This document is a curriculum vitae for Ghazanfar Hussain, a civil engineer and coordinator currently working for Saudi Oger Ltd. Co. in Riyadh, Saudi Arabia. He has over 14 years of experience in civil engineering and construction projects in Saudi Arabia, Qatar, and Pakistan. His roles have included site coordination, quality control, civil supervision, and project estimating. He holds a diploma in civil engineering and has managed various projects such as schools, factories, and infrastructure works during his career.
1. PROJECTS EXECUTED: OIL & GAS AS WELL AS BUILDING CONSTRUCTION PROJECTS ( AS A SUPERVISOR CIVIL)
1- Acting as a link between Civil Engineers and the Foreman & charge hand.
2- Execution of storm water trench, hot oil trench, electrical trench, post padding by sand for all pipelines, grade slab, paving, shim plate installation, anchor bolt installation in various foundations, pedestal casting and installation,
Manhole casting and installation, grouting of vessels and sewer pipe, fencing foundation casting and its installation.
3- Conducting Tool Box Talk on everyday basis on starting work Activity at site.
4- I can take permit of any work as per client specified specification and requirements.
5- I can execute any work in safe and in well-disciplined manners to give better output towards to achieve organization goals.
6- I can also execute more than 5 activities at a time on site by providing better output.
7- Assisting the site Foreman and charge hand in all site civil construction activities from foundation up to final finishing stage 8- Supervising all construction activities and providing technical inputs for construction and coordination with the site management.
9- Anchoring on-site construction activities to ensure completion of project within the time and cost parameters and effective resource utilization to maximize the output.
10- Checking the physical and chemical composition of materials such as concrete, brick, Block, Cement, aggregates (fine as well as coarse), Steel and plywood.
11- Calculation of materials for construction works at site.
12- Giving detailed notes on daily progress report to me superior about every day work.
13- Preparation of BBS, Supervision and Execution of Entire Civil works like Excavation, Backfilling, Compaction, Surface protection, Form work, Rebar work, Concreting Masonry work, Block work, plastering, Water proofing work Painting, Plumbing, Tiling and Flooring work.
• Well pad development and installation of foundation for pipelines.
1. PROJECTS EXECUTED: OIL & GAS AS WELL AS BUILDING CONSTRUCTION PROJECTS ( AS A SUPERVISOR CIVIL)
1- Acting as a link between Civil Engineers and the Foreman & charge hand.
2- Execution of storm water trench, hot oil trench, electrical trench, post padding by sand for all pipelines, grade slab, paving, shim plate installation, anchor bolt installation in various foundations, pedestal casting and installation,
Manhole casting and installation, grouting of vessels and sewer pipe, fencing foundation casting and its installation.
3- Conducting Tool Box Talk on everyday basis on starting work Activity at site.
4- I can take permit of any work as per client specified specification and requirements.
5- I can execute any work in safe and in well-disciplined manners to give better output towards to achieve organization goals.
6- I can also execute more than 5 activities at a time on site by providing better output.
7- Assisting the site Foreman and charge hand in all site civil construction activities from foundation up to final finishing stage 8- Supervising all construction activities and providing technical inputs for construction and coordination with the site management.
9- Anchoring on-site construction activities to ensure completion of project within the time and cost parameters and effective resource utilization to maximize the output.
10- Checking the physical and chemical composition of materials such as concrete, brick, Block, Cement, aggregates (fine as well as coarse), Steel and plywood.
11- Calculation of materials for construction works at site.
12- Giving detailed notes on daily progress report to me superior about every day work.
13- Preparation of BBS, Supervision and Execution of Entire Civil works like Excavation, Backfilling, Compaction, Surface protection, Form work, Rebar work, Concreting Masonry work, Block work, plastering, Water proofing work Painting, Plumbing, Tiling and Flooring work.
• Well pad development and installation of foundation for pipelines.
Having 10 Years Of Professional Experience In The Field Of Construction Of Different Projects Which Includes Major Experience In Construction Of Petrochemical Refinery Plants & Building construction With International Standards & Specifications.
Composites are engineered materials made from two or more constituents with different physical or chemical
properties, which remain separate and distinct within the finished structure. A fiber is a material, which is made into
a long filament with diameter generally in the order of 10 microns. The aspect ratio of length to diameter can be
ranging from thousands to infinity in continuous fibers. Increasing worldwide environmental awareness is
encouraging scientific research into the development of cheaper, more environmentally friendly and more
sustainable construction and packing materials. For environment concern on synthetic fiber (such as glass, carbon,
ceramic gibers etc) natural fibers (such as flax, hemp, jute, kenai) etc are widely used. Industrial hemp fiber is one
of the strongest of the natural fibers available and possesses benefits such as low cost and low production energy
requirements. The primary objective of this research is to fabricate the natural fiber composites with suitable
processing/manufacturing methods and to examine the mechanical properties when subjected to Tension, Bending
and to compare & contrast the results with the available literature. In this research work, hemp fiber reinforced
Epoxy matrix composites have been developed by hand layup method with varying process parameters, such as
coupling agent(with and without compatibilizers) and different fiber percentages (10%,20% and 30% by weight).
The developed composites were then characterized by tensile test and flexural testing. Results show that the tensile
strength and flexural properties increases with the increase in fiber percentage. However after a certain percentage
the tensile strength decreases again. Compared to untreated hemp fiber, no significant changes in the tensile strength
have been observed for treated hemp fiber reinforcement. The flexural strength / modulus of the composite were
higher compared to pure epoxy for all filler/fiber loadings.
Having 10 Years Of Professional Experience In The Field Of Construction Of Different Projects Which Includes Major Experience In Construction Of Petrochemical Refinery Plants & Building construction With International Standards & Specifications.
Composites are engineered materials made from two or more constituents with different physical or chemical
properties, which remain separate and distinct within the finished structure. A fiber is a material, which is made into
a long filament with diameter generally in the order of 10 microns. The aspect ratio of length to diameter can be
ranging from thousands to infinity in continuous fibers. Increasing worldwide environmental awareness is
encouraging scientific research into the development of cheaper, more environmentally friendly and more
sustainable construction and packing materials. For environment concern on synthetic fiber (such as glass, carbon,
ceramic gibers etc) natural fibers (such as flax, hemp, jute, kenai) etc are widely used. Industrial hemp fiber is one
of the strongest of the natural fibers available and possesses benefits such as low cost and low production energy
requirements. The primary objective of this research is to fabricate the natural fiber composites with suitable
processing/manufacturing methods and to examine the mechanical properties when subjected to Tension, Bending
and to compare & contrast the results with the available literature. In this research work, hemp fiber reinforced
Epoxy matrix composites have been developed by hand layup method with varying process parameters, such as
coupling agent(with and without compatibilizers) and different fiber percentages (10%,20% and 30% by weight).
The developed composites were then characterized by tensile test and flexural testing. Results show that the tensile
strength and flexural properties increases with the increase in fiber percentage. However after a certain percentage
the tensile strength decreases again. Compared to untreated hemp fiber, no significant changes in the tensile strength
have been observed for treated hemp fiber reinforcement. The flexural strength / modulus of the composite were
higher compared to pure epoxy for all filler/fiber loadings.
1. CURRICULUM VITAE
GHAZANFAR HUSSAIN
Contact No: +966-59-2233064
Res. No: +92-334-7445324,
+92-44-2703058,
Skype id miansb24
Present city Riyadh Saudi Arabia
E-mail id: miansb24@gmail.com
Designation: Coordinator Site /Controller Documents, Civil Engineer / Civil Supervisor
Career Objective: - To be a part of prestigious company that will enhance my capabilities and
achieve a higher level of responsibility through professionalism and dedicated hard work and to be
a team player for the achievement of the organizational goals with a strong belief in coordinated
team effort and prove to be an asset for its effective functioning. Presently working in SAUDI OGER
LTD. CO. KINGDOM OF SAUDI ARABIA as a COORDINATOR SITE from 06 July 2012 to till date.
Academic Qualification:-
Diploma of Associate Engineer (Civil) 1st Division (Year 1999 to 2002)
Matriculation (Year 1997 to 1999)
Work Experience:- Total Experience : (14 years)
Saudi Arabia : 4 years
Qatar : 5 years
Pakistan : 5 years
Summary of work:
As a Coordinator/Document Controller at SAUDI OGER on Kap1 project at Sakaka Al Jouf
Saudi Arabia & still continuous.
PO Box1449, Riyadh 11431 KSA, Tel: +96614773115, Fax+96614770079
Project: 11 Different Buildings Projects (Civil Defense Squad, Traffic Section,
Police Station, etc.)
Duration: July 2012 to continue
DUTIES AND RESPONSIBILITIES:
Keep the record of all 11 sites drawings, Progress reports & inventories.
Update the revision of Drawings from File Zilla (an application from Saudi
Oger Company) & also associate with Head office for updating.
Coordinate with 11 Site Engineers for send him updated Drawings & solves
their Critical & technical site issues with associate Head office.
Preparing the all required reports with MS Office.
Page1/3
2. As a QA/QC Engineer in AKS Engineering at 747 MW Combined Power Station Guddu
Sindh Pakistan under supervision the HEI china company
Duration: February 2012 to July 2012.
DUTIES AND RESPONSIBILITIES:
Monitor the quality control site activate
Control the Project Photos
All accepted inspection Reports Keep on file
Preparing internal inspection Reports and NCR Log.
Preparing Client Request Rectification Procedure and Method Statement.
Preparing internal observation Reports
Responsible for field inspection Survey before client final inspection
Responsible the closure Final Punch list Comments.
Preparing inspection Reports RFI Log.
Responsible for internal inspection before prior to client final inspection
As a Civil Engineer/ Engineer In charge at REDCO INTL. on Pre-Cast & Hollow core factory in
Doha Qatar
Duration: March 2009 to February 2012.
DUTIES AND RESPONSIBILITIES:
Produce the quality & quantity of production (Precast & Hollow core).
Manage the site material & workers(Engineers, Foreman’s & laborer)
Manage the Hollow core production, stocking & sending on different projects.
Maintain the Hollow Core machinery ( Elematic & Ultra span setup)
Site safety works.
As a Site/Civil Supervisor at REDCO-PEARL NLC (j.v) on 10 KG School Projects at Doha Qatar
their my responsibilities are handling the whole site & laborer & taking progress in shuttering, steal
fixing, concreting, tile fixing, plastering, painting etc.
Duration: November 2007 to March 2009.
DUTIES AND RESPONSIBILITIES:
Handling the whole site & workers.
Estimating & billing for subcontractors.
Achieve the progress from Steel fixers, carpenters, Tile fixers, painters etc.
Arrange the required material on the time.
As a Civil Engineer/QC Engineer at N.L.C Construction on projects of Education Sector
Reforms & Health sector Reforms. (Schools, Hospitals, Colleges etc.)
Duration: January 2007 to November 2007.
DUTIES AND RESPONSIBILITIES:
Estimating the projects before starting & take approval from required
departments.
Site supervising during work & take quality construction work as per
specifications.
Preparing the bills during work & after finish the work.
Page2/3
3. As a Civil Supervisor under scheme (NPIW) Water course improvement and construction at
OFWM Department District Okara
Duration: August 2005 to January 2007
DUTIES AND RESPONSIBILITIES:
Motivation the peoples to achieve the given target and teach him about
advantages of designed watercourses & prepare their minds to construct the
water courses.
Surveying & leveling the fields.
Design the water course as per water quantity & field levels.
Estimating & preparing the documents & take approval before start the work.
Supervision during work as per specification & give the Levels as per Design
during work.
Take approval from Consultant NESPAK during & after finish the work.
I worked as Sub Engineer in Tehsil Municipal Administration (TMA) Okara.
Duration: June 2002 to August 2005
Projects
Sports Complex Okara.
Safdar shaheed Park.
Zia shaheed Library.
Sewerage & drainage projects.
DUTIES AND RESPONSIBILITIES:
Surveying & Estimating before start the work.
Supervision during work.
Billing on measuring book during work & final bill.
Computer Literacy:-
*MS Office,*Computer application, *Operating System, *Auto CAD, File Zella
Personal Details:-
Name : Ghazanfar Hussain
Father’s Name : Faqeer Hussain
Date of Birth : 10/10/1982 Age: 34 Years
Religion : Islam
Domicile : Okara (Punjab)
NIC NO : 35302-1941294-1
Passport No : AX6892943 (Valid Till 21-SEP-2020)
Gender : Male
Martial Status : Married
Language Known : English, Arabic, Urdu
Visa Status : Employment (SAUDI OGER LTD.CO.)
Transferable Iqama
Driving License : Valid (KSA)
Contact No’s : PAK. > +92-3347445324
Saudi Arabia > +966-592233064
Permanent Address : H.No.35/W Street No.2 Govt. Colony Tehsil & District
Okara (Punjab) Pakistan.
REFERENCE(S):- Available upon request.
Page3/3