This document is a curriculum vitae for Ramadan Samy Ramadan El Feky, an Egyptian cable jointer supervisor based in Abu Dhabi, UAE. It includes his personal details, qualifications, certifications in cable jointing and termination up to 33kV, and descriptions of his work on various projects in the UAE from 2014 to present involving cable laying, termination, testing and commissioning of substations.
1. CURRICULUM VITAE
NAME: Ramadan Samy Ramadan El Feky
PERSONAL DETAILS :
Designation : Cable Jointer Supervisor
Nationality : Egyptian
Place of Birth : El Monofiya
Address : El Menofiya Egypt
Birthdate : September 29, 1987
Passport No. : A13084293
Degree : Industrial
Present Address : Abu Dhabi PO Box. : 45837, UAE
Mobile : +971 55 412 4129 / +971 50 520 5947
Email : rsamy216@gmail.com
AUTHORIZATION CERTIFICATE/ TRAININGS ATTENDED:
1. ADDC Cable Jointer Authorization Certificate
Authorized for:
1. 11kV Joint and Termination (Heat/Cold/Hybrid Shrinkable Type)
2. 22kV Joint and Termination (Heat/Cold/Hybrid Shrinkable Type)
3. 33kV Joint and Termination (Heat/Cold/Hybrid Shrinkable Type)
4. 11, 22 & 33kV Plug in Termination
28/10/2013 – 22/10/2016
2. Training Program on Installation of Raychem Plug-in Terminations (RPIT) up to 42kV
TYCO ELECTRONICS RAYCHEM GMBH, Abu Dhabi
22/09/2014
3. ADDC Cable Jointer Authorization Certificate
Authorized for:
5. 11kV Joint and Termination (Heat Shrinkable Type)
6. 33kV Joint and Termination (Heat Shrinkable Type)
7. 11 & 33kV Plug in Termination
20/07/2010 – 19/07/2013
4. Basic First Aid Training
Emirates Technical & Safety Development Centre
April 20, 2010
5. Basic Fire Fighting Training
Emirates Technical & Safety Development Centre
April 20, 2010
Page | 1
2. 6. Sensoform Earth Fault Indicator Technical Training Course
Theory of operation, Configuration, Installation, Testing, Safety, and Decommissioning of the
Sensorform range of Earth Fault Indicator
Suparule Systems Ltd.
July 19, 2009
7. In-House Technical Training
Global Transformers and Switchgears FZCO
October 15, 2009 – November 15, 2009
8. Partial Discharge Training in the use of the Ultra TEV Detector and Installation of Ultra TEV Alarm
Systems
EA Technology
May 15, 2009
9. Training Program for construction, operation and maintenance of 11 & 33kV Switchgear
Hyundai Heavy Industries Co. Ltd.
October 9, 2008 – November 14, 2008
10. Training Program for construction, operation and maintenance of 145kV GIS
Hyundai Heavy Industries Co. Ltd.
October 13, 2008 – November 07, 2008
11. Training Program for construction, operation and maintenance of Power Transformers
Hyundai Heavy Industries Co. Ltd.
October 17, 2008 – November 21, 2008
PROJECTS WORK INVOLVED (2014-PRESENT):
Project : TAKREER Power Transformer (still on going)
Client : IMECO
Scope of Work : Design, Engineering, Manufacture, Supply, Supervise the Installation, Testing and
Commissioning for Power and Distribution Transformers at Ruwais Refinery
Year : 2015
Project : LEAF TOWER (still on going)
Client : COMMODORE CONTRACTING CO.
Scope of Work : Supply, Installation, Testing, Commissioning and Handing Over to ADDC of complete
22kV Substation Works
Year : 2015
Project : Electrical Works for 22kV Substation
Client : TRISTAR
Scope of Work : Supply, Installation, Testing and Commissioning of 22kVSubstation
Year : 2015
Project : DAMAC Crescent Properties LLC
Client : ETA-ASCON
Scope of Work : Termination of LV Power & Control Cables including the cable glanding, earthing of
cable glands, crimping and provision of necessary tools and tackles for carrying out
cable termination works
Year : 2015
Project : Fujairah Freezone Substation – Cable Termination Works
Page | 2
3. Client : ETA - PPD
Scope of Work : Plug-in Cable Termination for 33kV GIS IDT Feeders and Freezone Substation
Outgoing Feeders
Year : 2015
Project : Termination Works – Al Ain
Client : ENVICON
Scope of Work : 11kV Indoor Termination – euromold type including T-boot (combination of heat
and cold) on HV panel
Year : 2015
Project : Supply and Installation of Transformer and QRM-MOI
Client : SITE TECHNOLOGY
Scope of Work : Supply, Installation, Insulation, Testing and Commissioning of 11/0.4, 1500Kva
and 50Hz, 3Ph Dyn11,ONAN, sealed type transformer with off circuit tap charger and HV tap
switch of ±5% in steps of 2.5 as per IEC 60076 spec as per ADDC requirements
Year : 2014
Project : DANAT EL EMARAT
Client : DRAKE AND SKULL
Scope of Work : Termination of 3cx185mm2 Heat Shrink MV cable and VLF test
Year : 2014
Project : Accommodation Works of Drainage at Delma Island
Client : TANKLINE
Scope of Work : Follow with ADDC for the following: Cable Route Approval, Cable Scheme, Cable
termination case. Substation, Energizing with coordination with ADDC
Year : 2014
Project : Dubai International Airport Expansion – Phase II; AX-134 (C3) Package
Client : ETA
Scope of work: LV Cable Laying and Termination
Year: 2014
Project : Saadiyat Beach Apartment
Client : Drake and Scull
Scope of work: Supply, Installation, Cable Laying of 22kV Cable Termination and Hi
Pot Test
Year: 2014
Project : Dubal Contract Package P12/002-Civil Works for Building 420-
33kV Switchgear Replacement
Client: ETA
Scope of work: Complete Termination Works
Project: Taweelah Powerstation
Client: DEUTSCHE BABCOCK
Scope of work: Supply and Installation of 11kV 3Cx185mm2 Indoor Termination
Project: Termination of 11kV End Termination/FO requirement
Client: Abu Dhabi Terminals
Scope of work: Supply, installation, testing and commissioning of 11kV
termination kit
Page | 3
4. Project: Al Ghareba-Installation of HV and LV Termination
Client: Envicon Emirates
Scope of work: Installation of LV Termination, Indoor Terminations.
Project: Khalifa Port-Supply and Installation of Cable Glands
Client: MIDONG
Scope of work: Installation of 11kV Cable Glands 3Cx300mm2
Project: Zayed Mina Port
Client: AGTHIA
Scope of work: Disconnecting of 4Cx240mm2 Cable, Testing and submission of Test
Report, Testing and Commissioning of LV Cables 1Cx120mm2 and cable
Fault locator and Repairing of Circuit Breaker
Project: LV CABLE REMOVAL/SHIFTING OF LV CABLE
Client: ADDC
Scope of work: LV CABLE REMOVAL/SHIFTING OF LV CABLE
Project: Installation Testing and Commissioning at Saadiyat Island-Marina District
Phase 1 Area A
Client: ENVICON
Scope of work: Installation, Testing and Commissioning and Cable Terminations
Project: D-8577 Supply and Installation of 11kV Cables, with excavation,
recovery, relaying and final re-instatement-S/S E03C35
Client: ADDC/DRAKE AND SCULL
Scope of work: Supply and Installation of Straight Through Joint 3Cx240mm2, Supply
and Installation of 11kV Indoor Termination 3Cx95mm2 W/RAB and
Exposing and removing of ceramic tiles (Interlock tiles)/Jointing
Pit/Backfilling/cermic tile (interloc tiles) reinstatement
Project: EMAL-Contract No. 503406-11/0.4kV Construction Power Reticulation
Package TK 8607
Client: ETA
Scope of work: Heat Shrinkable Outdoor Termination Kit + Glanding and Cable Joint Kits
Project: Khalifa Port and Industrial Zone Project Offshore Terminal Area
Client: Hyundai Engineering & Construction Co.
Scope of work: Installation of 11kV Cable Termination
Project: D-8577-Supply and Installation of 11KV cables, with Excavation,
Recovery, Relaying and final re-instatement
Client: Falcor Engineering
Scope of work: Supply and Installation of 11KV cables, with Excavation, Recovery,
Relaying and final re-instatement of E15C4, E04C31, E01C6
Project: D-8577 Supply and Installation of 11KV cables, with Excavation,
Recovery, Relaying and final re-instatement for Substation E02 and E11
Client: Falcor Engineering
Scope of work: Supply and Installation of 11KV cables, with Excavation, Recovery,
Relaying and final re-instatement for Substation E02 and E11
Project: D-8580 Long Term Rate Agreement for Automation of Distribution
Substation in Central Region (Assorted Make)
Client: ADDC
Main Contractor: Autochim Systems
Scope of work: Replacement of the Existing 11kV RMU/QRM comprising
Page | 4
5. Replacement, refurbishing & retrofitting works/ Site Survey
Project: A-4513 Supply, Installation & Commissioning of Earth Fault
Indicators & Partial Discharge Detectors with Remote Link on AADC
Distribution & Primary Substation System
Client: Al Ain Distribution Company
Scope of Work: Supply, Installation & Commissioning of Earth Fault Indicators &
Partial Discharge Detectors with Remote Link on AADC Distribution
& Primary Substation System
Project: N-6081.1 Silicon Rubber Coating of Outdoor Porcelain Insulation of
OHTL Circuit ends
Client: TRANSCO
Scope of work: Coating All 400&220 KV Outdoor Insulators with HVIC At Al Dahma
(400&220kv), Al Ain Power Station, Al Hayer, Sanaiya and Sweihan
Project: Proposed Construction of Hotel & Resorts Between Two Bridges,
B2B Hotel & Resort at Plot no P3B, Sector S23, Abu Dhabi
Client: ADDC
Main Contractor: Square General Contracting Co. L.L.C.
Scope of work : Installation, Testing and Commissioning and Handing
over to ADDC of 11kV FKI Swithchgear 16 Panel Board
Project: D-8579 Long Term Rate Agreement for Automation of Distribution
Substation in Central Region (Lucy Make)
Client: ADDC
Main Contractor: Lucy Switchgear
Scope of work: Replacement of the Existing 11kV RMU/QRM comprising replacement,
refurbishing & retrofitting works/ Site Survey
Project: Dubai LRT Project
Client: Concord
Scope of work: Installation of Accessories, Testing and Commissioning
Project: Installation of Pfisterer ixosil Accessories at Dubai
Client: Scan Powers
Scope of work: Installation of 145kV Joints
Project: Installation and Supervision of 63kV GIS Termination at MC
Client: Safanicu
Scope of work: Installation/ Supervision of 72.5kV Pfisterer Ixosil Accessories
Project: N-6081.1 Silicon Rubber Coating of Outdoor Porcelain Insulation of
OHTL Circuit ends
Client: TRANSCO
Scope of work: Coating All 400&220 KV Outdoor Insulators with HVIC At Al Dahma
(400&220kv), Al Ain Power Station, Al Hayer, Sanaiya and Sweihan
Project: Proposed Construction of Hotel & Resorts Between Two Bridges,
B2B Hotel & Resort at Plot no P3B, Sector S23, Abu Dhabi
Client: ADDC
Main Contractor: Square General Contracting Co. L.L.C.
Scope of work: Installation, Testing and Commissioning and Handing over to ADDC
of 11kV FKI Swithchgear 16 Panel Board
Project: D-8579 Long Term Rate Agreement for Automation of Distribution
Substation in Central Region (Lucy Make)
Client: ADDC
Main Contractor: Lucy Switchgear
Page | 5
6. Scope of work: Replacement of the Existing 11kV RMU/QRM comprising
replacement, refurbishing & retrofitting works/ Site Survey
Project: Dubai LRT Project
Client: Concord
Scope of work: Installation of Accessories, Testing and Commissioning
Project: Proposed Construction of Hotel & Resorts Between Two Bridges,
B2B Hotel & Resort at Plot no P3B, Sector S23, Abu Dhabi
Client: ADDC
Main Contractor: Square General Contracting Co. L.L.C.
Scope of work: Installation, Testing and Commissioning and Handing over to ADDC
of 11kV FKI Swithchgear 16 Panel Board
Project: D-8579 Long Term Rate Agreement for Automation of Distribution
Substation in Central Region (Lucy Make)
Client: ADDC
Main Contractor: Lucy Switchgear
Scope of work: Replacement of the Existing 11kV RMU/QRM comprising
replacement, refurbishing & retrofitting works/ Site Survey
Project: Dubai LRT Project
Client: Concord
Scope of work: Installation of Accessories, Testing and Commissioning
Project: Termination Works for Project 38322
Client: NPES
Scope of Work: Installation of 22kV 1C x 630mm2 Plug-in Termination
Project: Metro Dubai LRT Project MPS2 and MPS3
Client: Midong
Scope of Work: Installation
Project: 132KV Tranformer Sealing End - SS1400
Client: IMECO
Scope of work: Supply and Installation of SF6 Termination Type: KSEV 145V Size:
4 V2
Page | 6
7. Scope of work: Replacement of the Existing 11kV RMU/QRM comprising
replacement, refurbishing & retrofitting works/ Site Survey
Project: Dubai LRT Project
Client: Concord
Scope of work: Installation of Accessories, Testing and Commissioning
Project: Proposed Construction of Hotel & Resorts Between Two Bridges,
B2B Hotel & Resort at Plot no P3B, Sector S23, Abu Dhabi
Client: ADDC
Main Contractor: Square General Contracting Co. L.L.C.
Scope of work: Installation, Testing and Commissioning and Handing over to ADDC
of 11kV FKI Swithchgear 16 Panel Board
Project: D-8579 Long Term Rate Agreement for Automation of Distribution
Substation in Central Region (Lucy Make)
Client: ADDC
Main Contractor: Lucy Switchgear
Scope of work: Replacement of the Existing 11kV RMU/QRM comprising
replacement, refurbishing & retrofitting works/ Site Survey
Project: Dubai LRT Project
Client: Concord
Scope of work: Installation of Accessories, Testing and Commissioning
Project: Termination Works for Project 38322
Client: NPES
Scope of Work: Installation of 22kV 1C x 630mm2 Plug-in Termination
Project: Metro Dubai LRT Project MPS2 and MPS3
Client: Midong
Scope of Work: Installation
Project: 132KV Tranformer Sealing End - SS1400
Client: IMECO
Scope of work: Supply and Installation of SF6 Termination Type: KSEV 145V Size:
4 V2
Page | 6