What's involved in a complete end-to-end contract manufacturing and assembly solution? PP C&A looks at the offer from early design concepts, design for manufacture and assembly (DFMA), supply chain design & optimisation, to product standardisation, design approval processes and machine build, test and logistics.
AVEVA World Conference NA - Ryan/Avantsa, CFIHOS WorkshopAVEVA-Americas
This presentation provides an introduction and overview of the USPI-NL, Capital Facility Information HandOver Specification (CFIHOS) and was presented alongside an open workshop discussion among OOs, EPCs and Suppliers regarding CFIHOS adoption and compliance to support a Plant Digitalization strategy across the capital facility industry.
Adapting Project Productivity to a Different World of Competition by Harry Be...AVEVA Group plc
The oil & gas industry faces long-term price pressures from new competitors and future project portfolios need to be scalable and flexible, avoiding the high risks, costs, and poor productivity of the past. Lessons in efficient manufacturing will need to be learned. Industry expert, Harry Benham, formerly Shell, explains how to put energy projects back on track and discusses the 5 key actions to catalyze reduction in project size and complexity and increase performance.
Find out more how AVEVA can transform your business here >> www.aveva.com
Cauvesoft Engineering was founded as a part of diversification plans in response to the opening up of markets for Industrial design services.
Contact : info@cauve.com
The principles at the heart of BIM were central to AVEVA long before BIM was introduced. So it’s no surprise we wholeheartedly support its aims and values - and have a range of technologies that can add value to your BIM execution plan.
Contact the team at http://www.aveva.com/en/Contact to discover how AVEVA solutions can add value to BIM projects across multiple industry sectors or visit www.aveva.com for more information.
AVEVA World Conference NA - Todd Kubiak, AVEVA NETAVEVA-Americas
Keeping on top of constantly changing information from multiple sources is a time-consuming, risk-prone task. In fact, most engineering professionals spend more than 20% of their time checking and transcribing information.
This presentation that presents the challenge, ‘How fast can you access information?’ and demonstrates how AVEVA Net provides rapid access to all types of data and documents, and then validates it across all sources, enabling faster, more informed decision making for our customers.
AVEVA World Conference NA - Alan Smith, WorleyParsonsAVEVA-Americas
There has been a decade’s long vision that technology will assist us with project design and execution, handling 2D and 3D design and data integration, saving time and improving quality. However, our industry still seems to get to the end of the project and break out the colored pencils and Excel / Access to see what we missed.
Are we finally on a path where the tools are going to deliver the vision?
AVEVA World Conference NA - Ryan/Avantsa, CFIHOS WorkshopAVEVA-Americas
This presentation provides an introduction and overview of the USPI-NL, Capital Facility Information HandOver Specification (CFIHOS) and was presented alongside an open workshop discussion among OOs, EPCs and Suppliers regarding CFIHOS adoption and compliance to support a Plant Digitalization strategy across the capital facility industry.
Adapting Project Productivity to a Different World of Competition by Harry Be...AVEVA Group plc
The oil & gas industry faces long-term price pressures from new competitors and future project portfolios need to be scalable and flexible, avoiding the high risks, costs, and poor productivity of the past. Lessons in efficient manufacturing will need to be learned. Industry expert, Harry Benham, formerly Shell, explains how to put energy projects back on track and discusses the 5 key actions to catalyze reduction in project size and complexity and increase performance.
Find out more how AVEVA can transform your business here >> www.aveva.com
Cauvesoft Engineering was founded as a part of diversification plans in response to the opening up of markets for Industrial design services.
Contact : info@cauve.com
The principles at the heart of BIM were central to AVEVA long before BIM was introduced. So it’s no surprise we wholeheartedly support its aims and values - and have a range of technologies that can add value to your BIM execution plan.
Contact the team at http://www.aveva.com/en/Contact to discover how AVEVA solutions can add value to BIM projects across multiple industry sectors or visit www.aveva.com for more information.
AVEVA World Conference NA - Todd Kubiak, AVEVA NETAVEVA-Americas
Keeping on top of constantly changing information from multiple sources is a time-consuming, risk-prone task. In fact, most engineering professionals spend more than 20% of their time checking and transcribing information.
This presentation that presents the challenge, ‘How fast can you access information?’ and demonstrates how AVEVA Net provides rapid access to all types of data and documents, and then validates it across all sources, enabling faster, more informed decision making for our customers.
AVEVA World Conference NA - Alan Smith, WorleyParsonsAVEVA-Americas
There has been a decade’s long vision that technology will assist us with project design and execution, handling 2D and 3D design and data integration, saving time and improving quality. However, our industry still seems to get to the end of the project and break out the colored pencils and Excel / Access to see what we missed.
Are we finally on a path where the tools are going to deliver the vision?
We help our clients accelerate their research & development, solving complex engineering problems by applying our advanced multiphysics simulation and measurement techniques.
AVEVA World Conference NA - Ross Killmurray, AVEVA IE&DAVEVA-Americas
A sneak peek at our ‘from the lab’ material showing the up andcoming features, functions and products still in development, including AVEVA Everything3D, AVEVA Engineering 15.1 and thenew AVEVA Electrical & Instrumentation 15.1.
Technical support for strategic investment in the aluminium industry, including technical due diligence, pre-feasibility studies, plant design, cost modelling and upgrade support.
ATC follows Agile Software Development Methodology (based on iterative and incremental development processes), where requirements and solutions evolve through collaboration between self-organizing, cross-functional teams.
Work with us to create a service that meets your strategy in a timely, efficient and flexible way.
AVEVA World Conference NA - Greg Pada, Digital Twin SolutionsAVEVA-Americas
Industry 4.0 is the buzzword of the day. It speaks to a massive shift in reliance on centralized universally accessible data that enables tools to drive efficiencies in all aspects of business. AVEVA’s core data-centric philosophy is leading this shift in the world of Industrial Facility Engineering. EPC 4.0 is coming.
AVEVA World Conference NA - Patrick Reilly, Vista ProjectsAVEVA-Americas
We receive all types of day to day information from news to banking in real time. But many projects are still executing based on stale data that is days or weeks old.
This presentation covers why this is a great opportunity to improve projects and how enabling project teams to work with real time data drives collaboration, transparency and overall improved project results.
Transformational Change in Managing Assets for Operational Excellence by Jan ...AVEVA Group plc
Jan Shumate, Eastman Chemical Company discusses the ‘Transformational Change in Managing Assets for Operational Excellence’ at the AVEVA World Summit 2016, New Orleans. Jan outlines ‘The Journey from Documents to Data’ and by using AVEVA Integrated Engineering and Design (IE&D) solution, learn how Eastman created a data-centric engineering platform to improve their plan engineering processes.
Discover how you can also maintain an evergreen digital asset for plant operations using AVEVA software the same way Eastman Chemical Company have. Contact us at http://www.aveva.com/en/Contact.aspx to start transforming your business today.
Engineering & Construction 4.0 – A Digital pathway to a more profitable futureLaurianneSchillesDur
The Engineering & Construction industry is under increasing pressure from the clients leading to significant transfer of scope and risk coupled with intense cost pressure
In response, the E&C players have thus far adopted the traditional measures e.g. M&A to expand scope and standardization to better control costs.
n this paper we outline how a holistic and integrated Digital landscape unifies both the Off-site and on-site activities enabling true seamless collaboration and illustrate proven use cases which could aid E&C players in their Digital journey
RT332: Measuring Progress and Productivity in Model-based EngineeringAVEVA Group plc
CII is an organization consisting of owners, constructors, designers, and academia dedicated to improving the construction industry as a whole, providing meaningful research to yield useful tools to improve all aspects of the construction industry. Learn how AVEVA is collaborating with CII's Research Team 332 on researching and developing adoptable and adaptable solutions for the task of progressing and measuring productivity within 3D modeling environments.
Presented by:
Dr. Mani Golparvar-Fard—University of Illinois at Urbana-Champaign
Gustavo Garciat—University of Illinois at Urbana-Champaign
Derwin Cartmel—Day & Zimmermann
Discover how AVEVA can transform your business today
www.aveva.com
AVEVA Integrated Shipbuilding Solution by Robert Pesut, BrodosplitAVEVA Group plc
Robert Pesut, Brodosplit, presents the ‘Integrated Shipbuilding Solution’ at the AVEVA World Summit 2016, New Orleans. Robert discusses the implementation process of the integrated shipbuilding solution into the shipyard that is under restructuring process. As a result of using AVEVA Marine and ERM solutions the project will see improved design speed, reduced design time and improved production planning. Find out more how AVEVA can transform your business >> www.aveva.com
AVEVA World Conference NA - Greg Lawes, Point3DAVEVA-Americas
In this presentation, Greg Lawes explores the possibilities of utilizing technology to support intelligent digitalization of an asset through extracting, validating, and linking data from the field to the model, throughout an asset’s lifecycle, to enable a true Virtual Field Walkdown.
AVEVA World Conference NA - Justin Weaver, Southern CompanyAVEVA-Americas
Digitalization often focuses on engineering and design. But how can digitalization open up opportunities in EPC project performance beyond engineering?
This presentation reviews the potential benefits Southern Company has found in procurement, construction, project controls, and commissioning. It also covers the implementation plan at Southern Company and how it ties into their larger Advanced Work Packaging and Materials Management initiatives.
A Journey to AVEVA E3D, Competition & Costs delves into Lutz, Daily & Brain’s experiences on the path to AVEVA E3D, while examining how, as a mid-sized company, they are able to utilize and benefit from the software while controlling costs and leveraging its capabilities versus competitors.
Presented by: Matt Ross—Lutz, Daily & Brain
Discover how AVEVA can transform your business today
www.aveva.com
Whether you’re working on an experimental step, new business opportunity or one-off project, our highly experienced team is here to consult and fully take charge at every step of the way. You simply provide the specifications and we deliver the sources upon completion.
We can also help hire, train and scale a business team to support your organizational goals and projects - minimizing risks and disruption to your day to day business. Upon task completion, resources can be transferred back to you.
IoT-Indus is a team of electronics engineers specialized in the New Product Introduction and manufacturing of IoT products.
New product introduction is a crucial step for your product. Our experts know perfectly how to manage every stage to make your project a success on your market.
We help our clients accelerate their research & development, solving complex engineering problems by applying our advanced multiphysics simulation and measurement techniques.
AVEVA World Conference NA - Ross Killmurray, AVEVA IE&DAVEVA-Americas
A sneak peek at our ‘from the lab’ material showing the up andcoming features, functions and products still in development, including AVEVA Everything3D, AVEVA Engineering 15.1 and thenew AVEVA Electrical & Instrumentation 15.1.
Technical support for strategic investment in the aluminium industry, including technical due diligence, pre-feasibility studies, plant design, cost modelling and upgrade support.
ATC follows Agile Software Development Methodology (based on iterative and incremental development processes), where requirements and solutions evolve through collaboration between self-organizing, cross-functional teams.
Work with us to create a service that meets your strategy in a timely, efficient and flexible way.
AVEVA World Conference NA - Greg Pada, Digital Twin SolutionsAVEVA-Americas
Industry 4.0 is the buzzword of the day. It speaks to a massive shift in reliance on centralized universally accessible data that enables tools to drive efficiencies in all aspects of business. AVEVA’s core data-centric philosophy is leading this shift in the world of Industrial Facility Engineering. EPC 4.0 is coming.
AVEVA World Conference NA - Patrick Reilly, Vista ProjectsAVEVA-Americas
We receive all types of day to day information from news to banking in real time. But many projects are still executing based on stale data that is days or weeks old.
This presentation covers why this is a great opportunity to improve projects and how enabling project teams to work with real time data drives collaboration, transparency and overall improved project results.
Transformational Change in Managing Assets for Operational Excellence by Jan ...AVEVA Group plc
Jan Shumate, Eastman Chemical Company discusses the ‘Transformational Change in Managing Assets for Operational Excellence’ at the AVEVA World Summit 2016, New Orleans. Jan outlines ‘The Journey from Documents to Data’ and by using AVEVA Integrated Engineering and Design (IE&D) solution, learn how Eastman created a data-centric engineering platform to improve their plan engineering processes.
Discover how you can also maintain an evergreen digital asset for plant operations using AVEVA software the same way Eastman Chemical Company have. Contact us at http://www.aveva.com/en/Contact.aspx to start transforming your business today.
Engineering & Construction 4.0 – A Digital pathway to a more profitable futureLaurianneSchillesDur
The Engineering & Construction industry is under increasing pressure from the clients leading to significant transfer of scope and risk coupled with intense cost pressure
In response, the E&C players have thus far adopted the traditional measures e.g. M&A to expand scope and standardization to better control costs.
n this paper we outline how a holistic and integrated Digital landscape unifies both the Off-site and on-site activities enabling true seamless collaboration and illustrate proven use cases which could aid E&C players in their Digital journey
RT332: Measuring Progress and Productivity in Model-based EngineeringAVEVA Group plc
CII is an organization consisting of owners, constructors, designers, and academia dedicated to improving the construction industry as a whole, providing meaningful research to yield useful tools to improve all aspects of the construction industry. Learn how AVEVA is collaborating with CII's Research Team 332 on researching and developing adoptable and adaptable solutions for the task of progressing and measuring productivity within 3D modeling environments.
Presented by:
Dr. Mani Golparvar-Fard—University of Illinois at Urbana-Champaign
Gustavo Garciat—University of Illinois at Urbana-Champaign
Derwin Cartmel—Day & Zimmermann
Discover how AVEVA can transform your business today
www.aveva.com
AVEVA Integrated Shipbuilding Solution by Robert Pesut, BrodosplitAVEVA Group plc
Robert Pesut, Brodosplit, presents the ‘Integrated Shipbuilding Solution’ at the AVEVA World Summit 2016, New Orleans. Robert discusses the implementation process of the integrated shipbuilding solution into the shipyard that is under restructuring process. As a result of using AVEVA Marine and ERM solutions the project will see improved design speed, reduced design time and improved production planning. Find out more how AVEVA can transform your business >> www.aveva.com
AVEVA World Conference NA - Greg Lawes, Point3DAVEVA-Americas
In this presentation, Greg Lawes explores the possibilities of utilizing technology to support intelligent digitalization of an asset through extracting, validating, and linking data from the field to the model, throughout an asset’s lifecycle, to enable a true Virtual Field Walkdown.
AVEVA World Conference NA - Justin Weaver, Southern CompanyAVEVA-Americas
Digitalization often focuses on engineering and design. But how can digitalization open up opportunities in EPC project performance beyond engineering?
This presentation reviews the potential benefits Southern Company has found in procurement, construction, project controls, and commissioning. It also covers the implementation plan at Southern Company and how it ties into their larger Advanced Work Packaging and Materials Management initiatives.
A Journey to AVEVA E3D, Competition & Costs delves into Lutz, Daily & Brain’s experiences on the path to AVEVA E3D, while examining how, as a mid-sized company, they are able to utilize and benefit from the software while controlling costs and leveraging its capabilities versus competitors.
Presented by: Matt Ross—Lutz, Daily & Brain
Discover how AVEVA can transform your business today
www.aveva.com
Whether you’re working on an experimental step, new business opportunity or one-off project, our highly experienced team is here to consult and fully take charge at every step of the way. You simply provide the specifications and we deliver the sources upon completion.
We can also help hire, train and scale a business team to support your organizational goals and projects - minimizing risks and disruption to your day to day business. Upon task completion, resources can be transferred back to you.
IoT-Indus is a team of electronics engineers specialized in the New Product Introduction and manufacturing of IoT products.
New product introduction is a crucial step for your product. Our experts know perfectly how to manage every stage to make your project a success on your market.
Tooltech Global Engineering Pvt. Ltd, one of the first Indian Companies to set up operations in Scandinavia, is a leading Engineering Design and Simulation solutions provider serving marquee European clients.
Indus Aviation's Product Engineering expertise. The services includes Product Engineerings, Product Development, Product Testing - right from ideation to the end of life.
SmartBrains An Indian government authorize Training center offer various types of skill and development course in various cities in India. Our head office at noida U.P.
SmartBrains An Indian government authorize Training center offer various types of skill and development course in various cities in India. Our head office at Noida U.P.
Understanding Inductive Bias in Machine LearningSUTEJAS
This presentation explores the concept of inductive bias in machine learning. It explains how algorithms come with built-in assumptions and preferences that guide the learning process. You'll learn about the different types of inductive bias and how they can impact the performance and generalizability of machine learning models.
The presentation also covers the positive and negative aspects of inductive bias, along with strategies for mitigating potential drawbacks. We'll explore examples of how bias manifests in algorithms like neural networks and decision trees.
By understanding inductive bias, you can gain valuable insights into how machine learning models work and make informed decisions when building and deploying them.
We have compiled the most important slides from each speaker's presentation. This year’s compilation, available for free, captures the key insights and contributions shared during the DfMAy 2024 conference.
6th International Conference on Machine Learning & Applications (CMLA 2024)ClaraZara1
6th International Conference on Machine Learning & Applications (CMLA 2024) will provide an excellent international forum for sharing knowledge and results in theory, methodology and applications of on Machine Learning & Applications.
ACEP Magazine edition 4th launched on 05.06.2024Rahul
This document provides information about the third edition of the magazine "Sthapatya" published by the Association of Civil Engineers (Practicing) Aurangabad. It includes messages from current and past presidents of ACEP, memories and photos from past ACEP events, information on life time achievement awards given by ACEP, and a technical article on concrete maintenance, repairs and strengthening. The document highlights activities of ACEP and provides a technical educational article for members.
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...ssuser7dcef0
Power plants release a large amount of water vapor into the
atmosphere through the stack. The flue gas can be a potential
source for obtaining much needed cooling water for a power
plant. If a power plant could recover and reuse a portion of this
moisture, it could reduce its total cooling water intake
requirement. One of the most practical way to recover water
from flue gas is to use a condensing heat exchanger. The power
plant could also recover latent heat due to condensation as well
as sensible heat due to lowering the flue gas exit temperature.
Additionally, harmful acids released from the stack can be
reduced in a condensing heat exchanger by acid condensation. reduced in a condensing heat exchanger by acid condensation.
Condensation of vapors in flue gas is a complicated
phenomenon since heat and mass transfer of water vapor and
various acids simultaneously occur in the presence of noncondensable
gases such as nitrogen and oxygen. Design of a
condenser depends on the knowledge and understanding of the
heat and mass transfer processes. A computer program for
numerical simulations of water (H2O) and sulfuric acid (H2SO4)
condensation in a flue gas condensing heat exchanger was
developed using MATLAB. Governing equations based on
mass and energy balances for the system were derived to
predict variables such as flue gas exit temperature, cooling
water outlet temperature, mole fraction and condensation rates
of water and sulfuric acid vapors. The equations were solved
using an iterative solution technique with calculations of heat
and mass transfer coefficients and physical properties.
A review on techniques and modelling methodologies used for checking electrom...nooriasukmaningtyas
The proper function of the integrated circuit (IC) in an inhibiting electromagnetic environment has always been a serious concern throughout the decades of revolution in the world of electronics, from disjunct devices to today’s integrated circuit technology, where billions of transistors are combined on a single chip. The automotive industry and smart vehicles in particular, are confronting design issues such as being prone to electromagnetic interference (EMI). Electronic control devices calculate incorrect outputs because of EMI and sensors give misleading values which can prove fatal in case of automotives. In this paper, the authors have non exhaustively tried to review research work concerned with the investigation of EMI in ICs and prediction of this EMI using various modelling methodologies and measurement setups.
Water billing management system project report.pdfKamal Acharya
Our project entitled “Water Billing Management System” aims is to generate Water bill with all the charges and penalty. Manual system that is employed is extremely laborious and quite inadequate. It only makes the process more difficult and hard.
The aim of our project is to develop a system that is meant to partially computerize the work performed in the Water Board like generating monthly Water bill, record of consuming unit of water, store record of the customer and previous unpaid record.
We used HTML/PHP as front end and MYSQL as back end for developing our project. HTML is primarily a visual design environment. We can create a android application by designing the form and that make up the user interface. Adding android application code to the form and the objects such as buttons and text boxes on them and adding any required support code in additional modular.
MySQL is free open source database that facilitates the effective management of the databases by connecting them to the software. It is a stable ,reliable and the powerful solution with the advanced features and advantages which are as follows: Data Security.MySQL is free open source database that facilitates the effective management of the databases by connecting them to the software.
HEAP SORT ILLUSTRATED WITH HEAPIFY, BUILD HEAP FOR DYNAMIC ARRAYS.
Heap sort is a comparison-based sorting technique based on Binary Heap data structure. It is similar to the selection sort where we first find the minimum element and place the minimum element at the beginning. Repeat the same process for the remaining elements.
2. As you grow, you will be looking to add significant
value to your specific production activities and
associated processes. As an outsourcing partner,
PP C&A will be able to assist in numerous ways.
From early design concepts, design for
manufacture and assembly (DFMA), supply chain
design and optimisation, to product standardisation,
design approval processes and machine build, test
and logistics – a complete end-to-end contract
manufacturing solution is available.
UNLOCK YOUR GROWTH POTENTIAL
4. SATISFYING THE DEMAND FOR
SMARTER, MORE COMPLEX BUILDS
n Full design and production capabilities with PP C&A
technicians and technical partners.
n Build to print & DFM capabilities optimise performance cost.
n Reducing customer’s total acquisition costs and
streamlining production.
n Dedicated and controlled ESD environment has capacity for
more complex builds, encompassing high-end PCB assemblies
and box builds.
To support electronics assembly demand, PP
C&A has invested heavily in its own facility
and specifically, in a dedicated environment
adhering to the stringent demands of ESD
(electro-static discharge). With significant added
value and lead-time reductions, PP C&A can
satisfy very specific and stringent electronics
assembly work and subsequently explore and
support new markets and applications.
5. This dedicated and controlled environment
has capacity for more complex and delicate
builds, encompassing high-end PCB
assemblies and box builds.
The environment meet the specific needs of
customer projects and the legal compliance
to the recognised standards which includes
investment in special flooring, benches and
test equipment – all grounded to earth to
ensure that life of the electronics is protected
from potential electrostatic discharge.
ESD INVESTMENT
Currently operating >98.50%
‘on time in full (OTIF)’ service.
6. This partnership is helping bring new tele-optometry solutions to market at a time when
remote technology is in huge demand. EYOTO™ is a world leader in the creation of
advanced tele-optometry solutions for the global optical industry.
By using PP C&A’s outsourcing service, the firm could speed up time to market, so crucial
to maximising the commercial benefits of the technology, whilst also leaving its experts
free to concentrate on core business activities such as R&D.
Casestudy
Our ability to have the right skills available in engineering competence, cable preparation
and creation, electro-mechanical build and assembly meant we had the majority of what
we needed under one roof and then it was simply a case of designing the build process.
Garry Myatt, PP C&A Sales Director
“
7. PP C&A is a proud member of the Manufacturing
Assembly Network (MAN Group). The MAN Group
is a network of manufacturing companies designed
to share technical excellence in mechanical,
electrical and electronic engineering processes.
ASSOCIATIONS & PARTNERSHIPS
UNLOCK WIDER CAPABILITIES
n Industrial design
n Contract electronics manufacturing
n Electrical & electronic assembly
n PCB design & manufacture
n High volume precision stamping
n Plastic injection moulding
n Aluminium casting & CNC machining
n Forging
The MAN Group provides access to numerous
manufacturing disciplines from a single
source, and a more stable solution for
complex, multi-discipline engineering projects.
8. As a customer of PP C&A, you benefit
from our long-standing relationships with
expert providers of control, automation,
and information technology products,
specialist providers of cabling,
interconnectivity and electronics
solutions, and industry specific
consultancies and testing organisations.
Machinery automation
Remote monitoring, sensing & cyber-security
Robotics & AI
Machine connectivity
Mechanical design
Software development
Standards & approvals
Safety specific applications
Electronics design
Fabrications & machined parts
Plastic moulding & forming
9. Too many times companies allow a product
design that engineers in unnecessary cost,
creates a cumbersome supply chain and poor
efficiency of build. Such companies then spend
time and energy, post-design, attempting to
reduce costs. It is often too little, too late.
A typical pain point for many can be alleviated by
PP C&A’s proven expertise in value engineering
at the initial design stage with the customer,
and optimising the supply chain to create both
competitiveness and resilience, eliminating ‘hidden
costs’ and risk.
Supply chain ownership requires valuable
experience and the necessary competence, in
order to streamline the supply chain, improving
efficiencies and associated costs at the same time.
Don’t overlook commercial opportunities.
Let us manage the supply chain
10. n Reduced costs associated with tactical purchasing – day
to day “placing & chasing” functions within the purchasing
resource can be focused on strategic activities
n Minimised goods in and internal logistics processes
n Reduction in physical space for inventory – creating
additional added value spaces (e.g. additional production)
n Improved working capital and cash conversion cycle times
n Access to alternative suppliers and product solutions that
can provide additional technical benefits
n Combined customer and supplier purchasing needs,
which opens-up an opportunity to leverage volume-based
cost reductions
By considering
the end-to-end
supply chain,
we can derive
maximum
benefits for the
customer.
11. PP C&A has a proven track record
of working with many of the world’s
leading OEMs and understand the
importance of managing the detail.
Cross-functional
project management
Cross functional project management teams can
assist you every step of the way, to ensure the
move to outsourced manufacturing is a smooth
transition with the minimum of disruption.
PP C&A work with your team and consider all
factors that can impact the program.
n Engineering design
n Design for Manufacture and Assembly
n Technical compliance
n Approvals and standards
n Test specifications
n Supply chain considerations
n Packaging and logistics
12. This is a partnership making the most of £multi-million global opportunities to supply
SmartStores Secure cloud-based technological innovation to customers around the
world. The relationship has seen PP C&A and Inventor-e collaborate to develop a secure
industrial vending machine cabinet, specifically designed for unmanned/remote stores.
PP C&A established a dedicated production cell to cut lead times by 20% and help
increase capacity to cope with new orders. The product has been developed for the North
American marketplace, with all systems fully approved to the relevant UL standards.
Casestudy
The team at PP C&A has provided us with a lot
of food for thought on future builds and we have
already used its design and engineering expertise
to improve our solutions and reduce costs.
Andy Ingram, Inventor-e Sales Director“
13. The complete end-to-end contract
manufacturing & assembly solution
Multi-discipline production
& engineering capabilities
Early design concepts & design for
manufacture and assembly (DFMA)
Supply chain design & optimisation
Product standardisation & design
approval processes
Machine build, test and logistics
Cross-functional
project management
Established technical partnerships
Outsourcing model unlocks real
business benefits.
14. Landywood Green, Cheslyn Hay
West Midlands WS6 7AL
+44 (0)1922 419109
info@ppcanda.com
ppcanda.com
/contract-manufacturing-assembly/
“Providing our customers with a more
comprehensive outsourcing solution
that enables them to focus on growing
their sales revenue and market share
is critical to our joint success.”
TONY HAGUE, C.E.O
PP CONTROL & AUTOMATION
CONTROL & AUTOMATION CONTRACT MANUFACTURINGSTRATEGIC OUTSOURCING
Control & Automation
Complete manufacturing solutions