“PREPARATION ON #300 AREA”
IW SUPPLY SYSTEM
PREPARED BY : JAYPALSINH BORADHARA
EMPLOYEE CODE : Y00550
DEPARTMENT : UTILITY (W22)
DATE : 18--2017
PRESENTATION OUTLINE
 SCHEMATIC DRAWING OF WATER
TREATMENT SECTION
 ABOUT #300 AREA (COOLING TOWER)
 WATER IMPURITIES & ITS EFFECT
 COOLING WATER PROBLEMS
 SUPPLY FLOW RATE & REQUIREMENTS
 MAIN SPECIFICATION OF COOLING TOWER
 SITE PICTURES
 MASS FLOW BALANCE SHEET
100 #
Treated Water plant
300#
IW cooling
system
UTILITY CONTROL
BUILDING
800#
PA Station
400#
DM WATER PLANT
WATER SYSTEM
700#
WASTE WATER TREATMENT PLANT
N2 & H2
STATION
NG
STATION
SCHEMATIC DIAGRAM
COOLING TOWER
Cooling towers are heat removal devices
used to transfer process waste heat to
the atmosphere. Cooling towers may either
use the evaporation of water to remove
process heat and cool the working fluid to
near the wet-bulb air temperature or, in the
case of closed circuit dry cooling towers, rely
solely on air to cool the working fluid to near
the dry-bulb air temperature.
TYPES OF COOLING TOWER
COOLING TOWERS
Natural Draft Mechanical Draft
Design of Cooling tower is
such that cold air at the
bottom of tower pushes the
warmer air out from top.
Forced Draft
Air is pushed in
the tower with a
fan at the side.
Induced Draft
Air is pulled from
cooling tower by
a fan at the top
Counter Flow Cross Flow
TYPES OF COOLING TOWER
Natural Draft
Forced Draft
TYPES OF COOLING TOWER
Counter Flow Cooling Tower
CSCI-COOLING TOWER
FRAME & CASING – support the exterior enclosures
FILL- to facilitate heat transfer by maximizing water & air contact
COLD WATER BASIN- the basin usually has a sump or low point for
the cold water discharge connection.
DRIFT ELIMINATORS - these capture water droplets entrapped in the
air stream that, otherwise would be lost to the atmosphere
LOUVERS – the purpose of louvers is to equalize air flow into the fill
and retain the water within the tower. mostly used in cross flow.
NOZZLES – these provide the water sprays to wet the fill.
FANS – propeller & centrifugal are generally used in cooling tower.
propeller fan is generally used in induced draft.
COOLING TOWER COMPONENTS
COOLING TOWER PERFORMANCE
COOLONG TOWER
PERFORMANCE :
COOLONG RANGE :-
RANGE = HOT WATER
TEMPRATURE – COLD
WATER TEMPERATURE
COOLING TOWER
APPROACH :-
APPROACH = COLD WATER
TEMPERATURE – WET BULB
TEMPERATURE
EVAPORATION E:-
E = ∆T × R × 0.00085 (T in °F)
E = ∆T × R × 0.00153 (T in °C) Where,
where, E=Evaporation
R= Recirculating Rate in (m3/hour)
Temperature drop ∆T:-
∆T= TR – TS where TR – inlet temp.
TS – outlet temp.
Make up Water MU:-
MU = E + BD where, MU = make up rate (m3/hour)
E = evaporation rate (m3/hour)
BD = blowdown rate (m3/hour)
COOLING TOWER CALCULATION
COOLING TOWER CALCULATION
BLOW DOWN RATE BD:-
BD= E/CR-1 Where, BD = blowdown rate (m3/hour)
E = evaporation rate (m3/hour)
CR = cycle of concentration
 CYCLE OF CONCENTRATION :-
C.O.C = TSS in recirculation water
TSS in make up water
COOLING WATER PROBLEMS
MICROBIOLOGICAL
GROWTH
FOULING
CORROSION
 An electrochemical process in which a metal in it’s elemental
form returns to it’s native.
WATER (ELECTROLYTE)
O2
Fe(OH)2
ANODE
Fe
++
ELECTRON
FLOW
CATHODE
OH
-
O
=
O2
H O2
3
Fe(OH)
 Reduced heat transfer (lost efficiency)
 Increased cleaning (added costs and hassle)
 Equipment repair and replacement (lost revenue)
 Process or waste–side contamination (poor product
quality)
 Unscheduled shutdown (lost revenue)
CONSEQUENCE OF CORROSION
TYPES OF CORROSION
Uniform corrosion
or
Localized corrosion
Macroscopic
Other
Microscopic
• Galvanic
• Concentration Cell
• Pitting
• Selective Leaching
• Microbiological
• Erosion Corrosion
• Intergranular
• Corrosion Fatigue
• SCC
 Two dissimilar metals in contact with an
electrolyte
 Anode and Cathode in different metals
 One metal is the anode, the other is the
cathode
 One metal corrodes, the other is protected
Galvanic Corrosion
Brass Bolt
Aluminum
Electrolyte
Corroded Zones
Galvanic Corrosion
CONCENTRATION CELL
 Anode and Cathode in same metal (c.f.
galvanic corrosion
 Anode becomes localized by some mechanism
that makes it the preferred site
 Can occur at crevices or under deposits
CONCENTRATION CELL
PITTING
 Caused by Localized Deposition & Differential Oxygen cells.
Tuberculation leads to pitting
Water
Iron
Tubercle
Protective Film
Pit Forming
at Small Anodes(陽極)
Selective Leaching
Selective removal of one element from an alloy
by corrosion
–Examples:
• Dezincification - removal of zinc from brass alloys
• Graphitization - removal of Fe from cast iron
• Dealuminumification - removal of Al from aluminum
bronzes
• Denickelification - removal of Ni from Cu: Ni Alloy
Selective Leaching
Denickelification of Cu:Ni AlloyDezincification of Admiralty Brass
Erosion Corrosion
• Via compact(high speed water flow or
suspended solid)
• Rate of corrosion affected by:
– Velocity
– Turbulence
– Impingement
– particulate solids
 Copper alloys particularly susceptible as
soft
Erosion Corrosion
Microbiological corrosion
STRESS CORROSION CRACKING(SCC)
 Localized attack due to a combination of surface
tensile stress, temperature and a corrosive
environment
 Either inter or transgranular
 Certain ions are particularly aggressive to certain
metals
SCC Failure
SCALE TYPES
•sludge
•Organic and oil
•precipitation
•Corrosion product
•Microorganism product
FOULANTS
• Mud / Silts
• Organics / Oils
• Dust / dirt
• Matter precipitated in
bulk water
• Corrosion products
• Microorganisms
FOULANTS
• Suspended Solids - settle in low flow areas
–obey Stokes Law
–shell-side coolers, plate exchangers
• Organic materials and microorganisms can act
as binding agents
• Do not form scale deposits by themselves
MICROORGANISMS POLLUTION
MICROORGANISMS FORMING
TYPES
• Algae
• Fungi
• Bacteria
ENVIRONMENT
• Water
• Temperature
• pH
o Corrosion inhibitors
o scaling inhibitors
o Dispersant
o H2SO4
o NaOCl
COOLING TOWER DOSING
MAIN SPECIFICATION OF COOLING TOWER
1300M3/Hour×2 cells× 45 – 35 ° C Cross flow type
× 29 ° C –W.B (Including 1 set stand by)
Flow rate = 1200 m3/hour
Cycle of concentration = 3 times
Inlet temperature = 45 ° C
Outlet temperature = 35 ° C
Windage loss = 0.22 %
• Evaporation loss = 20.7 m3/hour
• Windage loss = 0.24 m3/hour
• Blow down = 10.1 m3/hour
• Make up = 31.1 m3/hour
 Retention Time (T) for cold well = 1258 m3/hour
1200 m3/hour
T = 62.9 minutes.
 IW supply pumps = 720 CMH × 65 M × 3 sets ( Including 1 set
stand by)
 Emergency IW pump = 250 CMH × 60 M × 1 set
MAIN SPECIFICATION OF COOLING TOWER
Design Flow rate = 1200 m3/hour
Design temperature : <35°C
Design supply pressure at T.O.P = 4.5 Kg/cm2
pH = 7~8.5
Suspended solid (mg/L) : <30
Total hardness as CaCO3 (ppm) : <800
SUPPLY FLOW RATE & REQUIREMENT
SUPPLY FLOW RATE & REQUIREMENT
1) ACL plant requirement = 716 m3/hour
2) Compressed air supply system = 105 m3/hour
3) Utility control Building = 50 m3/hour
4) Auxiliary Building = 243 m3/day
5) Main Substation Building = 76 m3/hour
 Total flow rate = 1190 m3/day
 Design flow rate = 1200 m3/hour
 Design temperature = 45°C
SITE PICTURES
RETURN
HEADER
NaOCl
STORAGE
TANK
H2SO4
STORAGE
TANK
COUNTER
FLOW
COOLING
TOWER
EMERGENCY
PUMP ROOM
SITE PICTURES
IW SUPPLY PUMP P-
3A01A/B/C
COUNTER
FLOW
COOLING
TOWER
FAN STACK
COLD WELL
MASS FLOW BALANCE
THANK YOU
ANY QUESTION?

More Related Content

What's hot

POWER PLANT CHEMISTRY( WATER TREATMENT FOR BOILERS)
POWER PLANT CHEMISTRY( WATER TREATMENT FOR BOILERS)POWER PLANT CHEMISTRY( WATER TREATMENT FOR BOILERS)
POWER PLANT CHEMISTRY( WATER TREATMENT FOR BOILERS)Dilip Kumar
 
Cooling water Treatment presentation
Cooling water Treatment presentationCooling water Treatment presentation
Cooling water Treatment presentationkamran ul hassan
 
Cooling Water Treatment
Cooling Water TreatmentCooling Water Treatment
Cooling Water Treatment
Ashutosh Mehndiratta
 
DM PLANT LECTURE.ppt
DM PLANT LECTURE.pptDM PLANT LECTURE.ppt
DM PLANT LECTURE.ppt
NeerajKumar420811
 
Basic Thermal Power Plant Chemistry, for Operational Staff.
Basic Thermal Power Plant Chemistry, for Operational Staff.Basic Thermal Power Plant Chemistry, for Operational Staff.
Basic Thermal Power Plant Chemistry, for Operational Staff.
Syed Aqeel Ahmed
 
Boiler Water Treatment -
Boiler Water Treatment - Boiler Water Treatment -
Cooling water system presentation
Cooling water system presentationCooling water system presentation
Cooling water system presentation
umar farooq
 
Buckmen Cooling Tower Chemistry
Buckmen Cooling Tower ChemistryBuckmen Cooling Tower Chemistry
Buckmen Cooling Tower Chemistry
Muhammad Abbas-ul-haq
 
Boiler Water Treatment
Boiler Water TreatmentBoiler Water Treatment
Boiler Water Treatment
Dr. Rohit Singh Lather, Ph.D.
 
Power plant chemistry by ramesh
Power plant chemistry by rameshPower plant chemistry by ramesh
Power plant chemistry by ramesh
Komma Ramesh
 
U#3 BOILER CHEMICAL CLEANING.
U#3 BOILER CHEMICAL CLEANING.U#3 BOILER CHEMICAL CLEANING.
U#3 BOILER CHEMICAL CLEANING.Dilip Kumar
 
S k-sharma-water-chemistry-in-thermal-power-plants
S k-sharma-water-chemistry-in-thermal-power-plantsS k-sharma-water-chemistry-in-thermal-power-plants
S k-sharma-water-chemistry-in-thermal-power-plants
teddy tavares
 
Power plant chemistry
Power plant chemistryPower plant chemistry
Power plant chemistry
Raghab Gorain
 
Boiler Water Chemistry for Large PF Fired Boilers in TPS.
Boiler Water Chemistry for Large PF Fired Boilers in TPS.Boiler Water Chemistry for Large PF Fired Boilers in TPS.
Boiler Water Chemistry for Large PF Fired Boilers in TPS.
Manohar Tatwawadi
 
Essentials for a sound boiler water treatment program
Essentials for a sound boiler water treatment programEssentials for a sound boiler water treatment program
Essentials for a sound boiler water treatment program
lorenzo Monasca
 
Power Plant Chemistry FEED WATER TREATMENT
Power Plant Chemistry FEED WATER TREATMENTPower Plant Chemistry FEED WATER TREATMENT
Power Plant Chemistry FEED WATER TREATMENTDilip Kumar
 
Power Plant Water Treatment
 Power Plant Water Treatment Power Plant Water Treatment
Power Plant Water Treatment
Rama Chandra Reddy
 
POWER PLANT CHEMISTRY
POWER PLANT CHEMISTRYPOWER PLANT CHEMISTRY
POWER PLANT CHEMISTRYDilip Kumar
 
Boiler Cycle water chemistry by Sudhanshu Dash
Boiler Cycle water chemistry by Sudhanshu DashBoiler Cycle water chemistry by Sudhanshu Dash
Boiler Cycle water chemistry by Sudhanshu Dash
Sudhanshu Sekhar Dash
 

What's hot (20)

POWER PLANT CHEMISTRY( WATER TREATMENT FOR BOILERS)
POWER PLANT CHEMISTRY( WATER TREATMENT FOR BOILERS)POWER PLANT CHEMISTRY( WATER TREATMENT FOR BOILERS)
POWER PLANT CHEMISTRY( WATER TREATMENT FOR BOILERS)
 
Cooling water Treatment presentation
Cooling water Treatment presentationCooling water Treatment presentation
Cooling water Treatment presentation
 
Cooling Water Treatment
Cooling Water TreatmentCooling Water Treatment
Cooling Water Treatment
 
DM PLANT LECTURE.ppt
DM PLANT LECTURE.pptDM PLANT LECTURE.ppt
DM PLANT LECTURE.ppt
 
Basic Thermal Power Plant Chemistry, for Operational Staff.
Basic Thermal Power Plant Chemistry, for Operational Staff.Basic Thermal Power Plant Chemistry, for Operational Staff.
Basic Thermal Power Plant Chemistry, for Operational Staff.
 
Boiler Water Treatment -
Boiler Water Treatment - Boiler Water Treatment -
Boiler Water Treatment -
 
Cooling water system presentation
Cooling water system presentationCooling water system presentation
Cooling water system presentation
 
Buckmen Cooling Tower Chemistry
Buckmen Cooling Tower ChemistryBuckmen Cooling Tower Chemistry
Buckmen Cooling Tower Chemistry
 
Boiler Water Treatment
Boiler Water TreatmentBoiler Water Treatment
Boiler Water Treatment
 
Power plant chemistry by ramesh
Power plant chemistry by rameshPower plant chemistry by ramesh
Power plant chemistry by ramesh
 
U#3 BOILER CHEMICAL CLEANING.
U#3 BOILER CHEMICAL CLEANING.U#3 BOILER CHEMICAL CLEANING.
U#3 BOILER CHEMICAL CLEANING.
 
S k-sharma-water-chemistry-in-thermal-power-plants
S k-sharma-water-chemistry-in-thermal-power-plantsS k-sharma-water-chemistry-in-thermal-power-plants
S k-sharma-water-chemistry-in-thermal-power-plants
 
Power plant chemistry
Power plant chemistryPower plant chemistry
Power plant chemistry
 
Boiler Water Chemistry for Large PF Fired Boilers in TPS.
Boiler Water Chemistry for Large PF Fired Boilers in TPS.Boiler Water Chemistry for Large PF Fired Boilers in TPS.
Boiler Water Chemistry for Large PF Fired Boilers in TPS.
 
Cooling Tower
Cooling TowerCooling Tower
Cooling Tower
 
Essentials for a sound boiler water treatment program
Essentials for a sound boiler water treatment programEssentials for a sound boiler water treatment program
Essentials for a sound boiler water treatment program
 
Power Plant Chemistry FEED WATER TREATMENT
Power Plant Chemistry FEED WATER TREATMENTPower Plant Chemistry FEED WATER TREATMENT
Power Plant Chemistry FEED WATER TREATMENT
 
Power Plant Water Treatment
 Power Plant Water Treatment Power Plant Water Treatment
Power Plant Water Treatment
 
POWER PLANT CHEMISTRY
POWER PLANT CHEMISTRYPOWER PLANT CHEMISTRY
POWER PLANT CHEMISTRY
 
Boiler Cycle water chemistry by Sudhanshu Dash
Boiler Cycle water chemistry by Sudhanshu DashBoiler Cycle water chemistry by Sudhanshu Dash
Boiler Cycle water chemistry by Sudhanshu Dash
 

Similar to Cooling Tower & cooling water treatment

cooling towers system .pdf
cooling towers system .pdfcooling towers system .pdf
cooling towers system .pdf
Karnav Rana
 
4 cooling system dynamics
4 cooling system dynamics4 cooling system dynamics
4 cooling system dynamics
Fuad Kareem.
 
Basics on Cooling Tower & Water.pdf sana parveen
Basics on Cooling Tower & Water.pdf sana parveenBasics on Cooling Tower & Water.pdf sana parveen
Basics on Cooling Tower & Water.pdf sana parveen
Sana Khan
 
project presentation 1 (2).pptx
project presentation 1 (2).pptxproject presentation 1 (2).pptx
project presentation 1 (2).pptx
DivinKV
 
106381932-Fridge.pptx
106381932-Fridge.pptx106381932-Fridge.pptx
106381932-Fridge.pptx
AlthafMk3
 
solar refrigerator .pptx
solar refrigerator .pptxsolar refrigerator .pptx
solar refrigerator .pptx
SANGARALINGAMT
 
Cooling tower
Cooling tower Cooling tower
Cooling tower
Mostafa Nassar
 
Cooling Towers - An Extensive Approach
Cooling Towers - An Extensive ApproachCooling Towers - An Extensive Approach
Cooling Towers - An Extensive Approach
Noaman Ahmed
 
Performance Analysis of the Natural Draft Cooling Tower in Different Seasons
Performance Analysis of the Natural Draft Cooling Tower in Different SeasonsPerformance Analysis of the Natural Draft Cooling Tower in Different Seasons
Performance Analysis of the Natural Draft Cooling Tower in Different Seasons
IOSR Journals
 
Heat Transfer in Heat Exchangers in Details.pdf
Heat Transfer in Heat Exchangers in Details.pdfHeat Transfer in Heat Exchangers in Details.pdf
Heat Transfer in Heat Exchangers in Details.pdf
KAhmedRehman
 
Heat transfer
Heat transferHeat transfer
Heat transfer
teja permana
 
Energy efficiency in Refrigeration Systems
Energy efficiency in Refrigeration SystemsEnergy efficiency in Refrigeration Systems
Energy efficiency in Refrigeration Systems
eecfncci
 
Basics of heat transfer
Basics of heat transferBasics of heat transfer
Basics of heat transfer
Abhishek Srivastav
 
THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)
Baibhav Saha
 
2nd CSP Training series : solar desalination (1/2)
2nd CSP Training series : solar desalination (1/2)2nd CSP Training series : solar desalination (1/2)
2nd CSP Training series : solar desalination (1/2)
Leonardo ENERGY
 
1st sem
1st sem1st sem
cooling tower
cooling tower cooling tower
cooling tower
Sadam Shahani
 
hvac and refrigeration system
hvac and refrigeration systemhvac and refrigeration system
hvac and refrigeration system
SRINIVASGILLALA
 
Final report on spent solution in hydro
Final report on spent solution in hydroFinal report on spent solution in hydro
Final report on spent solution in hydro
prateekj765
 

Similar to Cooling Tower & cooling water treatment (20)

cooling towers system .pdf
cooling towers system .pdfcooling towers system .pdf
cooling towers system .pdf
 
4 cooling system dynamics
4 cooling system dynamics4 cooling system dynamics
4 cooling system dynamics
 
Basics on Cooling Tower & Water.pdf sana parveen
Basics on Cooling Tower & Water.pdf sana parveenBasics on Cooling Tower & Water.pdf sana parveen
Basics on Cooling Tower & Water.pdf sana parveen
 
project presentation 1 (2).pptx
project presentation 1 (2).pptxproject presentation 1 (2).pptx
project presentation 1 (2).pptx
 
106381932-Fridge.pptx
106381932-Fridge.pptx106381932-Fridge.pptx
106381932-Fridge.pptx
 
solar refrigerator .pptx
solar refrigerator .pptxsolar refrigerator .pptx
solar refrigerator .pptx
 
Cooling tower
Cooling tower Cooling tower
Cooling tower
 
Cooling Towers - An Extensive Approach
Cooling Towers - An Extensive ApproachCooling Towers - An Extensive Approach
Cooling Towers - An Extensive Approach
 
Performance Analysis of the Natural Draft Cooling Tower in Different Seasons
Performance Analysis of the Natural Draft Cooling Tower in Different SeasonsPerformance Analysis of the Natural Draft Cooling Tower in Different Seasons
Performance Analysis of the Natural Draft Cooling Tower in Different Seasons
 
Heat Transfer in Heat Exchangers in Details.pdf
Heat Transfer in Heat Exchangers in Details.pdfHeat Transfer in Heat Exchangers in Details.pdf
Heat Transfer in Heat Exchangers in Details.pdf
 
Heat transfer
Heat transferHeat transfer
Heat transfer
 
Energy efficiency in Refrigeration Systems
Energy efficiency in Refrigeration SystemsEnergy efficiency in Refrigeration Systems
Energy efficiency in Refrigeration Systems
 
Heat transfer
Heat transferHeat transfer
Heat transfer
 
Basics of heat transfer
Basics of heat transferBasics of heat transfer
Basics of heat transfer
 
THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)
 
2nd CSP Training series : solar desalination (1/2)
2nd CSP Training series : solar desalination (1/2)2nd CSP Training series : solar desalination (1/2)
2nd CSP Training series : solar desalination (1/2)
 
1st sem
1st sem1st sem
1st sem
 
cooling tower
cooling tower cooling tower
cooling tower
 
hvac and refrigeration system
hvac and refrigeration systemhvac and refrigeration system
hvac and refrigeration system
 
Final report on spent solution in hydro
Final report on spent solution in hydroFinal report on spent solution in hydro
Final report on spent solution in hydro
 

Recently uploaded

Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 

Recently uploaded (20)

Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 

Cooling Tower & cooling water treatment

  • 1. “PREPARATION ON #300 AREA” IW SUPPLY SYSTEM PREPARED BY : JAYPALSINH BORADHARA EMPLOYEE CODE : Y00550 DEPARTMENT : UTILITY (W22) DATE : 18--2017
  • 2. PRESENTATION OUTLINE  SCHEMATIC DRAWING OF WATER TREATMENT SECTION  ABOUT #300 AREA (COOLING TOWER)  WATER IMPURITIES & ITS EFFECT  COOLING WATER PROBLEMS  SUPPLY FLOW RATE & REQUIREMENTS  MAIN SPECIFICATION OF COOLING TOWER  SITE PICTURES  MASS FLOW BALANCE SHEET
  • 3. 100 # Treated Water plant 300# IW cooling system UTILITY CONTROL BUILDING 800# PA Station 400# DM WATER PLANT WATER SYSTEM 700# WASTE WATER TREATMENT PLANT N2 & H2 STATION NG STATION SCHEMATIC DIAGRAM
  • 4. COOLING TOWER Cooling towers are heat removal devices used to transfer process waste heat to the atmosphere. Cooling towers may either use the evaporation of water to remove process heat and cool the working fluid to near the wet-bulb air temperature or, in the case of closed circuit dry cooling towers, rely solely on air to cool the working fluid to near the dry-bulb air temperature.
  • 5. TYPES OF COOLING TOWER COOLING TOWERS Natural Draft Mechanical Draft Design of Cooling tower is such that cold air at the bottom of tower pushes the warmer air out from top. Forced Draft Air is pushed in the tower with a fan at the side. Induced Draft Air is pulled from cooling tower by a fan at the top Counter Flow Cross Flow
  • 6. TYPES OF COOLING TOWER Natural Draft Forced Draft
  • 7. TYPES OF COOLING TOWER Counter Flow Cooling Tower
  • 9. FRAME & CASING – support the exterior enclosures FILL- to facilitate heat transfer by maximizing water & air contact COLD WATER BASIN- the basin usually has a sump or low point for the cold water discharge connection. DRIFT ELIMINATORS - these capture water droplets entrapped in the air stream that, otherwise would be lost to the atmosphere LOUVERS – the purpose of louvers is to equalize air flow into the fill and retain the water within the tower. mostly used in cross flow. NOZZLES – these provide the water sprays to wet the fill. FANS – propeller & centrifugal are generally used in cooling tower. propeller fan is generally used in induced draft. COOLING TOWER COMPONENTS
  • 10. COOLING TOWER PERFORMANCE COOLONG TOWER PERFORMANCE : COOLONG RANGE :- RANGE = HOT WATER TEMPRATURE – COLD WATER TEMPERATURE COOLING TOWER APPROACH :- APPROACH = COLD WATER TEMPERATURE – WET BULB TEMPERATURE
  • 11. EVAPORATION E:- E = ∆T × R × 0.00085 (T in °F) E = ∆T × R × 0.00153 (T in °C) Where, where, E=Evaporation R= Recirculating Rate in (m3/hour) Temperature drop ∆T:- ∆T= TR – TS where TR – inlet temp. TS – outlet temp. Make up Water MU:- MU = E + BD where, MU = make up rate (m3/hour) E = evaporation rate (m3/hour) BD = blowdown rate (m3/hour) COOLING TOWER CALCULATION
  • 12. COOLING TOWER CALCULATION BLOW DOWN RATE BD:- BD= E/CR-1 Where, BD = blowdown rate (m3/hour) E = evaporation rate (m3/hour) CR = cycle of concentration  CYCLE OF CONCENTRATION :- C.O.C = TSS in recirculation water TSS in make up water
  • 14. CORROSION  An electrochemical process in which a metal in it’s elemental form returns to it’s native. WATER (ELECTROLYTE) O2 Fe(OH)2 ANODE Fe ++ ELECTRON FLOW CATHODE OH - O = O2 H O2 3 Fe(OH)
  • 15.  Reduced heat transfer (lost efficiency)  Increased cleaning (added costs and hassle)  Equipment repair and replacement (lost revenue)  Process or waste–side contamination (poor product quality)  Unscheduled shutdown (lost revenue) CONSEQUENCE OF CORROSION
  • 16. TYPES OF CORROSION Uniform corrosion or Localized corrosion Macroscopic Other Microscopic • Galvanic • Concentration Cell • Pitting • Selective Leaching • Microbiological • Erosion Corrosion • Intergranular • Corrosion Fatigue • SCC
  • 17.  Two dissimilar metals in contact with an electrolyte  Anode and Cathode in different metals  One metal is the anode, the other is the cathode  One metal corrodes, the other is protected Galvanic Corrosion Brass Bolt Aluminum Electrolyte Corroded Zones
  • 19. CONCENTRATION CELL  Anode and Cathode in same metal (c.f. galvanic corrosion  Anode becomes localized by some mechanism that makes it the preferred site  Can occur at crevices or under deposits
  • 21. PITTING  Caused by Localized Deposition & Differential Oxygen cells. Tuberculation leads to pitting Water Iron Tubercle Protective Film Pit Forming at Small Anodes(陽極)
  • 22. Selective Leaching Selective removal of one element from an alloy by corrosion –Examples: • Dezincification - removal of zinc from brass alloys • Graphitization - removal of Fe from cast iron • Dealuminumification - removal of Al from aluminum bronzes • Denickelification - removal of Ni from Cu: Ni Alloy
  • 23. Selective Leaching Denickelification of Cu:Ni AlloyDezincification of Admiralty Brass
  • 24. Erosion Corrosion • Via compact(high speed water flow or suspended solid) • Rate of corrosion affected by: – Velocity – Turbulence – Impingement – particulate solids  Copper alloys particularly susceptible as soft
  • 27. STRESS CORROSION CRACKING(SCC)  Localized attack due to a combination of surface tensile stress, temperature and a corrosive environment  Either inter or transgranular  Certain ions are particularly aggressive to certain metals
  • 29. SCALE TYPES •sludge •Organic and oil •precipitation •Corrosion product •Microorganism product
  • 30. FOULANTS • Mud / Silts • Organics / Oils • Dust / dirt • Matter precipitated in bulk water • Corrosion products • Microorganisms
  • 31. FOULANTS • Suspended Solids - settle in low flow areas –obey Stokes Law –shell-side coolers, plate exchangers • Organic materials and microorganisms can act as binding agents • Do not form scale deposits by themselves
  • 33. MICROORGANISMS FORMING TYPES • Algae • Fungi • Bacteria ENVIRONMENT • Water • Temperature • pH
  • 34. o Corrosion inhibitors o scaling inhibitors o Dispersant o H2SO4 o NaOCl COOLING TOWER DOSING
  • 35. MAIN SPECIFICATION OF COOLING TOWER 1300M3/Hour×2 cells× 45 – 35 ° C Cross flow type × 29 ° C –W.B (Including 1 set stand by) Flow rate = 1200 m3/hour Cycle of concentration = 3 times Inlet temperature = 45 ° C Outlet temperature = 35 ° C Windage loss = 0.22 %
  • 36. • Evaporation loss = 20.7 m3/hour • Windage loss = 0.24 m3/hour • Blow down = 10.1 m3/hour • Make up = 31.1 m3/hour  Retention Time (T) for cold well = 1258 m3/hour 1200 m3/hour T = 62.9 minutes.  IW supply pumps = 720 CMH × 65 M × 3 sets ( Including 1 set stand by)  Emergency IW pump = 250 CMH × 60 M × 1 set MAIN SPECIFICATION OF COOLING TOWER
  • 37. Design Flow rate = 1200 m3/hour Design temperature : <35°C Design supply pressure at T.O.P = 4.5 Kg/cm2 pH = 7~8.5 Suspended solid (mg/L) : <30 Total hardness as CaCO3 (ppm) : <800 SUPPLY FLOW RATE & REQUIREMENT
  • 38. SUPPLY FLOW RATE & REQUIREMENT 1) ACL plant requirement = 716 m3/hour 2) Compressed air supply system = 105 m3/hour 3) Utility control Building = 50 m3/hour 4) Auxiliary Building = 243 m3/day 5) Main Substation Building = 76 m3/hour  Total flow rate = 1190 m3/day  Design flow rate = 1200 m3/hour  Design temperature = 45°C
  • 40. SITE PICTURES IW SUPPLY PUMP P- 3A01A/B/C COUNTER FLOW COOLING TOWER FAN STACK COLD WELL