The document discusses the benefits of tower sharing in the telecom industry, including significantly reduced capital expenditures and operating costs for mobile operators, faster rollout times, and savings of billions of pesos by not having to construct every telecom tower individually. Tower sharing can help operators lower costs and earn better margins while also providing more cost effective coverage, especially in rural areas. Sharing infrastructure is presented as a viable strategy for new telecom companies and a means to more efficiently pool resources.
The document discusses reducing the height of an EDP/LRP stack on the Snorre B workover system. The original height requirement was 9400mm but through design changes, the height was reduced by 226mm to 9348.35mm, clearing the requirement by 49mm. This height reduction earned a 900,000 British pound bonus, or 11.3 million Norwegian krone, equal to 1 million krone for every 20mm saved. Meeting the reduced height was crucial to avoid contract cancellation penalties within the 30-day design freeze period. Defining and freezing requirements early leads to successful on-time and on-budget project execution.
This document presents an investment proposal for Bam d'Afrique and NewCo BioCarbon's project in Newcastle, South Africa totaling $502 million over three years and three phases. The project involves establishing bamboo plantations, building a carbonizing plant to produce BamCoke from bamboo, constructing a Biomass-to-Liquid refinery, and generating electricity. Financial projections estimate annual returns of 62-86% for farming and 77% for BamCoke, BTL, and power generation. The project is expected to create jobs and establish a new industry in Swaziland while providing significant carbon offset credits through displacement of fossil fuels.
The first 3-Axis MEMS Gyroscope to meet Automotive AEC-Q100 qualification
MEMS are getting broadly adopted in the automotive industry and non-safety applications like in-dash navigation are now requiring low-cost and small footprint components.
The A3G4250D is a low power consumption MEMS gyroscope which is the first 3-axis gyroscope to have met the industry-standard qualification for automotive integrated circuits (AEC-Q100).
This 3-axis gyroscope for automotive applications measures angular rates up to ±245 dps. It has been designed and produced using the same manufacturing process (THELMA) than consumer products in order to get full benefit of STMicroelectronics 10 years of consumer electronic market.
Assembled in a 4.0 x 4.0 x 1.1mm package, it embeds an 8-bit temperature sensor and operates within an extended temperature range from -40 to 85°C.
It is suitable for applications including in-dash navigation, telematics and vehicle tolling systems, motion control with MMI (man-machine interface), appliances and robotics.
The document outlines the budget for an advertising shoot including staff costs and equipment hire. It lists the daily salaries for camera operators, boom operators, production managers, and actors totaling £3,273 for a 3 day shoot. Equipment hire includes cameras, microphones, lighting and tripods costing £702 for 3 days. The total budget is £3,975 leaving a remainder of £25.
This document presents a plan for ADR Motors Pvt. Ltd., an Indian car manufacturing company, to set up an alternate power generation unit due to recent grid collapses affecting several of their northern India plants. It compares the feasibility of setting up a 110 MW wind farm in Jaisalmer, Rajasthan or a hydel power plant. Cost estimates are provided for the wind farm project totaling Rs. 554 crores. A hydel plant is estimated to cost Rs. 822.5 crores but has longer life expectancy and lower operational costs.
Capacity building 2010 day 1 wind energy in moroccoRCREEE
The document discusses wind energy potential and development in Morocco. It notes that Morocco has excellent wind resources along its northern and southern coasts, with average wind speeds between 7.5-11 m/s. Key points include Morocco's large wind energy potential of 7936 TWh/year, the development of wind atlases and measurement stations to assess this, and feasibility studies being conducted for wind farm projects. Existing wind farms discussed include the 50 MW El Koudia El Baida farm and the 60 MW Cap Sim farm near Essaouira.
Miniaturized Cavity Backed Substrate Integrated Waveguide Antenna for Ku-Band...IRJET Journal
- The document describes a miniaturized cavity-backed substrate integrated waveguide antenna designed for Ku-band applications such as satellite communications.
- The antenna consists of a rectangular slot in the ground plane enclosed by closely spaced vertical cylinders.
- Simulation results show the antenna achieves an impedance bandwidth of 0.202 GHz (1.4%), maximum gain of 5.35 dBi, directivity of 6.26 dBi, high front-to-back ratio of 20, and overall efficiency of 76.9%.
The document discusses reducing the height of an EDP/LRP stack on the Snorre B workover system. The original height requirement was 9400mm but through design changes, the height was reduced by 226mm to 9348.35mm, clearing the requirement by 49mm. This height reduction earned a 900,000 British pound bonus, or 11.3 million Norwegian krone, equal to 1 million krone for every 20mm saved. Meeting the reduced height was crucial to avoid contract cancellation penalties within the 30-day design freeze period. Defining and freezing requirements early leads to successful on-time and on-budget project execution.
This document presents an investment proposal for Bam d'Afrique and NewCo BioCarbon's project in Newcastle, South Africa totaling $502 million over three years and three phases. The project involves establishing bamboo plantations, building a carbonizing plant to produce BamCoke from bamboo, constructing a Biomass-to-Liquid refinery, and generating electricity. Financial projections estimate annual returns of 62-86% for farming and 77% for BamCoke, BTL, and power generation. The project is expected to create jobs and establish a new industry in Swaziland while providing significant carbon offset credits through displacement of fossil fuels.
The first 3-Axis MEMS Gyroscope to meet Automotive AEC-Q100 qualification
MEMS are getting broadly adopted in the automotive industry and non-safety applications like in-dash navigation are now requiring low-cost and small footprint components.
The A3G4250D is a low power consumption MEMS gyroscope which is the first 3-axis gyroscope to have met the industry-standard qualification for automotive integrated circuits (AEC-Q100).
This 3-axis gyroscope for automotive applications measures angular rates up to ±245 dps. It has been designed and produced using the same manufacturing process (THELMA) than consumer products in order to get full benefit of STMicroelectronics 10 years of consumer electronic market.
Assembled in a 4.0 x 4.0 x 1.1mm package, it embeds an 8-bit temperature sensor and operates within an extended temperature range from -40 to 85°C.
It is suitable for applications including in-dash navigation, telematics and vehicle tolling systems, motion control with MMI (man-machine interface), appliances and robotics.
The document outlines the budget for an advertising shoot including staff costs and equipment hire. It lists the daily salaries for camera operators, boom operators, production managers, and actors totaling £3,273 for a 3 day shoot. Equipment hire includes cameras, microphones, lighting and tripods costing £702 for 3 days. The total budget is £3,975 leaving a remainder of £25.
This document presents a plan for ADR Motors Pvt. Ltd., an Indian car manufacturing company, to set up an alternate power generation unit due to recent grid collapses affecting several of their northern India plants. It compares the feasibility of setting up a 110 MW wind farm in Jaisalmer, Rajasthan or a hydel power plant. Cost estimates are provided for the wind farm project totaling Rs. 554 crores. A hydel plant is estimated to cost Rs. 822.5 crores but has longer life expectancy and lower operational costs.
Capacity building 2010 day 1 wind energy in moroccoRCREEE
The document discusses wind energy potential and development in Morocco. It notes that Morocco has excellent wind resources along its northern and southern coasts, with average wind speeds between 7.5-11 m/s. Key points include Morocco's large wind energy potential of 7936 TWh/year, the development of wind atlases and measurement stations to assess this, and feasibility studies being conducted for wind farm projects. Existing wind farms discussed include the 50 MW El Koudia El Baida farm and the 60 MW Cap Sim farm near Essaouira.
Miniaturized Cavity Backed Substrate Integrated Waveguide Antenna for Ku-Band...IRJET Journal
- The document describes a miniaturized cavity-backed substrate integrated waveguide antenna designed for Ku-band applications such as satellite communications.
- The antenna consists of a rectangular slot in the ground plane enclosed by closely spaced vertical cylinders.
- Simulation results show the antenna achieves an impedance bandwidth of 0.202 GHz (1.4%), maximum gain of 5.35 dBi, directivity of 6.26 dBi, high front-to-back ratio of 20, and overall efficiency of 76.9%.
PJBUMI Heavy Engineering & Services Sdn. Bhd. is an engineering company with divisions in property development, digital solutions, energy, and telecommunications. The intern's objectives were to adapt to the working environment, apply classroom knowledge, and learn new skills. During the internship, the intern assisted with tender proposals, project work, and administrative tasks like setting up meetings and editing company documents. The intern concluded that the experience provided valuable practical training and insights into engineering applications in industry.
This document summarizes an internship presentation given by Nurul Syafiqah Binti Mohd Najib. The presentation covered:
1. An overview of Siemens Malaysia, including its divisions and business areas.
2. Details about the internship program, including a 5-month placement in the office followed by 1.5 months on-site.
3. The internship project, which involved retrofitting synchronization and generator protection systems at the TNB Putrajaya Power Station. The project exposed the intern to various electrical and commissioning tasks.
This document provides a preliminary cost appraisal and cost plan for the construction of two 31-story residential tower blocks with 7-story podium and 2-story basement on a site with an area of 160,000 square feet. It includes estimated costs for various elements of the structure, architectural, mechanical and electrical works. The total estimated construction cost is RM336,568,652.15 or RM3,750.93 per square meter of construction floor area. The document further breaks down the estimated costs by cost per square meter for the basement, podium and each tower block.
This document provides information about fibre optic cabling courses and certifications offered by Fibreplus Ltd. It summarizes the Level 2 Award in Communications Cabling offered by City & Guilds, which consists of three units covering basic communication systems principles, internal fibre optic cabling, and external fibre optic cabling. It also lists the locations of Fibreplus training centers across the UK and provides details about fibre optic and data communication courses at levels 2, 3, and 4, covering topics like installation, testing, design, and apprenticeships. Accessories like fusion splicers and toolkits are also advertised for sale or hire.
Wind Technicians competence framework SIEMENSFrank Emil Moen
The document discusses Siemens' wind turbine technician competence framework and the need for operations and maintenance technicians in the wind turbine manufacturing industry. It provides an overview of Siemens' wind power business, including their installed base, workforce size, and order backlog. It also summarizes Norway's wind power market potential and identified projects between 2010-2025.
This document discusses the stalemate of cable digital switchover in various countries. It provides data on digital cable penetration rates around the world and analyzes the digital conversion of cable TV in Taiwan from 2003-2012. The results suggest that IPTV competition has positively impacted cable digitization since 2009. Economies of scale from more cable subscribers and equivalent-sized competitive overbuilds also increased digital adoption, while unequal competition decreased it. Monthly cable fees did not influence digital adoption rates. The document proposes deregulatory approaches like lifting integration restrictions and providing economic incentives to promote further cable digitization.
IRJET- Design and Manufacturing of Ladder Roof Lift for Material LiftingIRJET Journal
This document describes the design and manufacturing of a ladder roof lift for material lifting at construction sites. The lift is intended to efficiently transfer large quantities of material between floors without requiring manual labor, reducing the risk of accidents. It utilizes multiple containers on a ladder-like frame that can be raised and lowered via a chain drive or other mechanism. Calculations are shown for selecting materials and components like the chain, sprockets, and supporting shaft. Advantages include safer and easier material handling compared to existing manual methods. The ladder roof lift is also portable to use in different locations.
The Kusile Power Station project in South Africa leveraged 3D modeling and simulation technology to improve project execution, maximize returns, and deliver an integrated information asset. By using Bentley software like MicroStation for 3D modeling and simulation tools, the project achieved benefits like improved commissioning, training, and lifecycle management. This supported delivering the large, complex plant faster while enhancing safety and operational readiness.
Introduction of Orissa Wicomm corporate profile and products.
Representing Narada Liithium-ion and Lead Acid Battery products and solution. Lightning Protection and Site Access Monitoring & Control Solution
The document provides a resume for Amarjeet Kumar, who has over 7 years of experience in electrical engineering projects including planning, designing, and maintenance of substations, energy management systems, and industrial facilities. Amarjeet has worked on projects in various industries and has skills in areas such as project management, maintenance, cost analysis, and PLC and HMI programming. He is currently serving as a Senior Engineer Project - Electrical at Bedmutha Industries Ltd. overseeing electrical work for their wire, rope, copper, and tire bead plants.
This document provides an overview and summary of a project report on the installation, commissioning, and planning of a Nokia Flexi Edge BTS (Base Transceiver Station). It was submitted by Saurabh Bansal, an electronics and communications engineering student, under the guidance of his professor Sumit Singh Dhanda. The report includes sections on the history of Nokia Siemens Networks, an overview of BTS components and functions, radio frequency details, operations, administration, maintenance, provisioning, and commissioning of the Nokia Flexi Edge BTS site.
The document provides information on solar light systems including lanterns, home lights, and street lights. It details the production capacity, market potential, manufacturing process, quality standards, implementation schedule, machinery requirements, pollution control measures, energy conservation steps, and financial aspects such as fixed capital costs and working capital requirements to produce 24,000 units per year of each product. The total projected annual production value is Rs. 66 crores.
Presentation on project Initiating TelecomNaveed Daar
This document summarizes a project proposal to install 288 telephone lines across two MSAG switches in Loralai District, Balochistan, Pakistan. The proposal outlines the project details, including installation of switching equipment, outside plant, and related infrastructure at an estimated cost of 13.3 million PKR. It provides financial projections showing revenue growth, expenses, cash flows, and profitability over a 10-year period, with the project reaching profitability in year 4 and full payback by year 9. The proposal recommends approval to provide improved telecommunication services to the area.
Part II...A functional look at Interpolative Scope and its proposed capabilities , Story #1 Specifications in Glass, Conversion Process at the Gate from Wall Synergy, Load Value and Invested Margin, View toward Instancing This is Part II of Interpolative Scope dialogue... added drivers and functional mark-up. Development of Tools for Instances. and Tested for Appliance Use
quiz Solar PV Rooftop Training Entrepreneurship DevelopmentChirag Jain
The document outlines a training program on rooftop solar PV for utility engineers presented by USAID's Partnership To Advance Clean Energy-Deployment technical assistance program. It includes a quiz to test knowledge on topics like solar applications, system components, site assessment factors, and state targets for rooftop solar. The training aims to increase understanding of grid-connected rooftop solar PV systems.
This document summarizes cable TV penetration rates and digitization efforts in various Asian countries. It shows that South Korea has the highest rates of pay-TV and digital cable penetration, while countries like Indonesia and the Philippines still have low overall penetration rates. Tables provide data on the growth of digital cable subscriptions over time in Taiwan and the breakdown of cable operators by size. The document also analyzes factors that influence cable rates and competition between multi-system and independent cable operators.
This document discusses the costs involved in establishing a new spinning project with 25,200 spindles. It outlines the costs of land, buildings, plant and machinery, working capital, and other expenses. It provides details on the machinery requirements and costs. It also projects the annual production, costs including raw materials, wages, power, and overheads. Based on assumptions around utilization rates and selling prices, it estimates annual sales, costs of production, and an operating profit before interest and depreciation of -Rs. 78 lakhs. Finally, it calculates the working capital requirement of Rs. 1550 lakhs.
PJBUMI Heavy Engineering & Services Sdn. Bhd. is an engineering company with divisions in property development, digital solutions, energy, and telecommunications. The intern's objectives were to adapt to the working environment, apply classroom knowledge, and learn new skills. During the internship, the intern assisted with tender proposals, project work, and administrative tasks like setting up meetings and editing company documents. The intern concluded that the experience provided valuable practical training and insights into engineering applications in industry.
This document summarizes an internship presentation given by Nurul Syafiqah Binti Mohd Najib. The presentation covered:
1. An overview of Siemens Malaysia, including its divisions and business areas.
2. Details about the internship program, including a 5-month placement in the office followed by 1.5 months on-site.
3. The internship project, which involved retrofitting synchronization and generator protection systems at the TNB Putrajaya Power Station. The project exposed the intern to various electrical and commissioning tasks.
This document provides a preliminary cost appraisal and cost plan for the construction of two 31-story residential tower blocks with 7-story podium and 2-story basement on a site with an area of 160,000 square feet. It includes estimated costs for various elements of the structure, architectural, mechanical and electrical works. The total estimated construction cost is RM336,568,652.15 or RM3,750.93 per square meter of construction floor area. The document further breaks down the estimated costs by cost per square meter for the basement, podium and each tower block.
This document provides information about fibre optic cabling courses and certifications offered by Fibreplus Ltd. It summarizes the Level 2 Award in Communications Cabling offered by City & Guilds, which consists of three units covering basic communication systems principles, internal fibre optic cabling, and external fibre optic cabling. It also lists the locations of Fibreplus training centers across the UK and provides details about fibre optic and data communication courses at levels 2, 3, and 4, covering topics like installation, testing, design, and apprenticeships. Accessories like fusion splicers and toolkits are also advertised for sale or hire.
Wind Technicians competence framework SIEMENSFrank Emil Moen
The document discusses Siemens' wind turbine technician competence framework and the need for operations and maintenance technicians in the wind turbine manufacturing industry. It provides an overview of Siemens' wind power business, including their installed base, workforce size, and order backlog. It also summarizes Norway's wind power market potential and identified projects between 2010-2025.
This document discusses the stalemate of cable digital switchover in various countries. It provides data on digital cable penetration rates around the world and analyzes the digital conversion of cable TV in Taiwan from 2003-2012. The results suggest that IPTV competition has positively impacted cable digitization since 2009. Economies of scale from more cable subscribers and equivalent-sized competitive overbuilds also increased digital adoption, while unequal competition decreased it. Monthly cable fees did not influence digital adoption rates. The document proposes deregulatory approaches like lifting integration restrictions and providing economic incentives to promote further cable digitization.
IRJET- Design and Manufacturing of Ladder Roof Lift for Material LiftingIRJET Journal
This document describes the design and manufacturing of a ladder roof lift for material lifting at construction sites. The lift is intended to efficiently transfer large quantities of material between floors without requiring manual labor, reducing the risk of accidents. It utilizes multiple containers on a ladder-like frame that can be raised and lowered via a chain drive or other mechanism. Calculations are shown for selecting materials and components like the chain, sprockets, and supporting shaft. Advantages include safer and easier material handling compared to existing manual methods. The ladder roof lift is also portable to use in different locations.
The Kusile Power Station project in South Africa leveraged 3D modeling and simulation technology to improve project execution, maximize returns, and deliver an integrated information asset. By using Bentley software like MicroStation for 3D modeling and simulation tools, the project achieved benefits like improved commissioning, training, and lifecycle management. This supported delivering the large, complex plant faster while enhancing safety and operational readiness.
Introduction of Orissa Wicomm corporate profile and products.
Representing Narada Liithium-ion and Lead Acid Battery products and solution. Lightning Protection and Site Access Monitoring & Control Solution
The document provides a resume for Amarjeet Kumar, who has over 7 years of experience in electrical engineering projects including planning, designing, and maintenance of substations, energy management systems, and industrial facilities. Amarjeet has worked on projects in various industries and has skills in areas such as project management, maintenance, cost analysis, and PLC and HMI programming. He is currently serving as a Senior Engineer Project - Electrical at Bedmutha Industries Ltd. overseeing electrical work for their wire, rope, copper, and tire bead plants.
This document provides an overview and summary of a project report on the installation, commissioning, and planning of a Nokia Flexi Edge BTS (Base Transceiver Station). It was submitted by Saurabh Bansal, an electronics and communications engineering student, under the guidance of his professor Sumit Singh Dhanda. The report includes sections on the history of Nokia Siemens Networks, an overview of BTS components and functions, radio frequency details, operations, administration, maintenance, provisioning, and commissioning of the Nokia Flexi Edge BTS site.
The document provides information on solar light systems including lanterns, home lights, and street lights. It details the production capacity, market potential, manufacturing process, quality standards, implementation schedule, machinery requirements, pollution control measures, energy conservation steps, and financial aspects such as fixed capital costs and working capital requirements to produce 24,000 units per year of each product. The total projected annual production value is Rs. 66 crores.
Presentation on project Initiating TelecomNaveed Daar
This document summarizes a project proposal to install 288 telephone lines across two MSAG switches in Loralai District, Balochistan, Pakistan. The proposal outlines the project details, including installation of switching equipment, outside plant, and related infrastructure at an estimated cost of 13.3 million PKR. It provides financial projections showing revenue growth, expenses, cash flows, and profitability over a 10-year period, with the project reaching profitability in year 4 and full payback by year 9. The proposal recommends approval to provide improved telecommunication services to the area.
Part II...A functional look at Interpolative Scope and its proposed capabilities , Story #1 Specifications in Glass, Conversion Process at the Gate from Wall Synergy, Load Value and Invested Margin, View toward Instancing This is Part II of Interpolative Scope dialogue... added drivers and functional mark-up. Development of Tools for Instances. and Tested for Appliance Use
quiz Solar PV Rooftop Training Entrepreneurship DevelopmentChirag Jain
The document outlines a training program on rooftop solar PV for utility engineers presented by USAID's Partnership To Advance Clean Energy-Deployment technical assistance program. It includes a quiz to test knowledge on topics like solar applications, system components, site assessment factors, and state targets for rooftop solar. The training aims to increase understanding of grid-connected rooftop solar PV systems.
This document summarizes cable TV penetration rates and digitization efforts in various Asian countries. It shows that South Korea has the highest rates of pay-TV and digital cable penetration, while countries like Indonesia and the Philippines still have low overall penetration rates. Tables provide data on the growth of digital cable subscriptions over time in Taiwan and the breakdown of cable operators by size. The document also analyzes factors that influence cable rates and competition between multi-system and independent cable operators.
This document discusses the costs involved in establishing a new spinning project with 25,200 spindles. It outlines the costs of land, buildings, plant and machinery, working capital, and other expenses. It provides details on the machinery requirements and costs. It also projects the annual production, costs including raw materials, wages, power, and overheads. Based on assumptions around utilization rates and selling prices, it estimates annual sales, costs of production, and an operating profit before interest and depreciation of -Rs. 78 lakhs. Finally, it calculates the working capital requirement of Rs. 1550 lakhs.
3. Benefits
Sharing of infrastructure can lead to several benefits. Operators resorting to
infrastructure sharing would reduce their payback time significantly by reducing
both their operating expenditures and capital expenditures.
Infrastructure sharing can be used in both the start-up phase to build coverage
quickly and longer term, and to build more cost effective coverage in rural areas.
Sharing arrangement provides the highest savings in cases of low traffic demand and
more efficiency is achieved by pooling resources.
For new telecom companies such infrastructure sharing will mean not just faster rollout
but also savings in billions of Peso’s. To set up every telecom towers the cost ranges
between Php 1.5 to Php 4.0 million
5. Sharing can be broadly classified into 2 groups
Passive Infrastructure sharing
Active Elements
Passive Infrastructure sharing (tower sharing) : Passive infrastructure being one of the
most important components of a mobile network, the same has been a critical area
of operations for telecom companies in the past. With increasing competition
posing an urgent need for telecom companies to expand their coverage and sharpen
their focus on core operation.
Active Elements: Two or more operators deploy a completely shared radio network and
in some case, a partly shared core network. The shared radio network consist of Radio
base station, Radio network controllers, Transmissions. Active sharing is not allowed
by regulations
18. Key benefits relating to the tower sharing :
• Greenfield tower sites requires a capital expenditures of Php 1.5 to Php 4m.
Given the high capital investments required in the business, tower sharing
are highly leveraged.
• Stable and predictable cash flow. Once a tower asset is rented out, it usually
generates a stable and predictable cash flow of tower rentals.
• Tower operating expenses can be shared, such as site rentals, O&M expenses,
and energy and fuel expenses
• Enhancement of profitability. Tower sharing can help operators lower their operating
cost and capital expenditures and earn better margins.
• Shorter and faster Roll out time
19. Construction Cost
Greenfield SST MD Sites
30m Tower 36m Tower 45m Tower 53m Tower 65m Tower 71m Tower
Construction plan & As-built drawings 14,000.00 14,000.00 14,000.00 14,000.00 14,000.00 14,000.00
Site Design
GF OD SST MD 458,918.91 513,055.91 690,068.06 946,149.75 1,137,130.15 1,477,529.82
Foundation and Earth Work
Masts, Towers and Monopole Work
Equipment Stand and Housing Work
Electric and Mechanical Systems Work
SST MD 30m, material 275,875.37 348,468.60 467,770.58 707,096.13 1,132,826.89 1,229,596.13
Masts, Towers and Monopoles
Electrical and Mech. Systems-Material
ME Outdoor 59,669.58 59,669.58 59,669.58 71,794.58 71,794.58 71,794.58
Site Preparation
Masts, Towers and Monopoles
Electrical and Mech. Systems-Material
Base frame2/3G(WF200x100-L4900m) 43,565.08 43,565.08 43,565.08 43,565.08 43,565.08 43,565.08
Equipment Stands and Housings-Material
Transp. cost for CME Kitting 14,132.26 14,132.26 14,132.26 30,179.82 39,874.13 95,208.93
Transportation
Fence & Yard 146,845.85 146,845.85 155,901.87 180,845.66 166,128.13 184,652.50
Site Preparation
Transp. Tower materials 19,691.06 24,921.74 33,518.01 76,062.03 110,774.18 322,362.97
Tower Transportation
Power Connection 170,000.00 170,000.00 170,000.00 170,000.00 170,000.00 170,000.00
Electrical and Mechanical System Work
Amount 1,202,698.09 1,334,659.01 1,648,625.42 2,239,693.05 2,886,093.13 3,608,709.98
Site Acquisition / Permits 350,000.00 350,000.00 350,000.00 350,000.00 350,000.00 350,000.00
Permits : Pre-Con to Post-Construction
Total Cost PHP 1,552,698.09 PHP 1,684,659.01 PHP 1,998,625.42 PHP 2,589,693.05 PHP 3,236,093.13 PHP 3,958,709.98
22. Conclusion:
• Sharing of infrastructure reduces significantly the capital expenditures of
every mobile operators, and provides faster rate in terms of roll out activities.
•The concept will provide savings on operational expenses.
•Tower sharing is a viable alternative in rural areas, and for the purpose of
road coverage.
23. References :
Growth Opportunities in the Philippines, Frost & Sullivan Press Release 2009
Philippines Telecom Brief, Ken Zita
Trends of Technological Innovation style in the Philippine Mobile
Telecommunication Industry
Philippine Economic Growth: Can it last? , Emmanuel S. De Dios