Mosleh Zober Khidir provides his curriculum vitae, which includes his contact information, education history, work experience, skills and qualifications. He has over 25 years of experience in mechanical engineering, logistics, project management and construction roles. He is fluent in Kurdish, English and Arabic and has worked on water treatment plants, pipeline installation, and other infrastructure projects throughout Iraq.
This Appendix provides an outline of typical construction methods and plant likely to be used for the main roadworks, structures including bridges, and environmental mitigation works for the AWPR.
This Appendix provides an outline of typical construction methods and plant likely to be used for the main roadworks, structures including bridges, and environmental mitigation works for the AWPR.
1. Curriculum Vitae
Personal data
Name: Mosleh Zober Khidir
Address: Erbil / Shahidan, Iraq.
Tel. Mobil: 0750 462 4640 korek telecom
E-mail address mosleh.khidir @ gmail.com
Date of birth: 1-7-1967.
Nationality: Iraqi – Kurdish.
Gender: Male.
Martial Status: Married.
Education and professional status.
• B.Sc. in Engineering, (General Mechanic), from the University of Mosul – Engineering College / Mechanical department 1989.
• Certification of Excellence project management from project management institute in Amman.
• Certificate of effective project management from project management institute in Amman.
• Pass certificate of computer science 1995.
• Certificate of basic security precaution in the field.
• Passing training course of local and international procurement in 2003.
• Find attached recommendation letters from my supervisors.
Language
• Kurdish - Mother tongue.
• English, (Fluent in reading, writing, speaking and understanding).
• Arabic, (Fluent in reading, writing, speaking and understanding).
References
• Roger Mell operation manager.
Rogr.mell@fluor.com.
• Ray Spaulding Commissioning manager, engineering manager.
Ray. Spaulding@fluor.com.
• Michael MacDonald Mechanical superintend Fluor-Amec Lcc –Erbil – Ifraz Water project .
Michael_Macdonald@fwuk.fwc.com
• Dick Sullivan, Project Controller Fluor-Amec Lcc –Erbil – Ifraz Water project. Dick.Sullivan@fluor.com
• Mohanlal pieris, acting Programme Manager – UNOPS WATSAN- Erbil ("Mailto Mohanlalpeiris@hotmail.com ".)
• UNOPS / WATSAN Programme Manager Dr. Labi Werner ( labiwerner@yahoo.com )
• Sudip Sharma (UNCHS) Habitat Erbil.
• Robert Goodwin UNHSP Un-Habitat, North Iraq. Acting Coordinator.
Key competencies:
• Mechanical Engineering, logistic work controlling movement of material, Warehousing, stock control, Distribution planning,
Estimating most economical way for loading, unloading and transportation of equipment and materials, following up over see and local
purchasing material, Experience in working in conflict areas (Iraq north and south), Set up the logistics, building database for
controlling logistic work and preparing monthly reports, conducting physical inventory or different projects. Acting as security focal
point for taking security precautions. Preparing bill of quantities for all requirement-implanting projects especially water projects.
Experience Record:
Form 25 –March -2015 I am working for – Khatib Alami Company at Ifraz 3 Water treatment plant project.
As Consultant Mechanical Engineer, performed following activity:
• Supervising Implementation of Extension for the Ifraz 3 water treatment plant , for increasing the capacity of the project from 6000 cm/hr to 10000
cbm / hr. the project consist of the 4 clarifiers , 8 filter cells and installing 9 Goulds pumps with capacity 2000 cbm/hr. in various locations the project
2. values is 36 Million USD.
• The project is designed by Khatib alami company, due my previous experience in the existing project I been selected as mechanical consultant for the
project, during this work I was advise and help implementer contractor ( STFA) for right way for implementation and ordering right equipment.
• Now we are in the final stage of completion of the project, there fore I am interesting in finding another work with another company.
Form 01 –July -2011 – 20-March - 2015 I am worked for – Erbil directorate of water at Ifraz 3 Water treatment plant project.
As Senior Mechanical Engineer, performed following activity:
• Supervising maintenance team for normal daily / weekly / monthly and yearly maintenance for the whole project.
• Preparing bill of quantities for ordering required spare parts and material.
• Repairing different kind of pumps and changing different parts of ratchet plated, couplings, pins bushes and bearings …… etc.
• Instructing maintenance team for performing best maintenance procedure for increasing efficiency of the project.
• Implementing many purchase orders and receiving many spare parts.
• Supervising many big faults successfully during occurring faults in the project.
Form 01–june -2009 -30-June 2011 I am working for UNICEF Organization as Senior Facilitator Engineer as part time two days in a week performed the
following activity:
• Prepared bill of quantities for many water project and coordinated with related office for Erbil & Duhok Governorate.
• Prepared bill of quantities for many sewerage projects and coordinated with related office for Erbil & Duhok Governorate.
• Supervised implementation of Tanrjan Tobzawa Ahmedi , Lajan village and Kasnazan omer senary quarter sub district successfully they are serving the
population.
• Supervised implementation of Nishtiman quarter sewerage project which is now serving the population.
• I shall supervise the construction of sewerage project of kumary quarter because it awarded to a contractor.
• I shall supervise the construction of six deep well and pump room project at Erbil Governorate because it awarded to a contractor.
Form 06 –August -2007 up to 31-Dec. – 2008 I had worked for – Middle East Corporation for Reconstruction and Investment company at
Dream city project.
As Consultant Mechanical Engineer as part time two days in a week performed following activity:
• Preparing lists and recording specification for ordering fittings from over seas.
• Instructing training execution teams during implementing the work and solving the problems according to the engineering standards.
• Training team for using PPE electro fusion & PPR Heat fusion devices for welding PPE pipes.
• Setting plan and time schedule for implementing the job and reporting the progress of the work to high level supervisors.
• Installing two pump stations including dozing pump units for chlorine for disinfection all amount of pumped water to residents.
• Training some staffs how they operating pump station and how they preparing chlorine solution for dosing pump and injecting to the pipe line.
• Preparing drawing for detail of the manholes supports and thrust blocks.
Conducting meeting with contractor engineers for explains for them detail of the drawing and specification
Form 19 –july-2006 up to 19 -july-2007 I had worked for Fluor-Amec LCC, us Senior Mechanical Engineer supervising mechanical
maintenance team for taking care of the maintenance of the ifraz water treatment plant project during this period we had performed the following
activities.
• Supervising maintenance team and training them how start maintenance of the water treatment plant project
• Teaching maintenance team how repair different kind of faults such changing bearings, ratchet plates and how they make alignment of
the motor shaft and pump shaft.
• Training maintenance team how they can repair split units available at the project compounds..
• Preparing scope of work and required amount of chlorine and equipment for disinfecting all plant and pipe line.
• Preparing plane and required fittings for reinstalling damaged pipes headers.
• Conducting weekly mechanical meeting with subcontractor engineers for discussing problems and best way for progress including
finding solution according to the specification.
• Follow up progress of the work including finding reason for the delay and reporting to high level for taking necessary action for
activating the progress.
• Conducting meeting with related local authority people for solving problems especially at the pipe line.
• Preparing daily reports regarding statues of the maintenance and statues of all equipment.
• Preparing progress reports for quantity and quality of the water treated and total quantity issued to the city.
• Supervising construction of the project compounds from clarifiers, filter building and High lift pump station.
• Supervising pipe line excavation and pipe installation.
Form 2 –Feb-2005 up to 19-july-2006 I had worked for Fluor-Amec LCC, constructing water treatment plant at Erbil- fraz this project it was
very big and contain 6 no of clarifiers , filter building, Chlorination building, Alum polymer building , Administration , rapid mix two no. of
High lift pump station , booster pump station and 32 km of the transmission pipe ling, as Senior Mechanical Engineer. Supervising four
3. colleagues (Mechanical engineers).
During this period I had performed the following activities.
• Preparing many shop drawing on auto cad and revised many drawing for the whole project.
• Preparing bill of quantity and scope of work for extra work of implanting ifraz 3 water treatment plant projects.
• Preparing scope of work and required amount of chlorine and equipment for disinfecting all plant and pipe line.
• Preparing plane and required fittings for reinstalling damaged pipes headers.
• Conducting weekly mechanical meeting with subcontractor engineers for discussing problems and best way for progress including
finding solution according to the specification.
• Follow up progress of the work including finding reason for the delay and reporting to high level for taking necessary action for
activating the progress.
• Conducting meeting with related local authority people for solving problems especially at the pipe line.
• Preparing daily reports regarding statues of the maintenance and statues of all equipment.
• Preparing progress reports for quantity and quality of the water treated and total quantity issued to the city.
• Supervising construction of the project compounds from clarifiers, filter building and High lift pump station.
• Supervising pipe line excavation and pipe installation.
18-9-2004 up to 2 Feb. 2005 I had worked for Fluor-Amec LCC Company as Quantity Surveyor Engineer,. During this work I was
performed following activity.
• Preparing scope of the work for survey whole site and pipe line including taking bore holes for testing the type of soil.
• Studding minimum and maximum level of the water for four years to be taken inconsideration for designing the foundation or the
intake structure.
• Studding amount or rain fall for four years to be taken inconsideration for setting schedule for implanting the project for no. or working
days.
• Supervising survey work for whole site and transmission pipe line about 32 km length.
• Preparing progress reports and specific charts for indicating work quantity and status of the project.
• Using total station and estimating quantities for the amount of cutting and back filling for the whole site.
• Estimating quantity of concrete and all other required quantities for payment purpose and showing the progress.
• Preparing daily progress report and daily manpower report.
• Conducting meeting and negotiation with local authority for solving raised problem during implementing the project. Especially in the
pipe line
14-1-2004 up to 31-8-2004 I had worked for (Angelique International Limited). As Project Engineer Site Mechanical Engineer) for
implementing project of installing and erecting central maintenance workshop in Erbil. Which is funded by UNOPS originally.
• Implementing project of installing and erecting central maintenance workshop in Erbil.
• Daily studding drawings and implementing its detail step by step.
• Finding proper solution according to the Engineering standard for all problems may raised during the work.
• Installing different type of machines and preparing there bases and foundation.
• Installing air compressed net work and pipe line to be used by all machine operators.
• Connecting central air cooling system and revising duct design process to be proper with local weather.
• Preparing work progress schedule report or receiving interim payment.
From 10-Nov-2002 up to (21-Dec-2003): Working as logistic Clerk with (UNOPS / WATSAN)
• Organizing logistic work in the WATSAN Office by building data base containing all information about material movement from
purchasing until arriving them to the beneficiaries.
• Receiving different type of material regarding spare parts for generators and some water leak detection equipment.
• Preparing Good Receive note for item arrived to our location from different suppliers.
• Receiving Office equipment and checking them with preparing loss/ Damage reports when finding any loss or damages.
• Preparing purchase requisition for required items for various projects or WATSAN field offices.
• Checking specification of received items and comparing with requested specification defining the discrepancy and reporting to my
supervisor.
• Auditing / arranging all received, Issued , Returned. Technical reports related to the logistic documentation system.
• Preparing many type of internal use vouchers for distributing and handling materials and equipment
From 10-8-1998 up to 10-11-2002 working as Warehouse Checker. With (UNHSP (UN-Habitat)
4. • Supervising and monitoring all activities regarding the loading, unloading in the warehouse.
• Building database for controlling movement of the material including fast finding the a mount and location of each part.
• Checking all items arrived to the warehouse and making stock cards for each of them.
• checking specification and quality for different type of generators like Lombardi, Iveco iaifo, cutter pillar & Perkens. And their spare
part lists like engine kit, gaskets, injector bill, rings, AVR, tappets, bearings, O- rings…etc.
• Checking laboratory Equipment for three governorates, which were consisted of (183) different type of machines & instruments of
waycom frrance origin.
• Checking and sorting different type of centrifugal pumps like C.M.S, grundfose & cappirori type. With their spare parts from Bearing,
impellers, diffusers, spacers, cocks, packing, hoses goose necks & water seals…….. Etc.
• Checking & sorting different type of submersible pumps like C.M.S, grundfose with their spare parts of cable termination kit service kit
& cable clips ……Etc.
• Receiving different items and comparing with our contracted quantities and reporting the shortage or pipe lining quantity. & preparing
arrival reports.
• Preparation for good received notes and confirming arrived quantity as soon as possible. & Deducting shortage and damaged quantities
from the total value of the contract.
• documentation keeping for each consignment, receiving or issuing waybills & variation orders.
• Auditing field offices allocated quantities according to the distribution plans and issuing their allocation exactly.
From 04-1992 up to 03-1995 Working as Fuel Station Supervisor with ( CARE INTRNATIONAL ORGANIZATION)
• writing of commodity movement stock reports.
• Providing other care fuel stations with fuel.
• Took necessary stand to receive all supplies and distribute it to INGO and LNGO’S in the best manner.
• Keeping & maintaining all record for receipt and distribution in the fuel station.
• Preparing Special forms for internal treatment and fuel distributions popularization those to the other care fuel stations. Making special
calculation to reconcile balance of allocations to each distention.
• Checking quality of fuel specifications in the laboratory. Checking the quantity received from the contractor.
• writing daily & weekly fuel distributed and progresses reports. Checking of fuel issued & receipt and losses.
From 8-1991 up to 11-1991 Working as administrator with (MEDICINE SANS FRONTIERES)
• maintains financial and monitoring system to record and reconcile expenditures balances payments.
• Selects and enters data from a wide variety of document, verify accuracy by checking sources, making necessary calculation.
• Prepare reports as scheduled and special reports as required for budget preparation audits or other reasons.
• Maintains liaison with officials of local bankers to obtain day –to day information on the rate exchange and interest rates.
• participating with camp committee to solve their problems.
• Preparing inventory survey for what we remained in the warehouse.
• Repairing fuel pumps in the filling station when required.
From 06-1989 up to 03-1990 working as Mechanical Engineer with (MINISTRY of INDUSTRY and ENERGY).
• Supervising workers during making production and instructing them for better quality and rejecting what not conform to the standard
specification.
• Book keeping the quantity of items incoming and outgoing to the W/H with preparing stock cards indicating the customer name,
receiving date with expected completed date.
• Preparing daily roster for other colleagues and preparing instruction for safety of machines.
• Survey and daily report selecting the type of items distributed to high levels.
• Receiving the old parts from the customers to indicate the real need.
• Preparing lists for different type of spare parts like (bulldozers, Shovel dozers, small vehicles and generators)
• Checking specification of products or repaired parts according to the engineering standard measurements. Like clearness and tolerance
in the dimensions of the liners, connected rods, covers & block machines using filler gauge and dial gauge to finding the percentage of
allowable deflection. & using the advanced device super ultra sonic waves to finding cracks in the surface of crank shafts & came
shafts.
Computer Skills
• Excellent command of M.S. window, word, Excel and Power point.
• Excellent command of M.S. Access.
• Knowledge of basic of Auto cad.
5. Publications
I have submitted three searches:
• Use of solar energy for domestic work. Submitted to head of university of mosul.
• Search on repairing damaged connecting rod.
• Search on repairing damaged machine block, which I have submitted second, & third one to technical department of rebuilding spare
parts military company.
Driving License:
• UN-Driving license No. UNCHS 2076 issued on 8-12-1998.
• Iraqi General Driving License No. 70158 issued on 18/7/2002.
Note: I have recommendation letters from all employers I had worked for them I will submits when required.
6. Publications
I have submitted three searches:
• Use of solar energy for domestic work. Submitted to head of university of mosul.
• Search on repairing damaged connecting rod.
• Search on repairing damaged machine block, which I have submitted second, & third one to technical department of rebuilding spare
parts military company.
Driving License:
• UN-Driving license No. UNCHS 2076 issued on 8-12-1998.
• Iraqi General Driving License No. 70158 issued on 18/7/2002.
Note: I have recommendation letters from all employers I had worked for them I will submits when required.