SlideShare a Scribd company logo
Ferdinand Tabaco Cabunoc
Block 10 Lot 10 Camia St. Villa Candida Subdivision Bulua, Cagayan De Oro City
Misamis Oriental, Philippines
Mobile No.: +966538634186/+966582029671
Email Add: ft_cabunoc@yahoo.com
Current Location: Cagayan De Oro City, Philippines.
Availability: I can start work whenever being advice.
PERSONAL DATA
Age: 48
Date of Birth: May 30, 1967
Gender: Male
Civil Status: Married
Height: 163 cm.
Weight: 65 kg
Nationality: Filipino
Religion: Roman Catholic
Permanent Address: Philippines
WORK EXPERIENCE
I have been working for 22 years.
1. Position : Civil Engineer – Water Drilling Projects (MODON)
Duration : February 13, 2015 – January 09, 2016
Company : Bernard LTD.
Industry : Consultancy-Construction
Location : Arar, Kingdom of Saudi Arabia
Department : Project Management Office
Scope of Work :
 Supervising the project as a Resident Engineer: Water Supply for Potential Industrial
Cities, Qassim 2, Zulfi, Shaqra, Hafr Al Batin and Arar.
 Monitoring the well drilling work done by the contractor up to its desired depth as per
required with complete testing, logging, casing and pumping.
 Supervised and monitor the road construction of the project from survey works, sub-
grade preparation, aggregate base coarse laying spreading and compaction, testing,
MC1 application and asphalt laying.
 Monitor and control the quality output of all item involve in the completion of the
project which includes material used and see to it that all are in conformance and
compliance to project specification and standards.
 Check and evaluate the contractors performance in implementing item of works if
standard procedures are applied along with safety consideration until the project
completion.
 Checked and evaluate quality plan, safety plan and method statement submitted by
contractor and see to it that it is being followed and applied during the
implementation of work in the site.
 Imposed and employ safety precautionary measures upon the performance of the
project.
 Initiate the conduction of toolbox meeting, discussing site safety hazard and
employing mitigation for risk reduction and control with strict consideration to
housekeeping in all areas of work.
 Facilitate the installation of safety devices and application of safety standard in the
site which includes personal protective equipment and collective safety devices.
 Facilitate the conduction of staff meeting to update the various item related to
project execution with the evaluation of project status and offer options to remedy in
any case are there problem arises.
 Includes preparation of pertinent document such as Program of Work and S-curve for
project monitoring guidance.
 Prepare project status report in daily, weekly and monthly basis with all important
and necessary attachment to convey exact and complete information.
2. Position : Safety Engineer – Storm Water Drainage Projects (AMANA)
Duration : January 13, 2014 – February 12, 2015
Company : Bernard LTD.
Industry : Consultancy-Construction
Location : Riyadh, Kingdom of Saudi Arabia
Department : Project Management Office
Scope of Work :
 Check and evaluate the contractor performance in implementing item of works if
safety standard is applied until the project completion.
 Determine cause of unsafe condition through procedure review, equipment and
facilities inspection, and worker observation with corrective action recommendations
provided.
 Imposed and employ safety precautionary measures upon the performance of the
project.
 Initiate the conduction of toolbox meeting, discussing site safety hazard and
employing mitigation for risk reduction and control with strict consideration to
housekeeping in all areas of work.
 Facilitate the installation of safety devices and application of safety standard in the
site which includes personal protective equipment and collective safety devices.
 See to it and ensure that all necessary and important safety devices are visible in the
site in the area where hazard and risk issues are of greater chances to contribute
accidents.
 Take site safety discrepancy photos , issued safety notices, write letter to contractor
issuing site instruction, prepare and submit safety report along with safety risk
evaluation.
3. Position : Project Control/Safety Engineer- (STC-FTTH Projects)
Duration : September 22, 2012 – November 23, 2013
Company : Saudi Trans Telecoms Company
Industry : Telecommunication
Location : Riyadh, Kingdom of Saudi Arabia
Department : Project Management Office
Scope of Work :
 Reporting directly and provide support to project manager across a wide range of
Fiber To The Home (FTTH) project.
 Performed and demonstrate remotely via collaboration tools by sending emails and
telephonic discussions to contractor and OSP inspector pertaining to the project
during the pre-construction and implementation period.
 Provide knowledgeable support to the party involved in the implementation process
of the project.
 Review schedule, progress and productivity resources and relay information and
reminder to manager what are those activities that are set ahead specially when its
consider priority.
 Evaluate and update data regarding cost status, resources requirement, commitment
data and productivity variance report.
 Plan, manage and control risk register activities and emphasize safety precautionary
measures through monitoring site application all the time during project
implementation process.
• Serve as technical resource ensuring safe practices, injury/illness prevention
processes and risk management for all company site.
• Monitor and verify regulatory compliance in manpower health condition, air and
water quality, noise temperature and pest control.
• Inspect facility, machinery and equipment safety. Identify and correct potential
hazards wherever/whenever required.
• Assist in developing safety procedures, monitor and ensure technical and labor
safety compliance and deliver relevant safety training.
• Monitor and ensure regulatory program are develop and implemented.
• Check and verify if safety barricades and safety signs are installed at designated
area and conform as per required.
4. Position : Billing Clerk – (STC-FTTH Projects)
Duration : Oct 29, 2011 - Sep 21, 2012
Company : Saudi Trans Telecoms Company
Industry : Telecommunication
Location : Riyadh, Kingdom of Saudi Arabia
Department : Project Management Office
Scope of Work :
 Calculate quantities as per pre-conducted site survey and prepare and submit re-
design plan reflecting changes based on actual site measurement.
 Check and evaluate flimsy/invoice submitted by contractor and see to it that quantity
reflected in the document conformed to the actual installation in the site.
 Check and review bill of quantities and see to it that description of materials as per
item of work conforms to the actual with reference to standard specifications.
 Facilitate the requisition of material supply and inform the contractor the availability
and the pick-up schedule.
 Monitor the material utilization and conduct inventory to all material releases.
 Check and evaluate as-built plan and review length of measurement and quantity
reflected.
 Tabulate all data acquired, make report and submit to manager including all
necessary attachment.
5. Position : Project Engineer – (Housing and Road Project-Phils.)
Duration : Mar 1, 2009 - Oct 27, 2011
Company : ENROGEL Construction Corporation
Industry : Construction / Building / Engineering
Location : Cagayan De Oro City, Philippines
Department : Project Implementation
Scope of Work :
 Supervised the construction of Robinson Housing project which include swimming
pool construction, earthwork, drainage system, water work, road concreting and
building construction.
 Review plans, prepare Bar Chart, compressed PERT-CPM, prepare S-Curve and
programmed manpower and equipment utilization.
 Check and review bill of quantities and see to it that description of materials as per
item of work conforms to the actual with reference to standard specifications.
 Facilitate the requisition of material supply and inform the contractor the availability
and the pick-up schedule.
 Monitor the material utilization and conduct inventory to all material releases.
 Check and evaluate as-built plan and review length of measurement and quantity
reflected.
 Initiate safety application when on site and conduct tool box meeting regularly to
emphasized and discussed safety rules, construction procedure, work specification
including the importance of housekeeping.
7. Position : Project Engineer – (Oil & Gas Bulk Plant-Phils.)
Duration : Mar. 5, 2003 – Jan. 10, 2004
Company : FERM Construction Inc..
Industry : Construction/Building/Engineering
Location : Cagayan De Oro City, Philippines
Department : Project Implementation
8. Position : Project Engineer – (Philippine Government Project-Phils.)
Duration : Jan. 4, 2000 – Dec. 16, 2003
Company : Rakil Construction Inc..
Industry : Construction/Building/Engineering
Location : Misamis Oriental, Philippines
Department : Project Implementation
• Develop skills in material conservation and control overhead expenses thru
proper utilization of resources by monitoring strictly the project implementation
process.
• Evaluate manpower capability and upgrading the skills thru teaching new method
of construction techniques and application.
• Conduct road survey and established finish elevation of every item of work and
alignment of roadways.
• Prepare and submit accomplishment report and input data required for other
project related documents.
6. Position : Safety Engineer – (Telecom Project-Phils.)
Duration : Jan 15, 2004 - Dec 10, 2008
Company : NESIC Philippines Inc.
Industry : Telecommunication
Location : Makati Manila, Philippines
Department : Project Implementation
Scope of Work :
 Responsible for the conduction of toolbox meeting emphasizing the safety procedures
along with the usage and application of safety gears and equipment.
 Implement procedures and processes to control/reduce occupational risk and support
the health and safety policies of the company through site application.
 Conduct safety assessment and analysis in all company project site.
 Comply with the Government any legal requirement, prepare and apply company
safety policies and procedures and establish best practices.
 Monitor and verify regulatory compliance in manpower including health condition
 Emphasize the importance and initiate a move to conduct housekeeping every
after work of the day.
• Prepare and submit report to head office in Manila thru e-mail when work is
100% completed with all the necessary attachment and inform the other team to
proceed in the area after work is completed by the first team.
• Sent to India for a Commissioning work of TATA Telecom Project in the
year 2009. This to activate cell sites of the said company in New Delhi
region.
• Supervised the installation of outdoor and indoor equipment and
conduct activation thru computer programming in Pasolink project of
the country.
• Prepare and submit accomplishment report, material utilization report
and targeted/projected accomplishment for the next schedule to sub
office in Bangalore.
9. Position : Project Engineer – (Housing and Road Project-Phils.)
Duration : Feb. 1, 1998 – Jan. 3, 2000
Company : JCG International Inc.
Industry : Construction/Building/Engineering
Location : Cagayan De Oro City, Philippines
Department : Project Implementation
Scope of Work
 Supervised the construction of Liquefied petroleum gas spherical tank
foundation, concrete pipe pedestal, tank fabrication and installation,
piping work and sea port construction.
 Supervised road concreting, asphalting, drainage construction health centers and
school building constructions.
 Supervised the site development of a housing project, road mapping and
subdivision, drainage designed and disposal, earth works and water works.
 Check and monitor quality output of every item of work and see to it that it
conform to the construction plan and standard specifications.
 Review plans, prepare Bar Chart, compressed PERT-CPM, prepare S-Curve and
programmed manpower and equipment utilization.
 Check and review bill of quantities and see to it that description of materials as per
item of work conforms to the actual with reference to standard specifications.
 Facilitate the requisition of material supply and inform the contractor the
availability and the pick-up schedule.
 Monitor the material utilization and conduct inventory to all material releases.
 Check and evaluate as-built plan and review length of measurement and quantity
reflected.
 Initiate safety application when on site and conduct tool box meeting regularly to
emphasized and discussed safety rules, construction procedure, work specification
including the importance of housekeeping.
• Develop skills in material conservation and control overhead expenses thru
proper utilization of resources by monitoring strictly the project implementation
process.
• Evaluate manpower capability and upgrading the skills thru teaching new method
of construction techniques and application.
• Conduct road survey and established finish elevation of every item of work and
alignment of roadways.
• Prepare and submit accomplishment report and input data required for other
project related documents.
10. Position : Field Engineer – (Bridge Construction Project-Phils.)
Duration : Nov. 22, 1995 – Jan. 30, 1998
Company : Urban Integrated Consultancy Inc. (UICI)
Industry : Consultancy-Construction
Location : Camiguin Province, Philippines
Department : Project Management
Scope of Work
 Draftsman for the 5th
. IBRD Package in the construction of Dinanggasan bridge
project of the province.
 Prepare and submit accomplishment report with progress photographs along with
S-curve, manpower, material quantity and equipment utilization cost.
 Instrument man and conduct upstream and downstream survey, establish natural
and finished grade line elevation of roadway, embankment, piers and abutment.
 Compute cut and fill volume of embankment and monitor quality and suitability of
filling materials.
 Monitor compaction activity of the embankment, sub-base and base coarse layer by
layer and witness the conduction of compaction test (FDT).
 Quality inspector for the construction of grouted riprap, stone masonry and bridge
approaches of the project.
 Witness material testing and conduct trial mixed.
 Control and monitor quantity of materials as per design mixed for concrete pouring
activity.
 Monitor pile driving activity and record penetration per number of blows as per
calibration.
 Witness post tensioning activity for the reinforced concrete dick girder.
11. Position : Draftsman/Instrument Man/Field Engineer – (Bridge Construction Project)
Duration : Nov. 24, 1993 – Jul. 24, 1995
Company : G & P Builders Inc.
Industry : Construction/Building/Engineering
Location : Camiguin Province, Philippines
Department : Project Implementation
Scope of Work
 Draftsman for the 3rd
. IBRD Package in the construction of Box Culvert and
Storm Drainage project of the province.
 Prepare and submit accomplishment report with progress photographs along
with S-curve, manpower, material quantity and equipment utilization cost.
 Instrument man and conduct upstream and downstream survey, establish
natural and finished grade line elevation of roadway, embankment, piers and
abutment.
 Compute cut and fill volume of embankment and monitor quality and suitability
of filling materials.
 Monitor compaction activity of the embankment, sub-base and base coarse
layer by layer and witness the conduction of compaction test (FDT).
 Quality inspector for the construction of grouted riprap, stone masonry and box
culvert approaches of the project.
 Witness material testing and conduct trial mixed.
 Control and monitor quantity of materials as per design mixed for concrete
pouring activity.
CV SUMMARY
KEY SKILLS:
 Ability to lead a team.
 Good communication and interpersonal skills.
 Completing the projects on given deadlines.
 Experience in working with different teams.
 Ability to work under stress and multi-tasking scenario.
 Proficient in use of computers and software.
 Good knowledge of financial and budgetary management.
 Versed in project management, site construction coordination, estimating, cost controlling, contract
administrations.
 Materials & cost estimates.
 Quantity surveying.
 AutoCAD NC11 2D
 Multiple projects management.
 Safety Engineering.
EDUCATION
Education Level : Bachelor / College Degree
Education Field : Engineering
Course : Bachelor of Science in Civil Engineering
School/University : Cagayan De Oro College
Location : Cagayan De Oro City, Philippines
Date Graduated : March, 1996
LICENSES AND TRAINING CERTIFICATION
Licenses License Number Place
1.) Licensed Professional Engineer 0117275 Philippines
2.) Licensed Professional Driver K0298076043 Philippines
3.) Driving License Kingdom of Saudi Arabia
Certifications Time Duration Place
1.) IOSH-Managing Safely 40 Hrs. STC-Riyadh, KSA
2.) Basic Auto CAD 24 Hrs. Riyadh, KSA
3.) Primavera Project Management 24 Hrs. Riyadh, KSA
4.) Construction Safety Training 40 Hrs. Philippines
5.) Ergonomics and Psychological First-Aid 8 Hrs. Philippines
6.) Occupational Safety and Health Network 40 Hrs. Philippines
AVAILABLE DOCUMENT
Passport No. EB6791790 Issued in Riyadh, KSA Expiry Date: Nov. 19, 2017
LANGUAGE SPOKEN
Filipino (Fluent)
English (Intermediate)
Arabic (Average)
REFERENCES
Name : Engr. Pedro Pablo Bascones
Position : Project Manager
Company : Bernard LTD.
Tel. No. : +966504164159/+966583726470
Email Add. : p.bascones@bernard-ltd.com
Name : Engr. Sorin Popa
Position : Resident Engineer
Company : Bernard LTD.
Tel. No. : +966598556009
Email Add. : p.sorin@bernard-ltd.com
Name : Engr. Basilio A. Varques
Position : Civil/Structural Engineer
Company : Saudi Consul
Tel. No. : +639128440492
Email Add. : bvarx68@yahoo.com

More Related Content

What's hot

Curriculum Vitae (B. Pancho)2015
Curriculum Vitae (B. Pancho)2015Curriculum Vitae (B. Pancho)2015
Curriculum Vitae (B. Pancho)2015Bernard Pancho
 
William keane. 03.25.2016 final
William keane. 03.25.2016 finalWilliam keane. 03.25.2016 final
William keane. 03.25.2016 finalWilliam Keane
 
CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)Joedon Cunanan
 
Ryan Ministrelli Resume 2016
Ryan Ministrelli Resume 2016Ryan Ministrelli Resume 2016
Ryan Ministrelli Resume 2016Ryan Ministrelli
 
ERECTION METHOD STATEMENT
ERECTION METHOD STATEMENTERECTION METHOD STATEMENT
ERECTION METHOD STATEMENTmustafa hussain
 
RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015Ricky Dasal
 
ENGINEERING PROJECTS 1
ENGINEERING PROJECTS 1ENGINEERING PROJECTS 1
ENGINEERING PROJECTS 1uche ibekwe
 
Johannes Jacobus(Kiewiet) Peens cv 2015
Johannes Jacobus(Kiewiet) Peens cv 2015Johannes Jacobus(Kiewiet) Peens cv 2015
Johannes Jacobus(Kiewiet) Peens cv 2015JOHANNES JACOBUS PEENS
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
MOHAMAD ANWAR MALIK
 
Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016Ayman Issa
 

What's hot (19)

Curriculum Vitae (B. Pancho)2015
Curriculum Vitae (B. Pancho)2015Curriculum Vitae (B. Pancho)2015
Curriculum Vitae (B. Pancho)2015
 
William keane. 03.25.2016 final
William keane. 03.25.2016 finalWilliam keane. 03.25.2016 final
William keane. 03.25.2016 final
 
Peter L. Cabbab.
Peter L. Cabbab.Peter L. Cabbab.
Peter L. Cabbab.
 
Edumac Resume part 3333333
Edumac Resume part 3333333Edumac Resume part 3333333
Edumac Resume part 3333333
 
Civil Engineer 2
Civil Engineer 2Civil Engineer 2
Civil Engineer 2
 
Harley's CV1
Harley's  CV1Harley's  CV1
Harley's CV1
 
CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)
 
Ryan Ministrelli Resume 2016
Ryan Ministrelli Resume 2016Ryan Ministrelli Resume 2016
Ryan Ministrelli Resume 2016
 
CV Dodo NEW
CV Dodo NEWCV Dodo NEW
CV Dodo NEW
 
CV@JOMY NEW
CV@JOMY NEWCV@JOMY NEW
CV@JOMY NEW
 
Naushad_CV 2016
Naushad_CV 2016Naushad_CV 2016
Naushad_CV 2016
 
ERECTION METHOD STATEMENT
ERECTION METHOD STATEMENTERECTION METHOD STATEMENT
ERECTION METHOD STATEMENT
 
RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015
 
Roman Victor Santos
Roman Victor SantosRoman Victor Santos
Roman Victor Santos
 
ENGINEERING PROJECTS 1
ENGINEERING PROJECTS 1ENGINEERING PROJECTS 1
ENGINEERING PROJECTS 1
 
Johannes Jacobus(Kiewiet) Peens cv 2015
Johannes Jacobus(Kiewiet) Peens cv 2015Johannes Jacobus(Kiewiet) Peens cv 2015
Johannes Jacobus(Kiewiet) Peens cv 2015
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
 
CV OF MVV
CV OF MVVCV OF MVV
CV OF MVV
 
Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016
 

Viewers also liked

Jennifer salinas vs angel gladney live
Jennifer salinas vs angel gladney liveJennifer salinas vs angel gladney live
Jennifer salinas vs angel gladney live
justinian39
 
ジョーンズ ラング ラサール 日本企業CREインデックス 2013年
ジョーンズ ラング ラサール 日本企業CREインデックス 2013年ジョーンズ ラング ラサール 日本企業CREインデックス 2013年
ジョーンズ ラング ラサール 日本企業CREインデックス 2013年JLL
 
Lawyer Up Philly Rack Card
Lawyer Up Philly Rack CardLawyer Up Philly Rack Card
Lawyer Up Philly Rack CardJERRY EHRLICH
 
Biblioteconomia virtuala v.scurta
Biblioteconomia virtuala v.scurtaBiblioteconomia virtuala v.scurta
Biblioteconomia virtuala v.scurta
National Library of Republic of Moldova
 
Proven_Practice_Merging_Libraries_Workbook_Suppl_Material
Proven_Practice_Merging_Libraries_Workbook_Suppl_MaterialProven_Practice_Merging_Libraries_Workbook_Suppl_Material
Proven_Practice_Merging_Libraries_Workbook_Suppl_MaterialMary Jo Devereaux, MLS
 
India mapping assignment
India mapping assignmentIndia mapping assignment
India mapping assignment
quesoqueen
 
NSTDA Annual Report 2015
NSTDA Annual Report 2015NSTDA Annual Report 2015
Cognizant separation letter
Cognizant separation letterCognizant separation letter
Cognizant separation letterMerlin Jacob
 
Making wearables with NodeMCU - FOSDEM 2017
Making wearables with NodeMCU - FOSDEM 2017Making wearables with NodeMCU - FOSDEM 2017
Making wearables with NodeMCU - FOSDEM 2017
Etiene Dalcol
 

Viewers also liked (9)

Jennifer salinas vs angel gladney live
Jennifer salinas vs angel gladney liveJennifer salinas vs angel gladney live
Jennifer salinas vs angel gladney live
 
ジョーンズ ラング ラサール 日本企業CREインデックス 2013年
ジョーンズ ラング ラサール 日本企業CREインデックス 2013年ジョーンズ ラング ラサール 日本企業CREインデックス 2013年
ジョーンズ ラング ラサール 日本企業CREインデックス 2013年
 
Lawyer Up Philly Rack Card
Lawyer Up Philly Rack CardLawyer Up Philly Rack Card
Lawyer Up Philly Rack Card
 
Biblioteconomia virtuala v.scurta
Biblioteconomia virtuala v.scurtaBiblioteconomia virtuala v.scurta
Biblioteconomia virtuala v.scurta
 
Proven_Practice_Merging_Libraries_Workbook_Suppl_Material
Proven_Practice_Merging_Libraries_Workbook_Suppl_MaterialProven_Practice_Merging_Libraries_Workbook_Suppl_Material
Proven_Practice_Merging_Libraries_Workbook_Suppl_Material
 
India mapping assignment
India mapping assignmentIndia mapping assignment
India mapping assignment
 
NSTDA Annual Report 2015
NSTDA Annual Report 2015NSTDA Annual Report 2015
NSTDA Annual Report 2015
 
Cognizant separation letter
Cognizant separation letterCognizant separation letter
Cognizant separation letter
 
Making wearables with NodeMCU - FOSDEM 2017
Making wearables with NodeMCU - FOSDEM 2017Making wearables with NodeMCU - FOSDEM 2017
Making wearables with NodeMCU - FOSDEM 2017
 

Similar to CVFTCabunoc

Resume 08--Earl Victor -
Resume 08--Earl Victor -Resume 08--Earl Victor -
Resume 08--Earl Victor -Earlvic Torcino
 
RONALD CV 17.11.2015
RONALD CV 17.11.2015RONALD CV 17.11.2015
RONALD CV 17.11.2015Ronald Fung
 
Engr ilyas cv new
Engr ilyas cv newEngr ilyas cv new
Engr ilyas cv new
Malik Ilyas KHATTAK
 
CV of Raffy Feliciano
CV of Raffy FelicianoCV of Raffy Feliciano
CV of Raffy Feliciano
Raffy Feliciano
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Mostafa Sayed
 

Similar to CVFTCabunoc (20)

GERRY PANTIG MANICLANG
GERRY PANTIG MANICLANGGERRY PANTIG MANICLANG
GERRY PANTIG MANICLANG
 
JAY CV 2016
JAY CV 2016JAY CV 2016
JAY CV 2016
 
CV-R.B.Guinir Jr.(01-15-17)
CV-R.B.Guinir Jr.(01-15-17)CV-R.B.Guinir Jr.(01-15-17)
CV-R.B.Guinir Jr.(01-15-17)
 
Abo-Eldardaa_CV_2015 & Duties
Abo-Eldardaa_CV_2015 & DutiesAbo-Eldardaa_CV_2015 & Duties
Abo-Eldardaa_CV_2015 & Duties
 
Resume 08--Earl Victor -
Resume 08--Earl Victor -Resume 08--Earl Victor -
Resume 08--Earl Victor -
 
Rolando Resume
Rolando ResumeRolando Resume
Rolando Resume
 
SAQIB (2) (1)
SAQIB (2) (1)SAQIB (2) (1)
SAQIB (2) (1)
 
RONALD CV 17.11.2015
RONALD CV 17.11.2015RONALD CV 17.11.2015
RONALD CV 17.11.2015
 
Moh CV Updated
Moh CV UpdatedMoh CV Updated
Moh CV Updated
 
Sachin parab
Sachin parabSachin parab
Sachin parab
 
2015 CV
2015 CV 2015 CV
2015 CV
 
Engr ilyas cv new
Engr ilyas cv newEngr ilyas cv new
Engr ilyas cv new
 
cv.akram sabri
cv.akram sabricv.akram sabri
cv.akram sabri
 
Joshua Ibbertson CV 2015
Joshua Ibbertson CV 2015Joshua Ibbertson CV 2015
Joshua Ibbertson CV 2015
 
resume with daewoo
resume with daewooresume with daewoo
resume with daewoo
 
0 ranny ancero CV
0 ranny ancero CV0 ranny ancero CV
0 ranny ancero CV
 
CV-FRANCISCO L. ABOR
CV-FRANCISCO L. ABORCV-FRANCISCO L. ABOR
CV-FRANCISCO L. ABOR
 
Hafiz- resume
Hafiz- resumeHafiz- resume
Hafiz- resume
 
CV of Raffy Feliciano
CV of Raffy FelicianoCV of Raffy Feliciano
CV of Raffy Feliciano
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
 

CVFTCabunoc

  • 1. Ferdinand Tabaco Cabunoc Block 10 Lot 10 Camia St. Villa Candida Subdivision Bulua, Cagayan De Oro City Misamis Oriental, Philippines Mobile No.: +966538634186/+966582029671 Email Add: ft_cabunoc@yahoo.com Current Location: Cagayan De Oro City, Philippines. Availability: I can start work whenever being advice. PERSONAL DATA Age: 48 Date of Birth: May 30, 1967 Gender: Male Civil Status: Married Height: 163 cm. Weight: 65 kg Nationality: Filipino Religion: Roman Catholic Permanent Address: Philippines WORK EXPERIENCE I have been working for 22 years. 1. Position : Civil Engineer – Water Drilling Projects (MODON) Duration : February 13, 2015 – January 09, 2016 Company : Bernard LTD. Industry : Consultancy-Construction Location : Arar, Kingdom of Saudi Arabia Department : Project Management Office Scope of Work :  Supervising the project as a Resident Engineer: Water Supply for Potential Industrial Cities, Qassim 2, Zulfi, Shaqra, Hafr Al Batin and Arar.  Monitoring the well drilling work done by the contractor up to its desired depth as per required with complete testing, logging, casing and pumping.  Supervised and monitor the road construction of the project from survey works, sub- grade preparation, aggregate base coarse laying spreading and compaction, testing, MC1 application and asphalt laying.  Monitor and control the quality output of all item involve in the completion of the project which includes material used and see to it that all are in conformance and compliance to project specification and standards.  Check and evaluate the contractors performance in implementing item of works if standard procedures are applied along with safety consideration until the project completion.  Checked and evaluate quality plan, safety plan and method statement submitted by contractor and see to it that it is being followed and applied during the implementation of work in the site.  Imposed and employ safety precautionary measures upon the performance of the project.
  • 2.  Initiate the conduction of toolbox meeting, discussing site safety hazard and employing mitigation for risk reduction and control with strict consideration to housekeeping in all areas of work.  Facilitate the installation of safety devices and application of safety standard in the site which includes personal protective equipment and collective safety devices.  Facilitate the conduction of staff meeting to update the various item related to project execution with the evaluation of project status and offer options to remedy in any case are there problem arises.  Includes preparation of pertinent document such as Program of Work and S-curve for project monitoring guidance.  Prepare project status report in daily, weekly and monthly basis with all important and necessary attachment to convey exact and complete information. 2. Position : Safety Engineer – Storm Water Drainage Projects (AMANA) Duration : January 13, 2014 – February 12, 2015 Company : Bernard LTD. Industry : Consultancy-Construction Location : Riyadh, Kingdom of Saudi Arabia Department : Project Management Office Scope of Work :  Check and evaluate the contractor performance in implementing item of works if safety standard is applied until the project completion.  Determine cause of unsafe condition through procedure review, equipment and facilities inspection, and worker observation with corrective action recommendations provided.  Imposed and employ safety precautionary measures upon the performance of the project.  Initiate the conduction of toolbox meeting, discussing site safety hazard and employing mitigation for risk reduction and control with strict consideration to housekeeping in all areas of work.  Facilitate the installation of safety devices and application of safety standard in the site which includes personal protective equipment and collective safety devices.  See to it and ensure that all necessary and important safety devices are visible in the site in the area where hazard and risk issues are of greater chances to contribute accidents.  Take site safety discrepancy photos , issued safety notices, write letter to contractor issuing site instruction, prepare and submit safety report along with safety risk evaluation. 3. Position : Project Control/Safety Engineer- (STC-FTTH Projects) Duration : September 22, 2012 – November 23, 2013 Company : Saudi Trans Telecoms Company Industry : Telecommunication Location : Riyadh, Kingdom of Saudi Arabia Department : Project Management Office Scope of Work :  Reporting directly and provide support to project manager across a wide range of Fiber To The Home (FTTH) project.  Performed and demonstrate remotely via collaboration tools by sending emails and telephonic discussions to contractor and OSP inspector pertaining to the project during the pre-construction and implementation period.  Provide knowledgeable support to the party involved in the implementation process of the project.  Review schedule, progress and productivity resources and relay information and reminder to manager what are those activities that are set ahead specially when its consider priority.  Evaluate and update data regarding cost status, resources requirement, commitment data and productivity variance report.  Plan, manage and control risk register activities and emphasize safety precautionary
  • 3. measures through monitoring site application all the time during project implementation process. • Serve as technical resource ensuring safe practices, injury/illness prevention processes and risk management for all company site. • Monitor and verify regulatory compliance in manpower health condition, air and water quality, noise temperature and pest control. • Inspect facility, machinery and equipment safety. Identify and correct potential hazards wherever/whenever required. • Assist in developing safety procedures, monitor and ensure technical and labor safety compliance and deliver relevant safety training. • Monitor and ensure regulatory program are develop and implemented. • Check and verify if safety barricades and safety signs are installed at designated area and conform as per required. 4. Position : Billing Clerk – (STC-FTTH Projects) Duration : Oct 29, 2011 - Sep 21, 2012 Company : Saudi Trans Telecoms Company Industry : Telecommunication Location : Riyadh, Kingdom of Saudi Arabia Department : Project Management Office Scope of Work :  Calculate quantities as per pre-conducted site survey and prepare and submit re- design plan reflecting changes based on actual site measurement.  Check and evaluate flimsy/invoice submitted by contractor and see to it that quantity reflected in the document conformed to the actual installation in the site.  Check and review bill of quantities and see to it that description of materials as per item of work conforms to the actual with reference to standard specifications.  Facilitate the requisition of material supply and inform the contractor the availability and the pick-up schedule.  Monitor the material utilization and conduct inventory to all material releases.  Check and evaluate as-built plan and review length of measurement and quantity reflected.  Tabulate all data acquired, make report and submit to manager including all necessary attachment. 5. Position : Project Engineer – (Housing and Road Project-Phils.) Duration : Mar 1, 2009 - Oct 27, 2011 Company : ENROGEL Construction Corporation Industry : Construction / Building / Engineering Location : Cagayan De Oro City, Philippines Department : Project Implementation Scope of Work :  Supervised the construction of Robinson Housing project which include swimming pool construction, earthwork, drainage system, water work, road concreting and building construction.  Review plans, prepare Bar Chart, compressed PERT-CPM, prepare S-Curve and programmed manpower and equipment utilization.  Check and review bill of quantities and see to it that description of materials as per item of work conforms to the actual with reference to standard specifications.  Facilitate the requisition of material supply and inform the contractor the availability and the pick-up schedule.  Monitor the material utilization and conduct inventory to all material releases.  Check and evaluate as-built plan and review length of measurement and quantity reflected.  Initiate safety application when on site and conduct tool box meeting regularly to emphasized and discussed safety rules, construction procedure, work specification including the importance of housekeeping.
  • 4. 7. Position : Project Engineer – (Oil & Gas Bulk Plant-Phils.) Duration : Mar. 5, 2003 – Jan. 10, 2004 Company : FERM Construction Inc.. Industry : Construction/Building/Engineering Location : Cagayan De Oro City, Philippines Department : Project Implementation 8. Position : Project Engineer – (Philippine Government Project-Phils.) Duration : Jan. 4, 2000 – Dec. 16, 2003 Company : Rakil Construction Inc.. Industry : Construction/Building/Engineering Location : Misamis Oriental, Philippines Department : Project Implementation • Develop skills in material conservation and control overhead expenses thru proper utilization of resources by monitoring strictly the project implementation process. • Evaluate manpower capability and upgrading the skills thru teaching new method of construction techniques and application. • Conduct road survey and established finish elevation of every item of work and alignment of roadways. • Prepare and submit accomplishment report and input data required for other project related documents. 6. Position : Safety Engineer – (Telecom Project-Phils.) Duration : Jan 15, 2004 - Dec 10, 2008 Company : NESIC Philippines Inc. Industry : Telecommunication Location : Makati Manila, Philippines Department : Project Implementation Scope of Work :  Responsible for the conduction of toolbox meeting emphasizing the safety procedures along with the usage and application of safety gears and equipment.  Implement procedures and processes to control/reduce occupational risk and support the health and safety policies of the company through site application.  Conduct safety assessment and analysis in all company project site.  Comply with the Government any legal requirement, prepare and apply company safety policies and procedures and establish best practices.  Monitor and verify regulatory compliance in manpower including health condition  Emphasize the importance and initiate a move to conduct housekeeping every after work of the day. • Prepare and submit report to head office in Manila thru e-mail when work is 100% completed with all the necessary attachment and inform the other team to proceed in the area after work is completed by the first team. • Sent to India for a Commissioning work of TATA Telecom Project in the year 2009. This to activate cell sites of the said company in New Delhi region. • Supervised the installation of outdoor and indoor equipment and conduct activation thru computer programming in Pasolink project of the country. • Prepare and submit accomplishment report, material utilization report and targeted/projected accomplishment for the next schedule to sub office in Bangalore.
  • 5. 9. Position : Project Engineer – (Housing and Road Project-Phils.) Duration : Feb. 1, 1998 – Jan. 3, 2000 Company : JCG International Inc. Industry : Construction/Building/Engineering Location : Cagayan De Oro City, Philippines Department : Project Implementation Scope of Work  Supervised the construction of Liquefied petroleum gas spherical tank foundation, concrete pipe pedestal, tank fabrication and installation, piping work and sea port construction.  Supervised road concreting, asphalting, drainage construction health centers and school building constructions.  Supervised the site development of a housing project, road mapping and subdivision, drainage designed and disposal, earth works and water works.  Check and monitor quality output of every item of work and see to it that it conform to the construction plan and standard specifications.  Review plans, prepare Bar Chart, compressed PERT-CPM, prepare S-Curve and programmed manpower and equipment utilization.  Check and review bill of quantities and see to it that description of materials as per item of work conforms to the actual with reference to standard specifications.  Facilitate the requisition of material supply and inform the contractor the availability and the pick-up schedule.  Monitor the material utilization and conduct inventory to all material releases.  Check and evaluate as-built plan and review length of measurement and quantity reflected.  Initiate safety application when on site and conduct tool box meeting regularly to emphasized and discussed safety rules, construction procedure, work specification including the importance of housekeeping. • Develop skills in material conservation and control overhead expenses thru proper utilization of resources by monitoring strictly the project implementation process. • Evaluate manpower capability and upgrading the skills thru teaching new method of construction techniques and application. • Conduct road survey and established finish elevation of every item of work and alignment of roadways. • Prepare and submit accomplishment report and input data required for other project related documents. 10. Position : Field Engineer – (Bridge Construction Project-Phils.) Duration : Nov. 22, 1995 – Jan. 30, 1998 Company : Urban Integrated Consultancy Inc. (UICI) Industry : Consultancy-Construction Location : Camiguin Province, Philippines Department : Project Management Scope of Work  Draftsman for the 5th . IBRD Package in the construction of Dinanggasan bridge project of the province.  Prepare and submit accomplishment report with progress photographs along with S-curve, manpower, material quantity and equipment utilization cost.  Instrument man and conduct upstream and downstream survey, establish natural and finished grade line elevation of roadway, embankment, piers and abutment.  Compute cut and fill volume of embankment and monitor quality and suitability of filling materials.  Monitor compaction activity of the embankment, sub-base and base coarse layer by layer and witness the conduction of compaction test (FDT).  Quality inspector for the construction of grouted riprap, stone masonry and bridge
  • 6. approaches of the project.  Witness material testing and conduct trial mixed.  Control and monitor quantity of materials as per design mixed for concrete pouring activity.  Monitor pile driving activity and record penetration per number of blows as per calibration.  Witness post tensioning activity for the reinforced concrete dick girder. 11. Position : Draftsman/Instrument Man/Field Engineer – (Bridge Construction Project) Duration : Nov. 24, 1993 – Jul. 24, 1995 Company : G & P Builders Inc. Industry : Construction/Building/Engineering Location : Camiguin Province, Philippines Department : Project Implementation Scope of Work  Draftsman for the 3rd . IBRD Package in the construction of Box Culvert and Storm Drainage project of the province.  Prepare and submit accomplishment report with progress photographs along with S-curve, manpower, material quantity and equipment utilization cost.  Instrument man and conduct upstream and downstream survey, establish natural and finished grade line elevation of roadway, embankment, piers and abutment.  Compute cut and fill volume of embankment and monitor quality and suitability of filling materials.  Monitor compaction activity of the embankment, sub-base and base coarse layer by layer and witness the conduction of compaction test (FDT).  Quality inspector for the construction of grouted riprap, stone masonry and box culvert approaches of the project.  Witness material testing and conduct trial mixed.  Control and monitor quantity of materials as per design mixed for concrete pouring activity. CV SUMMARY KEY SKILLS:  Ability to lead a team.  Good communication and interpersonal skills.  Completing the projects on given deadlines.  Experience in working with different teams.  Ability to work under stress and multi-tasking scenario.  Proficient in use of computers and software.  Good knowledge of financial and budgetary management.  Versed in project management, site construction coordination, estimating, cost controlling, contract administrations.  Materials & cost estimates.  Quantity surveying.  AutoCAD NC11 2D  Multiple projects management.  Safety Engineering.
  • 7. EDUCATION Education Level : Bachelor / College Degree Education Field : Engineering Course : Bachelor of Science in Civil Engineering School/University : Cagayan De Oro College Location : Cagayan De Oro City, Philippines Date Graduated : March, 1996 LICENSES AND TRAINING CERTIFICATION Licenses License Number Place 1.) Licensed Professional Engineer 0117275 Philippines 2.) Licensed Professional Driver K0298076043 Philippines 3.) Driving License Kingdom of Saudi Arabia Certifications Time Duration Place 1.) IOSH-Managing Safely 40 Hrs. STC-Riyadh, KSA 2.) Basic Auto CAD 24 Hrs. Riyadh, KSA 3.) Primavera Project Management 24 Hrs. Riyadh, KSA 4.) Construction Safety Training 40 Hrs. Philippines 5.) Ergonomics and Psychological First-Aid 8 Hrs. Philippines 6.) Occupational Safety and Health Network 40 Hrs. Philippines AVAILABLE DOCUMENT Passport No. EB6791790 Issued in Riyadh, KSA Expiry Date: Nov. 19, 2017 LANGUAGE SPOKEN Filipino (Fluent) English (Intermediate) Arabic (Average) REFERENCES Name : Engr. Pedro Pablo Bascones Position : Project Manager Company : Bernard LTD. Tel. No. : +966504164159/+966583726470 Email Add. : p.bascones@bernard-ltd.com Name : Engr. Sorin Popa Position : Resident Engineer Company : Bernard LTD. Tel. No. : +966598556009 Email Add. : p.sorin@bernard-ltd.com Name : Engr. Basilio A. Varques Position : Civil/Structural Engineer Company : Saudi Consul Tel. No. : +639128440492 Email Add. : bvarx68@yahoo.com