CURRICULUM VITAE
I. VEERAPANDIAN
Mobile: +91-9488242254
Email id: ivpandian84@gmail.com
OBJECTIVE :
To achieve a good position with best of my skills that would benefit the
company as well as myself mutually.
PROFESSIONAL QUALIFICATION:
INDUSTRIAL ROPE ACCESS TRADE ASSOCIATION (IRATA)
• Rope access level 2 (IRATA No : 2/77409) (Valid till 06/07/2019)
OPITO-BASIC OFFSHORE SAFETY INDUCTION AND EMERGENCY TRAINING
• T-BOSIET (No: 0051590623111411828) (Valid till 22/11/2018)
• H2S Certificate
OFFSHORE MEDICAL
• OGUK (Valid till 04/08/2018)
PERSONAL CERTIFICATION FOR NON-DESTRUCTIVE TESTING (PCN Level - II)
(PCN No:321511)
• Ultrasonic Testing ( UT) 3.1(plate), 3.2 (pipe), 3.8 (nozzle) & 3.9(node)
• Magnetic Particle Testing (MT)
• Dye Penetrant Testing (PT)
AMERICAN SOCIETY FOR NON- DESTRUCTIVE TESTING (ASNT LEVEL - II)
• Ultrasonic testing (UT)
• Penetrant Testing (PT)
• Magnetic Particle Testing (MT)
• Radiography testing (RT)
• Eddy current testing (ET)
• Visual Testing(VT)
ACADEMIC QUALIFICATION
Course : Diploma in Electronics and Communication Engineering
Institution : AVC Polytechnic College, Mayiladuthurai
Course : Bachelor of Computer Application
Institution : Annamalai University, Chidambaram
Computer Software Experience
• Computer Basics
• Auto-cad 2010
• MS-Office
Overview
Having over all (Seven) 7+ years of working experience in the field of NDT (multi-
discipline),as exposure in oil and gas industries as Corrosion monitoring and in-service
maintenance and inspection of Onshore and Offshore facilities, pipe works, structures, vessels,
risers and tanks and complying to the safety standards, clients specification requirement and
relevant code and practice.
Employer - NOV, KSA ( OFFSHORE)
Period : Aug 2016 to Till now
Position : NDT Inspector with Rope access
Client : Arabian Drilling
Location : KSA
Duties & Responsibilities:
Carrying out Maintenance Assessment utilizing non-destructive testing (NDT) such as Visual,
Ultrasonic, Magnetic Particle, Eddy Current offshore facilities to ascertain their recommend
necessary action are taken as per required codes, standards and specification.
MPI Carried out of Drill Handling Tools.
UT thickness survey of high Pressure line.
Eddy Current Carried out of Pad eyes and Skid welded area.
Complying with Permit to work systems & report writing with MS- Office word & excel.
Employer- GLOBAL REMOTE, CHENNAI
Period : May2015 to July 2016
Position : NDT Inspector with Rope access
Client : Various Clint
Location : India & Abudhabi
Duties & Responsibilities:
Carrying out Maintenance Assessment and On-Stream Inspection utilizing non-destructive
testing (NDT) such as Visual, Ultrasonic weld scan, on onshore facilities to ascertain their
integrity and recommend necessary action are taken as per required codes, standards and
specification.
Ultrasonic corrosion monitoring of defined process piping to detect internal wall loss.
Ultrasonic weld scan of piping and structural.
Employer - MOZZAT ENTERPRISE SDN BHD, BRUNEI (OFFSHORE)
Period : Aug 2014 to Jan 2015
Position : NDT Inspector with Rope access
Client : SHELL PETROLEUM
Location : BSP Brunei
Duties & Responsibilities:
Carrying out Maintenance Assessment and On-Stream Inspection utilizing non-destructive
testing (NDT) such as Visual, Ultrasonic, Magnetic Particle, and Dye Penetrant offshore
facilities to ascertain their recommend necessary action are taken as per required codes,
standards and specification.
Ultrasonic corrosion monitoring of defined process piping to detect internal wall loss.
UT thickness survey of tanks & pressure vessels.
Close 100% Visual Inspection of defined pressure piping systems, structural & pressure vessels.
Familiar with isometric & updating of as built.
Employer –EMIRATES INDUSTRIAL LABORATORY, QATAR
Period : Feb 2014 to May 2014
Position : Multi NDT Inspector
Client : QAFAC
Location : QATAR
Duties & Responsibilities:
Carrying out Maintenance Assessment and On-Stream Inspection utilizing non-destructive
testing (NDT) such as Visual, Ultrasonic weld scan, on onshore facilities to ascertain their
integrity and recommend necessary action are taken as per required codes, standards and
specification.
Ultrasonic corrosion monitoring of defined process piping to detect internal wall loss.
UT thickness survey of tanks & pressure vessels.
Close Visual Inspection of defined pressure piping systems, support & pressure vessels.
Familiar with isometric & updating of as built.
Complying with Permit to work systems & report writing with MS- Office word & excel.
Employer- IMEXICO INDUSTRIES UG LTD, UGANDA
Period : Mar2013 to Oct2013
Position : Multi NDT Inspector
Client : NIGIGI
Location : UGANDA
Duties & Responsibilities:
Visual inspection Reporting & Documentation as per client specification.
VT of Piping, process piping & structure.
MPI carried out on field pressure piping welded area.
MT of equipment on running plants.
PT of field bevel and completed assemblies.
PT on condenser, strippers on welded joints.
On-line inspection thickness gauge measurement for various products & corrosion monitoring.
UT Thickness of pressure vessel & process piping.
Ultrasonic testing of plates pipes for lamination.
VIBRANT NDT INSPECTIONS SERVICES PVT LTD,INDIA Contract with Cether
Vessels (p) Ltd., [CVPL], Trichy, Nuclear Power India Limited(NPCIL), Kudangulam is a
company involved in NDT inspection in boiler components, pressure vessels, heat exchangers
and for various power and process plants, under third party inspection agencies like LIOYDS,
IBR, Tata Project Ltd(TPL) as per ASME code and standards.
OTHER CONTRACTORS (INDIA):
TNEB Power plant, Nagapatinam.
GTN Engineering, Coimbatore.
Abon Construction [P] Ltd., [ONGC project], Nagapatinam.
ONGC, kuttalam
Pipelines & Process Equipment [P] Ltd., Trichy.
Oriental plants Equipment (P) Ltd., Coimbatore.
Sri Venkateswara Engineering., Coimbatore.
Indo Shell [P] Ltd., Coimbatore.
Jubilant Engineering, Coimbatore.
Arun Enterprises, Trichy.
Mukand Ltd, Kudangulam.
Duties & Responsibilities:
Carried out UT Weld scanning of Pipelines, Column and Beam.
UT grid scanning & Pit mapping of Storage Tank.
Carried out Structural & Tubular T, K, Y weld joints.
Corrosion survey of in service components, Vessels, chemical storage Tanks.
Performed UT on Weldments and raw materials for lamination check on all
Vessels, Boiler drums and builds up welds for storage tanks.
Piping instrument diagram (P&ID) and Isometric Drawings to initiate Inspection.
Carried out Ultrasonic Thickness Gauge on Weldments and Vessels for Tubes,
Interpretation and evaluation, reported and submission for approval.
Carried out LPT Test on EDGE Preparation and weldment on weld joints.
Carried out MPI Test on Boilers.
Carried out MPI Test on Valve Bodies, Forging Roads in Fluorescent method.
Preparation of progress reports and inspection reports.
Familiarization with Equipment Handled:
Ultrasonic Testing :
USM-35, Modsonic –Einstein-II TFT, DIGISCAN, Olympus M45
Magnetic Testing Equipment:
Model: AC YOKE/MT200 PERMANENT YOKE-ELYMAGI PM2000
Liquid Penetrant Testing:
Model: Developer-SKD-S2&Chemical Penetrant-SKL-SP&Chemical
Cleaner-SKC-S& Chemical
Eddy Current Testing:
Olympus NORTEC 500D, Mentor GN
Codes & Standards
 ASTM E-709
 ASME SEC VIII
 ASME SEC V ARTICLE 4&5
 ASME SEC V ARTICLE 8, 2
 AWS D1.1 ( Statically )
 API RP 7L & API RP 8A
PERSONAL PROFILE:-
Name : I.VEERAPANDIAN
Father’s Name : N.INDURAJITH
Date of Birth : 20.09.1983
Gender : Male
Marital Status : Single
Nationality : Indian
Religion : Hindu
Languages Known : Tamil & English
Permanent Address : No.3/87B,
Arayapuram,
Kuttalam (tk),
Nagai (D.T),
Tamil Nadu, India- 609806
DECLARATION:-
I hereby declare that the above furnished information are true and correct to
my knowledge.
Place: Yours Faithfully,
Date:
(I.VEERAPANDIAN)
Olympus NORTEC 500D, Mentor GN
Codes & Standards
 ASTM E-709
 ASME SEC VIII
 ASME SEC V ARTICLE 4&5
 ASME SEC V ARTICLE 8, 2
 AWS D1.1 ( Statically )
 API RP 7L & API RP 8A
PERSONAL PROFILE:-
Name : I.VEERAPANDIAN
Father’s Name : N.INDURAJITH
Date of Birth : 20.09.1983
Gender : Male
Marital Status : Single
Nationality : Indian
Religion : Hindu
Languages Known : Tamil & English
Permanent Address : No.3/87B,
Arayapuram,
Kuttalam (tk),
Nagai (D.T),
Tamil Nadu, India- 609806
DECLARATION:-
I hereby declare that the above furnished information are true and correct to
my knowledge.
Place: Yours Faithfully,
Date:
(I.VEERAPANDIAN)

VEERAPANDIAN CV.doc1

  • 1.
    CURRICULUM VITAE I. VEERAPANDIAN Mobile:+91-9488242254 Email id: ivpandian84@gmail.com OBJECTIVE : To achieve a good position with best of my skills that would benefit the company as well as myself mutually. PROFESSIONAL QUALIFICATION: INDUSTRIAL ROPE ACCESS TRADE ASSOCIATION (IRATA) • Rope access level 2 (IRATA No : 2/77409) (Valid till 06/07/2019) OPITO-BASIC OFFSHORE SAFETY INDUCTION AND EMERGENCY TRAINING • T-BOSIET (No: 0051590623111411828) (Valid till 22/11/2018) • H2S Certificate OFFSHORE MEDICAL • OGUK (Valid till 04/08/2018) PERSONAL CERTIFICATION FOR NON-DESTRUCTIVE TESTING (PCN Level - II) (PCN No:321511) • Ultrasonic Testing ( UT) 3.1(plate), 3.2 (pipe), 3.8 (nozzle) & 3.9(node) • Magnetic Particle Testing (MT) • Dye Penetrant Testing (PT)
  • 2.
    AMERICAN SOCIETY FORNON- DESTRUCTIVE TESTING (ASNT LEVEL - II) • Ultrasonic testing (UT) • Penetrant Testing (PT) • Magnetic Particle Testing (MT) • Radiography testing (RT) • Eddy current testing (ET) • Visual Testing(VT) ACADEMIC QUALIFICATION Course : Diploma in Electronics and Communication Engineering Institution : AVC Polytechnic College, Mayiladuthurai Course : Bachelor of Computer Application Institution : Annamalai University, Chidambaram Computer Software Experience • Computer Basics • Auto-cad 2010 • MS-Office Overview Having over all (Seven) 7+ years of working experience in the field of NDT (multi- discipline),as exposure in oil and gas industries as Corrosion monitoring and in-service maintenance and inspection of Onshore and Offshore facilities, pipe works, structures, vessels, risers and tanks and complying to the safety standards, clients specification requirement and relevant code and practice. Employer - NOV, KSA ( OFFSHORE) Period : Aug 2016 to Till now Position : NDT Inspector with Rope access Client : Arabian Drilling Location : KSA
  • 3.
    Duties & Responsibilities: Carryingout Maintenance Assessment utilizing non-destructive testing (NDT) such as Visual, Ultrasonic, Magnetic Particle, Eddy Current offshore facilities to ascertain their recommend necessary action are taken as per required codes, standards and specification. MPI Carried out of Drill Handling Tools. UT thickness survey of high Pressure line. Eddy Current Carried out of Pad eyes and Skid welded area. Complying with Permit to work systems & report writing with MS- Office word & excel. Employer- GLOBAL REMOTE, CHENNAI Period : May2015 to July 2016 Position : NDT Inspector with Rope access Client : Various Clint Location : India & Abudhabi Duties & Responsibilities: Carrying out Maintenance Assessment and On-Stream Inspection utilizing non-destructive testing (NDT) such as Visual, Ultrasonic weld scan, on onshore facilities to ascertain their integrity and recommend necessary action are taken as per required codes, standards and specification. Ultrasonic corrosion monitoring of defined process piping to detect internal wall loss. Ultrasonic weld scan of piping and structural. Employer - MOZZAT ENTERPRISE SDN BHD, BRUNEI (OFFSHORE) Period : Aug 2014 to Jan 2015 Position : NDT Inspector with Rope access Client : SHELL PETROLEUM Location : BSP Brunei Duties & Responsibilities: Carrying out Maintenance Assessment and On-Stream Inspection utilizing non-destructive testing (NDT) such as Visual, Ultrasonic, Magnetic Particle, and Dye Penetrant offshore facilities to ascertain their recommend necessary action are taken as per required codes, standards and specification. Ultrasonic corrosion monitoring of defined process piping to detect internal wall loss. UT thickness survey of tanks & pressure vessels. Close 100% Visual Inspection of defined pressure piping systems, structural & pressure vessels. Familiar with isometric & updating of as built.
  • 4.
    Employer –EMIRATES INDUSTRIALLABORATORY, QATAR Period : Feb 2014 to May 2014 Position : Multi NDT Inspector Client : QAFAC Location : QATAR Duties & Responsibilities: Carrying out Maintenance Assessment and On-Stream Inspection utilizing non-destructive testing (NDT) such as Visual, Ultrasonic weld scan, on onshore facilities to ascertain their integrity and recommend necessary action are taken as per required codes, standards and specification. Ultrasonic corrosion monitoring of defined process piping to detect internal wall loss. UT thickness survey of tanks & pressure vessels. Close Visual Inspection of defined pressure piping systems, support & pressure vessels. Familiar with isometric & updating of as built. Complying with Permit to work systems & report writing with MS- Office word & excel. Employer- IMEXICO INDUSTRIES UG LTD, UGANDA Period : Mar2013 to Oct2013 Position : Multi NDT Inspector Client : NIGIGI Location : UGANDA Duties & Responsibilities: Visual inspection Reporting & Documentation as per client specification. VT of Piping, process piping & structure. MPI carried out on field pressure piping welded area. MT of equipment on running plants. PT of field bevel and completed assemblies. PT on condenser, strippers on welded joints. On-line inspection thickness gauge measurement for various products & corrosion monitoring. UT Thickness of pressure vessel & process piping. Ultrasonic testing of plates pipes for lamination. VIBRANT NDT INSPECTIONS SERVICES PVT LTD,INDIA Contract with Cether Vessels (p) Ltd., [CVPL], Trichy, Nuclear Power India Limited(NPCIL), Kudangulam is a
  • 5.
    company involved inNDT inspection in boiler components, pressure vessels, heat exchangers and for various power and process plants, under third party inspection agencies like LIOYDS, IBR, Tata Project Ltd(TPL) as per ASME code and standards. OTHER CONTRACTORS (INDIA): TNEB Power plant, Nagapatinam. GTN Engineering, Coimbatore. Abon Construction [P] Ltd., [ONGC project], Nagapatinam. ONGC, kuttalam Pipelines & Process Equipment [P] Ltd., Trichy. Oriental plants Equipment (P) Ltd., Coimbatore. Sri Venkateswara Engineering., Coimbatore. Indo Shell [P] Ltd., Coimbatore. Jubilant Engineering, Coimbatore. Arun Enterprises, Trichy. Mukand Ltd, Kudangulam. Duties & Responsibilities: Carried out UT Weld scanning of Pipelines, Column and Beam. UT grid scanning & Pit mapping of Storage Tank. Carried out Structural & Tubular T, K, Y weld joints. Corrosion survey of in service components, Vessels, chemical storage Tanks. Performed UT on Weldments and raw materials for lamination check on all Vessels, Boiler drums and builds up welds for storage tanks. Piping instrument diagram (P&ID) and Isometric Drawings to initiate Inspection. Carried out Ultrasonic Thickness Gauge on Weldments and Vessels for Tubes, Interpretation and evaluation, reported and submission for approval. Carried out LPT Test on EDGE Preparation and weldment on weld joints. Carried out MPI Test on Boilers. Carried out MPI Test on Valve Bodies, Forging Roads in Fluorescent method. Preparation of progress reports and inspection reports. Familiarization with Equipment Handled: Ultrasonic Testing : USM-35, Modsonic –Einstein-II TFT, DIGISCAN, Olympus M45 Magnetic Testing Equipment: Model: AC YOKE/MT200 PERMANENT YOKE-ELYMAGI PM2000 Liquid Penetrant Testing: Model: Developer-SKD-S2&Chemical Penetrant-SKL-SP&Chemical Cleaner-SKC-S& Chemical Eddy Current Testing:
  • 6.
    Olympus NORTEC 500D,Mentor GN Codes & Standards  ASTM E-709  ASME SEC VIII  ASME SEC V ARTICLE 4&5  ASME SEC V ARTICLE 8, 2  AWS D1.1 ( Statically )  API RP 7L & API RP 8A PERSONAL PROFILE:- Name : I.VEERAPANDIAN Father’s Name : N.INDURAJITH Date of Birth : 20.09.1983 Gender : Male Marital Status : Single Nationality : Indian Religion : Hindu Languages Known : Tamil & English Permanent Address : No.3/87B, Arayapuram, Kuttalam (tk), Nagai (D.T), Tamil Nadu, India- 609806 DECLARATION:- I hereby declare that the above furnished information are true and correct to my knowledge. Place: Yours Faithfully, Date: (I.VEERAPANDIAN)
  • 7.
    Olympus NORTEC 500D,Mentor GN Codes & Standards  ASTM E-709  ASME SEC VIII  ASME SEC V ARTICLE 4&5  ASME SEC V ARTICLE 8, 2  AWS D1.1 ( Statically )  API RP 7L & API RP 8A PERSONAL PROFILE:- Name : I.VEERAPANDIAN Father’s Name : N.INDURAJITH Date of Birth : 20.09.1983 Gender : Male Marital Status : Single Nationality : Indian Religion : Hindu Languages Known : Tamil & English Permanent Address : No.3/87B, Arayapuram, Kuttalam (tk), Nagai (D.T), Tamil Nadu, India- 609806 DECLARATION:- I hereby declare that the above furnished information are true and correct to my knowledge. Place: Yours Faithfully, Date: (I.VEERAPANDIAN)