This document provides a summary of Ferdinand Tabaco Cabunoc's work experience and qualifications. He has over 22 years of experience working in construction and engineering projects in the Philippines and Saudi Arabia, holding roles such as civil engineer, safety engineer, project engineer, and field engineer. His experience includes managing water drilling, storm drainage, telecommunications, and housing projects. He has a bachelor's degree in civil engineering and professional engineering licenses in the Philippines and Saudi Arabia.
Senior Supervisor Piping & Mechanical
Piping &Pipe Line Fabrication/Erection&/ Hydro test /Mechanical Completion Pre-Commissioning
I have around17+, years ‘work experience I have done three years diploma inMechanical engineering,
I have worked as a Piping supervisor in Oil, Gas, power plant & Petro-chemical.
Senior Supervisor Piping & Mechanical
Piping &Pipe Line Fabrication/Erection&/ Hydro test /Mechanical Completion Pre-Commissioning
I have around17+, years ‘work experience I have done three years diploma inMechanical engineering,
I have worked as a Piping supervisor in Oil, Gas, power plant & Petro-chemical.
รายงานประจำปี สวทช. พ.ศ. 2558, สำนักงานพัฒนาวิทยาศาสตร์และเทคโนโลยีแห่งชาติ
NSTDA: National Science and Technology Development Agency, Annual Report 2015
Making wearables with NodeMCU - FOSDEM 2017Etiene Dalcol
NodeMCU is an open hardware IoT platform based on eLua for the ESP8266 microcontroller. It allows creating low-cost projects using Wi-Fi and easy scripting in Lua, which makes it great for making wearables, for example. In this talk I'll give an introduction to the platform, show how I built an audio reactive graduation dress and share the materials to get you started on your own wearable project. This talk is ideal for beginners to hardware hacking or Lua enthusiasts looking for project inspiration.
Registered Professional Civil Engineer in Philippines. A competent, highly-motivated, and dynamic engineering professional with an enriching cross functional experience of over 5 years in Philippines and in Qatar.
1. Ferdinand Tabaco Cabunoc
Block 10 Lot 10 Camia St. Villa Candida Subdivision Bulua, Cagayan De Oro City
Misamis Oriental, Philippines
Mobile No.: +966538634186/+966582029671
Email Add: ft_cabunoc@yahoo.com
Current Location: Cagayan De Oro City, Philippines.
Availability: I can start work whenever being advice.
PERSONAL DATA
Age: 48
Date of Birth: May 30, 1967
Gender: Male
Civil Status: Married
Height: 163 cm.
Weight: 65 kg
Nationality: Filipino
Religion: Roman Catholic
Permanent Address: Philippines
WORK EXPERIENCE
I have been working for 22 years.
1. Position : Civil Engineer – Water Drilling Projects (MODON)
Duration : February 13, 2015 – January 09, 2016
Company : Bernard LTD.
Industry : Consultancy-Construction
Location : Arar, Kingdom of Saudi Arabia
Department : Project Management Office
Scope of Work :
Supervising the project as a Resident Engineer: Water Supply for Potential Industrial
Cities, Qassim 2, Zulfi, Shaqra, Hafr Al Batin and Arar.
Monitoring the well drilling work done by the contractor up to its desired depth as per
required with complete testing, logging, casing and pumping.
Supervised and monitor the road construction of the project from survey works, sub-
grade preparation, aggregate base coarse laying spreading and compaction, testing,
MC1 application and asphalt laying.
Monitor and control the quality output of all item involve in the completion of the
project which includes material used and see to it that all are in conformance and
compliance to project specification and standards.
Check and evaluate the contractors performance in implementing item of works if
standard procedures are applied along with safety consideration until the project
completion.
Checked and evaluate quality plan, safety plan and method statement submitted by
contractor and see to it that it is being followed and applied during the
implementation of work in the site.
Imposed and employ safety precautionary measures upon the performance of the
project.
2. Initiate the conduction of toolbox meeting, discussing site safety hazard and
employing mitigation for risk reduction and control with strict consideration to
housekeeping in all areas of work.
Facilitate the installation of safety devices and application of safety standard in the
site which includes personal protective equipment and collective safety devices.
Facilitate the conduction of staff meeting to update the various item related to
project execution with the evaluation of project status and offer options to remedy in
any case are there problem arises.
Includes preparation of pertinent document such as Program of Work and S-curve for
project monitoring guidance.
Prepare project status report in daily, weekly and monthly basis with all important
and necessary attachment to convey exact and complete information.
2. Position : Safety Engineer – Storm Water Drainage Projects (AMANA)
Duration : January 13, 2014 – February 12, 2015
Company : Bernard LTD.
Industry : Consultancy-Construction
Location : Riyadh, Kingdom of Saudi Arabia
Department : Project Management Office
Scope of Work :
Check and evaluate the contractor performance in implementing item of works if
safety standard is applied until the project completion.
Determine cause of unsafe condition through procedure review, equipment and
facilities inspection, and worker observation with corrective action recommendations
provided.
Imposed and employ safety precautionary measures upon the performance of the
project.
Initiate the conduction of toolbox meeting, discussing site safety hazard and
employing mitigation for risk reduction and control with strict consideration to
housekeeping in all areas of work.
Facilitate the installation of safety devices and application of safety standard in the
site which includes personal protective equipment and collective safety devices.
See to it and ensure that all necessary and important safety devices are visible in the
site in the area where hazard and risk issues are of greater chances to contribute
accidents.
Take site safety discrepancy photos , issued safety notices, write letter to contractor
issuing site instruction, prepare and submit safety report along with safety risk
evaluation.
3. Position : Project Control/Safety Engineer- (STC-FTTH Projects)
Duration : September 22, 2012 – November 23, 2013
Company : Saudi Trans Telecoms Company
Industry : Telecommunication
Location : Riyadh, Kingdom of Saudi Arabia
Department : Project Management Office
Scope of Work :
Reporting directly and provide support to project manager across a wide range of
Fiber To The Home (FTTH) project.
Performed and demonstrate remotely via collaboration tools by sending emails and
telephonic discussions to contractor and OSP inspector pertaining to the project
during the pre-construction and implementation period.
Provide knowledgeable support to the party involved in the implementation process
of the project.
Review schedule, progress and productivity resources and relay information and
reminder to manager what are those activities that are set ahead specially when its
consider priority.
Evaluate and update data regarding cost status, resources requirement, commitment
data and productivity variance report.
Plan, manage and control risk register activities and emphasize safety precautionary
3. measures through monitoring site application all the time during project
implementation process.
• Serve as technical resource ensuring safe practices, injury/illness prevention
processes and risk management for all company site.
• Monitor and verify regulatory compliance in manpower health condition, air and
water quality, noise temperature and pest control.
• Inspect facility, machinery and equipment safety. Identify and correct potential
hazards wherever/whenever required.
• Assist in developing safety procedures, monitor and ensure technical and labor
safety compliance and deliver relevant safety training.
• Monitor and ensure regulatory program are develop and implemented.
• Check and verify if safety barricades and safety signs are installed at designated
area and conform as per required.
4. Position : Billing Clerk – (STC-FTTH Projects)
Duration : Oct 29, 2011 - Sep 21, 2012
Company : Saudi Trans Telecoms Company
Industry : Telecommunication
Location : Riyadh, Kingdom of Saudi Arabia
Department : Project Management Office
Scope of Work :
Calculate quantities as per pre-conducted site survey and prepare and submit re-
design plan reflecting changes based on actual site measurement.
Check and evaluate flimsy/invoice submitted by contractor and see to it that quantity
reflected in the document conformed to the actual installation in the site.
Check and review bill of quantities and see to it that description of materials as per
item of work conforms to the actual with reference to standard specifications.
Facilitate the requisition of material supply and inform the contractor the availability
and the pick-up schedule.
Monitor the material utilization and conduct inventory to all material releases.
Check and evaluate as-built plan and review length of measurement and quantity
reflected.
Tabulate all data acquired, make report and submit to manager including all
necessary attachment.
5. Position : Project Engineer – (Housing and Road Project-Phils.)
Duration : Mar 1, 2009 - Oct 27, 2011
Company : ENROGEL Construction Corporation
Industry : Construction / Building / Engineering
Location : Cagayan De Oro City, Philippines
Department : Project Implementation
Scope of Work :
Supervised the construction of Robinson Housing project which include swimming
pool construction, earthwork, drainage system, water work, road concreting and
building construction.
Review plans, prepare Bar Chart, compressed PERT-CPM, prepare S-Curve and
programmed manpower and equipment utilization.
Check and review bill of quantities and see to it that description of materials as per
item of work conforms to the actual with reference to standard specifications.
Facilitate the requisition of material supply and inform the contractor the availability
and the pick-up schedule.
Monitor the material utilization and conduct inventory to all material releases.
Check and evaluate as-built plan and review length of measurement and quantity
reflected.
Initiate safety application when on site and conduct tool box meeting regularly to
emphasized and discussed safety rules, construction procedure, work specification
including the importance of housekeeping.
4. 7. Position : Project Engineer – (Oil & Gas Bulk Plant-Phils.)
Duration : Mar. 5, 2003 – Jan. 10, 2004
Company : FERM Construction Inc..
Industry : Construction/Building/Engineering
Location : Cagayan De Oro City, Philippines
Department : Project Implementation
8. Position : Project Engineer – (Philippine Government Project-Phils.)
Duration : Jan. 4, 2000 – Dec. 16, 2003
Company : Rakil Construction Inc..
Industry : Construction/Building/Engineering
Location : Misamis Oriental, Philippines
Department : Project Implementation
• Develop skills in material conservation and control overhead expenses thru
proper utilization of resources by monitoring strictly the project implementation
process.
• Evaluate manpower capability and upgrading the skills thru teaching new method
of construction techniques and application.
• Conduct road survey and established finish elevation of every item of work and
alignment of roadways.
• Prepare and submit accomplishment report and input data required for other
project related documents.
6. Position : Safety Engineer – (Telecom Project-Phils.)
Duration : Jan 15, 2004 - Dec 10, 2008
Company : NESIC Philippines Inc.
Industry : Telecommunication
Location : Makati Manila, Philippines
Department : Project Implementation
Scope of Work :
Responsible for the conduction of toolbox meeting emphasizing the safety procedures
along with the usage and application of safety gears and equipment.
Implement procedures and processes to control/reduce occupational risk and support
the health and safety policies of the company through site application.
Conduct safety assessment and analysis in all company project site.
Comply with the Government any legal requirement, prepare and apply company
safety policies and procedures and establish best practices.
Monitor and verify regulatory compliance in manpower including health condition
Emphasize the importance and initiate a move to conduct housekeeping every
after work of the day.
• Prepare and submit report to head office in Manila thru e-mail when work is
100% completed with all the necessary attachment and inform the other team to
proceed in the area after work is completed by the first team.
• Sent to India for a Commissioning work of TATA Telecom Project in the
year 2009. This to activate cell sites of the said company in New Delhi
region.
• Supervised the installation of outdoor and indoor equipment and
conduct activation thru computer programming in Pasolink project of
the country.
• Prepare and submit accomplishment report, material utilization report
and targeted/projected accomplishment for the next schedule to sub
office in Bangalore.
5. 9. Position : Project Engineer – (Housing and Road Project-Phils.)
Duration : Feb. 1, 1998 – Jan. 3, 2000
Company : JCG International Inc.
Industry : Construction/Building/Engineering
Location : Cagayan De Oro City, Philippines
Department : Project Implementation
Scope of Work
Supervised the construction of Liquefied petroleum gas spherical tank
foundation, concrete pipe pedestal, tank fabrication and installation,
piping work and sea port construction.
Supervised road concreting, asphalting, drainage construction health centers and
school building constructions.
Supervised the site development of a housing project, road mapping and
subdivision, drainage designed and disposal, earth works and water works.
Check and monitor quality output of every item of work and see to it that it
conform to the construction plan and standard specifications.
Review plans, prepare Bar Chart, compressed PERT-CPM, prepare S-Curve and
programmed manpower and equipment utilization.
Check and review bill of quantities and see to it that description of materials as per
item of work conforms to the actual with reference to standard specifications.
Facilitate the requisition of material supply and inform the contractor the
availability and the pick-up schedule.
Monitor the material utilization and conduct inventory to all material releases.
Check and evaluate as-built plan and review length of measurement and quantity
reflected.
Initiate safety application when on site and conduct tool box meeting regularly to
emphasized and discussed safety rules, construction procedure, work specification
including the importance of housekeeping.
• Develop skills in material conservation and control overhead expenses thru
proper utilization of resources by monitoring strictly the project implementation
process.
• Evaluate manpower capability and upgrading the skills thru teaching new method
of construction techniques and application.
• Conduct road survey and established finish elevation of every item of work and
alignment of roadways.
• Prepare and submit accomplishment report and input data required for other
project related documents.
10. Position : Field Engineer – (Bridge Construction Project-Phils.)
Duration : Nov. 22, 1995 – Jan. 30, 1998
Company : Urban Integrated Consultancy Inc. (UICI)
Industry : Consultancy-Construction
Location : Camiguin Province, Philippines
Department : Project Management
Scope of Work
Draftsman for the 5th
. IBRD Package in the construction of Dinanggasan bridge
project of the province.
Prepare and submit accomplishment report with progress photographs along with
S-curve, manpower, material quantity and equipment utilization cost.
Instrument man and conduct upstream and downstream survey, establish natural
and finished grade line elevation of roadway, embankment, piers and abutment.
Compute cut and fill volume of embankment and monitor quality and suitability of
filling materials.
Monitor compaction activity of the embankment, sub-base and base coarse layer by
layer and witness the conduction of compaction test (FDT).
Quality inspector for the construction of grouted riprap, stone masonry and bridge
6. approaches of the project.
Witness material testing and conduct trial mixed.
Control and monitor quantity of materials as per design mixed for concrete pouring
activity.
Monitor pile driving activity and record penetration per number of blows as per
calibration.
Witness post tensioning activity for the reinforced concrete dick girder.
11. Position : Draftsman/Instrument Man/Field Engineer – (Bridge Construction Project)
Duration : Nov. 24, 1993 – Jul. 24, 1995
Company : G & P Builders Inc.
Industry : Construction/Building/Engineering
Location : Camiguin Province, Philippines
Department : Project Implementation
Scope of Work
Draftsman for the 3rd
. IBRD Package in the construction of Box Culvert and
Storm Drainage project of the province.
Prepare and submit accomplishment report with progress photographs along
with S-curve, manpower, material quantity and equipment utilization cost.
Instrument man and conduct upstream and downstream survey, establish
natural and finished grade line elevation of roadway, embankment, piers and
abutment.
Compute cut and fill volume of embankment and monitor quality and suitability
of filling materials.
Monitor compaction activity of the embankment, sub-base and base coarse
layer by layer and witness the conduction of compaction test (FDT).
Quality inspector for the construction of grouted riprap, stone masonry and box
culvert approaches of the project.
Witness material testing and conduct trial mixed.
Control and monitor quantity of materials as per design mixed for concrete
pouring activity.
CV SUMMARY
KEY SKILLS:
Ability to lead a team.
Good communication and interpersonal skills.
Completing the projects on given deadlines.
Experience in working with different teams.
Ability to work under stress and multi-tasking scenario.
Proficient in use of computers and software.
Good knowledge of financial and budgetary management.
Versed in project management, site construction coordination, estimating, cost controlling, contract
administrations.
Materials & cost estimates.
Quantity surveying.
AutoCAD NC11 2D
Multiple projects management.
Safety Engineering.
7. EDUCATION
Education Level : Bachelor / College Degree
Education Field : Engineering
Course : Bachelor of Science in Civil Engineering
School/University : Cagayan De Oro College
Location : Cagayan De Oro City, Philippines
Date Graduated : March, 1996
LICENSES AND TRAINING CERTIFICATION
Licenses License Number Place
1.) Licensed Professional Engineer 0117275 Philippines
2.) Licensed Professional Driver K0298076043 Philippines
3.) Driving License Kingdom of Saudi Arabia
Certifications Time Duration Place
1.) IOSH-Managing Safely 40 Hrs. STC-Riyadh, KSA
2.) Basic Auto CAD 24 Hrs. Riyadh, KSA
3.) Primavera Project Management 24 Hrs. Riyadh, KSA
4.) Construction Safety Training 40 Hrs. Philippines
5.) Ergonomics and Psychological First-Aid 8 Hrs. Philippines
6.) Occupational Safety and Health Network 40 Hrs. Philippines
AVAILABLE DOCUMENT
Passport No. EB6791790 Issued in Riyadh, KSA Expiry Date: Nov. 19, 2017
LANGUAGE SPOKEN
Filipino (Fluent)
English (Intermediate)
Arabic (Average)
REFERENCES
Name : Engr. Pedro Pablo Bascones
Position : Project Manager
Company : Bernard LTD.
Tel. No. : +966504164159/+966583726470
Email Add. : p.bascones@bernard-ltd.com
Name : Engr. Sorin Popa
Position : Resident Engineer
Company : Bernard LTD.
Tel. No. : +966598556009
Email Add. : p.sorin@bernard-ltd.com
Name : Engr. Basilio A. Varques
Position : Civil/Structural Engineer
Company : Saudi Consul
Tel. No. : +639128440492
Email Add. : bvarx68@yahoo.com