SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
BACHELOR OF QUANTITY SURVEYING (HONOURS)
Construction Supply Chain Management
(QSB 2433 / MGT 60803)
Group Project (maximum 6 members)
Total percentage: 50%
Deadline: 12pm, 29th
November 2016
This project aims to familiarize the students with the current technology trend in the industry and
allows students to analyze the impact of the technology towards construction supply chain
management.
Building information modeling (BIM) is a process involving the generation and management of digital
representations of physical and functional characteristics of places. Some BIM software claim ability
to do 7D BIM.
Prepare a report that consist (but not limited to) the following elements:
a) Introduction to BIM and the content of each dimension of BIM. List out the available software that
can perform BIM at different dimension.
b) Explain how each dimension of BIM improves the construction supply chain management.
c) Identify and discuss disadvantages or cost involve in each dimension of BIM.
d) Conclusion and recommendation to the construction industry player (in this case QS consultant).
e) Reference.

More Related Content

What's hot

BIM Maturity Levels Explained Level 0, Level 1, Level 2, Level 3
BIM Maturity Levels Explained Level 0, Level 1, Level 2, Level 3BIM Maturity Levels Explained Level 0, Level 1, Level 2, Level 3
BIM Maturity Levels Explained Level 0, Level 1, Level 2, Level 3United-BIM
 
BIM - A New Concept in Practice
BIM - A New Concept in PracticeBIM - A New Concept in Practice
BIM - A New Concept in Practicerondellaria
 
BIM Contract International Conference 2017
BIM Contract International Conference 2017BIM Contract International Conference 2017
BIM Contract International Conference 2017Chun Keung Ng
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectMANNU KUMAR
 
IRJET- Testing Practical Applicability of 5-Dimensional BIM using a Pilot...
IRJET-  	  Testing Practical Applicability of 5-Dimensional BIM using a Pilot...IRJET-  	  Testing Practical Applicability of 5-Dimensional BIM using a Pilot...
IRJET- Testing Practical Applicability of 5-Dimensional BIM using a Pilot...IRJET Journal
 
Change the Way We build - Part 3
Change the Way We build -  Part 3Change the Way We build -  Part 3
Change the Way We build - Part 3Amol Vidwans
 
What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?Chun Keung Ng
 
Bim presentation km 21-10-2011
Bim presentation km 21-10-2011Bim presentation km 21-10-2011
Bim presentation km 21-10-2011KarinSundberg
 
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...Omer Syed - The Integration of BIM in Construction Organizations & its Impact...
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...Omer Syed
 
BIM for Construction, BPMs and Owners
BIM for Construction, BPMs and OwnersBIM for Construction, BPMs and Owners
BIM for Construction, BPMs and OwnersMarc Goldman
 
Digital Transformation of the Construction Industry
Digital Transformation of the Construction IndustryDigital Transformation of the Construction Industry
Digital Transformation of the Construction IndustryCCT International
 
The Information Challenge Managing Construction with BIM
The Information ChallengeManaging Construction with BIMThe Information ChallengeManaging Construction with BIM
The Information Challenge Managing Construction with BIMCCT International
 

What's hot (20)

BIM Maturity Levels Explained Level 0, Level 1, Level 2, Level 3
BIM Maturity Levels Explained Level 0, Level 1, Level 2, Level 3BIM Maturity Levels Explained Level 0, Level 1, Level 2, Level 3
BIM Maturity Levels Explained Level 0, Level 1, Level 2, Level 3
 
BIM - A New Concept in Practice
BIM - A New Concept in PracticeBIM - A New Concept in Practice
BIM - A New Concept in Practice
 
BIM Contract International Conference 2017
BIM Contract International Conference 2017BIM Contract International Conference 2017
BIM Contract International Conference 2017
 
Innovative BIM Solution For Project Management And Quantity Surveying Mr. Ken...
Innovative BIM Solution For Project Management And Quantity Surveying Mr. Ken...Innovative BIM Solution For Project Management And Quantity Surveying Mr. Ken...
Innovative BIM Solution For Project Management And Quantity Surveying Mr. Ken...
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real project
 
IRJET- Testing Practical Applicability of 5-Dimensional BIM using a Pilot...
IRJET-  	  Testing Practical Applicability of 5-Dimensional BIM using a Pilot...IRJET-  	  Testing Practical Applicability of 5-Dimensional BIM using a Pilot...
IRJET- Testing Practical Applicability of 5-Dimensional BIM using a Pilot...
 
Change the Way We build - Part 3
Change the Way We build -  Part 3Change the Way We build -  Part 3
Change the Way We build - Part 3
 
Economic-Benefits-BIM
Economic-Benefits-BIMEconomic-Benefits-BIM
Economic-Benefits-BIM
 
What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?
 
Bim presentation km 21-10-2011
Bim presentation km 21-10-2011Bim presentation km 21-10-2011
Bim presentation km 21-10-2011
 
What is True BIM?
What is True BIM?What is True BIM?
What is True BIM?
 
A gentle introduction to BIM
A gentle introduction to BIMA gentle introduction to BIM
A gentle introduction to BIM
 
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...Omer Syed - The Integration of BIM in Construction Organizations & its Impact...
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...
 
BIM for Construction, BPMs and Owners
BIM for Construction, BPMs and OwnersBIM for Construction, BPMs and Owners
BIM for Construction, BPMs and Owners
 
BIM comp
BIM compBIM comp
BIM comp
 
BIM Application in Hong Kong Housing Authority by Mr. Lawrence K.W. CHUNG
BIM Application in Hong Kong Housing Authority by Mr. Lawrence K.W. CHUNGBIM Application in Hong Kong Housing Authority by Mr. Lawrence K.W. CHUNG
BIM Application in Hong Kong Housing Authority by Mr. Lawrence K.W. CHUNG
 
bim ppt 2 final
bim ppt 2 finalbim ppt 2 final
bim ppt 2 final
 
BIM case study
BIM case studyBIM case study
BIM case study
 
Digital Transformation of the Construction Industry
Digital Transformation of the Construction IndustryDigital Transformation of the Construction Industry
Digital Transformation of the Construction Industry
 
The Information Challenge Managing Construction with BIM
The Information ChallengeManaging Construction with BIMThe Information ChallengeManaging Construction with BIM
The Information Challenge Managing Construction with BIM
 

Viewers also liked

M3 EG BQ steel struture
M3 EG BQ steel strutureM3 EG BQ steel struture
M3 EG BQ steel strutureEst
 
M3 Assignment cover
M3 Assignment cover M3 Assignment cover
M3 Assignment cover Est
 
M3 Lecture 8 specification
M3 Lecture 8 specificationM3 Lecture 8 specification
M3 Lecture 8 specificationEst
 
M3 EG BQ timber windows
M3 EG BQ timber windowsM3 EG BQ timber windows
M3 EG BQ timber windowsEst
 
M3 Metal roof lecture rv2 an
M3 Metal roof lecture rv2 anM3 Metal roof lecture rv2 an
M3 Metal roof lecture rv2 anEst
 
M3 Lecture 1 notes aluminium windows
M3 Lecture 1 notes aluminium windowsM3 Lecture 1 notes aluminium windows
M3 Lecture 1 notes aluminium windowsEst
 
M3 Lecture 3 notes timber lourvred window
M3 Lecture 3 notes timber lourvred windowM3 Lecture 3 notes timber lourvred window
M3 Lecture 3 notes timber lourvred windowEst
 
Dấu hiệu cảnh báo suy tim
Dấu hiệu cảnh báo suy timDấu hiệu cảnh báo suy tim
Dấu hiệu cảnh báo suy timlananhlt206
 
Shaping Global and National Economies to Better Respond to Climate Challenge...
Shaping Global and National Economies to Better Respond  to Climate Challenge...Shaping Global and National Economies to Better Respond  to Climate Challenge...
Shaping Global and National Economies to Better Respond to Climate Challenge...Ngozi Okonjo-Iweala
 
CSCM Evaluate supplier performance
CSCM Evaluate supplier performanceCSCM Evaluate supplier performance
CSCM Evaluate supplier performanceEst
 
Fundamentos de Gestion Empresarial
Fundamentos de Gestion EmpresarialFundamentos de Gestion Empresarial
Fundamentos de Gestion EmpresarialAngelDelgadoR
 
Cartaz ativ. pre escolar dezembro 2011-12
Cartaz ativ. pre  escolar dezembro 2011-12Cartaz ativ. pre  escolar dezembro 2011-12
Cartaz ativ. pre escolar dezembro 2011-12bibdjosei2006
 
João gabriel da silva
João gabriel da silvaJoão gabriel da silva
João gabriel da silvaFABIANA
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof coveringEst
 
M3 Lecture 10 timber roof structure answer
M3 Lecture 10 timber roof structure answerM3 Lecture 10 timber roof structure answer
M3 Lecture 10 timber roof structure answerEst
 

Viewers also liked (20)

M3 EG BQ steel struture
M3 EG BQ steel strutureM3 EG BQ steel struture
M3 EG BQ steel struture
 
M3 Assignment cover
M3 Assignment cover M3 Assignment cover
M3 Assignment cover
 
M3 Lecture 8 specification
M3 Lecture 8 specificationM3 Lecture 8 specification
M3 Lecture 8 specification
 
M3 EG BQ timber windows
M3 EG BQ timber windowsM3 EG BQ timber windows
M3 EG BQ timber windows
 
M3 Metal roof lecture rv2 an
M3 Metal roof lecture rv2 anM3 Metal roof lecture rv2 an
M3 Metal roof lecture rv2 an
 
M3 Lecture 1 notes aluminium windows
M3 Lecture 1 notes aluminium windowsM3 Lecture 1 notes aluminium windows
M3 Lecture 1 notes aluminium windows
 
M3 Lecture 3 notes timber lourvred window
M3 Lecture 3 notes timber lourvred windowM3 Lecture 3 notes timber lourvred window
M3 Lecture 3 notes timber lourvred window
 
Apresentação
ApresentaçãoApresentação
Apresentação
 
Dấu hiệu cảnh báo suy tim
Dấu hiệu cảnh báo suy timDấu hiệu cảnh báo suy tim
Dấu hiệu cảnh báo suy tim
 
Vom Pfannkuchenbäcker zum Multihotelier.doc
Vom Pfannkuchenbäcker zum Multihotelier.docVom Pfannkuchenbäcker zum Multihotelier.doc
Vom Pfannkuchenbäcker zum Multihotelier.doc
 
Shaping Global and National Economies to Better Respond to Climate Challenge...
Shaping Global and National Economies to Better Respond  to Climate Challenge...Shaping Global and National Economies to Better Respond  to Climate Challenge...
Shaping Global and National Economies to Better Respond to Climate Challenge...
 
CSCM Evaluate supplier performance
CSCM Evaluate supplier performanceCSCM Evaluate supplier performance
CSCM Evaluate supplier performance
 
Veterans day 2015
Veterans day 2015Veterans day 2015
Veterans day 2015
 
Fundamentos de Gestion Empresarial
Fundamentos de Gestion EmpresarialFundamentos de Gestion Empresarial
Fundamentos de Gestion Empresarial
 
Cartaz ativ. pre escolar dezembro 2011-12
Cartaz ativ. pre  escolar dezembro 2011-12Cartaz ativ. pre  escolar dezembro 2011-12
Cartaz ativ. pre escolar dezembro 2011-12
 
Enigma google
Enigma googleEnigma google
Enigma google
 
Ejercicio2
Ejercicio2Ejercicio2
Ejercicio2
 
João gabriel da silva
João gabriel da silvaJoão gabriel da silva
João gabriel da silva
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof covering
 
M3 Lecture 10 timber roof structure answer
M3 Lecture 10 timber roof structure answerM3 Lecture 10 timber roof structure answer
M3 Lecture 10 timber roof structure answer
 

Similar to CSCM group project aug 2016

Cscm group report
Cscm  group reportCscm  group report
Cscm group reportlohwenjun
 
What you have1) Draft word file2) Feedbacks and comments3) .docx
What you have1) Draft word file2) Feedbacks and comments3) .docxWhat you have1) Draft word file2) Feedbacks and comments3) .docx
What you have1) Draft word file2) Feedbacks and comments3) .docxeubanksnefen
 
Software Application in Quantity Surveying - Report
Software Application in Quantity Surveying - ReportSoftware Application in Quantity Surveying - Report
Software Application in Quantity Surveying - ReportPang Khai Shuen
 
IS BIM ADVANTAGEOUS IN PAKISTAN?
IS BIM ADVANTAGEOUS IN PAKISTAN?IS BIM ADVANTAGEOUS IN PAKISTAN?
IS BIM ADVANTAGEOUS IN PAKISTAN?Anees Ur Rehman
 
An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...IRJET Journal
 
Building information modelling report
Building information modelling reportBuilding information modelling report
Building information modelling reportKiran Birdi
 
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...Omer Syed - The Integration of BIM in Construction Organizations & its Impact...
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...Omer Syed
 
4058f1cb-2aef-4437-bf32-968325c024e7-160414132040.pdf
4058f1cb-2aef-4437-bf32-968325c024e7-160414132040.pdf4058f1cb-2aef-4437-bf32-968325c024e7-160414132040.pdf
4058f1cb-2aef-4437-bf32-968325c024e7-160414132040.pdfWaliEdwardian1
 
Advantages and Challenges of Using BIM: a Cost Consultant's Perspective
Advantages and Challenges of Using BIM: a Cost Consultant's PerspectiveAdvantages and Challenges of Using BIM: a Cost Consultant's Perspective
Advantages and Challenges of Using BIM: a Cost Consultant's PerspectiveMichael Cook
 
Advantages and Challenges of Using BIM: a Cost Consultant's Perspective
Advantages and Challenges of Using BIM: a Cost Consultant's PerspectiveAdvantages and Challenges of Using BIM: a Cost Consultant's Perspective
Advantages and Challenges of Using BIM: a Cost Consultant's PerspectiveMichael Cook
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docxEst
 
Introduction to BIM
Introduction to BIM Introduction to BIM
Introduction to BIM YOGESH MAKKAR
 
Building Information Modelling (BIM)Entities Promoting.docx
Building Information Modelling (BIM)Entities Promoting.docxBuilding Information Modelling (BIM)Entities Promoting.docx
Building Information Modelling (BIM)Entities Promoting.docxcurwenmichaela
 
Project Management Individual Assignment
Project Management Individual AssignmentProject Management Individual Assignment
Project Management Individual AssignmentArissa Loh
 
EFFECTIVENESS OF IMPLEMENTING 5D BIM.pptx
EFFECTIVENESS OF IMPLEMENTING 5D BIM.pptxEFFECTIVENESS OF IMPLEMENTING 5D BIM.pptx
EFFECTIVENESS OF IMPLEMENTING 5D BIM.pptxyustofiachmad
 
Application of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction ProjectApplication of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction ProjectIRJET Journal
 
Iabse2008 Chicago Jyrki Jauhiainen
Iabse2008 Chicago Jyrki JauhiainenIabse2008 Chicago Jyrki Jauhiainen
Iabse2008 Chicago Jyrki Jauhiainenjjauhiai
 

Similar to CSCM group project aug 2016 (20)

Cscm group report
Cscm  group reportCscm  group report
Cscm group report
 
What you have1) Draft word file2) Feedbacks and comments3) .docx
What you have1) Draft word file2) Feedbacks and comments3) .docxWhat you have1) Draft word file2) Feedbacks and comments3) .docx
What you have1) Draft word file2) Feedbacks and comments3) .docx
 
Software Application in Quantity Surveying - Report
Software Application in Quantity Surveying - ReportSoftware Application in Quantity Surveying - Report
Software Application in Quantity Surveying - Report
 
IS BIM ADVANTAGEOUS IN PAKISTAN?
IS BIM ADVANTAGEOUS IN PAKISTAN?IS BIM ADVANTAGEOUS IN PAKISTAN?
IS BIM ADVANTAGEOUS IN PAKISTAN?
 
An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...
 
wong2020.pdf
wong2020.pdfwong2020.pdf
wong2020.pdf
 
Building information modelling report
Building information modelling reportBuilding information modelling report
Building information modelling report
 
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...Omer Syed - The Integration of BIM in Construction Organizations & its Impact...
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...
 
4058f1cb-2aef-4437-bf32-968325c024e7-160414132040.pdf
4058f1cb-2aef-4437-bf32-968325c024e7-160414132040.pdf4058f1cb-2aef-4437-bf32-968325c024e7-160414132040.pdf
4058f1cb-2aef-4437-bf32-968325c024e7-160414132040.pdf
 
4 mark mc kane, uu
4   mark mc kane, uu4   mark mc kane, uu
4 mark mc kane, uu
 
Advantages and Challenges of Using BIM: a Cost Consultant's Perspective
Advantages and Challenges of Using BIM: a Cost Consultant's PerspectiveAdvantages and Challenges of Using BIM: a Cost Consultant's Perspective
Advantages and Challenges of Using BIM: a Cost Consultant's Perspective
 
Advantages and Challenges of Using BIM: a Cost Consultant's Perspective
Advantages and Challenges of Using BIM: a Cost Consultant's PerspectiveAdvantages and Challenges of Using BIM: a Cost Consultant's Perspective
Advantages and Challenges of Using BIM: a Cost Consultant's Perspective
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docx
 
Introduction to BIM
Introduction to BIM Introduction to BIM
Introduction to BIM
 
Building Information Modelling (BIM)Entities Promoting.docx
Building Information Modelling (BIM)Entities Promoting.docxBuilding Information Modelling (BIM)Entities Promoting.docx
Building Information Modelling (BIM)Entities Promoting.docx
 
Project Management Individual Assignment
Project Management Individual AssignmentProject Management Individual Assignment
Project Management Individual Assignment
 
EFFECTIVENESS OF IMPLEMENTING 5D BIM.pptx
EFFECTIVENESS OF IMPLEMENTING 5D BIM.pptxEFFECTIVENESS OF IMPLEMENTING 5D BIM.pptx
EFFECTIVENESS OF IMPLEMENTING 5D BIM.pptx
 
Bim and building life cycle
Bim and building life cycleBim and building life cycle
Bim and building life cycle
 
Application of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction ProjectApplication of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction Project
 
Iabse2008 Chicago Jyrki Jauhiainen
Iabse2008 Chicago Jyrki JauhiainenIabse2008 Chicago Jyrki Jauhiainen
Iabse2008 Chicago Jyrki Jauhiainen
 

More from Est

SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017Est
 
Sabd undergraduate pg draft v3
Sabd undergraduate pg draft   v3Sabd undergraduate pg draft   v3
Sabd undergraduate pg draft v3Est
 
BS 2 Fire protection 4
BS 2 Fire protection 4BS 2 Fire protection 4
BS 2 Fire protection 4Est
 
CSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscmCSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscmEst
 
CSCM Partnering
CSCM PartneringCSCM Partnering
CSCM PartneringEst
 
CSCM Communication in construction
CSCM Communication in constructionCSCM Communication in construction
CSCM Communication in constructionEst
 
CSCM Material delivery problems cscm
CSCM Material delivery problems cscmCSCM Material delivery problems cscm
CSCM Material delivery problems cscmEst
 
BS 2 Escalators arrangement
BS 2 Escalators arrangementBS 2 Escalators arrangement
BS 2 Escalators arrangementEst
 
BS 2 Escalators 1of 2
BS 2 Escalators 1of 2BS 2 Escalators 1of 2
BS 2 Escalators 1of 2Est
 
BS 2 Group assignment brief question august 2016
BS 2 Group assignment brief  question august 2016BS 2 Group assignment brief  question august 2016
BS 2 Group assignment brief question august 2016Est
 
BS 2 Variable air volume systems
BS 2 Variable air volume systemsBS 2 Variable air volume systems
BS 2 Variable air volume systemsEst
 
CSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmCSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmEst
 
CSCM individual assignment
CSCM individual assignmentCSCM individual assignment
CSCM individual assignmentEst
 
Management science group assignment MS
Management science group assignment MSManagement science group assignment MS
Management science group assignment MSEst
 
MS Tutorial 12 hrm
MS Tutorial 12 hrmMS Tutorial 12 hrm
MS Tutorial 12 hrmEst
 
MS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerbergMS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerbergEst
 
MS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivationMS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivationEst
 
MS Lecture 8 communication
MS Lecture 8 communicationMS Lecture 8 communication
MS Lecture 8 communicationEst
 
MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016Est
 
BS 2 5 electrical installatition
BS 2 5 electrical installatitionBS 2 5 electrical installatition
BS 2 5 electrical installatitionEst
 

More from Est (20)

SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017
 
Sabd undergraduate pg draft v3
Sabd undergraduate pg draft   v3Sabd undergraduate pg draft   v3
Sabd undergraduate pg draft v3
 
BS 2 Fire protection 4
BS 2 Fire protection 4BS 2 Fire protection 4
BS 2 Fire protection 4
 
CSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscmCSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscm
 
CSCM Partnering
CSCM PartneringCSCM Partnering
CSCM Partnering
 
CSCM Communication in construction
CSCM Communication in constructionCSCM Communication in construction
CSCM Communication in construction
 
CSCM Material delivery problems cscm
CSCM Material delivery problems cscmCSCM Material delivery problems cscm
CSCM Material delivery problems cscm
 
BS 2 Escalators arrangement
BS 2 Escalators arrangementBS 2 Escalators arrangement
BS 2 Escalators arrangement
 
BS 2 Escalators 1of 2
BS 2 Escalators 1of 2BS 2 Escalators 1of 2
BS 2 Escalators 1of 2
 
BS 2 Group assignment brief question august 2016
BS 2 Group assignment brief  question august 2016BS 2 Group assignment brief  question august 2016
BS 2 Group assignment brief question august 2016
 
BS 2 Variable air volume systems
BS 2 Variable air volume systemsBS 2 Variable air volume systems
BS 2 Variable air volume systems
 
CSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmCSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscm
 
CSCM individual assignment
CSCM individual assignmentCSCM individual assignment
CSCM individual assignment
 
Management science group assignment MS
Management science group assignment MSManagement science group assignment MS
Management science group assignment MS
 
MS Tutorial 12 hrm
MS Tutorial 12 hrmMS Tutorial 12 hrm
MS Tutorial 12 hrm
 
MS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerbergMS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerberg
 
MS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivationMS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivation
 
MS Lecture 8 communication
MS Lecture 8 communicationMS Lecture 8 communication
MS Lecture 8 communication
 
MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016
 
BS 2 5 electrical installatition
BS 2 5 electrical installatitionBS 2 5 electrical installatition
BS 2 5 electrical installatition
 

Recently uploaded

VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girladitipandeya
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 
Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Corporation
 
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130  Available With RoomVIP Kolkata Call Girl Entally 👉 8250192130  Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Roomdivyansh0kumar0
 
slideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanslideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanhanshkumar9870
 
Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024TeckResourcesLtd
 
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书Fis s
 
OKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T ShirtsOKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T Shirtsrahman018755
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girladitipandeya
 
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With RoomVIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Roomrran7532
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 

Recently uploaded (20)

VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
 
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)
 
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130  Available With RoomVIP Kolkata Call Girl Entally 👉 8250192130  Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Room
 
Call Girls 🫤 East Of Kailash ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
Call Girls 🫤 East Of Kailash ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...Call Girls 🫤 East Of Kailash ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...
Call Girls 🫤 East Of Kailash ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
 
slideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanslideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhan
 
Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024
 
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
 
Preet Vihar (Delhi) 9953330565 Escorts, Call Girls Services
Preet Vihar (Delhi) 9953330565 Escorts, Call Girls ServicesPreet Vihar (Delhi) 9953330565 Escorts, Call Girls Services
Preet Vihar (Delhi) 9953330565 Escorts, Call Girls Services
 
Call Girls In Vasant Kunj 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In Vasant Kunj 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICECall Girls In Vasant Kunj 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In Vasant Kunj 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
 
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
 
OKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T ShirtsOKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T Shirts
 
Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝
 
Call Girls 🫤 Mukherjee Nagar ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
Call Girls 🫤 Mukherjee Nagar ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...Call Girls 🫤 Mukherjee Nagar ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...
Call Girls 🫤 Mukherjee Nagar ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
 
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With RoomVIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
Call Girls 🫤 Nehru Place ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
Call Girls 🫤 Nehru Place ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOYCall Girls 🫤 Nehru Place ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOY
Call Girls 🫤 Nehru Place ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
 

CSCM group project aug 2016

  • 1. SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN BACHELOR OF QUANTITY SURVEYING (HONOURS) Construction Supply Chain Management (QSB 2433 / MGT 60803) Group Project (maximum 6 members) Total percentage: 50% Deadline: 12pm, 29th November 2016 This project aims to familiarize the students with the current technology trend in the industry and allows students to analyze the impact of the technology towards construction supply chain management. Building information modeling (BIM) is a process involving the generation and management of digital representations of physical and functional characteristics of places. Some BIM software claim ability to do 7D BIM. Prepare a report that consist (but not limited to) the following elements: a) Introduction to BIM and the content of each dimension of BIM. List out the available software that can perform BIM at different dimension. b) Explain how each dimension of BIM improves the construction supply chain management. c) Identify and discuss disadvantages or cost involve in each dimension of BIM. d) Conclusion and recommendation to the construction industry player (in this case QS consultant). e) Reference.