical Engineer MBA-2014Sanjeev Randev Resume Electrical Engineer MBA-2014
Sanjeev Randev Resume Electrical Engineer MBA-2014
 
RAHUL_CV-2015
RAHUL_CV-2015RAHUL_CV-2015
RAHUL_CV-2015
 
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERINGRESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
 
d premanatha reddy_original (2)
d premanatha reddy_original (2)d premanatha reddy_original (2)
d premanatha reddy_original (2)
 
CV Raza_Ali_Saleem
CV Raza_Ali_SaleemCV Raza_Ali_Saleem
CV Raza_Ali_Saleem
 
Jeya CV - updated
Jeya CV - updatedJeya CV - updated
Jeya CV - updated
 
Sam res (houston) oil and gas
Sam res (houston) oil and gasSam res (houston) oil and gas
Sam res (houston) oil and gas
 
Sam res (houston) O &G
Sam res (houston) O &GSam res (houston) O &G
Sam res (houston) O &G
 
HARTEK POWER - POWER SYSTEM PROFILE
HARTEK POWER - POWER SYSTEM PROFILEHARTEK POWER - POWER SYSTEM PROFILE
HARTEK POWER - POWER SYSTEM PROFILE
 
tufail CV dxb
tufail CV dxbtufail CV dxb
tufail CV dxb
 
cv_amitava_updated
cv_amitava_updatedcv_amitava_updated
cv_amitava_updated
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
 
CV_Ashok Jain
CV_Ashok JainCV_Ashok Jain
CV_Ashok Jain
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
 

Viewers also liked

Hawke Universal Cable Glands - Installation Instruction
Hawke Universal Cable Glands - Installation InstructionHawke Universal Cable Glands - Installation Instruction
Hawke Universal Cable Glands - Installation Instruction
Thorne & Derrick International
 
JohnHigginsResume-11-2016
JohnHigginsResume-11-2016JohnHigginsResume-11-2016
JohnHigginsResume-11-2016John Higgins
 
VINOTH RESUME UPDATED
VINOTH RESUME UPDATEDVINOTH RESUME UPDATED
VINOTH RESUME UPDATEDVinod Ravi
 
Nagaganesh M_original
Nagaganesh M_originalNagaganesh M_original
Nagaganesh M_originalNagaganesh M
 
Microcontroller based mho relay for distance protection (1)
Microcontroller based mho relay for distance protection (1)Microcontroller based mho relay for distance protection (1)
Microcontroller based mho relay for distance protection (1)
mohan_K_M
 
Badar Abdullah Al Abri - CV
Badar Abdullah Al Abri - CVBadar Abdullah Al Abri - CV
Badar Abdullah Al Abri - CVBadar Al Abri
 
RAMEEZ AJAZ resume k
RAMEEZ AJAZ resume kRAMEEZ AJAZ resume k
RAMEEZ AJAZ resume kRameez Ajaz
 
Resume:Sarah Lombard
Resume:Sarah LombardResume:Sarah Lombard
Resume:Sarah LombardSarah Lombard
 

Viewers also liked (10)

Hawke Universal Cable Glands - Installation Instruction
Hawke Universal Cable Glands - Installation InstructionHawke Universal Cable Glands - Installation Instruction
Hawke Universal Cable Glands - Installation Instruction
 
JohnHigginsResume-11-2016
JohnHigginsResume-11-2016JohnHigginsResume-11-2016
JohnHigginsResume-11-2016
 
VINOTH RESUME UPDATED
VINOTH RESUME UPDATEDVINOTH RESUME UPDATED
VINOTH RESUME UPDATED
 
my_resume
my_resumemy_resume
my_resume
 
Nagaganesh M_original
Nagaganesh M_originalNagaganesh M_original
Nagaganesh M_original
 
Microcontroller based mho relay for distance protection (1)
Microcontroller based mho relay for distance protection (1)Microcontroller based mho relay for distance protection (1)
Microcontroller based mho relay for distance protection (1)
 
HUSAMELDIN MOHAMED 13-05-2016
HUSAMELDIN MOHAMED 13-05-2016HUSAMELDIN MOHAMED 13-05-2016
HUSAMELDIN MOHAMED 13-05-2016
 
Badar Abdullah Al Abri - CV
Badar Abdullah Al Abri - CVBadar Abdullah Al Abri - CV
Badar Abdullah Al Abri - CV
 
RAMEEZ AJAZ resume k
RAMEEZ AJAZ resume kRAMEEZ AJAZ resume k
RAMEEZ AJAZ resume k
 
Resume:Sarah Lombard
Resume:Sarah LombardResume:Sarah Lombard
Resume:Sarah Lombard
 

Similar to CV_Rachmad Arif

CV Haris Hakim - Electrical Engineer-1
CV Haris Hakim - Electrical Engineer-1CV Haris Hakim - Electrical Engineer-1
CV Haris Hakim - Electrical Engineer-1Haris Hakim
 
CV Eko Fuji SM
CV Eko Fuji SMCV Eko Fuji SM
CV Eko Fuji SMechopower
 
Electrical engineer rikshit
Electrical engineer rikshitElectrical engineer rikshit
Electrical engineer rikshit
Rixit Patel
 
Resume
ResumeResume
CV - Karim Kamarudin - Oct 15
CV - Karim Kamarudin - Oct 15CV - Karim Kamarudin - Oct 15
CV - Karim Kamarudin - Oct 15Karim Kamarudin
 
Resume-Venkata Vamsi Krishna Y
Resume-Venkata Vamsi Krishna YResume-Venkata Vamsi Krishna Y
Resume-Venkata Vamsi Krishna YVamsi Krishna
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
shaik karimulla
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
shaik karimulla
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
shaik karimulla
 
Resume of suvendu senapati
Resume of suvendu senapatiResume of suvendu senapati
Resume of suvendu senapati
Suvendu Senapati
 
DIPAS GANGULY -RESUME
DIPAS GANGULY -RESUMEDIPAS GANGULY -RESUME
DIPAS GANGULY -RESUMEDIPAS GANGULY
 

Similar to CV_Rachmad Arif (20)

CV Haris Hakim - Electrical Engineer-1
CV Haris Hakim - Electrical Engineer-1CV Haris Hakim - Electrical Engineer-1
CV Haris Hakim - Electrical Engineer-1
 
CV Eko Fuji SM
CV Eko Fuji SMCV Eko Fuji SM
CV Eko Fuji SM
 
MASP-QA-CV-2016-A
MASP-QA-CV-2016-AMASP-QA-CV-2016-A
MASP-QA-CV-2016-A
 
Sudarsang electrical designer
Sudarsang electrical designerSudarsang electrical designer
Sudarsang electrical designer
 
jragojo CV
jragojo CVjragojo CV
jragojo CV
 
CV Solar
CV SolarCV Solar
CV Solar
 
Electrical engineer rikshit
Electrical engineer rikshitElectrical engineer rikshit
Electrical engineer rikshit
 
Resume
ResumeResume
Resume
 
CV-Gusryan Zari Khamsya
CV-Gusryan Zari KhamsyaCV-Gusryan Zari Khamsya
CV-Gusryan Zari Khamsya
 
Nadeem CV
Nadeem CVNadeem CV
Nadeem CV
 
CV - Karim Kamarudin - Oct 15
CV - Karim Kamarudin - Oct 15CV - Karim Kamarudin - Oct 15
CV - Karim Kamarudin - Oct 15
 
Resume-Venkata Vamsi Krishna Y
Resume-Venkata Vamsi Krishna YResume-Venkata Vamsi Krishna Y
Resume-Venkata Vamsi Krishna Y
 
SANJEEV KUMAR
SANJEEV KUMARSANJEEV KUMAR
SANJEEV KUMAR
 
Ben's CV
Ben's CVBen's CV
Ben's CV
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Resume of suvendu senapati
Resume of suvendu senapatiResume of suvendu senapati
Resume of suvendu senapati
 
Behnam Nikouei resume
Behnam Nikouei resumeBehnam Nikouei resume
Behnam Nikouei resume
 
DIPAS GANGULY -RESUME
DIPAS GANGULY -RESUMEDIPAS GANGULY -RESUME
DIPAS GANGULY -RESUME
 

CV_Rachmad Arif

  • 1. Career Resume Page 1 of5 RACHMAD ARIF ELECTRICAL ENGINEER Date of Birth : June 11th , 1981 Nationality : Indonesian Education : Electrical Engineering Bandung Institute of Technology Mobile no. : +62 811-929554 Email : rachmad.arif@gmail.com Summary of Experience: Eleven (11) years’ experience as Electrical Engineer in Engineering, Procurement and Construction Project at Oil and Gas also Power Utility. Responsibility including prepares & supervises of engineering data for Electrical basic and detail engineering also support Construction at site for Engineering such as:  Electrical Specification, Data Sheets, Vendor Drawing Review, Material Take Off (MTO), Requisition for Quotation (RFQ), and Technical Bid Evaluation (TBE) for Electrical Equipment (HV and LV Switchgear/MCC, Power Transformer, ECMS, Electrical Cables, UPS, Motor, Generator)  Electrical Load List and Load Summary Balance, Electrical Equipment sizing, Electrical Cable Sizing Calculation and Electrical Cable Schedule  Power System Study Short Circuit, Load Flow, Motor Starting by using ETAP,  Electrical Drawing, Single Line Diagram, Protection and Metering Diagram, Schematic Diagram, Electrical Equipment Substation Layouts, and Typical Detail Installation  Interfacing with other contractor, other Discipline, and other department, Correspondence with Client & Vendor,  Do some inspection for Electrical Equipment (HV and LV Switchgear/MCC, Power Transformer, ECMS, Electrical Cables, UPS, Motor, Generator)  Site visit to support construction for various projects such as Oil and Gas projects, Mining, and Transmission Project  Support Construction at Site for Engineering, Site Acceptance Test, Mechanical Completion, Pre Commissioning, Commissioning and Energize for Electrical Equipment (HV and LV Switchgear/MCC, Power Transformer, ECMS, Electrical Cables, UPS, Motor, Generator)
  • 2. Career Resume Page 2 of5 Language Speak Read Write Indonesia Fluent Fluent Fluent English Good Good Good Employment History (Summary) : PT. TRIPATRA ENGINEERING,Jakarta – Indonesia 2014 - Present PT. JGC INDONESIA, Jakarta – Indonesia 2010 - 2014 PT. SIEMENS INDONESIA, Jakarta – Indonesia 2007 - 2010 PT. ABB TRANSMISSON & DISTRIBUTION, Jakarta – Indonesia 2006 - 2007 PT. METAEPI, Jakarta – Indonesia 2005 - 2006 Career Highlights: Employer : PT. Tripatra Engineering Period : December 2014 - Present Position held : Senior Electrical Engineer Project Done at PT. Tripatra 1. Period : December 2015 – Now (1 year) Project : JANGKRIK COMPLEXPROJECT FLOATINGPRODUCTION UNIT Location : SULAWESI, INDONESIA Plant Owner : ENI MUARA BAKAU Position Held : Field Electrical Engineer Responsible for : • Review Vendor Drawing document HV and LV Switchgear/MCC, Power Transformer, EMS, UPS, Lighting and Small Power Distribution • Preparing and Review Interconnection Diagram LV Switchgear, HV switchgear, UPS, EMS, Lighting and Small Power Distribution Board • Support Construction at Yard/Site for Engineering, Redline Marked Up Drawing, Closing punch list, Site Acceptance Test, Mechanical Completion, Pre Commissioning, Commissioning and Energize for Electrical Equipment (HV and LV Switchgear/MCC, Power Transformer, ECMS, Electrical Cables, UPS, Motor, Generator) 2. Period : January 2015 – December 2015 (1 year) Project : TANGGUH EXPANSION PROJECT – LNGFEED Location : PAPUA, INDONESIA Plant Owner : BP TANGGUH LNG Position Held : Electrical Engineer Responsible for : • Preparing Electrical Single line diagram, Protection and Metering Diagram and Electrical equipment Substation Layout • Preparing Power Management System (PMS), Single Line Diagram PMS, Network System Principle Scheme PMS, PMS Fiber Optic Block Diagram • Preparing P roject specification and Datasheet for Power Transformer, LV Switchgear/MCC, HV Switchgear/MCC, DC Battery Charger , AC UPS, Motor, Distribution Panel • Preparing Technical Bid Evaluation Vendor Package Electrical Substation Building complete with PMS, 33kV Switchgear, 6.6kV Switchgear, 380V Switchgear, Transformer, Battery Charger and Distribution panel • Preparing Electrical Tie In List and Site Survey at Tangguh LNG Papua, Preparing Lighting System Typical Drawing, Preparing MTO for Lighting, Checking Cable Sizing Calculation and Electrical Cable Schedule
  • 3. Career Resume Page 3 of5 Previous Company Period : November 2010 - December 2014 (4 years) Employer : PT. JGC INDONESIA Project Done at PT. JGC Indonesia – Jakarta 1. Period : March 2013 - August 2014 (1.5 years) Project : FLNG FEED – ABADI GAS FIELD DEVELOPMENT Location : MALUKU SELATAN, INDONESIA Plant Owner : INPEX MASELA Position Held : Electrical Engineer Responsible for : • Prepare ElectricalLoad list Calculation, Electrical Load Summary, Electrical Equipment Sizing, Electrical Cable sizing and Illumination level calculation for lighting. • Preparing Electrical Single line diagram, Protection and Metering Diagram and Electrical equipment layout. • Preparing P roject specification and Datasheet for Transformer, LV Switchgear/MCC, HV Switchgear/MCC,DC Battery Charger ,AC UPS,Motor 2. Period : November 2012 - February 2013 (4 months) Project : ASC PHASE V EXPANSION Location : CILEGON,INDONESIA Plant Owner : PT. ASAHIMAS Position Held : Field Engineer Responsible for : • Perform Site Acceptance Test, Pre commissioning, commissioning and energizing Motor, LV Switchgear,LV MCC, MV Switchgear,MV MCC,Transformer, AC UPS, DC Battery Charger, Lighting Panel, and Distribution Board. 3. Period : July 2012 - October 2012 (4 months) Project : DONGGI-SENORO LNG PROJECT Location : LUWUK SULAWESI, INDONESIA Plant Owner : PT. Donggi Senoro LNG Position Held : Electrical Engineer and Electrical Inspector Responsible for: • Prepare Connection Diagram • Inspect fabrication and Factory Acceptance Test for ElectricalEquipment, LV Switchgear, LV MCC,MV Switchgear, MV MCC, Busduct & Power Cable. 4. Period : March 2012 - May 2012 (3 months) Project : JGC COAL FUEL PROJECT Location : KARAWANG, INDONESIA Plant Owner : JGC Coal Fuel (JCF) Position Held : Electrical Inspector and Field Engineer Responsible for : • Factory Acceptance Test for 20kV Switchgear • Site Acceptance Test at Site,including supervision electrical installation, supervision electrical commissioning Transformer and 20kV Switchgear
  • 4. Career Resume Page 4 of5 5. Period : October 2011 - March 2012 (6 months) Project : LNG PNG PROJECT Location : PAPUA NEW GUINEA, AUSTRALIA Plant Owner : EXXON MOBIL Position Held : Electrical Inspector Responsible for : • FAT at Siemens Factory, Jakarta for LV and MV Switchgear • Factory Acceptance Test at Siemens Singapore, Factory Batam,Indonesia for Electrical Packaged Substation Room Module, consist of LV MCC/Swithcgear,MV MCC/Switchgear,Electrical Control and Monitoring System (ECMS), Instrument IRP Instrument Panel,PCS Instrument Panel, HVAC Panel, Battery Charger, AC UPS,Lighting Panel,LV Distribution Board. 6. Period : August 2011 - November 2011 (4 months) Project : NIPPON OIL LUBRICANTS INDONESIA Location : CIBITUNG, WEST JAVA, INDONESIA Plant Owner : PT. JX NIPPON OIL & ENERGY LUBRICANT INDONESIA Position Held : Electrical Inspector Responsible for : • Inspect fabrication for LV and MV Switchgear at PT. Bina Control Power (Eaton) • Factory Acceptance Test at Bina Control Power (Eaton) for LV and MV Switchgear 7. Period : January 2011 - November 2011 (1.5 years) Project : FEED AND CONSTRUCTABILITY REVAMPING RU-III FCCU Location : PLAJU, SOUTH SUMATERA, INDONESIA Plant Owner : PT.PERTAMINA RU-III Position Held : Electrical Engineer Responsible for : • Electrical Load list Calculation, Short circuit calculation, Load flow calculation, Load shedding, Cable sizing and Illumination level calculation for lighting. • Preparing single line diagram, schematic, power layout, grounding layout, cable route, lighting layout. • Preparing project specification general, package, electrical building, motor, switchgear, MCC, transformer and cable. • Preparing Bill Material and Bill Quantity.
  • 5. Career Resume Page 5 of5 Period : February 2007 - November 2010 (4 years) Employer : PT. SIEMENS INDONESIA Position : Electrical Design Engineer Responsible : • Performing ratification engineering between Scope of Supply with Detail Technical Specification Customer • Prepare Primary Drawing, Single Line Diagram, General Arrangement, Floor Cutout, Section Drawing, Secondary Drawing, Schematic, Terminal List Diagram and Component List for Medium Voltage Switchgear • Performing Electrical System analysis such as CT Calculation, Heat Dissipation, and Power Consumption for Medium Voltage Switchgear • Support and Assist Quality Control for witness Factory Acceptance MV Switchgear with client Period : February 2006 - February 2007 (1 year) Employer : PT. ABB Transmission and Distribution Position : Project Engineer Responsible : • Execute project for Power Product ABB (i.e. Transformer,Switchgear,Motor) • Conduct witness for Factory Acceptance Test (FAT) with client at ABB Factory Period : November 2005 - February 2006 (1 year) Employer : PT. METAEPSI Position : Electrical Engineer Responsible : • Preparing Single Line Diagram 150kV Substation and 20kV Substation • Working with designers in preparing Electrical Power Layout, Substation Equipment Layout, Lighting Layout, Lighting PanelSchedule, Connection Diagram, transformer control schematic diagram, Cable Schedule.