Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningMohamed Mustafa
Highly ambitious and self-motivated Project Management Professional with over 10 years in the Oil & Gas Industry in the fields of Project Construction & Commissioning. All experience enhanced by multi-functional business trips in United Arab Emirates, Oman, Algeria and Egypt for large scale EPC projects with Major EPC and Petroleum companies’ region.
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningMohamed Mustafa
Highly ambitious and self-motivated Project Management Professional with over 10 years in the Oil & Gas Industry in the fields of Project Construction & Commissioning. All experience enhanced by multi-functional business trips in United Arab Emirates, Oman, Algeria and Egypt for large scale EPC projects with Major EPC and Petroleum companies’ region.
Experience:
Worked the following positions over the past 30 years in Oil and Gas:
• Team lead / Project Manager MEP/ EPC.
• Site Construction Manager MEP/ EPC.
• QA/QC Manager MEP & EPC Oil & Gas proficient in ASME, API, NEC, IEEE and Saudi Aramco Standards.
• QA/QC Supervisor MEP.
• QA/QC Manager Irish Metro system.
• QA/QC Manager Large Airports INDIA, Budapest, Sofia.
• QA/QC Manager Oil & Gas, KSA, Kuwait, UAE
• QA/Qc Manager OIL Rig refurbishment on and off shore.
• QA/QC Heavy Metals Non Ferrous and Ferrous.
• QA/QC Manager Heavy Civil.
• QA/QC Manager Fossil Fuel Combined cycle power plants.
• QA/QC Manager Gas Combined cycle power plants.
• QA/QC Manager High Rise Towers 40 stories plus.
• QA/QC Manager Conveyor Systems cross country 25 KM Plus.
• QA/QC Manager Pharmaceutical Plants Pfizer, GSK, Sandoz, Lilly.
• E&I Commissioning Engineer.
I have used Oracle Primavera Project Management P6 to built my resume. I did the experience and it looks pretty well to me. Comments are welcome to further improve.
Gerencia de Proyectos de Tecnología EducativaFufo Vega Cabra
¿Cuál es el rol principal de un profesional en el desarrollo de proyectos basados en una excelente gestión de proyectos?
¿Qué elementos son necesarios para que pueda garantizarse un ciclo de vida de un proyecto completamente?
¿Quiénes son los principales responsables de establecer adecuadamente el ciclo de vida de un proyecto?
Experience:
Worked the following positions over the past 30 years in Oil and Gas:
• Team lead / Project Manager MEP/ EPC.
• Site Construction Manager MEP/ EPC.
• QA/QC Manager MEP & EPC Oil & Gas proficient in ASME, API, NEC, IEEE and Saudi Aramco Standards.
• QA/QC Supervisor MEP.
• QA/QC Manager Irish Metro system.
• QA/QC Manager Large Airports INDIA, Budapest, Sofia.
• QA/QC Manager Oil & Gas, KSA, Kuwait, UAE
• QA/Qc Manager OIL Rig refurbishment on and off shore.
• QA/QC Heavy Metals Non Ferrous and Ferrous.
• QA/QC Manager Heavy Civil.
• QA/QC Manager Fossil Fuel Combined cycle power plants.
• QA/QC Manager Gas Combined cycle power plants.
• QA/QC Manager High Rise Towers 40 stories plus.
• QA/QC Manager Conveyor Systems cross country 25 KM Plus.
• QA/QC Manager Pharmaceutical Plants Pfizer, GSK, Sandoz, Lilly.
• E&I Commissioning Engineer.
I have used Oracle Primavera Project Management P6 to built my resume. I did the experience and it looks pretty well to me. Comments are welcome to further improve.
Gerencia de Proyectos de Tecnología EducativaFufo Vega Cabra
¿Cuál es el rol principal de un profesional en el desarrollo de proyectos basados en una excelente gestión de proyectos?
¿Qué elementos son necesarios para que pueda garantizarse un ciclo de vida de un proyecto completamente?
¿Quiénes son los principales responsables de establecer adecuadamente el ciclo de vida de un proyecto?
Embrace DevOps: Delivery Value with Puppet AutomationNavin Kumaran
This is the first of series of meetup conducted in AWS Chennai. Session 2 was "Embrace DevOps: Delivery Value with Puppet Automation". AWS Chennai Meetup at 8KMiles.
How to Implement Data Governance Best PracticeDATAVERSITY
Data Governance Best Practice is defined as basis and guidelines for suggested governing activities. Organizations define best practices to be used as a point of comparison when determining their readiness, willingness and actions necessary to put a Data Governance program in place. But what are the best practices and how can they be implemented? This webinar will address these questions and more.
In this RWDG webinar, Bob Seiner will talk about how to create, validate, assess and implement Data Governance Best Practice with immediate impact on present and future Data Governance activities. The result of a Best Practice assessment is a thorough actionable plan focused on demonstrating value from your Data Governance program.This webinar will cover:
• Two Criteria for Data Governance Best Practice Development
• How to Assess against Best Practice to Build Program Success
• Examples of Industry Selected DG Best Practice
• How to Communicate DG Best Practice in a Non-Threatening Way
• How to Build DG Best Practice into Daily Operations
Experience:
Worked the following positions over the past 30 years in Oil and Gas:
• Team lead / Project Manager MEP/ EPC.
• Site Construction Manager MEP/ EPC.
• QA/QC Manager MEP & EPC Oil & Gas proficient in ASME, API, NEC, IEEE and Saudi Aramco Standards.
• QA/QC Supervisor MEP.
• QA/QC Manager Irish Metro system.
• QA/QC Manager Large Airports INDIA, Budapest, Sofia.
• QA/QC Manager Oil & Gas, KSA, Kuwait, UAE
• QA/Qc Manager OIL Rig refurbishment on and off shore.
• QA/QC Heavy Metals Non Ferrous and Ferrous.
• QA/QC Manager Heavy Civil.
• QA/QC Manager Fossil Fuel Combined cycle power plants.
• QA/QC Manager Gas Combined cycle power plants.
• QA/QC Manager High Rise Towers 40 stories plus.
• QA/QC Manager Conveyor Systems cross country 25 KM Plus.
• QA/QC Manager Pharmaceutical Plants Pfizer, GSK, Sandoz, Lilly.
• E&I Commissioning Engineer.
Worked the following positions over the past 30 years in Oil and Gas:
• Team lead / Project Manager MEP/ EPC.
• Site Construction Manager MEP/ EPC.
• QA/QC Manager MEP & EPC Oil & Gas proficient in ASME, API, NEC, IEEE and Saudi Aramco Standards.
• QA/QC Supervisor MEP.
• QA/QC Manager Irish Metro system.
• QA/QC Manager Large Airports INDIA, Budapest, Sofia.
• QA/QC Manager Oil & Gas, KSA, Kuwait, UAE
• QA/Qc Manager OIL Rig refurbishment on and off shore.
• QA/QC Heavy Metals Non Ferrous and Ferrous.
• QA/QC Manager Heavy Civil.
• QA/QC Manager Fossil Fuel Combined cycle power plants.
• QA/QC Manager Gas Combined cycle power plants.
• QA/QC Manager High Rise Towers 40 stories plus.
• QA/QC Manager Conveyor Systems cross country 25 KM Plus.
• QA/QC Large Port development, Heavy lifting equipments.
• QA/QC Manager Pharmaceutical Plants Pfizer, GSK, Sandoz, Lilly.
• E&I Commissioning Engineer.
A post graduate of petroleum Engineer (from PME) with 10 years of experience in project engineering and project management from conception to commissioning of multi-discipline EPC contracts related to chemical, refinery, oil & gas and LNG sectors including Egypt, Qatar, Abu Dhabi and Oman.
Working in Arabian Industries (AI) LLC for nearly 6 years in feasibility, detailed engineering, EPC, EMC and IMC Projects for PDO (Petroleum Development Oman) and ORPIC.
I’m a petroleum Engineer with an Excellent experience In Oil & Gas Projects and industries such as exploration ,drilling ,work over , Oil & Gas well drilling & ALS Production services and Projects in oil & Gas Energy field section ,My experience in the Drilling , Well control & wellhead equipment Inspection ,Refurbishment , Maintenance , Testing , Recertification and Installation As per API(6A , 6D , 16A , 16D, 16C & 7K ) Specification. Oil & Gas artificial lift production technology and solution. Maintenance, Installation and Overhaul of well head and well control tools and equipment; furthermore, many projects for new rigs (on shore) and offshore rig (ST-Bahari1- Jack up), Prove leadership skills involving managing, developing and motivating teams to achieve their objectives. Reliable, trustworthy and meticulous, gained a good understanding of what is required of Oil & Gas engineering.
Career Objective
Intend to build a career with a leading organization with committed & dedicated people in a challenging and creative environment. Seeking a promising position that offers both a challenge and a good opportunity for growth and to upgrade skills to serve the company better.
1. CURRICULUM VITAE
Personal Information
Name : HAYDER N. KADHIM AL BRAICH
Nationality : Iraqi
Date of Birth : July 1, 1965
Place of Birth : Basrah - Iraq
Passport Number : A9693459
Validity : August, 13, 2023
Marital Status : Married (with two children’s)
Contact Address : P.O. Box: 121266 Dubai, UAE.
Tel: Res. : 009716-7425695
Office : 009714-2580995
Fax Off. : 009714-2580996
Mobile : 0097150-4132772
E-Mail: albraich2002@yahoo.co.uk
E-Mail: haider@hkpgas.com
Mobile: 00964-7813235357 & 00964-7700358580
Languages : Fluent in Arabic & English
(Reading, writing and speaking)
Qualification : B.Sc. Physics, University of Basrah, Iraq- 1989.
(Equivalent to other related Engineering field)
Experience:
23/01/2013- Up To Date : U.A.E. - Dubai -AL Helal AL Khaseeb Gas Piping (HKPGAS)
Worked as (General Manager/ Partner) for Management
Director, Business Development Regionally, Contracting,
Design, Installation with Maintenance of LPGas & N.Gas
Central System.
• Director Manager of the Company.
• Business Development Regionally in Iraq, KSA, and others.
• Approval the contracts, & met the Clients with Consultants.
• Handling of Sales Department in good faith and professional aspects.
• Follow up continuously and strongly the quotation list with direct contact to the concerned parties.
• Coordinating with the work Management Department for the packages that has been issued for the day.
• Full knowledge of LPG and Natural gas codes for construction.
• To check and approved the shop drawings with the coordination of Design Engineer, Technical Manager
And get the approval of the drawings from relevant Authorities.
• Handover the system to Consultant, Civil Defence Authorities and owners.
• Maintain all the documents / records and update them.
• Responsible for the whole Sales and Technical Department.
• Handling of clients inquiry with regards to the equipment’s and most of all during the Exhibition.
• Coordinating with our Principals in regards to the equipment being sold by the company.
• Checking & approved the quotations for all the technical data of the company.
2. 10/12/2009 Up to date : IRAQ, SULAIMANYIAH, KURDUSTAN.
Worked as (Consultant & Supply of Materials
For L.P. Gas Central Systems) Such as:-
(Shary Jwan Hotel, Baranan City Hotel, Goundy Building,
Rank Kitchen Building, I.V. Factory & Others.)
10/12/2012 Up to 22/01/2013 : IRAQ- Basra, Gulf Pearl Group
Worked as (Business Development Manager & HSE Manager)
For Manage The Technical Department & Safety Works
Of Crude Oil Tanks (Repair, Maintenance, Demolition
& Construction Of New Crude Oil Tanks.
For Installation, maintenance and repair of the Tanks with Indoor Fire Fighting system.
Responsibilities include:
• Responsible for leading a team of service, delivery and staff.
• Putting strategy for production teams for different trades to increase efficiency and
to utilize the learning curve.
• Maintaining and enforcing high commitment to excellence.
2010 – 30/12/2012 : U.A.E. – Dubai, Integrated Gas Services Co. (IGS & SERGAS)
Worked as (Asst. Area Manager Technical) for Manage
The Technical Department & Design
Of LPGas & S.N.Gas Central System.
MUSCAT, OMAN (AIGESCO) Our Group of SERGAS
Worked as (Technical Manager) & Branch Manage
For the Technical Department & Design with Sales
Of LPGas & S.N.Gas Central System.
2003 - 2010 : U.A.E. - Dubai, International Gas Services Est. (SERGAS & IGS)
Worked as (Sales Manager) for Estimations & Design
Of L.P.Gas & S.N.Gas Central System.
• Handling of Sales Department in good faith and professional aspects.
• Getting the enquiries, preparing offer in cooperation with the Draughtsman and submitted to the
concerned party.
• Follow up continuously and strongly the quotation list with direct contact to the concerned parties.
3. • Follow up the payment of each project.
• To prepare a Weekly / Monthly Activity Progress Report to be discussed with the BM /AM & GM.
Feb 6, 1999 - 2003 : U.A.E. - Dubai International Gas Services Est. (SERGAS)
Worked as (Project Manager) for Design, Installation with
Maintenance of LPGas & N.Gas Central System.
• Handling of Sales Department in good faith and professional aspects.
• Getting the enquiries, preparing offer in cooperation with the Draughtsman get it approved from the Branch
Manager and submitted to the concerned party.
• Follow up continuously and strongly the quotation list with direct contact to the concerned parties.
• Follow up the payment of each project. To prepare a Weekly / Monthly Activity Progress Report to be discussed
with the SM /PM & GM. Mainly responsible of Design, Installation with maintenance of L.P.Gas & Natural gas
piping Central system( PE ,PEX ,Copper& C.S.) above and below ground.
• Making lay out planning.
• Preparing of all the materials and re cancellation.
• Coordinating with the work Management Department for the packages that has been issued for the day.
• Making the pre conversion and conversion for charging the cookers from
L.P.Gas to Natural Gas and installation of commercials
• In – charge for the paper works and the daily report to be submitted at the end of the day.
• Full knowledge of LPG and Natural gas codes for construction.
• Preparation of shop drawings with the coordination of Design Engineer, Technical Manager
And get the approval of the drawings from relevant Authorities.
• Supervise the technicians and site works.
• Coordinate with the Maintenance Department and prepare the system for Inspection of TPI & DCD.
• Handover the system to Consultant, Civil Defence Authorities and owners.
• Maintain all the documents / records and update them.
• Responsible for the whole Sales and Technical Department.
• Handling of clients inquiry with regards to the equipments and most of all during the Exhibition.
• Coordinating with our Principals in regards to the equipments being sold by the company.
• Making the quotations for all the technical data of the company.
• Handling of clients inquiry.
I have been participating in the supervising and executing of LPG central system projects
For Hotels, Universities, Schools, Restaurants, Resident Buildings and Factories in U.A.E
(Dubai, Sharjah, Ras Al Khaima, Al Ain, and Abu Dhabi).
Such as Burj Al Arab Hotel, Aqua Park (Jumairah Beach Hotel), Royal Meridian, Hotel, Hilton
Jumairah Dubai, Fairmot Hotel Dubai, Rotana Beach Hotel, Amrican University Dubai
AlMureikhi Building, & The Gardens ,Mall of Emirates, The Palm Jumeirah, Burj Dubai and
others.- Dubai.
Higher Technology College (Men and Women) - RAK.
Conference Palace Hotel – Abu Dhabi & .Intercontinental Hotel Al Ain- AlAin.
4. 1997-1999 : Jordan- Jordan Gas Company
Worked as (Plant Operator) for Production of
. Medical Gas Factory - Nitrous Oxide, Nitrogen & Oxygen (N2O, N2 & O2) gases / liquid.
Responsibilities include:
• Reviewing production schedule prepared by manufacturing unit and to extract the required
manpower and equipment as scheduled and to arrange for it in timely manner.
• Finding solutions for site problems related to the methodology and to make necessary actions.
• Responsible for production profit and loss and cost control.
• Monitor and identify areas for improvement.
• Quality Control Engineer
Industrial Gases Factory (Oxygen, Nitrogen and Argon) Production.
Responsibilities include:
• Quality Assurance-Ensuring standard’s specifications and requirements are
Implemented according to agreed upon deliverables.
• Enforcing company Safety, Quality Control and other policies and procedures.
• Assisting in the development of work for the benefit of the Client.
• Insuring full compliance of works with specifications.
1996-1997 : Iraq- State Establishment of Pipelines (Southern Area) Basrah.
LPG complex for transportation, storage, cooling and export
Terminal.
Worked as (Head of Operation) shift group
& Quality Control Engineer for production (C3, C4, N.G. & N2)
Industrial Gases Factory (Propane, Butane, Natural Gas & Nitrogen Unit) Production.
Responsibilities include:
• Quality Assurance-Ensuring standard’s specifications and requirements
5. Are implemented according to agreed upon deliverables.
• Enforcing company Safety, Quality Control and other policies and procedures.
• Assisting in the development of work for the benefit of the Client.
• Insuring full compliance of works with specifications.
1995-1996 : Iraq- S.E.O.P. Basrah - LPG complex
Worked as (Shift Engineer) responsible for Operation in Gas
Pressurization Unit.
1989-1995 : Iraq- S.E.O.P. Basrah- LPG complex
Worked as Units Operator (Assistant Shift Engineer) in the
LPG plant.
During the above period in Iraq, I have been participated in
The preparation and maintenance works of Re- building of
LPG storage terminal with the main contractors companies.
(Toyo /Japan, Noil/ Germany and Saipem / Italy.)
Courses:
Date
From To
13/03/90 24/04/90 : 1. Toyo Engineering Corporation, Tokyo-Japan
• Plant Operations and Maintenance such as
• Loading of LPG on tankers in LGT Japan
• Loading berth.
• Operation of Gas pressurization units, with
• Mitsubishi Petrochemical complex, Japan.
02/06/90 03/06/90 : 2. SGS DePauw & Stockow- N.V. Belgium
• Course on Transport and Handling of LPG,
Held at Basra - Iraq.
03/04/93 12/04/93 : 3. Ministry of Oil - Baghdad -Iraq
• Gas Technology, Loading of liquefied gas.
17/08/96 22/08/96 : 4. Southern Oil Company, Basrah -Iraq
• Calculation methods of (P.V.T) for Oil resources.
01/07/97 31/07/97 : 5. University of Basrah - Iraq
• Computer program course.
• MS-DOS 6.22
• Basic
• Dbase lll+
6. • Professional write
• Microsoft
01/07/99 20/08/99 : 6. Zenith Training Institute, Abu Dhabi - U.A.E.
• Course on Elementary English B
2005 : 7. Hepworth & G+F Training Dubai - U.A.E.
• Course about PE pipe with fittings
• Course about Electro fusion welding
2007 : 8. Sharjah Engineering Cooperation.
• Course about Safety & Rules Of Civil Defence
• Course about Estimations & Calculation of
work
Feb. /2012 : 9. DCD & ARAB Civil Defense Conference, Abu Dhabi,
05th
/January 2013-01-13 : 10. TEKFEN CONSTRUCTION
• Course about Safety & Golden Rules HSE
Training at North Rumaila, Basra, Iraq.
Seminar, Exhibition & Conference:
6th
- 9th
December, 2011 & 2012: 2nd
& 3rd Basrah Oil & Gas – Exhibition & Conference.
Iraq- Basrah
17th
- 20th
September, 2005 : Arab Oil & Gas Show Dubai; Seminar @ Dubai Air
Show Center.
13th
- 16th
October, 2002 -2012 : 10th
ADIPEC; Abu Dhabi International Petroleum
Exhibition & Conference. Abu Dhabi-
United Arab Emirates.
13th
- February, 2002 : AQUAGAS Advanced pipe system;
Conference @ the Fairmont Dubai ballroom,
“The latest Water & Gas Distributing Technologies&”
“Wastewater Solutions”. Dubai – U.A.E.
17th
- September, 2001 : Arab Oil & Gas Show Dubai; Seminar @
Dubai World Trade Center.
"Safety & New Technology for LPG Central System” By
International Gas Services Est.
27th - 31st
October, 2001-2012 : The Big 5 2001; Dubai World Trade Center,
Dubai- U.A.E.
1st
- November, 2000 : What Al-Amman; Quarterly Specialized Magazine Published
By Dubai Civil Defence. Viewpoint about-:
“sfer, Distribution & Using of L.P.Gas & Natural Gas
Central System” Dubai -U.A.E.
27th
- February, 1999 : SEWA Natural Gas Department; “Awareness Seminar”
Symposium on Future Requirements of Piped
Natural Gas Supply to New Buildings in Sharjah
7. . Other
I have the following Sales Training:
- How to make more and better appointments.
- How to close more sales.
- How to ask for the order and get it.
- How to be a salesperson the customers like best.
- How to cold canvass.
- How to get business before your competitor.
References and documents will be available upon request.