Tower Sharing Benefits
Benefits
Sharing of infrastructure can lead to several benefits. Operators resorting to
infrastructure sharing would reduce their payback time significantly by reducing
both their operating expenditures and capital expenditures.


Infrastructure sharing can be used in both the start-up phase to build coverage
quickly and longer term, and to build more cost effective coverage in rural areas.
Sharing arrangement provides the highest savings in cases of low traffic demand and
more efficiency is achieved by pooling resources.

For new telecom companies such infrastructure sharing will mean not just faster rollout
but also savings in billions of Peso’s. To set up every telecom towers the cost ranges
between Php 1.5 to Php 4.0 million
Shared
Infrastructure
Sharing can be broadly classified into 2 groups


                            Passive Infrastructure sharing
                            Active Elements



Passive Infrastructure sharing (tower sharing) : Passive infrastructure being one of the
most important components of a mobile network, the same has been a critical area
of operations for telecom companies in the past. With increasing competition
posing an urgent need for telecom companies to expand their coverage and sharpen
their focus on core operation.


Active Elements: Two or more operators deploy a completely shared radio network and
in some case, a partly shared core network. The shared radio network consist of Radio
base station, Radio network controllers, Transmissions. Active sharing is not allowed
by regulations
Passive Infrastructure

or Non-Electronic Infrastructure
Tower Type:

Telecom towers are broadly
classified as:

 Greenfield sites
 Rooftop sites
Typical rooftop sites:

• Pole mount
• 25 m Mast
Medium Duty Angular & Tubular Tower Type:
Heavy Duty 4-legged Angular Towers:
WIRELESS NETWORK
Mobile Network
Network Plan
Naga City Network Plan
RF Survey Report
Economic Side
Key benefits relating to the tower sharing :
• Greenfield tower sites requires a capital expenditures of Php 1.5 to Php 4m.
  Given the high capital investments required in the business, tower sharing
  are highly leveraged.

• Stable and predictable cash flow. Once a tower asset is rented out, it usually
  generates a stable and predictable cash flow of tower rentals.

• Tower operating expenses can be shared, such as site rentals, O&M expenses,
  and energy and fuel expenses

• Enhancement of profitability. Tower sharing can help operators lower their operating
 cost and capital expenditures and earn better margins.

• Shorter and faster Roll out time
Construction Cost
Greenfield SST MD Sites

                                           30m Tower        36m Tower         45m Tower        53m Tower        65m Tower        71m Tower

Construction plan & As-built drawings           14,000.00        14,000.00        14,000.00        14,000.00        14,000.00        14,000.00
Site Design
GF OD SST MD                                   458,918.91       513,055.91       690,068.06       946,149.75      1,137,130.15     1,477,529.82
Foundation and Earth Work
Masts, Towers and Monopole Work
Equipment Stand and Housing Work
Electric and Mechanical Systems Work
SST MD 30m, material                           275,875.37       348,468.60       467,770.58       707,096.13      1,132,826.89     1,229,596.13
Masts, Towers and Monopoles
Electrical and Mech. Systems-Material
ME Outdoor                                      59,669.58        59,669.58        59,669.58        71,794.58        71,794.58        71,794.58
Site Preparation
Masts, Towers and Monopoles
Electrical and Mech. Systems-Material
Base frame2/3G(WF200x100-L4900m)                43,565.08        43,565.08        43,565.08        43,565.08        43,565.08        43,565.08
Equipment Stands and Housings-Material
Transp. cost for CME Kitting                    14,132.26        14,132.26        14,132.26        30,179.82        39,874.13        95,208.93
Transportation
Fence & Yard                                   146,845.85       146,845.85       155,901.87       180,845.66       166,128.13       184,652.50
Site Preparation
Transp. Tower materials                         19,691.06        24,921.74        33,518.01        76,062.03       110,774.18       322,362.97
Tower Transportation
Power Connection                               170,000.00       170,000.00       170,000.00       170,000.00       170,000.00       170,000.00
Electrical and Mechanical System Work
Amount                                       1,202,698.09     1,334,659.01     1,648,625.42      2,239,693.05     2,886,093.13     3,608,709.98

Site Acquisition / Permits                     350,000.00       350,000.00       350,000.00       350,000.00       350,000.00       350,000.00
Permits : Pre-Con to Post-Construction
Total Cost                               PHP 1,552,698.09 PHP 1,684,659.01 PHP 1,998,625.42 PHP 2,589,693.05 PHP 3,236,093.13 PHP 3,958,709.98
CONSTRUCTION COST
Co-Location


                          CO-LOCATE 30 - 35m   CO-LOCATE 36 -45m   CO-LOCATE 46 - 55m   CO-LOCATE 56 - 65m
Permits                        110,000.00           110,000.00          110,000.00          110,000.00
Technical Site Survey          33,550.00            33,550.00           33,550.00            33,550.00
Site Design                     4,270.00             4,270.00            4,270.00            4,270.00
Tower
   Services                     14,487.50           14,487.50           14,487.50            14,487.50
   Materials                    33,791.35           33,791.35           33,791.35            33,791.35
Baseframe + Foundation
   Services                     54,961.00           54,961.00           54,961.00            54,961.00
   Materials                    32,268.24           32,268.24           32,268.24            32,268.24
Electrical & Mechanical
   Services                    196,091.14           201,276.14          206,461.14          211,646.14
   Materials                   77,081.26            80,950.67           84,820.09            88,689.50
TOTAL                          556,500.48           565,554.89          574,609.31          583,663.72
Conclusion:




• Sharing of infrastructure reduces significantly the capital expenditures of
every mobile operators, and provides faster rate in terms of roll out activities.

•The concept will provide savings on operational expenses.

•Tower sharing is a viable alternative in rural areas, and for the purpose of
 road coverage.
References :


 Growth Opportunities in the Philippines, Frost & Sullivan Press Release 2009

 Philippines Telecom Brief, Ken Zita

 Trends of Technological Innovation style in the Philippine Mobile
  Telecommunication Industry

 Philippine Economic Growth: Can it last? , Emmanuel S. De Dios

More Related Content

Similar to Tower sharing concept

INDUSTRIAL TRAINING SLIDE AFIF.pptx
INDUSTRIAL TRAINING SLIDE AFIF.pptxINDUSTRIAL TRAINING SLIDE AFIF.pptx
INDUSTRIAL TRAINING SLIDE AFIF.pptx
eiyshab5428
 
Internship Presentation - Siemens Malaysia
Internship Presentation - Siemens MalaysiaInternship Presentation - Siemens Malaysia
Internship Presentation - Siemens Malaysia
Syafiqah Najib
 
cost appraisal
cost appraisalcost appraisal
cost appraisal
ahmong4
 
3667 course book 2011
3667 course book 20113667 course book 2011
3667 course book 2011
Darren Penk
 
Wind Technicians competence framework SIEMENS
Wind Technicians competence framework SIEMENSWind Technicians competence framework SIEMENS
Wind Technicians competence framework SIEMENS
Frank Emil Moen
 
RCREEE-enerMENA_pgesco profile-rcree
RCREEE-enerMENA_pgesco profile-rcreeRCREEE-enerMENA_pgesco profile-rcree
RCREEE-enerMENA_pgesco profile-rcree
RCREEE
 
CPRSouth_9 20140911 @ South Africa
CPRSouth_9 20140911 @ South AfricaCPRSouth_9 20140911 @ South Africa
CPRSouth_9 20140911 @ South Africa
Jessica Chou
 
CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009
CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009
CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009
Leo Lastimosa
 
IRJET- Design and Manufacturing of Ladder Roof Lift for Material Lifting
IRJET-  	  Design and Manufacturing of Ladder Roof Lift for Material LiftingIRJET-  	  Design and Manufacturing of Ladder Roof Lift for Material Lifting
IRJET- Design and Manufacturing of Ladder Roof Lift for Material Lifting
IRJET Journal
 
Presentation.pptx jkjkjkdskjklds.sdf212fs
Presentation.pptx jkjkjkdskjklds.sdf212fsPresentation.pptx jkjkjkdskjklds.sdf212fs
Presentation.pptx jkjkjkdskjklds.sdf212fs
AbdoEssa5
 
Kusile Project Brochure
Kusile Project BrochureKusile Project Brochure
Kusile Project Brochure
Ricky Swanepoel
 
Orissa wicomm-product presentation
Orissa wicomm-product presentationOrissa wicomm-product presentation
Orissa wicomm-product presentation
Go-NPS
 
Amarjeet Copy
Amarjeet   CopyAmarjeet   Copy
Amarjeet Copy
Amarjeet kumar
 
Bts installation & commisioning
Bts installation & commisioningBts installation & commisioning
Bts installation & commisioning
AIRTEL
 
Solarlightsystems
SolarlightsystemsSolarlightsystems
Solarlightsystems
Motoor Mohammed Muzammil
 
Presentation on project Initiating Telecom
Presentation on project Initiating TelecomPresentation on project Initiating Telecom
Presentation on project Initiating Telecom
Naveed Daar
 
Instancing at the Gate v3 Observation of Function
Instancing at the Gate v3 Observation of FunctionInstancing at the Gate v3 Observation of Function
Instancing at the Gate v3 Observation of Function
Brij Consulting, LLC
 
quiz Solar PV Rooftop Training Entrepreneurship Development
quiz Solar PV Rooftop Training Entrepreneurship Developmentquiz Solar PV Rooftop Training Entrepreneurship Development
quiz Solar PV Rooftop Training Entrepreneurship Development
Chirag Jain
 
CASBAA 1030408 @ Taipei
CASBAA 1030408 @ TaipeiCASBAA 1030408 @ Taipei
CASBAA 1030408 @ Taipei
Jessica Chou
 
project appraisal-new.ppt
project appraisal-new.pptproject appraisal-new.ppt
project appraisal-new.ppt
JSathish3
 

Similar to Tower sharing concept (20)

INDUSTRIAL TRAINING SLIDE AFIF.pptx
INDUSTRIAL TRAINING SLIDE AFIF.pptxINDUSTRIAL TRAINING SLIDE AFIF.pptx
INDUSTRIAL TRAINING SLIDE AFIF.pptx
 
Internship Presentation - Siemens Malaysia
Internship Presentation - Siemens MalaysiaInternship Presentation - Siemens Malaysia
Internship Presentation - Siemens Malaysia
 
cost appraisal
cost appraisalcost appraisal
cost appraisal
 
3667 course book 2011
3667 course book 20113667 course book 2011
3667 course book 2011
 
Wind Technicians competence framework SIEMENS
Wind Technicians competence framework SIEMENSWind Technicians competence framework SIEMENS
Wind Technicians competence framework SIEMENS
 
RCREEE-enerMENA_pgesco profile-rcree
RCREEE-enerMENA_pgesco profile-rcreeRCREEE-enerMENA_pgesco profile-rcree
RCREEE-enerMENA_pgesco profile-rcree
 
CPRSouth_9 20140911 @ South Africa
CPRSouth_9 20140911 @ South AfricaCPRSouth_9 20140911 @ South Africa
CPRSouth_9 20140911 @ South Africa
 
CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009
CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009
CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009
 
IRJET- Design and Manufacturing of Ladder Roof Lift for Material Lifting
IRJET-  	  Design and Manufacturing of Ladder Roof Lift for Material LiftingIRJET-  	  Design and Manufacturing of Ladder Roof Lift for Material Lifting
IRJET- Design and Manufacturing of Ladder Roof Lift for Material Lifting
 
Presentation.pptx jkjkjkdskjklds.sdf212fs
Presentation.pptx jkjkjkdskjklds.sdf212fsPresentation.pptx jkjkjkdskjklds.sdf212fs
Presentation.pptx jkjkjkdskjklds.sdf212fs
 
Kusile Project Brochure
Kusile Project BrochureKusile Project Brochure
Kusile Project Brochure
 
Orissa wicomm-product presentation
Orissa wicomm-product presentationOrissa wicomm-product presentation
Orissa wicomm-product presentation
 
Amarjeet Copy
Amarjeet   CopyAmarjeet   Copy
Amarjeet Copy
 
Bts installation & commisioning
Bts installation & commisioningBts installation & commisioning
Bts installation & commisioning
 
Solarlightsystems
SolarlightsystemsSolarlightsystems
Solarlightsystems
 
Presentation on project Initiating Telecom
Presentation on project Initiating TelecomPresentation on project Initiating Telecom
Presentation on project Initiating Telecom
 
Instancing at the Gate v3 Observation of Function
Instancing at the Gate v3 Observation of FunctionInstancing at the Gate v3 Observation of Function
Instancing at the Gate v3 Observation of Function
 
quiz Solar PV Rooftop Training Entrepreneurship Development
quiz Solar PV Rooftop Training Entrepreneurship Developmentquiz Solar PV Rooftop Training Entrepreneurship Development
quiz Solar PV Rooftop Training Entrepreneurship Development
 
CASBAA 1030408 @ Taipei
CASBAA 1030408 @ TaipeiCASBAA 1030408 @ Taipei
CASBAA 1030408 @ Taipei
 
project appraisal-new.ppt
project appraisal-new.pptproject appraisal-new.ppt
project appraisal-new.ppt
 

Tower sharing concept

  • 1. Tower Sharing in Telco Industry : Its Leverage and Economic Value Engr . Paul N. Jacob Project Planning UST Grad School
  • 3. Benefits Sharing of infrastructure can lead to several benefits. Operators resorting to infrastructure sharing would reduce their payback time significantly by reducing both their operating expenditures and capital expenditures. Infrastructure sharing can be used in both the start-up phase to build coverage quickly and longer term, and to build more cost effective coverage in rural areas. Sharing arrangement provides the highest savings in cases of low traffic demand and more efficiency is achieved by pooling resources. For new telecom companies such infrastructure sharing will mean not just faster rollout but also savings in billions of Peso’s. To set up every telecom towers the cost ranges between Php 1.5 to Php 4.0 million
  • 5. Sharing can be broadly classified into 2 groups  Passive Infrastructure sharing  Active Elements Passive Infrastructure sharing (tower sharing) : Passive infrastructure being one of the most important components of a mobile network, the same has been a critical area of operations for telecom companies in the past. With increasing competition posing an urgent need for telecom companies to expand their coverage and sharpen their focus on core operation. Active Elements: Two or more operators deploy a completely shared radio network and in some case, a partly shared core network. The shared radio network consist of Radio base station, Radio network controllers, Transmissions. Active sharing is not allowed by regulations
  • 7. Tower Type: Telecom towers are broadly classified as:  Greenfield sites  Rooftop sites
  • 8. Typical rooftop sites: • Pole mount • 25 m Mast
  • 9. Medium Duty Angular & Tubular Tower Type:
  • 10. Heavy Duty 4-legged Angular Towers:
  • 11.
  • 18. Key benefits relating to the tower sharing : • Greenfield tower sites requires a capital expenditures of Php 1.5 to Php 4m. Given the high capital investments required in the business, tower sharing are highly leveraged. • Stable and predictable cash flow. Once a tower asset is rented out, it usually generates a stable and predictable cash flow of tower rentals. • Tower operating expenses can be shared, such as site rentals, O&M expenses, and energy and fuel expenses • Enhancement of profitability. Tower sharing can help operators lower their operating cost and capital expenditures and earn better margins. • Shorter and faster Roll out time
  • 19. Construction Cost Greenfield SST MD Sites 30m Tower 36m Tower 45m Tower 53m Tower 65m Tower 71m Tower Construction plan & As-built drawings 14,000.00 14,000.00 14,000.00 14,000.00 14,000.00 14,000.00 Site Design GF OD SST MD 458,918.91 513,055.91 690,068.06 946,149.75 1,137,130.15 1,477,529.82 Foundation and Earth Work Masts, Towers and Monopole Work Equipment Stand and Housing Work Electric and Mechanical Systems Work SST MD 30m, material 275,875.37 348,468.60 467,770.58 707,096.13 1,132,826.89 1,229,596.13 Masts, Towers and Monopoles Electrical and Mech. Systems-Material ME Outdoor 59,669.58 59,669.58 59,669.58 71,794.58 71,794.58 71,794.58 Site Preparation Masts, Towers and Monopoles Electrical and Mech. Systems-Material Base frame2/3G(WF200x100-L4900m) 43,565.08 43,565.08 43,565.08 43,565.08 43,565.08 43,565.08 Equipment Stands and Housings-Material Transp. cost for CME Kitting 14,132.26 14,132.26 14,132.26 30,179.82 39,874.13 95,208.93 Transportation Fence & Yard 146,845.85 146,845.85 155,901.87 180,845.66 166,128.13 184,652.50 Site Preparation Transp. Tower materials 19,691.06 24,921.74 33,518.01 76,062.03 110,774.18 322,362.97 Tower Transportation Power Connection 170,000.00 170,000.00 170,000.00 170,000.00 170,000.00 170,000.00 Electrical and Mechanical System Work Amount 1,202,698.09 1,334,659.01 1,648,625.42 2,239,693.05 2,886,093.13 3,608,709.98 Site Acquisition / Permits 350,000.00 350,000.00 350,000.00 350,000.00 350,000.00 350,000.00 Permits : Pre-Con to Post-Construction Total Cost PHP 1,552,698.09 PHP 1,684,659.01 PHP 1,998,625.42 PHP 2,589,693.05 PHP 3,236,093.13 PHP 3,958,709.98
  • 20. CONSTRUCTION COST Co-Location CO-LOCATE 30 - 35m CO-LOCATE 36 -45m CO-LOCATE 46 - 55m CO-LOCATE 56 - 65m Permits 110,000.00 110,000.00 110,000.00 110,000.00 Technical Site Survey 33,550.00 33,550.00 33,550.00 33,550.00 Site Design 4,270.00 4,270.00 4,270.00 4,270.00 Tower Services 14,487.50 14,487.50 14,487.50 14,487.50 Materials 33,791.35 33,791.35 33,791.35 33,791.35 Baseframe + Foundation Services 54,961.00 54,961.00 54,961.00 54,961.00 Materials 32,268.24 32,268.24 32,268.24 32,268.24 Electrical & Mechanical Services 196,091.14 201,276.14 206,461.14 211,646.14 Materials 77,081.26 80,950.67 84,820.09 88,689.50 TOTAL 556,500.48 565,554.89 574,609.31 583,663.72
  • 21.
  • 22. Conclusion: • Sharing of infrastructure reduces significantly the capital expenditures of every mobile operators, and provides faster rate in terms of roll out activities. •The concept will provide savings on operational expenses. •Tower sharing is a viable alternative in rural areas, and for the purpose of road coverage.
  • 23. References :  Growth Opportunities in the Philippines, Frost & Sullivan Press Release 2009  Philippines Telecom Brief, Ken Zita  Trends of Technological Innovation style in the Philippine Mobile Telecommunication Industry  Philippine Economic Growth: Can it last? , Emmanuel S. De Dios