Computational Thinking:
An Important Skill for All
Students
Joe Kmoch
Washington HS of IT
Milwaukee Public Schools
joe@jkmoch.com
http://computationalthinking.pbworks.com
#nafnext
#NAFNext
Session Description
• Given the importance of computing and computer
science in most career paths, computational
thinking must be a part of every curriculum. This
session explores how computational thinking is
related to computer science and information
technology and how it might affect K-12 education.
Participants will look at curricula examples and
learn about new resources produced by a joint
ISTE/CSTA NSF group.
#nafnext
Three Statements about
Computational Thinking
• Based on 9 computer science practices and their
application to most subject domains
– Data Collection, Data Analysis, Data
Representation, Problem Decomposition,
Abstraction, Algorithms, Automation,
Simulation, Parallelization
• Related to Common Core in Mathematics
• Probably our best shot to get Computer Science
experiences in K-12
3
#nafnext
Critical Thinking + Computing Power
= Making Decisions or Innovating Solutions
(Think “Create, Produce, Manipulate”)
What is CT?
#nafnext
The core principles of Computer Science are the
basis for Computational Thinking.
CT is the use of
CS principles in problem
domains
What is CT?
#nafnext
A Digital Age Skill for
Everyone
A Digital Age Skill for
Everyone
Why CT? Why Now?
#nafnext
The knowledge and
skills that students
need to know and
be able to do by the
time they graduate
from secondary
school.
CT for All Students
#nafnext
The CT Student
#nafnext
CT for All Teachers
All teachers can and should be responsible for
teaching skills, practice, and assessment of CT. This
is not a “computer thing”.
#nafnext
CT for All Teachers
Most teachers already incorporate CT basics, but
may not know it.
#nafnext
CT for All Teachers
CT has a shared vocabulary that can be highlighted
in lessons from every discipline.
#nafnext
CT for All Teachers
CT is made up of foundational building blocks of
concepts, skills, and dispositions that get more
sophisticated as students get older.
#nafnext
CT for All Teachers
CT doesn’t necessarily require computers.
#nafnext
CT Operational Definition (handout)
#nafnext
Computational Thinking is
The marriage of
– the big ideas in computer science (such as
abstraction, algorithms, modeling, problem
decomposition)
– with problems and big ideas in most other subject
matter domains
CT Operational Definition
#nafnext
CT Building Blocks (handout)
#nafnext
High school
Abstraction
CT in the Classroom
#nafnext
• Technique of generalizing from specific instances
(dealing with both process and data)
• Capturing essential common characteristics while
discarding unessential characteristics
• Operating simultaneously at multiple layers and
define relationships between layers
What is abstraction?
#nafnext
Cooking a Meal Abstraction
Cooking a meal
• At the highest level we might have the list of courses
that make up the meal
– Appetizer(s)
– Soup/salad
– Entree
– Dessert
• And probably an order in which to work on them
(project timeline)
19
#nafnext
Cooking a Meal Abstraction
• At the next level, we might have the details of the
individual parts
– The recipes, for example
• At the next level, we might have the details of how to
do certain cooking actions
– doing a reduction or
– pureeing, or
– rolling dough
(All process abstractions)
20
#nafnext
Example of data abstraction
This Chicago transit
map is a data
abstraction; contains
essential info like
stations and transfer
points, avoids
details like exact
street locations of
stations or distances
21
#nafnext
Process Abstractions of the mind
• Techniques
• For example: Divide
and Conquer
• Abstraction of how to
solve a problem, not
actually a solution to
any particular
problem.
• Take a problem and
divide it into several
piece
• Solve or complete
each piece
• Re-combine the
pieces to solve
original problem
22
#nafnext
CT Learning Experiences
#nafnext
CT Learning Experiences
#nafnext
CT Learning Experiences
#nafnext
CT Learning Experiences
#nafnext
CT Learning Experiences
#nafnext
CT Learning Experiences
#nafnext
CT Learning Experiences
#nafnext
Traffic Jam (activity)
#nafnext
Another activity
• Please get into groups of 4-8
• Review the Computational Thinking within Disciplines
Chart
• Within your group brainstorm some lessons in your
discipline where you already include one or more of
the CT concepts or dispositions; together consider
how you could enhance these lessons to include one
or more additional CT concepts or dispositions.
• 20 minutes; write ideas on a large sheet
• Then we’ll share at least one idea from each group
#nafnext
Comparing CT Core Dispositions and CCSS
Standards for Mathematical Practice
CCSS Standards for Math Practice Computational Thinking core dispositions
1. Make sense of problems and persevere
in solving them
Confidence with complexity
Persistence in working through problems
2. Reason abstractly and quantitatively Ability to deal with open ended problems
3. Construct viable arguments and
critique the reasoning of others
Ability to communicate and collaborate to
achieve a common goal
4. Model with mathematics Tolerance for ambiguity
5. Use appropriate tools strategically Ability to communicate and collaborate to
achieve a common goal
6. Attend to precision Persistence in working through problems
7. Look for and make use of structure Ability to deal with open-ended problems
8. Look for and express regularity in
repeated reasoning
Ability to deal with open-ended problems
<http://www.corestandards.org/the-standards/mathematics/introduction/standards-
for-mathematical-practice/>
#nafnext
Comparing CT Core Concepts and CCSS
Standards for Mathematical Practice
CCSS Standards for Math Practice Computational Thinking core concepts
1. Make sense of problems and persevere
in solving them
Data collection, analysis, representation
Problem Decomposition/Analysis
2. Reason abstractly and quantitatively Abstraction
3. Construct viable arguments and
critique the reasoning of others
Algorithms and Procedures
4. Model with mathematics Modeling & Simulation
5. Use appropriate tools strategically Automation
6. Attend to precision Data collection, analysis, representation
7. Look for and make use of structure Parallelization
Algorithms & Procedures
8. Look for and express regularity in
repeated reasoning
Algorithms & Procedures
<http://www.corestandards.org/the-standards/mathematics/introduction/standards-
for-mathematical-practice/>
#nafnext
CCSS: Standards for
Mathematical Content
High School: Modeling
Modeling Standards
Modeling is best interpreted not as a collection of isolated
topics but rather in relation to other standards. Making
mathematical models is a Standard for Mathematical Practice,
and specific modeling standards appear throughout the high
school standards indicated by a star symbol (★).
<http://www.corestandards.org/the-standards/mathematics/high-school-
modeling/introduction/>
#nafnext
CT Statement #1
CT is a key interdisciplinary component in preparing
students to be successful in a globally competitive
workforce.
• If students are going to be successful in postsecondary
education and compete for and win jobs, they must have
the critical thinking and problem-solving skills that CT
provides (Wagner).
From ISTE CT Website, Computational Leadership Toolkit (8/22/11), p 42
Tony Wagner, Innovation Education Fellow, Technology and Entrepreneurship
Center, Harvard U
#nafnext
CT Statement #2
CT is a critical enabling skill that will raise the level of
achievement for all students, especially those who are
traditionally marginalized.
• Successful students must be able to connect and apply
academic content to real-world situations, and CT provides
a framework for that learning connection (Marzano).
From ISTE CT Website, Computational Leadership Toolkit (8/22/11), p 42
Robert J Marzano, Marzano Research Laboratory
#nafnext
CT Statement #3
CT is already a learning strategy in many classrooms
and lessons today. However, we need to more closely
examine the uses of CT and identify and expand
student and teacher awareness about its impact and
power.
• This means we probably do not have to expend large sums
of money. We just need to recognize and align
CT strategies to current practices.
From ISTE CT Website, Computational Leadership Toolkit (8/22/11), p 42
#nafnext
NSF CE21 proposals require CT
prominently
CSTA K-12 CS Standards, 3rd ed (CT is a
major focus of these new standards)
New AP Computer Science Principles and
Exploring CS Curricula – CT plays a major
role
CT is gaining traction!
#nafnext
Consuming content and parroting procedures is
19th and 20th Century
21st Century Education is about process, about
learning tools and skills to remake content, create
new learning and solve problems (think creators,
producers)
Not about just formal education in school but also
about informal education – 24 hour learning – the
network
CT promotes 21st Century Learning
Re-Imagining Learning in the 21st Century: MacArthur Foundation
http://www.youtube.com/watch?v=D6_U6jOKsG4&feature=relmfu
Rethinking Learning: The 21st Century Learner: MacArthur Foundation
http://www.youtube.com/watch?v=c0xa98cy-Rw&feature=relmfu
#nafnext
Contextual
Multidisciplinary
Project-based and inquiry based
Looking deeply at a problem
Using abstraction + algorithms + analysis +
bringing to bear any number of tools +
possibly automation/computing
CT Features
#nafnext
CT isn’t necessarily useful for all problems
...but for many of our largest problems
involving sciences, environment, social studies
for example where large datasets abound
and modeling and simulation techniques are
useful
CT for our larger problems
#nafnext
Technology Review (May/June 2013)
10 Emerging Technologies – among them:
Deep Learning (AI)
Prenatal DNA Sequencing
Baxter: Blue Collar Robot
Smart Watches
Ultra-Efficient Solar Power (Nanotechnology)
Big Data from Cheap Phones
Supergrids
CT in Emerging Technologies
#nafnext
CT Teacher Resources and CT Leadership Toolkit
For free download at www.iste.org/computational-thinking
Coming Soon! CT database for links to research and other teacher
resources.
CT Resources
#nafnext
For more information, contact:
computational-thinking@iste.org
Or
http://csta.acm.org/Curriculum/sub/CompThinking.html
www.iste.org/computational-thinking
Joe’s site: http://computationalthinking.pbworks.com
Thank you!

Computational Thinking: Why It is Important for All Students

  • 1.
    Computational Thinking: An ImportantSkill for All Students Joe Kmoch Washington HS of IT Milwaukee Public Schools joe@jkmoch.com http://computationalthinking.pbworks.com
  • 2.
    #nafnext #NAFNext Session Description • Giventhe importance of computing and computer science in most career paths, computational thinking must be a part of every curriculum. This session explores how computational thinking is related to computer science and information technology and how it might affect K-12 education. Participants will look at curricula examples and learn about new resources produced by a joint ISTE/CSTA NSF group.
  • 3.
    #nafnext Three Statements about ComputationalThinking • Based on 9 computer science practices and their application to most subject domains – Data Collection, Data Analysis, Data Representation, Problem Decomposition, Abstraction, Algorithms, Automation, Simulation, Parallelization • Related to Common Core in Mathematics • Probably our best shot to get Computer Science experiences in K-12 3
  • 4.
    #nafnext Critical Thinking +Computing Power = Making Decisions or Innovating Solutions (Think “Create, Produce, Manipulate”) What is CT?
  • 5.
    #nafnext The core principlesof Computer Science are the basis for Computational Thinking. CT is the use of CS principles in problem domains What is CT?
  • 6.
    #nafnext A Digital AgeSkill for Everyone A Digital Age Skill for Everyone Why CT? Why Now?
  • 7.
    #nafnext The knowledge and skillsthat students need to know and be able to do by the time they graduate from secondary school. CT for All Students
  • 8.
  • 9.
    #nafnext CT for AllTeachers All teachers can and should be responsible for teaching skills, practice, and assessment of CT. This is not a “computer thing”.
  • 10.
    #nafnext CT for AllTeachers Most teachers already incorporate CT basics, but may not know it.
  • 11.
    #nafnext CT for AllTeachers CT has a shared vocabulary that can be highlighted in lessons from every discipline.
  • 12.
    #nafnext CT for AllTeachers CT is made up of foundational building blocks of concepts, skills, and dispositions that get more sophisticated as students get older.
  • 13.
    #nafnext CT for AllTeachers CT doesn’t necessarily require computers.
  • 14.
  • 15.
    #nafnext Computational Thinking is Themarriage of – the big ideas in computer science (such as abstraction, algorithms, modeling, problem decomposition) – with problems and big ideas in most other subject matter domains CT Operational Definition
  • 16.
  • 17.
  • 18.
    #nafnext • Technique ofgeneralizing from specific instances (dealing with both process and data) • Capturing essential common characteristics while discarding unessential characteristics • Operating simultaneously at multiple layers and define relationships between layers What is abstraction?
  • 19.
    #nafnext Cooking a MealAbstraction Cooking a meal • At the highest level we might have the list of courses that make up the meal – Appetizer(s) – Soup/salad – Entree – Dessert • And probably an order in which to work on them (project timeline) 19
  • 20.
    #nafnext Cooking a MealAbstraction • At the next level, we might have the details of the individual parts – The recipes, for example • At the next level, we might have the details of how to do certain cooking actions – doing a reduction or – pureeing, or – rolling dough (All process abstractions) 20
  • 21.
    #nafnext Example of dataabstraction This Chicago transit map is a data abstraction; contains essential info like stations and transfer points, avoids details like exact street locations of stations or distances 21
  • 22.
    #nafnext Process Abstractions ofthe mind • Techniques • For example: Divide and Conquer • Abstraction of how to solve a problem, not actually a solution to any particular problem. • Take a problem and divide it into several piece • Solve or complete each piece • Re-combine the pieces to solve original problem 22
  • 23.
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
    #nafnext Another activity • Pleaseget into groups of 4-8 • Review the Computational Thinking within Disciplines Chart • Within your group brainstorm some lessons in your discipline where you already include one or more of the CT concepts or dispositions; together consider how you could enhance these lessons to include one or more additional CT concepts or dispositions. • 20 minutes; write ideas on a large sheet • Then we’ll share at least one idea from each group
  • 32.
    #nafnext Comparing CT CoreDispositions and CCSS Standards for Mathematical Practice CCSS Standards for Math Practice Computational Thinking core dispositions 1. Make sense of problems and persevere in solving them Confidence with complexity Persistence in working through problems 2. Reason abstractly and quantitatively Ability to deal with open ended problems 3. Construct viable arguments and critique the reasoning of others Ability to communicate and collaborate to achieve a common goal 4. Model with mathematics Tolerance for ambiguity 5. Use appropriate tools strategically Ability to communicate and collaborate to achieve a common goal 6. Attend to precision Persistence in working through problems 7. Look for and make use of structure Ability to deal with open-ended problems 8. Look for and express regularity in repeated reasoning Ability to deal with open-ended problems <http://www.corestandards.org/the-standards/mathematics/introduction/standards- for-mathematical-practice/>
  • 33.
    #nafnext Comparing CT CoreConcepts and CCSS Standards for Mathematical Practice CCSS Standards for Math Practice Computational Thinking core concepts 1. Make sense of problems and persevere in solving them Data collection, analysis, representation Problem Decomposition/Analysis 2. Reason abstractly and quantitatively Abstraction 3. Construct viable arguments and critique the reasoning of others Algorithms and Procedures 4. Model with mathematics Modeling & Simulation 5. Use appropriate tools strategically Automation 6. Attend to precision Data collection, analysis, representation 7. Look for and make use of structure Parallelization Algorithms & Procedures 8. Look for and express regularity in repeated reasoning Algorithms & Procedures <http://www.corestandards.org/the-standards/mathematics/introduction/standards- for-mathematical-practice/>
  • 34.
    #nafnext CCSS: Standards for MathematicalContent High School: Modeling Modeling Standards Modeling is best interpreted not as a collection of isolated topics but rather in relation to other standards. Making mathematical models is a Standard for Mathematical Practice, and specific modeling standards appear throughout the high school standards indicated by a star symbol (★). <http://www.corestandards.org/the-standards/mathematics/high-school- modeling/introduction/>
  • 35.
    #nafnext CT Statement #1 CTis a key interdisciplinary component in preparing students to be successful in a globally competitive workforce. • If students are going to be successful in postsecondary education and compete for and win jobs, they must have the critical thinking and problem-solving skills that CT provides (Wagner). From ISTE CT Website, Computational Leadership Toolkit (8/22/11), p 42 Tony Wagner, Innovation Education Fellow, Technology and Entrepreneurship Center, Harvard U
  • 36.
    #nafnext CT Statement #2 CTis a critical enabling skill that will raise the level of achievement for all students, especially those who are traditionally marginalized. • Successful students must be able to connect and apply academic content to real-world situations, and CT provides a framework for that learning connection (Marzano). From ISTE CT Website, Computational Leadership Toolkit (8/22/11), p 42 Robert J Marzano, Marzano Research Laboratory
  • 37.
    #nafnext CT Statement #3 CTis already a learning strategy in many classrooms and lessons today. However, we need to more closely examine the uses of CT and identify and expand student and teacher awareness about its impact and power. • This means we probably do not have to expend large sums of money. We just need to recognize and align CT strategies to current practices. From ISTE CT Website, Computational Leadership Toolkit (8/22/11), p 42
  • 38.
    #nafnext NSF CE21 proposalsrequire CT prominently CSTA K-12 CS Standards, 3rd ed (CT is a major focus of these new standards) New AP Computer Science Principles and Exploring CS Curricula – CT plays a major role CT is gaining traction!
  • 39.
    #nafnext Consuming content andparroting procedures is 19th and 20th Century 21st Century Education is about process, about learning tools and skills to remake content, create new learning and solve problems (think creators, producers) Not about just formal education in school but also about informal education – 24 hour learning – the network CT promotes 21st Century Learning Re-Imagining Learning in the 21st Century: MacArthur Foundation http://www.youtube.com/watch?v=D6_U6jOKsG4&feature=relmfu Rethinking Learning: The 21st Century Learner: MacArthur Foundation http://www.youtube.com/watch?v=c0xa98cy-Rw&feature=relmfu
  • 40.
    #nafnext Contextual Multidisciplinary Project-based and inquirybased Looking deeply at a problem Using abstraction + algorithms + analysis + bringing to bear any number of tools + possibly automation/computing CT Features
  • 41.
    #nafnext CT isn’t necessarilyuseful for all problems ...but for many of our largest problems involving sciences, environment, social studies for example where large datasets abound and modeling and simulation techniques are useful CT for our larger problems
  • 42.
    #nafnext Technology Review (May/June2013) 10 Emerging Technologies – among them: Deep Learning (AI) Prenatal DNA Sequencing Baxter: Blue Collar Robot Smart Watches Ultra-Efficient Solar Power (Nanotechnology) Big Data from Cheap Phones Supergrids CT in Emerging Technologies
  • 43.
    #nafnext CT Teacher Resourcesand CT Leadership Toolkit For free download at www.iste.org/computational-thinking Coming Soon! CT database for links to research and other teacher resources. CT Resources
  • 44.
    #nafnext For more information,contact: computational-thinking@iste.org Or http://csta.acm.org/Curriculum/sub/CompThinking.html www.iste.org/computational-thinking Joe’s site: http://computationalthinking.pbworks.com Thank you!

Editor's Notes

  • #5 There are many definitions of computational thinking, but simply put: CT combines critical thinking skills with the power of computing to make decisions or find solutions. Skills needed to solve an equation, plan a project, or develop an outline for a writing assignment share similar qualities. They all include important problem solving competencies that students need throughout their lifetime. CT can magnify problem-solving skills needed to address authentic, real-world issues. (JK modified from original)
  • #6 There are many definitions of computational thinking, but simply put: CT combines critical thinking skills with the power of computing to make decisions or find solutions. Skills needed to solve an equation, plan a project, or develop an outline for a writing assignment share similar qualities. They all include important problem solving competencies that students need throughout their lifetime. CT can magnify problem-solving skills needed to address authentic, real-world issues. (JK added slide to original)
  • #8 Bringing CT into formal K-12 education will provide our students with vital problem solving skills. CT is for students of all ages and can be learned and practiced in all disciplines.
  • #9 [To presenter: Click on the embedded link to start a 2 minute animation that describes the skills and dispositions that students gain when the practice computational thinking.]
  • #10 CT for all teachers: CT is cross-curricular, so all teachers are responsible for introducing, reinforcing, and assessing CT skills
  • #11 CT for all teachers: Most teachers already incorporate CT basics, but may not know it.
  • #12 CT for all teachers: * CT has a shared vocabulary that can be highlighted in lessons from every discipline
  • #13 CT for all teachers: * CT is made up of foundational building blocks of concepts, skills, and dispositions that get more sophisticated as students get older * CT is cross-curricular, so all teachers are responsible for introducing, reinforcing, and assessing CT skills CT has a shared vocabulary that can be highlighted in lessons from every discipline Most teachers are already incorporate CT basics, but may not know it. CT doesn’t necessarily require computers.
  • #14 CT for all teachers: * CT doesn’t necessarily require computers.
  • #15 [To presenter: Refer participants to the CT Operational Definition handout. As a presenter, you can decide if you want to walk through the operational definition via the slide deck or just use the handout. If you want to introduce the definition by slide use the next 4 slides (#15-18) and delete this slide.] The operational definition was developed by consensus of educators and CT advocates as a framework for CT in K-12 education. The operational definition was the bases for building resources for elementary and secondary school educators beginning to integrate CT into the classroom. The definition is made up of skills and dispositions or attitudes.
  • #16 CT is multidisciplinary use of CS concepts (JK slide added)
  • #17 [To presenter: Refer to CT Vocabulary and Progression Chart handout] CT Building Blocks start with core concepts. At this time, there are 9 core concepts including: Data Collection, Data Analysis, Data Representation, Problem Decomposition, Abstraction, Algorithms & Procedures, Automation, Simulation, and Parallelization. These concepts are defined on the chart and then illustrated by grade band.
  • #18 Again, here is an example from a high school history class. Connecting the vocabulary to an activity is the first step in integrating CT. The next step is integrating CT activities. We’ll look at that next.
  • #19 Again, here is an example from a high school history class. Connecting the vocabulary to an activity is the first step in integrating CT. The next step is integrating CT activities. We’ll look at that next.
  • #20 Highest levels – like a menu
  • #21 Recipies provides more details at another level At a more detailed level doing actual process (process abstractions)
  • #23 More generalized example – divide and conquer – decompose, solve re-combine
  • #24 [To Presenter: Reference the Computational Thinking Teacher Resources, a booklet that can be downloaded from the web site for free (www.iste.org/computational-thinking). The next several slides are for a high school reference. There are slides that reference an elementary school example. You can find how to read a CTLE on page 11 in the booklet. ] The CT Teacher Resources booklet is not a curriculum, but further “definitions-by-example,” including CT Learning Experiences. The booklet includes: 9 CT Learning Experiences and two scenarios to help educators understand what CT is. CT Learning Experiences (CTLEs) are examples of learning experiences for students of all ages and across content areas. This is an example from high school.
  • #25 Each CTLE includes a CT Guide on the Side that correlate the activities…
  • #26 …to CT skills (in black lettering) Identifying, analyzing and implementing is some of the CT skills contained in this lesson.
  • #27 ….and dispositions (in blue lettering). CTLEs can help teachers and students gain a better understanding of the CT building blocks. Tolerance for ambiguity and handling open-ended problems are the two dispositions featured in this learning experience.
  • #28 The body of the CTLE looks like a lesson plan or activity. The CT activity is correlated to an item in the Guide on the Side, like this activity
  • #29 ...or like this disposition (in blue lettering)
  • #30 Or this vocabulary (highlighted in green).
  • #31 [To presenter: This is an activity for presentation participants. Hand the high school Traffic Jam learning experience worksheet.] Use the CT Vocabulary Chart and the working definition of CT with the disposition listed to identify where you can find CT skills, vocabulary, and dispostions in the Traffic Jam Learning Experience. [Discuss what people found. IF you have printed out the CT Teacher Resources booklet, check answers with the booklet. IF you have not printed out the booklet, verbally use go through the correlations.]
  • #32 (JK this slide and the following 8 slides are added This list of mathematical practice standards echoes the knowledge, skills and dispositions noted in the development of CT
  • #33 CT Dispositions: Confidence with complexity Persistence in working with difficult problems Tolerance for ambiguity Ability to deal with open-ended problems Ability to communicate and collaborate to achieve a common goal
  • #34 CT Core Concepts Data Collection, Analysis, Representation Problem Decomposition /Analysis Abstraction Algorithms & Procedures Automation Modeling & Simulation Parallelization
  • #35 While CT fits into all of the mathematical content standards areas, this one detailing modeling is of particular interest
  • #36 Talking Points for District Leaders and Principals
  • #37 Talking Points for District Leaders and Principals
  • #38 Talking Points for District Leaders and Principals
  • #39 NSF, CSTA and new curricula are including CT in huge ways
  • #40 As noted in MacArthur Foundation studies, 21st century is no longer focused on content (which can be looked up and doesn’t need to be memorized) or memorized procedures, but rather on the process of creating that content and then using mash-ups and other means to create new content and procedures to solve new problems
  • #41 CT Features which promote new approaches to learning – project-based, inquiry-based, reality based, multidisciplinary, deep analysis, using concepts from CS preparing for the use of automation to help solve problems (most major scientific and even non-scientific research revolves around stating problems in such a way that computers can then harvest and help evaluate data)
  • #42 Problems involving interpersonal skills are not usually amenable to CT, computation, CS, though the problem analysis skills can often apply, so in that way there’s some possible involvement.
  • #43 Technology Review chose it’s 10 Emerging Technologies – all involve many of the core concepts and dispositions of CT
  • #44 CT Teacher Resources include: •   An operational definition of CT for K-12 Education •   A CT vocabulary and progression chart •   Nine CT Learning Experiences •   CT classroom scenarios CT Leadership Toolkit includes: •   Making the Case for CT •   Resources for Creating Systemic Change •   Implementing Strategies Guide  
  • #45 (JK modified slide to include my CT wiki)