January 2005 – May 2005
Hilton Hotel Malahide Road, Dublin
Client: Walls Developments
Architect: James Smyth Architects
Scope: Fit Out of new 4 star 166 bed hotel of 6 storeys over
basement car park
Total Value €35 mill
Duration: 5 months
June 2005 – August 2006
Rosemount Apts, Griffith Ave, Dublin
Client: Walls Developments
Architect: James Smyth Architects
Scope: Demolition of existing building and construction of
24nr high end apartments including car park
Value €5 mill
Duration: 15 months
August 2006 – Sept 2007
Fitzwilliam Hall, 25-27 Fitzwilliam Place, Dublin
Client: Glandore Business Centre
Architect: P A Lavin
Scope: Demolition and reconstruction of existing 5 floors with
full fit-out to 5-star quality for use as Business Centre.
Value €5 mill
Duration: 15 months
Sept 2007 – May 2008
Backweston FSC, Celbridge, Maynooth
Client: Office of Public Works
Architect: OPW Architects Services
Scope: 6500 m2office development consisting of 2 & 3 storey
wings linked to a central atrium and extensive landscaping of
surrounding grounds
Value €25 mill
Duration: 9 months
Awards: OPUS award 2009
May 2008 – Nov 2008
18-21 Lower Mount Street
Client: Bee Bee Developments
Architect: Douglas Wallace Associates
Scope: Completion of 22 high end Apartments
Value €15 mill
Duration: 18 months
Nov 2008 – May 2011
Trinity BioScience Labs
Client: Trinity College
Architect: RKD Engineers: ARUP
Value €100 mill +
Duration: 30 months
Scope: Construction of a 40,000sq.m. 8 storey building
over triple basement incorporating a modern academic
and research facility with high specification laboratories, teaching facilities and lecture theatres,
retail use and a basement carpark space. The development also includes a new entrance off
Pearse St. to the adjacent train and DART Station via the new retail mall.
February 2011- June 2011
HMH
Client: Houghton Mifflin Harcourt
Architect: RKD
Value €4 mill
Duration: 17 weeks
Scope: Fit out of 3 floors of new development for high end Office fit out total floor area of app
10000m2. Works include raised access floors, high end office furniture with free space areas
and external terrace roof level
July 2011- July 2012
ESB Sub Station
Client: ESB Networks
Architect: ESB International
Engineers: ESB International
Value €1.5 mill
Duration: 12 months
Scope: Construction of Sub Station for ESB with a basement and two floors over ground
incorporating service ducts within a very restricted city centre residential site maintaining access
to offices, restaurant and residential houses at all times
Awards: Irish Concrete Society Awards shortlisted
October 2012 – January 2013
Morrison Hotel
Client: Martinez Hotels
Architect: NODA
Value €6 mill
Duration: 11 weeks
Scope: Refurbishment of 144 bedrooms, new bar and dining room including front and back of
house major front of house and minor works to back of house over 11 week period.
Works included strip out of furniture and fittings to all bedrooms, complete strip out of 4
bedrooms and penthouse, demolition of main bar and upgrading of fire prevention works
Awards: CIOB CMYA 2014 winner in category
March 2013 - June 2013
Morrison Hotel
Architect: NODA
Client: Hilton Hotel Group
Value €500,000
Duration: 12 weeks
Scope: Additional work requested by client to bedrooms
carried out in a live hotel
June 2013 –September 2013
Malllow Hospital
Client: HSE
Architect: Pascall & Watson
Value €2.5 mill
Duration: 18 months
Scope: Completion of MAU unit extension to live hospital to
Include new entrance and stairway

More Related Content

What's hot

C.V-Ayman
C.V-Ayman  C.V-Ayman
C.V-Ayman
Ayman design
 
CV . 2017
CV . 2017CV . 2017
CV . 2017
Tahseen Sayed
 
Project
ProjectProject
Case Study - 2 bed Development, London
Case Study - 2 bed Development, LondonCase Study - 2 bed Development, London
Case Study - 2 bed Development, London
Joanna Tomasso
 
Nabil Soliman
Nabil SolimanNabil Soliman
Nabil Soliman
Nabil Soliman
 
Company Profile Wah Tung
Company Profile   Wah TungCompany Profile   Wah Tung
Company Profile Wah Tung
vipproject
 
construction manager 2015
construction manager 2015construction manager 2015
construction manager 2015
Hassan gariesh
 
GIA Projects
GIA ProjectsGIA Projects
C.V for M.ZAKI
C.V  for M.ZAKIC.V  for M.ZAKI
C.V for M.ZAKI
mohamed al tanboli
 
Mohan 3
Mohan 3Mohan 3
Mahmoud CV 2015
Mahmoud CV 2015Mahmoud CV 2015
Mahmoud CV 2015
Mahmoud Shawky
 
Hady Sawaya CV
Hady Sawaya CVHady Sawaya CV
Hady Sawaya CV
Hady Sawaya
 
1 c.v gomaa khamis osman
1  c.v  gomaa khamis osman1  c.v  gomaa khamis osman
1 c.v gomaa khamis osman
Gomaa Khamis
 
Ahmed Mohamed Maher Shafik
Ahmed Mohamed Maher ShafikAhmed Mohamed Maher Shafik
Ahmed Mohamed Maher Shafik
Ahmed Shafik
 
Mep contractors in abu dhabi
Mep contractors in abu dhabiMep contractors in abu dhabi
Mep contractors in abu dhabi
MuhammadSajid522189
 
213A Bath Rd Cheltenham project sheet_July 15
213A Bath Rd Cheltenham project sheet_July 15213A Bath Rd Cheltenham project sheet_July 15
213A Bath Rd Cheltenham project sheet_July 15
Ron O'Connor
 
Stadium Project
Stadium ProjectStadium Project
Stadium Project
lakvij
 
EQ Resume.pdf 2016
EQ Resume.pdf 2016EQ Resume.pdf 2016
EQ Resume.pdf 2016
Eduardo Abreu
 
CV
CVCV
Ahmed C.V
Ahmed C.VAhmed C.V
Ahmed C.V
Ahmed Sayed
 

What's hot (20)

C.V-Ayman
C.V-Ayman  C.V-Ayman
C.V-Ayman
 
CV . 2017
CV . 2017CV . 2017
CV . 2017
 
Project
ProjectProject
Project
 
Case Study - 2 bed Development, London
Case Study - 2 bed Development, LondonCase Study - 2 bed Development, London
Case Study - 2 bed Development, London
 
Nabil Soliman
Nabil SolimanNabil Soliman
Nabil Soliman
 
Company Profile Wah Tung
Company Profile   Wah TungCompany Profile   Wah Tung
Company Profile Wah Tung
 
construction manager 2015
construction manager 2015construction manager 2015
construction manager 2015
 
GIA Projects
GIA ProjectsGIA Projects
GIA Projects
 
C.V for M.ZAKI
C.V  for M.ZAKIC.V  for M.ZAKI
C.V for M.ZAKI
 
Mohan 3
Mohan 3Mohan 3
Mohan 3
 
Mahmoud CV 2015
Mahmoud CV 2015Mahmoud CV 2015
Mahmoud CV 2015
 
Hady Sawaya CV
Hady Sawaya CVHady Sawaya CV
Hady Sawaya CV
 
1 c.v gomaa khamis osman
1  c.v  gomaa khamis osman1  c.v  gomaa khamis osman
1 c.v gomaa khamis osman
 
Ahmed Mohamed Maher Shafik
Ahmed Mohamed Maher ShafikAhmed Mohamed Maher Shafik
Ahmed Mohamed Maher Shafik
 
Mep contractors in abu dhabi
Mep contractors in abu dhabiMep contractors in abu dhabi
Mep contractors in abu dhabi
 
213A Bath Rd Cheltenham project sheet_July 15
213A Bath Rd Cheltenham project sheet_July 15213A Bath Rd Cheltenham project sheet_July 15
213A Bath Rd Cheltenham project sheet_July 15
 
Stadium Project
Stadium ProjectStadium Project
Stadium Project
 
EQ Resume.pdf 2016
EQ Resume.pdf 2016EQ Resume.pdf 2016
EQ Resume.pdf 2016
 
CV
CVCV
CV
 
Ahmed C.V
Ahmed C.VAhmed C.V
Ahmed C.V
 

Viewers also liked

Sidang ta elok cutria t j3 e110023 fix
Sidang ta elok cutria t j3 e110023 fixSidang ta elok cutria t j3 e110023 fix
Sidang ta elok cutria t j3 e110023 fix
Elok Cutria
 
Presentatie donderdag
Presentatie donderdagPresentatie donderdag
Presentatie donderdag
Tale Meester
 
20131128 csrwebpage-sc
20131128 csrwebpage-sc20131128 csrwebpage-sc
20131128 csrwebpage-scnewwide
 
งานฝ้าย
งานฝ้ายงานฝ้าย
งานฝ้าย
Oatty_CMU
 
deluxe
deluxedeluxe
deluxe
Gary Elliott
 
THESISFINAL
THESISFINALTHESISFINAL
THESISFINAL
Walter Rossi
 

Viewers also liked (6)

Sidang ta elok cutria t j3 e110023 fix
Sidang ta elok cutria t j3 e110023 fixSidang ta elok cutria t j3 e110023 fix
Sidang ta elok cutria t j3 e110023 fix
 
Presentatie donderdag
Presentatie donderdagPresentatie donderdag
Presentatie donderdag
 
20131128 csrwebpage-sc
20131128 csrwebpage-sc20131128 csrwebpage-sc
20131128 csrwebpage-sc
 
งานฝ้าย
งานฝ้ายงานฝ้าย
งานฝ้าย
 
deluxe
deluxedeluxe
deluxe
 
THESISFINAL
THESISFINALTHESISFINAL
THESISFINAL
 

Similar to walls construction

Jackson House Reception V6
Jackson House Reception V6Jackson House Reception V6
Jackson House Reception V6
paulallen1962
 
Aap Presentation
Aap PresentationAap Presentation
Aap Presentation
jmccole1
 
Godfrey Martin Ltd - Statement of Competence - 09.01.17
Godfrey Martin Ltd - Statement of Competence - 09.01.17Godfrey Martin Ltd - Statement of Competence - 09.01.17
Godfrey Martin Ltd - Statement of Competence - 09.01.17
Kevin Martin MCIOB
 
Articles & Features
Articles & FeaturesArticles & Features
Articles & Features
Daniel Allen
 
Zoofenster
ZoofensterZoofenster
IHC_Selected PORTFOLIO_Sept2015_Built-b
IHC_Selected PORTFOLIO_Sept2015_Built-bIHC_Selected PORTFOLIO_Sept2015_Built-b
IHC_Selected PORTFOLIO_Sept2015_Built-b
israel hurtado cola
 
Spatial designers brochure 2011
Spatial designers brochure 2011Spatial designers brochure 2011
Spatial designers brochure 2011
Spatial Designers
 
MDF profile
MDF profileMDF profile
International
InternationalInternational
International
Robert Bazewicz
 
Baytree Dagenham Brochure
Baytree Dagenham BrochureBaytree Dagenham Brochure
Baytree Dagenham Brochure
Jonathan Priestley
 
RBR Profile Aug 2013
RBR Profile Aug 2013 RBR Profile Aug 2013
RBR Profile Aug 2013
Ronan Hogan
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016
Tim Read
 
Introduction to The Elliott Thomas Group
Introduction to The Elliott Thomas GroupIntroduction to The Elliott Thomas Group
Introduction to The Elliott Thomas Group
John Self
 
Curriculum Vitae of Gary Stephen Cutting
Curriculum Vitae of Gary Stephen CuttingCurriculum Vitae of Gary Stephen Cutting
Curriculum Vitae of Gary Stephen Cutting
Gary Cutting
 
09 flagship education projects 2012
09 flagship education projects 201209 flagship education projects 2012
09 flagship education projects 2012
JerramFalkus
 
Rob Hearne 8 Projects 2011
Rob Hearne 8  Projects 2011Rob Hearne 8  Projects 2011
Rob Hearne 8 Projects 2011
robhearne
 
Steve Bailey CV
Steve Bailey CVSteve Bailey CV
Steve Bailey CV
Steve Bailey
 
CWong Resume
CWong ResumeCWong Resume
CWong Resume
Cheryle Wong
 
RoyManncv5Link
RoyManncv5LinkRoyManncv5Link
RoyManncv5Link
roy mann
 
Cv & Portfolio
Cv & PortfolioCv & Portfolio
Cv & Portfolio
Riccardo Rabbiolo
 

Similar to walls construction (20)

Jackson House Reception V6
Jackson House Reception V6Jackson House Reception V6
Jackson House Reception V6
 
Aap Presentation
Aap PresentationAap Presentation
Aap Presentation
 
Godfrey Martin Ltd - Statement of Competence - 09.01.17
Godfrey Martin Ltd - Statement of Competence - 09.01.17Godfrey Martin Ltd - Statement of Competence - 09.01.17
Godfrey Martin Ltd - Statement of Competence - 09.01.17
 
Articles & Features
Articles & FeaturesArticles & Features
Articles & Features
 
Zoofenster
ZoofensterZoofenster
Zoofenster
 
IHC_Selected PORTFOLIO_Sept2015_Built-b
IHC_Selected PORTFOLIO_Sept2015_Built-bIHC_Selected PORTFOLIO_Sept2015_Built-b
IHC_Selected PORTFOLIO_Sept2015_Built-b
 
Spatial designers brochure 2011
Spatial designers brochure 2011Spatial designers brochure 2011
Spatial designers brochure 2011
 
MDF profile
MDF profileMDF profile
MDF profile
 
International
InternationalInternational
International
 
Baytree Dagenham Brochure
Baytree Dagenham BrochureBaytree Dagenham Brochure
Baytree Dagenham Brochure
 
RBR Profile Aug 2013
RBR Profile Aug 2013 RBR Profile Aug 2013
RBR Profile Aug 2013
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016
 
Introduction to The Elliott Thomas Group
Introduction to The Elliott Thomas GroupIntroduction to The Elliott Thomas Group
Introduction to The Elliott Thomas Group
 
Curriculum Vitae of Gary Stephen Cutting
Curriculum Vitae of Gary Stephen CuttingCurriculum Vitae of Gary Stephen Cutting
Curriculum Vitae of Gary Stephen Cutting
 
09 flagship education projects 2012
09 flagship education projects 201209 flagship education projects 2012
09 flagship education projects 2012
 
Rob Hearne 8 Projects 2011
Rob Hearne 8  Projects 2011Rob Hearne 8  Projects 2011
Rob Hearne 8 Projects 2011
 
Steve Bailey CV
Steve Bailey CVSteve Bailey CV
Steve Bailey CV
 
CWong Resume
CWong ResumeCWong Resume
CWong Resume
 
RoyManncv5Link
RoyManncv5LinkRoyManncv5Link
RoyManncv5Link
 
Cv & Portfolio
Cv & PortfolioCv & Portfolio
Cv & Portfolio
 

walls construction

  • 1. January 2005 – May 2005 Hilton Hotel Malahide Road, Dublin Client: Walls Developments Architect: James Smyth Architects Scope: Fit Out of new 4 star 166 bed hotel of 6 storeys over basement car park Total Value €35 mill Duration: 5 months June 2005 – August 2006 Rosemount Apts, Griffith Ave, Dublin Client: Walls Developments Architect: James Smyth Architects Scope: Demolition of existing building and construction of 24nr high end apartments including car park Value €5 mill Duration: 15 months August 2006 – Sept 2007 Fitzwilliam Hall, 25-27 Fitzwilliam Place, Dublin Client: Glandore Business Centre Architect: P A Lavin Scope: Demolition and reconstruction of existing 5 floors with full fit-out to 5-star quality for use as Business Centre. Value €5 mill Duration: 15 months
  • 2. Sept 2007 – May 2008 Backweston FSC, Celbridge, Maynooth Client: Office of Public Works Architect: OPW Architects Services Scope: 6500 m2office development consisting of 2 & 3 storey wings linked to a central atrium and extensive landscaping of surrounding grounds Value €25 mill Duration: 9 months Awards: OPUS award 2009 May 2008 – Nov 2008 18-21 Lower Mount Street Client: Bee Bee Developments Architect: Douglas Wallace Associates Scope: Completion of 22 high end Apartments Value €15 mill Duration: 18 months Nov 2008 – May 2011 Trinity BioScience Labs Client: Trinity College Architect: RKD Engineers: ARUP Value €100 mill + Duration: 30 months Scope: Construction of a 40,000sq.m. 8 storey building over triple basement incorporating a modern academic and research facility with high specification laboratories, teaching facilities and lecture theatres, retail use and a basement carpark space. The development also includes a new entrance off Pearse St. to the adjacent train and DART Station via the new retail mall.
  • 3. February 2011- June 2011 HMH Client: Houghton Mifflin Harcourt Architect: RKD Value €4 mill Duration: 17 weeks Scope: Fit out of 3 floors of new development for high end Office fit out total floor area of app 10000m2. Works include raised access floors, high end office furniture with free space areas and external terrace roof level July 2011- July 2012 ESB Sub Station Client: ESB Networks Architect: ESB International Engineers: ESB International Value €1.5 mill Duration: 12 months Scope: Construction of Sub Station for ESB with a basement and two floors over ground incorporating service ducts within a very restricted city centre residential site maintaining access to offices, restaurant and residential houses at all times Awards: Irish Concrete Society Awards shortlisted
  • 4. October 2012 – January 2013 Morrison Hotel Client: Martinez Hotels Architect: NODA Value €6 mill Duration: 11 weeks Scope: Refurbishment of 144 bedrooms, new bar and dining room including front and back of house major front of house and minor works to back of house over 11 week period. Works included strip out of furniture and fittings to all bedrooms, complete strip out of 4 bedrooms and penthouse, demolition of main bar and upgrading of fire prevention works Awards: CIOB CMYA 2014 winner in category March 2013 - June 2013 Morrison Hotel Architect: NODA Client: Hilton Hotel Group Value €500,000 Duration: 12 weeks Scope: Additional work requested by client to bedrooms carried out in a live hotel June 2013 –September 2013 Malllow Hospital Client: HSE Architect: Pascall & Watson Value €2.5 mill Duration: 18 months Scope: Completion of MAU unit extension to live hospital to Include new entrance and stairway