Jovanne T. Bernardino
Civil Engineer
Sta. Rosa, Laguna Philippines 4026
M: +966594001211, E: jovannebernardino.jb@gmail.com
Summary A high performing Civil Engineer who has 14 years’ hands on experience. Having
vast experience on advance construction methodologies, management and
international standards. I have dealt with the projects from design stage,
construction up to turning –over to the client. I am committed in delivering the
project on-time, within budget, with the highest quality standard and without
any LTI.
Field of Expertise
Power Plants Substations Transmission Lines
EPC Building Construction Interior Fit-outs
Industrial factories Chemical Factories Infrastructures
Quality Inspection Safety Construction Mngt.
Warehouses Bridges High-end Villas
Skills Engineering Professional Personal
Site Supervision Costumer Focused Problem Solving
Structural Engineering People Management Safety Conscious
Construction standards Quality Assurance Analytical Thinking
Design Techniques Computer Literate Always Pro-active
Interior-fit outs Risk Assessment Attention to details
Bid Documents Construction Management Logical Thinker
Engineering Concept Planning regulations Communication Skills
Career Senior Project Engineer (Civil)
Saudi Engineering Group Intl April 2016 – Present
(Supplied to
Duties:
• Serves as the project management/consultant of SEC’s EPC projects by
implementing quality procedures, safety and project coordination.
• Manages the daily civil works activities of CCPP, substations, OHL and
underground cables. Assures that all works were executed as per approved
drawings.
• Attends weekly meetings and provide PM with civil progress presentations
and analysis.
• Prepares reports & maintain records of daily manpower and activities, RFI,
NCR, Site instruction and test results for audit and project closing purpose.
• Prepares schedules and look ahead for sequential execution of project
including manpower, equipment schedule and material deliveries.
• Reviews technical drawing, method statements, material submittals and
approves RFI’s.
• Produces and maintains records for actual measurements as per BOQ for
contractor’s billing and invoices.
• Works closely with the contractor’s QA/QC team to ensure that all work was
done as per approved PQP, ITP, approved materials, construction standards
and method statements.
• Strictly implements safety as per approved safety plan and PTW without any
exemption.
Senior Project Engineer (Civil)
September 2014 – March 2016
Doha, Qatar (Project is Emir’s Palace Ifrane, Morocco)
Duties:
• Coordinates with subcontractors regarding work schedule, material
deliveries and manpower.
• Ensured strict implementation of safety and that all PTW’s are approved
prior to execution of work.
• Attends weekly meetings with subcontractors, PM and PD, provide progress
status, discusses critical issues ad possible solutions.
• Prepared and maintain records of manpower, progress and daily activities,
RFI’s, NCR’s, Site instructions and closes them at the soonest possible time.
• Assisted QA/QC on inspections and ensured quality is implemented as per
PQP.
• Checked, reviewed and strictly implemented method statements.
• Checked and assured that all fit-outs were installed with the highest quality
of standard
• Resolved technical queries by conducting meetings with the Construction
manager, persons involved technical manager and designers.
• Assured that all finishing works and fit-outs were as per IFC drawings, and
approved materials by personally supervising the work execution.
Construction Manager (Civil) October 2013 – September 2014
Larsen and Toubro Ltd. Doha, Qatar
Duties:
• Prepared the site and liaising with other construction professionals such as
QA/QC, planning, architects and site engineers during the execution process
to ensure that the project has minimal delays and highest quality.
• Involved in the planning, design and implementation of projects.
• Strictly implements safety on site without any exemptions as per KHARAMA
standards and international standards.
• Conducted weekly meetings with the construction team to monitor material
deliveries, problems encountered and delays. Made recovery plans and
instructed the sub-contractor to follow the plan without haste.
• Checked and reviewed drawings, technical specifications and method
statements prior to approval and submittal to the client. Strictly
implemented them on site.
• Directly coordinated with the Project Mngr. and Project Dir. regarding site
progress, lags and pending items. Assured that all pending items and
problems encountered were solved immediately.
• Thoroughly planned the work at site and executed according to work
schedule, approved PQP, ITP, company standard and technical specifications
without exemptions.
• Personally monitored and supervised the soil investigation of the site from
boring, water table level up to submittal of reports to client and design team.
• Provided inputs for the work schedule, prepared labor histograms and
comparisons. Finalized the price and acceptance of suppliers and sub-
contractors.
• Personally managed and supervised the civil works for 400kV, 132kV and
66/11kV substations under my package.
• Constantly coordinated with the UGC sub-contractors, discussed and
resolved right of way issues with the client.
• Prepared price comparison, held meetings for negotiation and finalized the
vendors which are within the project cost budget.
Site Manager (Civil) August 2010 – October 2013
ABB (Asea Brown Boveri) Contracting Ltd. Riyadh, KSA
Duties:
• Assisted the QA/QC engineers on audits and assured that the work is as per
PQP and ITP.
• Prepared daily, weekly reports look ahead schedules; NCR’s and site
instructions and kept record for audit. Assured that all NCR’s and Site
instructions were closed immediately and did not happen again.
• Coordinated with MEP subcontractors and assured that the work execution
was done as per approved drawings and technical specification.
• Strictly implemented safety as per ABB, SEC and international standards.
• Supervised and managed civil works for CCPP, 380kV, 132kV admin bldgs.
and cooling towers and assured that all were executed as per PQP, project
schedule and manpower allocation.
• Prepared sub-contractor’s comparisons, reviewed pre-qualifications and gave
recommendations for the approval and finalization of the job contract.
• Checked and ensured that all test results are well documented and follows
the ISO 9001 quality management procedures.
• Assured that the civil execution is coordinated with the equipment lay-out,
MEP drawings and manufacturer’s recommendations.
Site Manager (Civil)
ILO Construction Inc. July 2006 – August 2010
Duties:
• Managed and supervised the construction of middle to large manufacturing
buildings and infrastructures.
• Conducted weekly meetings with the subcontractors and the client.
Discussed with them all the activities in-progress, pending issue and provided
solutions for their discussions and approvals.
• Prepared work schedules, labor histograms/allocations and material requests
• Conducted material tests and site testing with third party. Kept records for
the project closing purposes.
• Strictly implemented safety without any exemption.
• Prepared bar bending schedule for fabrication or manufacturing and
managed the installation.
• Managed and supervised earthworks such as soil stabilization, excavation
works, dewatering operations, soil investigation, bored pilling and backfilling.
• Managed and checked painting works, architectural finishes and façade.
• Assured that all embedded items were installed and all trades were informed
prior to concrete pouring by preparing pouring requests.
• Assured that all standards were followed for the construction of
manufacturing and fertilizer plants.
• Conducted site reviews, soil investigations, site survey and assessment prior
to the actual construction of site.
Project Engineer (Civil)
LeJohn Trading and Const. May 2004 – June 2006
Duties:
• Overall supervision on telecom tower erections, residential and commercial
buildings.
• Involved in site investigation, design stage and tendering prior to actual
construction.
• Personally handled the building construction, exterior and interior
finishing/fit-outs and assisted the I.D. prior to turn-over to the client of high-
end house/villas.
• Prepared documents for biddings/tendering, BOQ, billings, change order and
variation orders using MS office software.
• Prepared equipment, manpower and material delivery schedule for proper
deployment and that no wastage on resources should be encountered.
• Involved in actual pricing for the project by contacting suppliers and checking
the quality, quantity available and the date when it is needed to be delivered
at site by making material checklists based on the work schedule.
• Prepared the manpower allocations for numerous projects that were
constructed simultaneously inside luxurious subdivisions.
Civil Engineer
Zeta Realty Corp. January 2003 – march 2004
Duties:
• Acted as the Civil Engineer of the owner for the construction of a 15-storey
condominium bldg.
• Monitored and supervised the work at site as per drawings and specs.
• Prepared bar bending schedule and act as a civil inspector.
• Supervised the setting out of the building prior to excavation and the
excavation itself.
• Prepared manpower and equipment schedule for Project managers approval.
• Assured that the materials being used were as per specification by checking
and monitoring delivery notes, trip tickets, witnessed material tests and kept
record for auditing and closing out.
• Monitored finishing/fit-out subcontractors on their trades, gave comments
and assured that all comments and work were done as per what the client
expects.
• Prepared mock-up rooms with the I.D. for open house touring.
Civil Engineer (Intern)
Zillion Builders January 2003 – march 2004
Duties:
• Prepared machinery schedules for the construction of the 22-km Southern
Tagalog toll-way.
• Assisted in the survey and assess possible right of ways for the road
construction.
• Prepared survey reports for the purpose of computing the volume of
borrowed fill.
• Assured that the grading/leveling and compaction on sub-base and base
course were as per drawing prior to asphalt spreading.
• Assured that all were prepared prior to the spreading and compaction of the
concrete asphalt by checking levels and FDT.
Academic Batangas State University June 1996 – March 2002
Bachelor of Science in Civil Engineering
Philippine Regulatory Commission November 2002
Registered Civil Engineer
Saudi Council of Engineers June 2016 – June 2019
Accredited Civil Engineer
References Available on Request
Projects Completed Available on Request

Civil Engineer 2

  • 1.
    Jovanne T. Bernardino CivilEngineer Sta. Rosa, Laguna Philippines 4026 M: +966594001211, E: jovannebernardino.jb@gmail.com Summary A high performing Civil Engineer who has 14 years’ hands on experience. Having vast experience on advance construction methodologies, management and international standards. I have dealt with the projects from design stage, construction up to turning –over to the client. I am committed in delivering the project on-time, within budget, with the highest quality standard and without any LTI. Field of Expertise Power Plants Substations Transmission Lines EPC Building Construction Interior Fit-outs Industrial factories Chemical Factories Infrastructures Quality Inspection Safety Construction Mngt. Warehouses Bridges High-end Villas Skills Engineering Professional Personal Site Supervision Costumer Focused Problem Solving Structural Engineering People Management Safety Conscious Construction standards Quality Assurance Analytical Thinking Design Techniques Computer Literate Always Pro-active Interior-fit outs Risk Assessment Attention to details Bid Documents Construction Management Logical Thinker Engineering Concept Planning regulations Communication Skills Career Senior Project Engineer (Civil) Saudi Engineering Group Intl April 2016 – Present (Supplied to Duties: • Serves as the project management/consultant of SEC’s EPC projects by implementing quality procedures, safety and project coordination.
  • 2.
    • Manages thedaily civil works activities of CCPP, substations, OHL and underground cables. Assures that all works were executed as per approved drawings. • Attends weekly meetings and provide PM with civil progress presentations and analysis. • Prepares reports & maintain records of daily manpower and activities, RFI, NCR, Site instruction and test results for audit and project closing purpose. • Prepares schedules and look ahead for sequential execution of project including manpower, equipment schedule and material deliveries. • Reviews technical drawing, method statements, material submittals and approves RFI’s. • Produces and maintains records for actual measurements as per BOQ for contractor’s billing and invoices. • Works closely with the contractor’s QA/QC team to ensure that all work was done as per approved PQP, ITP, approved materials, construction standards and method statements. • Strictly implements safety as per approved safety plan and PTW without any exemption. Senior Project Engineer (Civil) September 2014 – March 2016 Doha, Qatar (Project is Emir’s Palace Ifrane, Morocco) Duties: • Coordinates with subcontractors regarding work schedule, material deliveries and manpower. • Ensured strict implementation of safety and that all PTW’s are approved prior to execution of work. • Attends weekly meetings with subcontractors, PM and PD, provide progress status, discusses critical issues ad possible solutions. • Prepared and maintain records of manpower, progress and daily activities, RFI’s, NCR’s, Site instructions and closes them at the soonest possible time. • Assisted QA/QC on inspections and ensured quality is implemented as per PQP. • Checked, reviewed and strictly implemented method statements. • Checked and assured that all fit-outs were installed with the highest quality of standard • Resolved technical queries by conducting meetings with the Construction manager, persons involved technical manager and designers. • Assured that all finishing works and fit-outs were as per IFC drawings, and approved materials by personally supervising the work execution.
  • 3.
    Construction Manager (Civil)October 2013 – September 2014 Larsen and Toubro Ltd. Doha, Qatar Duties: • Prepared the site and liaising with other construction professionals such as QA/QC, planning, architects and site engineers during the execution process to ensure that the project has minimal delays and highest quality. • Involved in the planning, design and implementation of projects. • Strictly implements safety on site without any exemptions as per KHARAMA standards and international standards. • Conducted weekly meetings with the construction team to monitor material deliveries, problems encountered and delays. Made recovery plans and instructed the sub-contractor to follow the plan without haste. • Checked and reviewed drawings, technical specifications and method statements prior to approval and submittal to the client. Strictly implemented them on site. • Directly coordinated with the Project Mngr. and Project Dir. regarding site progress, lags and pending items. Assured that all pending items and problems encountered were solved immediately. • Thoroughly planned the work at site and executed according to work schedule, approved PQP, ITP, company standard and technical specifications without exemptions. • Personally monitored and supervised the soil investigation of the site from boring, water table level up to submittal of reports to client and design team. • Provided inputs for the work schedule, prepared labor histograms and comparisons. Finalized the price and acceptance of suppliers and sub- contractors. • Personally managed and supervised the civil works for 400kV, 132kV and 66/11kV substations under my package. • Constantly coordinated with the UGC sub-contractors, discussed and resolved right of way issues with the client. • Prepared price comparison, held meetings for negotiation and finalized the vendors which are within the project cost budget. Site Manager (Civil) August 2010 – October 2013 ABB (Asea Brown Boveri) Contracting Ltd. Riyadh, KSA Duties: • Assisted the QA/QC engineers on audits and assured that the work is as per PQP and ITP.
  • 4.
    • Prepared daily,weekly reports look ahead schedules; NCR’s and site instructions and kept record for audit. Assured that all NCR’s and Site instructions were closed immediately and did not happen again. • Coordinated with MEP subcontractors and assured that the work execution was done as per approved drawings and technical specification. • Strictly implemented safety as per ABB, SEC and international standards. • Supervised and managed civil works for CCPP, 380kV, 132kV admin bldgs. and cooling towers and assured that all were executed as per PQP, project schedule and manpower allocation. • Prepared sub-contractor’s comparisons, reviewed pre-qualifications and gave recommendations for the approval and finalization of the job contract. • Checked and ensured that all test results are well documented and follows the ISO 9001 quality management procedures. • Assured that the civil execution is coordinated with the equipment lay-out, MEP drawings and manufacturer’s recommendations. Site Manager (Civil) ILO Construction Inc. July 2006 – August 2010 Duties: • Managed and supervised the construction of middle to large manufacturing buildings and infrastructures. • Conducted weekly meetings with the subcontractors and the client. Discussed with them all the activities in-progress, pending issue and provided solutions for their discussions and approvals. • Prepared work schedules, labor histograms/allocations and material requests • Conducted material tests and site testing with third party. Kept records for the project closing purposes. • Strictly implemented safety without any exemption. • Prepared bar bending schedule for fabrication or manufacturing and managed the installation. • Managed and supervised earthworks such as soil stabilization, excavation works, dewatering operations, soil investigation, bored pilling and backfilling. • Managed and checked painting works, architectural finishes and façade. • Assured that all embedded items were installed and all trades were informed prior to concrete pouring by preparing pouring requests. • Assured that all standards were followed for the construction of manufacturing and fertilizer plants. • Conducted site reviews, soil investigations, site survey and assessment prior to the actual construction of site.
  • 5.
    Project Engineer (Civil) LeJohnTrading and Const. May 2004 – June 2006 Duties: • Overall supervision on telecom tower erections, residential and commercial buildings. • Involved in site investigation, design stage and tendering prior to actual construction. • Personally handled the building construction, exterior and interior finishing/fit-outs and assisted the I.D. prior to turn-over to the client of high- end house/villas. • Prepared documents for biddings/tendering, BOQ, billings, change order and variation orders using MS office software. • Prepared equipment, manpower and material delivery schedule for proper deployment and that no wastage on resources should be encountered. • Involved in actual pricing for the project by contacting suppliers and checking the quality, quantity available and the date when it is needed to be delivered at site by making material checklists based on the work schedule. • Prepared the manpower allocations for numerous projects that were constructed simultaneously inside luxurious subdivisions. Civil Engineer Zeta Realty Corp. January 2003 – march 2004 Duties: • Acted as the Civil Engineer of the owner for the construction of a 15-storey condominium bldg. • Monitored and supervised the work at site as per drawings and specs. • Prepared bar bending schedule and act as a civil inspector. • Supervised the setting out of the building prior to excavation and the excavation itself. • Prepared manpower and equipment schedule for Project managers approval. • Assured that the materials being used were as per specification by checking and monitoring delivery notes, trip tickets, witnessed material tests and kept record for auditing and closing out. • Monitored finishing/fit-out subcontractors on their trades, gave comments and assured that all comments and work were done as per what the client expects. • Prepared mock-up rooms with the I.D. for open house touring.
  • 6.
    Civil Engineer (Intern) ZillionBuilders January 2003 – march 2004 Duties: • Prepared machinery schedules for the construction of the 22-km Southern Tagalog toll-way. • Assisted in the survey and assess possible right of ways for the road construction. • Prepared survey reports for the purpose of computing the volume of borrowed fill. • Assured that the grading/leveling and compaction on sub-base and base course were as per drawing prior to asphalt spreading. • Assured that all were prepared prior to the spreading and compaction of the concrete asphalt by checking levels and FDT. Academic Batangas State University June 1996 – March 2002 Bachelor of Science in Civil Engineering Philippine Regulatory Commission November 2002 Registered Civil Engineer Saudi Council of Engineers June 2016 – June 2019 Accredited Civil Engineer References Available on Request Projects Completed Available on Request