60. • 1980s – SPSDL operated routinely from 1984 – 1993 (Pole Side was
displayed in the International Antarctic Centre 2003-2010 and now
in Canterbury Museum in Christchurch, New Zealand)
• 1983 – 2013 The McMurdo side of SPSDL became NAILS and
operated from 1994 to 2013 (moved to T-site in CY 2000)
61. 1988 – Long Duration
Balloons Launched from
McMurdo, Antarctica
62. 1996 – McMurdo TDRSS Relay System (MTRS-1) commissioned
on Black Island as a result of the successful Demos in 1992
63. 1993 – NASA VIP Assessment Team
for Thule Air Base
67. 1995 – NASA Mike First trip to North Pole (90N) –
(@ South Pole in Jan 1995 and @ North Pole in
April 1995, ~90 days)
NOTE: Some say this
mixing of the Polar
Waters triggered the
Recent Global Climate
Change, but that’s an
exaggeration.
111. 2005 – NAILS team upgrades MTRS-2 and Tests Robotic
Docking via Remote-Control from University of Michigan
112. 2006 – NAILS team
Calibration and Routine
Maintenance
113. Live Webcasting of Total Solar
Eclipse from Subsatellite Point in
Libya (Sahara Desert)
March 26, 2006
Note: Moon is 6 hours away
from totality but not visible until
photo is enhanced