SlideShare a Scribd company logo
CURRICULUM VITAE
NAME: Ramadan Samy Ramadan El Feky
PERSONAL DETAILS :
Designation : Cable Jointer Supervisor
Nationality : Egyptian
Place of Birth : El Monofiya
Address : El Menofiya Egypt
Birthdate : September 29, 1987
Passport No. : A13084293
Degree : Industrial
Present Address : Abu Dhabi PO Box. : 45837, UAE
Mobile : +971 55 412 4129 / +971 50 520 5947
Email : rsamy216@gmail.com
AUTHORIZATION CERTIFICATE/ TRAININGS ATTENDED:
1. ADDC Cable Jointer Authorization Certificate
Authorized for:
1. 11kV Joint and Termination (Heat/Cold/Hybrid Shrinkable Type)
2. 22kV Joint and Termination (Heat/Cold/Hybrid Shrinkable Type)
3. 33kV Joint and Termination (Heat/Cold/Hybrid Shrinkable Type)
4. 11, 22 & 33kV Plug in Termination
28/10/2013 – 22/10/2016
2. Training Program on Installation of Raychem Plug-in Terminations (RPIT) up to 42kV
TYCO ELECTRONICS RAYCHEM GMBH, Abu Dhabi
22/09/2014
3. ADDC Cable Jointer Authorization Certificate
Authorized for:
5. 11kV Joint and Termination (Heat Shrinkable Type)
6. 33kV Joint and Termination (Heat Shrinkable Type)
7. 11 & 33kV Plug in Termination
20/07/2010 – 19/07/2013
4. Basic First Aid Training
Emirates Technical & Safety Development Centre
April 20, 2010
5. Basic Fire Fighting Training
Emirates Technical & Safety Development Centre
April 20, 2010
Page | 1
6. Sensoform Earth Fault Indicator Technical Training Course
Theory of operation, Configuration, Installation, Testing, Safety, and Decommissioning of the
Sensorform range of Earth Fault Indicator
Suparule Systems Ltd.
July 19, 2009
7. In-House Technical Training
Global Transformers and Switchgears FZCO
October 15, 2009 – November 15, 2009
8. Partial Discharge Training in the use of the Ultra TEV Detector and Installation of Ultra TEV Alarm
Systems
EA Technology
May 15, 2009
9. Training Program for construction, operation and maintenance of 11 & 33kV Switchgear
Hyundai Heavy Industries Co. Ltd.
October 9, 2008 – November 14, 2008
10. Training Program for construction, operation and maintenance of 145kV GIS
Hyundai Heavy Industries Co. Ltd.
October 13, 2008 – November 07, 2008
11. Training Program for construction, operation and maintenance of Power Transformers
Hyundai Heavy Industries Co. Ltd.
October 17, 2008 – November 21, 2008
PROJECTS WORK INVOLVED (2014-PRESENT):
Project : TAKREER Power Transformer (still on going)
Client : IMECO
Scope of Work : Design, Engineering, Manufacture, Supply, Supervise the Installation, Testing and
Commissioning for Power and Distribution Transformers at Ruwais Refinery
Year : 2015
Project : LEAF TOWER (still on going)
Client : COMMODORE CONTRACTING CO.
Scope of Work : Supply, Installation, Testing, Commissioning and Handing Over to ADDC of complete
22kV Substation Works
Year : 2015
Project : Electrical Works for 22kV Substation
Client : TRISTAR
Scope of Work : Supply, Installation, Testing and Commissioning of 22kVSubstation
Year : 2015
Project : DAMAC Crescent Properties LLC
Client : ETA-ASCON
Scope of Work : Termination of LV Power & Control Cables including the cable glanding, earthing of
cable glands, crimping and provision of necessary tools and tackles for carrying out
cable termination works
Year : 2015
Project : Fujairah Freezone Substation – Cable Termination Works
Page | 2
Client : ETA - PPD
Scope of Work : Plug-in Cable Termination for 33kV GIS IDT Feeders and Freezone Substation
Outgoing Feeders
Year : 2015
Project : Termination Works – Al Ain
Client : ENVICON
Scope of Work : 11kV Indoor Termination – euromold type including T-boot (combination of heat
and cold) on HV panel
Year : 2015
Project : Supply and Installation of Transformer and QRM-MOI
Client : SITE TECHNOLOGY
Scope of Work : Supply, Installation, Insulation, Testing and Commissioning of 11/0.4, 1500Kva
and 50Hz, 3Ph Dyn11,ONAN, sealed type transformer with off circuit tap charger and HV tap
switch of ±5% in steps of 2.5 as per IEC 60076 spec as per ADDC requirements
Year : 2014
Project : DANAT EL EMARAT
Client : DRAKE AND SKULL
Scope of Work : Termination of 3cx185mm2 Heat Shrink MV cable and VLF test
Year : 2014
Project : Accommodation Works of Drainage at Delma Island
Client : TANKLINE
Scope of Work : Follow with ADDC for the following: Cable Route Approval, Cable Scheme, Cable
termination case. Substation, Energizing with coordination with ADDC
Year : 2014
Project : Dubai International Airport Expansion – Phase II; AX-134 (C3) Package
Client : ETA
Scope of work: LV Cable Laying and Termination
Year: 2014
Project : Saadiyat Beach Apartment
Client : Drake and Scull
Scope of work: Supply, Installation, Cable Laying of 22kV Cable Termination and Hi
Pot Test
Year: 2014
Project : Dubal Contract Package P12/002-Civil Works for Building 420-
33kV Switchgear Replacement
Client: ETA
Scope of work: Complete Termination Works
Project: Taweelah Powerstation
Client: DEUTSCHE BABCOCK
Scope of work: Supply and Installation of 11kV 3Cx185mm2 Indoor Termination
Project: Termination of 11kV End Termination/FO requirement
Client: Abu Dhabi Terminals
Scope of work: Supply, installation, testing and commissioning of 11kV
termination kit
Page | 3
Project: Al Ghareba-Installation of HV and LV Termination
Client: Envicon Emirates
Scope of work: Installation of LV Termination, Indoor Terminations.
Project: Khalifa Port-Supply and Installation of Cable Glands
Client: MIDONG
Scope of work: Installation of 11kV Cable Glands 3Cx300mm2
Project: Zayed Mina Port
Client: AGTHIA
Scope of work: Disconnecting of 4Cx240mm2 Cable, Testing and submission of Test
Report, Testing and Commissioning of LV Cables 1Cx120mm2 and cable
Fault locator and Repairing of Circuit Breaker
Project: LV CABLE REMOVAL/SHIFTING OF LV CABLE
Client: ADDC
Scope of work: LV CABLE REMOVAL/SHIFTING OF LV CABLE
Project: Installation Testing and Commissioning at Saadiyat Island-Marina District
Phase 1 Area A
Client: ENVICON
Scope of work: Installation, Testing and Commissioning and Cable Terminations
Project: D-8577 Supply and Installation of 11kV Cables, with excavation,
recovery, relaying and final re-instatement-S/S E03C35
Client: ADDC/DRAKE AND SCULL
Scope of work: Supply and Installation of Straight Through Joint 3Cx240mm2, Supply
and Installation of 11kV Indoor Termination 3Cx95mm2 W/RAB and
Exposing and removing of ceramic tiles (Interlock tiles)/Jointing
Pit/Backfilling/cermic tile (interloc tiles) reinstatement
Project: EMAL-Contract No. 503406-11/0.4kV Construction Power Reticulation
Package TK 8607
Client: ETA
Scope of work: Heat Shrinkable Outdoor Termination Kit + Glanding and Cable Joint Kits
Project: Khalifa Port and Industrial Zone Project Offshore Terminal Area
Client: Hyundai Engineering & Construction Co.
Scope of work: Installation of 11kV Cable Termination
Project: D-8577-Supply and Installation of 11KV cables, with Excavation,
Recovery, Relaying and final re-instatement
Client: Falcor Engineering
Scope of work: Supply and Installation of 11KV cables, with Excavation, Recovery,
Relaying and final re-instatement of E15C4, E04C31, E01C6
Project: D-8577 Supply and Installation of 11KV cables, with Excavation,
Recovery, Relaying and final re-instatement for Substation E02 and E11
Client: Falcor Engineering
Scope of work: Supply and Installation of 11KV cables, with Excavation, Recovery,
Relaying and final re-instatement for Substation E02 and E11
Project: D-8580 Long Term Rate Agreement for Automation of Distribution
Substation in Central Region (Assorted Make)
Client: ADDC
Main Contractor: Autochim Systems
Scope of work: Replacement of the Existing 11kV RMU/QRM comprising
Page | 4
Replacement, refurbishing & retrofitting works/ Site Survey
Project: A-4513 Supply, Installation & Commissioning of Earth Fault
Indicators & Partial Discharge Detectors with Remote Link on AADC
Distribution & Primary Substation System
Client: Al Ain Distribution Company
Scope of Work: Supply, Installation & Commissioning of Earth Fault Indicators &
Partial Discharge Detectors with Remote Link on AADC Distribution
& Primary Substation System
Project: N-6081.1 Silicon Rubber Coating of Outdoor Porcelain Insulation of
OHTL Circuit ends
Client: TRANSCO
Scope of work: Coating All 400&220 KV Outdoor Insulators with HVIC At Al Dahma
(400&220kv), Al Ain Power Station, Al Hayer, Sanaiya and Sweihan
Project: Proposed Construction of Hotel & Resorts Between Two Bridges,
B2B Hotel & Resort at Plot no P3B, Sector S23, Abu Dhabi
Client: ADDC
Main Contractor: Square General Contracting Co. L.L.C.
Scope of work : Installation, Testing and Commissioning and Handing
over to ADDC of 11kV FKI Swithchgear 16 Panel Board
Project: D-8579 Long Term Rate Agreement for Automation of Distribution
Substation in Central Region (Lucy Make)
Client: ADDC
Main Contractor: Lucy Switchgear
Scope of work: Replacement of the Existing 11kV RMU/QRM comprising replacement,
refurbishing & retrofitting works/ Site Survey
Project: Dubai LRT Project
Client: Concord
Scope of work: Installation of Accessories, Testing and Commissioning
Project: Installation of Pfisterer ixosil Accessories at Dubai
Client: Scan Powers
Scope of work: Installation of 145kV Joints
Project: Installation and Supervision of 63kV GIS Termination at MC
Client: Safanicu
Scope of work: Installation/ Supervision of 72.5kV Pfisterer Ixosil Accessories
Project: N-6081.1 Silicon Rubber Coating of Outdoor Porcelain Insulation of
OHTL Circuit ends
Client: TRANSCO
Scope of work: Coating All 400&220 KV Outdoor Insulators with HVIC At Al Dahma
(400&220kv), Al Ain Power Station, Al Hayer, Sanaiya and Sweihan
Project: Proposed Construction of Hotel & Resorts Between Two Bridges,
B2B Hotel & Resort at Plot no P3B, Sector S23, Abu Dhabi
Client: ADDC
Main Contractor: Square General Contracting Co. L.L.C.
Scope of work: Installation, Testing and Commissioning and Handing over to ADDC
of 11kV FKI Swithchgear 16 Panel Board
Project: D-8579 Long Term Rate Agreement for Automation of Distribution
Substation in Central Region (Lucy Make)
Client: ADDC
Main Contractor: Lucy Switchgear
Page | 5
Scope of work: Replacement of the Existing 11kV RMU/QRM comprising
replacement, refurbishing & retrofitting works/ Site Survey
Project: Dubai LRT Project
Client: Concord
Scope of work: Installation of Accessories, Testing and Commissioning
Project: Proposed Construction of Hotel & Resorts Between Two Bridges,
B2B Hotel & Resort at Plot no P3B, Sector S23, Abu Dhabi
Client: ADDC
Main Contractor: Square General Contracting Co. L.L.C.
Scope of work: Installation, Testing and Commissioning and Handing over to ADDC
of 11kV FKI Swithchgear 16 Panel Board
Project: D-8579 Long Term Rate Agreement for Automation of Distribution
Substation in Central Region (Lucy Make)
Client: ADDC
Main Contractor: Lucy Switchgear
Scope of work: Replacement of the Existing 11kV RMU/QRM comprising
replacement, refurbishing & retrofitting works/ Site Survey
Project: Dubai LRT Project
Client: Concord
Scope of work: Installation of Accessories, Testing and Commissioning
Project: Termination Works for Project 38322
Client: NPES
Scope of Work: Installation of 22kV 1C x 630mm2 Plug-in Termination
Project: Metro Dubai LRT Project MPS2 and MPS3
Client: Midong
Scope of Work: Installation
Project: 132KV Tranformer Sealing End - SS1400
Client: IMECO
Scope of work: Supply and Installation of SF6 Termination Type: KSEV 145V Size:
4 V2
Page | 6
Scope of work: Replacement of the Existing 11kV RMU/QRM comprising
replacement, refurbishing & retrofitting works/ Site Survey
Project: Dubai LRT Project
Client: Concord
Scope of work: Installation of Accessories, Testing and Commissioning
Project: Proposed Construction of Hotel & Resorts Between Two Bridges,
B2B Hotel & Resort at Plot no P3B, Sector S23, Abu Dhabi
Client: ADDC
Main Contractor: Square General Contracting Co. L.L.C.
Scope of work: Installation, Testing and Commissioning and Handing over to ADDC
of 11kV FKI Swithchgear 16 Panel Board
Project: D-8579 Long Term Rate Agreement for Automation of Distribution
Substation in Central Region (Lucy Make)
Client: ADDC
Main Contractor: Lucy Switchgear
Scope of work: Replacement of the Existing 11kV RMU/QRM comprising
replacement, refurbishing & retrofitting works/ Site Survey
Project: Dubai LRT Project
Client: Concord
Scope of work: Installation of Accessories, Testing and Commissioning
Project: Termination Works for Project 38322
Client: NPES
Scope of Work: Installation of 22kV 1C x 630mm2 Plug-in Termination
Project: Metro Dubai LRT Project MPS2 and MPS3
Client: Midong
Scope of Work: Installation
Project: 132KV Tranformer Sealing End - SS1400
Client: IMECO
Scope of work: Supply and Installation of SF6 Termination Type: KSEV 145V Size:
4 V2
Page | 6

More Related Content

What's hot

ALI FAKHIR IBRAHEEM - C.V
ALI FAKHIR IBRAHEEM -  C.VALI FAKHIR IBRAHEEM -  C.V
ALI FAKHIR IBRAHEEM - C.VAli Fakhir
 
Jamsheer P_CV (1)
Jamsheer P_CV (1)Jamsheer P_CV (1)
Jamsheer P_CV (1)jamsheer p
 
Mohammad Shahbaz Mallick ELECTRICAL Technician
Mohammad Shahbaz Mallick ELECTRICAL TechnicianMohammad Shahbaz Mallick ELECTRICAL Technician
Mohammad Shahbaz Mallick ELECTRICAL Technicianmd shahbaz mallick
 
PLB Format CV Updated 16-03-2015
PLB Format CV Updated 16-03-2015PLB Format CV Updated 16-03-2015
PLB Format CV Updated 16-03-2015Peter Bricknell
 
Sameh Youssef _Electrical Engineer_CV
Sameh Youssef _Electrical Engineer_CVSameh Youssef _Electrical Engineer_CV
Sameh Youssef _Electrical Engineer_CVSameh Youssef
 
Baraa Mohd Al Sotari CV
Baraa  Mohd Al Sotari CVBaraa  Mohd Al Sotari CV
Baraa Mohd Al Sotari CVbaraa Mohammad
 
Reda cv en
Reda cv enReda cv en
Reda cv en
reda rezk
 
Eng.Ahmed Hussein(4)
Eng.Ahmed Hussein(4)Eng.Ahmed Hussein(4)
Eng.Ahmed Hussein(4)Ahmed Hussein
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CVTawfig Adham
 
Marasigan Norvel Resume 2016
Marasigan Norvel Resume 2016Marasigan Norvel Resume 2016
Marasigan Norvel Resume 2016Norvel Marasigan
 
Reda cv en
Reda cv enReda cv en
Reda cv en
reda rezk
 

What's hot (17)

CV souvanna.2.2
CV souvanna.2.2CV souvanna.2.2
CV souvanna.2.2
 
CV mohamed -2016
CV mohamed  -2016CV mohamed  -2016
CV mohamed -2016
 
ALI FAKHIR IBRAHEEM - C.V
ALI FAKHIR IBRAHEEM -  C.VALI FAKHIR IBRAHEEM -  C.V
ALI FAKHIR IBRAHEEM - C.V
 
Ir. Unggang CV latest
Ir. Unggang CV latestIr. Unggang CV latest
Ir. Unggang CV latest
 
Jamsheer P_CV (1)
Jamsheer P_CV (1)Jamsheer P_CV (1)
Jamsheer P_CV (1)
 
Mohammad Shahbaz Mallick ELECTRICAL Technician
Mohammad Shahbaz Mallick ELECTRICAL TechnicianMohammad Shahbaz Mallick ELECTRICAL Technician
Mohammad Shahbaz Mallick ELECTRICAL Technician
 
PLB Format CV Updated 16-03-2015
PLB Format CV Updated 16-03-2015PLB Format CV Updated 16-03-2015
PLB Format CV Updated 16-03-2015
 
eng.msotafa cv[Conflict] (1)
eng.msotafa cv[Conflict] (1)eng.msotafa cv[Conflict] (1)
eng.msotafa cv[Conflict] (1)
 
Sameh Youssef _Electrical Engineer_CV
Sameh Youssef _Electrical Engineer_CVSameh Youssef _Electrical Engineer_CV
Sameh Youssef _Electrical Engineer_CV
 
Baraa Mohd Al Sotari CV
Baraa  Mohd Al Sotari CVBaraa  Mohd Al Sotari CV
Baraa Mohd Al Sotari CV
 
NEMER- CV - 16
NEMER- CV - 16NEMER- CV - 16
NEMER- CV - 16
 
Reda cv en
Reda cv enReda cv en
Reda cv en
 
Eng.Ahmed Hussein(4)
Eng.Ahmed Hussein(4)Eng.Ahmed Hussein(4)
Eng.Ahmed Hussein(4)
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CV
 
Marasigan Norvel Resume 2016
Marasigan Norvel Resume 2016Marasigan Norvel Resume 2016
Marasigan Norvel Resume 2016
 
Reda cv en
Reda cv enReda cv en
Reda cv en
 
curr. vitae
curr. vitaecurr. vitae
curr. vitae
 

Similar to CV - RAMADAN 2016

Sameh Hassan Aly Detailed CV2
Sameh Hassan Aly Detailed CV2Sameh Hassan Aly Detailed CV2
Sameh Hassan Aly Detailed CV2Sameh Aly
 
Muhammad Danish Rafiq
Muhammad Danish RafiqMuhammad Danish Rafiq
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMahesh Narayanan
 
Hossam salah-cv
Hossam salah-cvHossam salah-cv
Hossam salah-cv
Hosam Salah
 
Annexure - Projects
Annexure - ProjectsAnnexure - Projects
Annexure - ProjectsMohit Verma
 
FAWZEY CV LATEST UPDATE-3
FAWZEY CV LATEST  UPDATE-3FAWZEY CV LATEST  UPDATE-3
FAWZEY CV LATEST UPDATE-3fawzey mukhtar
 
Curriculum Vitae of Eugene Lockett.
Curriculum Vitae of Eugene Lockett.Curriculum Vitae of Eugene Lockett.
Curriculum Vitae of Eugene Lockett.Eugene Lockett
 
CV Updated 8-10-16
CV Updated 8-10-16CV Updated 8-10-16
CV Updated 8-10-16SHYAM NIKESH
 
Hani Shaker mep
Hani Shaker mepHani Shaker mep
Hani Shaker mephani ayyad
 
Konstantinos Valvis CV 17.08.2016
Konstantinos Valvis  CV 17.08.2016Konstantinos Valvis  CV 17.08.2016
Konstantinos Valvis CV 17.08.2016Konstantinos Valvis
 
1 update resume for electrical engineer
1  update resume for electrical engineer1  update resume for electrical engineer
1 update resume for electrical engineer
Iram shahzad khan
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEsekar palani
 
e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015mahmoud gaber
 

Similar to CV - RAMADAN 2016 (20)

Sameh Hassan Aly Detailed CV2
Sameh Hassan Aly Detailed CV2Sameh Hassan Aly Detailed CV2
Sameh Hassan Aly Detailed CV2
 
E&I Farukh
E&I FarukhE&I Farukh
E&I Farukh
 
ali mostafa cv
ali mostafa cvali mostafa cv
ali mostafa cv
 
Muhammad Danish Rafiq
Muhammad Danish RafiqMuhammad Danish Rafiq
Muhammad Danish Rafiq
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEER
 
MujibCV
MujibCVMujibCV
MujibCV
 
Hossam salah-cv
Hossam salah-cvHossam salah-cv
Hossam salah-cv
 
Annexure - Projects
Annexure - ProjectsAnnexure - Projects
Annexure - Projects
 
khalid obaidullah resume
khalid obaidullah resumekhalid obaidullah resume
khalid obaidullah resume
 
FAWZEY CV LATEST UPDATE-3
FAWZEY CV LATEST  UPDATE-3FAWZEY CV LATEST  UPDATE-3
FAWZEY CV LATEST UPDATE-3
 
Curriculum Vitae of Eugene Lockett.
Curriculum Vitae of Eugene Lockett.Curriculum Vitae of Eugene Lockett.
Curriculum Vitae of Eugene Lockett.
 
CV Updated 8-10-16
CV Updated 8-10-16CV Updated 8-10-16
CV Updated 8-10-16
 
Hani Shaker mep
Hani Shaker mepHani Shaker mep
Hani Shaker mep
 
KEVIN DAVID MORTON cv
KEVIN DAVID MORTON cvKEVIN DAVID MORTON cv
KEVIN DAVID MORTON cv
 
Konstantinos Valvis CV 17.08.2016
Konstantinos Valvis  CV 17.08.2016Konstantinos Valvis  CV 17.08.2016
Konstantinos Valvis CV 17.08.2016
 
Ashraf Suleiman.
Ashraf Suleiman.Ashraf Suleiman.
Ashraf Suleiman.
 
1 update resume for electrical engineer
1  update resume for electrical engineer1  update resume for electrical engineer
1 update resume for electrical engineer
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 
e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015
 
Abhilash CV
Abhilash CVAbhilash CV
Abhilash CV
 

CV - RAMADAN 2016

  • 1. CURRICULUM VITAE NAME: Ramadan Samy Ramadan El Feky PERSONAL DETAILS : Designation : Cable Jointer Supervisor Nationality : Egyptian Place of Birth : El Monofiya Address : El Menofiya Egypt Birthdate : September 29, 1987 Passport No. : A13084293 Degree : Industrial Present Address : Abu Dhabi PO Box. : 45837, UAE Mobile : +971 55 412 4129 / +971 50 520 5947 Email : rsamy216@gmail.com AUTHORIZATION CERTIFICATE/ TRAININGS ATTENDED: 1. ADDC Cable Jointer Authorization Certificate Authorized for: 1. 11kV Joint and Termination (Heat/Cold/Hybrid Shrinkable Type) 2. 22kV Joint and Termination (Heat/Cold/Hybrid Shrinkable Type) 3. 33kV Joint and Termination (Heat/Cold/Hybrid Shrinkable Type) 4. 11, 22 & 33kV Plug in Termination 28/10/2013 – 22/10/2016 2. Training Program on Installation of Raychem Plug-in Terminations (RPIT) up to 42kV TYCO ELECTRONICS RAYCHEM GMBH, Abu Dhabi 22/09/2014 3. ADDC Cable Jointer Authorization Certificate Authorized for: 5. 11kV Joint and Termination (Heat Shrinkable Type) 6. 33kV Joint and Termination (Heat Shrinkable Type) 7. 11 & 33kV Plug in Termination 20/07/2010 – 19/07/2013 4. Basic First Aid Training Emirates Technical & Safety Development Centre April 20, 2010 5. Basic Fire Fighting Training Emirates Technical & Safety Development Centre April 20, 2010 Page | 1
  • 2. 6. Sensoform Earth Fault Indicator Technical Training Course Theory of operation, Configuration, Installation, Testing, Safety, and Decommissioning of the Sensorform range of Earth Fault Indicator Suparule Systems Ltd. July 19, 2009 7. In-House Technical Training Global Transformers and Switchgears FZCO October 15, 2009 – November 15, 2009 8. Partial Discharge Training in the use of the Ultra TEV Detector and Installation of Ultra TEV Alarm Systems EA Technology May 15, 2009 9. Training Program for construction, operation and maintenance of 11 & 33kV Switchgear Hyundai Heavy Industries Co. Ltd. October 9, 2008 – November 14, 2008 10. Training Program for construction, operation and maintenance of 145kV GIS Hyundai Heavy Industries Co. Ltd. October 13, 2008 – November 07, 2008 11. Training Program for construction, operation and maintenance of Power Transformers Hyundai Heavy Industries Co. Ltd. October 17, 2008 – November 21, 2008 PROJECTS WORK INVOLVED (2014-PRESENT): Project : TAKREER Power Transformer (still on going) Client : IMECO Scope of Work : Design, Engineering, Manufacture, Supply, Supervise the Installation, Testing and Commissioning for Power and Distribution Transformers at Ruwais Refinery Year : 2015 Project : LEAF TOWER (still on going) Client : COMMODORE CONTRACTING CO. Scope of Work : Supply, Installation, Testing, Commissioning and Handing Over to ADDC of complete 22kV Substation Works Year : 2015 Project : Electrical Works for 22kV Substation Client : TRISTAR Scope of Work : Supply, Installation, Testing and Commissioning of 22kVSubstation Year : 2015 Project : DAMAC Crescent Properties LLC Client : ETA-ASCON Scope of Work : Termination of LV Power & Control Cables including the cable glanding, earthing of cable glands, crimping and provision of necessary tools and tackles for carrying out cable termination works Year : 2015 Project : Fujairah Freezone Substation – Cable Termination Works Page | 2
  • 3. Client : ETA - PPD Scope of Work : Plug-in Cable Termination for 33kV GIS IDT Feeders and Freezone Substation Outgoing Feeders Year : 2015 Project : Termination Works – Al Ain Client : ENVICON Scope of Work : 11kV Indoor Termination – euromold type including T-boot (combination of heat and cold) on HV panel Year : 2015 Project : Supply and Installation of Transformer and QRM-MOI Client : SITE TECHNOLOGY Scope of Work : Supply, Installation, Insulation, Testing and Commissioning of 11/0.4, 1500Kva and 50Hz, 3Ph Dyn11,ONAN, sealed type transformer with off circuit tap charger and HV tap switch of ±5% in steps of 2.5 as per IEC 60076 spec as per ADDC requirements Year : 2014 Project : DANAT EL EMARAT Client : DRAKE AND SKULL Scope of Work : Termination of 3cx185mm2 Heat Shrink MV cable and VLF test Year : 2014 Project : Accommodation Works of Drainage at Delma Island Client : TANKLINE Scope of Work : Follow with ADDC for the following: Cable Route Approval, Cable Scheme, Cable termination case. Substation, Energizing with coordination with ADDC Year : 2014 Project : Dubai International Airport Expansion – Phase II; AX-134 (C3) Package Client : ETA Scope of work: LV Cable Laying and Termination Year: 2014 Project : Saadiyat Beach Apartment Client : Drake and Scull Scope of work: Supply, Installation, Cable Laying of 22kV Cable Termination and Hi Pot Test Year: 2014 Project : Dubal Contract Package P12/002-Civil Works for Building 420- 33kV Switchgear Replacement Client: ETA Scope of work: Complete Termination Works Project: Taweelah Powerstation Client: DEUTSCHE BABCOCK Scope of work: Supply and Installation of 11kV 3Cx185mm2 Indoor Termination Project: Termination of 11kV End Termination/FO requirement Client: Abu Dhabi Terminals Scope of work: Supply, installation, testing and commissioning of 11kV termination kit Page | 3
  • 4. Project: Al Ghareba-Installation of HV and LV Termination Client: Envicon Emirates Scope of work: Installation of LV Termination, Indoor Terminations. Project: Khalifa Port-Supply and Installation of Cable Glands Client: MIDONG Scope of work: Installation of 11kV Cable Glands 3Cx300mm2 Project: Zayed Mina Port Client: AGTHIA Scope of work: Disconnecting of 4Cx240mm2 Cable, Testing and submission of Test Report, Testing and Commissioning of LV Cables 1Cx120mm2 and cable Fault locator and Repairing of Circuit Breaker Project: LV CABLE REMOVAL/SHIFTING OF LV CABLE Client: ADDC Scope of work: LV CABLE REMOVAL/SHIFTING OF LV CABLE Project: Installation Testing and Commissioning at Saadiyat Island-Marina District Phase 1 Area A Client: ENVICON Scope of work: Installation, Testing and Commissioning and Cable Terminations Project: D-8577 Supply and Installation of 11kV Cables, with excavation, recovery, relaying and final re-instatement-S/S E03C35 Client: ADDC/DRAKE AND SCULL Scope of work: Supply and Installation of Straight Through Joint 3Cx240mm2, Supply and Installation of 11kV Indoor Termination 3Cx95mm2 W/RAB and Exposing and removing of ceramic tiles (Interlock tiles)/Jointing Pit/Backfilling/cermic tile (interloc tiles) reinstatement Project: EMAL-Contract No. 503406-11/0.4kV Construction Power Reticulation Package TK 8607 Client: ETA Scope of work: Heat Shrinkable Outdoor Termination Kit + Glanding and Cable Joint Kits Project: Khalifa Port and Industrial Zone Project Offshore Terminal Area Client: Hyundai Engineering & Construction Co. Scope of work: Installation of 11kV Cable Termination Project: D-8577-Supply and Installation of 11KV cables, with Excavation, Recovery, Relaying and final re-instatement Client: Falcor Engineering Scope of work: Supply and Installation of 11KV cables, with Excavation, Recovery, Relaying and final re-instatement of E15C4, E04C31, E01C6 Project: D-8577 Supply and Installation of 11KV cables, with Excavation, Recovery, Relaying and final re-instatement for Substation E02 and E11 Client: Falcor Engineering Scope of work: Supply and Installation of 11KV cables, with Excavation, Recovery, Relaying and final re-instatement for Substation E02 and E11 Project: D-8580 Long Term Rate Agreement for Automation of Distribution Substation in Central Region (Assorted Make) Client: ADDC Main Contractor: Autochim Systems Scope of work: Replacement of the Existing 11kV RMU/QRM comprising Page | 4
  • 5. Replacement, refurbishing & retrofitting works/ Site Survey Project: A-4513 Supply, Installation & Commissioning of Earth Fault Indicators & Partial Discharge Detectors with Remote Link on AADC Distribution & Primary Substation System Client: Al Ain Distribution Company Scope of Work: Supply, Installation & Commissioning of Earth Fault Indicators & Partial Discharge Detectors with Remote Link on AADC Distribution & Primary Substation System Project: N-6081.1 Silicon Rubber Coating of Outdoor Porcelain Insulation of OHTL Circuit ends Client: TRANSCO Scope of work: Coating All 400&220 KV Outdoor Insulators with HVIC At Al Dahma (400&220kv), Al Ain Power Station, Al Hayer, Sanaiya and Sweihan Project: Proposed Construction of Hotel & Resorts Between Two Bridges, B2B Hotel & Resort at Plot no P3B, Sector S23, Abu Dhabi Client: ADDC Main Contractor: Square General Contracting Co. L.L.C. Scope of work : Installation, Testing and Commissioning and Handing over to ADDC of 11kV FKI Swithchgear 16 Panel Board Project: D-8579 Long Term Rate Agreement for Automation of Distribution Substation in Central Region (Lucy Make) Client: ADDC Main Contractor: Lucy Switchgear Scope of work: Replacement of the Existing 11kV RMU/QRM comprising replacement, refurbishing & retrofitting works/ Site Survey Project: Dubai LRT Project Client: Concord Scope of work: Installation of Accessories, Testing and Commissioning Project: Installation of Pfisterer ixosil Accessories at Dubai Client: Scan Powers Scope of work: Installation of 145kV Joints Project: Installation and Supervision of 63kV GIS Termination at MC Client: Safanicu Scope of work: Installation/ Supervision of 72.5kV Pfisterer Ixosil Accessories Project: N-6081.1 Silicon Rubber Coating of Outdoor Porcelain Insulation of OHTL Circuit ends Client: TRANSCO Scope of work: Coating All 400&220 KV Outdoor Insulators with HVIC At Al Dahma (400&220kv), Al Ain Power Station, Al Hayer, Sanaiya and Sweihan Project: Proposed Construction of Hotel & Resorts Between Two Bridges, B2B Hotel & Resort at Plot no P3B, Sector S23, Abu Dhabi Client: ADDC Main Contractor: Square General Contracting Co. L.L.C. Scope of work: Installation, Testing and Commissioning and Handing over to ADDC of 11kV FKI Swithchgear 16 Panel Board Project: D-8579 Long Term Rate Agreement for Automation of Distribution Substation in Central Region (Lucy Make) Client: ADDC Main Contractor: Lucy Switchgear Page | 5
  • 6. Scope of work: Replacement of the Existing 11kV RMU/QRM comprising replacement, refurbishing & retrofitting works/ Site Survey Project: Dubai LRT Project Client: Concord Scope of work: Installation of Accessories, Testing and Commissioning Project: Proposed Construction of Hotel & Resorts Between Two Bridges, B2B Hotel & Resort at Plot no P3B, Sector S23, Abu Dhabi Client: ADDC Main Contractor: Square General Contracting Co. L.L.C. Scope of work: Installation, Testing and Commissioning and Handing over to ADDC of 11kV FKI Swithchgear 16 Panel Board Project: D-8579 Long Term Rate Agreement for Automation of Distribution Substation in Central Region (Lucy Make) Client: ADDC Main Contractor: Lucy Switchgear Scope of work: Replacement of the Existing 11kV RMU/QRM comprising replacement, refurbishing & retrofitting works/ Site Survey Project: Dubai LRT Project Client: Concord Scope of work: Installation of Accessories, Testing and Commissioning Project: Termination Works for Project 38322 Client: NPES Scope of Work: Installation of 22kV 1C x 630mm2 Plug-in Termination Project: Metro Dubai LRT Project MPS2 and MPS3 Client: Midong Scope of Work: Installation Project: 132KV Tranformer Sealing End - SS1400 Client: IMECO Scope of work: Supply and Installation of SF6 Termination Type: KSEV 145V Size: 4 V2 Page | 6
  • 7. Scope of work: Replacement of the Existing 11kV RMU/QRM comprising replacement, refurbishing & retrofitting works/ Site Survey Project: Dubai LRT Project Client: Concord Scope of work: Installation of Accessories, Testing and Commissioning Project: Proposed Construction of Hotel & Resorts Between Two Bridges, B2B Hotel & Resort at Plot no P3B, Sector S23, Abu Dhabi Client: ADDC Main Contractor: Square General Contracting Co. L.L.C. Scope of work: Installation, Testing and Commissioning and Handing over to ADDC of 11kV FKI Swithchgear 16 Panel Board Project: D-8579 Long Term Rate Agreement for Automation of Distribution Substation in Central Region (Lucy Make) Client: ADDC Main Contractor: Lucy Switchgear Scope of work: Replacement of the Existing 11kV RMU/QRM comprising replacement, refurbishing & retrofitting works/ Site Survey Project: Dubai LRT Project Client: Concord Scope of work: Installation of Accessories, Testing and Commissioning Project: Termination Works for Project 38322 Client: NPES Scope of Work: Installation of 22kV 1C x 630mm2 Plug-in Termination Project: Metro Dubai LRT Project MPS2 and MPS3 Client: Midong Scope of Work: Installation Project: 132KV Tranformer Sealing End - SS1400 Client: IMECO Scope of work: Supply and Installation of SF6 Termination Type: KSEV 145V Size: 4 V2 Page | 6