CURRICULAM VITAE
Madhava Rao .V
S/o. V.Reddiyya,
Satulur P.O, ,
Nadendla M.D Phone: + 91 95503 40490
Guntur Dt.
Pin: 522 549. Email ID: vmadhav301@yahoo.co.in.
Andhra Pradesh, India. madhavarao.vajja@gmail.com
Career Objective:
To obtain a challenging position in the field of Offshore/Onshore Engineering where my
skills and creativity can be utilized to meet the company’s objective and vision while
providing career advancement opportunities with “CAN DO” attitude.
Snapshot on Area of Exposure & Expertise
 Overall 14+ years of experience in Mechanical Design & Engineering in the field of
Offshore & Onshore Oil & Gas, Petrochemical, Refinery and Power industry in Basic
Design, Proposal, Detail & PMC Engineering for various types of systems, Static
equipments and Packages.
 Interacted with many equipment manufacturers all over the world for the design,
engineering & procurement activities to full fill the customer requirement.
 Strong Working experience on Static Equipments such as pressure vessels, heat
exchangers, storage tanks, heaters, piping systems & other package equipment
items as outlined here after.
 Strong Working experience in PV Elite, Compress, HTRI, Navis Works Review & Auto
Cad.
 Basic knowledge on rotating equipments like Pumps, Compressor, Agitators, Mixers,
Blowers, Gear Box & Motors.
 Engineering codes and standards: ASME, API, ANSI, NACE, TEMA, PD 5500, IS and HEI
for Surface Condensers & Heaters.
 Knowledgeable in P&IDs, Piping plans, Isometric piping drawings, 3D modeling &
plant layout review etc.
 Considerable Knowledge in various company standards like ADMA-OPCO, SAUDI
ARAMCO, SABIC, PETRONAS, BP, TOTAL & SHELL.
 FEED, Proposal, Detail & PMC engineering for various offshore & onshore projects.
 Responsible for preparation of Specifications / Drawings and technical Data sheets,
Requisitions for Quotation, review of vendor offers, Technical queries, Technical bid
Analysis, Purchase Requisitions and approval of Vendor & Contractor Drawings /
documents
 Cost estimation of Equipments. Co-ordination with other disciplines for interface
engineering of Static Equipment and Packages
 Co-ordination with Team Members and Attending Model Review / Project /
Management review meetings
 Meeting the requirements of International client standards during the execution of
the projects
Education Details:
 B.Tech in Mechanical Engineering with distinction in S.C.R Engineering College
J.N.T. University, A.P, India.
 Diploma in Mechanical Engineering, D.A Govt. Polytechnic Ongole, S.B.T.E.T., A.P,
India.
Organizational Experience
Current Position : STATIC EQUIPMENT ENGINEER – PMC (Presently Located in South
Korea)
Industry : TECHNIP FRANCE (ABUDHABI) – PMC (HUB)
Experience : May 2015 – Till Date. (May 2015 – Jan 2016 in Singapore &
Feb 2016 Onwards in Seoul, South Korea)
 Worked as a Mechanical Engineer – Static in TECHNIP FRANCE (ABUDHABI) from
April 2013 to April 2015.
 Worked as a Sr. Engineer - Mechanical - Offshore in PETROFAC ENGINEERING
SERVICES INDIA (P) LTD - Chennai from Nov 2011 to Mar. 2013.
 Worked as a Senior Engineer in L&T-VALDEL ENGINEERING. LTD., Chennai from Oct
2009 to Oct. 2011.
 Worked as a Deputy Manager-Design., GE Godavari Engineering Ltd., Hyderabad
From June 2004 to September 2009.
 Worked as a Cad Design Engineer, SV Conveyors & Engineering Works, Hyderabad
From May 2000 to Jan 2001.
Current Experience
POSITION: STATIC EQUIPMENT ENGINEER - PMC
Project: NASR Full Field Development Project (NSFFD) - Phase II
Client: ADMA-OPCO.
Nominated as PMC Engineer for the Project
 Responsible for review of EPC contractor documents/drawings such as Specifications
/ Drawings and technical Data Sheets, Requisitions for Quotation, review of vendor
offers, Technical queries, Technical bid Analysis Purchase Requisitions, review and
approval of Vendor Drawings / documents for the following static
equipments/packages.
 PMC Engineering activities for the following Equipments/packages.
• Vessels (Cladded & Non Cladded)
• Pig Launcher & Receivers
• Nitrogen Cylinder Package
• Heat Exchangers
• Air Coolers,
• Tanks
• Water Heaters
• Static Equipment’s covered in the following package items.
- Gas Dehydration and Glycol Regeneration Package
- Produced Water Treatment Package
- Chemical Injection Package
- Air Dryer Package
- Fresh Water Maker Package
- Potable Water Chiller Package
- Vapor Recovery Unit
- Safety packages like Foam & Sprinkler etc.
POSITION: STATIC EQUIPMENT ENGINEER
Project: Additional Gas Supply to Onshore & Flexibility Assurance at USSC Project
Client: ADMA-OPCO.
Nominated as Job Engineer for the Project
 Responsible for preparation of Specifications / Drawings and technical Data Sheets,
Requisitions for Quotation, review of vendor offers, Technical queries, Technical bid
Analysis Purchase Requisitions, review and approval of Vendor Drawings /
documents for the following static equipment’s.
 Detail Engineering activities for the following Equipment’s/packages.
• Vessels
• Pig Traps (Scraper Launcher)
• Sea Water Filtration Package
• Internals Replacement for Separators & Discharge KOD
Project: FEED services for Additional Gas Supply to Onshore & Flexibility Assurance at
USSC Project
Client: ADMA-OPCO.
Nominated as Job Engineer for the Project
 Responsible for preparation of Specifications / Drawings and technical Data Sheets,
Requisitions for Quotation, review of vendor offers, Technical queries, Technical bid
Analysis for the following static equipment’s.
• Vessels
• Pig Traps (Scraper Launcher)
• Sea Water Filtration Package
• Internals Replacement for Separators & Discharge KOD
POSITION: STATIC EQUIPMENT ENGINEER
Project: HB Project, Saudi Arabia
Client: SABIC, Saudi Arabia.
Nominated as Job Engineer for the Project
 Responsible for Vendor Document review of the following list of Equipment’s and
Co-ordination with other disciplines for interface engineering of Static Equipment.
 Detail Engineering activities for the following Equipment’s/packages.
• Shell & Tube Heat Exchangers
• Filters
• Tanks
• Pressure Vessels
Previous Experience
POSITION: SR. ENGINEER – MECHANICAL - OFFSHORE
Project: North Tank Farm and Loading Arms & South Tank Farm Facilities – Saudi Arabia
Client: Saudi Aramco, Saudi Arabia.
Nominated as Job Engineer on deputation in Saudi Arabia
 Responsible for the preparation of RFQ, TQs, TBA, PS and Vendor Document review
for the following list of Packages/ Equipment’s handling and .Co-ordination with
other disciplines for interface engineering of Static Equipment and packages.
 Detail Engineering activities for the following Equipment’s/packages.
• Tanks
• Pressure Vessels
• Shell & Tube and Air Cooled Heat Exchangers
• Effluent Treatment Package
Project: Greater Stella Area Development - Ithaca Energy - UK
Nominated as Job Engineer for the Project
 Execution of detail engineering activities such as Attending the Kick – of – Meetings,
Review of detail engineering (Vendor) drawings/documents, interface engineering
with other discipline, Co-ordination with Team Members etc.
 Detail Engineering Activities for the following Equipments/packages.
• Shell and Tube Heat Exchangers (H.P & L.P)
• Plate and Frame Heat Exchangers
Proposal: Timimoun Field Development Project proposal – ALGERIA
Nominated as Lead Engineer for the proposal
 Execution of Proposal engineering activities such as preparation of Proposal & Detail
Engineering Execution Man-hours, Feed verification, Preparation of Client technical
Queries, Preparation of FEED verification report, technical Write – UP, BOQ’s, and
RFQ’s & Checking of RFQ’s prepared by Team Members, Co-ordination with Team
Members, interface engineering with other discipline and Attending Project review
meetings etc. Proposal engineering for the following Equipments/packages.
• Shell and Tube Heat Exchangers
• Air Cooled Heat Exchangers
• HP & LP Flare Package
• Pressure Vessels & Slug Catchers
• Storage Tanks
• Produced Water treatment Package
• Filters
Proposal: Inlet Separation & Boosting Facilities proposal – ALRAR, ALGERIA
Nominated as Lead Engineer for the proposal
 Execution of Proposal engineering activities such as preparation of Proposal & Detail
Engineering Execution Man-hours, Feed verification, Preparation of Client technical
Queries, Preparation of FEED verification report, technical Write – UP, BOQ’s, and
RFQ’s & Checking of RFQ’s prepared by Team Members, Co-ordination with Team
Members, interface engineering with other discipline and Attending Project review
meetings etc. Proposal engineering for the following Equipments/packages.
• Air Cooled Heat Exchangers
• HP & LP Flare Package
• Pressure Vessels & Filters
• Storage Tanks
• Mercury removal Unit
• Produced Water treatment Package
• Waste Water treatment Unit
• Electric heaters
Proposal: Jazan Refinery and Terminal Project (JR&TP), Saudi Arabia.
Nominated as Job Engineer for the proposal
 Feed verification, Preparation of Technical Queries, Preparation of RFQ and interface
engineering with other discipline for the following Equipments/packages.
• Shell and Tube Heat Exchangers
• Plate and Frame Heat Exchangers
• Deaerator
Proposal: EPC WORK FOR SATAH AL RAZBOOT (SARB) FIELD DEVELOPMENT PROJECT –
(PACKAGE 4 –OFFSHORE SCOPE), ABU DHABI.
Nominated as Job Engineer for the proposal
 Feed verification, Preparation of Technical Queries, Preparation of RFQ and interface
engineering with other discipline for the following Equipments/packages.
• Shell and Tube Heat Exchangers
• Sea Water Treatment Package
Proposal: EPC WORK FOR SATAH AL RAZBOOT (SARB) FIELD DEVELOPMENT PROJECT –
(PACKAGE 3 –OFFSHORE SCOPE), ABU DHABI.
Nominated as Job Engineer for the proposal
 Feed verification, Preparation of Technical Queries, Preparation of RFQ and interface
engineering with other discipline for Flare Package.
Proposal: CENTRAL DIYARBEKIR (CDDP-A) PLATFORM FOR DIYARBEKIR OIL DEVELOPMENT
PROJECT, TURKMENISTAN.
Nominated as Job Engineer for the proposal
 Feed verification, Preparation of Technical Queries & Cost estimation/CBE for tanks
and Sump Caisson.
Proposal: UZ 750 PROJECT – ISLAND SURFACE FACILITIES, UAE.
Nominated as Job Engineer for the proposal
 Feed verification, Vendor offer review, Preparation Technical Queries & TBE, Cost
Estimation/CBE for pressure vessels.
Past Experience
POSITION : SR. ENGINEER - MECHANICAL
INDUSTRY : L&T - VALDEL ENGINEERING. LTD., CHENNAI
EXPERIENCE : Oct. 2009 to Oct 2011.
CONTRIBUTION:
PROJECT: CEIL-RAVVA FIELD LIFE CYCLE PROJECT.
CLIENT: CAIRN ENERGY INDIA LTD.
Nominated as Lead Engineer for the project
Responsible for the preparation of Bid Documents like Job specifications, Mechanical
Datasheets etc as a part of FEED for the following.
 Produced Water Treatment Package
 Modification of Existing Test Separator to Production Separator
 Up gradation of existing Deck Crane to Higher Capacity
 Coil Tubing Unit
PROJECT: OSX-3 FPSO
CLIENT: MODEC INTERNATIONAL INC.
OWNER: OSX 3 LEASING B.V.
Nominated as Lead Engineer for the project
Responsible for study of material handling facilities and preparation of material handling
report & interdisciplinary co-ordination for the following modules.
 FWKOD & Test Separator
 PW Treatment & Crude Exchangers
 TEG Dehydration
 Crude Dehydration & Desalination
PROJECT: GSPC PROCESS PLATFORM & LIVING QUARTERS.
CLIENT: L&T- Oil & Gas Special Project & AKER SOLUTIONS.
OWNER: GSPC.
CONSULTANT: EIL.
Nominated as Sub - Lead Engineer for the project
Responsible for the preparation of RFQ, TQs, TBA, PS and Vendor Document review for the
following list of Packages/ Equipments handling and .Co-ordination with other disciplines for
interface engineering of Static Equipment and packages.
 Waste Heat Recovery system
 Hot Oil Dump Cooler
 HP Production Separator
 Well fluid cooler
 DCP Skid
PROJECT: MHN PROCESS PLATFORM & LIVING QUARTERS PROJECT.
CLIENT: L&T OGSP.
OWNER: ONGC.
Nominated as job engineer for the project
Responsible for the preparation of RFQ, TQs, PS and Vendor Document Review for the
following list of Packages/ Equipments handling.
 Miscellaneous vessels & Tanks
 Potable fresh water system
 Nitrogen Generator Package
 Filters
 CO2 Snuffing System
PROPOSAL ENGINEERING PROJECTS HANDLED.
PROJECT: DEVELOPMENT OF WO-16 CLUSTER & SB-14 WELLHEAD PLATFORM
CLIENT: L&T Oil and Gas Special Project. (OGSP)
OWNER: ONGC.
CONSULTANT: EIL.
Nominated as Lead Engineer for the project
Preparation & Checking of Pre-bid Deliverables for the following list of Packages/
Equipments handling.
 Miscellaneous Pressure vessels
 Process Vessels & Test Separators
 IUG & IUA Package
 CO2 Snuffing system
 Chemical injection package
 DCP Skid etc.
PROJECT: CLUSTER – 7 PIPELINES PROJECT
CLIENT: L&T OGSP.
OWNER: ONGC
CONSULTANT: EIL
Nominated as Lead Engineer for the project
Preparation & Checking of Pre-bid Deliverables for Hydraulic Power Unit.
PROJECT: B-46 SERIES AND N-15 & N-16 WELL PLATFORM PROJECT
CLIENT: L&T OGSP.
OWNER: ONGC
Nominated as job engineer for the project
Preparation & Checking of Pre-bid Deliverables for the following list of Packages/
Equipments.
 Miscellaneous Pressure vessels & Separators
 IUG & IUA Package
 CO2 Snuffing system
 Chemical injection package
 DCP Skid etc.
PROJECT: D1, D1B, D1C & D1D FIELD DEVELOPMENT PROJCET
CLIENT: L&T OGSP.
OWNER: ONGC.
Nominated as job engineer for the project
PLATFORMS DESCRPTION:
 D1B Well Head Platform
 D1C Well head Platform
 D1D Well head Platform
 D1 Field Development Project
Preparation & Checking of Pre-bid Deliverables for the following list of Packages/
Equipments involved in the above mentioned platforms
 Miscellaneous Pressure vessels & Separators
 Utility Gas compressor (Package)
 Instrument / Air Compressor (Package)
 CO2 Snuffing system
 Filters
Past Experience
Position : Deputy Manager-Design
Industry : GE Godavari Engineering Ltd., Patancheru, Hyd.
Experience : June 2004 – September 2009.
Detailing and Checking of Surface Condenser, Deaerator, Heaters and Structural Assemblies
Using Auto Cad, PV Elite & Unigraphics NX4. Good knowledge in Thermal and Mechanical
Design of above stated equipments.
About Company:
GE Godavari Engineering Ltd is an ISO 9001:2000 engineering industry, which has
the worldwide fame in the manufacturing of static equipment like Heat Exchangers,
Pressure vessels; Storage tanks particularly Surface Condensers, Deaerators, Heaters, Piping
systems, Structural and other critical fabrication equipments, which plays major role in Oil &
Gas and power plant. It is following the good quality systems and manufacturing processes.
Job Responsibilities:
 Preparing project schedule for design documents and other works.
 Design of static equipments as per tender requirements.
 Preparation of thermal and mechanical Design calculations.
 Preparation and checking of drawings as per design requirements and
documents.
 Responsible for drawing approvals from Customer and third party (If any)
 Complete execution of project up to end of that project.
 Continuous monitoring of project progress.
 Detailing and Checking of Surface Condenser, Deaerator, Heaters and Structural
Assemblies Using Auto Cad, PV Elite & Unigraphics NX4.
Accomplishment
 Completed the projects/packages in less than the estimated hours and created more
revenues as well as got the appreciation from client
 Prepared standard work procedure to carry out the engineering activity.
Past Experience
Position : Cad design Engineer
Industry : SV Conveyors & Engineering Works, Hyderabad.
Experience : May 2000 – Jan 2001.
 Job Responsibilities:
 Design of Material Handling Equipment’s as per tender requirements.
 Preparation of G.A Drawings & Fabrication drawings.
 Checking of drawings as per design requirements and documents.
 Responsible for drawing approvals from Customer and third party (If any)
 Complete execution of project up to end of that project.
 Detailing and Checking of Belt Conveyors, Chain Conveyors, Crushers and
 Structural Assemblies Using Auto cad.
Project Profile:
In Engineering Degree:
Title : Mechanical design of shell and tube heat exchangers
Location : BHPV, Vizag.
Description : Designing shell and tube heat exchanger and analyze the various forces and
stresses acting on the components of heat exchanger which contains shell, tubes, flanges,
baffle plates as per ASME and TEMA.
Strengths:
 Able to handle job perfectly with complete responsibilities and dedication.
 Patience and hard working.
 Getting adapted to new working culture.
 Good communication skills.
Personal Profile:
Name : Madhava Rao V
Date of Birth : 19-08-1980
Sex : Male
Marital Status : Married
Nationality : INDIAN
Languages Known : English, Telugu and Hindi.
Permanent Address : S/o Reddiyya
Satulur P.O,
Nadendla (Mandal)
Guntur -522 549,
Andhra Pradesh, India.
Declaration:
I consider myself familiar with Mechanical Engineering aspects. I am also Confident of my
ability to in a team .I here declare that the information. Furnished the above information is
true to best of my knowledge.
Place:
Date: MADHAVA RAO.V

CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.

  • 1.
    CURRICULAM VITAE Madhava Rao.V S/o. V.Reddiyya, Satulur P.O, , Nadendla M.D Phone: + 91 95503 40490 Guntur Dt. Pin: 522 549. Email ID: vmadhav301@yahoo.co.in. Andhra Pradesh, India. madhavarao.vajja@gmail.com Career Objective: To obtain a challenging position in the field of Offshore/Onshore Engineering where my skills and creativity can be utilized to meet the company’s objective and vision while providing career advancement opportunities with “CAN DO” attitude. Snapshot on Area of Exposure & Expertise  Overall 14+ years of experience in Mechanical Design & Engineering in the field of Offshore & Onshore Oil & Gas, Petrochemical, Refinery and Power industry in Basic Design, Proposal, Detail & PMC Engineering for various types of systems, Static equipments and Packages.  Interacted with many equipment manufacturers all over the world for the design, engineering & procurement activities to full fill the customer requirement.  Strong Working experience on Static Equipments such as pressure vessels, heat exchangers, storage tanks, heaters, piping systems & other package equipment items as outlined here after.  Strong Working experience in PV Elite, Compress, HTRI, Navis Works Review & Auto Cad.  Basic knowledge on rotating equipments like Pumps, Compressor, Agitators, Mixers, Blowers, Gear Box & Motors.  Engineering codes and standards: ASME, API, ANSI, NACE, TEMA, PD 5500, IS and HEI for Surface Condensers & Heaters.  Knowledgeable in P&IDs, Piping plans, Isometric piping drawings, 3D modeling & plant layout review etc.  Considerable Knowledge in various company standards like ADMA-OPCO, SAUDI ARAMCO, SABIC, PETRONAS, BP, TOTAL & SHELL.  FEED, Proposal, Detail & PMC engineering for various offshore & onshore projects.  Responsible for preparation of Specifications / Drawings and technical Data sheets, Requisitions for Quotation, review of vendor offers, Technical queries, Technical bid Analysis, Purchase Requisitions and approval of Vendor & Contractor Drawings / documents  Cost estimation of Equipments. Co-ordination with other disciplines for interface engineering of Static Equipment and Packages
  • 2.
     Co-ordination withTeam Members and Attending Model Review / Project / Management review meetings  Meeting the requirements of International client standards during the execution of the projects Education Details:  B.Tech in Mechanical Engineering with distinction in S.C.R Engineering College J.N.T. University, A.P, India.  Diploma in Mechanical Engineering, D.A Govt. Polytechnic Ongole, S.B.T.E.T., A.P, India. Organizational Experience Current Position : STATIC EQUIPMENT ENGINEER – PMC (Presently Located in South Korea) Industry : TECHNIP FRANCE (ABUDHABI) – PMC (HUB) Experience : May 2015 – Till Date. (May 2015 – Jan 2016 in Singapore & Feb 2016 Onwards in Seoul, South Korea)  Worked as a Mechanical Engineer – Static in TECHNIP FRANCE (ABUDHABI) from April 2013 to April 2015.  Worked as a Sr. Engineer - Mechanical - Offshore in PETROFAC ENGINEERING SERVICES INDIA (P) LTD - Chennai from Nov 2011 to Mar. 2013.  Worked as a Senior Engineer in L&T-VALDEL ENGINEERING. LTD., Chennai from Oct 2009 to Oct. 2011.  Worked as a Deputy Manager-Design., GE Godavari Engineering Ltd., Hyderabad From June 2004 to September 2009.  Worked as a Cad Design Engineer, SV Conveyors & Engineering Works, Hyderabad From May 2000 to Jan 2001. Current Experience POSITION: STATIC EQUIPMENT ENGINEER - PMC Project: NASR Full Field Development Project (NSFFD) - Phase II Client: ADMA-OPCO. Nominated as PMC Engineer for the Project  Responsible for review of EPC contractor documents/drawings such as Specifications / Drawings and technical Data Sheets, Requisitions for Quotation, review of vendor offers, Technical queries, Technical bid Analysis Purchase Requisitions, review and
  • 3.
    approval of VendorDrawings / documents for the following static equipments/packages.  PMC Engineering activities for the following Equipments/packages. • Vessels (Cladded & Non Cladded) • Pig Launcher & Receivers • Nitrogen Cylinder Package • Heat Exchangers • Air Coolers, • Tanks • Water Heaters • Static Equipment’s covered in the following package items. - Gas Dehydration and Glycol Regeneration Package - Produced Water Treatment Package - Chemical Injection Package - Air Dryer Package - Fresh Water Maker Package - Potable Water Chiller Package - Vapor Recovery Unit - Safety packages like Foam & Sprinkler etc. POSITION: STATIC EQUIPMENT ENGINEER Project: Additional Gas Supply to Onshore & Flexibility Assurance at USSC Project Client: ADMA-OPCO. Nominated as Job Engineer for the Project  Responsible for preparation of Specifications / Drawings and technical Data Sheets, Requisitions for Quotation, review of vendor offers, Technical queries, Technical bid Analysis Purchase Requisitions, review and approval of Vendor Drawings / documents for the following static equipment’s.  Detail Engineering activities for the following Equipment’s/packages. • Vessels • Pig Traps (Scraper Launcher) • Sea Water Filtration Package • Internals Replacement for Separators & Discharge KOD
  • 4.
    Project: FEED servicesfor Additional Gas Supply to Onshore & Flexibility Assurance at USSC Project Client: ADMA-OPCO. Nominated as Job Engineer for the Project  Responsible for preparation of Specifications / Drawings and technical Data Sheets, Requisitions for Quotation, review of vendor offers, Technical queries, Technical bid Analysis for the following static equipment’s. • Vessels • Pig Traps (Scraper Launcher) • Sea Water Filtration Package • Internals Replacement for Separators & Discharge KOD POSITION: STATIC EQUIPMENT ENGINEER Project: HB Project, Saudi Arabia Client: SABIC, Saudi Arabia. Nominated as Job Engineer for the Project  Responsible for Vendor Document review of the following list of Equipment’s and Co-ordination with other disciplines for interface engineering of Static Equipment.  Detail Engineering activities for the following Equipment’s/packages. • Shell & Tube Heat Exchangers • Filters • Tanks • Pressure Vessels Previous Experience POSITION: SR. ENGINEER – MECHANICAL - OFFSHORE Project: North Tank Farm and Loading Arms & South Tank Farm Facilities – Saudi Arabia Client: Saudi Aramco, Saudi Arabia. Nominated as Job Engineer on deputation in Saudi Arabia  Responsible for the preparation of RFQ, TQs, TBA, PS and Vendor Document review for the following list of Packages/ Equipment’s handling and .Co-ordination with other disciplines for interface engineering of Static Equipment and packages.  Detail Engineering activities for the following Equipment’s/packages. • Tanks • Pressure Vessels
  • 5.
    • Shell &Tube and Air Cooled Heat Exchangers • Effluent Treatment Package Project: Greater Stella Area Development - Ithaca Energy - UK Nominated as Job Engineer for the Project  Execution of detail engineering activities such as Attending the Kick – of – Meetings, Review of detail engineering (Vendor) drawings/documents, interface engineering with other discipline, Co-ordination with Team Members etc.  Detail Engineering Activities for the following Equipments/packages. • Shell and Tube Heat Exchangers (H.P & L.P) • Plate and Frame Heat Exchangers Proposal: Timimoun Field Development Project proposal – ALGERIA Nominated as Lead Engineer for the proposal  Execution of Proposal engineering activities such as preparation of Proposal & Detail Engineering Execution Man-hours, Feed verification, Preparation of Client technical Queries, Preparation of FEED verification report, technical Write – UP, BOQ’s, and RFQ’s & Checking of RFQ’s prepared by Team Members, Co-ordination with Team Members, interface engineering with other discipline and Attending Project review meetings etc. Proposal engineering for the following Equipments/packages. • Shell and Tube Heat Exchangers • Air Cooled Heat Exchangers • HP & LP Flare Package • Pressure Vessels & Slug Catchers • Storage Tanks • Produced Water treatment Package • Filters Proposal: Inlet Separation & Boosting Facilities proposal – ALRAR, ALGERIA Nominated as Lead Engineer for the proposal  Execution of Proposal engineering activities such as preparation of Proposal & Detail Engineering Execution Man-hours, Feed verification, Preparation of Client technical Queries, Preparation of FEED verification report, technical Write – UP, BOQ’s, and RFQ’s & Checking of RFQ’s prepared by Team Members, Co-ordination with Team Members, interface engineering with other discipline and Attending Project review meetings etc. Proposal engineering for the following Equipments/packages. • Air Cooled Heat Exchangers • HP & LP Flare Package
  • 6.
    • Pressure Vessels& Filters • Storage Tanks • Mercury removal Unit • Produced Water treatment Package • Waste Water treatment Unit • Electric heaters Proposal: Jazan Refinery and Terminal Project (JR&TP), Saudi Arabia. Nominated as Job Engineer for the proposal  Feed verification, Preparation of Technical Queries, Preparation of RFQ and interface engineering with other discipline for the following Equipments/packages. • Shell and Tube Heat Exchangers • Plate and Frame Heat Exchangers • Deaerator Proposal: EPC WORK FOR SATAH AL RAZBOOT (SARB) FIELD DEVELOPMENT PROJECT – (PACKAGE 4 –OFFSHORE SCOPE), ABU DHABI. Nominated as Job Engineer for the proposal  Feed verification, Preparation of Technical Queries, Preparation of RFQ and interface engineering with other discipline for the following Equipments/packages. • Shell and Tube Heat Exchangers • Sea Water Treatment Package Proposal: EPC WORK FOR SATAH AL RAZBOOT (SARB) FIELD DEVELOPMENT PROJECT – (PACKAGE 3 –OFFSHORE SCOPE), ABU DHABI. Nominated as Job Engineer for the proposal  Feed verification, Preparation of Technical Queries, Preparation of RFQ and interface engineering with other discipline for Flare Package. Proposal: CENTRAL DIYARBEKIR (CDDP-A) PLATFORM FOR DIYARBEKIR OIL DEVELOPMENT PROJECT, TURKMENISTAN. Nominated as Job Engineer for the proposal  Feed verification, Preparation of Technical Queries & Cost estimation/CBE for tanks and Sump Caisson. Proposal: UZ 750 PROJECT – ISLAND SURFACE FACILITIES, UAE. Nominated as Job Engineer for the proposal  Feed verification, Vendor offer review, Preparation Technical Queries & TBE, Cost Estimation/CBE for pressure vessels.
  • 7.
    Past Experience POSITION :SR. ENGINEER - MECHANICAL INDUSTRY : L&T - VALDEL ENGINEERING. LTD., CHENNAI EXPERIENCE : Oct. 2009 to Oct 2011. CONTRIBUTION: PROJECT: CEIL-RAVVA FIELD LIFE CYCLE PROJECT. CLIENT: CAIRN ENERGY INDIA LTD. Nominated as Lead Engineer for the project Responsible for the preparation of Bid Documents like Job specifications, Mechanical Datasheets etc as a part of FEED for the following.  Produced Water Treatment Package  Modification of Existing Test Separator to Production Separator  Up gradation of existing Deck Crane to Higher Capacity  Coil Tubing Unit PROJECT: OSX-3 FPSO CLIENT: MODEC INTERNATIONAL INC. OWNER: OSX 3 LEASING B.V. Nominated as Lead Engineer for the project Responsible for study of material handling facilities and preparation of material handling report & interdisciplinary co-ordination for the following modules.  FWKOD & Test Separator  PW Treatment & Crude Exchangers  TEG Dehydration  Crude Dehydration & Desalination PROJECT: GSPC PROCESS PLATFORM & LIVING QUARTERS. CLIENT: L&T- Oil & Gas Special Project & AKER SOLUTIONS. OWNER: GSPC. CONSULTANT: EIL. Nominated as Sub - Lead Engineer for the project Responsible for the preparation of RFQ, TQs, TBA, PS and Vendor Document review for the following list of Packages/ Equipments handling and .Co-ordination with other disciplines for interface engineering of Static Equipment and packages.
  • 8.
     Waste HeatRecovery system  Hot Oil Dump Cooler  HP Production Separator  Well fluid cooler  DCP Skid PROJECT: MHN PROCESS PLATFORM & LIVING QUARTERS PROJECT. CLIENT: L&T OGSP. OWNER: ONGC. Nominated as job engineer for the project Responsible for the preparation of RFQ, TQs, PS and Vendor Document Review for the following list of Packages/ Equipments handling.  Miscellaneous vessels & Tanks  Potable fresh water system  Nitrogen Generator Package  Filters  CO2 Snuffing System PROPOSAL ENGINEERING PROJECTS HANDLED. PROJECT: DEVELOPMENT OF WO-16 CLUSTER & SB-14 WELLHEAD PLATFORM CLIENT: L&T Oil and Gas Special Project. (OGSP) OWNER: ONGC. CONSULTANT: EIL. Nominated as Lead Engineer for the project Preparation & Checking of Pre-bid Deliverables for the following list of Packages/ Equipments handling.  Miscellaneous Pressure vessels  Process Vessels & Test Separators  IUG & IUA Package  CO2 Snuffing system  Chemical injection package  DCP Skid etc. PROJECT: CLUSTER – 7 PIPELINES PROJECT CLIENT: L&T OGSP.
  • 9.
    OWNER: ONGC CONSULTANT: EIL Nominatedas Lead Engineer for the project Preparation & Checking of Pre-bid Deliverables for Hydraulic Power Unit. PROJECT: B-46 SERIES AND N-15 & N-16 WELL PLATFORM PROJECT CLIENT: L&T OGSP. OWNER: ONGC Nominated as job engineer for the project Preparation & Checking of Pre-bid Deliverables for the following list of Packages/ Equipments.  Miscellaneous Pressure vessels & Separators  IUG & IUA Package  CO2 Snuffing system  Chemical injection package  DCP Skid etc. PROJECT: D1, D1B, D1C & D1D FIELD DEVELOPMENT PROJCET CLIENT: L&T OGSP. OWNER: ONGC. Nominated as job engineer for the project PLATFORMS DESCRPTION:  D1B Well Head Platform  D1C Well head Platform  D1D Well head Platform  D1 Field Development Project Preparation & Checking of Pre-bid Deliverables for the following list of Packages/ Equipments involved in the above mentioned platforms  Miscellaneous Pressure vessels & Separators  Utility Gas compressor (Package)  Instrument / Air Compressor (Package)  CO2 Snuffing system  Filters Past Experience
  • 10.
    Position : DeputyManager-Design Industry : GE Godavari Engineering Ltd., Patancheru, Hyd. Experience : June 2004 – September 2009. Detailing and Checking of Surface Condenser, Deaerator, Heaters and Structural Assemblies Using Auto Cad, PV Elite & Unigraphics NX4. Good knowledge in Thermal and Mechanical Design of above stated equipments. About Company: GE Godavari Engineering Ltd is an ISO 9001:2000 engineering industry, which has the worldwide fame in the manufacturing of static equipment like Heat Exchangers, Pressure vessels; Storage tanks particularly Surface Condensers, Deaerators, Heaters, Piping systems, Structural and other critical fabrication equipments, which plays major role in Oil & Gas and power plant. It is following the good quality systems and manufacturing processes. Job Responsibilities:  Preparing project schedule for design documents and other works.  Design of static equipments as per tender requirements.  Preparation of thermal and mechanical Design calculations.  Preparation and checking of drawings as per design requirements and documents.  Responsible for drawing approvals from Customer and third party (If any)  Complete execution of project up to end of that project.  Continuous monitoring of project progress.  Detailing and Checking of Surface Condenser, Deaerator, Heaters and Structural Assemblies Using Auto Cad, PV Elite & Unigraphics NX4. Accomplishment  Completed the projects/packages in less than the estimated hours and created more revenues as well as got the appreciation from client  Prepared standard work procedure to carry out the engineering activity. Past Experience Position : Cad design Engineer Industry : SV Conveyors & Engineering Works, Hyderabad. Experience : May 2000 – Jan 2001.  Job Responsibilities:  Design of Material Handling Equipment’s as per tender requirements.  Preparation of G.A Drawings & Fabrication drawings.
  • 11.
     Checking ofdrawings as per design requirements and documents.  Responsible for drawing approvals from Customer and third party (If any)  Complete execution of project up to end of that project.  Detailing and Checking of Belt Conveyors, Chain Conveyors, Crushers and  Structural Assemblies Using Auto cad. Project Profile: In Engineering Degree: Title : Mechanical design of shell and tube heat exchangers Location : BHPV, Vizag. Description : Designing shell and tube heat exchanger and analyze the various forces and stresses acting on the components of heat exchanger which contains shell, tubes, flanges, baffle plates as per ASME and TEMA. Strengths:  Able to handle job perfectly with complete responsibilities and dedication.  Patience and hard working.  Getting adapted to new working culture.  Good communication skills. Personal Profile: Name : Madhava Rao V Date of Birth : 19-08-1980 Sex : Male Marital Status : Married Nationality : INDIAN Languages Known : English, Telugu and Hindi. Permanent Address : S/o Reddiyya Satulur P.O, Nadendla (Mandal) Guntur -522 549, Andhra Pradesh, India. Declaration:
  • 12.
    I consider myselffamiliar with Mechanical Engineering aspects. I am also Confident of my ability to in a team .I here declare that the information. Furnished the above information is true to best of my knowledge. Place: Date: MADHAVA RAO.V