Sparrow Hospital Surgical Floor CDI model integratorGranger ConstructionLansing, MichiganComplete Digital integration, llc“Making dollars and sense out of BIM”
Company information   and   truBIM™Complete Digital Integration (CDI) is a company started from the need to educate and assist companies and contractors in achieving the maximum ROI when utilizing Building Information Modeling. CDI has a success rate of savings nearly 15% total construction cost and an annual cost savings for predictive and preventable maintenance (PPM) in the millions. With truBIM™, the sky is no longer the limit, we go further. Let Complete Digital Integration show you the way to maximize your investment through the lifecycle of a facility.truBIM™is the process of achieving a completely integrated information database model accompanied by a 3Dgraphical representationof the facility and siteThe final deliverable is an object that links metadata about the graphical object in a viewable dialog/report/dbSub / fabricator replaces  object with smart connection points for inlets and outletsA/E generically placesobjects requiring space reservationDIMdesign intent modelWIMwork intent modelBIMbuilding information model
Project portfolioSparrow HospitalUnderground utilities modeled for floor to floor coordination
Complex ductwork design and coordination

Complete Digital Integration, Llc

  • 1.
    Sparrow Hospital SurgicalFloor CDI model integratorGranger ConstructionLansing, MichiganComplete Digital integration, llc“Making dollars and sense out of BIM”
  • 2.
    Company information and truBIM™Complete Digital Integration (CDI) is a company started from the need to educate and assist companies and contractors in achieving the maximum ROI when utilizing Building Information Modeling. CDI has a success rate of savings nearly 15% total construction cost and an annual cost savings for predictive and preventable maintenance (PPM) in the millions. With truBIM™, the sky is no longer the limit, we go further. Let Complete Digital Integration show you the way to maximize your investment through the lifecycle of a facility.truBIM™is the process of achieving a completely integrated information database model accompanied by a 3Dgraphical representationof the facility and siteThe final deliverable is an object that links metadata about the graphical object in a viewable dialog/report/dbSub / fabricator replaces object with smart connection points for inlets and outletsA/E generically placesobjects requiring space reservationDIMdesign intent modelWIMwork intent modelBIMbuilding information model
  • 3.
    Project portfolioSparrow HospitalUndergroundutilities modeled for floor to floor coordination
  • 4.
    Complex ductwork designand coordination
  • 5.
    Mechanical and medicalpiping corridors
  • 6.
    Typical patient roommechanical systemsManufacturing FacilitiesComplete design validation
  • 7.
    Space protection forsafety issues and spacial reservation
  • 8.
  • 9.
    Development of 3DBIM protocol (standards, methods and means)truBIM™ TechnologyIntegration of manufacturer’s components into BIM model
  • 10.
    Downstream re-use ofmfr data to prepopulate your PPM system
  • 11.
    Compatible with yourcurrent design software (Autodesk & Bentley)Complete Digital integration, llc“Making dollars and sense out of BIM”ElectricalHVACStructuralPipingArchitecturalBringing it all togetherCDI Headquarters11329 Tyrone TrailFenton, Michigan 48430(810) 241-8980Design AssociatesOhioCaliforniaTexas