SlideShare a Scribd company logo
Create Your End User Adoption
Strategy
Erica Toelle
Portals & Content Manager
1. What is End User Adoption?
2. How to Actually Drive End User Adoption
Agenda
2
What is End User Adoption?
3
Benefits of OCM
4
Benefits of OCM
5
A systematic process that mitigates risks and leverages
change as a resource for project success
An actionable, process-driven effort with work streams
of activities and tasks
Has templates, forms, checklists and quality
measurements that drive the OCM process
What is OCM?
6
The Change Curve
7
Individual Change
Valley of
Despair
How people feel
Endings Transitions New Beginnings
Phases of Transition
The Kubler-Ross Change Curve
MoraleandCompetence
Time
Shock
Denial
Frustration
Depression
Experiment
Decision
Integration
8
Time
LevelofChangeEffortAdoption/Ownership occurs over time & with increasing effort
Awareness
Awareness: Sponsors, Stakeholders, and End Users are aware of the
project objectives, activities, and timeline.
Shared
Understanding Shared Understanding: Sponsors, Stakeholders, and End Users
understand the project and how the change it will impact them.
Shared Commitment Shared Commitment: Sponsors, Stakeholders, and End
Users agree with the objectives of the project and express
their support for the change.
Adoption / Ownership
Adoption/Ownership: Sponsors, Stakeholders,
and End Users demonstrate their commitment
to the change initiative. They feel responsible
and accountable for the project’s success.
OCM Project Workstreams
9
Stakeholder
Understanding
Communication
Training
Gain understanding and agreement from leadership and those
affected that the change is in their best interest. Have them follow
through on calls to action.
Support with the
Right Roles
Define how job descriptions change once the project is implemented.
This includes how the solution will be maintained and what training is
needed for whom.
Use existing communication channels to get the right message to the
right people at the right time.
Plan training on specific solutions and processes. Use a variety of
methods and timing.
OCM Work Stream Activities
10
Define Design Build Launch Operate
Organizational
Culture
Assessment
Change
Magnitude
Assessment
Leadership &
Stakeholder
Assessment
Communication
Plan
Training Plan
Stakeholder Meetings
Manage
Resistance to
Change
Operations Plan
Ongoing Training
Create Training
Execute Training
Execute Communication Plan
Change
Champion
Interviews
Change Champion Execution
Change Inventory
and Role
Mapping
Support with
the Right Roles
Stakeholder
Understanding
Communication
Training
Leadership &
Stakeholder
Strategy
1. Run a change champion program
2. Strategically manage your stakeholders
3. Use the stakeholders and information from the
change champions to customize the training and
communications plan to the organization
How to Drive End User Adoption
11
Use for:
• Having a “go-to” person in each stakeholder group
• Owner level commitment to the change
• First place to ask questions
• Helps to identify and manage resistance to change
What it is:
• A person who is selected as a change champion
• Also known as a super user, power user, etc.
Change Champion Overview
12
• Be well networked within the organization and respected by peers
• Want to improve the organization
• Have the courage to speak up for what they believe in
• Be seen as ‘go to’ people and opinion makers
• Have a broad understanding of the organization and how it works
• Be able to translate the overall change vision into local 'what’s in it for me' scenarios
• Feel passionate about the change while being empathetic to the mindset and
behavior shift their colleagues will need to go through
• 'Tuned in' to the mood of the area they are in and able to pick up on resistance to
the change, lack of understanding of the change journey and communication gaps
between the business and the program
Change Champion Characteristics
13
Change Champion Program
14
Define Design Build Launch Operate
• Conduct interviews
with change
champions
• Ask how they define
the business problem
• Ask about how they
would solve the
problem
• Ask what success
would look like
• Ask about perceived
blockers
• Have champions
review wireframes,
prototypes, proof of
concepts, etc.
• Ask them to help
identify stakeholders
• Involve them in
creating the
communications and
training plans
• Think of them as a
sort of “steering
committee”
• Participate in key
sprint reviews; ask for
feedback as solution
is developed
• Help to “localize”
communications and
training materials to
their department
• Provide input to
launch plan
• Identify resistance to
change and help to
mitigate
• Answer questions
about the project
• Help to deliver
training and
communications as
appropriate
• Participate in
operations as
appropriate
Stakeholder Management Overview
15
Define Design Build Launch Operate
• Inventory
stakeholders
• Understand their
current level of
commitment to the
project
• Determine the
desired level of future
commitment to the
project
• Develop strategy for
how you will move
stakeholders from
current level of
commitment to the
project to the future
level
• Conduct stakeholder
kick off meetings
• Continue to engage
the stakeholders
according to your
plan
• Ask them to review
training and
communications plan
• Identify resistance to
change and help to
mitigate
• Answer questions
about the project
• Help to deliver
communications as
appropriate
• Participate in
operations as
appropriate
16 Time
LevelofChangeEffortAdoption/Ownership occurs over time & with increasing effort
Awareness
Awareness: Sponsors, Stakeholders, and End Users are aware of the
project objectives, activities, and timeline.
Shared
Understanding Shared Understanding: Sponsors, Stakeholders, and End Users
understand the project and how the change it will impact them.
Shared Commitment Shared Commitment: Sponsors, Stakeholders, and End
Users agree with the objectives of the project and express
their support for the change.
Adoption / Ownership
Adoption/Ownership: Sponsors, Stakeholders,
and End Users demonstrate their commitment
to the change initiative. They feel responsible
and accountable for the project’s success.
Use for:
• Understanding who is impacted by the change
• Understanding the current and future levels of commitment
What it is:
• A way for the OCM resources and project team to accomplish the to-be
state in a structured manner
• The basis of the communications plan
Stakeholder Inventory
17
Stakeholder Inventory
18
Individuals or
Groups
Impact
Current
Commitment
Level
Future
Commitment Level
Project
Risk
Stakeholder
Group Name
Senior Executive High Awareness
Shared
Commitment
High
Sales Managers Medium Unaware Awareness Low
Finance
Workflow users
High Unaware Ownership Medium
Legend:
Impact on Project – High, Medium, Low
Current Commitment Level – Unaware, Awareness, Shared Understanding, Shared
Commitment, Ownership
Future Commitment Level – Unaware, Awareness, Shared Understanding, Shared
Commitment, Ownership
Project Risk – Risk if they don’t reach commitment level: High, Medium, Low
Use for:
• Creating awareness, buy-in and / or ownership among project
stakeholders (depending on desired outcome)
• Clearly communicating project information and asks
• Provides an opportunity for two way communication
What it is:
• A meeting or series of in person meetings
Stakeholder Kick off Meeting
19
Agenda:
1. Review project objectives
• Gain agreement with stakeholder
2. Review project timeline
3. Explain expected impact to their group / employees
4. Asks / Feedback
• Make sure they understand their importance to making the change
happen
• Ask for their participation in the stakeholder strategy
Example Kick off Meeting Agenda
20
Example Stakeholder Asks
Awareness Shared
Understanding
Buy-In Ownership
Knowledge of project and objectives X
Stakeholder Agrees with project objectives X
An understanding of how the change will impact their group X
Awareness of groups policies to which you must adhere X
Knowledge of existing processes that will be impacted X
Introduction to other stakeholders you may have missed X
Knowledge of competing initiatives and “busy times” X
Knowledge of preferred communication channels X
Identification of change champions X X
Awareness of existing materials that can be leveraged by the
project
X
Contribution of resources, budget, etc. X
Stakeholder agrees to send project communications X
Use for:
• Creating shared understanding with the team about who we are telling
what, when, how, and why
• Informing stakeholders about how you will communicate with them
going forward & what they can expect
• Execution of the communications plan should create shared
understanding & commitment with stakeholders
What it is:
• The master plan of who you are telling what
• Consists of a communication plan and channel plan
Communications Plan
22
Communications Plan
23
Audience
Sub
Audience
Channel Frequency Purpose
Content
Developer
Sender
Finance
Managers
Status call and email
recap
Weekly
Discuss key accomplishments, upcoming
milestones, issues / risks, and action
items.
John Doe Jane Doe
CFO Update Monthly
Provide credibility to the project and
create awareness and shared
understanding through updates.
John Doe Jane Doe
Leadership Monthly
Calls
Monthly
Continually evangelize work and
highlight project “wins”.
John Doe Jane Doe
End Users Web Portal Weekly Updates
Update on project efforts with links to
supporting detail.
John Doe Jane Doe
Sales
Account
Managers
Status call
And email recap
Weekly
Discuss key accomplishments, upcoming
milestones, issues / risks, and action
items.
John Doe Jane Doe
Account
segmentation and
pipeline meeting
Weekly
Provide visibility into the business impact
of the project. Ask questions as
necessary.
John Doe Jane Doe
Account
Team
Weekly Account
Wins Newsletter
Will submit content
on a bi-weekly
basis
The role-targeted newsletter will
aggregate many messages currently sent
through email and other newsletters
John Doe Jane Doe
Web Portal Weekly Updates
Update on project efforts with links to
supporting detail.
John Doe Jane Doe
Communication Channel List
24
Weekly Newsletter Web Portal
Audience Content should be directed to weekly newsletter if it is actionable,
timely, and helps the field meet revenue goals or other
commitments.
This is the primary source for all non-actionable messages for the field.
Product updates, contests, and other kinds of useful information.
Content The content is organized by role groups and sent via email as
an imbedded XML document. Based on user-profile, employee
receives weekly newsletter that includes broad information as
well as specific content segmented by role.
weekly newsletter articles should be actionable, clearly stating
what the reader should do and what benefit the action has for
the reader.
Articles may be up to 1,500 characters and must be submitted
in the form of a plain text file (.txt).
ThePortal offers broad information, as well as role-targeted
information.
You may submit content at any time, either as an update to a page
that already exists or you may request a new page be created.
After reviewing: the managing editor or community owners determine
that the content you submitted should be displayed differently than
you indicated on your original submission, you will be notified via
email of those changes prior to the content being published.
Deadline for
submission
Content must be submitted by end of day Wednesday to be
included in the following Monday publication.
N/A
Location of
submission
Web-based form is at the following link: Click here to complete
form
Email content to:
email@email.com
Cadence Weekly On as needed basis: generally expect a 24-48 hour turnaround time to
publication
Review Process Review and editing process conducted by the communication
team and the community owners.
All portal content submissions will go through a review process
conducted by the communication team and the community owners.
Who Owns Communication team:
Specific name
Communication team:
Specific name
 Use preferred senders to deliver the communication
 Use multiple voices and channels to communicate
 Honesty is the only policy
 Communicate clearly and predictably
 Answer “why is this change happening” and “what is the risk of not changing”
 Answer “What’s in it for me”
 Don’t have communications come from the project team or project leaders
 Use face to face communication
 Repeat key messages 5-7 times
 Create opportunities for two way communication
 Evaluate the effectiveness of your communications
Communications Checklist
25
Use for:
• Providing the knowledge stakeholders and users will need to obtain
buy-in or ownership level of adoption
What it is:
• The master plan of what training will be provided, by role and
stakeholder group
Training Plan
26
Training Options
27 Cost
SizeofAudience
1:1 Training
Office.com
Materials
Fast Track
Materials
Classroom
Training
Videos
Customized for
Solution
In-Context
Training Tools
Webinars
Quick Start
Guides
Written
Instructions
Communications Plan
28
Audience Sub Audience Training Method Frequency
Finance
Managers
1:1 training One time
In-context training Ongoing
End Users In-context training Ongoing
Sales
Account Managers
Custom Video Ongoing
Classroom training One time
Account
Team
Quick start guides Ongoing
Webinar Offered weekly for four weeks
1. Run a change champion program
2. Strategically manage your stakeholders
3. Use the stakeholders and information from the
change champions to customize the training and
communications plan to the organization
How to Drive End User Adoption
29
Erica Toelle
me@ericatoelle.com
http://ericatoelle.com
THANK YOU!!
30

More Related Content

What's hot

Management Consulting Toolkit - Framework, Best Practices and Templates
Management Consulting Toolkit - Framework, Best Practices and TemplatesManagement Consulting Toolkit - Framework, Best Practices and Templates
Management Consulting Toolkit - Framework, Best Practices and Templates
Aurelien Domont, MBA
 
Business Process Management Training | By ex-Deloitte & McKinsey Consultants
Business Process Management Training | By ex-Deloitte & McKinsey ConsultantsBusiness Process Management Training | By ex-Deloitte & McKinsey Consultants
Business Process Management Training | By ex-Deloitte & McKinsey Consultants
Aurelien Domont, MBA
 
Digital Transformation Strategy Template and Training
Digital Transformation Strategy Template and TrainingDigital Transformation Strategy Template and Training
Digital Transformation Strategy Template and Training
Aurelien Domont, MBA
 
Agile Portfolio Management Framework With Demand Management
Agile Portfolio Management Framework With Demand ManagementAgile Portfolio Management Framework With Demand Management
Agile Portfolio Management Framework With Demand Management
SlideTeam
 
Methods of Organizational Change Management
Methods of Organizational Change ManagementMethods of Organizational Change Management
Methods of Organizational Change Management
DATAVERSITY
 
Complete Business Frameworks Reference Guide
Complete Business Frameworks Reference GuideComplete Business Frameworks Reference Guide
Complete Business Frameworks Reference Guide
Flevy.com Best Practices
 
Customer Success Model PowerPoint Presentation Slides
Customer Success Model PowerPoint Presentation Slides Customer Success Model PowerPoint Presentation Slides
Customer Success Model PowerPoint Presentation Slides
SlideTeam
 
Post Merger Integration Toolkit - Framework, Best Practices and Templates
Post Merger Integration Toolkit - Framework, Best Practices and TemplatesPost Merger Integration Toolkit - Framework, Best Practices and Templates
Post Merger Integration Toolkit - Framework, Best Practices and Templates
Aurelien Domont, MBA
 
Corporate and Business Strategy Toolkit
Corporate and Business Strategy ToolkitCorporate and Business Strategy Toolkit
Corporate and Business Strategy Toolkit
Aurelien Domont, MBA
 
Change Management Toolkit including Models, Plans, Frameworks & Tools
Change Management Toolkit including Models, Plans, Frameworks & ToolsChange Management Toolkit including Models, Plans, Frameworks & Tools
Change Management Toolkit including Models, Plans, Frameworks & Tools
Aurelien Domont, MBA
 
Change Management Strategy
Change Management StrategyChange Management Strategy
Change Management Strategy
kudospower
 
Core Capabilities Of RPA Center Of Excellence Operating Framework
Core Capabilities Of RPA Center Of Excellence Operating FrameworkCore Capabilities Of RPA Center Of Excellence Operating Framework
Core Capabilities Of RPA Center Of Excellence Operating Framework
SlideTeam
 
IT Service Delivery Model Overview
IT Service Delivery Model OverviewIT Service Delivery Model Overview
IT Service Delivery Model Overview
Mark Peacock
 
Project Management Toolkit: Frameworks, Tools & Templates
Project Management Toolkit: Frameworks, Tools & TemplatesProject Management Toolkit: Frameworks, Tools & Templates
Project Management Toolkit: Frameworks, Tools & Templates
Aurelien Domont, MBA
 
Change and Project Management Toolkit - Framework, Best Practices and Templates
Change and Project Management Toolkit - Framework, Best Practices and TemplatesChange and Project Management Toolkit - Framework, Best Practices and Templates
Change and Project Management Toolkit - Framework, Best Practices and Templates
Aurelien Domont, MBA
 
Management Consultant Toolkit in powerpoint & Excel
Management Consultant Toolkit in powerpoint & ExcelManagement Consultant Toolkit in powerpoint & Excel
Management Consultant Toolkit in powerpoint & Excel
Aurelien Domont, MBA
 
Organizational Change Management for IT Projects
Organizational Change Management for IT ProjectsOrganizational Change Management for IT Projects
Organizational Change Management for IT Projects
David Solis
 
From Business model to Capability Map
From Business model to Capability Map From Business model to Capability Map
From Business model to Capability Map
COMPETENSIS
 
Digital Transformation Toolkit - Framework, Best Practices and Templates
Digital Transformation Toolkit - Framework, Best Practices and TemplatesDigital Transformation Toolkit - Framework, Best Practices and Templates
Digital Transformation Toolkit - Framework, Best Practices and Templates
Aurelien Domont, MBA
 
Enterprise Learning Reimagined
Enterprise Learning ReimaginedEnterprise Learning Reimagined
Enterprise Learning Reimagined
Workday, Inc.
 

What's hot (20)

Management Consulting Toolkit - Framework, Best Practices and Templates
Management Consulting Toolkit - Framework, Best Practices and TemplatesManagement Consulting Toolkit - Framework, Best Practices and Templates
Management Consulting Toolkit - Framework, Best Practices and Templates
 
Business Process Management Training | By ex-Deloitte & McKinsey Consultants
Business Process Management Training | By ex-Deloitte & McKinsey ConsultantsBusiness Process Management Training | By ex-Deloitte & McKinsey Consultants
Business Process Management Training | By ex-Deloitte & McKinsey Consultants
 
Digital Transformation Strategy Template and Training
Digital Transformation Strategy Template and TrainingDigital Transformation Strategy Template and Training
Digital Transformation Strategy Template and Training
 
Agile Portfolio Management Framework With Demand Management
Agile Portfolio Management Framework With Demand ManagementAgile Portfolio Management Framework With Demand Management
Agile Portfolio Management Framework With Demand Management
 
Methods of Organizational Change Management
Methods of Organizational Change ManagementMethods of Organizational Change Management
Methods of Organizational Change Management
 
Complete Business Frameworks Reference Guide
Complete Business Frameworks Reference GuideComplete Business Frameworks Reference Guide
Complete Business Frameworks Reference Guide
 
Customer Success Model PowerPoint Presentation Slides
Customer Success Model PowerPoint Presentation Slides Customer Success Model PowerPoint Presentation Slides
Customer Success Model PowerPoint Presentation Slides
 
Post Merger Integration Toolkit - Framework, Best Practices and Templates
Post Merger Integration Toolkit - Framework, Best Practices and TemplatesPost Merger Integration Toolkit - Framework, Best Practices and Templates
Post Merger Integration Toolkit - Framework, Best Practices and Templates
 
Corporate and Business Strategy Toolkit
Corporate and Business Strategy ToolkitCorporate and Business Strategy Toolkit
Corporate and Business Strategy Toolkit
 
Change Management Toolkit including Models, Plans, Frameworks & Tools
Change Management Toolkit including Models, Plans, Frameworks & ToolsChange Management Toolkit including Models, Plans, Frameworks & Tools
Change Management Toolkit including Models, Plans, Frameworks & Tools
 
Change Management Strategy
Change Management StrategyChange Management Strategy
Change Management Strategy
 
Core Capabilities Of RPA Center Of Excellence Operating Framework
Core Capabilities Of RPA Center Of Excellence Operating FrameworkCore Capabilities Of RPA Center Of Excellence Operating Framework
Core Capabilities Of RPA Center Of Excellence Operating Framework
 
IT Service Delivery Model Overview
IT Service Delivery Model OverviewIT Service Delivery Model Overview
IT Service Delivery Model Overview
 
Project Management Toolkit: Frameworks, Tools & Templates
Project Management Toolkit: Frameworks, Tools & TemplatesProject Management Toolkit: Frameworks, Tools & Templates
Project Management Toolkit: Frameworks, Tools & Templates
 
Change and Project Management Toolkit - Framework, Best Practices and Templates
Change and Project Management Toolkit - Framework, Best Practices and TemplatesChange and Project Management Toolkit - Framework, Best Practices and Templates
Change and Project Management Toolkit - Framework, Best Practices and Templates
 
Management Consultant Toolkit in powerpoint & Excel
Management Consultant Toolkit in powerpoint & ExcelManagement Consultant Toolkit in powerpoint & Excel
Management Consultant Toolkit in powerpoint & Excel
 
Organizational Change Management for IT Projects
Organizational Change Management for IT ProjectsOrganizational Change Management for IT Projects
Organizational Change Management for IT Projects
 
From Business model to Capability Map
From Business model to Capability Map From Business model to Capability Map
From Business model to Capability Map
 
Digital Transformation Toolkit - Framework, Best Practices and Templates
Digital Transformation Toolkit - Framework, Best Practices and TemplatesDigital Transformation Toolkit - Framework, Best Practices and Templates
Digital Transformation Toolkit - Framework, Best Practices and Templates
 
Enterprise Learning Reimagined
Enterprise Learning ReimaginedEnterprise Learning Reimagined
Enterprise Learning Reimagined
 

Similar to Create Your End User Adoption Strategy

Organizational change management
Organizational change managementOrganizational change management
Organizational change management
Hany Sewilam Abdel Hamid
 
Stakeholder Communication
Stakeholder CommunicationStakeholder Communication
Stakeholder Communication
Anand Subramaniam
 
Project Stakeholder Engagement
Project Stakeholder EngagementProject Stakeholder Engagement
Project Stakeholder Engagement
Mark Ritchie
 
Overview of Role of Sponsor in Change
Overview of Role of Sponsor in ChangeOverview of Role of Sponsor in Change
Overview of Role of Sponsor in ChangeRadhia Benalia
 
Org change communications strategy & tips
Org change communications strategy & tipsOrg change communications strategy & tips
Org change communications strategy & tips
Lsteblay
 
Project ECHO QI: Managing Up - Enhancing Your Relationship with Leaders
Project ECHO QI: Managing Up - Enhancing Your Relationship with LeadersProject ECHO QI: Managing Up - Enhancing Your Relationship with Leaders
Project ECHO QI: Managing Up - Enhancing Your Relationship with Leaders
CHC Connecticut
 
Managing stakeholders as critical success factor in operational excellence
Managing stakeholders as critical success factor in operational excellenceManaging stakeholders as critical success factor in operational excellence
Managing stakeholders as critical success factor in operational excellence
The Jamilah H
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
Danielle Logan
 
Stakeholder management in a matrix organisation - 25th August 2015
Stakeholder management in a matrix organisation - 25th August 2015Stakeholder management in a matrix organisation - 25th August 2015
Stakeholder management in a matrix organisation - 25th August 2015
Association for Project Management
 
ISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectationsISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectationsMichael Punzo
 
ISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectationsISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectationsMichael Punzo
 
1 eqs higheqleadereffectivese_2
1 eqs higheqleadereffectivese_21 eqs higheqleadereffectivese_2
1 eqs higheqleadereffectivese_2
Sudhir Singh
 
Create an End User Adoption Strategy
Create an End User Adoption StrategyCreate an End User Adoption Strategy
Create an End User Adoption Strategy
SPC Adriatics
 
How to successfully deliver business change
How to successfully deliver business changeHow to successfully deliver business change
How to successfully deliver business change
Association for Project Management
 
Royal Mail: Are sponsors 'for Christmas' or 'for life'?, 15 May 2018
Royal Mail: Are sponsors 'for Christmas' or 'for life'?, 15 May 2018Royal Mail: Are sponsors 'for Christmas' or 'for life'?, 15 May 2018
Royal Mail: Are sponsors 'for Christmas' or 'for life'?, 15 May 2018
Association for Project Management
 
thechangeaccelerationprocess-140215034525-phpapp01.pptx
thechangeaccelerationprocess-140215034525-phpapp01.pptxthechangeaccelerationprocess-140215034525-phpapp01.pptx
thechangeaccelerationprocess-140215034525-phpapp01.pptx
SamuelLee440194
 
10. Stakeholder Management
10. Stakeholder Management10. Stakeholder Management
10. Stakeholder Management
Sanjay Rajpoot
 
Stakeholder Managment - Presentation.pptx
Stakeholder Managment - Presentation.pptxStakeholder Managment - Presentation.pptx
Stakeholder Managment - Presentation.pptx
UmairZaman13
 
1113 PPT.pptx
1113 PPT.pptx1113 PPT.pptx
1113 PPT.pptx
AVNEETSingh40794
 

Similar to Create Your End User Adoption Strategy (20)

Organizational change management
Organizational change managementOrganizational change management
Organizational change management
 
Stakeholder Communication
Stakeholder CommunicationStakeholder Communication
Stakeholder Communication
 
Project Stakeholder Engagement
Project Stakeholder EngagementProject Stakeholder Engagement
Project Stakeholder Engagement
 
Overview of Role of Sponsor in Change
Overview of Role of Sponsor in ChangeOverview of Role of Sponsor in Change
Overview of Role of Sponsor in Change
 
Org change communications strategy & tips
Org change communications strategy & tipsOrg change communications strategy & tips
Org change communications strategy & tips
 
Project ECHO QI: Managing Up - Enhancing Your Relationship with Leaders
Project ECHO QI: Managing Up - Enhancing Your Relationship with LeadersProject ECHO QI: Managing Up - Enhancing Your Relationship with Leaders
Project ECHO QI: Managing Up - Enhancing Your Relationship with Leaders
 
Managing stakeholders as critical success factor in operational excellence
Managing stakeholders as critical success factor in operational excellenceManaging stakeholders as critical success factor in operational excellence
Managing stakeholders as critical success factor in operational excellence
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
Stakeholder management in a matrix organisation - 25th August 2015
Stakeholder management in a matrix organisation - 25th August 2015Stakeholder management in a matrix organisation - 25th August 2015
Stakeholder management in a matrix organisation - 25th August 2015
 
ISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectationsISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectations
 
ISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectationsISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectations
 
1 eqs higheqleadereffectivese_2
1 eqs higheqleadereffectivese_21 eqs higheqleadereffectivese_2
1 eqs higheqleadereffectivese_2
 
Create an End User Adoption Strategy
Create an End User Adoption StrategyCreate an End User Adoption Strategy
Create an End User Adoption Strategy
 
How to successfully deliver business change
How to successfully deliver business changeHow to successfully deliver business change
How to successfully deliver business change
 
Royal Mail: Are sponsors 'for Christmas' or 'for life'?, 15 May 2018
Royal Mail: Are sponsors 'for Christmas' or 'for life'?, 15 May 2018Royal Mail: Are sponsors 'for Christmas' or 'for life'?, 15 May 2018
Royal Mail: Are sponsors 'for Christmas' or 'for life'?, 15 May 2018
 
thechangeaccelerationprocess-140215034525-phpapp01.pptx
thechangeaccelerationprocess-140215034525-phpapp01.pptxthechangeaccelerationprocess-140215034525-phpapp01.pptx
thechangeaccelerationprocess-140215034525-phpapp01.pptx
 
10. Stakeholder Management
10. Stakeholder Management10. Stakeholder Management
10. Stakeholder Management
 
Stakeholder Managment - Presentation.pptx
Stakeholder Managment - Presentation.pptxStakeholder Managment - Presentation.pptx
Stakeholder Managment - Presentation.pptx
 
1113 PPT.pptx
1113 PPT.pptx1113 PPT.pptx
1113 PPT.pptx
 
The Other Side of Project Management
The Other Side of Project ManagementThe Other Side of Project Management
The Other Side of Project Management
 

More from Erica Toelle

The SharePoint Records Management Story
The SharePoint Records Management StoryThe SharePoint Records Management Story
The SharePoint Records Management Story
Erica Toelle
 
Create a Compliance Strategy for Office 365
Create a Compliance Strategy for Office 365Create a Compliance Strategy for Office 365
Create a Compliance Strategy for Office 365
Erica Toelle
 
Understanding Compliance in Office 365
Understanding Compliance in Office 365Understanding Compliance in Office 365
Understanding Compliance in Office 365
Erica Toelle
 
Create Your End User Adoption Strategy - Office 365 Edition
Create Your End User Adoption Strategy - Office 365 EditionCreate Your End User Adoption Strategy - Office 365 Edition
Create Your End User Adoption Strategy - Office 365 Edition
Erica Toelle
 
High Value Scenarios for Microsoft Teams
High Value Scenarios for Microsoft TeamsHigh Value Scenarios for Microsoft Teams
High Value Scenarios for Microsoft Teams
Erica Toelle
 
Plan to Migrate to SharePoint Online
Plan to Migrate to SharePoint OnlinePlan to Migrate to SharePoint Online
Plan to Migrate to SharePoint Online
Erica Toelle
 
OneDrive for Business: Much More Than a File Share
OneDrive for Business: Much More Than a File ShareOneDrive for Business: Much More Than a File Share
OneDrive for Business: Much More Than a File Share
Erica Toelle
 
SharePoint Business Governance
SharePoint Business GovernanceSharePoint Business Governance
SharePoint Business GovernanceErica Toelle
 
Design a SharePoint Program for Ongoing Operational Excellence
Design a SharePoint Program for Ongoing Operational ExcellenceDesign a SharePoint Program for Ongoing Operational Excellence
Design a SharePoint Program for Ongoing Operational ExcellenceErica Toelle
 

More from Erica Toelle (9)

The SharePoint Records Management Story
The SharePoint Records Management StoryThe SharePoint Records Management Story
The SharePoint Records Management Story
 
Create a Compliance Strategy for Office 365
Create a Compliance Strategy for Office 365Create a Compliance Strategy for Office 365
Create a Compliance Strategy for Office 365
 
Understanding Compliance in Office 365
Understanding Compliance in Office 365Understanding Compliance in Office 365
Understanding Compliance in Office 365
 
Create Your End User Adoption Strategy - Office 365 Edition
Create Your End User Adoption Strategy - Office 365 EditionCreate Your End User Adoption Strategy - Office 365 Edition
Create Your End User Adoption Strategy - Office 365 Edition
 
High Value Scenarios for Microsoft Teams
High Value Scenarios for Microsoft TeamsHigh Value Scenarios for Microsoft Teams
High Value Scenarios for Microsoft Teams
 
Plan to Migrate to SharePoint Online
Plan to Migrate to SharePoint OnlinePlan to Migrate to SharePoint Online
Plan to Migrate to SharePoint Online
 
OneDrive for Business: Much More Than a File Share
OneDrive for Business: Much More Than a File ShareOneDrive for Business: Much More Than a File Share
OneDrive for Business: Much More Than a File Share
 
SharePoint Business Governance
SharePoint Business GovernanceSharePoint Business Governance
SharePoint Business Governance
 
Design a SharePoint Program for Ongoing Operational Excellence
Design a SharePoint Program for Ongoing Operational ExcellenceDesign a SharePoint Program for Ongoing Operational Excellence
Design a SharePoint Program for Ongoing Operational Excellence
 

Recently uploaded

Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
ThousandEyes
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
Paul Groth
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Jeffrey Haguewood
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
Product School
 
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
Prayukth K V
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
Laura Byrne
 
Search and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical FuturesSearch and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical Futures
Bhaskar Mitra
 
UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
DianaGray10
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
Cheryl Hung
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
DanBrown980551
 
Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........
Alison B. Lowndes
 
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Product School
 
ODC, Data Fabric and Architecture User Group
ODC, Data Fabric and Architecture User GroupODC, Data Fabric and Architecture User Group
ODC, Data Fabric and Architecture User Group
CatarinaPereira64715
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Product School
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
Elena Simperl
 
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Product School
 
"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi
Fwdays
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
91mobiles
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
Safe Software
 

Recently uploaded (20)

Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
 
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
 
Search and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical FuturesSearch and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical Futures
 
UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
 
Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........
 
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...
 
ODC, Data Fabric and Architecture User Group
ODC, Data Fabric and Architecture User GroupODC, Data Fabric and Architecture User Group
ODC, Data Fabric and Architecture User Group
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
 
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
 
"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
 

Create Your End User Adoption Strategy

  • 1. Create Your End User Adoption Strategy Erica Toelle Portals & Content Manager
  • 2. 1. What is End User Adoption? 2. How to Actually Drive End User Adoption Agenda 2
  • 3. What is End User Adoption? 3
  • 6. A systematic process that mitigates risks and leverages change as a resource for project success An actionable, process-driven effort with work streams of activities and tasks Has templates, forms, checklists and quality measurements that drive the OCM process What is OCM? 6
  • 7. The Change Curve 7 Individual Change Valley of Despair How people feel Endings Transitions New Beginnings Phases of Transition The Kubler-Ross Change Curve MoraleandCompetence Time Shock Denial Frustration Depression Experiment Decision Integration
  • 8. 8 Time LevelofChangeEffortAdoption/Ownership occurs over time & with increasing effort Awareness Awareness: Sponsors, Stakeholders, and End Users are aware of the project objectives, activities, and timeline. Shared Understanding Shared Understanding: Sponsors, Stakeholders, and End Users understand the project and how the change it will impact them. Shared Commitment Shared Commitment: Sponsors, Stakeholders, and End Users agree with the objectives of the project and express their support for the change. Adoption / Ownership Adoption/Ownership: Sponsors, Stakeholders, and End Users demonstrate their commitment to the change initiative. They feel responsible and accountable for the project’s success.
  • 9. OCM Project Workstreams 9 Stakeholder Understanding Communication Training Gain understanding and agreement from leadership and those affected that the change is in their best interest. Have them follow through on calls to action. Support with the Right Roles Define how job descriptions change once the project is implemented. This includes how the solution will be maintained and what training is needed for whom. Use existing communication channels to get the right message to the right people at the right time. Plan training on specific solutions and processes. Use a variety of methods and timing.
  • 10. OCM Work Stream Activities 10 Define Design Build Launch Operate Organizational Culture Assessment Change Magnitude Assessment Leadership & Stakeholder Assessment Communication Plan Training Plan Stakeholder Meetings Manage Resistance to Change Operations Plan Ongoing Training Create Training Execute Training Execute Communication Plan Change Champion Interviews Change Champion Execution Change Inventory and Role Mapping Support with the Right Roles Stakeholder Understanding Communication Training Leadership & Stakeholder Strategy
  • 11. 1. Run a change champion program 2. Strategically manage your stakeholders 3. Use the stakeholders and information from the change champions to customize the training and communications plan to the organization How to Drive End User Adoption 11
  • 12. Use for: • Having a “go-to” person in each stakeholder group • Owner level commitment to the change • First place to ask questions • Helps to identify and manage resistance to change What it is: • A person who is selected as a change champion • Also known as a super user, power user, etc. Change Champion Overview 12
  • 13. • Be well networked within the organization and respected by peers • Want to improve the organization • Have the courage to speak up for what they believe in • Be seen as ‘go to’ people and opinion makers • Have a broad understanding of the organization and how it works • Be able to translate the overall change vision into local 'what’s in it for me' scenarios • Feel passionate about the change while being empathetic to the mindset and behavior shift their colleagues will need to go through • 'Tuned in' to the mood of the area they are in and able to pick up on resistance to the change, lack of understanding of the change journey and communication gaps between the business and the program Change Champion Characteristics 13
  • 14. Change Champion Program 14 Define Design Build Launch Operate • Conduct interviews with change champions • Ask how they define the business problem • Ask about how they would solve the problem • Ask what success would look like • Ask about perceived blockers • Have champions review wireframes, prototypes, proof of concepts, etc. • Ask them to help identify stakeholders • Involve them in creating the communications and training plans • Think of them as a sort of “steering committee” • Participate in key sprint reviews; ask for feedback as solution is developed • Help to “localize” communications and training materials to their department • Provide input to launch plan • Identify resistance to change and help to mitigate • Answer questions about the project • Help to deliver training and communications as appropriate • Participate in operations as appropriate
  • 15. Stakeholder Management Overview 15 Define Design Build Launch Operate • Inventory stakeholders • Understand their current level of commitment to the project • Determine the desired level of future commitment to the project • Develop strategy for how you will move stakeholders from current level of commitment to the project to the future level • Conduct stakeholder kick off meetings • Continue to engage the stakeholders according to your plan • Ask them to review training and communications plan • Identify resistance to change and help to mitigate • Answer questions about the project • Help to deliver communications as appropriate • Participate in operations as appropriate
  • 16. 16 Time LevelofChangeEffortAdoption/Ownership occurs over time & with increasing effort Awareness Awareness: Sponsors, Stakeholders, and End Users are aware of the project objectives, activities, and timeline. Shared Understanding Shared Understanding: Sponsors, Stakeholders, and End Users understand the project and how the change it will impact them. Shared Commitment Shared Commitment: Sponsors, Stakeholders, and End Users agree with the objectives of the project and express their support for the change. Adoption / Ownership Adoption/Ownership: Sponsors, Stakeholders, and End Users demonstrate their commitment to the change initiative. They feel responsible and accountable for the project’s success.
  • 17. Use for: • Understanding who is impacted by the change • Understanding the current and future levels of commitment What it is: • A way for the OCM resources and project team to accomplish the to-be state in a structured manner • The basis of the communications plan Stakeholder Inventory 17
  • 18. Stakeholder Inventory 18 Individuals or Groups Impact Current Commitment Level Future Commitment Level Project Risk Stakeholder Group Name Senior Executive High Awareness Shared Commitment High Sales Managers Medium Unaware Awareness Low Finance Workflow users High Unaware Ownership Medium Legend: Impact on Project – High, Medium, Low Current Commitment Level – Unaware, Awareness, Shared Understanding, Shared Commitment, Ownership Future Commitment Level – Unaware, Awareness, Shared Understanding, Shared Commitment, Ownership Project Risk – Risk if they don’t reach commitment level: High, Medium, Low
  • 19. Use for: • Creating awareness, buy-in and / or ownership among project stakeholders (depending on desired outcome) • Clearly communicating project information and asks • Provides an opportunity for two way communication What it is: • A meeting or series of in person meetings Stakeholder Kick off Meeting 19
  • 20. Agenda: 1. Review project objectives • Gain agreement with stakeholder 2. Review project timeline 3. Explain expected impact to their group / employees 4. Asks / Feedback • Make sure they understand their importance to making the change happen • Ask for their participation in the stakeholder strategy Example Kick off Meeting Agenda 20
  • 21. Example Stakeholder Asks Awareness Shared Understanding Buy-In Ownership Knowledge of project and objectives X Stakeholder Agrees with project objectives X An understanding of how the change will impact their group X Awareness of groups policies to which you must adhere X Knowledge of existing processes that will be impacted X Introduction to other stakeholders you may have missed X Knowledge of competing initiatives and “busy times” X Knowledge of preferred communication channels X Identification of change champions X X Awareness of existing materials that can be leveraged by the project X Contribution of resources, budget, etc. X Stakeholder agrees to send project communications X
  • 22. Use for: • Creating shared understanding with the team about who we are telling what, when, how, and why • Informing stakeholders about how you will communicate with them going forward & what they can expect • Execution of the communications plan should create shared understanding & commitment with stakeholders What it is: • The master plan of who you are telling what • Consists of a communication plan and channel plan Communications Plan 22
  • 23. Communications Plan 23 Audience Sub Audience Channel Frequency Purpose Content Developer Sender Finance Managers Status call and email recap Weekly Discuss key accomplishments, upcoming milestones, issues / risks, and action items. John Doe Jane Doe CFO Update Monthly Provide credibility to the project and create awareness and shared understanding through updates. John Doe Jane Doe Leadership Monthly Calls Monthly Continually evangelize work and highlight project “wins”. John Doe Jane Doe End Users Web Portal Weekly Updates Update on project efforts with links to supporting detail. John Doe Jane Doe Sales Account Managers Status call And email recap Weekly Discuss key accomplishments, upcoming milestones, issues / risks, and action items. John Doe Jane Doe Account segmentation and pipeline meeting Weekly Provide visibility into the business impact of the project. Ask questions as necessary. John Doe Jane Doe Account Team Weekly Account Wins Newsletter Will submit content on a bi-weekly basis The role-targeted newsletter will aggregate many messages currently sent through email and other newsletters John Doe Jane Doe Web Portal Weekly Updates Update on project efforts with links to supporting detail. John Doe Jane Doe
  • 24. Communication Channel List 24 Weekly Newsletter Web Portal Audience Content should be directed to weekly newsletter if it is actionable, timely, and helps the field meet revenue goals or other commitments. This is the primary source for all non-actionable messages for the field. Product updates, contests, and other kinds of useful information. Content The content is organized by role groups and sent via email as an imbedded XML document. Based on user-profile, employee receives weekly newsletter that includes broad information as well as specific content segmented by role. weekly newsletter articles should be actionable, clearly stating what the reader should do and what benefit the action has for the reader. Articles may be up to 1,500 characters and must be submitted in the form of a plain text file (.txt). ThePortal offers broad information, as well as role-targeted information. You may submit content at any time, either as an update to a page that already exists or you may request a new page be created. After reviewing: the managing editor or community owners determine that the content you submitted should be displayed differently than you indicated on your original submission, you will be notified via email of those changes prior to the content being published. Deadline for submission Content must be submitted by end of day Wednesday to be included in the following Monday publication. N/A Location of submission Web-based form is at the following link: Click here to complete form Email content to: email@email.com Cadence Weekly On as needed basis: generally expect a 24-48 hour turnaround time to publication Review Process Review and editing process conducted by the communication team and the community owners. All portal content submissions will go through a review process conducted by the communication team and the community owners. Who Owns Communication team: Specific name Communication team: Specific name
  • 25.  Use preferred senders to deliver the communication  Use multiple voices and channels to communicate  Honesty is the only policy  Communicate clearly and predictably  Answer “why is this change happening” and “what is the risk of not changing”  Answer “What’s in it for me”  Don’t have communications come from the project team or project leaders  Use face to face communication  Repeat key messages 5-7 times  Create opportunities for two way communication  Evaluate the effectiveness of your communications Communications Checklist 25
  • 26. Use for: • Providing the knowledge stakeholders and users will need to obtain buy-in or ownership level of adoption What it is: • The master plan of what training will be provided, by role and stakeholder group Training Plan 26
  • 27. Training Options 27 Cost SizeofAudience 1:1 Training Office.com Materials Fast Track Materials Classroom Training Videos Customized for Solution In-Context Training Tools Webinars Quick Start Guides Written Instructions
  • 28. Communications Plan 28 Audience Sub Audience Training Method Frequency Finance Managers 1:1 training One time In-context training Ongoing End Users In-context training Ongoing Sales Account Managers Custom Video Ongoing Classroom training One time Account Team Quick start guides Ongoing Webinar Offered weekly for four weeks
  • 29. 1. Run a change champion program 2. Strategically manage your stakeholders 3. Use the stakeholders and information from the change champions to customize the training and communications plan to the organization How to Drive End User Adoption 29