SlideShare a Scribd company logo
Marwan Bou Antoun
Position Sought Site Superintendent.
Education 1979 Secondary School Certificate.
Languages Arabic, French, and English.
Nationality
Work Experience
Lebanese.
April 2015- to present
Kfoury Engineering & General Contracting Dekwaneh
Project: Forty Four Project
Gracefully rising 44 floors above the city skyline and located on the Saloume
roundabout, SAYFCO presents Lebanon's second highest tower: FortyFour.
June 2013- to April 2015
Kfoury Engineering & General Contracting Antelias
Project: Crystal Towers & Plaza Tower
Crystal Towers project is located in Antelias region, rising 100 meters on
the Metn coastline, with a total surface built- in area of 35,000sqm.
The project consists of a 30 floor residential tower with apartments
ranging between 170sqm and 255sqm, and a 20 floor commercial tower
with offices from 120sqm to thousands of sqm.
The works consist of all concrete, architectural, electromechanical and
finishing works
Plaza Tower is a Top Down Project
Responsible for Concrete - finishing and site coordinator.
July 2011- to present
Al Saad General Contracting (S.G.C) Beirut
Project: Beirut City Center (Majid Al Futaim Propreties)
Page 1 of 4
Fahed Bou Antoun Street,
Houmal, Lebanon.
Phone 03/217234 -05941963
E: marwanbouantoun@hotmail.com
Responsible for finishing and site coordinater.
Apr 2009- june 2011 Beirut
ETS Suheil dagher ( bekfaya ) five stars hotel . The building consisting four
basement levels , services , parking , mezzanine and four superstructure
levels swimming pool in ground floor, and three apartment floors.
Jan 2006- Apr 2009
Site superintendent Qatar
Aljaber & Partners Pearl G T L (gas to liquid ) Ras Lafan Industrial city
project Manager Shell . responsible for concrete work ,planning of work
coordination between management and site
Aug 2005- Dec 2006
General Foreman
 Platinum Tower Hotel Beirut Down town . The Superstructure is a forty
story tower I was in charge of concrete work
Sep 03 – Aug 2005 ACC International. Beirut
General Foreman
This is an extension project to the previously constructed five star
Metropolitan hotel, situated in Lebanon’s Sin El Fil. The project consists of
six basement levels (12000 m2
/ Each Floor) containing a 2400m2
Banquet
hall under a suspended post tensioned ceiling. The Superstructure is a thirty
story tower of furnished apartments connected to the hotel via a foot bridge.
My Job as a general Foreman, in the concrete stage of the project, required
my vigilant attention for the most complicated area of the project, The car
park Ramps and Swimming Pool Areas.
In The finishing stage I was in charge of all the External finishing works
including Aluminum and granite cladding.
Jun 02 – Sep 03 ACC International. UAE AbuDhabi
General Foreman
Assigned as a General Foreman In The Conference Palace Project Abu
Dhabi. I was in charge of the concrete works for the East Hotel and East
Ramp in addition to the finishing works of the car park.
Oct. 00 – Jun 02 ACC International. Tripoli
General Foreman
 Assigned as a General Foreman to all the works of the Fayhaa’
Secondary School Project, in Maarad area of Tripoli. The Project consists of
11000 m2 of built up area and around 8000 m3 of concrete with external
Page 2 of 4
stone cladding. The project was to be completed in two phases, the
superstructure works (classrooms and administration) to be completed in 10
months, while the remaining underground finishing works (pool, auditorium
and car park) are to be handed over lately due to variation orders and
modifications.
Apr. 00 – Oct. 00 ACC International. Tripoli
General Foreman
 Assigned to the finishing works of the Reconstruction Of Houses For
The Displaced Project, in Kobbah – Tebbanah area of Tripoli. I was
responsible for the finishing works of 16 buildings of the project. The project
involves 900 apartments in 68 buildings, totaling 85000 m2.
Nov. 97 – Apr. 00 ACC International. Beirut
General Foreman
 Responsible for concrete and finishing works in the Souks Of Beirut
Parking Facility Project, situated in the Solidere District. The project
comprised of four basement levels with an area of 100,000 m2
and 95,000
m3
of concrete cast in 13 months. I was also assigned to the handing over of
the E.S.C.W.A. building and the Beirut Municipal Stadium after the expiry of
the maintenance period.
Aug. 96 – Nov. 97 ACC International. Beirut
General Foreman
 Worked through the concrete and finishing stages of the E.S.C.W.A.
building project in Riad El Soloh, situated in the Solidere district. The
building, consisting of seven basement levels and eight superstructure levels
was completed in seven months concrete works and seven months finishing.
Feb. 96 – Aug. 96 Pivot Engineering Co. (W.L.L.) AbuDhabi
General Foreman
 Worked in a tower for Mr. Khalifa Humaid Abdulla Al-Rumaithy, on
Salam Street. The building was comprised of a basement level, ground floor,
mezzanine and eighteen typical floors.
Jun. 95 – Feb. 96 Pivot Engineering Co. (W.L.L.) AbuDhabi
Coordinator / General Foreman
 Worked in ADNOC’s Ruwais Sulfur Handling Expansion Project.
Responsible for coordinating construction activities with the client and overall
supervision of the civil works.
Jun. 93 – May. 95 Pivot Engineering Co. (W.L.L.) AbuDhabi
General Foreman
 Worked from the beginning till the final handing over of the Garden City
Page 3 of 4
Tower. A building of twenty floors for Sheik Mohammed Bin Khaled Al
Nahyan at Khaldiya Street near Dana Plaza.
 Responsible for supervision of all construction activities, liaising with
various subcontractors and reporting directly to the project manager.

Dec. 92 – May. 93 Pivot Engineering Co. (W.L.L.) AbuDhabi
Civil Foreman
 Responsible for mobilization and piling works at the Hilton Extension
Project, and simultaneously managing snags at a six-building project, near
Adma Apco.
1990 – 1992 Eng. Salim Chamma Lebanon
Civil Foreman
 Worked in the construction of eleven villas in Chamville City.
1986 – 1990 Albert Abi Said Lebanon
Civil Foreman
 Responsible for concrete works, blockwork, ceramic tiling and marble
works at Naif and Mary Center, consisting of two blocks. Block “A” consisted
of 14 floors hotel with a shopping center and a cinema hall. Block “B”
consisted of a 14 floors office building.
1985 – 1986 Eng. Salim Chamma Lebanon
Civil Foreman
 Worked in the construction of an eight-story building for Salim Chamma
in Al Maten.
1982 – 1985 Private Work Lebanon
Civil Foreman
 Assisted in Family Business, managing the subcontracted works for
Fouad Al Gazal Co. in the finishing of 3 buildings comprising of 5 floors each.
1979 – 1982 Albert Sarqasian Eng. Co. Lebanon
Supervisor
 Worked as a supervisor for maintenance of residential buildings.
References Available upon request.
Page 4 of 4

More Related Content

What's hot

Oday Aswad Portfolio 16
Oday Aswad Portfolio 16Oday Aswad Portfolio 16
Oday Aswad Portfolio 16Oday Aswad
 
Callum Black Portfolio_V3_180716
Callum Black Portfolio_V3_180716Callum Black Portfolio_V3_180716
Callum Black Portfolio_V3_180716callum black
 
Carlos A Reparaz CV Hill Formated 170516_EN
Carlos A Reparaz CV Hill Formated 170516_ENCarlos A Reparaz CV Hill Formated 170516_EN
Carlos A Reparaz CV Hill Formated 170516_ENCarlos Alberto Reparaz
 
New York Skyline - One World Trade Center
New York Skyline - One World Trade CenterNew York Skyline - One World Trade Center
New York Skyline - One World Trade Center
WDF Inc.
 
213A Bath Rd Cheltenham project sheet_July 15
213A Bath Rd Cheltenham project sheet_July 15213A Bath Rd Cheltenham project sheet_July 15
213A Bath Rd Cheltenham project sheet_July 15Ron O'Connor
 
References koné
References konéReferences koné
References konéSami Sahli
 
Final MBC's Presentation
Final MBC's PresentationFinal MBC's Presentation
Final MBC's PresentationMena Nagy Gad
 
visualloft architectural visualisation portfolio
visualloft architectural visualisation portfoliovisualloft architectural visualisation portfolio
visualloft architectural visualisation portfolio
visualloft
 
IHC_Selected PORTFOLIO_Sept2015_Built-b
IHC_Selected PORTFOLIO_Sept2015_Built-bIHC_Selected PORTFOLIO_Sept2015_Built-b
IHC_Selected PORTFOLIO_Sept2015_Built-bisrael hurtado cola
 
Suvo's portfolio
Suvo's portfolioSuvo's portfolio
Suvo's portfolio
Suvo Ghosh
 
Profile Pictures
Profile PicturesProfile Pictures
Profile Pictures
hadham
 
Report of cayan tower
Report of cayan towerReport of cayan tower
Report of cayan tower
sagar arora
 
RGB-portfolio
RGB-portfolioRGB-portfolio
RGB-portfolio
Raúl González Bravo
 
RGB_professional&academic portfolio
RGB_professional&academic portfolioRGB_professional&academic portfolio
RGB_professional&academic portfolio
Raúl Bravo
 
Kaminska 10409475 Exchange Square
Kaminska 10409475 Exchange SquareKaminska 10409475 Exchange Square
Kaminska 10409475 Exchange SquareNatalia Kaminska
 

What's hot (20)

Wissam chehab's CV
Wissam chehab's CVWissam chehab's CV
Wissam chehab's CV
 
Oday Aswad Portfolio 16
Oday Aswad Portfolio 16Oday Aswad Portfolio 16
Oday Aswad Portfolio 16
 
Callum Black Portfolio_V3_180716
Callum Black Portfolio_V3_180716Callum Black Portfolio_V3_180716
Callum Black Portfolio_V3_180716
 
Carlos A Reparaz CV Hill Formated 170516_EN
Carlos A Reparaz CV Hill Formated 170516_ENCarlos A Reparaz CV Hill Formated 170516_EN
Carlos A Reparaz CV Hill Formated 170516_EN
 
CV-04-14
CV-04-14CV-04-14
CV-04-14
 
JOBS
JOBSJOBS
JOBS
 
New York Skyline - One World Trade Center
New York Skyline - One World Trade CenterNew York Skyline - One World Trade Center
New York Skyline - One World Trade Center
 
Skyscrapers
SkyscrapersSkyscrapers
Skyscrapers
 
213A Bath Rd Cheltenham project sheet_July 15
213A Bath Rd Cheltenham project sheet_July 15213A Bath Rd Cheltenham project sheet_July 15
213A Bath Rd Cheltenham project sheet_July 15
 
References koné
References konéReferences koné
References koné
 
Final MBC's Presentation
Final MBC's PresentationFinal MBC's Presentation
Final MBC's Presentation
 
visualloft architectural visualisation portfolio
visualloft architectural visualisation portfoliovisualloft architectural visualisation portfolio
visualloft architectural visualisation portfolio
 
IHC_Selected PORTFOLIO_Sept2015_Built-b
IHC_Selected PORTFOLIO_Sept2015_Built-bIHC_Selected PORTFOLIO_Sept2015_Built-b
IHC_Selected PORTFOLIO_Sept2015_Built-b
 
Suvo's portfolio
Suvo's portfolioSuvo's portfolio
Suvo's portfolio
 
Profile Pictures
Profile PicturesProfile Pictures
Profile Pictures
 
Report of cayan tower
Report of cayan towerReport of cayan tower
Report of cayan tower
 
RGB-portfolio
RGB-portfolioRGB-portfolio
RGB-portfolio
 
RGB_professional&academic portfolio
RGB_professional&academic portfolioRGB_professional&academic portfolio
RGB_professional&academic portfolio
 
eng.msotafa cv[Conflict] (1)
eng.msotafa cv[Conflict] (1)eng.msotafa cv[Conflict] (1)
eng.msotafa cv[Conflict] (1)
 
Kaminska 10409475 Exchange Square
Kaminska 10409475 Exchange SquareKaminska 10409475 Exchange Square
Kaminska 10409475 Exchange Square
 

Similar to Marwan Bou Antoun

Cv & Portfolio
Cv & PortfolioCv & Portfolio
Cv & Portfolio
Riccardo Rabbiolo
 
Jeff's cv - 2015 version
Jeff's  cv - 2015 versionJeff's  cv - 2015 version
Jeff's cv - 2015 versionJeffrey Hunt
 
-----ENGLISH--HESHAM-C.V
-----ENGLISH--HESHAM-C.V-----ENGLISH--HESHAM-C.V
-----ENGLISH--HESHAM-C.VHesham Khalifa
 
Steve Whyte CV. PDF
Steve Whyte CV. PDFSteve Whyte CV. PDF
Steve Whyte CV. PDFSteve Whyte
 
Mohamed Barakat Updated CV
Mohamed Barakat Updated CVMohamed Barakat Updated CV
Mohamed Barakat Updated CVMohamed Barakat
 
HASSAN ELESAYED ELEMAM PMP
HASSAN ELESAYED ELEMAM PMPHASSAN ELESAYED ELEMAM PMP
HASSAN ELESAYED ELEMAM PMPhassan elemam
 

Similar to Marwan Bou Antoun (20)

c v english
c v englishc v english
c v english
 
Nabil Soliman
Nabil SolimanNabil Soliman
Nabil Soliman
 
Cv & Portfolio
Cv & PortfolioCv & Portfolio
Cv & Portfolio
 
CV.2016
CV.2016CV.2016
CV.2016
 
Jeff's cv - 2015 version
Jeff's  cv - 2015 versionJeff's  cv - 2015 version
Jeff's cv - 2015 version
 
CV Mahmoud Farid PM
CV Mahmoud Farid PMCV Mahmoud Farid PM
CV Mahmoud Farid PM
 
-----ENGLISH--HESHAM-C.V
-----ENGLISH--HESHAM-C.V-----ENGLISH--HESHAM-C.V
-----ENGLISH--HESHAM-C.V
 
Hesham ELdieushy 2016
Hesham ELdieushy 2016Hesham ELdieushy 2016
Hesham ELdieushy 2016
 
modified cv khaled
modified  cv khaledmodified  cv khaled
modified cv khaled
 
Ahmed Aboul Azm
Ahmed Aboul AzmAhmed Aboul Azm
Ahmed Aboul Azm
 
Hady Sawaya CV
Hady Sawaya CVHady Sawaya CV
Hady Sawaya CV
 
Steve Whyte CV. PDF
Steve Whyte CV. PDFSteve Whyte CV. PDF
Steve Whyte CV. PDF
 
Mohamed Barakat Updated CV
Mohamed Barakat Updated CVMohamed Barakat Updated CV
Mohamed Barakat Updated CV
 
Abd El-Rahman Wakeb CV
Abd El-Rahman Wakeb CVAbd El-Rahman Wakeb CV
Abd El-Rahman Wakeb CV
 
HASSAN ELESAYED ELEMAM PMP
HASSAN ELESAYED ELEMAM PMPHASSAN ELESAYED ELEMAM PMP
HASSAN ELESAYED ELEMAM PMP
 
C.V for M.ZAKI
C.V  for M.ZAKIC.V  for M.ZAKI
C.V for M.ZAKI
 
Sayed CV
Sayed CVSayed CV
Sayed CV
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
A.Hussein - C.V
A.Hussein - C.VA.Hussein - C.V
A.Hussein - C.V
 
C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)
 

Marwan Bou Antoun

  • 1. Marwan Bou Antoun Position Sought Site Superintendent. Education 1979 Secondary School Certificate. Languages Arabic, French, and English. Nationality Work Experience Lebanese. April 2015- to present Kfoury Engineering & General Contracting Dekwaneh Project: Forty Four Project Gracefully rising 44 floors above the city skyline and located on the Saloume roundabout, SAYFCO presents Lebanon's second highest tower: FortyFour. June 2013- to April 2015 Kfoury Engineering & General Contracting Antelias Project: Crystal Towers & Plaza Tower Crystal Towers project is located in Antelias region, rising 100 meters on the Metn coastline, with a total surface built- in area of 35,000sqm. The project consists of a 30 floor residential tower with apartments ranging between 170sqm and 255sqm, and a 20 floor commercial tower with offices from 120sqm to thousands of sqm. The works consist of all concrete, architectural, electromechanical and finishing works Plaza Tower is a Top Down Project Responsible for Concrete - finishing and site coordinator. July 2011- to present Al Saad General Contracting (S.G.C) Beirut Project: Beirut City Center (Majid Al Futaim Propreties) Page 1 of 4 Fahed Bou Antoun Street, Houmal, Lebanon. Phone 03/217234 -05941963 E: marwanbouantoun@hotmail.com
  • 2. Responsible for finishing and site coordinater. Apr 2009- june 2011 Beirut ETS Suheil dagher ( bekfaya ) five stars hotel . The building consisting four basement levels , services , parking , mezzanine and four superstructure levels swimming pool in ground floor, and three apartment floors. Jan 2006- Apr 2009 Site superintendent Qatar Aljaber & Partners Pearl G T L (gas to liquid ) Ras Lafan Industrial city project Manager Shell . responsible for concrete work ,planning of work coordination between management and site Aug 2005- Dec 2006 General Foreman  Platinum Tower Hotel Beirut Down town . The Superstructure is a forty story tower I was in charge of concrete work Sep 03 – Aug 2005 ACC International. Beirut General Foreman This is an extension project to the previously constructed five star Metropolitan hotel, situated in Lebanon’s Sin El Fil. The project consists of six basement levels (12000 m2 / Each Floor) containing a 2400m2 Banquet hall under a suspended post tensioned ceiling. The Superstructure is a thirty story tower of furnished apartments connected to the hotel via a foot bridge. My Job as a general Foreman, in the concrete stage of the project, required my vigilant attention for the most complicated area of the project, The car park Ramps and Swimming Pool Areas. In The finishing stage I was in charge of all the External finishing works including Aluminum and granite cladding. Jun 02 – Sep 03 ACC International. UAE AbuDhabi General Foreman Assigned as a General Foreman In The Conference Palace Project Abu Dhabi. I was in charge of the concrete works for the East Hotel and East Ramp in addition to the finishing works of the car park. Oct. 00 – Jun 02 ACC International. Tripoli General Foreman  Assigned as a General Foreman to all the works of the Fayhaa’ Secondary School Project, in Maarad area of Tripoli. The Project consists of 11000 m2 of built up area and around 8000 m3 of concrete with external Page 2 of 4
  • 3. stone cladding. The project was to be completed in two phases, the superstructure works (classrooms and administration) to be completed in 10 months, while the remaining underground finishing works (pool, auditorium and car park) are to be handed over lately due to variation orders and modifications. Apr. 00 – Oct. 00 ACC International. Tripoli General Foreman  Assigned to the finishing works of the Reconstruction Of Houses For The Displaced Project, in Kobbah – Tebbanah area of Tripoli. I was responsible for the finishing works of 16 buildings of the project. The project involves 900 apartments in 68 buildings, totaling 85000 m2. Nov. 97 – Apr. 00 ACC International. Beirut General Foreman  Responsible for concrete and finishing works in the Souks Of Beirut Parking Facility Project, situated in the Solidere District. The project comprised of four basement levels with an area of 100,000 m2 and 95,000 m3 of concrete cast in 13 months. I was also assigned to the handing over of the E.S.C.W.A. building and the Beirut Municipal Stadium after the expiry of the maintenance period. Aug. 96 – Nov. 97 ACC International. Beirut General Foreman  Worked through the concrete and finishing stages of the E.S.C.W.A. building project in Riad El Soloh, situated in the Solidere district. The building, consisting of seven basement levels and eight superstructure levels was completed in seven months concrete works and seven months finishing. Feb. 96 – Aug. 96 Pivot Engineering Co. (W.L.L.) AbuDhabi General Foreman  Worked in a tower for Mr. Khalifa Humaid Abdulla Al-Rumaithy, on Salam Street. The building was comprised of a basement level, ground floor, mezzanine and eighteen typical floors. Jun. 95 – Feb. 96 Pivot Engineering Co. (W.L.L.) AbuDhabi Coordinator / General Foreman  Worked in ADNOC’s Ruwais Sulfur Handling Expansion Project. Responsible for coordinating construction activities with the client and overall supervision of the civil works. Jun. 93 – May. 95 Pivot Engineering Co. (W.L.L.) AbuDhabi General Foreman  Worked from the beginning till the final handing over of the Garden City Page 3 of 4
  • 4. Tower. A building of twenty floors for Sheik Mohammed Bin Khaled Al Nahyan at Khaldiya Street near Dana Plaza.  Responsible for supervision of all construction activities, liaising with various subcontractors and reporting directly to the project manager.  Dec. 92 – May. 93 Pivot Engineering Co. (W.L.L.) AbuDhabi Civil Foreman  Responsible for mobilization and piling works at the Hilton Extension Project, and simultaneously managing snags at a six-building project, near Adma Apco. 1990 – 1992 Eng. Salim Chamma Lebanon Civil Foreman  Worked in the construction of eleven villas in Chamville City. 1986 – 1990 Albert Abi Said Lebanon Civil Foreman  Responsible for concrete works, blockwork, ceramic tiling and marble works at Naif and Mary Center, consisting of two blocks. Block “A” consisted of 14 floors hotel with a shopping center and a cinema hall. Block “B” consisted of a 14 floors office building. 1985 – 1986 Eng. Salim Chamma Lebanon Civil Foreman  Worked in the construction of an eight-story building for Salim Chamma in Al Maten. 1982 – 1985 Private Work Lebanon Civil Foreman  Assisted in Family Business, managing the subcontracted works for Fouad Al Gazal Co. in the finishing of 3 buildings comprising of 5 floors each. 1979 – 1982 Albert Sarqasian Eng. Co. Lebanon Supervisor  Worked as a supervisor for maintenance of residential buildings. References Available upon request. Page 4 of 4