Curriculum Vitae
Personal Information
•1 Name: Mohamed Mohamed Ali Abulila.
•2 Date of Birth: 21 /03 /1979.
•3 Nationality: Egyptian.
•4 Religion: Muslim.
•5 Marital Status: Married.
•6 Military Service: Completed.
•7 Valid Driving License: Yes.
•8 Address: Saudi Arabia.
• Telephone No: +966503239728
• Email: Mohamed_Abulila@Yahoo.com
Career Objective
•9 Seeking A Challenge Position As A Mechanical Engineer.
•10Sharing Success And Achievements With Team Work And Having Good Career
Opportunity.
•11Develop My Personal Skills And Creativity.
Academic Information
•12B.Sc. In Mechanical Power Engineering, June 2004, Faculty of Engineering, Mansoura
University.
•13General Grade: Pass.
•14Graduation Project: Design of 60 MW Wind Energy Power Plant. Project Grade:
Excellent.
Experience Periods
From To Company
10/2013 Present Abdullah A . M . Al Khodari Sons Co.(Saudi Arabia)
02/2005 09/2013 International Environmental Technologies Co.(Egypt)
Languages
Language Speaking Writing
Arabic Native Language Native Language
English Very Good Very Good
Personal Skills
• Serious And Ambitious.
• Ability To Work Under- Stress.
• Work Harder.
• Work Smarter.
• Learn Well.
• Accept New Challenges.
• Self-Discipline.
• Ability To Lead People Influence.
• Good Communication Skills.
• Have A Flexibility To Adapt To Different
Working Conditions.
• Self-Motivator & Self Control.
Hobbies
• Self- Development And Attendance At Scientific Training Courses.
• Reading, Travel, Tourism And Learn The Habits And Traditions of Peoples.
Computer Skills
• Very Good User And Expert Knowledge of Microsoft Office Suite, Word Processing,
Presentation Power Point, Excel & Outlook.
• Good User In Engineering Programs (Auto Cad, Water Cad, Sewer Cad ).
Training And Certificates
From To Institution Specialty
2004 2005 Egyptian Air Force. Internal Combustion Engines.
2001 2004 Talkha Power Plant. 750 MW Combined Cycle Power Plant.
Experiences In Details
Abdullah A . M . Al Khodari Sons Co (Saudi Arabia).
Position: Workshop Manager(Sewage Networks In Afif City From06-2014to Present ).
Description Of My Duties And Tasks:
• Use maintenance management systems to co-ordinate, distribute and execute work and
ensure history data is entered and maintained.
• Liaise with Sales, Accounts, and Parts of Company Directors as required.
• Undertake welding, fabrication, mechanical or machining work as required.
• To oversee workshop staff so that appropriate information, instruction, training and guidance
is provided when required.
• Responsible for job allocation and job flow in the workshop including job scheduling
and labour allocation for day to day operations.
• Assist with quoting, project management, materials purchasing and quality checks.
• Promote a Health and Safety culture within the business.
Description of My Work Activities:
Supervise work execution and carrying out mechanical routine jobs, troubleshooting to
mechanical faults for all equipment as clear at table below.
EQUIPMENT MAKE EQUIPMENT MAKE
Excavators CATERPILLER-
DOOSAN-HUYNDAI
Concrete Mixture GUY NOEL
Backhoe JCB-CATERPILLAR Water Pump HONDA –SUBARU-
ROBIN-KOSHIN
Loader DOOSAN-KOMATSU Generator OLYMPIAN
Mini Loader BOBCAT Compressor DOOSAN-AIRMAC
Hand Roller DYNAPAC Tower Light TREEX
Roller CATERPILLAR Arc Welding Machine TELWIN
Boom Truck ISUZU-MITSUBISHI Weld Plastic Machine LEISTER (FUSION)
Dump Truck MITSUBISHI-
MERCEDES
Hot-Air Hand Tools LEISTER ( TRIAC)
Plate Compactor JCF MACHINERY Spark Tester PCWI
Jumper Compactor JCF MACHINERY Drilling Machine GOLZ
Asphalt Cutter JCF MACHINERY Jack Hammer FURUKAWA
VEHICLE MAKE VEHICLE MAKE
Sedan KIA-FORTUNER Water Tanker ISUZU
Pickup ISUZU-NISSAN-
T0Y0TA
Big Bus ASHOK LEYLAND
Diesel Tanker ISUZU Small Bus ISUZU
Position: Project Engineer (Sewage Networks in Baha City From 10-2013 to 06-2014 ).
Description of My Duties and Tasks:
• Develops project objectives by reviewing project proposals and plans, conferring with
management.
• Determines project schedule by studying project plan and specifications, calculating time
requirements, sequencing project elements.
• Maintains project schedule by monitoring project progress, coordinating activities, resolving
problems.
• Controls project plan by reviewing design, specifications, and plan and schedule changes,
recommending actions.
• Prepares project status reports by collecting, analyzing, and summarizing information and
trends, recommending actions.
• Maintains safe and clean working environment by enforcing procedures, rules, and
regulations.
• Maintains project data base by writing computer programs, entering and backing up data.
Description of My Work Activities:
Work as a project engineer in sewer network projects in the following activities:
• Review and approve drawings and submittals for sewer network pipe lines and lift pump
stations.
• Establish and review invoices and all reports which concern consultant and owner.
• Overseeing the implementation of two duplex pump stations & one triplex pump station with
three force main pipe lines from ductile iron with diameter 100mm & 400mm.
• Overseeing the implementation of Pipe laying with different materials of sewer pipe lines:
Description of My Projects In Khodari Co.
No Project Name City Length
(KM)
1 Sewage Networks in Afif City ( Saudi Arabia ). Afif 36
2 Sewage Networks in Baha City ( Saudi Arabia ). Kulwa 63
References In KHODARI Co.
Eng/ Magdy Arafa Project Manager of sewage network In Afif for KHODARI CO.
Telephone No +966593076661
Email Magdy.arafa@alkhodari.Com
Eng/ Mohamed
Zaghloul
Project Manager of sewage network In Baha for KHODARI CO.
Telephone No +966506421804
Email Mohamed.zaghloul@alkhodari.Com
International Environmental Technologies Co (INTECH) (Egypt).
Position: Installation & Maintenance Mechanical Engineer.
Description of My Duties And Tasks:
• Oversee Installation & Maintenance To Ensure That Machines And Equipment Are Installed
And Functioning According To Specifications.
• Read And Interpret Blueprints, Technical Drawings, Schematics, And Computer-Generated
Reports.
• Developing A Project Specification With Colleagues, Often Including Those From Other
Engineering Disciplines.
• Providing Information To Supervisors, Co-Workers, And Subordinates By Telephone, In
Written Form, E-Mail, Or In Person.
• Discussing And Solving Complex Problems With Manufacturing Departments, Sub-
Contractors And Suppliers.
• Planning, Coordination, And Supervision- Pre Commissioning, Commissioning &
Stabilization Of Various Machines And Equipment.
Description of My Work Activities:
Installation & Maintenance of Waste Water Treatment Plants & Seawater Desalination
Plants In The Following Activities:
• Installation of Grit Removal (Hydro-International) By Different Diameter.
• Installation & Maintenance of Grit Classifier (Huber- Technology) By Different Size.
• Installation & Maintenance of Mechanical Screen (Huber- Technology) and Manual
Screen by Different Size.
• Installation of Different Types of Gates(Water Man Industries) By Different Size.
• Installation & Maintenance of Different Types of Aeration Equipment (Rotational Wheels-
EDI Diffuser –Bioworks Diffuser).
• Installation & Maintenance of Different Types of Clarifier Collection Equipment (Aqua
Concept Scraper-Bioworks Scraper).
• Installation & Maintenance of Different Generation of Delta Blower (Aerazner).
• Installation & Maintenance of Different Size of Invent Hyper Classic Mixer.
• Installation & Maintenance of Sludge Pump, Supernatant Pump, Scum Pump And
Chlorine Dosing Pump.
• Installation & Maintenance of Sludge Dewatering Centrifuge(Flottweg) And
Polymer Dosing Pump.
• Installation & Maintenance of Plant Water System For Fire Fighting , Irrigation , Service
Water , Plumping And Washing Equipment.
• Installation of Different Types of Piping And Fitting (UPVC-HDPE-DCI-GRP-ST.ST-
C.ST) By Different Size.
• Installation of Different Types of Valves (Gate, Check, Ball, Relief, Butterfly, Back
Pressure, Air Release).
• Forming And Installation of Different Types of Pipe Supports.
• Installation & Maintenance of Centrifugal Pumps, Positive Displacement Pumps,
Reciprocating Compressors, Gear Boxes, Generators And Blowers.
Description of My Completed Projects:
Installation & Maintenance of Waste Water Treatment Plants By Three Systems:
A- Rotating Biological Contactor (RBC):
No Project Name City Capacity
(M3/Day)
1 Waste Water Treatment Plant For Awlad Sabour. Elmanzala 1000
2 Waste Water Treatment Plant For Nesheil. Tanta 3000
3 Waste Water Treatment Plant For Mansheit Abd
Elsamd.
Bany Suif 3000
4 Waste Water Treatment Plant For Nena. Bany Suif 3000
5 Waste Water Treatment Plant For Telbana. Mansoura 8000
6 Waste Water Treatment Plant For Mahlet Engak. Mansoura 8000
7 Waste Water Treatment Plant For Dahab. Dahab 8000
B- Advanced Sequential Batch Reactor(ASBR):
No Project Name City Capacity
(M3/Day)
1 Waste Water Treatment Plant For Damas. Mitt Ghamr 12000
C- Membrane Bio Reactor (MBR) Bioworks Technology:
No Project Name City Capacity
(M3/Day)
1 Waste Water Treatment Plant For Mahlet Monuf. Tanta 20,000
2 Waste Water Treatment Plant For 6th of October. 6th of October 100, 0000
Installation & Maintenance of Seawater Desalination Plants by Reverse Osmosis:
No Project Name City Capacity
(M3/Day)
1 Seawater Desalination Plant For Dahab. Dahab 12000
References In INTECH Co.
Eng/ Shehata Bioumy General Director of Electromechanical Installations &
Maintenance Department for INTECH CO.
Telephone No +201008551564
Email Shehatabioumy@Yahoo.Com
References: All My Documents And Certificates Up on Request.
Installation & Maintenance of Waste Water Treatment Plants By Three Systems:
A- Rotating Biological Contactor (RBC):
No Project Name City Capacity
(M3/Day)
1 Waste Water Treatment Plant For Awlad Sabour. Elmanzala 1000
2 Waste Water Treatment Plant For Nesheil. Tanta 3000
3 Waste Water Treatment Plant For Mansheit Abd
Elsamd.
Bany Suif 3000
4 Waste Water Treatment Plant For Nena. Bany Suif 3000
5 Waste Water Treatment Plant For Telbana. Mansoura 8000
6 Waste Water Treatment Plant For Mahlet Engak. Mansoura 8000
7 Waste Water Treatment Plant For Dahab. Dahab 8000
B- Advanced Sequential Batch Reactor(ASBR):
No Project Name City Capacity
(M3/Day)
1 Waste Water Treatment Plant For Damas. Mitt Ghamr 12000
C- Membrane Bio Reactor (MBR) Bioworks Technology:
No Project Name City Capacity
(M3/Day)
1 Waste Water Treatment Plant For Mahlet Monuf. Tanta 20,000
2 Waste Water Treatment Plant For 6th of October. 6th of October 100, 0000
Installation & Maintenance of Seawater Desalination Plants by Reverse Osmosis:
No Project Name City Capacity
(M3/Day)
1 Seawater Desalination Plant For Dahab. Dahab 12000
References In INTECH Co.
Eng/ Shehata Bioumy General Director of Electromechanical Installations &
Maintenance Department for INTECH CO.
Telephone No +201008551564
Email Shehatabioumy@Yahoo.Com
References: All My Documents And Certificates Up on Request.

CV-Mohamed Abulila 01- 2016

  • 1.
    Curriculum Vitae Personal Information •1Name: Mohamed Mohamed Ali Abulila. •2 Date of Birth: 21 /03 /1979. •3 Nationality: Egyptian. •4 Religion: Muslim. •5 Marital Status: Married. •6 Military Service: Completed. •7 Valid Driving License: Yes. •8 Address: Saudi Arabia. • Telephone No: +966503239728 • Email: Mohamed_Abulila@Yahoo.com Career Objective •9 Seeking A Challenge Position As A Mechanical Engineer. •10Sharing Success And Achievements With Team Work And Having Good Career Opportunity. •11Develop My Personal Skills And Creativity. Academic Information •12B.Sc. In Mechanical Power Engineering, June 2004, Faculty of Engineering, Mansoura University. •13General Grade: Pass. •14Graduation Project: Design of 60 MW Wind Energy Power Plant. Project Grade: Excellent. Experience Periods From To Company 10/2013 Present Abdullah A . M . Al Khodari Sons Co.(Saudi Arabia) 02/2005 09/2013 International Environmental Technologies Co.(Egypt) Languages Language Speaking Writing Arabic Native Language Native Language English Very Good Very Good
  • 2.
    Personal Skills • SeriousAnd Ambitious. • Ability To Work Under- Stress. • Work Harder. • Work Smarter. • Learn Well. • Accept New Challenges. • Self-Discipline. • Ability To Lead People Influence. • Good Communication Skills. • Have A Flexibility To Adapt To Different Working Conditions. • Self-Motivator & Self Control. Hobbies • Self- Development And Attendance At Scientific Training Courses. • Reading, Travel, Tourism And Learn The Habits And Traditions of Peoples. Computer Skills • Very Good User And Expert Knowledge of Microsoft Office Suite, Word Processing, Presentation Power Point, Excel & Outlook. • Good User In Engineering Programs (Auto Cad, Water Cad, Sewer Cad ). Training And Certificates From To Institution Specialty 2004 2005 Egyptian Air Force. Internal Combustion Engines. 2001 2004 Talkha Power Plant. 750 MW Combined Cycle Power Plant. Experiences In Details Abdullah A . M . Al Khodari Sons Co (Saudi Arabia). Position: Workshop Manager(Sewage Networks In Afif City From06-2014to Present ). Description Of My Duties And Tasks: • Use maintenance management systems to co-ordinate, distribute and execute work and ensure history data is entered and maintained. • Liaise with Sales, Accounts, and Parts of Company Directors as required. • Undertake welding, fabrication, mechanical or machining work as required. • To oversee workshop staff so that appropriate information, instruction, training and guidance is provided when required. • Responsible for job allocation and job flow in the workshop including job scheduling and labour allocation for day to day operations. • Assist with quoting, project management, materials purchasing and quality checks. • Promote a Health and Safety culture within the business.
  • 3.
    Description of MyWork Activities: Supervise work execution and carrying out mechanical routine jobs, troubleshooting to mechanical faults for all equipment as clear at table below. EQUIPMENT MAKE EQUIPMENT MAKE Excavators CATERPILLER- DOOSAN-HUYNDAI Concrete Mixture GUY NOEL Backhoe JCB-CATERPILLAR Water Pump HONDA –SUBARU- ROBIN-KOSHIN Loader DOOSAN-KOMATSU Generator OLYMPIAN Mini Loader BOBCAT Compressor DOOSAN-AIRMAC Hand Roller DYNAPAC Tower Light TREEX Roller CATERPILLAR Arc Welding Machine TELWIN Boom Truck ISUZU-MITSUBISHI Weld Plastic Machine LEISTER (FUSION) Dump Truck MITSUBISHI- MERCEDES Hot-Air Hand Tools LEISTER ( TRIAC) Plate Compactor JCF MACHINERY Spark Tester PCWI Jumper Compactor JCF MACHINERY Drilling Machine GOLZ Asphalt Cutter JCF MACHINERY Jack Hammer FURUKAWA VEHICLE MAKE VEHICLE MAKE Sedan KIA-FORTUNER Water Tanker ISUZU Pickup ISUZU-NISSAN- T0Y0TA Big Bus ASHOK LEYLAND Diesel Tanker ISUZU Small Bus ISUZU Position: Project Engineer (Sewage Networks in Baha City From 10-2013 to 06-2014 ). Description of My Duties and Tasks: • Develops project objectives by reviewing project proposals and plans, conferring with management. • Determines project schedule by studying project plan and specifications, calculating time requirements, sequencing project elements. • Maintains project schedule by monitoring project progress, coordinating activities, resolving problems. • Controls project plan by reviewing design, specifications, and plan and schedule changes, recommending actions. • Prepares project status reports by collecting, analyzing, and summarizing information and trends, recommending actions. • Maintains safe and clean working environment by enforcing procedures, rules, and regulations. • Maintains project data base by writing computer programs, entering and backing up data. Description of My Work Activities: Work as a project engineer in sewer network projects in the following activities: • Review and approve drawings and submittals for sewer network pipe lines and lift pump stations. • Establish and review invoices and all reports which concern consultant and owner. • Overseeing the implementation of two duplex pump stations & one triplex pump station with three force main pipe lines from ductile iron with diameter 100mm & 400mm. • Overseeing the implementation of Pipe laying with different materials of sewer pipe lines: Description of My Projects In Khodari Co.
  • 4.
    No Project NameCity Length (KM) 1 Sewage Networks in Afif City ( Saudi Arabia ). Afif 36 2 Sewage Networks in Baha City ( Saudi Arabia ). Kulwa 63 References In KHODARI Co. Eng/ Magdy Arafa Project Manager of sewage network In Afif for KHODARI CO. Telephone No +966593076661 Email Magdy.arafa@alkhodari.Com Eng/ Mohamed Zaghloul Project Manager of sewage network In Baha for KHODARI CO. Telephone No +966506421804 Email Mohamed.zaghloul@alkhodari.Com International Environmental Technologies Co (INTECH) (Egypt). Position: Installation & Maintenance Mechanical Engineer. Description of My Duties And Tasks: • Oversee Installation & Maintenance To Ensure That Machines And Equipment Are Installed And Functioning According To Specifications. • Read And Interpret Blueprints, Technical Drawings, Schematics, And Computer-Generated Reports. • Developing A Project Specification With Colleagues, Often Including Those From Other Engineering Disciplines. • Providing Information To Supervisors, Co-Workers, And Subordinates By Telephone, In Written Form, E-Mail, Or In Person. • Discussing And Solving Complex Problems With Manufacturing Departments, Sub- Contractors And Suppliers. • Planning, Coordination, And Supervision- Pre Commissioning, Commissioning & Stabilization Of Various Machines And Equipment. Description of My Work Activities:
  • 5.
    Installation & Maintenanceof Waste Water Treatment Plants & Seawater Desalination Plants In The Following Activities: • Installation of Grit Removal (Hydro-International) By Different Diameter. • Installation & Maintenance of Grit Classifier (Huber- Technology) By Different Size. • Installation & Maintenance of Mechanical Screen (Huber- Technology) and Manual Screen by Different Size. • Installation of Different Types of Gates(Water Man Industries) By Different Size. • Installation & Maintenance of Different Types of Aeration Equipment (Rotational Wheels- EDI Diffuser –Bioworks Diffuser). • Installation & Maintenance of Different Types of Clarifier Collection Equipment (Aqua Concept Scraper-Bioworks Scraper). • Installation & Maintenance of Different Generation of Delta Blower (Aerazner). • Installation & Maintenance of Different Size of Invent Hyper Classic Mixer. • Installation & Maintenance of Sludge Pump, Supernatant Pump, Scum Pump And Chlorine Dosing Pump. • Installation & Maintenance of Sludge Dewatering Centrifuge(Flottweg) And Polymer Dosing Pump. • Installation & Maintenance of Plant Water System For Fire Fighting , Irrigation , Service Water , Plumping And Washing Equipment. • Installation of Different Types of Piping And Fitting (UPVC-HDPE-DCI-GRP-ST.ST- C.ST) By Different Size. • Installation of Different Types of Valves (Gate, Check, Ball, Relief, Butterfly, Back Pressure, Air Release). • Forming And Installation of Different Types of Pipe Supports. • Installation & Maintenance of Centrifugal Pumps, Positive Displacement Pumps, Reciprocating Compressors, Gear Boxes, Generators And Blowers. Description of My Completed Projects:
  • 6.
    Installation & Maintenanceof Waste Water Treatment Plants By Three Systems: A- Rotating Biological Contactor (RBC): No Project Name City Capacity (M3/Day) 1 Waste Water Treatment Plant For Awlad Sabour. Elmanzala 1000 2 Waste Water Treatment Plant For Nesheil. Tanta 3000 3 Waste Water Treatment Plant For Mansheit Abd Elsamd. Bany Suif 3000 4 Waste Water Treatment Plant For Nena. Bany Suif 3000 5 Waste Water Treatment Plant For Telbana. Mansoura 8000 6 Waste Water Treatment Plant For Mahlet Engak. Mansoura 8000 7 Waste Water Treatment Plant For Dahab. Dahab 8000 B- Advanced Sequential Batch Reactor(ASBR): No Project Name City Capacity (M3/Day) 1 Waste Water Treatment Plant For Damas. Mitt Ghamr 12000 C- Membrane Bio Reactor (MBR) Bioworks Technology: No Project Name City Capacity (M3/Day) 1 Waste Water Treatment Plant For Mahlet Monuf. Tanta 20,000 2 Waste Water Treatment Plant For 6th of October. 6th of October 100, 0000 Installation & Maintenance of Seawater Desalination Plants by Reverse Osmosis: No Project Name City Capacity (M3/Day) 1 Seawater Desalination Plant For Dahab. Dahab 12000 References In INTECH Co. Eng/ Shehata Bioumy General Director of Electromechanical Installations & Maintenance Department for INTECH CO. Telephone No +201008551564 Email Shehatabioumy@Yahoo.Com References: All My Documents And Certificates Up on Request.
  • 7.
    Installation & Maintenanceof Waste Water Treatment Plants By Three Systems: A- Rotating Biological Contactor (RBC): No Project Name City Capacity (M3/Day) 1 Waste Water Treatment Plant For Awlad Sabour. Elmanzala 1000 2 Waste Water Treatment Plant For Nesheil. Tanta 3000 3 Waste Water Treatment Plant For Mansheit Abd Elsamd. Bany Suif 3000 4 Waste Water Treatment Plant For Nena. Bany Suif 3000 5 Waste Water Treatment Plant For Telbana. Mansoura 8000 6 Waste Water Treatment Plant For Mahlet Engak. Mansoura 8000 7 Waste Water Treatment Plant For Dahab. Dahab 8000 B- Advanced Sequential Batch Reactor(ASBR): No Project Name City Capacity (M3/Day) 1 Waste Water Treatment Plant For Damas. Mitt Ghamr 12000 C- Membrane Bio Reactor (MBR) Bioworks Technology: No Project Name City Capacity (M3/Day) 1 Waste Water Treatment Plant For Mahlet Monuf. Tanta 20,000 2 Waste Water Treatment Plant For 6th of October. 6th of October 100, 0000 Installation & Maintenance of Seawater Desalination Plants by Reverse Osmosis: No Project Name City Capacity (M3/Day) 1 Seawater Desalination Plant For Dahab. Dahab 12000 References In INTECH Co. Eng/ Shehata Bioumy General Director of Electromechanical Installations & Maintenance Department for INTECH CO. Telephone No +201008551564 Email Shehatabioumy@Yahoo.Com References: All My Documents And Certificates Up on Request.