Marwan Bou Antoun is seeking a position as a site superintendent with over 35 years of experience in construction projects in Lebanon, Qatar, UAE, and Libya. He has worked on numerous high-rise residential and commercial buildings as well as infrastructure projects in roles such as general foreman, coordinator, and civil foreman. His responsibilities included concrete works, planning, coordination, and site supervision. He has a secondary school certificate and is fluent in Arabic, French, and English.
A construction firm with a history going back eight decades, WDF, Inc., delivers premier quality HVAC, plumbing, and related contracting solutions for clients involved in major New York projects. In fact, WDF, Inc., has worked on such iconic construction projects as One World Trade Center.
A construction firm with a history going back eight decades, WDF, Inc., delivers premier quality HVAC, plumbing, and related contracting solutions for clients involved in major New York projects. In fact, WDF, Inc., has worked on such iconic construction projects as One World Trade Center.
With 20+ years of experience in the Architectural field I experienced design from concepts to completion in several areas of the world.
A constant commitment, driven by a passionate approach to design, brought me to discover amazing architectural challenges.
Standing buildings, I have been pleased to design, are the witnesses of my professional career.
Leading a design process from concept to completion needs the strong motivation that I always tried to transfer to the working teams. Inspiration, open discussion, common goals are always key factor to manage a project.
No really matter where I have been, I experienced Architecture as a wonderful combination of cultural journeys and “problem solving” attitude. Keep them tight accordingly to client requirements would always give the right path to follow.
Design is still a learning process impelling a focused reading of the human behaviours and “lifestyle”.
1. Marwan Bou Antoun
Position Sought Site Superintendent.
Education 1979 Secondary School Certificate.
Languages Arabic, French, and English.
Nationality
Work Experience
Lebanese.
April 2015- to present
Kfoury Engineering & General Contracting Dekwaneh
Project: Forty Four Project
Gracefully rising 44 floors above the city skyline and located on the Saloume
roundabout, SAYFCO presents Lebanon's second highest tower: FortyFour.
June 2013- to April 2015
Kfoury Engineering & General Contracting Antelias
Project: Crystal Towers & Plaza Tower
Crystal Towers project is located in Antelias region, rising 100 meters on
the Metn coastline, with a total surface built- in area of 35,000sqm.
The project consists of a 30 floor residential tower with apartments
ranging between 170sqm and 255sqm, and a 20 floor commercial tower
with offices from 120sqm to thousands of sqm.
The works consist of all concrete, architectural, electromechanical and
finishing works
Plaza Tower is a Top Down Project
Responsible for Concrete - finishing and site coordinator.
July 2011- to present
Al Saad General Contracting (S.G.C) Beirut
Project: Beirut City Center (Majid Al Futaim Propreties)
Page 1 of 4
Fahed Bou Antoun Street,
Houmal, Lebanon.
Phone 03/217234 -05941963
E: marwanbouantoun@hotmail.com
2. Responsible for finishing and site coordinater.
Apr 2009- june 2011 Beirut
ETS Suheil dagher ( bekfaya ) five stars hotel . The building consisting four
basement levels , services , parking , mezzanine and four superstructure
levels swimming pool in ground floor, and three apartment floors.
Jan 2006- Apr 2009
Site superintendent Qatar
Aljaber & Partners Pearl G T L (gas to liquid ) Ras Lafan Industrial city
project Manager Shell . responsible for concrete work ,planning of work
coordination between management and site
Aug 2005- Dec 2006
General Foreman
Platinum Tower Hotel Beirut Down town . The Superstructure is a forty
story tower I was in charge of concrete work
Sep 03 – Aug 2005 ACC International. Beirut
General Foreman
This is an extension project to the previously constructed five star
Metropolitan hotel, situated in Lebanon’s Sin El Fil. The project consists of
six basement levels (12000 m2
/ Each Floor) containing a 2400m2
Banquet
hall under a suspended post tensioned ceiling. The Superstructure is a thirty
story tower of furnished apartments connected to the hotel via a foot bridge.
My Job as a general Foreman, in the concrete stage of the project, required
my vigilant attention for the most complicated area of the project, The car
park Ramps and Swimming Pool Areas.
In The finishing stage I was in charge of all the External finishing works
including Aluminum and granite cladding.
Jun 02 – Sep 03 ACC International. UAE AbuDhabi
General Foreman
Assigned as a General Foreman In The Conference Palace Project Abu
Dhabi. I was in charge of the concrete works for the East Hotel and East
Ramp in addition to the finishing works of the car park.
Oct. 00 – Jun 02 ACC International. Tripoli
General Foreman
Assigned as a General Foreman to all the works of the Fayhaa’
Secondary School Project, in Maarad area of Tripoli. The Project consists of
11000 m2 of built up area and around 8000 m3 of concrete with external
Page 2 of 4
3. stone cladding. The project was to be completed in two phases, the
superstructure works (classrooms and administration) to be completed in 10
months, while the remaining underground finishing works (pool, auditorium
and car park) are to be handed over lately due to variation orders and
modifications.
Apr. 00 – Oct. 00 ACC International. Tripoli
General Foreman
Assigned to the finishing works of the Reconstruction Of Houses For
The Displaced Project, in Kobbah – Tebbanah area of Tripoli. I was
responsible for the finishing works of 16 buildings of the project. The project
involves 900 apartments in 68 buildings, totaling 85000 m2.
Nov. 97 – Apr. 00 ACC International. Beirut
General Foreman
Responsible for concrete and finishing works in the Souks Of Beirut
Parking Facility Project, situated in the Solidere District. The project
comprised of four basement levels with an area of 100,000 m2
and 95,000
m3
of concrete cast in 13 months. I was also assigned to the handing over of
the E.S.C.W.A. building and the Beirut Municipal Stadium after the expiry of
the maintenance period.
Aug. 96 – Nov. 97 ACC International. Beirut
General Foreman
Worked through the concrete and finishing stages of the E.S.C.W.A.
building project in Riad El Soloh, situated in the Solidere district. The
building, consisting of seven basement levels and eight superstructure levels
was completed in seven months concrete works and seven months finishing.
Feb. 96 – Aug. 96 Pivot Engineering Co. (W.L.L.) AbuDhabi
General Foreman
Worked in a tower for Mr. Khalifa Humaid Abdulla Al-Rumaithy, on
Salam Street. The building was comprised of a basement level, ground floor,
mezzanine and eighteen typical floors.
Jun. 95 – Feb. 96 Pivot Engineering Co. (W.L.L.) AbuDhabi
Coordinator / General Foreman
Worked in ADNOC’s Ruwais Sulfur Handling Expansion Project.
Responsible for coordinating construction activities with the client and overall
supervision of the civil works.
Jun. 93 – May. 95 Pivot Engineering Co. (W.L.L.) AbuDhabi
General Foreman
Worked from the beginning till the final handing over of the Garden City
Page 3 of 4
4. Tower. A building of twenty floors for Sheik Mohammed Bin Khaled Al
Nahyan at Khaldiya Street near Dana Plaza.
Responsible for supervision of all construction activities, liaising with
various subcontractors and reporting directly to the project manager.
Dec. 92 – May. 93 Pivot Engineering Co. (W.L.L.) AbuDhabi
Civil Foreman
Responsible for mobilization and piling works at the Hilton Extension
Project, and simultaneously managing snags at a six-building project, near
Adma Apco.
1990 – 1992 Eng. Salim Chamma Lebanon
Civil Foreman
Worked in the construction of eleven villas in Chamville City.
1986 – 1990 Albert Abi Said Lebanon
Civil Foreman
Responsible for concrete works, blockwork, ceramic tiling and marble
works at Naif and Mary Center, consisting of two blocks. Block “A” consisted
of 14 floors hotel with a shopping center and a cinema hall. Block “B”
consisted of a 14 floors office building.
1985 – 1986 Eng. Salim Chamma Lebanon
Civil Foreman
Worked in the construction of an eight-story building for Salim Chamma
in Al Maten.
1982 – 1985 Private Work Lebanon
Civil Foreman
Assisted in Family Business, managing the subcontracted works for
Fouad Al Gazal Co. in the finishing of 3 buildings comprising of 5 floors each.
1979 – 1982 Albert Sarqasian Eng. Co. Lebanon
Supervisor
Worked as a supervisor for maintenance of residential buildings.