©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
Standard Operations Track
Creating and Reporting on
Budgets
Presented by Andy Harbison, CEM
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
Agenda:
Overview
Budget Creation
Quick Views of Budget Data
Using Budget Versions
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
Agenda (continued):
Editing a Budget
Budgeting for Deregulated Accounts
Reporting
Importing a Budget
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
Overview
Budget Manager is
found on the
Analysis Module.
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
Forecast by Commodity
Historical Bill Based
Compare Multiple Years
Common Unit Basis
Graph and Spreadsheet
Views of Data
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
Creating a Budget
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
Up to 36 months
Billing or Accounting
Period Basis
Avg, High, Low,
Latest
Bill Spanning
Budget Year
Filter by TMP,
Group, and
Commodity
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
Quick View of Budget Data
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
Two Chart Types
Three Data Types:
1. Budget: Cost Comparison
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
Three Data Types:
2. Forecast: Usage Comparison
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
Three Data Types:
3. Unit Cost: Blend of Cost and
Use Comparison
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
Data from charts is exportable to
spreadsheets or Microsoft Word
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
Budget Versions
Use versions early and often
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
Use a new version to back up
your work.
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
Use a new version for
“what if” scenarios
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
Editing a Budget
Select forecast
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
Select level to revise
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
Iterate one change at a time
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
Change by +/- percent
Force close
Affect unit or usage
Select affected months
Filter by vendor and/or
vendor rate
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
Deregulated Account
Budgets
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
Unconsolidated example
Separate forecasts for supplier and
LDC accounts
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
Reporting on Budgets
Use budget reports, which group by
meter, building, and commodity
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
Budget Reports
Custom Spreadsheets provide summary
or actual vs. budget
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
Budget custom spreadsheet
Audit bills using
ECE Audit 48,
which compares
actuals versus
budget
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
Budget audit
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
Importing a Budget
Begin by creating a Budget using the
Budget Wizard
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
This creates a placeholder for each
account in the database
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
Then export your budget
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
Ensure your design follows the import
format specified in the Online
Help Manual
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
Then edit your budget
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
Finally import your budget
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com
Questions
Visit the Ace Place to learn more!
©2013 EnergyCAP, Inc. @energycap www.EnergyCAP.com

Creating and Reporting on Budgets in EnergyCAP

Editor's Notes

  • #2 Tell them what to listen for
  • #7 EMPHASIZE COMPARISON OF ACTUALS AND CHECKING IS BUDGET REALISTIC
  • #9 Emphasize that Whatever usage method you use. It ALWAYS uses todays cost.
  • #10 Selecting Budget Year –first select “Master Budget”change the yearunselect “Master Budget”
  • #13 Budget Data is $$$Forecast is Usage , Kwh, CCF, MCF, Gal, etcUnit Cost is $$/KWh
  • #14 Budget Data is $$$Forecast is Usage , Kwh, CCF, MCF, Gal, etcUnit Cost is $$/KWh
  • #15 Budget Data is $$$Forecast is Usage , Kwh, CCF, MCF, Gal, etcUnit Cost is $$/KWh
  • #23 EMPHASIZE THE SELECTION DRIVES WHAT I AM EDITINGEMPHASIZE THE CONTROL SELECTING A METER GIVES
  • #24 SLOW DOWN – WARN OF COMPLEXITY – EXPLAIN ITERATION – GIVE LOTS OF EXAMPLES
  • #25 Talk about the various combinations and the effects.Make 1 change, save and look at the results.Ex. Change use by 5%, then unit cost by 10%
  • #31 MENTION SAMPLE REPORT VIEWER
  • #34 EMPHASIZE THAT AUDIT 48 IS ONE OF THE 52 ECE AUDITS
  • #36 Why Import a Budget?Import data from your existing ERP system
  • #37 COUNTERINTUITIVE – WARNING OF COMPLEXITY - GOAL
  • #40 Budget Data must be Meter-by-Meter, Month-by-MonthYou can add extra fields to help match up your data, but they must be deleted before importing.
  • #43 Since there’s still time, lets look at modifying an actual budget in EnergyCAP.Open the DEMO database to edit and revise.