SlideShare a Scribd company logo
CV-Vuong Huy Hai
Page 1 / 7
CURRICULUM VITAE
Name : VUONG HUY HAI
Date of birth : 6 March 1981
Nationality : Vietnamese
Graduated education : Engineer
Sex : Male
Marital status : Married
Contact number : 0909366861 email: vuonghuyhai@gmail.com
1. CERTIFICATES & QUALIFICATION
• CSWIP Welding Inspector 3.1 Level 2.
• CSWIP Radiographic Interpreter Level 2, Categories Awarded: A, B, D.
• CSWIP Welds Ultrasonics Level 2, Categories Awarded: 3.1, 3.2, 3.8 & 3.9.
• ASNT-SNT–TC-1A: MT, PT, RT, UT level 3.
• BOSIET offshore safety certificate.
• Certificate of Completion of Training course in inspection of pressure equipments in accordance to
TCVN 6153-1996, TCVN 6154-1996, TCVN 6155-1996, TCVN 6156-1996 & API 510 – 2006 issued
by Ministry of Labor , Invalid and Social Affair - Center of Industrial Safety Registration Zone 2
(CISR2).
• Certificate of Completion of Training course in piping inspection in accordance to TCVN 6158-1996,
TCVN 6159-1996, TCVN 7441 – 2004, API 570 – 1998 addendum 2001 issued by Ministry of Labor ,
Invalid and Social Affair - Center of Industrial Safety Registration Zone 2 (CISR2).
2. BRIEF EMPLOYMENT HISTORY.
• From Jan. 2015 to now:
(1) Employed by QIS-NDT Services Co., Ltd.
(2) Employed by ABSG Consulting Inc. – Malaysia.
• From November 2013 to Dec. 2014: Employed by ABSG Consulting Inc. – Singapore.
• From January 2012 to November 2013: Employed by Quoc Anh Services & Fabrication
Company Limited.
• From July 2003 to January 2012: Employed by QIS-NDT Services Co., Ltd.
3. WORK EXPERIENCES.
3.1. Summary of experiences
Overall working experience: More than ten (10) years of working in the application of NDT techniques as
Radiographic interpreter, MPI/PT/UT technician, QC inspector, Welding inspection of welds of steel
structures, piping systems, pipelines and pressure equipments in the oil and gas, refinery, chemical/gas
plant and heavy steel fabrication industrial.
Work experience includes: new ship construction, ship repair/conversation, fabrication of jack-up rigs,
fabrication and installation of offshore jackets/topside modules and sub-sea pipelines, fabrication of
pressure vessels, maintenance/ shutdown/turnaround inspection of refinery and offshore platforms, piping
inspection, pressure vessel inspection.
Familiar with working to the following codes/standards: AWS D1.1, ASME V, ASME VIII, ASME IX, ASME
B31.3, ASME B31.1, ASME B31.8, API 510, API 570, NBIC 23, API 650, API 1104, API RP-2X, API RP-
2A, API-5L, AS 4037-1999, AS/NZS 1554.1, BS3923 and ISO 5817/6520.
CV-Vuong Huy Hai
Page 2 / 7
3.2. Detail of employment & experienced projects
From Jan. 2015 to now:
 Employed by QIS-NDT Services Co., Ltd.
Responsibilities: Supervising of NDT works, conduct NDT training.
 Employed by ABSG Consulting Inc. – Malaysia.
- Project: LUBEREF YANBU REFINERY EXPANSION.
- Location: DOOSAN VINA – DUNG QUAT, QUANG NGAI, VIET NAM
- Position: Monitoring Inspector.
Responsibilities: Supervising, Inspection & monitoring for fabrication of adsorber vessels & drums.
- Review Material Test Certificates.
- Witness welding inspection & dimension works, review related inspection reports.
- Witness NDT works, review NDT reports / radiographs.
- Witness Hydrostatic Test.
- Witness painting works, review related inspection reports.
- Witness packing / shipping works, review related reports.
- Review Manufacturer Data Record (MDR).
From Nov. 2013 to Dec. 2014: Employed by ABSG Consulting Inc. - Singapore.
- Project: ICHYTHYS ON SHORE LNG FACILITIES
- Location: PTSC Phu My Port, Ba Ria – Vung Tau, Viet Nam.
- Position: Monitoring Inspector.
Responsibilities: Supervising, Inspection & monitoring for fabrication / erection of structural
steels.
- Witness all assembly & erection works, review related inspection reports.
- Witness welding inspection & dimension works, review related inspection reports.
- Witness NDT works, review NDT reports / radiographs.
- Witness painting works, review related inspection reports.
- Witness packing works, review related reports.
- Witness shipping works, review related reports.
- Review Manufacturer Data Record (MDR).
From Jan. 2012 to Nov. 2013: Employed by Quoc Anh Services & Fabrication Company Limited.
Position: QC Inspector supervisor
Responsibilities:
- Supervising all QC activities and inspection works.
- Conducting Welding Inspection & dimension inspection.
- Witnessing NDT and review NDT reports, radiographs.
- Study for application of welding technology into production.
- Managing / conducting all welding procedure qualifications.
- Managing / training / conducting all welder qualification. Record and monitor the qualification
status of welder.
- In charge for assurance of welding quality.
Working for following projects:
- 15 units of 3200 Cu.ft Bulk silo (ASME VIII div 1, U stamped) for Drilling Fluid and Wells Services
Ltd. ASME Code stamped.
CV-Vuong Huy Hai
Page 3 / 7
- 23 units 600 GAL Tote Tank (ASME VIII div 1, U stamped) for HALLIBURTON.
- 9 units SILO 500 Cu. ft Bulk Tank (ASME VIII div 1, U stamped) for HALLIBURTON.
- 5 units of Dump Truck for BMT WMB AUSTRALIA-USA-CANADA.
- 5 units of 3200 Cu. ft Bulk Silo (ASME VIII div 1, U stamped) for MI SWACO.
- 3 units of Air receiver (ASME VIII div 1, U stamped) for MI SWACO. Site installation in Thailand.
- 5 units of 2.5m3 Cutting bottle (ASME VIII div 1, U stamped) for MI SWACO.
- 6 units 3000 Cu. ft Bulk Tank (ASME VIII div 1, U stamped) for HALLIBURTON.
- 2 units of 880 cu.Ft Bulk Tank (ASME VIII div 1, U stamped) for BAKER HUGHES.
- 4 units 400 Cu. Ft Blender (ASME VIII div 1, U stamped) for BJ DRILLING SERVICES.
- 17 units of pressure vessels, include bulk silo, air receivers, and tote tanks (ASME VIII div 1, U
stamped) for DMC Vietnam.
- Fabrication of offshore container to ISO /EN 12079
From July 2003 to January 2012: Employed by QIS-NDT Services Co., Ltd.
Position: NDT supervisor / NDT Inspector
Responsibilities:
- Supervising NDT works carried out by other colleges
- Managing and Performing in-services inspection of pressure vessels, piping systems and steel
structures
- Performing NDT inspection activities.
- Study for application of new NDT technologies.
- Radiation Safety Officer.
Projects performed: From Jan-2011 to Jan-2012:
• Japan Vietnam Petroleum Company
- Project: Pressure vessel inspection for N1 Inlet Cooler.
- Project: Piping & Pressure vessel inspection on NULQ, NCWI, CLPP, WHP-N1, WHP-E1, WHP-
C1, WHP-S1, WHP-PD Rang Dong field.
- Project: Visual inspection & UTM for WHP-N1 jacket.
- Project: Vessel inspection on NCWI, WHP-N1, CLPP (Vessel entry), Rang Dong field
- Project: Fare boom inspection on CLPP, Rang Dong field.
• PVD Tech.
- Project: PTI - Fabrication burner boom.
- Project: PTI - FABRICATION VERTICAL SURGE TANK.
- Project: TALISMAN Vietnam 05-2/10 B.V – CASING.
- Project: PEARL OIL – CASING.
- Project: Hoang Long JOC, H04-Compact Manifold.
- Project: Bien Dong – CASING.
- Project: PTSC MC/ Bien Dong - Chemical Injection Skid.
- Project: PHU QUY – CASING.
- Project: EXON MOBIL – CASING.
• PVEP POC – DAI HUNG 01 Oil Rig.
- Project: Pressure Vessel Inspection on Dai Hung 01 Oil Rig.
• Quoc Anh Company.
- Project: HALLIBURTON - 1500 CU. FT scale tanks.
- Project: MI SWACO - 1000 BBL storage tank.
- Project: PV Drilling and investment- 2600 CU.FT portable bulk tanks.
• Vina Offshore Fabrication & Engineering Co. ltd.
CV-Vuong Huy Hai
Page 4 / 7
- Project: CUULONG JOC - Carry out site survey, fabrication & installation of the WHP-B 12P
flowlines c/w pipe supports, sutuden field.
- Project: CUULONG JOC - Carry out site survey, fabrication & installation of the 8P-ST flowline
converted from 8I on WHP-A.
- Project: CUULONG JOC - Carry out site survey, fabrication & installation of the 9P-ST flowline
converted from 9I on WHP-A.
- Project: PVTRANS - Fabrication of fire pump cooling water spools.
- Project: MISC BERHAD - Onshore fabrication of temporary spool in place of SDV 1002 for Ruby
FBSO.
• Oil and Gas Production Enterprise - Vietsovpetro
- Project: BK3.
- Project: Gaslift MSP1-BK7.
- Project: BK10.
- Project: Extension of Gaslift System for MSP - 6 and MSP – 10.
From Jan-2010 to Jan-2011: Carried out inspection & NDT works (MT, PT, UT, UTM & Radiographic
Interpreter) for following projects:
• PVD Tech.
- Project: TGT Compact Manifold, Hoang Long JOC.
• Japan Vietnam Petroleum Company
- Project: Vessel inspection on NCWI (Vessel entry), Rang Dong field.
- Project: Vessel inspection on NULQ (Vessel entry), Rang Dong field.
- Project: Piping & Pressure vessel inspection on NULQ, NCWI, CLPP, WHP-N1, WHP-E1, WHP-
C1, WHP-S1, WHP-PD Rang Dong field.
From Jan-2009 to Jan-2010: Carried out inspection & NDT works (MT, PT, UT, UTM & Radiographic
Interpreter) for following projects:
• Alpha ECC / Japan Vietnam Petroleum Company
- Project: Pressure vessel inspection on NCWI, Rang Dong field.
• VIETSOVPETRO J/V / VRJ (Vietnam – Russia – Japan)
- Project: Fabrication of RC-Doi Moi topside.
• Alpha ECC / Japan Vietnam Petroleum Company
- Project: Pressure vessel inspection on WHP – E1, N1, CLPP, NULQ, NCWI, Rang Dong field.
• Dai Hung Petroleum Operating Co. Ltd.
- Project: Pressure vessel inspection on Dai Hung – 01 Rig, Dai Hung field.
- Project: Ultrasonic thickness measurement of process piping, pressure vessels, fire water lines,
air compressors & non-process vessel on Dai Hung - 01 Rig, Dai Hung field.
• Strategic Marine (V) Co., Ltd
- Project: AUSTRALIA MARINE COMPLEX, 80001-Submarine support cradles.
- Project: STX EUROPE, STX EUROPE Floating dock.
• PVD Tech
- Project: PVEP PHUQUY, Fabrication of 20” casing for Phuquy.
- Project: PVEP CUBA, Fabrication of 20” casing.
- Project: Technics Offshore Engineering Pte Ltd, Fabrication of 20” casing.
- Project: VIETSOVPETRO J/V, NAM RONG – DOI MOI RC-4 / RC-5 / RC-DOI MOI topside.
- Project: VIETSOVPETRO J/V, Fabrication of 30” casing.
- Project: PVEP BACH DANG Company Limited, Provision of OCTG supply 20” casing.
- Project: Cuu Long Joint Operating Company, Provision of conductor.
- Project: Petrovietnam Fertilizer and Chemicals Corporation - The Phu My fertilizer plant,
Fabrication & installation of blowdown pipings line - VT090041.
- Project: Danieli, Sliding covers.
CV-Vuong Huy Hai
Page 5 / 7
• VIETSOVPETRO J/V
- Project: Premier Oil Vietnam Offshore B.V (POVO) / PTSC M&C, Fabrication of Chim Sao South
Jacket.
• Vina Offshore Fabrication & Engineering Co. Ltd. / CUU LONG Joint Operating Company
- Project: Carry out fabrication and installation of LGC-B leaking valve pipe spool on TBVN FPSO –
Project no.: 09-F-040.
- Project: Carry out site survey, fabrication and installation of flowline & gaslift lines of wells (well
no.: 7P, 8P, 9P, 10P) c/w pipe support on CPP, Su Tu Vang field – Project no.: 09-F-047, 09-F-
055.
- Project: Carry out site survey, fabrication and installation of flowline & gaslift lines of wells (well
no.: 26I, 12P) c/w pipe support on WHP-A, Su Tu Den field – Project no.: 09-F-046, 09-F-080.
- Project: Site measurement, fabrication and installation of well casing venting system on WHP-A,
Su Tu Den field– Project no.: 09-F-045.
- Project: Site measurement, fabrication and installation of seawater crossover, Su Tu Vang field.
- Project: 1-3-5-6 Nozzles on CPP manifolds – Project no.: 09-F-041.
- Project: 9-10-11-12 Nozzles on CPP Manifolds.
• Vina Offshore Fabrication & Engineering Co. Ltd. / Technics Offshore Engineering Pte Ltd
- Project: Fabrication of water tank, foam tank, open & closed drain tank skid – Project no.: 09-F-
025.
- Project: Fabrication of air receiver (ASME “U” stamp) – Project no.: 09-F-A021.
- Project: Fabrication of strainer housing – Project no.: 09-F-034.
• Vina Offshore Fabrication & Engineering Co. Ltd. / PVD Tech
- Project: Fabrication of gaslift metering skids, vent scrubber skids – Project no.: 09-F-030.
From Jan-2008 to Dec-2008: Carried out inspection & NDT works (MT, PT, UT, UTM & Radiographic
Interpreter) for following projects:
• Japan Vietnam Petroleum Company
- Projects: Visual inspection and ultrasonic thickness measurement of piping work and vessel
systems.
• VIETSOVPETRO J/V
- Project: PC Vietnam Limited, Fabrication of PLDP-A jacket for pearl Development.
• PVD Tech
- VIETSOVPETRO J/V, BK7.
- Cuu Long JOC, Provision of conductor.
• AMIGOS Co., Ltd
- MI Swaco, Fabrication of CFU water treatment packages – OGP 355.
- Project: PROMECON, Prefabrication of pipe spools for "dong chp 7047" – IND 151.
- NEM POWER SYSTEMS, Mesaieed – IND 130.
• Japan Vietnam Petroleum Company
- Projects: Visual inspection and ultrasonic thickness measurement of piping work and vessel
systems.
• Vina Offshore Fabrication & Engineering Co. Ltd.
- Project: Bluewater Energy Services B.V, Fabrication of mid water arch tank & gravity base frame
for blue water energy.
• Japan Vietnam Petroleum Company
- Project: Ultrasonic thickness measurement of piping systems on WHP-N1, E1, C1, S1 & CLPP,
Rang Dong field.
• Nhat Nam Co., Ltd
- Project: NACAP, Phu My - Ho Chi Minh gas pipeline.
CV-Vuong Huy Hai
Page 6 / 7
From Jan-2007 to Jan-2008: Carried out NDT works (MT, PT, UT, UTM, Radiographic Interpreter) for
following projects:
• PVECC
- Project: SBM, Fabrication of suction piles.
• Vina Offshore Fabrication & Engineering Co. Ltd.
- Project: Petro Vietnam Drilling Company, Offshore modification of air line, oil line & gas line.
• AMIGOS Co., Ltd
- Project: NEM POWER SYSTEMS, TKS CSA Rio De Janeiro power plant – IND 127.
- Project: NEM POWER SYSTEMS, Twence-Martin GMBH – IND 133.
- Project: AARDING THERMAL ACOUSTICS– IND 132, Bumper fabrication.
- CUU LONG JOC, Offshore periodical MT for lifting equipments.
• Vina Offshore Fabrication & Engineering Co. Ltd.
- Project: CUU LONG JOC, Onshore fabrication and offshore installation of 28 P flowline and gaslift
line.
- Project: CUU LONG JOC, Onshore fabrication and offshore installation of 24 P flowline and gaslift
line.
• MODEC Vietnam
- Project: Ultrasonic thickness measurement, visual inspection on piping works and pressure
vessels.
• Japan Vietnam Petroleum Company
- Project: Yearly crane inspection of offshore cranes.
From Jan-2006 to Jan-2007: Carried out NDT works (MT, PT, UT, UTM & Radiographic Interpreter) for
following projects:
• GLOBAL SANTA FE
- Project: Adriatic XI, Preload tank repair.
• Cuu Long Joint Operating Company.
- Project: Fabrication & installation of 16I water injection on WHP-A.
• LILAMA 18-3
- Project: Thu Thiem Brigde Vietnam.
- Project: Daininh power plant.
- Camau 1 & 2 Power plant combination.
• ALCAN Vietnam Company
- Project: Gove third stage expansion.
From Jan-2005 to Jan-2006: Carried out NDT works (MT, PT, UT, UTM & Radiographic Interpreter) for
following projects:
• AMIGOS Co.,Ltd
- Project: DOWNER ENGINEERING, CO –E3P Power project, Huntly Unit 5.
• Vina Offshore Fabrication & Engineering Co. Ltd.
- Project: Japan Vietnam Petroleum Company, WHP-S1 Installation, Tie in, Modification of
pipelines.
• Saigon Shipmarin
- Project: VIETSOVPETRO J/V, Fabrication of new petroleum special barge 15000 MT.
• Thanh Ngoc Co.,Ltd
- Project: GLOBAL SANTAFE, Offshore fabrication of pipeline on Galveston Key rig.
• APAVE Vietnam & South East Asia
- Project: Petronas, Fabrication of topside for Ruby WHP-B.
• Vungtau Shipyard
- Project: VIETSOVPETRO J/V, Long Son 01 boat inspection.
CV-Vuong Huy Hai
Page 7 / 7
• Schlumberger
- Project: UT inspection for SLB 1440 PSI test separator (Tank & Pipes).
- Project: Fabrication of piping work for well test line.
• MITSHUBISHI
- Project: Fabrication of piping of SBM/MC-level control upgrade.
• Japan Vietnam Petroleum Company
- Project: Yearly inspection of offshore lifting appliances.
From Jul-2003 to Jan-2005: Carried out NDT works (MT, PT, UTM, Radiographer) for following projects:
• MHE / DEMAG Co., LTD
- Project: Fabrication of cranes.
• AMIGOS Co., LTD
- Project: 2000 tons structural works for leighton ltd of blue scope steel.
- Project: piping work & pressure vessel projects for VIETSOVPETRO J/V.
- Project: Piping work & pressure vessel for NUPLEX Ltd.
• HUYNDAI VINASHIN Co., LTD
- Project: Semi submersible oil rig Dai Hung 01 inspection.

More Related Content

What's hot

CV of Mr. NGUYEN VAN TRANG.doc
CV of Mr. NGUYEN VAN TRANG.docCV of Mr. NGUYEN VAN TRANG.doc
CV of Mr. NGUYEN VAN TRANG.docNguyenvan Trang
 
C.V Momen.last update
C.V Momen.last updateC.V Momen.last update
C.V Momen.last updateMomen Mohamed
 
QA-QC WELDING & NDT Inspector for poland updated
QA-QC WELDING &  NDT Inspector for poland updatedQA-QC WELDING &  NDT Inspector for poland updated
QA-QC WELDING & NDT Inspector for poland updatedSantosh Gurajada
 
QA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrenceQA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrence
Simon Lawrence
 
Cv ardiansyah t.a cswip 3.1
Cv ardiansyah t.a cswip 3.1Cv ardiansyah t.a cswip 3.1
Cv ardiansyah t.a cswip 3.1
Ardiansyah Teuku Agam
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)Ahmed Youssef
 
Qa qc mech enggs or sr.qc inspector welding.piping.pipeline
Qa qc mech enggs or sr.qc inspector welding.piping.pipelineQa qc mech enggs or sr.qc inspector welding.piping.pipeline
Qa qc mech enggs or sr.qc inspector welding.piping.pipeline
JOBY Joby.Stephan
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Chandra ABS IV
 
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)Rajeev Kumar
 
mohamed daowod cv
mohamed daowod cvmohamed daowod cv
mohamed daowod cv
MOHAMED DAOWOD
 
Venugopal revised cv
Venugopal revised cvVenugopal revised cv
Venugopal revised cv
Venu Gopal
 
M.Nouman Aramco Format CV
M.Nouman Aramco Format CVM.Nouman Aramco Format CV
M.Nouman Aramco Format CVMuhammad Nouman
 
Updated cv
Updated cvUpdated cv
Inspection Engineer 1
Inspection Engineer 1Inspection Engineer 1
Inspection Engineer 1karuppa samy
 

What's hot (19)

CV of Mr. NGUYEN VAN TRANG.doc
CV of Mr. NGUYEN VAN TRANG.docCV of Mr. NGUYEN VAN TRANG.doc
CV of Mr. NGUYEN VAN TRANG.doc
 
LINGAM
LINGAMLINGAM
LINGAM
 
C.V Momen.last update
C.V Momen.last updateC.V Momen.last update
C.V Momen.last update
 
QA-QC WELDING & NDT Inspector for poland updated
QA-QC WELDING &  NDT Inspector for poland updatedQA-QC WELDING &  NDT Inspector for poland updated
QA-QC WELDING & NDT Inspector for poland updated
 
QA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrenceQA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrence
 
Cv ardiansyah t.a cswip 3.1
Cv ardiansyah t.a cswip 3.1Cv ardiansyah t.a cswip 3.1
Cv ardiansyah t.a cswip 3.1
 
Lead Inspection Engineer CV
Lead Inspection Engineer CVLead Inspection Engineer CV
Lead Inspection Engineer CV
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)
 
Qa qc mech enggs or sr.qc inspector welding.piping.pipeline
Qa qc mech enggs or sr.qc inspector welding.piping.pipelineQa qc mech enggs or sr.qc inspector welding.piping.pipeline
Qa qc mech enggs or sr.qc inspector welding.piping.pipeline
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
 
R.Krishna Raj Sr. QC_Inspector-19-04-16
R.Krishna Raj Sr. QC_Inspector-19-04-16R.Krishna Raj Sr. QC_Inspector-19-04-16
R.Krishna Raj Sr. QC_Inspector-19-04-16
 
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)
 
mohamed daowod cv
mohamed daowod cvmohamed daowod cv
mohamed daowod cv
 
Venugopal revised cv
Venugopal revised cvVenugopal revised cv
Venugopal revised cv
 
NDT Resume
NDT ResumeNDT Resume
NDT Resume
 
M.Nouman Aramco Format CV
M.Nouman Aramco Format CVM.Nouman Aramco Format CV
M.Nouman Aramco Format CV
 
Mani cv
Mani   cvMani   cv
Mani cv
 
Updated cv
Updated cvUpdated cv
Updated cv
 
Inspection Engineer 1
Inspection Engineer 1Inspection Engineer 1
Inspection Engineer 1
 

Viewers also liked

How sparkly are your treasures? Demonstrating the impact of special collections
How sparkly are your treasures? Demonstrating the impact of special collectionsHow sparkly are your treasures? Demonstrating the impact of special collections
How sparkly are your treasures? Demonstrating the impact of special collections
northerncollaboration
 
Diario de aprendizaje (Entrada final)
Diario de aprendizaje (Entrada final)Diario de aprendizaje (Entrada final)
Diario de aprendizaje (Entrada final)
CEDEC
 
Ahmed Mubarak Al Doosre 2015
Ahmed  Mubarak  Al Doosre 2015Ahmed  Mubarak  Al Doosre 2015
Ahmed Mubarak Al Doosre 2015Ahmed Aldossary
 
Boletín 120816
Boletín 120816Boletín 120816
Boletín 120816
Isabel Tc
 
Piale Canadá 2015. Rosa.ppt
Piale Canadá 2015. Rosa.pptPiale Canadá 2015. Rosa.ppt
Piale Canadá 2015. Rosa.ppt
Rosa4Perez
 
Carus: Celebrating a Century
Carus: Celebrating a Century Carus: Celebrating a Century
Carus: Celebrating a Century
Carus Corporation
 
IDECON 2016-BRANDING MALACCA AS A COMPLETE GREEN CITY FOR STATE IMAGE ENHANCE...
IDECON 2016-BRANDING MALACCA AS A COMPLETE GREEN CITY FOR STATE IMAGE ENHANCE...IDECON 2016-BRANDING MALACCA AS A COMPLETE GREEN CITY FOR STATE IMAGE ENHANCE...
IDECON 2016-BRANDING MALACCA AS A COMPLETE GREEN CITY FOR STATE IMAGE ENHANCE...
FATIN HAFIZAH MOHAMMAD SUKRI
 
Blue Eyes Technology
Blue Eyes TechnologyBlue Eyes Technology
Blue Eyes Technology
Suchita Agrawal
 
Integrated wte gasification & solar power plant for Terengganu
Integrated wte gasification & solar power plant for TerengganuIntegrated wte gasification & solar power plant for Terengganu
Integrated wte gasification & solar power plant for Terengganu
Dato Mat Isa
 
Historia de c++
Historia de c++Historia de c++
Historia de c++
alex laica
 
Contrato de trabajo
Contrato de trabajoContrato de trabajo
Contrato de trabajo
VenezuelaG
 
Narrative Mind Week 6 H4D Stanford 2016
Narrative Mind Week 6 H4D Stanford 2016Narrative Mind Week 6 H4D Stanford 2016
Narrative Mind Week 6 H4D Stanford 2016
Stanford University
 

Viewers also liked (13)

How sparkly are your treasures? Demonstrating the impact of special collections
How sparkly are your treasures? Demonstrating the impact of special collectionsHow sparkly are your treasures? Demonstrating the impact of special collections
How sparkly are your treasures? Demonstrating the impact of special collections
 
Diario de aprendizaje (Entrada final)
Diario de aprendizaje (Entrada final)Diario de aprendizaje (Entrada final)
Diario de aprendizaje (Entrada final)
 
Ahmed Mubarak Al Doosre 2015
Ahmed  Mubarak  Al Doosre 2015Ahmed  Mubarak  Al Doosre 2015
Ahmed Mubarak Al Doosre 2015
 
Boletín 120816
Boletín 120816Boletín 120816
Boletín 120816
 
Piale Canadá 2015. Rosa.ppt
Piale Canadá 2015. Rosa.pptPiale Canadá 2015. Rosa.ppt
Piale Canadá 2015. Rosa.ppt
 
Carus: Celebrating a Century
Carus: Celebrating a Century Carus: Celebrating a Century
Carus: Celebrating a Century
 
Aarthy Eswari
Aarthy EswariAarthy Eswari
Aarthy Eswari
 
IDECON 2016-BRANDING MALACCA AS A COMPLETE GREEN CITY FOR STATE IMAGE ENHANCE...
IDECON 2016-BRANDING MALACCA AS A COMPLETE GREEN CITY FOR STATE IMAGE ENHANCE...IDECON 2016-BRANDING MALACCA AS A COMPLETE GREEN CITY FOR STATE IMAGE ENHANCE...
IDECON 2016-BRANDING MALACCA AS A COMPLETE GREEN CITY FOR STATE IMAGE ENHANCE...
 
Blue Eyes Technology
Blue Eyes TechnologyBlue Eyes Technology
Blue Eyes Technology
 
Integrated wte gasification & solar power plant for Terengganu
Integrated wte gasification & solar power plant for TerengganuIntegrated wte gasification & solar power plant for Terengganu
Integrated wte gasification & solar power plant for Terengganu
 
Historia de c++
Historia de c++Historia de c++
Historia de c++
 
Contrato de trabajo
Contrato de trabajoContrato de trabajo
Contrato de trabajo
 
Narrative Mind Week 6 H4D Stanford 2016
Narrative Mind Week 6 H4D Stanford 2016Narrative Mind Week 6 H4D Stanford 2016
Narrative Mind Week 6 H4D Stanford 2016
 

Similar to Hai_Vuong Huy_CV_ins

Tin's cv
Tin's cvTin's cv
Tin's cv
Tin Ha Minh
 
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume -   Sr.QC Inspector-Mech.welding-painting-piping-pipelineResume -   Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipelineUDAYAKUMAR P C PANICKER
 
Meshak cv
Meshak cv Meshak cv
Meshak cv
Meshak Mathew
 
Meshak cv
Meshak cv Meshak cv
Meshak cv
Meshak Mathew
 
Rengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15doneRengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15done
Assignment Help
 
Resume-Welding inspector
Resume-Welding inspectorResume-Welding inspector
Resume-Welding inspectorLatchanna Akula
 
QA-QC ENGINEER
QA-QC ENGINEERQA-QC ENGINEER
QA-QC ENGINEERnader rizq
 
Lo Xuan Son's CV updated May-2016
Lo Xuan Son's CV updated May-2016Lo Xuan Son's CV updated May-2016
Lo Xuan Son's CV updated May-2016SON LO XUAN
 
QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.Vijay Sekaran
 
Steven Wilson CV New
Steven Wilson CV NewSteven Wilson CV New
Steven Wilson CV NewSteven Wilson
 
QA-QC ENGINEER
QA-QC ENGINEERQA-QC ENGINEER
QA-QC ENGINEERnader rizq
 

Similar to Hai_Vuong Huy_CV_ins (20)

Tin's cv
Tin's cvTin's cv
Tin's cv
 
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume -   Sr.QC Inspector-Mech.welding-painting-piping-pipelineResume -   Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
 
Phairat-CV(2015)
Phairat-CV(2015)Phairat-CV(2015)
Phairat-CV(2015)
 
CV - Prasath.V.R
CV - Prasath.V.RCV - Prasath.V.R
CV - Prasath.V.R
 
Meshak cv
Meshak cv Meshak cv
Meshak cv
 
Meshak cv
Meshak cv Meshak cv
Meshak cv
 
Rengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15doneRengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15done
 
Resume-Welding inspector
Resume-Welding inspectorResume-Welding inspector
Resume-Welding inspector
 
QA-QC ENGINEER
QA-QC ENGINEERQA-QC ENGINEER
QA-QC ENGINEER
 
Senthilnathan
SenthilnathanSenthilnathan
Senthilnathan
 
Lo Xuan Son's CV updated May-2016
Lo Xuan Son's CV updated May-2016Lo Xuan Son's CV updated May-2016
Lo Xuan Son's CV updated May-2016
 
RESUME 2015 - Copy
RESUME 2015 - CopyRESUME 2015 - Copy
RESUME 2015 - Copy
 
RAJU CV
RAJU  CVRAJU  CV
RAJU CV
 
QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.
 
Steven Wilson CV New
Steven Wilson CV NewSteven Wilson CV New
Steven Wilson CV New
 
CV Herwandi
CV HerwandiCV Herwandi
CV Herwandi
 
01-Mamdouh CV-2015
01-Mamdouh CV-201501-Mamdouh CV-2015
01-Mamdouh CV-2015
 
QA-QC ENGINEER
QA-QC ENGINEERQA-QC ENGINEER
QA-QC ENGINEER
 
navjay
navjaynavjay
navjay
 
Santhosh-CV
Santhosh-CVSanthosh-CV
Santhosh-CV
 

Hai_Vuong Huy_CV_ins

  • 1. CV-Vuong Huy Hai Page 1 / 7 CURRICULUM VITAE Name : VUONG HUY HAI Date of birth : 6 March 1981 Nationality : Vietnamese Graduated education : Engineer Sex : Male Marital status : Married Contact number : 0909366861 email: vuonghuyhai@gmail.com 1. CERTIFICATES & QUALIFICATION • CSWIP Welding Inspector 3.1 Level 2. • CSWIP Radiographic Interpreter Level 2, Categories Awarded: A, B, D. • CSWIP Welds Ultrasonics Level 2, Categories Awarded: 3.1, 3.2, 3.8 & 3.9. • ASNT-SNT–TC-1A: MT, PT, RT, UT level 3. • BOSIET offshore safety certificate. • Certificate of Completion of Training course in inspection of pressure equipments in accordance to TCVN 6153-1996, TCVN 6154-1996, TCVN 6155-1996, TCVN 6156-1996 & API 510 – 2006 issued by Ministry of Labor , Invalid and Social Affair - Center of Industrial Safety Registration Zone 2 (CISR2). • Certificate of Completion of Training course in piping inspection in accordance to TCVN 6158-1996, TCVN 6159-1996, TCVN 7441 – 2004, API 570 – 1998 addendum 2001 issued by Ministry of Labor , Invalid and Social Affair - Center of Industrial Safety Registration Zone 2 (CISR2). 2. BRIEF EMPLOYMENT HISTORY. • From Jan. 2015 to now: (1) Employed by QIS-NDT Services Co., Ltd. (2) Employed by ABSG Consulting Inc. – Malaysia. • From November 2013 to Dec. 2014: Employed by ABSG Consulting Inc. – Singapore. • From January 2012 to November 2013: Employed by Quoc Anh Services & Fabrication Company Limited. • From July 2003 to January 2012: Employed by QIS-NDT Services Co., Ltd. 3. WORK EXPERIENCES. 3.1. Summary of experiences Overall working experience: More than ten (10) years of working in the application of NDT techniques as Radiographic interpreter, MPI/PT/UT technician, QC inspector, Welding inspection of welds of steel structures, piping systems, pipelines and pressure equipments in the oil and gas, refinery, chemical/gas plant and heavy steel fabrication industrial. Work experience includes: new ship construction, ship repair/conversation, fabrication of jack-up rigs, fabrication and installation of offshore jackets/topside modules and sub-sea pipelines, fabrication of pressure vessels, maintenance/ shutdown/turnaround inspection of refinery and offshore platforms, piping inspection, pressure vessel inspection. Familiar with working to the following codes/standards: AWS D1.1, ASME V, ASME VIII, ASME IX, ASME B31.3, ASME B31.1, ASME B31.8, API 510, API 570, NBIC 23, API 650, API 1104, API RP-2X, API RP- 2A, API-5L, AS 4037-1999, AS/NZS 1554.1, BS3923 and ISO 5817/6520.
  • 2. CV-Vuong Huy Hai Page 2 / 7 3.2. Detail of employment & experienced projects From Jan. 2015 to now:  Employed by QIS-NDT Services Co., Ltd. Responsibilities: Supervising of NDT works, conduct NDT training.  Employed by ABSG Consulting Inc. – Malaysia. - Project: LUBEREF YANBU REFINERY EXPANSION. - Location: DOOSAN VINA – DUNG QUAT, QUANG NGAI, VIET NAM - Position: Monitoring Inspector. Responsibilities: Supervising, Inspection & monitoring for fabrication of adsorber vessels & drums. - Review Material Test Certificates. - Witness welding inspection & dimension works, review related inspection reports. - Witness NDT works, review NDT reports / radiographs. - Witness Hydrostatic Test. - Witness painting works, review related inspection reports. - Witness packing / shipping works, review related reports. - Review Manufacturer Data Record (MDR). From Nov. 2013 to Dec. 2014: Employed by ABSG Consulting Inc. - Singapore. - Project: ICHYTHYS ON SHORE LNG FACILITIES - Location: PTSC Phu My Port, Ba Ria – Vung Tau, Viet Nam. - Position: Monitoring Inspector. Responsibilities: Supervising, Inspection & monitoring for fabrication / erection of structural steels. - Witness all assembly & erection works, review related inspection reports. - Witness welding inspection & dimension works, review related inspection reports. - Witness NDT works, review NDT reports / radiographs. - Witness painting works, review related inspection reports. - Witness packing works, review related reports. - Witness shipping works, review related reports. - Review Manufacturer Data Record (MDR). From Jan. 2012 to Nov. 2013: Employed by Quoc Anh Services & Fabrication Company Limited. Position: QC Inspector supervisor Responsibilities: - Supervising all QC activities and inspection works. - Conducting Welding Inspection & dimension inspection. - Witnessing NDT and review NDT reports, radiographs. - Study for application of welding technology into production. - Managing / conducting all welding procedure qualifications. - Managing / training / conducting all welder qualification. Record and monitor the qualification status of welder. - In charge for assurance of welding quality. Working for following projects: - 15 units of 3200 Cu.ft Bulk silo (ASME VIII div 1, U stamped) for Drilling Fluid and Wells Services Ltd. ASME Code stamped.
  • 3. CV-Vuong Huy Hai Page 3 / 7 - 23 units 600 GAL Tote Tank (ASME VIII div 1, U stamped) for HALLIBURTON. - 9 units SILO 500 Cu. ft Bulk Tank (ASME VIII div 1, U stamped) for HALLIBURTON. - 5 units of Dump Truck for BMT WMB AUSTRALIA-USA-CANADA. - 5 units of 3200 Cu. ft Bulk Silo (ASME VIII div 1, U stamped) for MI SWACO. - 3 units of Air receiver (ASME VIII div 1, U stamped) for MI SWACO. Site installation in Thailand. - 5 units of 2.5m3 Cutting bottle (ASME VIII div 1, U stamped) for MI SWACO. - 6 units 3000 Cu. ft Bulk Tank (ASME VIII div 1, U stamped) for HALLIBURTON. - 2 units of 880 cu.Ft Bulk Tank (ASME VIII div 1, U stamped) for BAKER HUGHES. - 4 units 400 Cu. Ft Blender (ASME VIII div 1, U stamped) for BJ DRILLING SERVICES. - 17 units of pressure vessels, include bulk silo, air receivers, and tote tanks (ASME VIII div 1, U stamped) for DMC Vietnam. - Fabrication of offshore container to ISO /EN 12079 From July 2003 to January 2012: Employed by QIS-NDT Services Co., Ltd. Position: NDT supervisor / NDT Inspector Responsibilities: - Supervising NDT works carried out by other colleges - Managing and Performing in-services inspection of pressure vessels, piping systems and steel structures - Performing NDT inspection activities. - Study for application of new NDT technologies. - Radiation Safety Officer. Projects performed: From Jan-2011 to Jan-2012: • Japan Vietnam Petroleum Company - Project: Pressure vessel inspection for N1 Inlet Cooler. - Project: Piping & Pressure vessel inspection on NULQ, NCWI, CLPP, WHP-N1, WHP-E1, WHP- C1, WHP-S1, WHP-PD Rang Dong field. - Project: Visual inspection & UTM for WHP-N1 jacket. - Project: Vessel inspection on NCWI, WHP-N1, CLPP (Vessel entry), Rang Dong field - Project: Fare boom inspection on CLPP, Rang Dong field. • PVD Tech. - Project: PTI - Fabrication burner boom. - Project: PTI - FABRICATION VERTICAL SURGE TANK. - Project: TALISMAN Vietnam 05-2/10 B.V – CASING. - Project: PEARL OIL – CASING. - Project: Hoang Long JOC, H04-Compact Manifold. - Project: Bien Dong – CASING. - Project: PTSC MC/ Bien Dong - Chemical Injection Skid. - Project: PHU QUY – CASING. - Project: EXON MOBIL – CASING. • PVEP POC – DAI HUNG 01 Oil Rig. - Project: Pressure Vessel Inspection on Dai Hung 01 Oil Rig. • Quoc Anh Company. - Project: HALLIBURTON - 1500 CU. FT scale tanks. - Project: MI SWACO - 1000 BBL storage tank. - Project: PV Drilling and investment- 2600 CU.FT portable bulk tanks. • Vina Offshore Fabrication & Engineering Co. ltd.
  • 4. CV-Vuong Huy Hai Page 4 / 7 - Project: CUULONG JOC - Carry out site survey, fabrication & installation of the WHP-B 12P flowlines c/w pipe supports, sutuden field. - Project: CUULONG JOC - Carry out site survey, fabrication & installation of the 8P-ST flowline converted from 8I on WHP-A. - Project: CUULONG JOC - Carry out site survey, fabrication & installation of the 9P-ST flowline converted from 9I on WHP-A. - Project: PVTRANS - Fabrication of fire pump cooling water spools. - Project: MISC BERHAD - Onshore fabrication of temporary spool in place of SDV 1002 for Ruby FBSO. • Oil and Gas Production Enterprise - Vietsovpetro - Project: BK3. - Project: Gaslift MSP1-BK7. - Project: BK10. - Project: Extension of Gaslift System for MSP - 6 and MSP – 10. From Jan-2010 to Jan-2011: Carried out inspection & NDT works (MT, PT, UT, UTM & Radiographic Interpreter) for following projects: • PVD Tech. - Project: TGT Compact Manifold, Hoang Long JOC. • Japan Vietnam Petroleum Company - Project: Vessel inspection on NCWI (Vessel entry), Rang Dong field. - Project: Vessel inspection on NULQ (Vessel entry), Rang Dong field. - Project: Piping & Pressure vessel inspection on NULQ, NCWI, CLPP, WHP-N1, WHP-E1, WHP- C1, WHP-S1, WHP-PD Rang Dong field. From Jan-2009 to Jan-2010: Carried out inspection & NDT works (MT, PT, UT, UTM & Radiographic Interpreter) for following projects: • Alpha ECC / Japan Vietnam Petroleum Company - Project: Pressure vessel inspection on NCWI, Rang Dong field. • VIETSOVPETRO J/V / VRJ (Vietnam – Russia – Japan) - Project: Fabrication of RC-Doi Moi topside. • Alpha ECC / Japan Vietnam Petroleum Company - Project: Pressure vessel inspection on WHP – E1, N1, CLPP, NULQ, NCWI, Rang Dong field. • Dai Hung Petroleum Operating Co. Ltd. - Project: Pressure vessel inspection on Dai Hung – 01 Rig, Dai Hung field. - Project: Ultrasonic thickness measurement of process piping, pressure vessels, fire water lines, air compressors & non-process vessel on Dai Hung - 01 Rig, Dai Hung field. • Strategic Marine (V) Co., Ltd - Project: AUSTRALIA MARINE COMPLEX, 80001-Submarine support cradles. - Project: STX EUROPE, STX EUROPE Floating dock. • PVD Tech - Project: PVEP PHUQUY, Fabrication of 20” casing for Phuquy. - Project: PVEP CUBA, Fabrication of 20” casing. - Project: Technics Offshore Engineering Pte Ltd, Fabrication of 20” casing. - Project: VIETSOVPETRO J/V, NAM RONG – DOI MOI RC-4 / RC-5 / RC-DOI MOI topside. - Project: VIETSOVPETRO J/V, Fabrication of 30” casing. - Project: PVEP BACH DANG Company Limited, Provision of OCTG supply 20” casing. - Project: Cuu Long Joint Operating Company, Provision of conductor. - Project: Petrovietnam Fertilizer and Chemicals Corporation - The Phu My fertilizer plant, Fabrication & installation of blowdown pipings line - VT090041. - Project: Danieli, Sliding covers.
  • 5. CV-Vuong Huy Hai Page 5 / 7 • VIETSOVPETRO J/V - Project: Premier Oil Vietnam Offshore B.V (POVO) / PTSC M&C, Fabrication of Chim Sao South Jacket. • Vina Offshore Fabrication & Engineering Co. Ltd. / CUU LONG Joint Operating Company - Project: Carry out fabrication and installation of LGC-B leaking valve pipe spool on TBVN FPSO – Project no.: 09-F-040. - Project: Carry out site survey, fabrication and installation of flowline & gaslift lines of wells (well no.: 7P, 8P, 9P, 10P) c/w pipe support on CPP, Su Tu Vang field – Project no.: 09-F-047, 09-F- 055. - Project: Carry out site survey, fabrication and installation of flowline & gaslift lines of wells (well no.: 26I, 12P) c/w pipe support on WHP-A, Su Tu Den field – Project no.: 09-F-046, 09-F-080. - Project: Site measurement, fabrication and installation of well casing venting system on WHP-A, Su Tu Den field– Project no.: 09-F-045. - Project: Site measurement, fabrication and installation of seawater crossover, Su Tu Vang field. - Project: 1-3-5-6 Nozzles on CPP manifolds – Project no.: 09-F-041. - Project: 9-10-11-12 Nozzles on CPP Manifolds. • Vina Offshore Fabrication & Engineering Co. Ltd. / Technics Offshore Engineering Pte Ltd - Project: Fabrication of water tank, foam tank, open & closed drain tank skid – Project no.: 09-F- 025. - Project: Fabrication of air receiver (ASME “U” stamp) – Project no.: 09-F-A021. - Project: Fabrication of strainer housing – Project no.: 09-F-034. • Vina Offshore Fabrication & Engineering Co. Ltd. / PVD Tech - Project: Fabrication of gaslift metering skids, vent scrubber skids – Project no.: 09-F-030. From Jan-2008 to Dec-2008: Carried out inspection & NDT works (MT, PT, UT, UTM & Radiographic Interpreter) for following projects: • Japan Vietnam Petroleum Company - Projects: Visual inspection and ultrasonic thickness measurement of piping work and vessel systems. • VIETSOVPETRO J/V - Project: PC Vietnam Limited, Fabrication of PLDP-A jacket for pearl Development. • PVD Tech - VIETSOVPETRO J/V, BK7. - Cuu Long JOC, Provision of conductor. • AMIGOS Co., Ltd - MI Swaco, Fabrication of CFU water treatment packages – OGP 355. - Project: PROMECON, Prefabrication of pipe spools for "dong chp 7047" – IND 151. - NEM POWER SYSTEMS, Mesaieed – IND 130. • Japan Vietnam Petroleum Company - Projects: Visual inspection and ultrasonic thickness measurement of piping work and vessel systems. • Vina Offshore Fabrication & Engineering Co. Ltd. - Project: Bluewater Energy Services B.V, Fabrication of mid water arch tank & gravity base frame for blue water energy. • Japan Vietnam Petroleum Company - Project: Ultrasonic thickness measurement of piping systems on WHP-N1, E1, C1, S1 & CLPP, Rang Dong field. • Nhat Nam Co., Ltd - Project: NACAP, Phu My - Ho Chi Minh gas pipeline.
  • 6. CV-Vuong Huy Hai Page 6 / 7 From Jan-2007 to Jan-2008: Carried out NDT works (MT, PT, UT, UTM, Radiographic Interpreter) for following projects: • PVECC - Project: SBM, Fabrication of suction piles. • Vina Offshore Fabrication & Engineering Co. Ltd. - Project: Petro Vietnam Drilling Company, Offshore modification of air line, oil line & gas line. • AMIGOS Co., Ltd - Project: NEM POWER SYSTEMS, TKS CSA Rio De Janeiro power plant – IND 127. - Project: NEM POWER SYSTEMS, Twence-Martin GMBH – IND 133. - Project: AARDING THERMAL ACOUSTICS– IND 132, Bumper fabrication. - CUU LONG JOC, Offshore periodical MT for lifting equipments. • Vina Offshore Fabrication & Engineering Co. Ltd. - Project: CUU LONG JOC, Onshore fabrication and offshore installation of 28 P flowline and gaslift line. - Project: CUU LONG JOC, Onshore fabrication and offshore installation of 24 P flowline and gaslift line. • MODEC Vietnam - Project: Ultrasonic thickness measurement, visual inspection on piping works and pressure vessels. • Japan Vietnam Petroleum Company - Project: Yearly crane inspection of offshore cranes. From Jan-2006 to Jan-2007: Carried out NDT works (MT, PT, UT, UTM & Radiographic Interpreter) for following projects: • GLOBAL SANTA FE - Project: Adriatic XI, Preload tank repair. • Cuu Long Joint Operating Company. - Project: Fabrication & installation of 16I water injection on WHP-A. • LILAMA 18-3 - Project: Thu Thiem Brigde Vietnam. - Project: Daininh power plant. - Camau 1 & 2 Power plant combination. • ALCAN Vietnam Company - Project: Gove third stage expansion. From Jan-2005 to Jan-2006: Carried out NDT works (MT, PT, UT, UTM & Radiographic Interpreter) for following projects: • AMIGOS Co.,Ltd - Project: DOWNER ENGINEERING, CO –E3P Power project, Huntly Unit 5. • Vina Offshore Fabrication & Engineering Co. Ltd. - Project: Japan Vietnam Petroleum Company, WHP-S1 Installation, Tie in, Modification of pipelines. • Saigon Shipmarin - Project: VIETSOVPETRO J/V, Fabrication of new petroleum special barge 15000 MT. • Thanh Ngoc Co.,Ltd - Project: GLOBAL SANTAFE, Offshore fabrication of pipeline on Galveston Key rig. • APAVE Vietnam & South East Asia - Project: Petronas, Fabrication of topside for Ruby WHP-B. • Vungtau Shipyard - Project: VIETSOVPETRO J/V, Long Son 01 boat inspection.
  • 7. CV-Vuong Huy Hai Page 7 / 7 • Schlumberger - Project: UT inspection for SLB 1440 PSI test separator (Tank & Pipes). - Project: Fabrication of piping work for well test line. • MITSHUBISHI - Project: Fabrication of piping of SBM/MC-level control upgrade. • Japan Vietnam Petroleum Company - Project: Yearly inspection of offshore lifting appliances. From Jul-2003 to Jan-2005: Carried out NDT works (MT, PT, UTM, Radiographer) for following projects: • MHE / DEMAG Co., LTD - Project: Fabrication of cranes. • AMIGOS Co., LTD - Project: 2000 tons structural works for leighton ltd of blue scope steel. - Project: piping work & pressure vessel projects for VIETSOVPETRO J/V. - Project: Piping work & pressure vessel for NUPLEX Ltd. • HUYNDAI VINASHIN Co., LTD - Project: Semi submersible oil rig Dai Hung 01 inspection.