SlideShare a Scribd company logo
Mostafa Abd El-Sadek Mohamed
Personal Information :
Date of birth
Address
Mobile
E- Mail
Marital Status
Military Services
Nationality
Religion
Driving license
 7/4/1979
 Megawra #54 -10th
Ramadan City
 0122 8769450 - 01001688771
 mostafasadek79@yahoo.com
 Married
 Completed
 Egyptian
 Moslem
 Valid
Qualification
 Degree: B.Sc. of Electronic Engineering
 Major: Industrial Electronics & Automatic Control Engineering.
 Faculty of Electronic Engineering (Minouf)
 Minoufia University
 Graduation: May 2001.
 Project: PLC. Application & PID Control.
Langauges :
English
Arabic
: Very Good Command of English
: Mother Tongue
Computer Skills
Microsoft® Office
Internet
AutoCAD
C ++ Language
Experience Fields & skills :
 Preventive Maintenance & Troubleshooting and ability to Upgrade
Ectromechanical system for wide variety of Production lines , Machines ,
Equipments and Units :
 HVAC units ( AHUs – Chillers – LAFS – Cold stores - Exhaust fans – DX units,
all units Controlled by BMS and I desigin & Install & Program BMS system .
 Water plant of purified water and water for injection (WFI) controlled by PLC &
SCADA system.
 Utility Equipments (Air compressors, Diesel Generators, Steam Boilers, Fire
fighting system, Nitrogen generatorsa nd City water pumps.)
 Syrup production line ( Full automatic preparation tanks , Air washing machine ,
Filling machine ,Capping machine, Labeling machine , Full automatic packaging
machine )
 Solid production machines (Coating, Blister, Tablet press, Mixers, Sieve
Equipment, Capsol filling, Fluid Bed Dryer (FBD), Sachet filling machine and
Automatic CIP &WIP Eqipments).
 Sterile Powder filling line (Vail washing machine, Sterilizing & Depyrogenation
Tunnel, Powder filling machine, Crimping machine, Labelling machine, Fully
automatic packaging machine.
 Sterile liquid lines (Ampule and vail washing, Sterilizing & Depyrogenation
Tunnel, liquid filling and sealing machine, Crimping and labeling machines.
 Eye drops production line (automatic preparation tanks by SCADA system ,
Filling Dropper Capping machine, Labeling machine ,Fully automatic packaging
machine )
 Autocalves and other sterilization equipments.
 Bottelpack® Blow-Fill-Seal Machines – Rommelag, Leak Test machine and WFI.
Ampoules labelling machine.
 Good programmer and installation of PLC, HMI, and SCADA on different
application and machines & Maintenance all machines Controlled by PLC.
 Good experience of Electrical maintanance, Mechanical maintanance,
Pneumatics systems maintanance and hydrolic systems maintenance.
 Experience in Commissioning and Startup machines and Execution of ( FAT,
SAT, IQ, OQ, PQ ) Protcols.
 Good Experience of Electrical and Mechanical maintenance for LAP
equipments
Practical Training:
 PLC
 HMI
 SCADA
 Validation
 Soft skills
 Chillers
o Siemens - Fatek – LG - Omron – Mitsubishi
o Hitech- EasyView- LG – WINCC- Omron –Mitsubishi
o DAQ-Factory – WINCC
o Computer system validation
o Communication skills ,Project manegment
o LG Absorbition Chiller
Work Experience:
From 1/2014
To Present
From 6/2012
To 12014 :-
“Maintainance Manager”
RAMEDA Pharmaceuticals – 6th
October
i. Leading maintenance team as “Maintenance Manager”
(Five Engineers and Thirty technicians).
ii. Preparing preventive maintenance plan
iii. Collecting all data about job scope to plans urgent
Corrective, Preventive and Predictive Maintenance Work
Orders by coordinate with planning section.
iv. Request spare parts, materials tools after inspect
available in workshop and stores to Purchase it.
v. Prepare for repairs, overhauls and shutdown plans to
minimize the maintenance times and cost.
vi. Prepare training plan for technicians and engineers
according to technical requirements
vii. Coordinates all maintenance activities with production
plants to guide and supervises the multi-craft
maintenance teams.
viii. All activity has done on all Production lines, Utilitys
equipments, HVAC units, Water plant.
ix. Co- Operation with projects mangment to Upgrading
Four areas to Pass the audit of the Egyptian Ministry of
Health
x. Dealing with audits requirements and details
xi. Ensuring that Working under safety regulations
xii. ADD some Modification to machines to improve the
machines proformance and productivity.
“ Production Maintainance and Projects Section head”
EIMC United Pharmaceuticals “EUP” – Bader City
 Direct on mechanical maintenance In addition to
Responsibility on overall electrical maintanence
 Implementation of projects such as :
i. Sterile areas SCADA system to monitoring Room’s
Diffreintial pressure and Data Loging and alarming.
ii. Modification of Crimping machine to detect raising of
Rupper stopper.
iii. Continuous Particulate Counters system installation.
iv. FAT of solid line in india and SAT in EIMC
v. “STILMAS “Water plant electrovalve modification
vi. Plant Extention for Solids and Packaging area (civil
work , Clean partition, Lighting and HVAC & BMS
system)
From 5/2010
To 5/2012:
From 11/2007
To 5/2010:
Electrical Section Head
EIMC United Pharmaceuticals “EUP” – Bader City
i. Directs, supervise the maintenance & repair of overall
electrical control system & instrument equipments.
ii. Implement electrical maintenance activates in different
areas of the plant.
iii. Provide of the monthly reports and ensuring the safety
regulations and standards are maintained & plan
schedule planned maintenance work of plant ,
equipment and machinery to improve the proformance
and productivity .
Automation Projects Manager
Industrial Systems for consultancy engineering Co.
i. Supervision on Automation projects and leadership the
Team works to complete projects.
ii. Overcome the technical difficulties for engineers in the
field
iii. Coordination between departments on the one hand
and Customer on the other to complete the project
iv. Preview the projects site and Determinde the Projects
compounents and quotations.
v. Study the new projects to planning and do the time
schedule.
vi. Study the new automation technologies to use in
projects
vii. Lead automation training department and works as
Automation instructor.
From: 52004
To :112007
Automation Projects Engineer
Industrial Systems for consultancy engineering Co.
i. Modifying and upgrading of machines with
conventional control by PLC and Touch screen and
SCADA In many applications and industrys such as
Filling machines , Packaging machines, Injection
moulding machines, Textile machines, Chemicals and
Pharmaceuticals prepration & filling line &Sterilization
autoclaves & Coating machines , Cutting and
positioning machines in Metallic industries , Chillers ,
Air compressors, installation and programming BMS
by SCADA system.
ii. Design and maintenance of low voltage panels and
Conventional Control Circuits.
iii. installation and maintenance of all automation devices
and istrumintation
Availability and Job Requested
Career objective
Availability and Job Requested
From :1/2003
To :5/2004:
Maintenance Engineer
Solimar Company, sharminning in resort
Maintenance and design of control circuit, electronic cards,
electrical devices, AC generators
From : 4/2002 –
To :1/2003:
Maintenance Engineer
Army forces
maintenance of electronic cards, electrical devices, AC
generators
Experience: 15 years
To contribute relevent experience and education background to my working
field.
Availability:
I am able to start work after 2 weeks from
announcement
As: Full Time
Job field:
i. Pharmaceutical Engineering and projects
Management,
ii. Electrical Engineering and projects mangment
Job location: Egypt- Arab Countries

More Related Content

What's hot

Capgemini ses - smart grid operational services - going mobile is smart fac...
Capgemini   ses - smart grid operational services - going mobile is smart fac...Capgemini   ses - smart grid operational services - going mobile is smart fac...
Capgemini ses - smart grid operational services - going mobile is smart fac...
Gord Reynolds
 
140409 smart industry presentation
140409 smart industry presentation140409 smart industry presentation
140409 smart industry presentation
Herm van der Beek
 
SkillsFuture Festival at NUS 2019-How does analytics drive Industry 4.0
SkillsFuture Festival at NUS 2019-How does analytics drive Industry 4.0SkillsFuture Festival at NUS 2019-How does analytics drive Industry 4.0
SkillsFuture Festival at NUS 2019-How does analytics drive Industry 4.0
NUS-ISS
 
An Overview of Products Certfication Webinar
An Overview of Products Certfication WebinarAn Overview of Products Certfication Webinar
An Overview of Products Certfication Webinar
Sadatulla Zishan
 
Transformation 101 - Business Model Workshop
Transformation 101 - Business Model WorkshopTransformation 101 - Business Model Workshop
Transformation 101 - Business Model Workshop
Daniel Li
 
IRJET- A Quality Watch Android Based Application for Monitoring Robotic A...
IRJET-  	  A Quality Watch Android Based Application for Monitoring Robotic A...IRJET-  	  A Quality Watch Android Based Application for Monitoring Robotic A...
IRJET- A Quality Watch Android Based Application for Monitoring Robotic A...
IRJET Journal
 
Industry 4.0 IIoT Audit - What, How, When & Where ?
Industry 4.0 IIoT Audit - What, How, When & Where ?Industry 4.0 IIoT Audit - What, How, When & Where ?
Industry 4.0 IIoT Audit - What, How, When & Where ?
Enerco Energy Solutions LLP
 
IRJET - Industry 4.0 for Manufacturing Organization in India
IRJET - Industry 4.0 for Manufacturing Organization in IndiaIRJET - Industry 4.0 for Manufacturing Organization in India
IRJET - Industry 4.0 for Manufacturing Organization in India
IRJET Journal
 
Industrial revolution4
Industrial revolution4Industrial revolution4
Industrial revolution4
sonalijagtap15
 
Service & Software driven business model innovation for the electronics indus...
Service & Software driven business model innovation for the electronics indus...Service & Software driven business model innovation for the electronics indus...
Service & Software driven business model innovation for the electronics indus...
Thorsten Schroeer
 
Page 28_30_32_TECH TALK_Special Feature Additive Manufacturing
Page  28_30_32_TECH TALK_Special Feature Additive ManufacturingPage  28_30_32_TECH TALK_Special Feature Additive Manufacturing
Page 28_30_32_TECH TALK_Special Feature Additive ManufacturingMegha Roy
 
Industry 5.0
Industry 5.0Industry 5.0
Industry 5.0
alasdairg
 
Industry 4.0 - The State of the Nations - Executive Summary
Industry 4.0 - The State of the Nations - Executive SummaryIndustry 4.0 - The State of the Nations - Executive Summary
Industry 4.0 - The State of the Nations - Executive Summary
Infosys
 
POV: Industry 4.0 and M&A Prespective
POV: Industry 4.0 and M&A PrespectivePOV: Industry 4.0 and M&A Prespective
POV: Industry 4.0 and M&A Prespective
Sanjay Talukdar
 
Industry 4.0 training, Industrie 4.0 crash course : Tonex Training
Industry 4.0 training, Industrie 4.0 crash course : Tonex TrainingIndustry 4.0 training, Industrie 4.0 crash course : Tonex Training
Industry 4.0 training, Industrie 4.0 crash course : Tonex Training
Bryan Len
 
SAND SKILLS
SAND SKILLSSAND SKILLS
SAND SKILLS
Elkouri Abdelali
 
Industry 4.0 managing the digital transformation (2018)
Industry 4.0 managing the digital transformation (2018) Industry 4.0 managing the digital transformation (2018)
Industry 4.0 managing the digital transformation (2018)
Bui Quoc Vu
 
Industry 4.0
Industry 4.0Industry 4.0
Industry 4.0
Meysam Maleki
 
idc_analyst_connection
idc_analyst_connectionidc_analyst_connection
idc_analyst_connectionShalini Verma
 
Industry 4.0 Training Certification Course - Tonex Training
Industry 4.0 Training Certification Course - Tonex TrainingIndustry 4.0 Training Certification Course - Tonex Training
Industry 4.0 Training Certification Course - Tonex Training
Bryan Len
 

What's hot (20)

Capgemini ses - smart grid operational services - going mobile is smart fac...
Capgemini   ses - smart grid operational services - going mobile is smart fac...Capgemini   ses - smart grid operational services - going mobile is smart fac...
Capgemini ses - smart grid operational services - going mobile is smart fac...
 
140409 smart industry presentation
140409 smart industry presentation140409 smart industry presentation
140409 smart industry presentation
 
SkillsFuture Festival at NUS 2019-How does analytics drive Industry 4.0
SkillsFuture Festival at NUS 2019-How does analytics drive Industry 4.0SkillsFuture Festival at NUS 2019-How does analytics drive Industry 4.0
SkillsFuture Festival at NUS 2019-How does analytics drive Industry 4.0
 
An Overview of Products Certfication Webinar
An Overview of Products Certfication WebinarAn Overview of Products Certfication Webinar
An Overview of Products Certfication Webinar
 
Transformation 101 - Business Model Workshop
Transformation 101 - Business Model WorkshopTransformation 101 - Business Model Workshop
Transformation 101 - Business Model Workshop
 
IRJET- A Quality Watch Android Based Application for Monitoring Robotic A...
IRJET-  	  A Quality Watch Android Based Application for Monitoring Robotic A...IRJET-  	  A Quality Watch Android Based Application for Monitoring Robotic A...
IRJET- A Quality Watch Android Based Application for Monitoring Robotic A...
 
Industry 4.0 IIoT Audit - What, How, When & Where ?
Industry 4.0 IIoT Audit - What, How, When & Where ?Industry 4.0 IIoT Audit - What, How, When & Where ?
Industry 4.0 IIoT Audit - What, How, When & Where ?
 
IRJET - Industry 4.0 for Manufacturing Organization in India
IRJET - Industry 4.0 for Manufacturing Organization in IndiaIRJET - Industry 4.0 for Manufacturing Organization in India
IRJET - Industry 4.0 for Manufacturing Organization in India
 
Industrial revolution4
Industrial revolution4Industrial revolution4
Industrial revolution4
 
Service & Software driven business model innovation for the electronics indus...
Service & Software driven business model innovation for the electronics indus...Service & Software driven business model innovation for the electronics indus...
Service & Software driven business model innovation for the electronics indus...
 
Page 28_30_32_TECH TALK_Special Feature Additive Manufacturing
Page  28_30_32_TECH TALK_Special Feature Additive ManufacturingPage  28_30_32_TECH TALK_Special Feature Additive Manufacturing
Page 28_30_32_TECH TALK_Special Feature Additive Manufacturing
 
Industry 5.0
Industry 5.0Industry 5.0
Industry 5.0
 
Industry 4.0 - The State of the Nations - Executive Summary
Industry 4.0 - The State of the Nations - Executive SummaryIndustry 4.0 - The State of the Nations - Executive Summary
Industry 4.0 - The State of the Nations - Executive Summary
 
POV: Industry 4.0 and M&A Prespective
POV: Industry 4.0 and M&A PrespectivePOV: Industry 4.0 and M&A Prespective
POV: Industry 4.0 and M&A Prespective
 
Industry 4.0 training, Industrie 4.0 crash course : Tonex Training
Industry 4.0 training, Industrie 4.0 crash course : Tonex TrainingIndustry 4.0 training, Industrie 4.0 crash course : Tonex Training
Industry 4.0 training, Industrie 4.0 crash course : Tonex Training
 
SAND SKILLS
SAND SKILLSSAND SKILLS
SAND SKILLS
 
Industry 4.0 managing the digital transformation (2018)
Industry 4.0 managing the digital transformation (2018) Industry 4.0 managing the digital transformation (2018)
Industry 4.0 managing the digital transformation (2018)
 
Industry 4.0
Industry 4.0Industry 4.0
Industry 4.0
 
idc_analyst_connection
idc_analyst_connectionidc_analyst_connection
idc_analyst_connection
 
Industry 4.0 Training Certification Course - Tonex Training
Industry 4.0 Training Certification Course - Tonex TrainingIndustry 4.0 Training Certification Course - Tonex Training
Industry 4.0 Training Certification Course - Tonex Training
 

Similar to mostafa(8)

Ahmed Gomaa CV
Ahmed Gomaa CVAhmed Gomaa CV
Ahmed Gomaa CV
Ahmed Gomaa
 
Eng_ Mahdy CV 8-2015
Eng_ Mahdy CV 8-2015Eng_ Mahdy CV 8-2015
Eng_ Mahdy CV 8-2015Mahdy Hammad
 
Islam's CV.pdf
Islam's CV.pdfIslam's CV.pdf
Islam's CV.pdf
IslamAzkoul1
 
S m umer wasi
S m umer wasiS m umer wasi
S m umer wasi
S M Umer Wasi
 
FInal_CV_08_4_2016
FInal_CV_08_4_2016FInal_CV_08_4_2016
FInal_CV_08_4_2016PANKAJ PAL
 
Ahmed nasr cv 2016
Ahmed nasr cv 2016Ahmed nasr cv 2016
Ahmed nasr cv 2016
ahmed nasr
 
Resume
ResumeResume
Resume
Mohan Singh
 
Emad.cv.f
Emad.cv.fEmad.cv.f
Emad.cv.f
emad bek
 
Resume
ResumeResume

Similar to mostafa(8) (20)

Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Ahmed Gomaa CV
Ahmed Gomaa CVAhmed Gomaa CV
Ahmed Gomaa CV
 
MAS Profile
MAS ProfileMAS Profile
MAS Profile
 
Mohamed Zakaria 01-2017
Mohamed Zakaria 01-2017Mohamed Zakaria 01-2017
Mohamed Zakaria 01-2017
 
Ahmed Hussein
Ahmed HusseinAhmed Hussein
Ahmed Hussein
 
Eng_ Mahdy CV 8-2015
Eng_ Mahdy CV 8-2015Eng_ Mahdy CV 8-2015
Eng_ Mahdy CV 8-2015
 
Ahmed El_Nashar
Ahmed El_NasharAhmed El_Nashar
Ahmed El_Nashar
 
S M UMER WASI
S M UMER WASIS M UMER WASI
S M UMER WASI
 
khaled cv
khaled cvkhaled cv
khaled cv
 
Islam's CV.pdf
Islam's CV.pdfIslam's CV.pdf
Islam's CV.pdf
 
Ahmed El_Nashar
Ahmed El_NasharAhmed El_Nashar
Ahmed El_Nashar
 
Ahmed El_Nashar
Ahmed El_NasharAhmed El_Nashar
Ahmed El_Nashar
 
S m umer wasi
S m umer wasiS m umer wasi
S m umer wasi
 
FInal_CV_08_4_2016
FInal_CV_08_4_2016FInal_CV_08_4_2016
FInal_CV_08_4_2016
 
MY_CV
MY_CVMY_CV
MY_CV
 
Ahmed nasr cv 2016
Ahmed nasr cv 2016Ahmed nasr cv 2016
Ahmed nasr cv 2016
 
Resume
ResumeResume
Resume
 
Emad.cv.f
Emad.cv.fEmad.cv.f
Emad.cv.f
 
Eng Ramadan Elwan
Eng Ramadan ElwanEng Ramadan Elwan
Eng Ramadan Elwan
 
Resume
ResumeResume
Resume
 

mostafa(8)

  • 1. Mostafa Abd El-Sadek Mohamed Personal Information : Date of birth Address Mobile E- Mail Marital Status Military Services Nationality Religion Driving license  7/4/1979  Megawra #54 -10th Ramadan City  0122 8769450 - 01001688771  mostafasadek79@yahoo.com  Married  Completed  Egyptian  Moslem  Valid Qualification  Degree: B.Sc. of Electronic Engineering  Major: Industrial Electronics & Automatic Control Engineering.  Faculty of Electronic Engineering (Minouf)  Minoufia University  Graduation: May 2001.  Project: PLC. Application & PID Control. Langauges : English Arabic : Very Good Command of English : Mother Tongue Computer Skills Microsoft® Office Internet AutoCAD C ++ Language
  • 2. Experience Fields & skills :  Preventive Maintenance & Troubleshooting and ability to Upgrade Ectromechanical system for wide variety of Production lines , Machines , Equipments and Units :  HVAC units ( AHUs – Chillers – LAFS – Cold stores - Exhaust fans – DX units, all units Controlled by BMS and I desigin & Install & Program BMS system .  Water plant of purified water and water for injection (WFI) controlled by PLC & SCADA system.  Utility Equipments (Air compressors, Diesel Generators, Steam Boilers, Fire fighting system, Nitrogen generatorsa nd City water pumps.)  Syrup production line ( Full automatic preparation tanks , Air washing machine , Filling machine ,Capping machine, Labeling machine , Full automatic packaging machine )  Solid production machines (Coating, Blister, Tablet press, Mixers, Sieve Equipment, Capsol filling, Fluid Bed Dryer (FBD), Sachet filling machine and Automatic CIP &WIP Eqipments).  Sterile Powder filling line (Vail washing machine, Sterilizing & Depyrogenation Tunnel, Powder filling machine, Crimping machine, Labelling machine, Fully automatic packaging machine.  Sterile liquid lines (Ampule and vail washing, Sterilizing & Depyrogenation Tunnel, liquid filling and sealing machine, Crimping and labeling machines.  Eye drops production line (automatic preparation tanks by SCADA system , Filling Dropper Capping machine, Labeling machine ,Fully automatic packaging machine )  Autocalves and other sterilization equipments.  Bottelpack® Blow-Fill-Seal Machines – Rommelag, Leak Test machine and WFI. Ampoules labelling machine.  Good programmer and installation of PLC, HMI, and SCADA on different application and machines & Maintenance all machines Controlled by PLC.  Good experience of Electrical maintanance, Mechanical maintanance, Pneumatics systems maintanance and hydrolic systems maintenance.  Experience in Commissioning and Startup machines and Execution of ( FAT, SAT, IQ, OQ, PQ ) Protcols.  Good Experience of Electrical and Mechanical maintenance for LAP equipments Practical Training:  PLC  HMI  SCADA  Validation  Soft skills  Chillers o Siemens - Fatek – LG - Omron – Mitsubishi o Hitech- EasyView- LG – WINCC- Omron –Mitsubishi o DAQ-Factory – WINCC o Computer system validation o Communication skills ,Project manegment o LG Absorbition Chiller
  • 3. Work Experience: From 1/2014 To Present From 6/2012 To 12014 :- “Maintainance Manager” RAMEDA Pharmaceuticals – 6th October i. Leading maintenance team as “Maintenance Manager” (Five Engineers and Thirty technicians). ii. Preparing preventive maintenance plan iii. Collecting all data about job scope to plans urgent Corrective, Preventive and Predictive Maintenance Work Orders by coordinate with planning section. iv. Request spare parts, materials tools after inspect available in workshop and stores to Purchase it. v. Prepare for repairs, overhauls and shutdown plans to minimize the maintenance times and cost. vi. Prepare training plan for technicians and engineers according to technical requirements vii. Coordinates all maintenance activities with production plants to guide and supervises the multi-craft maintenance teams. viii. All activity has done on all Production lines, Utilitys equipments, HVAC units, Water plant. ix. Co- Operation with projects mangment to Upgrading Four areas to Pass the audit of the Egyptian Ministry of Health x. Dealing with audits requirements and details xi. Ensuring that Working under safety regulations xii. ADD some Modification to machines to improve the machines proformance and productivity. “ Production Maintainance and Projects Section head” EIMC United Pharmaceuticals “EUP” – Bader City  Direct on mechanical maintenance In addition to Responsibility on overall electrical maintanence  Implementation of projects such as : i. Sterile areas SCADA system to monitoring Room’s Diffreintial pressure and Data Loging and alarming. ii. Modification of Crimping machine to detect raising of Rupper stopper. iii. Continuous Particulate Counters system installation. iv. FAT of solid line in india and SAT in EIMC v. “STILMAS “Water plant electrovalve modification vi. Plant Extention for Solids and Packaging area (civil work , Clean partition, Lighting and HVAC & BMS system)
  • 4. From 5/2010 To 5/2012: From 11/2007 To 5/2010: Electrical Section Head EIMC United Pharmaceuticals “EUP” – Bader City i. Directs, supervise the maintenance & repair of overall electrical control system & instrument equipments. ii. Implement electrical maintenance activates in different areas of the plant. iii. Provide of the monthly reports and ensuring the safety regulations and standards are maintained & plan schedule planned maintenance work of plant , equipment and machinery to improve the proformance and productivity . Automation Projects Manager Industrial Systems for consultancy engineering Co. i. Supervision on Automation projects and leadership the Team works to complete projects. ii. Overcome the technical difficulties for engineers in the field iii. Coordination between departments on the one hand and Customer on the other to complete the project iv. Preview the projects site and Determinde the Projects compounents and quotations. v. Study the new projects to planning and do the time schedule. vi. Study the new automation technologies to use in projects vii. Lead automation training department and works as Automation instructor. From: 52004 To :112007 Automation Projects Engineer Industrial Systems for consultancy engineering Co. i. Modifying and upgrading of machines with conventional control by PLC and Touch screen and SCADA In many applications and industrys such as Filling machines , Packaging machines, Injection moulding machines, Textile machines, Chemicals and Pharmaceuticals prepration & filling line &Sterilization autoclaves & Coating machines , Cutting and positioning machines in Metallic industries , Chillers , Air compressors, installation and programming BMS by SCADA system. ii. Design and maintenance of low voltage panels and Conventional Control Circuits. iii. installation and maintenance of all automation devices and istrumintation
  • 5. Availability and Job Requested Career objective Availability and Job Requested From :1/2003 To :5/2004: Maintenance Engineer Solimar Company, sharminning in resort Maintenance and design of control circuit, electronic cards, electrical devices, AC generators From : 4/2002 – To :1/2003: Maintenance Engineer Army forces maintenance of electronic cards, electrical devices, AC generators Experience: 15 years To contribute relevent experience and education background to my working field. Availability: I am able to start work after 2 weeks from announcement As: Full Time Job field: i. Pharmaceutical Engineering and projects Management, ii. Electrical Engineering and projects mangment Job location: Egypt- Arab Countries