The document outlines reasons for cost overruns in a railway project from the original estimated cost to the revised estimate. Key reasons include increases in land costs due to delays and changes in land rules, increased tunnel and station lengths, the need for more bridges, additional facilities at stations, and the inclusion of new works like electrification, signaling, and mechanical works that were not originally considered. The total estimated increase listed is over 5,000 crore rupees.
ESKOM will show you how to:
Understanding what risks Eskom face when it comes to grid connection so you know if your project’s timings are structured appropriately
Discussing whether developers can absorb any of the risk to benefit both themselves and Eskom in creating a quicker and less risky connection
Hearing lessons learnt from REIPPP programme so far with reference to grid integration from Eskom and understand how you can aid a smooth connection
ESKOM will show you how to:
Understanding what risks Eskom face when it comes to grid connection so you know if your project’s timings are structured appropriately
Discussing whether developers can absorb any of the risk to benefit both themselves and Eskom in creating a quicker and less risky connection
Hearing lessons learnt from REIPPP programme so far with reference to grid integration from Eskom and understand how you can aid a smooth connection
Plan for all, build for 5G. Strategies for designing a heterogeneous fiber ne...Comsof
In this presentation we discuss the cost impact and practical implications of different deployment strategies of 5G and migration strategies to FTTH. We answer the following questions based on a case study on a reference area:
How to plan a heterogeneous network for 5G, FTTH, FTTB,...
How to build the initial 5G fiber network with support for future expansions
Crossrail - Integrated Assurance, Chris Sexton, APM Assurance Specific Interest Group, Integrated Assurance - how to achieve it real organisations conference
Performance evaluation of comprehensive bandwidth utilization for 10-gigabit ...journalBEEI
Bandwidth allocation during upstream transmission is crucial to determine the efficiency and performance of a XG-PON. For XG-PON, bandwidth assignment is done based on T-CONT which represents a traffic class as per ITU recommendation. DBA scheme used in this paper is based on CBU to assign bandwidth to ONUs based on the T-CONT supporting QoS as per SLA. In this paper, CATV traffic is used as traffic generator which used for generation of Ethernet frames and results showed expected trend of mean upstream delay for traffic class T2, T3 and T4 as compared to recommended value which is below 1.5ms. These results prove that CBU can also be implemented on real time traffic.
Plan for all, build for 5G. Strategies for designing a heterogeneous fiber ne...Comsof
In this presentation we discuss the cost impact and practical implications of different deployment strategies of 5G and migration strategies to FTTH. We answer the following questions based on a case study on a reference area:
How to plan a heterogeneous network for 5G, FTTH, FTTB,...
How to build the initial 5G fiber network with support for future expansions
Crossrail - Integrated Assurance, Chris Sexton, APM Assurance Specific Interest Group, Integrated Assurance - how to achieve it real organisations conference
Performance evaluation of comprehensive bandwidth utilization for 10-gigabit ...journalBEEI
Bandwidth allocation during upstream transmission is crucial to determine the efficiency and performance of a XG-PON. For XG-PON, bandwidth assignment is done based on T-CONT which represents a traffic class as per ITU recommendation. DBA scheme used in this paper is based on CBU to assign bandwidth to ONUs based on the T-CONT supporting QoS as per SLA. In this paper, CATV traffic is used as traffic generator which used for generation of Ethernet frames and results showed expected trend of mean upstream delay for traffic class T2, T3 and T4 as compared to recommended value which is below 1.5ms. These results prove that CBU can also be implemented on real time traffic.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
1. 1. Reasons of Cost overrun:
a) 1110- Preliminary Expenses: Due to additional requirement of GT survey, Bore logs to finalise
the location of tunnel portals and bridge piers & abutment, cost has been increased by Rs
9.98 Crs.
b) 1120- Land: Cost escalation due to delays in handing over of land by Forest Deptt. and taking
up the works of the project for about 11 years. Increase in base rate in Forest and revenue
land due to change in land rule, cost of land increased. Land for adit tunnels, approach road of
main tunnels was not considered in DE. Cost of land has increased by Rs. 414.13 Crs.
c) 1130- Structural Engineering works (Formation): In compare to DE, adit length has increased.
Due to land restriction, protection work in yard changed from DE. Due to high cutting, hillside
protection with permanent anchor with shotcrete has been considered and RE wall has been
introduced due to high filling. Due to increase in tunnel length and cavern length in Tessta
station, and price escalation, Cost has increased by Rs. 3763.76 Crs.
d) 1140- Structural Engineering works (P-way): Due the change in rail section, sleeper section
and its fitting and escalation in price, Cost has increased by Rs. 298.75 Crs. In DE, there was no
provision of BLT. Same has been considered in Re as per railway board instruction.
REASON FOR COST OVERRUN
2. e) 1150- Structural Engineering works (Bridges): After finalization of alignment, span arrangement of
bridges has changed w.r.t. DE, leading to requirement of 13 Major bridges as compared to only 2
major bridges originally. Cost of bridges has increased by Rs. 548.67 Crs.
f) 1160- Structural Engineering works (Station Building): Due to increase in no. of quarter and other
structures and considering Rangpo station as world class station and additional facilities required at
station yards as per operational requirement, cost has increased by Rs. 386.38 Crs.
g) 1180- General charges (Establishment): Due to increase in cost in above mentioned sub-head, D&G
charged has increased by Rs. 303.97 Crs.
h) 1190- General charges (other than Establishment):Due to increase in cost in above mentioned sub-
head, D&G charged has increased. Further 1% cost against Environmental related works and 0.5%
against sport development has been considered and Railway board circular which was not in DE.
Due to this cost has increased by Rs. 187.99 Crs.
i) Additional 6% of GST has been kept in RE due to change in GST rate from 12% to 18% as per Govt.
circular.
j) Escalation due to PVC @20% has been considered on the balance work.
REASON FOR COST OVERRUN (Contd..)
3. k) Provision of E&M in tunnels: As per DE, sanctioned cost for Electrical work is Rs. 90.49 Cr. In DE,
Railway Electrification work was not included. In proposed RE, revised cost is Rs. 1577.14Cr. for E&M
works and Rs.171.59 Cr. for Railway Electrification works. Proposed RE cost is Rs.1748.73 Cr. Other
than escalation, variation in this cost is Rs. 1512.67 Cr due to change in power supply arrangement,
addition of DG set, Yard Illumination, Utilities shifting work, now integrated substation is proposed for
OHE & Tunnel at Rangpo, change in nos of quarters, consideration of Tunnel ventilation for the tunnels
having length more than 4 Km or nearby 4 Km i.e. T-1, T-4,T-6,T-7, Underground Teesta Station, T-8 &
T-10, provision of scope for SCADA, firefighting and safety system in tunnel.
Railway Electrification has been included in the RE as per Railway board letter no.
2015/W1/NF/NL/Sivok-Rangpo/Pt-1 dt. 15.07.2022 .
REASON FOR COST OVERRUN (Contd..)
4. l) Provision of S&T : As per DE, sanctioned cost for S&T work is Rs. 75.48 Cr. As per proposed RE, this
amount proposed is Rs. 225.89 Cr with a variation of Rs. 150.40 Cr on account of escalation other than
price escalation. This variation is due to (i) Provision of Centralized Architecture of Electronic
Interlocking for Multiple stations for the entire section in lieu of Relay interlocking at all four stations,
(ii) Provision of IP based Tunnel communication in entire section. (iii) Provision of CCTV surveillance
system, Radio Communication, fire retardant low smoke cable, in Tunnel, (iv) Provision of
PA/Emergency call system for tunnel longer than 2 km, (v) Take off point will be from Sivok where
complete yard remodeling with shifting of entire existing Station yard 1s involved. This variation also
includes increase in GST from 12% to 18% and Rs. 16.91 Cr. against IRCON's profit.
m) Provision of Mechanical :The sanctioned DE amount for Mechanical department work is Rs. 0.28 Cr
which is increased to Rs. 93.06 Cr in the proposed RE. There is an increase of Rs. 92.79 Cr in the RE.
Provision of only M&P work has been kept which increased by Rs. 92.79 Cr in the RE as per
requirement.
REASON FOR COST OVERRUN (Contd..)