The document is a final lecture by David Collings at the University of Surrey discussing various long span bridges (LSBs) under construction worldwide as of spring 2015. It highlights specific projects, such as the Sungai Brunei Bridge and the Izmit Bay Bridge, detailing their spans and construction progress. Additionally, Collings expresses intent to update the lecture in the future, inviting suggestions for interesting LSBs via LinkedIn.