The prevention of breakdowns & electrical fires in logisticsTony Dale
A handy guide to identify and prevent breakdowns in the logistical supply chain and warehouse storage, using regular thermal imaging surveys in annual maintenance testing
The prevention of breakdowns & electrical fires in logisticsTony Dale
A handy guide to identify and prevent breakdowns in the logistical supply chain and warehouse storage, using regular thermal imaging surveys in annual maintenance testing
Geo Therm Ltd -The prevention of breakdowns and electrical fires in logistics...Tony Dale
A general guide looking at the prevention of breakdown and in particular electrical fires in the storage and logistical supply chain warehousing using thermal imaging, with empathsis within the middle east region, yet applicable everywhere.
Asset corrosion management cui - masterclass 2018Marcep Inc.
The course content will cover why CUI has become a major problem in today's context and also cover various
corrosion mechanisms which affect the insulated piping/ equipment and the major parameters which influence the
rate of degradation. The course will cover various NDE methods available and successfully used to detect CUI. The
participant will also learn the strategies for defining scope of work for detecting CUI based on RBI (Risk Based
Inspection) approach. The NACE RP 0198 and API RP 583 will be discussed in detail and so also the leaning from
various published case studies on CUI.
Geo Therm Ltd -The prevention of breakdowns and electrical fires in logistics...Tony Dale
A general guide looking at the prevention of breakdown and in particular electrical fires in the storage and logistical supply chain warehousing using thermal imaging, with empathsis within the middle east region, yet applicable everywhere.
Asset corrosion management cui - masterclass 2018Marcep Inc.
The course content will cover why CUI has become a major problem in today's context and also cover various
corrosion mechanisms which affect the insulated piping/ equipment and the major parameters which influence the
rate of degradation. The course will cover various NDE methods available and successfully used to detect CUI. The
participant will also learn the strategies for defining scope of work for detecting CUI based on RBI (Risk Based
Inspection) approach. The NACE RP 0198 and API RP 583 will be discussed in detail and so also the leaning from
various published case studies on CUI.
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Construction equipment management chapter 5
1. Chapter 5
Chapter 5
Equipment Operation
Equipment Operation
Madawalabu
Madawalabu
University
University
Chapter 5
Chapter 5
Equipment Operation
Equipment Operation
Inst
Instr
ructor
uctor:
: Andualem
Andualem Endris
Endris (
(M.Sc
M.Sc)
)
andu0117@yahoo.com
andu0117@yahoo.com
School of Engineering,
School of Engineering,
Construction Technology & Management
Construction Technology & Management D
Department
epartment
A. Safety
A. Safety
2. Signs and symbols
Signs and symbols
Visible at all times
Visible at all times
Danger signs
Danger signs
Caution signs
Caution signs
Visible at all times
Visible at all times
Danger signs
Danger signs
Caution signs
Caution signs
1a
February 2, 2019 2
COTM 4202
3. Exit signs
Exit signs
Legible red letters
Legible red letters
Or red background with legible
Or red background with legible
white letters
white letters
Legible red letters
Legible red letters
Or red background with legible
Or red background with legible
white letters
white letters
2a
CLOSED CLOSED
February 2, 2019 3
COTM 4202
5. Traffic signs
Traffic signs
Use at points of hazard
Use at points of hazard
Place at 50m from points of
Place at 50m from points of
hazard
hazard
Use at points of hazard
Use at points of hazard
Place at 50m from points of
Place at 50m from points of
hazard
hazard
4a
February 2, 2019 5
COTM 4202
6. Accident prevention
Accident prevention
tags
tags
Temporary means of warning
Temporary means of warning
employees
employees
Not be used in place of accident
Not be used in place of accident
prevention signs
prevention signs
Temporary means of warning
Temporary means of warning
employees
employees
Not be used in place of accident
Not be used in place of accident
prevention signs
prevention signs
5a
February 2, 2019 6
COTM 4202
7. Requirements for
Requirements for
flagmen
flagmen
Red flags at least
Red flags at least
18 inches
18 inches
square
square
Sign paddles
Sign paddles
Red flags at least
Red flags at least
18 inches
18 inches
square
square
Sign paddles
Sign paddles
6a
February 2, 2019 7
COTM 4202
8. Requirements for
Requirements for
flagmen
flagmen
In darkness
In darkness—
—red lights
red lights
Warning garment
Warning garment
In darkness
In darkness—
—red lights
red lights
Warning garment
Warning garment
6b
February 2, 2019 8
COTM 4202
9. Construction equipment
Construction equipment
Adjacent to
Adjacent to
a highway
a highway
•
• Unattended at night
Unattended at night
Adjacent to
Adjacent to
a highway
a highway
•
• Unattended at night
Unattended at night
8a
February 2, 2019 9
COTM 4202
10. Construction equipment
Construction equipment
Adjacent to construction areas
Adjacent to construction areas
Provide lights or
Provide lights or
reflectors
reflectors
Adjacent to construction areas
Adjacent to construction areas
Provide lights or
Provide lights or
reflectors
reflectors
8b
February 2, 2019 10
COTM 4202
11. Equipment inspection
Equipment inspection
Operate on an off
Operate on an off-
-highway
highway
jobsite
jobsite
Not open to
Not open to
public traffic
public traffic
Beginning of
Beginning of
each shift
each shift
Operate on an off
Operate on an off-
-highway
highway
jobsite
jobsite
Not open to
Not open to
public traffic
public traffic
Beginning of
Beginning of
each shift
each shift
12a
February 2, 2019 11
COTM 4202
12. Inspect for:
Inspect for:
Service breakers
Service breakers
Tires
Tires
Brakes
Brakes
Service breakers
Service breakers
Tires
Tires
Brakes
Brakes
12c
February 2, 2019 12
COTM 4202
14. Inspect for:
Inspect for:
Lights
Lights
Fire extinguishers
Fire extinguishers
Reflectors
Reflectors
Other
Other
equipment
equipment
Lights
Lights
Fire extinguishers
Fire extinguishers
Reflectors
Reflectors
Other
Other
equipment
equipment
12f
February 2, 2019
14
COTM 4202
15. Correct all defects
Correct all defects
Before equipment is placed in
Before equipment is placed in
service
service
12h
February 2, 2019 15
COTM 4202
16. Operating equipment in
Operating equipment in
reverse: Do if
reverse: Do if
The equipment has a reverse
The equipment has a reverse
signal alarm distinguishable
signal alarm distinguishable
from the surrounding noise
from the surrounding noise
level, or
level, or
An employee signals that it is
An employee signals that it is
safe to do so
safe to do so
The equipment has a reverse
The equipment has a reverse
signal alarm distinguishable
signal alarm distinguishable
from the surrounding noise
from the surrounding noise
level, or
level, or
An employee signals that it is
An employee signals that it is
safe to do so
safe to do so
13a
February 2, 2019 16
COTM 4202
18. B. Equipment Utilization
B. Equipment Utilization
Utilization is working time
Utilization is working time
duration, not calendar duration
duration, not calendar duration
Utilization data are:
Utilization data are:
•
• Work load
Work load
•
• Speed
Speed
•
• Environment
Environment
(See Chapter 3: Productivity)
Utilization is working time
Utilization is working time
duration, not calendar duration
duration, not calendar duration
Utilization data are:
Utilization data are:
•
• Work load
Work load
•
• Speed
Speed
•
• Environment
Environment
(See Chapter 3: Productivity)
February 2, 2019 COTM 4202 18
19. C. Technology
C. Technology
Automation of Equipment
• The introduction of new mechanized equipment
in construction has had a profound effect on the
cost and productivity of construction as well as
the methods used for construction itself.
• An exciting example of innovation in this regard
is the introduction of computer microprocessors
on tools and equipment. As a result, the
performance and activity of equipment can be
continually monitored and adjusted for
improvement.
Automation of Equipment
• The introduction of new mechanized equipment
in construction has had a profound effect on the
cost and productivity of construction as well as
the methods used for construction itself.
• An exciting example of innovation in this regard
is the introduction of computer microprocessors
on tools and equipment. As a result, the
performance and activity of equipment can be
continually monitored and adjusted for
improvement.
February 2, 2019 COTM 4202 19
20. Thank You
Thank You
STAY SAFE!
STAY SAFE!
Thank You
Thank You
STAY SAFE!
STAY SAFE!
February 2, 2019 COTM 4202 20