SlideShare a Scribd company logo
VISION AND MISSION
DENKI ENGINEERING, PT has started the General Contractor & Suppliers in a wide variety of
commercial and industrial projects.
PT. DENKI ENGINEERING dimulai sebagai General Contractor & Pemasok di berbagai proyek komersial dan industri.
Our Commitment to professional excellence has enabled us to achieve, often even exceeds, our
clients expectations. With efficient utilization of human and technical resources has also enabled
us to complete projects within the designated time frame and budgets, while adhering closelt to
the stringent performance requirements. Ever supported by quality, speed, safety, cost
effectiveness and the professional technicians.
Komitmen kami untuk keunggulan profesional telah memungkinkan kami untuk mencapai, bahkan sering melebihi,
harapan klien kami. Dengan penggunaan sumber daya manusia dan teknis yang efisien memungkinkan kami untuk
menyelesaikan proyek dalam jangka waktu dan anggaran yang ditentukan, dengan berpegang erat dengan
persyaratan kinerja yang ketat. Didukung oleh kualitas, kecepatan, keamanan, efektivitas biaya dan teknisi
profesional.
VISION (VISI) : A company's competitive and reliable, able to perform synergy with others, and
strive to become a global construction company. Make employees prosper, dedicated and high
integrity, and professional employees that are close the technology. Having a harmonious working
environment, transparent and conducive creativity and empowerment of employees.
Sebuah perusahaan yang kompetitif dan dapat diandalkan, mampu melakukan sinergi dengan orang lain, dan
berusaha untuk menjadi sebuah perusahaan konstruksi global. Membuat karyawan sejahtera, berdedikasi dan
integritas yang tinggi, dan karyawan profesional yang dekat teknologi. Memiliki lingkungan kerja yang harmonis,
kreativitas yang transparan dan konduktif dan pemberdayaan karyawan.
MISSION (Misi) : Provide engineering services in a professional way for our customer
satisfaction and the prosperity of stakeholder.
Menyediakan Jasa keteknisan secara profesional untuk kepuasan pelanggan dan kemakmuran para pemangku
kepentingan.
ORGANIZATION STRUCTURE
COMPANY'S DOCUMENT
Company Name : PT. DENKI ENGINEERING
Address : SENTRA NIAGA KALIMALANG
Jl. Ahmad Yani Blok B1 No.29
Kayuringinjaya - Bekasi Selatan
Kota Bekasi 17144
Phone : 021 - 885 0852, 885 - 0358
Fax : 021 - 885 0238
Company's Documents : - Notaris Ingrid Lannywaty, SH., No.5 tanggal
Notarial Deed of 01 Pebruari 2007.
Establishment - Keputusan Menteri Hukum & HAM RI
W7-02837 HT.01.01-TH.2007
TDP : 1 0 2 6 1 4 6 0 4 2 3 8
NPWP : 02.630.831.2-432.000
PKP : PEM-00389/WPJ.22/KP.1203/2011
SKDU : 503/48/Kl.Kj/II/2015
SIUP : 510/1626-BPPT/PM/IX/2012
Banker : - Bank Name : MANDIRI BANK
- Branch : Bekasi-SentraNiaga Kalimalang
- Account No. : 167 0000 718717
website : www.ptdenki.com
ISO : ISO 9001:2008 ACS REGISTRARS No. 130316
SIUJKN : No. Reg. 1-094208-3275-00030
SBUJK : No. Reg. 2.3275-4-19-1-10-094208
BUSINESS FIELD
PROJECT EVALUATION SERVICES
LAYANAN EVALUASI PROYEK
DESIGN & CONSTRUCTION SERVICES
DESAIN & JASA KONSTRUKSI
 Design, Engineering and Construction Consultation
Desain, Konsultasi Teknik dan Konstruksi
 Electrical Works (Pekerjaan Kelistrikan)
 Mechanical Works (Pekerjaan Mekanikal)
 Machinery Works (Pekerjaan Permesinan)
QA/QC DIV
HR & GA
DEPT
ENGINERRING
DIV
DIRECTOR
TECHNICAL
ADVISOR
MANAGEMENT
REPRESENTATIVE
OPERATIONAL
DIV
ADMINISTRATION
DIV
PROJECT &
MAINTENANCE
ESTIMATE &
DESIGN
PURCH. &
WHS DEPT
FINANCE
DEPT
ACCOUNTING &
TAX DEPT
DOCUMENT
CONTROL
QUALITY
CONTROL DEPT.
QC
INCOMING
QC
INSPECTOR
QC
ENGINEER
QA/QC
ADMINISTRATION
National Construction Service Business License
CERTICATE OF LEGAL BUSINESS
PT. DENKI ENGINEERING
General Electrical & Mechanical Contractor
Electrical Installation Work,
Astra Tower, Jakarta-2015
Electrical Installation Work,
Mass Rapid Transit (MRT), Jakarta-2015
Maintenance Work,
PT. Denso Indonesia, Jakarta,2007-2015
Machine Installation Work,
PT Bentoel-BAT, East Java-2015
Electrical Installation Work for Inst.
Machine,
PT. P&G Indonesia, Karawang-2013
Electrical Installation Work,
PT. Nipro Indonesia, Karawang-2013
Mechanical & Electrical Installation Work,
PT. JFE Steel Indonesia, Cibitung 2014-2015
Electrical Installation Work,
PT. United Can Company, Mojokerto-2013
Mechanical, Electrical & Pipe Insullation Work,
PT Evoluzione Tyres Indonesia, West Java-2015
Electrical Installation Work,
PT F-TECH Indonesia, Karawang-2014
Electrical Installation Work,
PT. Top Tube Indonesia, Karawang-2014
Electrical Installation Work,
PT. Marimo Apartment, Cikarang 2013
Electrical Installation Work,
PT. Indo Japan Steel, Karawang-2013
Electrical Installation Work,
PT. Araya Indonesia, Cikarang-2013
Electrical Installation Work,
PT. Seiren Indonesia, Cikarang-2013
Electrical Installation Work,
PT Mitsui Kinzoku ACT Indonesia,
Karawang-2014
PT. Usui International, Cibitung - 2014
PT Metalart Indonesia, Karawang-2014
PROJECTS EXPERIENCES
 2009
• PT. DENSO INDONESIA, Design Installation Power Machine
• PT. TAIKISHA INDONESIA ENGINEERING, Installation Electrical Utility (MVMDB, TR, LVMDB, Cable Feeder, Lighting
Receptacle, Sound System, Fire Alarm, Telephone, Lightning Protection.
• PT. KAYABA INDONESIA, Design, Installation for Sub Station (MVMDB, TR, LVMDB).
• PT. IWATANI INDUSTRIAL GAS INDONESIA, Design, Installation Power Machine
• PT. AE AUTOMATION INDONESIA, Design, Installation Power Machine
• PT. RINNAI INDONESIA, Design, Installation Power Machine
• PT. MIYUKI INDONESIA, Design, Installation Power Machine
• PT. SANYO JAYA COMPONENT INDONESIA, Design, Installation Power Machine
• PT. SUMCO INDONESIA, Design, Installation Fire Alarm System
• PT. SUPRAMAS SAKTI, Design, Installation Power Machine
• PT. KYOTO TERM INDONESIA, Design, Installation Power Machine
 2010
• PT. KATSHUSHIRO INDONESIA, Design, Installation for M&E(Lighting, Receptacle, LAN, Fire Alarm, TEL, Sound, A/C, Fan).
• PT. DENSO INDONESIA, Design, Installation Power Machine.
• PT. KAYABA INDONESIA, Design, Installation Ventilation System
• PT. INDONESIA NIPPON STEEL PIPE, Design, Installation Ventilation System & Power Machine.
• PT. KIMBERLY CLARK INDONESIA, Design, Installation Ventilation System & Power Machine
• PT. SHIBATAYA ENGINEERING, Design, Installation for Sub Station (MVMDB, TR, LVMDB).
• PT. DYNAPLAST, Design, Installation Ventilation System & Power Machine.
• PT. ORBIT ENGINEERING INDONESIA, Design, Installation Power Machine.
 2011
• PT. PANASONIC SEMICONDUCTOR INDONESIA, Design, Installation Power Machine.
• PT. LANGGENG MULTI USAHA, Design, Installation Power Machine
• PT. SUMBER PIRANTI, Design, Installation Power Machine
• PT. FUJI TECHNICA INDONESIA, Design, Installation for Electrical (Lighting, Receptacle, Power Machine).
• PT. SHINRYO INDONESIA, Installation Electrical Utility (MVMDB, TR, LVMDB, Cable Feeder, Lighting Receptacle, Sound
System, Fire Alarm, Telephone, Lightning Protection .
• PT. UNIVANCE INDONESIA, Design, Installation for Electrical (Lighting, Receptacle, Power Machine)
• SHIMIZU CORPORATION, P&G Project, Design, Installation for M&E(Lighting, Receptacle, LAN, TEL, A/C, Fan).
 2012
• PT. DENSO INDONESIA, Design, Installation Power Machine
• PT. TAISEI INDONESIA CONSTRUCTION, Design, Installation for Electrical (Lighting, Receptacle, Power Machine).
• PT. PANASONIC SEMICONDUCTOR INDONESIA, Design, Installation for Electrical (Lighting, Receptacle, Power Machine).
• PT. INDONESIA NIPPON STEEL PIPE, Design, Installation Ventilation System & Power Machine.
• PT. KIMBERLY CLARK INDONESIA, Design, Installation Power Machine.
• PT. AU AUTOMOTIVE COMPRESSOR INDONESIA, Design, Installation for Electrical (Lighting, Receptacle, Power Machine).
• PT. UNIVANCE INDONESIA, Design, Installation Power Machine
• PT. DJK INDONESIA, Design, Installation Power Machine
 2013
• PT. INTI GRAHA SEMBADA, PT. METAL ART INDONESIA, Design, Installation M&E Works (Sub station, Main Feeder,
Lighting Receptacle, Sound, Fire Alarm, TEL, CCTV, Lightning Protection, A/C, Ventilation, Fire Hydrant, Water supply,
Cooling Tower, Compressor).
• JO SHIMIZU - BANGUN CIPTA KONTRAKTOR, PT. USUI INTERNATIONAL, Design, Installation Electrical Works (Sub
station, Main Feeder, Lighting Receptacle, Sound, Fire Alarm, TEL, MATV, Lightning Protection)
• JO TECHNO RYOWA - GRAHA BARATA, PT. INDO JAPAN STEEL CENTER, Design, Installation Electrical Works (Sub station,
Main Feeder, Lighting Receptacle, Sound, Fire Alarm, TEL, MATV, Lightning Protection) Design, Installation Electrical
Works (Sub station, Main Feeder, Lighting Receptacle, Sound, Fire Alarm, TEL, MATV, Lightning Protection) .
• JO TECHNO RYOWA - GRAHA BARATA, PT. ARAYA STEEL TUBE, Design, Installation Electrical Works (Sub station, Main
Feeder, Lighting Receptacle, Sound, Fire Alarm, TEL, Lightning Protection).
• JO TECHNO RYOWA - GRAHA BARATA, PT. SEIREN INDONESIA, Design, Installation Electrical Works (Sub station, Main
Feeder, Lighting Receptacle, Sound, Fire Alarm, TEL, Lightning Protection)
• JO TECHNO RYOWA - GRAHA BARATA, PT. MARIMO APARTMENT SERVICE, Design, Installation M&E Works (Sub station,
Main Feeder, Lighting Receptacle, Sound, Fire Alarm, TEL, MATV, CCTV, ACESS CARD, Lightning Protection).
• PT. ITO TAKA CONTRUCTION, PT. INTI KERTASINDO, Design, Installation Electrical Works (Sub station, Main Feeder,
Lighting Receptacle, Sound, Fire Alarm, TEL, Lightning Protection)
 2014
• PT. SWADAYA INDO PRIMA, Design, Installation M&E Works (Sub station, Main Feeder, Lighting Receptacle, Sound, Fire
Alarm, TEL, Lightning Protection, A/C, Ventilation, Water supply).
• JO TECHNO RYOWA - GRAHA BARATA, PT. UNITED CAN COMPANY, Design, Installation Electrical Works (Sub station,
Main Feeder, Lighting Receptacle, Sound, Fire Alarm, TEL, CCTV, Lightning Protection)
• PT. KATSUYAMASEIKI KKB INDONESIA, Design, Installation for Electrical (Lighting, Receptacle, Power Machine).
• JO TECHNO RYOWA - GRAHA BARATA, PT. TOP TUBE INDONESIA, Design, Installation Electrical Works (Sub station, Main
Feeder, Lighting Receptacle, Sound, Fire Alarm, TEL, MATV, Lightning Protection).
• PT. TAIHO NUSANTARA, Design, Installation for Electrical (Lighting, Receptacle, Power Machine).
• PT. ITO TAKA CONTRUCTION, Design, Installation Electrical Works (Sub station, Main Feeder, Lighting Receptacle, Sound,
Fire Alarm, TEL, Lightning Protection).
• JO TECHNO RYOWA - GRAHA BARATA, PT. F-TECH INDONESIA, Design, Installation Electrical Works (Sub station, Main
Feeder, Lighting Receptacle, Sound, Fire Alarm, TEL, Lightning Protection, Power Machine)
• JO SHIMIZU-OBAYASHI-WIKA-JAKON, MRT JAKARTA, Design, Installation M&E Works (Main Feeder, Lighting Receptacle,
TEL).
• JO TECHNO RYOWA - GRAHA BARATA, PT. MITSUI KINZOKU ACT, Design, Installation Electrical Works (Sub station, Main
Feeder, Lighting Receptacle, Sound, Fire Alarm, TEL, Lightning Protection).
• PT. SHINRYO INDONESIA, PT. TANABE INDONESIA, Installation Electrical Utility (MVMDB, TR, LVMDB, Cable Feeder,
Lighting Receptacle, Sound System, Fire Alarm, Telephone, Lightning Protection
• PT. DJABESMEN, Design, Installation Ventilation System Royal Board.
• PT. DENSO INDONESIA,Design, Installation for Electrical (Lighting, Receptacle, Power Machine)
• SHIMIZU CORPORATION, NEW OFFICE, Design, Installation Electrical Works (Main Feeder, Lighting Receptacle, TEL)
• PT. KIMBERLY CLARK INDONESIA, Design, Installation Power Machine
• JO SHIMIZU-BANGUN CIPTA KONTRAKTOR, Design, Installation Electrical Works (Main Feeder, Lighting Receptacle,
Sound, Fire Alarm, TEL, LAN, Lightning Protection)
• PT. TSKEI MOLDING INDONESIA, Design, Installation Power Machine
• PT. KINDEN INDONESIA, PT. SUMCO INDONESIA, Design, Installation Power Machine
• PT. FRINA LESTARI NUSANTARA, Design, Installation Fire Alarm System
• PT. YAMATE METAL INDONESIA, Design, Installation M&E Works (Sub station, Main Feeder, Lighting Receptacle, TEL,
Lightning Protection, Compressor , A/C, Ventilation)
• JO KANDENKO-HAMANROKO, PT.. TIGER SASH INDONESIA, Design, Installation Electrical Works (Main Feeder, Lighting
Receptacle, Sound, Fire Alarm, TEL)
 2015
• JO SHIMIZU-OBAYASHI-WIJAYA KARYA-JAYA KONTRUKSI, Supply and Installation of Electrical Work for Jakarta Mass
Rapid Transit (MRT)-Underground Section CP104 & CP105.
• PT. BENTOEL PRIMA - BAT, Dismantling, Moving and Installation of Machine .
• PT. EVOLUZIONE TYRES INDONESIA, Mechanical, Electrical & Pipe Insullation Work.
• PT. METAL ART INDONESIA, Add Secondary Works.
• JO TECHNO RYOWA - GRAHA BARATA, PT. MEIJI RUBBER INDONESIA, Electrical Work for New Factory.
• JO HAZAMA - ANDO MURINDA, PT. MITSUBA INDONESIA, Design and Build Clean Room Class 100.000
• PT. DENSO INDONESIA, Design, Installation for Electrical (Lighting, Receptacle, Power Machine).
• JO KANDENKO-DENKI ENGINEERING, Jakarta MRT Temporary Works.

More Related Content

What's hot

Contoh Proposal Kegiatan
Contoh Proposal KegiatanContoh Proposal Kegiatan
Contoh Proposal Kegiatan
Bayu Mahesa Mahesa
 
Business Model Canvas - GoJek
Business Model Canvas - GoJekBusiness Model Canvas - GoJek
Business Model Canvas - GoJek
Eli Ermawati
 
Annual Report YSK 2022
Annual Report YSK 2022Annual Report YSK 2022
Annual Report YSK 2022
Yayasan Senyum Kita
 
Susunan acara panggung hiburan
Susunan acara panggung hiburanSusunan acara panggung hiburan
Susunan acara panggung hiburan
Salakory Ricko Abraham
 
Proposal Acara Family Gathering Perusahaan
Proposal Acara Family Gathering PerusahaanProposal Acara Family Gathering Perusahaan
Proposal Acara Family Gathering Perusahaan
Wisata Kepulauan Seribu
 
Laporan Kunjungan Industri PT FUBORU INDONESIA
Laporan Kunjungan Industri PT FUBORU INDONESIALaporan Kunjungan Industri PT FUBORU INDONESIA
Laporan Kunjungan Industri PT FUBORU INDONESIALisa Rahayuningsih
 
Surat magang
Surat magangSurat magang
Surat magang
Bambang Sugiarto
 
Program Kemitraan dan Bina Lingkungan BUMN
Program Kemitraan dan Bina Lingkungan BUMNProgram Kemitraan dan Bina Lingkungan BUMN
Program Kemitraan dan Bina Lingkungan BUMN
Ridho Fitrah Hyzkia
 
Proposal donor darah fki 2017
Proposal donor darah fki 2017Proposal donor darah fki 2017
Proposal donor darah fki 2017
ekochoeg
 
Karya Tulis Ilmiah Tema Lingkungan (Pengelolaan Limbah Plastik)
Karya Tulis Ilmiah Tema Lingkungan (Pengelolaan Limbah Plastik)Karya Tulis Ilmiah Tema Lingkungan (Pengelolaan Limbah Plastik)
Karya Tulis Ilmiah Tema Lingkungan (Pengelolaan Limbah Plastik)
Muhammad Yasir Abdad
 
Seputar event organizer
Seputar event organizerSeputar event organizer
Seputar event organizer
Ari Wahyu
 
CV Fasilitator/Narasumber TRAINING (Kanaidi, SE., M.SI)
CV Fasilitator/Narasumber TRAINING (Kanaidi, SE., M.SI)CV Fasilitator/Narasumber TRAINING (Kanaidi, SE., M.SI)
CV Fasilitator/Narasumber TRAINING (Kanaidi, SE., M.SI)
Kanaidi ken
 
Contoh proposal pkl
Contoh proposal pklContoh proposal pkl
Contoh proposal pkl
Elfira Oktavianti
 
Proposal kicau burung
Proposal kicau burungProposal kicau burung
Proposal kicau burung
Ihsan Muhamad
 
Makalah Pembuatan Biogas
Makalah Pembuatan BiogasMakalah Pembuatan Biogas
Makalah Pembuatan BiogasMeidina Yellisa
 
70-1597651884-Kurikulum Merdeka Belajar PSTE_Rev1.pdf
70-1597651884-Kurikulum Merdeka Belajar PSTE_Rev1.pdf70-1597651884-Kurikulum Merdeka Belajar PSTE_Rev1.pdf
70-1597651884-Kurikulum Merdeka Belajar PSTE_Rev1.pdf
JeniverYuliantiBatsi
 
Surat pernyataan Penyerahan Barang
Surat pernyataan Penyerahan BarangSurat pernyataan Penyerahan Barang
Surat pernyataan Penyerahan Barang
5h1n35
 
Proposal peringatan hari ulang tahun
Proposal peringatan hari ulang tahunProposal peringatan hari ulang tahun
Proposal peringatan hari ulang tahun
Dzakiyyah Salma Damayanti
 
proposal bisnis rumah makan "LESEHAN"
proposal bisnis rumah makan "LESEHAN"proposal bisnis rumah makan "LESEHAN"
proposal bisnis rumah makan "LESEHAN"
trihiriani vickriyati
 

What's hot (20)

Contoh Proposal Kegiatan
Contoh Proposal KegiatanContoh Proposal Kegiatan
Contoh Proposal Kegiatan
 
Business Model Canvas - GoJek
Business Model Canvas - GoJekBusiness Model Canvas - GoJek
Business Model Canvas - GoJek
 
Annual Report YSK 2022
Annual Report YSK 2022Annual Report YSK 2022
Annual Report YSK 2022
 
Susunan acara panggung hiburan
Susunan acara panggung hiburanSusunan acara panggung hiburan
Susunan acara panggung hiburan
 
Proposal Acara Family Gathering Perusahaan
Proposal Acara Family Gathering PerusahaanProposal Acara Family Gathering Perusahaan
Proposal Acara Family Gathering Perusahaan
 
Laporan Kunjungan Industri PT FUBORU INDONESIA
Laporan Kunjungan Industri PT FUBORU INDONESIALaporan Kunjungan Industri PT FUBORU INDONESIA
Laporan Kunjungan Industri PT FUBORU INDONESIA
 
Surat magang
Surat magangSurat magang
Surat magang
 
Program Kemitraan dan Bina Lingkungan BUMN
Program Kemitraan dan Bina Lingkungan BUMNProgram Kemitraan dan Bina Lingkungan BUMN
Program Kemitraan dan Bina Lingkungan BUMN
 
Proposal donor darah fki 2017
Proposal donor darah fki 2017Proposal donor darah fki 2017
Proposal donor darah fki 2017
 
Karya Tulis Ilmiah Tema Lingkungan (Pengelolaan Limbah Plastik)
Karya Tulis Ilmiah Tema Lingkungan (Pengelolaan Limbah Plastik)Karya Tulis Ilmiah Tema Lingkungan (Pengelolaan Limbah Plastik)
Karya Tulis Ilmiah Tema Lingkungan (Pengelolaan Limbah Plastik)
 
Seputar event organizer
Seputar event organizerSeputar event organizer
Seputar event organizer
 
CV Fasilitator/Narasumber TRAINING (Kanaidi, SE., M.SI)
CV Fasilitator/Narasumber TRAINING (Kanaidi, SE., M.SI)CV Fasilitator/Narasumber TRAINING (Kanaidi, SE., M.SI)
CV Fasilitator/Narasumber TRAINING (Kanaidi, SE., M.SI)
 
Surat pernyataan jual beli tanah
Surat pernyataan jual beli tanahSurat pernyataan jual beli tanah
Surat pernyataan jual beli tanah
 
Contoh proposal pkl
Contoh proposal pklContoh proposal pkl
Contoh proposal pkl
 
Proposal kicau burung
Proposal kicau burungProposal kicau burung
Proposal kicau burung
 
Makalah Pembuatan Biogas
Makalah Pembuatan BiogasMakalah Pembuatan Biogas
Makalah Pembuatan Biogas
 
70-1597651884-Kurikulum Merdeka Belajar PSTE_Rev1.pdf
70-1597651884-Kurikulum Merdeka Belajar PSTE_Rev1.pdf70-1597651884-Kurikulum Merdeka Belajar PSTE_Rev1.pdf
70-1597651884-Kurikulum Merdeka Belajar PSTE_Rev1.pdf
 
Surat pernyataan Penyerahan Barang
Surat pernyataan Penyerahan BarangSurat pernyataan Penyerahan Barang
Surat pernyataan Penyerahan Barang
 
Proposal peringatan hari ulang tahun
Proposal peringatan hari ulang tahunProposal peringatan hari ulang tahun
Proposal peringatan hari ulang tahun
 
proposal bisnis rumah makan "LESEHAN"
proposal bisnis rumah makan "LESEHAN"proposal bisnis rumah makan "LESEHAN"
proposal bisnis rumah makan "LESEHAN"
 

Similar to Company profile pt. denki engineering

Cv pt oods era mandiri may 2014
Cv pt oods era mandiri may 2014Cv pt oods era mandiri may 2014
Cv pt oods era mandiri may 2014
fandy iood
 
Cv pt oods era mandiri may 2014
Cv pt oods era mandiri may 2014Cv pt oods era mandiri may 2014
Cv pt oods era mandiri may 2014
fandy iood
 
Porto Folio HP39
Porto Folio HP39Porto Folio HP39
Porto Folio HP39
Hendra Permana
 
NTEL_Profile_ Projects_120815
NTEL_Profile_ Projects_120815NTEL_Profile_ Projects_120815
NTEL_Profile_ Projects_120815
NEEV TECH ENGINEERS LLP
 
Resume-Venkata Vamsi Krishna Y
Resume-Venkata Vamsi Krishna YResume-Venkata Vamsi Krishna Y
Resume-Venkata Vamsi Krishna Y
Vamsi Krishna
 
Profile for MEP Service Consultant
Profile for MEP Service ConsultantProfile for MEP Service Consultant
Profile for MEP Service Consultant
shefal shah
 
Quamaxindo Utama Company Profile
Quamaxindo Utama Company ProfileQuamaxindo Utama Company Profile
Quamaxindo Utama Company Profile
Yul Amrozi
 
Udaya CV 10
Udaya CV 10Udaya CV 10
Udaya CV 10
Udaya Kumar
 
SSCPL Profile
SSCPL ProfileSSCPL Profile
SSCPL Profile
AP Murthy
 
MOHAN M&E SUPERVISOR CV
MOHAN M&E SUPERVISOR CVMOHAN M&E SUPERVISOR CV
MOHAN M&E SUPERVISOR CV
Mohan Soundararaj
 
Diesel Genset Construction Project Management
Diesel Genset Construction Project ManagementDiesel Genset Construction Project Management
Diesel Genset Construction Project Management
WawanSetiawan834646
 
my cv govind 1(1)
my cv govind 1(1)my cv govind 1(1)
my cv govind 1(1)
GOVIND SINGH
 
K.VIJAYAKUMAR CV FOR FIELD ENGINEER- PAINTING INSULATION FIREPROOFING04122014
K.VIJAYAKUMAR CV FOR FIELD ENGINEER- PAINTING INSULATION FIREPROOFING04122014K.VIJAYAKUMAR CV FOR FIELD ENGINEER- PAINTING INSULATION FIREPROOFING04122014
K.VIJAYAKUMAR CV FOR FIELD ENGINEER- PAINTING INSULATION FIREPROOFING04122014
KANNAIYAN VIJAYAKUMAR
 
Quamaxindo Utama Company Profile
Quamaxindo Utama Company ProfileQuamaxindo Utama Company Profile
Quamaxindo Utama Company Profile
Yul Amrozi
 
MEC Engineers Company Profiles f
MEC Engineers Company Profiles fMEC Engineers Company Profiles f
MEC Engineers Company Profiles f
RAVICHANDER
 
nixon cv-Jan2016 _2_
nixon cv-Jan2016 _2_nixon cv-Jan2016 _2_
nixon cv-Jan2016 _2_
Nixon Das
 
Amartya
AmartyaAmartya
My Resume
My ResumeMy Resume
Enercon Systems Profile
Enercon Systems ProfileEnercon Systems Profile
AEC Company profile 2015
AEC Company profile 2015AEC Company profile 2015
AEC Company profile 2015
Adedoyin Adeleye
 

Similar to Company profile pt. denki engineering (20)

Cv pt oods era mandiri may 2014
Cv pt oods era mandiri may 2014Cv pt oods era mandiri may 2014
Cv pt oods era mandiri may 2014
 
Cv pt oods era mandiri may 2014
Cv pt oods era mandiri may 2014Cv pt oods era mandiri may 2014
Cv pt oods era mandiri may 2014
 
Porto Folio HP39
Porto Folio HP39Porto Folio HP39
Porto Folio HP39
 
NTEL_Profile_ Projects_120815
NTEL_Profile_ Projects_120815NTEL_Profile_ Projects_120815
NTEL_Profile_ Projects_120815
 
Resume-Venkata Vamsi Krishna Y
Resume-Venkata Vamsi Krishna YResume-Venkata Vamsi Krishna Y
Resume-Venkata Vamsi Krishna Y
 
Profile for MEP Service Consultant
Profile for MEP Service ConsultantProfile for MEP Service Consultant
Profile for MEP Service Consultant
 
Quamaxindo Utama Company Profile
Quamaxindo Utama Company ProfileQuamaxindo Utama Company Profile
Quamaxindo Utama Company Profile
 
Udaya CV 10
Udaya CV 10Udaya CV 10
Udaya CV 10
 
SSCPL Profile
SSCPL ProfileSSCPL Profile
SSCPL Profile
 
MOHAN M&E SUPERVISOR CV
MOHAN M&E SUPERVISOR CVMOHAN M&E SUPERVISOR CV
MOHAN M&E SUPERVISOR CV
 
Diesel Genset Construction Project Management
Diesel Genset Construction Project ManagementDiesel Genset Construction Project Management
Diesel Genset Construction Project Management
 
my cv govind 1(1)
my cv govind 1(1)my cv govind 1(1)
my cv govind 1(1)
 
K.VIJAYAKUMAR CV FOR FIELD ENGINEER- PAINTING INSULATION FIREPROOFING04122014
K.VIJAYAKUMAR CV FOR FIELD ENGINEER- PAINTING INSULATION FIREPROOFING04122014K.VIJAYAKUMAR CV FOR FIELD ENGINEER- PAINTING INSULATION FIREPROOFING04122014
K.VIJAYAKUMAR CV FOR FIELD ENGINEER- PAINTING INSULATION FIREPROOFING04122014
 
Quamaxindo Utama Company Profile
Quamaxindo Utama Company ProfileQuamaxindo Utama Company Profile
Quamaxindo Utama Company Profile
 
MEC Engineers Company Profiles f
MEC Engineers Company Profiles fMEC Engineers Company Profiles f
MEC Engineers Company Profiles f
 
nixon cv-Jan2016 _2_
nixon cv-Jan2016 _2_nixon cv-Jan2016 _2_
nixon cv-Jan2016 _2_
 
Amartya
AmartyaAmartya
Amartya
 
My Resume
My ResumeMy Resume
My Resume
 
Enercon Systems Profile
Enercon Systems ProfileEnercon Systems Profile
Enercon Systems Profile
 
AEC Company profile 2015
AEC Company profile 2015AEC Company profile 2015
AEC Company profile 2015
 

Recently uploaded

Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEMTIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
HODECEDSIET
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
Engine Lubrication performance System.pdf
Engine Lubrication performance System.pdfEngine Lubrication performance System.pdf
Engine Lubrication performance System.pdf
mamamaam477
 
Recycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part IIRecycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part II
Aditya Rajan Patra
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
RadiNasr
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
University of Maribor
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
mamunhossenbd75
 

Recently uploaded (20)

Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEMTIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
Engine Lubrication performance System.pdf
Engine Lubrication performance System.pdfEngine Lubrication performance System.pdf
Engine Lubrication performance System.pdf
 
Recycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part IIRecycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part II
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
 

Company profile pt. denki engineering

  • 1. VISION AND MISSION DENKI ENGINEERING, PT has started the General Contractor & Suppliers in a wide variety of commercial and industrial projects. PT. DENKI ENGINEERING dimulai sebagai General Contractor & Pemasok di berbagai proyek komersial dan industri. Our Commitment to professional excellence has enabled us to achieve, often even exceeds, our clients expectations. With efficient utilization of human and technical resources has also enabled us to complete projects within the designated time frame and budgets, while adhering closelt to the stringent performance requirements. Ever supported by quality, speed, safety, cost effectiveness and the professional technicians. Komitmen kami untuk keunggulan profesional telah memungkinkan kami untuk mencapai, bahkan sering melebihi, harapan klien kami. Dengan penggunaan sumber daya manusia dan teknis yang efisien memungkinkan kami untuk menyelesaikan proyek dalam jangka waktu dan anggaran yang ditentukan, dengan berpegang erat dengan persyaratan kinerja yang ketat. Didukung oleh kualitas, kecepatan, keamanan, efektivitas biaya dan teknisi profesional. VISION (VISI) : A company's competitive and reliable, able to perform synergy with others, and strive to become a global construction company. Make employees prosper, dedicated and high integrity, and professional employees that are close the technology. Having a harmonious working environment, transparent and conducive creativity and empowerment of employees. Sebuah perusahaan yang kompetitif dan dapat diandalkan, mampu melakukan sinergi dengan orang lain, dan berusaha untuk menjadi sebuah perusahaan konstruksi global. Membuat karyawan sejahtera, berdedikasi dan integritas yang tinggi, dan karyawan profesional yang dekat teknologi. Memiliki lingkungan kerja yang harmonis, kreativitas yang transparan dan konduktif dan pemberdayaan karyawan. MISSION (Misi) : Provide engineering services in a professional way for our customer satisfaction and the prosperity of stakeholder. Menyediakan Jasa keteknisan secara profesional untuk kepuasan pelanggan dan kemakmuran para pemangku kepentingan. ORGANIZATION STRUCTURE COMPANY'S DOCUMENT Company Name : PT. DENKI ENGINEERING Address : SENTRA NIAGA KALIMALANG Jl. Ahmad Yani Blok B1 No.29 Kayuringinjaya - Bekasi Selatan Kota Bekasi 17144 Phone : 021 - 885 0852, 885 - 0358 Fax : 021 - 885 0238 Company's Documents : - Notaris Ingrid Lannywaty, SH., No.5 tanggal Notarial Deed of 01 Pebruari 2007. Establishment - Keputusan Menteri Hukum & HAM RI W7-02837 HT.01.01-TH.2007 TDP : 1 0 2 6 1 4 6 0 4 2 3 8 NPWP : 02.630.831.2-432.000 PKP : PEM-00389/WPJ.22/KP.1203/2011 SKDU : 503/48/Kl.Kj/II/2015 SIUP : 510/1626-BPPT/PM/IX/2012 Banker : - Bank Name : MANDIRI BANK - Branch : Bekasi-SentraNiaga Kalimalang - Account No. : 167 0000 718717 website : www.ptdenki.com ISO : ISO 9001:2008 ACS REGISTRARS No. 130316 SIUJKN : No. Reg. 1-094208-3275-00030 SBUJK : No. Reg. 2.3275-4-19-1-10-094208 BUSINESS FIELD PROJECT EVALUATION SERVICES LAYANAN EVALUASI PROYEK DESIGN & CONSTRUCTION SERVICES DESAIN & JASA KONSTRUKSI  Design, Engineering and Construction Consultation Desain, Konsultasi Teknik dan Konstruksi  Electrical Works (Pekerjaan Kelistrikan)  Mechanical Works (Pekerjaan Mekanikal)  Machinery Works (Pekerjaan Permesinan) QA/QC DIV HR & GA DEPT ENGINERRING DIV DIRECTOR TECHNICAL ADVISOR MANAGEMENT REPRESENTATIVE OPERATIONAL DIV ADMINISTRATION DIV PROJECT & MAINTENANCE ESTIMATE & DESIGN PURCH. & WHS DEPT FINANCE DEPT ACCOUNTING & TAX DEPT DOCUMENT CONTROL QUALITY CONTROL DEPT. QC INCOMING QC INSPECTOR QC ENGINEER QA/QC ADMINISTRATION
  • 2. National Construction Service Business License CERTICATE OF LEGAL BUSINESS PT. DENKI ENGINEERING General Electrical & Mechanical Contractor
  • 3. Electrical Installation Work, Astra Tower, Jakarta-2015 Electrical Installation Work, Mass Rapid Transit (MRT), Jakarta-2015 Maintenance Work, PT. Denso Indonesia, Jakarta,2007-2015 Machine Installation Work, PT Bentoel-BAT, East Java-2015 Electrical Installation Work for Inst. Machine, PT. P&G Indonesia, Karawang-2013 Electrical Installation Work, PT. Nipro Indonesia, Karawang-2013 Mechanical & Electrical Installation Work, PT. JFE Steel Indonesia, Cibitung 2014-2015 Electrical Installation Work, PT. United Can Company, Mojokerto-2013 Mechanical, Electrical & Pipe Insullation Work, PT Evoluzione Tyres Indonesia, West Java-2015 Electrical Installation Work, PT F-TECH Indonesia, Karawang-2014 Electrical Installation Work, PT. Top Tube Indonesia, Karawang-2014 Electrical Installation Work, PT. Marimo Apartment, Cikarang 2013 Electrical Installation Work, PT. Indo Japan Steel, Karawang-2013 Electrical Installation Work, PT. Araya Indonesia, Cikarang-2013 Electrical Installation Work, PT. Seiren Indonesia, Cikarang-2013 Electrical Installation Work, PT Mitsui Kinzoku ACT Indonesia, Karawang-2014 PT. Usui International, Cibitung - 2014 PT Metalart Indonesia, Karawang-2014
  • 4. PROJECTS EXPERIENCES  2009 • PT. DENSO INDONESIA, Design Installation Power Machine • PT. TAIKISHA INDONESIA ENGINEERING, Installation Electrical Utility (MVMDB, TR, LVMDB, Cable Feeder, Lighting Receptacle, Sound System, Fire Alarm, Telephone, Lightning Protection. • PT. KAYABA INDONESIA, Design, Installation for Sub Station (MVMDB, TR, LVMDB). • PT. IWATANI INDUSTRIAL GAS INDONESIA, Design, Installation Power Machine • PT. AE AUTOMATION INDONESIA, Design, Installation Power Machine • PT. RINNAI INDONESIA, Design, Installation Power Machine • PT. MIYUKI INDONESIA, Design, Installation Power Machine • PT. SANYO JAYA COMPONENT INDONESIA, Design, Installation Power Machine • PT. SUMCO INDONESIA, Design, Installation Fire Alarm System • PT. SUPRAMAS SAKTI, Design, Installation Power Machine • PT. KYOTO TERM INDONESIA, Design, Installation Power Machine  2010 • PT. KATSHUSHIRO INDONESIA, Design, Installation for M&E(Lighting, Receptacle, LAN, Fire Alarm, TEL, Sound, A/C, Fan). • PT. DENSO INDONESIA, Design, Installation Power Machine. • PT. KAYABA INDONESIA, Design, Installation Ventilation System • PT. INDONESIA NIPPON STEEL PIPE, Design, Installation Ventilation System & Power Machine. • PT. KIMBERLY CLARK INDONESIA, Design, Installation Ventilation System & Power Machine • PT. SHIBATAYA ENGINEERING, Design, Installation for Sub Station (MVMDB, TR, LVMDB). • PT. DYNAPLAST, Design, Installation Ventilation System & Power Machine. • PT. ORBIT ENGINEERING INDONESIA, Design, Installation Power Machine.  2011 • PT. PANASONIC SEMICONDUCTOR INDONESIA, Design, Installation Power Machine. • PT. LANGGENG MULTI USAHA, Design, Installation Power Machine • PT. SUMBER PIRANTI, Design, Installation Power Machine • PT. FUJI TECHNICA INDONESIA, Design, Installation for Electrical (Lighting, Receptacle, Power Machine). • PT. SHINRYO INDONESIA, Installation Electrical Utility (MVMDB, TR, LVMDB, Cable Feeder, Lighting Receptacle, Sound System, Fire Alarm, Telephone, Lightning Protection . • PT. UNIVANCE INDONESIA, Design, Installation for Electrical (Lighting, Receptacle, Power Machine) • SHIMIZU CORPORATION, P&G Project, Design, Installation for M&E(Lighting, Receptacle, LAN, TEL, A/C, Fan).  2012 • PT. DENSO INDONESIA, Design, Installation Power Machine • PT. TAISEI INDONESIA CONSTRUCTION, Design, Installation for Electrical (Lighting, Receptacle, Power Machine). • PT. PANASONIC SEMICONDUCTOR INDONESIA, Design, Installation for Electrical (Lighting, Receptacle, Power Machine). • PT. INDONESIA NIPPON STEEL PIPE, Design, Installation Ventilation System & Power Machine. • PT. KIMBERLY CLARK INDONESIA, Design, Installation Power Machine. • PT. AU AUTOMOTIVE COMPRESSOR INDONESIA, Design, Installation for Electrical (Lighting, Receptacle, Power Machine). • PT. UNIVANCE INDONESIA, Design, Installation Power Machine • PT. DJK INDONESIA, Design, Installation Power Machine  2013 • PT. INTI GRAHA SEMBADA, PT. METAL ART INDONESIA, Design, Installation M&E Works (Sub station, Main Feeder, Lighting Receptacle, Sound, Fire Alarm, TEL, CCTV, Lightning Protection, A/C, Ventilation, Fire Hydrant, Water supply, Cooling Tower, Compressor). • JO SHIMIZU - BANGUN CIPTA KONTRAKTOR, PT. USUI INTERNATIONAL, Design, Installation Electrical Works (Sub station, Main Feeder, Lighting Receptacle, Sound, Fire Alarm, TEL, MATV, Lightning Protection) • JO TECHNO RYOWA - GRAHA BARATA, PT. INDO JAPAN STEEL CENTER, Design, Installation Electrical Works (Sub station, Main Feeder, Lighting Receptacle, Sound, Fire Alarm, TEL, MATV, Lightning Protection) Design, Installation Electrical Works (Sub station, Main Feeder, Lighting Receptacle, Sound, Fire Alarm, TEL, MATV, Lightning Protection) . • JO TECHNO RYOWA - GRAHA BARATA, PT. ARAYA STEEL TUBE, Design, Installation Electrical Works (Sub station, Main Feeder, Lighting Receptacle, Sound, Fire Alarm, TEL, Lightning Protection). • JO TECHNO RYOWA - GRAHA BARATA, PT. SEIREN INDONESIA, Design, Installation Electrical Works (Sub station, Main Feeder, Lighting Receptacle, Sound, Fire Alarm, TEL, Lightning Protection) • JO TECHNO RYOWA - GRAHA BARATA, PT. MARIMO APARTMENT SERVICE, Design, Installation M&E Works (Sub station, Main Feeder, Lighting Receptacle, Sound, Fire Alarm, TEL, MATV, CCTV, ACESS CARD, Lightning Protection). • PT. ITO TAKA CONTRUCTION, PT. INTI KERTASINDO, Design, Installation Electrical Works (Sub station, Main Feeder, Lighting Receptacle, Sound, Fire Alarm, TEL, Lightning Protection)  2014 • PT. SWADAYA INDO PRIMA, Design, Installation M&E Works (Sub station, Main Feeder, Lighting Receptacle, Sound, Fire Alarm, TEL, Lightning Protection, A/C, Ventilation, Water supply). • JO TECHNO RYOWA - GRAHA BARATA, PT. UNITED CAN COMPANY, Design, Installation Electrical Works (Sub station, Main Feeder, Lighting Receptacle, Sound, Fire Alarm, TEL, CCTV, Lightning Protection) • PT. KATSUYAMASEIKI KKB INDONESIA, Design, Installation for Electrical (Lighting, Receptacle, Power Machine). • JO TECHNO RYOWA - GRAHA BARATA, PT. TOP TUBE INDONESIA, Design, Installation Electrical Works (Sub station, Main Feeder, Lighting Receptacle, Sound, Fire Alarm, TEL, MATV, Lightning Protection). • PT. TAIHO NUSANTARA, Design, Installation for Electrical (Lighting, Receptacle, Power Machine). • PT. ITO TAKA CONTRUCTION, Design, Installation Electrical Works (Sub station, Main Feeder, Lighting Receptacle, Sound, Fire Alarm, TEL, Lightning Protection). • JO TECHNO RYOWA - GRAHA BARATA, PT. F-TECH INDONESIA, Design, Installation Electrical Works (Sub station, Main Feeder, Lighting Receptacle, Sound, Fire Alarm, TEL, Lightning Protection, Power Machine) • JO SHIMIZU-OBAYASHI-WIKA-JAKON, MRT JAKARTA, Design, Installation M&E Works (Main Feeder, Lighting Receptacle, TEL). • JO TECHNO RYOWA - GRAHA BARATA, PT. MITSUI KINZOKU ACT, Design, Installation Electrical Works (Sub station, Main Feeder, Lighting Receptacle, Sound, Fire Alarm, TEL, Lightning Protection). • PT. SHINRYO INDONESIA, PT. TANABE INDONESIA, Installation Electrical Utility (MVMDB, TR, LVMDB, Cable Feeder, Lighting Receptacle, Sound System, Fire Alarm, Telephone, Lightning Protection • PT. DJABESMEN, Design, Installation Ventilation System Royal Board. • PT. DENSO INDONESIA,Design, Installation for Electrical (Lighting, Receptacle, Power Machine) • SHIMIZU CORPORATION, NEW OFFICE, Design, Installation Electrical Works (Main Feeder, Lighting Receptacle, TEL) • PT. KIMBERLY CLARK INDONESIA, Design, Installation Power Machine • JO SHIMIZU-BANGUN CIPTA KONTRAKTOR, Design, Installation Electrical Works (Main Feeder, Lighting Receptacle, Sound, Fire Alarm, TEL, LAN, Lightning Protection) • PT. TSKEI MOLDING INDONESIA, Design, Installation Power Machine • PT. KINDEN INDONESIA, PT. SUMCO INDONESIA, Design, Installation Power Machine • PT. FRINA LESTARI NUSANTARA, Design, Installation Fire Alarm System • PT. YAMATE METAL INDONESIA, Design, Installation M&E Works (Sub station, Main Feeder, Lighting Receptacle, TEL, Lightning Protection, Compressor , A/C, Ventilation) • JO KANDENKO-HAMANROKO, PT.. TIGER SASH INDONESIA, Design, Installation Electrical Works (Main Feeder, Lighting Receptacle, Sound, Fire Alarm, TEL)  2015 • JO SHIMIZU-OBAYASHI-WIJAYA KARYA-JAYA KONTRUKSI, Supply and Installation of Electrical Work for Jakarta Mass Rapid Transit (MRT)-Underground Section CP104 & CP105. • PT. BENTOEL PRIMA - BAT, Dismantling, Moving and Installation of Machine . • PT. EVOLUZIONE TYRES INDONESIA, Mechanical, Electrical & Pipe Insullation Work. • PT. METAL ART INDONESIA, Add Secondary Works. • JO TECHNO RYOWA - GRAHA BARATA, PT. MEIJI RUBBER INDONESIA, Electrical Work for New Factory. • JO HAZAMA - ANDO MURINDA, PT. MITSUBA INDONESIA, Design and Build Clean Room Class 100.000 • PT. DENSO INDONESIA, Design, Installation for Electrical (Lighting, Receptacle, Power Machine). • JO KANDENKO-DENKI ENGINEERING, Jakarta MRT Temporary Works.