SlideShare a Scribd company logo
MURUGAN PARAMASIVAM
249, South Street, Velikoonakurichi, Neyveli, Tamilnadu-607802, India.
09865597711, powermurugan@gmail.com
Page 1 of 6
PROFESSIONAL SUMMARY
Extremely creative and resourceful Electrical Engineer with 9Years 4Months
Experience in Thermalpower plant ElectricalProjects (Generation, Transmission & Distribution),
Operations (Normal & Emergency), Maintenance (Preventive & Condition Based), Energy Auditing
(Thermal & Electrical systems). Expert to handle multiple projects simultaneously with high degree of
Professionalism and Accuracy.
EDUCATION
Bachelor of Engineering, Electrical & Electronics, May2007.
“First class withDistinction”, OGPA: 8.54 / 10.0
Annamalai University, Tamilnadu, India.
HSC, State Board, Tamilnadu, Mar 2003.
First Class, Percentage: 65.66%,
NLC Higher Secondary School, Cuddalore, Tamilnadu.
SSLC, State Board, Tamilnadu, Mar 2001
First Class, Percentage: 77.8%,
NLC Higher Secondary School, Cuddalore, Tamilnadu.
GOVERMENT CERTIFICATIONS
 “Certified Energy Auditor & Certified Energy Manager” by Bureau of energy efficiency
(Government of India)under Energy conservation Act 2001. Regn.No.EA-13550;
Certificate No. 7288; March 2014.
 “Certified Boiler operation engineer” under Boiler Operation engineer’s rules 2011 by Government of
India. Regn.No: 20120718; Feb 2013.
MURUGAN PARAMASIVAM
249, South Street, Velikoonakurichi, Neyveli, Tamilnadu-607802, India.
09865597711, powermurugan@gmail.com
Page 2 of 6
 “Certified ElectricalSupervisory competent” by Government of Tamilnadu. Regn.No: C 40035;
Oct 2010.
TRAINING CERTIFICATIONS
 Course Title: ABB Unitrol-5000 Parameterize, Operate & Maintenance
Faculty: ABB Ltd. Bangalore, India, April 2014.
 Course Title: ALSTOM Power System Protection
Faculty: ALSTOM T&D INDIA LIMITED, Chennai, India, March 2014.
 Course Title: Thermal power plant Familiarization.
Faculty: Mr.D.Hanumantha Reddy, NPTI Director, India, March 2009.
 Course Title: In Plant Training on Thermalpower plant 7X210 MW.
Faculty: NLC Limited, Govt.of.India, Neyveli, India, March 2006.
 Course Title: Internal Auditor Training : ISO 9001:20008 ,ISO 14001:2004&OHSAS
18001:2007 Standards
Faculty: GE AR KAY ASSOCIATES, Chennai, India, March 2006.
PROFESSIONAL EXPERIENCE
Total Experience : 9 Years 4 Months
Field of Experience : (Thermal power plant ElectricalProjects, Operations & Maintenance, Energy
Auditing & Energy management)
 M/s Power Engineering Services, Power Group, Neyveli, Tamilnadu, India.
MURUGAN PARAMASIVAM
249, South Street, Velikoonakurichi, Neyveli, Tamilnadu-607802, India.
09865597711, powermurugan@gmail.com
Page 3 of 6
Aug 2014 to Present
Manager – Electrical Projects, O&M, Energy Auditor (ThermalPower Division)
 M/s Talwandi Sabo Power limited, Vedanta Group, Bhatindha, Punjab, India.
Oct 2013 to Aug 2014
Associate Manager – Electrical Projects, O&M, Energy Auditor (3 X 660 MW = 1980MW)
 M/s MALCO Power Limited, Vedanta Group, Mettur, Tamilnadu, India
Jun 2007 to Oct 2013
Associate Manager – Electrical Projects, O&M, Energy Auditor (4 X 30 MW = 120MW)
CAREER ROLES AND RESPONSIBLITIES
Power Plant Electrical Projects Responsibilities:
 Testing & commissioning of 3X660MW ThermalPower Electrical BTG Package & BOP Package with
adherence to quality and safety standards.
 Testing & Commissioning of Generators up to 776.5 MVA (660MW)(DONGFENGELECTRIC.PR.
CHINA) & Transformers up to 3 X270 MVA (GT, UAT&ST), HT Motor up to 16.5MW.
 Testing & commissioning of 400KV One and Half Breaker scheme Switchyard with ‘I’ type
Configuration with 6 Full DIA, 110KV Double Main Bus bar with CB By-Pass Switchyard.
 Erection, Testing & Commissioning of ABB Unitrol - 5000 Static Excitation System for 660MW, ABB
Unitrol - F Static Excitation System for 30MW.
 Erection, Testing & Commissioning of Power and Distribution transformers Range from 1.6 MVA
to 270 MVA.
 Erection, Testing & Commissioning of Range from 110KV to 400KV SF-6, Spring Operated Circuit
Breaker.
MURUGAN PARAMASIVAM
249, South Street, Velikoonakurichi, Neyveli, Tamilnadu-607802, India.
09865597711, powermurugan@gmail.com
Page 4 of 6
 Erection, Testing & Commissioning of HT and LT switchboards/Switchgears Ranges of 11KV, 6.6KV
and 415 V.
 Erection, Testing & Commissioning of Generator Protection Relays of NARI - PCS 985G, AREVA -
MICOM P343, ABB – REM543 relays for Generator Range from 8MW to 660MW.
 Erection, Testing & Commissioning of Transformer Protection Relays of NARI - PCS 978, AREVA -
MICOM P633/P632 relays for Transformer Range from 1MVA to 270MVA.
 Erection, Testing & Commissioning of Live & Dead Tank CT, PT, LA, Double Break Isolators of 110KV
& 400KV.
 Erection, Testing & Commissioning of Transmission Line Feeder Protection relays of AREVA P441,
P442, P543, P127 relays & Switchyard Bay Control Unit (BCU) &SCADA Schemes.
 Erection, Testing & Commissioning of ABB ACS400, ACS800 VFD (Variable Frequency Drives) for
Pumps, Fans & Conveyors Applications.
 Erection, Testing & Commissioning of 2X80KVA UPS system, 2X2000AH DC Battery system &
2000KVA DG system.
 Erection, Testing & Commissioning of Generator Synchronization Relay system of NARI
PCS -9659, ALSTOM - SKE, SKD system.
 Erection, Testing & Commissioning of Metering Systems of L&T Meter ERP 300P & SECURE Meter
Premier 300.
 Erection, Testing & Commissioning of SECURE EMS (Energy Management system) for all HT & LT
loads like (CT fan, FD fan, ID fan, Mill motor, PA fan ,BFP Motor, LT feeders&HT feeders.)
 Commissioning of Boiler 135 TPH at 9.3Mpa, Pulverized fuel fired, NaturalCirculation, Balanced draft,
& Single drum Boiler, Make: Shanghai Boiler Works, China with Boiler Accessories &Boiler Mountings.
 Commissioning of Ball and Race Mill of 9.5TPH TPH at 9.3Mpa, FD fan, PA fan, ID fan, Coal
feeders, ESP Precipitators of Steam Generator.
 Commissioning of 30 MW Turbine with six extractions withSurface Condensing type, Along
with the Governing System Make: Shanghaiturbine work, China.
 Commissioning of Cooling Towers of Induced Draught for 30MW capacity unit.
MURUGAN PARAMASIVAM
249, South Street, Velikoonakurichi, Neyveli, Tamilnadu-607802, India.
09865597711, powermurugan@gmail.com
Page 5 of 6
Power Plant Electrical Maintenance Responsibilities:
 Overhauling & Maintenance of HT Motor ABB Make, Chinese Make up to 16.5MW and LT Motor.
 Overhauling & Maintenance of Generators up to 776.5 MVA (660MW) & Transformers up to 3 X270
MVA,
 Condition Monitoring Tests of Generators Up to 776.5MVA.
 Condition Monitoring Tests of Transformers Up to 270MVA.(IR value, Tan delta,Magnetising
Current,SFRA test, Ratio Test, Polarity Test, Oil BDV,etc..)
 Overhauling & Maintenance of ABB Unitrol - 5000 Static Excitation System for 660MW, ABB Unitrol
- F Static Excitation System for 30MW.
 Overhauling & Maintenance of 11KV & 6.6KV HT Vacuum breaker (Make Siemens, ABB & GE).
 Overhauling & Maintenance of HT and LT Switchboards (11KV, 6.6KV and 415 V) (Make Siemens,
ABB, GE, L&T).
 Overhauling & Maintenance 400KV & 110KV SF6 Circuit Breaker (ABB, AREVA, GE, L&T) HT & LT
Air Circuit Breaker.
 Thermography Test on Static & Rotating Electric Equipments,LT switchboards & Transmission Line to
identify the weak point in the system.
 Preparation of Monthly/Yearly Preventive Maintenance & Preventive Inspection schedule for all
Electrical equipment’s.
 Maintenance & Calibration of Protection & Metering Systems, of 0.4 KV, 6.6 KV, 11KV, 22KV,
110KV&400KV Distribution Systems.
 Maintenance of electrical equipment’s of 3X660MW BTG unit, BOP(Balance Of Plant – Raw water
system,Chemcial waer system,Fuel oil system, Firefighting systems, Coal Handling systems
Including Stacker and re - claimer) critical boiler & turbine auxiliaries.
 Overhauling and Maintenance of 400 KV, 110KV switchyard equipment’s like CT, PT, CVT, LA, SF6
breaker, Isolators etc.
 Operation & Maintenance of up to 2X80KVA UPS system, 2X2000AH DC battery system &
2000KVA DG system.
MURUGAN PARAMASIVAM
249, South Street, Velikoonakurichi, Neyveli, Tamilnadu-607802, India.
09865597711, powermurugan@gmail.com
Page 6 of 6
 Data collection and Analysis of the entire running Electrical equipment’s through EMS and by field
verifications of the plant and taking corrective action where required in System.
 Overhauling, Maintenance & Trouble shooting of ABB make Variable Frequency Drives.
 Testing of Interlocks, Protection Matrix and Programmable Scheme Logics for Generators,
Transformers, Switchgear Equipment’s and Switchyard Equipment’s.
 Relay setting Calculations & Analysis for Generator, Transformer, Motor, Bus bar & Line Protection
Relays and Power System Studies.
 Condition monitoring live analysis for static & rotating equipment through Signature Analysis.
 Coordination with State Electricity Board (TNEB & PSEB)and ElectricalInspectorate (CEIG) for
Load dispatch to third Party customers within the State.
 Electrical& Operations ISO coordinator for ISO 9001:20008, ISO 14001:2004&OHSAS 18001:2007
Standards.
Power Plant Operations Responsibilities:
 DCS Operation of 4x30 MW Power plant Boiler of each 135 TPH at 9.3Mpa, Pulverized fuel fired,
Natural Circulation, Balanced draft, & Single drum Boiler, Make : Shanghai Boiler Works, China
 Handling Various Emergency Operations of 3 X 660MW & 4X30MW Power Plant.
 Checking all Protective logic and interlocks for Boilers, Turbine & generator equipment’s & their
respective Accessories of 3 X 660MW & 4X30MW units.
 Synchronization of Generator range from 30MW to 660MW
 Handling Boiler Inspection including Hydro-test as per statuary requirements.
 Handling of Emergencies during boiler / Turbine tripping and other operational upsets.
Power Plant Energy Auditor Responsibilities:
 Efficiency & Performance evaluation of Electrical systems, Electric motors, Transformers.
 Efficiency & Performance evaluation & Heat Exchangers.
MURUGAN PARAMASIVAM
249, South Street, Velikoonakurichi, Neyveli, Tamilnadu-607802, India.
09865597711, powermurugan@gmail.com
Page 7 of 6
 Efficiency & Performance evaluation of Fans, Pumps, Blowers & Compressors.
 Performance evaluation of Thermal Power plant (Plant Efficiency, Station Heat rate, Specific Steam
Consumption).
CORPORATE HONORS & CERTIFICATIONS
 Vedanta Group has Awarded Job through Campus Interview held on University during 3rd
year
study and Placed for Thermal power plant at Mettur on Jun 2007.
 “Best Engineer Award”of the Year 2008 in Vedanta group after one year performance from the
organization and rewarded with “SPRITZ AWARD”
 “Excellent Performer Award - 2Times” from Vedanta group during Annual Review.
 “Super Achiever Award -2 Times” for increasing the Third party Power sales by 47% & Energy
Savings Achieved in Compressor systems.
 “CEO kitty Award - 2 Times” for Load reduction in Boiler feed Pump by Optimizing Scoop Control
& Erection and Commissioning of 1X30MW power Plant.
 “Star Performer Award – 3 Times” for Installing Static Excitation System in Unit-2 and
Modifications in LT systems of Unit-4, Stabilizations of 110KV & 6.6KV systems.
 Awarded 850 Options “Shares of Vedanta Resources Plc.” on Sep 2012 for building partnership
with business for “Excellence in Execution”.
PERSONAL INFORMATION
 Date of Birth : 14 Feb 1986
 Gender : Male
 Nationality : Indian
 Languages : Tamil-Native, English-Excellent, Hindi-Fair.
 Marital Status : Married
 Passport Details
Passport No. : 3666183
Date of Issue : 09/09/2016
MURUGAN PARAMASIVAM
249, South Street, Velikoonakurichi, Neyveli, Tamilnadu-607802, India.
09865597711, powermurugan@gmail.com
Page 8 of 6
Date of Expiry : 08/09/2026
 Notice Period : 5 days
 Expected CTC: Negotiable
DECLARATION
I do here by declare that the particulars of information and facts stated here in above are true,
correct and complete to the best of my knowledge and belief.
Place: Neyveli. Yours Truly
Date:
(MURUGAN P)

More Related Content

What's hot

Amrit kumar pattanaik resume
Amrit kumar pattanaik resumeAmrit kumar pattanaik resume
Amrit kumar pattanaik resume
amrit pattanaik
 
Banc d'essai expérimental de panneau photovoltaïque
Banc d'essai expérimental de panneau photovoltaïqueBanc d'essai expérimental de panneau photovoltaïque
Banc d'essai expérimental de panneau photovoltaïque
Premkumar K
 
1 s2.0-s187661021301103 x-main
1 s2.0-s187661021301103 x-main1 s2.0-s187661021301103 x-main
1 s2.0-s187661021301103 x-main
AhmedAljabari
 
Powerstar Brochure
Powerstar BrochurePowerstar Brochure
Powerstar Brochure
Tracy Eaton
 

What's hot (20)

Maximum Power Point Tracking Technologies for Photovoltaic Efficiency Improve...
Maximum Power Point Tracking Technologies for Photovoltaic Efficiency Improve...Maximum Power Point Tracking Technologies for Photovoltaic Efficiency Improve...
Maximum Power Point Tracking Technologies for Photovoltaic Efficiency Improve...
 
IRJET- Arduino UNO Controlled DC Weaving Machine Powered by Solar Energy
IRJET- Arduino UNO Controlled DC Weaving Machine Powered by Solar EnergyIRJET- Arduino UNO Controlled DC Weaving Machine Powered by Solar Energy
IRJET- Arduino UNO Controlled DC Weaving Machine Powered by Solar Energy
 
hybrid
hybridhybrid
hybrid
 
Amrit kumar pattanaik resume
Amrit kumar pattanaik resumeAmrit kumar pattanaik resume
Amrit kumar pattanaik resume
 
IRJET-Robot Control by using Human Hand Gestures
IRJET-Robot Control by using Human Hand GesturesIRJET-Robot Control by using Human Hand Gestures
IRJET-Robot Control by using Human Hand Gestures
 
Integral sliding-mode controller for maximum power point tracking in the grid...
Integral sliding-mode controller for maximum power point tracking in the grid...Integral sliding-mode controller for maximum power point tracking in the grid...
Integral sliding-mode controller for maximum power point tracking in the grid...
 
40220140504010
4022014050401040220140504010
40220140504010
 
Banc d'essai expérimental de panneau photovoltaïque
Banc d'essai expérimental de panneau photovoltaïqueBanc d'essai expérimental de panneau photovoltaïque
Banc d'essai expérimental de panneau photovoltaïque
 
1 s2.0-s187661021301103 x-main
1 s2.0-s187661021301103 x-main1 s2.0-s187661021301103 x-main
1 s2.0-s187661021301103 x-main
 
Ijmet 06 09_009
Ijmet 06 09_009Ijmet 06 09_009
Ijmet 06 09_009
 
Ijsdr1701014
Ijsdr1701014Ijsdr1701014
Ijsdr1701014
 
study of 12 kw solar office system at atomic energy centre chittagong
study of 12 kw solar office system at atomic energy centre chittagongstudy of 12 kw solar office system at atomic energy centre chittagong
study of 12 kw solar office system at atomic energy centre chittagong
 
An Experimental Study of P&O MPPT Control for Photovoltaic Systems
An Experimental Study of P&O MPPT Control for Photovoltaic SystemsAn Experimental Study of P&O MPPT Control for Photovoltaic Systems
An Experimental Study of P&O MPPT Control for Photovoltaic Systems
 
F010324347
F010324347F010324347
F010324347
 
Powerstar Brochure
Powerstar BrochurePowerstar Brochure
Powerstar Brochure
 
IRJET - MPPT based Photovoltaic System with Zeta Converter for DC Load
IRJET - MPPT based Photovoltaic System with Zeta Converter for DC LoadIRJET - MPPT based Photovoltaic System with Zeta Converter for DC Load
IRJET - MPPT based Photovoltaic System with Zeta Converter for DC Load
 
IRJET- Micro Inverter
IRJET-  	  Micro InverterIRJET-  	  Micro Inverter
IRJET- Micro Inverter
 
Nonlinear Current Controller for a Single Phase Grid Connected Photovoltaic S...
Nonlinear Current Controller for a Single Phase Grid Connected Photovoltaic S...Nonlinear Current Controller for a Single Phase Grid Connected Photovoltaic S...
Nonlinear Current Controller for a Single Phase Grid Connected Photovoltaic S...
 
Design an electric vehicle using PV array with five phase permanent magnet sy...
Design an electric vehicle using PV array with five phase permanent magnet sy...Design an electric vehicle using PV array with five phase permanent magnet sy...
Design an electric vehicle using PV array with five phase permanent magnet sy...
 
Db826f3131dd6ecc792ec0848cd8afe7c2c4
Db826f3131dd6ecc792ec0848cd8afe7c2c4Db826f3131dd6ecc792ec0848cd8afe7c2c4
Db826f3131dd6ecc792ec0848cd8afe7c2c4
 

Viewers also liked

IT used by terrorists
IT used by terroristsIT used by terrorists
IT used by terrorists
cpandey76
 
แบบสำรวจ
แบบสำรวจแบบสำรวจ
แบบสำรวจ
NaCk Wanasanan
 
What is Bitcoin? How Bitcoin works in under 5 minutes.
What is Bitcoin? How Bitcoin works in under 5 minutes.What is Bitcoin? How Bitcoin works in under 5 minutes.
What is Bitcoin? How Bitcoin works in under 5 minutes.
Ryan Shea
 

Viewers also liked (17)

WebAction-Sami Abkay
WebAction-Sami AbkayWebAction-Sami Abkay
WebAction-Sami Abkay
 
Web components - An Introduction
Web components - An IntroductionWeb components - An Introduction
Web components - An Introduction
 
DisrupTech - Robin Bloor (2)
DisrupTech - Robin Bloor (2)DisrupTech - Robin Bloor (2)
DisrupTech - Robin Bloor (2)
 
Drive It Home: A Roadmap for Today's Data-Driven Culture
Drive It Home: A Roadmap for Today's Data-Driven CultureDrive It Home: A Roadmap for Today's Data-Driven Culture
Drive It Home: A Roadmap for Today's Data-Driven Culture
 
IT used by terrorists
IT used by terroristsIT used by terrorists
IT used by terrorists
 
แบบสำรวจ
แบบสำรวจแบบสำรวจ
แบบสำรวจ
 
Nava1
Nava1Nava1
Nava1
 
Red Hat - Sarangan Rangachari
Red Hat - Sarangan RangachariRed Hat - Sarangan Rangachari
Red Hat - Sarangan Rangachari
 
The Postulate of Human Ecology
The Postulate of Human EcologyThe Postulate of Human Ecology
The Postulate of Human Ecology
 
The Maturity Model: Taking the Growing Pains Out of Hadoop
The Maturity Model: Taking the Growing Pains Out of HadoopThe Maturity Model: Taking the Growing Pains Out of Hadoop
The Maturity Model: Taking the Growing Pains Out of Hadoop
 
Understanding What’s Possible: Getting Business Value from Big Data Quickly
Understanding What’s Possible: Getting Business Value from Big Data QuicklyUnderstanding What’s Possible: Getting Business Value from Big Data Quickly
Understanding What’s Possible: Getting Business Value from Big Data Quickly
 
Big Data Refinery: Distilling Value for User-Driven Analytics
Big Data Refinery: Distilling Value for User-Driven AnalyticsBig Data Refinery: Distilling Value for User-Driven Analytics
Big Data Refinery: Distilling Value for User-Driven Analytics
 
Humanitarianism and volunteerism
Humanitarianism and volunteerismHumanitarianism and volunteerism
Humanitarianism and volunteerism
 
The Great Lakes: How to Approach a Big Data Implementation
The Great Lakes: How to Approach a Big Data ImplementationThe Great Lakes: How to Approach a Big Data Implementation
The Great Lakes: How to Approach a Big Data Implementation
 
Anthropometry presentation on height and weight measurement
Anthropometry presentation on height and weight measurementAnthropometry presentation on height and weight measurement
Anthropometry presentation on height and weight measurement
 
Ford presentation
Ford presentationFord presentation
Ford presentation
 
What is Bitcoin? How Bitcoin works in under 5 minutes.
What is Bitcoin? How Bitcoin works in under 5 minutes.What is Bitcoin? How Bitcoin works in under 5 minutes.
What is Bitcoin? How Bitcoin works in under 5 minutes.
 

Similar to CV-MURUGAN PARAMASIVAM

Mani CV - Power Plant Maintenance
Mani CV - Power Plant MaintenanceMani CV - Power Plant Maintenance
Mani CV - Power Plant Maintenance
Mani Sharma
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Upendra Kumar Yadav
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineer
KRISHNAMOORTHY A
 
madhu resume for core companies
madhu resume for core companiesmadhu resume for core companies
madhu resume for core companies
bala madhu
 

Similar to CV-MURUGAN PARAMASIVAM (20)

Daman resume
Daman resumeDaman resume
Daman resume
 
Mani CV - Power Plant Maintenance
Mani CV - Power Plant MaintenanceMani CV - Power Plant Maintenance
Mani CV - Power Plant Maintenance
 
shankar resume
shankar resumeshankar resume
shankar resume
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineer
 
madhu resume for core companies
madhu resume for core companiesmadhu resume for core companies
madhu resume for core companies
 
Cv
CvCv
Cv
 
Saran Resume
Saran ResumeSaran Resume
Saran Resume
 
CV Vijay_Vora
CV Vijay_VoraCV Vijay_Vora
CV Vijay_Vora
 
Cv vijay vora
Cv vijay voraCv vijay vora
Cv vijay vora
 
Resume E&I Engineer
Resume E&I EngineerResume E&I Engineer
Resume E&I Engineer
 
Shah faisal shah cv
Shah faisal shah cvShah faisal shah cv
Shah faisal shah cv
 
sanjog navandars
sanjog navandarssanjog navandars
sanjog navandars
 
Updated CV 2016
Updated CV 2016Updated CV 2016
Updated CV 2016
 
Sanjog navandars
Sanjog navandarsSanjog navandars
Sanjog navandars
 
resume
resumeresume
resume
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
SASIdharan p CV
SASIdharan p CVSASIdharan p CV
SASIdharan p CV
 
CV-Mohan_raju
CV-Mohan_rajuCV-Mohan_raju
CV-Mohan_raju
 
sathish kannan EEE
sathish kannan EEEsathish kannan EEE
sathish kannan EEE
 

CV-MURUGAN PARAMASIVAM

  • 1. MURUGAN PARAMASIVAM 249, South Street, Velikoonakurichi, Neyveli, Tamilnadu-607802, India. 09865597711, powermurugan@gmail.com Page 1 of 6 PROFESSIONAL SUMMARY Extremely creative and resourceful Electrical Engineer with 9Years 4Months Experience in Thermalpower plant ElectricalProjects (Generation, Transmission & Distribution), Operations (Normal & Emergency), Maintenance (Preventive & Condition Based), Energy Auditing (Thermal & Electrical systems). Expert to handle multiple projects simultaneously with high degree of Professionalism and Accuracy. EDUCATION Bachelor of Engineering, Electrical & Electronics, May2007. “First class withDistinction”, OGPA: 8.54 / 10.0 Annamalai University, Tamilnadu, India. HSC, State Board, Tamilnadu, Mar 2003. First Class, Percentage: 65.66%, NLC Higher Secondary School, Cuddalore, Tamilnadu. SSLC, State Board, Tamilnadu, Mar 2001 First Class, Percentage: 77.8%, NLC Higher Secondary School, Cuddalore, Tamilnadu. GOVERMENT CERTIFICATIONS  “Certified Energy Auditor & Certified Energy Manager” by Bureau of energy efficiency (Government of India)under Energy conservation Act 2001. Regn.No.EA-13550; Certificate No. 7288; March 2014.  “Certified Boiler operation engineer” under Boiler Operation engineer’s rules 2011 by Government of India. Regn.No: 20120718; Feb 2013.
  • 2. MURUGAN PARAMASIVAM 249, South Street, Velikoonakurichi, Neyveli, Tamilnadu-607802, India. 09865597711, powermurugan@gmail.com Page 2 of 6  “Certified ElectricalSupervisory competent” by Government of Tamilnadu. Regn.No: C 40035; Oct 2010. TRAINING CERTIFICATIONS  Course Title: ABB Unitrol-5000 Parameterize, Operate & Maintenance Faculty: ABB Ltd. Bangalore, India, April 2014.  Course Title: ALSTOM Power System Protection Faculty: ALSTOM T&D INDIA LIMITED, Chennai, India, March 2014.  Course Title: Thermal power plant Familiarization. Faculty: Mr.D.Hanumantha Reddy, NPTI Director, India, March 2009.  Course Title: In Plant Training on Thermalpower plant 7X210 MW. Faculty: NLC Limited, Govt.of.India, Neyveli, India, March 2006.  Course Title: Internal Auditor Training : ISO 9001:20008 ,ISO 14001:2004&OHSAS 18001:2007 Standards Faculty: GE AR KAY ASSOCIATES, Chennai, India, March 2006. PROFESSIONAL EXPERIENCE Total Experience : 9 Years 4 Months Field of Experience : (Thermal power plant ElectricalProjects, Operations & Maintenance, Energy Auditing & Energy management)  M/s Power Engineering Services, Power Group, Neyveli, Tamilnadu, India.
  • 3. MURUGAN PARAMASIVAM 249, South Street, Velikoonakurichi, Neyveli, Tamilnadu-607802, India. 09865597711, powermurugan@gmail.com Page 3 of 6 Aug 2014 to Present Manager – Electrical Projects, O&M, Energy Auditor (ThermalPower Division)  M/s Talwandi Sabo Power limited, Vedanta Group, Bhatindha, Punjab, India. Oct 2013 to Aug 2014 Associate Manager – Electrical Projects, O&M, Energy Auditor (3 X 660 MW = 1980MW)  M/s MALCO Power Limited, Vedanta Group, Mettur, Tamilnadu, India Jun 2007 to Oct 2013 Associate Manager – Electrical Projects, O&M, Energy Auditor (4 X 30 MW = 120MW) CAREER ROLES AND RESPONSIBLITIES Power Plant Electrical Projects Responsibilities:  Testing & commissioning of 3X660MW ThermalPower Electrical BTG Package & BOP Package with adherence to quality and safety standards.  Testing & Commissioning of Generators up to 776.5 MVA (660MW)(DONGFENGELECTRIC.PR. CHINA) & Transformers up to 3 X270 MVA (GT, UAT&ST), HT Motor up to 16.5MW.  Testing & commissioning of 400KV One and Half Breaker scheme Switchyard with ‘I’ type Configuration with 6 Full DIA, 110KV Double Main Bus bar with CB By-Pass Switchyard.  Erection, Testing & Commissioning of ABB Unitrol - 5000 Static Excitation System for 660MW, ABB Unitrol - F Static Excitation System for 30MW.  Erection, Testing & Commissioning of Power and Distribution transformers Range from 1.6 MVA to 270 MVA.  Erection, Testing & Commissioning of Range from 110KV to 400KV SF-6, Spring Operated Circuit Breaker.
  • 4. MURUGAN PARAMASIVAM 249, South Street, Velikoonakurichi, Neyveli, Tamilnadu-607802, India. 09865597711, powermurugan@gmail.com Page 4 of 6  Erection, Testing & Commissioning of HT and LT switchboards/Switchgears Ranges of 11KV, 6.6KV and 415 V.  Erection, Testing & Commissioning of Generator Protection Relays of NARI - PCS 985G, AREVA - MICOM P343, ABB – REM543 relays for Generator Range from 8MW to 660MW.  Erection, Testing & Commissioning of Transformer Protection Relays of NARI - PCS 978, AREVA - MICOM P633/P632 relays for Transformer Range from 1MVA to 270MVA.  Erection, Testing & Commissioning of Live & Dead Tank CT, PT, LA, Double Break Isolators of 110KV & 400KV.  Erection, Testing & Commissioning of Transmission Line Feeder Protection relays of AREVA P441, P442, P543, P127 relays & Switchyard Bay Control Unit (BCU) &SCADA Schemes.  Erection, Testing & Commissioning of ABB ACS400, ACS800 VFD (Variable Frequency Drives) for Pumps, Fans & Conveyors Applications.  Erection, Testing & Commissioning of 2X80KVA UPS system, 2X2000AH DC Battery system & 2000KVA DG system.  Erection, Testing & Commissioning of Generator Synchronization Relay system of NARI PCS -9659, ALSTOM - SKE, SKD system.  Erection, Testing & Commissioning of Metering Systems of L&T Meter ERP 300P & SECURE Meter Premier 300.  Erection, Testing & Commissioning of SECURE EMS (Energy Management system) for all HT & LT loads like (CT fan, FD fan, ID fan, Mill motor, PA fan ,BFP Motor, LT feeders&HT feeders.)  Commissioning of Boiler 135 TPH at 9.3Mpa, Pulverized fuel fired, NaturalCirculation, Balanced draft, & Single drum Boiler, Make: Shanghai Boiler Works, China with Boiler Accessories &Boiler Mountings.  Commissioning of Ball and Race Mill of 9.5TPH TPH at 9.3Mpa, FD fan, PA fan, ID fan, Coal feeders, ESP Precipitators of Steam Generator.  Commissioning of 30 MW Turbine with six extractions withSurface Condensing type, Along with the Governing System Make: Shanghaiturbine work, China.  Commissioning of Cooling Towers of Induced Draught for 30MW capacity unit.
  • 5. MURUGAN PARAMASIVAM 249, South Street, Velikoonakurichi, Neyveli, Tamilnadu-607802, India. 09865597711, powermurugan@gmail.com Page 5 of 6 Power Plant Electrical Maintenance Responsibilities:  Overhauling & Maintenance of HT Motor ABB Make, Chinese Make up to 16.5MW and LT Motor.  Overhauling & Maintenance of Generators up to 776.5 MVA (660MW) & Transformers up to 3 X270 MVA,  Condition Monitoring Tests of Generators Up to 776.5MVA.  Condition Monitoring Tests of Transformers Up to 270MVA.(IR value, Tan delta,Magnetising Current,SFRA test, Ratio Test, Polarity Test, Oil BDV,etc..)  Overhauling & Maintenance of ABB Unitrol - 5000 Static Excitation System for 660MW, ABB Unitrol - F Static Excitation System for 30MW.  Overhauling & Maintenance of 11KV & 6.6KV HT Vacuum breaker (Make Siemens, ABB & GE).  Overhauling & Maintenance of HT and LT Switchboards (11KV, 6.6KV and 415 V) (Make Siemens, ABB, GE, L&T).  Overhauling & Maintenance 400KV & 110KV SF6 Circuit Breaker (ABB, AREVA, GE, L&T) HT & LT Air Circuit Breaker.  Thermography Test on Static & Rotating Electric Equipments,LT switchboards & Transmission Line to identify the weak point in the system.  Preparation of Monthly/Yearly Preventive Maintenance & Preventive Inspection schedule for all Electrical equipment’s.  Maintenance & Calibration of Protection & Metering Systems, of 0.4 KV, 6.6 KV, 11KV, 22KV, 110KV&400KV Distribution Systems.  Maintenance of electrical equipment’s of 3X660MW BTG unit, BOP(Balance Of Plant – Raw water system,Chemcial waer system,Fuel oil system, Firefighting systems, Coal Handling systems Including Stacker and re - claimer) critical boiler & turbine auxiliaries.  Overhauling and Maintenance of 400 KV, 110KV switchyard equipment’s like CT, PT, CVT, LA, SF6 breaker, Isolators etc.  Operation & Maintenance of up to 2X80KVA UPS system, 2X2000AH DC battery system & 2000KVA DG system.
  • 6. MURUGAN PARAMASIVAM 249, South Street, Velikoonakurichi, Neyveli, Tamilnadu-607802, India. 09865597711, powermurugan@gmail.com Page 6 of 6  Data collection and Analysis of the entire running Electrical equipment’s through EMS and by field verifications of the plant and taking corrective action where required in System.  Overhauling, Maintenance & Trouble shooting of ABB make Variable Frequency Drives.  Testing of Interlocks, Protection Matrix and Programmable Scheme Logics for Generators, Transformers, Switchgear Equipment’s and Switchyard Equipment’s.  Relay setting Calculations & Analysis for Generator, Transformer, Motor, Bus bar & Line Protection Relays and Power System Studies.  Condition monitoring live analysis for static & rotating equipment through Signature Analysis.  Coordination with State Electricity Board (TNEB & PSEB)and ElectricalInspectorate (CEIG) for Load dispatch to third Party customers within the State.  Electrical& Operations ISO coordinator for ISO 9001:20008, ISO 14001:2004&OHSAS 18001:2007 Standards. Power Plant Operations Responsibilities:  DCS Operation of 4x30 MW Power plant Boiler of each 135 TPH at 9.3Mpa, Pulverized fuel fired, Natural Circulation, Balanced draft, & Single drum Boiler, Make : Shanghai Boiler Works, China  Handling Various Emergency Operations of 3 X 660MW & 4X30MW Power Plant.  Checking all Protective logic and interlocks for Boilers, Turbine & generator equipment’s & their respective Accessories of 3 X 660MW & 4X30MW units.  Synchronization of Generator range from 30MW to 660MW  Handling Boiler Inspection including Hydro-test as per statuary requirements.  Handling of Emergencies during boiler / Turbine tripping and other operational upsets. Power Plant Energy Auditor Responsibilities:  Efficiency & Performance evaluation of Electrical systems, Electric motors, Transformers.  Efficiency & Performance evaluation & Heat Exchangers.
  • 7. MURUGAN PARAMASIVAM 249, South Street, Velikoonakurichi, Neyveli, Tamilnadu-607802, India. 09865597711, powermurugan@gmail.com Page 7 of 6  Efficiency & Performance evaluation of Fans, Pumps, Blowers & Compressors.  Performance evaluation of Thermal Power plant (Plant Efficiency, Station Heat rate, Specific Steam Consumption). CORPORATE HONORS & CERTIFICATIONS  Vedanta Group has Awarded Job through Campus Interview held on University during 3rd year study and Placed for Thermal power plant at Mettur on Jun 2007.  “Best Engineer Award”of the Year 2008 in Vedanta group after one year performance from the organization and rewarded with “SPRITZ AWARD”  “Excellent Performer Award - 2Times” from Vedanta group during Annual Review.  “Super Achiever Award -2 Times” for increasing the Third party Power sales by 47% & Energy Savings Achieved in Compressor systems.  “CEO kitty Award - 2 Times” for Load reduction in Boiler feed Pump by Optimizing Scoop Control & Erection and Commissioning of 1X30MW power Plant.  “Star Performer Award – 3 Times” for Installing Static Excitation System in Unit-2 and Modifications in LT systems of Unit-4, Stabilizations of 110KV & 6.6KV systems.  Awarded 850 Options “Shares of Vedanta Resources Plc.” on Sep 2012 for building partnership with business for “Excellence in Execution”. PERSONAL INFORMATION  Date of Birth : 14 Feb 1986  Gender : Male  Nationality : Indian  Languages : Tamil-Native, English-Excellent, Hindi-Fair.  Marital Status : Married  Passport Details Passport No. : 3666183 Date of Issue : 09/09/2016
  • 8. MURUGAN PARAMASIVAM 249, South Street, Velikoonakurichi, Neyveli, Tamilnadu-607802, India. 09865597711, powermurugan@gmail.com Page 8 of 6 Date of Expiry : 08/09/2026  Notice Period : 5 days  Expected CTC: Negotiable DECLARATION I do here by declare that the particulars of information and facts stated here in above are true, correct and complete to the best of my knowledge and belief. Place: Neyveli. Yours Truly Date: (MURUGAN P)