1. Transformer: Testing procedure for HV testing ,Phase shifting/ phase group , Radio
interference, Ratio Test , Load loss ,Separate source voltage testing ,Induced voltage
testing , Impulse & Surge testing , Noise level & vibration testing , Short circuit
withstand test ,Tan Delta test , Core insulation voltage test, Measurement of
impedance ,Testing of auxiliaries & safety device , Oil testing , Classification of
testing methods , Testing of bushing. DC & AC Resistance measurement, Temp. Rise
test, Short circuit test, Dielectric test, Partial discharge, Insulation resistance testing.
Polarity testing, Short time current rating, Impulse & surge testing, Determination of
error & accuracy class, Power frequency voltage withstand test, over voltage inter-turn
test. Determination of polarization index for transformer. Drying out procedure for
transformer. Commissioning steps for transformer, Purification & Filtration Procedure
for Transformer oil. Troubleshooting & Maintenance of transformer.
08
2. Induction Motor: Testing (3-phase & 1-phase): Hammer test, Testing against
variation of voltage/current/frequency, Load test, NL & BR test, DC & AC,
Resistance measurement, Insulation measurement, Starting test, Temp. Rise test, Slip
measurement, HV test, Testing on auxiliaries, Vibration Test, Noise level test. Drying
out methods / Polarization Index / Hot Temperature measurement Degree of
protection (IP Grade) Commissioning steps for Induction motor, Heat Run Test.
Commissioning of Induction Generator. Troubleshooting & maintenance of induction
motor
06
3. Substation Equipments:
Bus bar Temp. Rise test, Rated short time current test, HV test, Power frequency
voltage withstand test, Impulse / surge testing, Vibration.
Earthing Earthing resistance measurement, Substation grid Earthing, Soil resistivity
measurement.
Isolator Testing Temp. Resistance test, Short circuit test, Charging current making &
breaking test, Inductive current making & breaking test.
06
4. Circuit breaker: Testing of HV/LV circuit breaker: No load Mechanical
Operation, Mechanical endurance test, Temp. Rise test, Impulse & surge testing, short
time current test. Short circuit making & breaking test, Line Charging current making
& breaking test, Cable charging & capacitor bank making & breaking test, Out of
phase switching, Short line fault test, and Electrical & Mechanical endurance test for
LT switch gear like MCB / MCCB / ELCB etc. C.T. & P.T. Testing, Relay testing,
Coupling capacitors, Station Batteries for D.C. Supply, Fire Shifting Equipments.
Testing & Commissioning of Lightning Arrestor, Substation Commissioning by
Thermograph. Troubleshooting & maintenance of circuit breakers.
06
5. DC Machine: Testing Voltage drop test or bar to bar test, Load test, Open circuit &
magnetizing test, Insulation resistance, Starting performance, Dielectric test.
Swinburne’s test, Hopkinson’s test, Field test, Separation of losses in DC shunt
machine. Temp. rise test & Heat run test Drying out process
Commissioning steps for DC machines Troubleshooting & maintenance
06
6. Synchronous machine: Testing
OC & SC test, Characteristics, Loss measurement, Temp. rise test , Over speed test ,
HV testing , Insulation resistance wave form interference , DC & AC Resistance of
armature & field winding measurement , Dielectric testing on armature & field
winding , Mechanical balance , Magnetic balance , Current balance , Phase sequence ,
06
Harmonic analysis , reactance & time constant , Speed torque current , Vibration &
noise measurement , SC test , Synchronizing circuit testing , Testing of voltage
regulators , Excitation circuit testing ,Voltage recovery test , Retardation test on load /
no load .Drying out procedure Commissioning steps for synchronous machines
Troubleshooting & maintenance.
7. Commissioning of transmission line & Cable: Derating of cable capacity, HV test,
AC & DC Resistance check, Insulation resistance, Impedance measurement, Location
finding technique for fault in underground cables (Murray loop test & Warley loop
test), Testing of open circuit faults in cables. Line charging, loading & Dropping.
04
Term work:
Term work shall be based on above syllabus.
Reference Books:
1. Testing, Commissioning & maintenance of electrical equipment By S. S. Rao, khanna publications
2. The commissioning of Electrical Plant by RCH Richardson (Chapman & Hall)
Commissioning of electrical equipments

More Related Content

What's hot

Pre commissioning checks & periodic inspection on power transformers
Pre commissioning checks & periodic inspection  on power transformersPre commissioning checks & periodic inspection  on power transformers
Pre commissioning checks & periodic inspection on power transformers
ayyadurai SHANMUGAM
 
Simple Current Transformer (CT) Testing for Switchyard Equipment.
Simple Current Transformer (CT) Testing for Switchyard Equipment.Simple Current Transformer (CT) Testing for Switchyard Equipment.
Simple Current Transformer (CT) Testing for Switchyard Equipment.
SARAVANAN A
 
Your Guide to the Load Cell Field Guide
Your Guide to the Load Cell Field GuideYour Guide to the Load Cell Field Guide
Your Guide to the Load Cell Field Guide
Interface Inc.
 
TESCO Tuesday: Test Switch Operation & Accessories
TESCO Tuesday: Test Switch Operation & AccessoriesTESCO Tuesday: Test Switch Operation & Accessories
TESCO Tuesday: Test Switch Operation & Accessories
TESCO - The Eastern Specialty Company
 
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
Jobin Abraham
 
Transformer Oil Testing services
Transformer Oil Testing servicesTransformer Oil Testing services
Transformer Oil Testing services
Power Electronical
 
Load Cell Lunch and Learn Presented by Interface
Load Cell Lunch and Learn Presented by InterfaceLoad Cell Lunch and Learn Presented by Interface
Load Cell Lunch and Learn Presented by Interface
Interface
 
TESCO Tuesday: Traditional Ratio, Burden, Admittance and Demag Testing – Part II
TESCO Tuesday: Traditional Ratio, Burden, Admittance and Demag Testing – Part IITESCO Tuesday: Traditional Ratio, Burden, Admittance and Demag Testing – Part II
TESCO Tuesday: Traditional Ratio, Burden, Admittance and Demag Testing – Part II
TESCO - The Eastern Specialty Company
 
Catalog for high voltage test equipment
Catalog for high voltage test equipmentCatalog for high voltage test equipment
Catalog for high voltage test equipment
katherine feng
 
Unit 1-2-b
Unit 1-2-bUnit 1-2-b
Unit 1-2-b
srichakra kripa
 
TESCO Tuesday: Ratio, Burden and Admittance
TESCO Tuesday: Ratio, Burden and AdmittanceTESCO Tuesday: Ratio, Burden and Admittance
TESCO Tuesday: Ratio, Burden and Admittance
TESCO - The Eastern Specialty Company
 
Identifying Casing Shorts With or Without Test Leads - Jim Walton
Identifying Casing Shorts With or Without Test Leads - Jim WaltonIdentifying Casing Shorts With or Without Test Leads - Jim Walton
Identifying Casing Shorts With or Without Test Leads - Jim Walton
nacetwincities
 
Testing of Transformer (AREVA)
Testing of Transformer (AREVA)Testing of Transformer (AREVA)
Testing of Transformer (AREVA)
AHMED MOHAMED HEGAB
 
CT Burden Testing
CT Burden TestingCT Burden Testing
TESCO Tuesday: Transformer-Rated & Self-Contained Metering Fundamentals
TESCO Tuesday: Transformer-Rated & Self-Contained Metering FundamentalsTESCO Tuesday: Transformer-Rated & Self-Contained Metering Fundamentals
TESCO Tuesday: Transformer-Rated & Self-Contained Metering Fundamentals
TESCO - The Eastern Specialty Company
 
Sona Electric Power Engineering and Testing Centre
Sona Electric Power Engineering and Testing CentreSona Electric Power Engineering and Testing Centre
Sona Electric Power Engineering and Testing Centre
Sona College of Technology
 
Simple Disconnector Switch (DS) Testing for Switchyard Equipment
Simple Disconnector Switch (DS) Testing for Switchyard EquipmentSimple Disconnector Switch (DS) Testing for Switchyard Equipment
Simple Disconnector Switch (DS) Testing for Switchyard Equipment
SARAVANAN A
 
Manuval
ManuvalManuval
CT Testing: Theory and Practice
CT Testing: Theory and PracticeCT Testing: Theory and Practice
CT Testing: Theory and Practice
TESCO - The Eastern Specialty Company
 
Types of Load Cells and Force Sensors Commonly used as force standards
Types of Load Cells and Force Sensors Commonly used as force standards Types of Load Cells and Force Sensors Commonly used as force standards
Types of Load Cells and Force Sensors Commonly used as force standards
Henry Zumbrun
 

What's hot (20)

Pre commissioning checks & periodic inspection on power transformers
Pre commissioning checks & periodic inspection  on power transformersPre commissioning checks & periodic inspection  on power transformers
Pre commissioning checks & periodic inspection on power transformers
 
Simple Current Transformer (CT) Testing for Switchyard Equipment.
Simple Current Transformer (CT) Testing for Switchyard Equipment.Simple Current Transformer (CT) Testing for Switchyard Equipment.
Simple Current Transformer (CT) Testing for Switchyard Equipment.
 
Your Guide to the Load Cell Field Guide
Your Guide to the Load Cell Field GuideYour Guide to the Load Cell Field Guide
Your Guide to the Load Cell Field Guide
 
TESCO Tuesday: Test Switch Operation & Accessories
TESCO Tuesday: Test Switch Operation & AccessoriesTESCO Tuesday: Test Switch Operation & Accessories
TESCO Tuesday: Test Switch Operation & Accessories
 
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
 
Transformer Oil Testing services
Transformer Oil Testing servicesTransformer Oil Testing services
Transformer Oil Testing services
 
Load Cell Lunch and Learn Presented by Interface
Load Cell Lunch and Learn Presented by InterfaceLoad Cell Lunch and Learn Presented by Interface
Load Cell Lunch and Learn Presented by Interface
 
TESCO Tuesday: Traditional Ratio, Burden, Admittance and Demag Testing – Part II
TESCO Tuesday: Traditional Ratio, Burden, Admittance and Demag Testing – Part IITESCO Tuesday: Traditional Ratio, Burden, Admittance and Demag Testing – Part II
TESCO Tuesday: Traditional Ratio, Burden, Admittance and Demag Testing – Part II
 
Catalog for high voltage test equipment
Catalog for high voltage test equipmentCatalog for high voltage test equipment
Catalog for high voltage test equipment
 
Unit 1-2-b
Unit 1-2-bUnit 1-2-b
Unit 1-2-b
 
TESCO Tuesday: Ratio, Burden and Admittance
TESCO Tuesday: Ratio, Burden and AdmittanceTESCO Tuesday: Ratio, Burden and Admittance
TESCO Tuesday: Ratio, Burden and Admittance
 
Identifying Casing Shorts With or Without Test Leads - Jim Walton
Identifying Casing Shorts With or Without Test Leads - Jim WaltonIdentifying Casing Shorts With or Without Test Leads - Jim Walton
Identifying Casing Shorts With or Without Test Leads - Jim Walton
 
Testing of Transformer (AREVA)
Testing of Transformer (AREVA)Testing of Transformer (AREVA)
Testing of Transformer (AREVA)
 
CT Burden Testing
CT Burden TestingCT Burden Testing
CT Burden Testing
 
TESCO Tuesday: Transformer-Rated & Self-Contained Metering Fundamentals
TESCO Tuesday: Transformer-Rated & Self-Contained Metering FundamentalsTESCO Tuesday: Transformer-Rated & Self-Contained Metering Fundamentals
TESCO Tuesday: Transformer-Rated & Self-Contained Metering Fundamentals
 
Sona Electric Power Engineering and Testing Centre
Sona Electric Power Engineering and Testing CentreSona Electric Power Engineering and Testing Centre
Sona Electric Power Engineering and Testing Centre
 
Simple Disconnector Switch (DS) Testing for Switchyard Equipment
Simple Disconnector Switch (DS) Testing for Switchyard EquipmentSimple Disconnector Switch (DS) Testing for Switchyard Equipment
Simple Disconnector Switch (DS) Testing for Switchyard Equipment
 
Manuval
ManuvalManuval
Manuval
 
CT Testing: Theory and Practice
CT Testing: Theory and PracticeCT Testing: Theory and Practice
CT Testing: Theory and Practice
 
Types of Load Cells and Force Sensors Commonly used as force standards
Types of Load Cells and Force Sensors Commonly used as force standards Types of Load Cells and Force Sensors Commonly used as force standards
Types of Load Cells and Force Sensors Commonly used as force standards
 

Similar to Commissioning of electrical equipments

New cv jithesh
New cv jitheshNew cv jithesh
New cv jithesh
Jithesh Keezhedath
 
Isolator and bushing
Isolator and bushingIsolator and bushing
Isolator and bushing
Novia Putri
 
REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANT
RAJPRASAD RS
 
CPS Profile PPT
CPS Profile PPTCPS Profile PPT
CPS Profile PPT
cambay power services
 
Testing of circuit breakers
Testing of circuit breakersTesting of circuit breakers
Testing of circuit breakers
Kabilesh K
 
CV 5 yrs
CV 5 yrsCV 5 yrs
CV 5 yrs
Shakeel Ansari
 
TESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.pptTESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.ppt
ChristinaBoyd12
 
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
santubanga333
 
TESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.pptTESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.ppt
ssuser1f60f6
 
Relay service providers and dealers
Relay service providers and dealers Relay service providers and dealers
Relay service providers and dealers
ashwini reliserv
 
HV CB testing.pdf
HV CB testing.pdfHV CB testing.pdf
HV CB testing.pdf
ssusereeea97
 
Unit 1-2-a
Unit 1-2-aUnit 1-2-a
Unit 1-2-a
srichakra kripa
 
QA/QC ENGINEER
QA/QC ENGINEERQA/QC ENGINEER
QA/QC ENGINEER
T.N. Sathish
 
cv of pjnehru
cv of pjnehrucv of pjnehru
cv of pjnehru
Jawaharlal nehru
 
resume
resumeresume
Shafiq CV
Shafiq CVShafiq CV
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear
johny renoald
 
gautham CV updated
gautham CV updatedgautham CV updated
gautham CV updated
gautham kanagasabai
 
Ratio Burden Admittance Testing
Ratio Burden Admittance TestingRatio Burden Admittance Testing
Ratio Burden Admittance Testing
TESCO - The Eastern Specialty Company
 
electrician
electricianelectrician
electrician
Mahesh Nai
 

Similar to Commissioning of electrical equipments (20)

New cv jithesh
New cv jitheshNew cv jithesh
New cv jithesh
 
Isolator and bushing
Isolator and bushingIsolator and bushing
Isolator and bushing
 
REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANT
 
CPS Profile PPT
CPS Profile PPTCPS Profile PPT
CPS Profile PPT
 
Testing of circuit breakers
Testing of circuit breakersTesting of circuit breakers
Testing of circuit breakers
 
CV 5 yrs
CV 5 yrsCV 5 yrs
CV 5 yrs
 
TESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.pptTESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.ppt
 
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
 
TESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.pptTESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.ppt
 
Relay service providers and dealers
Relay service providers and dealers Relay service providers and dealers
Relay service providers and dealers
 
HV CB testing.pdf
HV CB testing.pdfHV CB testing.pdf
HV CB testing.pdf
 
Unit 1-2-a
Unit 1-2-aUnit 1-2-a
Unit 1-2-a
 
QA/QC ENGINEER
QA/QC ENGINEERQA/QC ENGINEER
QA/QC ENGINEER
 
cv of pjnehru
cv of pjnehrucv of pjnehru
cv of pjnehru
 
resume
resumeresume
resume
 
Shafiq CV
Shafiq CVShafiq CV
Shafiq CV
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear
 
gautham CV updated
gautham CV updatedgautham CV updated
gautham CV updated
 
Ratio Burden Admittance Testing
Ratio Burden Admittance TestingRatio Burden Admittance Testing
Ratio Burden Admittance Testing
 
electrician
electricianelectrician
electrician
 

More from Hemal Ariwala

Guidelines regarding departmental elective
Guidelines regarding departmental electiveGuidelines regarding departmental elective
Guidelines regarding departmental elective
Hemal Ariwala
 
Power system practice and design
Power system practice and designPower system practice and design
Power system practice and design
Hemal Ariwala
 
Electrical power utilization
Electrical power utilizationElectrical power utilization
Electrical power utilization
Hemal Ariwala
 
Advanced processor and controllers
Advanced processor and controllersAdvanced processor and controllers
Advanced processor and controllers
Hemal Ariwala
 
Advanced power electronics ii
Advanced power electronics iiAdvanced power electronics ii
Advanced power electronics ii
Hemal Ariwala
 
scheme
schemescheme
Advanced power system ii
Advanced power system iiAdvanced power system ii
Advanced power system ii
Hemal Ariwala
 
Project i
Project  iProject  i
Project i
Hemal Ariwala
 
Inter connected power system
Inter connected power systemInter connected power system
Inter connected power system
Hemal Ariwala
 
Industrial instrumentation
Industrial instrumentationIndustrial instrumentation
Industrial instrumentation
Hemal Ariwala
 
Electrical machine design
Electrical machine designElectrical machine design
Electrical machine design
Hemal Ariwala
 
Electrical engg. sem vii with project teaching scheme
Electrical engg. sem vii with project teaching schemeElectrical engg. sem vii with project teaching scheme
Electrical engg. sem vii with project teaching scheme
Hemal Ariwala
 
Advanced power
Advanced power Advanced power
Advanced power
Hemal Ariwala
 
Advanced power el
Advanced power elAdvanced power el
Advanced power el
Hemal Ariwala
 
Advanced system(department elective i)
Advanced system(department elective i)Advanced system(department elective i)
Advanced system(department elective i)
Hemal Ariwala
 

More from Hemal Ariwala (15)

Guidelines regarding departmental elective
Guidelines regarding departmental electiveGuidelines regarding departmental elective
Guidelines regarding departmental elective
 
Power system practice and design
Power system practice and designPower system practice and design
Power system practice and design
 
Electrical power utilization
Electrical power utilizationElectrical power utilization
Electrical power utilization
 
Advanced processor and controllers
Advanced processor and controllersAdvanced processor and controllers
Advanced processor and controllers
 
Advanced power electronics ii
Advanced power electronics iiAdvanced power electronics ii
Advanced power electronics ii
 
scheme
schemescheme
scheme
 
Advanced power system ii
Advanced power system iiAdvanced power system ii
Advanced power system ii
 
Project i
Project  iProject  i
Project i
 
Inter connected power system
Inter connected power systemInter connected power system
Inter connected power system
 
Industrial instrumentation
Industrial instrumentationIndustrial instrumentation
Industrial instrumentation
 
Electrical machine design
Electrical machine designElectrical machine design
Electrical machine design
 
Electrical engg. sem vii with project teaching scheme
Electrical engg. sem vii with project teaching schemeElectrical engg. sem vii with project teaching scheme
Electrical engg. sem vii with project teaching scheme
 
Advanced power
Advanced power Advanced power
Advanced power
 
Advanced power el
Advanced power elAdvanced power el
Advanced power el
 
Advanced system(department elective i)
Advanced system(department elective i)Advanced system(department elective i)
Advanced system(department elective i)
 

Recently uploaded

留学挂科(UofM毕业证)明尼苏达大学毕业证成绩单复刻办理
留学挂科(UofM毕业证)明尼苏达大学毕业证成绩单复刻办理留学挂科(UofM毕业证)明尼苏达大学毕业证成绩单复刻办理
留学挂科(UofM毕业证)明尼苏达大学毕业证成绩单复刻办理
uehowe
 
Should Repositories Participate in the Fediverse?
Should Repositories Participate in the Fediverse?Should Repositories Participate in the Fediverse?
Should Repositories Participate in the Fediverse?
Paul Walk
 
留学学历(UoA毕业证)奥克兰大学毕业证成绩单官方原版办理
留学学历(UoA毕业证)奥克兰大学毕业证成绩单官方原版办理留学学历(UoA毕业证)奥克兰大学毕业证成绩单官方原版办理
留学学历(UoA毕业证)奥克兰大学毕业证成绩单官方原版办理
bseovas
 
manuaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaal
manuaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaalmanuaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaal
manuaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaal
wolfsoftcompanyco
 
7 Best Cloud Hosting Services to Try Out in 2024
7 Best Cloud Hosting Services to Try Out in 20247 Best Cloud Hosting Services to Try Out in 2024
7 Best Cloud Hosting Services to Try Out in 2024
Danica Gill
 
成绩单ps(UST毕业证)圣托马斯大学毕业证成绩单快速办理
成绩单ps(UST毕业证)圣托马斯大学毕业证成绩单快速办理成绩单ps(UST毕业证)圣托马斯大学毕业证成绩单快速办理
成绩单ps(UST毕业证)圣托马斯大学毕业证成绩单快速办理
ysasp1
 
假文凭国外(Adelaide毕业证)澳大利亚国立大学毕业证成绩单办理
假文凭国外(Adelaide毕业证)澳大利亚国立大学毕业证成绩单办理假文凭国外(Adelaide毕业证)澳大利亚国立大学毕业证成绩单办理
假文凭国外(Adelaide毕业证)澳大利亚国立大学毕业证成绩单办理
cuobya
 
Search Result Showing My Post is Now Buried
Search Result Showing My Post is Now BuriedSearch Result Showing My Post is Now Buried
Search Result Showing My Post is Now Buried
Trish Parr
 
Understanding User Behavior with Google Analytics.pdf
Understanding User Behavior with Google Analytics.pdfUnderstanding User Behavior with Google Analytics.pdf
Understanding User Behavior with Google Analytics.pdf
SEO Article Boost
 
学位认证网(DU毕业证)迪肯大学毕业证成绩单一比一原版制作
学位认证网(DU毕业证)迪肯大学毕业证成绩单一比一原版制作学位认证网(DU毕业证)迪肯大学毕业证成绩单一比一原版制作
学位认证网(DU毕业证)迪肯大学毕业证成绩单一比一原版制作
zyfovom
 
办理毕业证(UPenn毕业证)宾夕法尼亚大学毕业证成绩单快速办理
办理毕业证(UPenn毕业证)宾夕法尼亚大学毕业证成绩单快速办理办理毕业证(UPenn毕业证)宾夕法尼亚大学毕业证成绩单快速办理
办理毕业证(UPenn毕业证)宾夕法尼亚大学毕业证成绩单快速办理
uehowe
 
重新申请毕业证书(RMIT毕业证)皇家墨尔本理工大学毕业证成绩单精仿办理
重新申请毕业证书(RMIT毕业证)皇家墨尔本理工大学毕业证成绩单精仿办理重新申请毕业证书(RMIT毕业证)皇家墨尔本理工大学毕业证成绩单精仿办理
重新申请毕业证书(RMIT毕业证)皇家墨尔本理工大学毕业证成绩单精仿办理
vmemo1
 
办理新西兰奥克兰大学毕业证学位证书范本原版一模一样
办理新西兰奥克兰大学毕业证学位证书范本原版一模一样办理新西兰奥克兰大学毕业证学位证书范本原版一模一样
办理新西兰奥克兰大学毕业证学位证书范本原版一模一样
xjq03c34
 
制作毕业证书(ANU毕业证)莫纳什大学毕业证成绩单官方原版办理
制作毕业证书(ANU毕业证)莫纳什大学毕业证成绩单官方原版办理制作毕业证书(ANU毕业证)莫纳什大学毕业证成绩单官方原版办理
制作毕业证书(ANU毕业证)莫纳什大学毕业证成绩单官方原版办理
cuobya
 
Design Thinking NETFLIX using all techniques.pptx
Design Thinking NETFLIX using all techniques.pptxDesign Thinking NETFLIX using all techniques.pptx
Design Thinking NETFLIX using all techniques.pptx
saathvikreddy2003
 
可查真实(Monash毕业证)西澳大学毕业证成绩单退学买
可查真实(Monash毕业证)西澳大学毕业证成绩单退学买可查真实(Monash毕业证)西澳大学毕业证成绩单退学买
可查真实(Monash毕业证)西澳大学毕业证成绩单退学买
cuobya
 
Gen Z and the marketplaces - let's translate their needs
Gen Z and the marketplaces - let's translate their needsGen Z and the marketplaces - let's translate their needs
Gen Z and the marketplaces - let's translate their needs
Laura Szabó
 
办理毕业证(NYU毕业证)纽约大学毕业证成绩单官方原版办理
办理毕业证(NYU毕业证)纽约大学毕业证成绩单官方原版办理办理毕业证(NYU毕业证)纽约大学毕业证成绩单官方原版办理
办理毕业证(NYU毕业证)纽约大学毕业证成绩单官方原版办理
uehowe
 
[HUN][hackersuli] Red Teaming alapok 2024
[HUN][hackersuli] Red Teaming alapok 2024[HUN][hackersuli] Red Teaming alapok 2024
[HUN][hackersuli] Red Teaming alapok 2024
hackersuli
 
Meet up Milano 14 _ Axpo Italia_ Migration from Mule3 (On-prem) to.pdf
Meet up Milano 14 _ Axpo Italia_ Migration from Mule3 (On-prem) to.pdfMeet up Milano 14 _ Axpo Italia_ Migration from Mule3 (On-prem) to.pdf
Meet up Milano 14 _ Axpo Italia_ Migration from Mule3 (On-prem) to.pdf
Florence Consulting
 

Recently uploaded (20)

留学挂科(UofM毕业证)明尼苏达大学毕业证成绩单复刻办理
留学挂科(UofM毕业证)明尼苏达大学毕业证成绩单复刻办理留学挂科(UofM毕业证)明尼苏达大学毕业证成绩单复刻办理
留学挂科(UofM毕业证)明尼苏达大学毕业证成绩单复刻办理
 
Should Repositories Participate in the Fediverse?
Should Repositories Participate in the Fediverse?Should Repositories Participate in the Fediverse?
Should Repositories Participate in the Fediverse?
 
留学学历(UoA毕业证)奥克兰大学毕业证成绩单官方原版办理
留学学历(UoA毕业证)奥克兰大学毕业证成绩单官方原版办理留学学历(UoA毕业证)奥克兰大学毕业证成绩单官方原版办理
留学学历(UoA毕业证)奥克兰大学毕业证成绩单官方原版办理
 
manuaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaal
manuaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaalmanuaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaal
manuaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaal
 
7 Best Cloud Hosting Services to Try Out in 2024
7 Best Cloud Hosting Services to Try Out in 20247 Best Cloud Hosting Services to Try Out in 2024
7 Best Cloud Hosting Services to Try Out in 2024
 
成绩单ps(UST毕业证)圣托马斯大学毕业证成绩单快速办理
成绩单ps(UST毕业证)圣托马斯大学毕业证成绩单快速办理成绩单ps(UST毕业证)圣托马斯大学毕业证成绩单快速办理
成绩单ps(UST毕业证)圣托马斯大学毕业证成绩单快速办理
 
假文凭国外(Adelaide毕业证)澳大利亚国立大学毕业证成绩单办理
假文凭国外(Adelaide毕业证)澳大利亚国立大学毕业证成绩单办理假文凭国外(Adelaide毕业证)澳大利亚国立大学毕业证成绩单办理
假文凭国外(Adelaide毕业证)澳大利亚国立大学毕业证成绩单办理
 
Search Result Showing My Post is Now Buried
Search Result Showing My Post is Now BuriedSearch Result Showing My Post is Now Buried
Search Result Showing My Post is Now Buried
 
Understanding User Behavior with Google Analytics.pdf
Understanding User Behavior with Google Analytics.pdfUnderstanding User Behavior with Google Analytics.pdf
Understanding User Behavior with Google Analytics.pdf
 
学位认证网(DU毕业证)迪肯大学毕业证成绩单一比一原版制作
学位认证网(DU毕业证)迪肯大学毕业证成绩单一比一原版制作学位认证网(DU毕业证)迪肯大学毕业证成绩单一比一原版制作
学位认证网(DU毕业证)迪肯大学毕业证成绩单一比一原版制作
 
办理毕业证(UPenn毕业证)宾夕法尼亚大学毕业证成绩单快速办理
办理毕业证(UPenn毕业证)宾夕法尼亚大学毕业证成绩单快速办理办理毕业证(UPenn毕业证)宾夕法尼亚大学毕业证成绩单快速办理
办理毕业证(UPenn毕业证)宾夕法尼亚大学毕业证成绩单快速办理
 
重新申请毕业证书(RMIT毕业证)皇家墨尔本理工大学毕业证成绩单精仿办理
重新申请毕业证书(RMIT毕业证)皇家墨尔本理工大学毕业证成绩单精仿办理重新申请毕业证书(RMIT毕业证)皇家墨尔本理工大学毕业证成绩单精仿办理
重新申请毕业证书(RMIT毕业证)皇家墨尔本理工大学毕业证成绩单精仿办理
 
办理新西兰奥克兰大学毕业证学位证书范本原版一模一样
办理新西兰奥克兰大学毕业证学位证书范本原版一模一样办理新西兰奥克兰大学毕业证学位证书范本原版一模一样
办理新西兰奥克兰大学毕业证学位证书范本原版一模一样
 
制作毕业证书(ANU毕业证)莫纳什大学毕业证成绩单官方原版办理
制作毕业证书(ANU毕业证)莫纳什大学毕业证成绩单官方原版办理制作毕业证书(ANU毕业证)莫纳什大学毕业证成绩单官方原版办理
制作毕业证书(ANU毕业证)莫纳什大学毕业证成绩单官方原版办理
 
Design Thinking NETFLIX using all techniques.pptx
Design Thinking NETFLIX using all techniques.pptxDesign Thinking NETFLIX using all techniques.pptx
Design Thinking NETFLIX using all techniques.pptx
 
可查真实(Monash毕业证)西澳大学毕业证成绩单退学买
可查真实(Monash毕业证)西澳大学毕业证成绩单退学买可查真实(Monash毕业证)西澳大学毕业证成绩单退学买
可查真实(Monash毕业证)西澳大学毕业证成绩单退学买
 
Gen Z and the marketplaces - let's translate their needs
Gen Z and the marketplaces - let's translate their needsGen Z and the marketplaces - let's translate their needs
Gen Z and the marketplaces - let's translate their needs
 
办理毕业证(NYU毕业证)纽约大学毕业证成绩单官方原版办理
办理毕业证(NYU毕业证)纽约大学毕业证成绩单官方原版办理办理毕业证(NYU毕业证)纽约大学毕业证成绩单官方原版办理
办理毕业证(NYU毕业证)纽约大学毕业证成绩单官方原版办理
 
[HUN][hackersuli] Red Teaming alapok 2024
[HUN][hackersuli] Red Teaming alapok 2024[HUN][hackersuli] Red Teaming alapok 2024
[HUN][hackersuli] Red Teaming alapok 2024
 
Meet up Milano 14 _ Axpo Italia_ Migration from Mule3 (On-prem) to.pdf
Meet up Milano 14 _ Axpo Italia_ Migration from Mule3 (On-prem) to.pdfMeet up Milano 14 _ Axpo Italia_ Migration from Mule3 (On-prem) to.pdf
Meet up Milano 14 _ Axpo Italia_ Migration from Mule3 (On-prem) to.pdf
 

Commissioning of electrical equipments

  • 1. GUJARAT TECHNOLOGICAL UNIVERSITY B.E. SEMESTER : VIII ELECTRICAL ENGINEERING Subject Name: COMMISSIONING OF ELECTRICAL EQUIPMENTS Sr. No. Course Contents Total Hrs 1. Transformer: Testing procedure for HV testing ,Phase shifting/ phase group , Radio interference, Ratio Test , Load loss ,Separate source voltage testing ,Induced voltage testing , Impulse & Surge testing , Noise level & vibration testing , Short circuit withstand test ,Tan Delta test , Core insulation voltage test, Measurement of impedance ,Testing of auxiliaries & safety device , Oil testing , Classification of testing methods , Testing of bushing. DC & AC Resistance measurement, Temp. Rise test, Short circuit test, Dielectric test, Partial discharge, Insulation resistance testing. Polarity testing, Short time current rating, Impulse & surge testing, Determination of error & accuracy class, Power frequency voltage withstand test, over voltage inter-turn test. Determination of polarization index for transformer. Drying out procedure for transformer. Commissioning steps for transformer, Purification & Filtration Procedure for Transformer oil. Troubleshooting & Maintenance of transformer. 08 2. Induction Motor: Testing (3-phase & 1-phase): Hammer test, Testing against variation of voltage/current/frequency, Load test, NL & BR test, DC & AC, Resistance measurement, Insulation measurement, Starting test, Temp. Rise test, Slip measurement, HV test, Testing on auxiliaries, Vibration Test, Noise level test. Drying out methods / Polarization Index / Hot Temperature measurement Degree of protection (IP Grade) Commissioning steps for Induction motor, Heat Run Test. Commissioning of Induction Generator. Troubleshooting & maintenance of induction motor 06 3. Substation Equipments: Bus bar Temp. Rise test, Rated short time current test, HV test, Power frequency voltage withstand test, Impulse / surge testing, Vibration. Earthing Earthing resistance measurement, Substation grid Earthing, Soil resistivity measurement. Isolator Testing Temp. Resistance test, Short circuit test, Charging current making & breaking test, Inductive current making & breaking test. 06 4. Circuit breaker: Testing of HV/LV circuit breaker: No load Mechanical Operation, Mechanical endurance test, Temp. Rise test, Impulse & surge testing, short time current test. Short circuit making & breaking test, Line Charging current making & breaking test, Cable charging & capacitor bank making & breaking test, Out of phase switching, Short line fault test, and Electrical & Mechanical endurance test for LT switch gear like MCB / MCCB / ELCB etc. C.T. & P.T. Testing, Relay testing, Coupling capacitors, Station Batteries for D.C. Supply, Fire Shifting Equipments. Testing & Commissioning of Lightning Arrestor, Substation Commissioning by Thermograph. Troubleshooting & maintenance of circuit breakers. 06 5. DC Machine: Testing Voltage drop test or bar to bar test, Load test, Open circuit & magnetizing test, Insulation resistance, Starting performance, Dielectric test. Swinburne’s test, Hopkinson’s test, Field test, Separation of losses in DC shunt machine. Temp. rise test & Heat run test Drying out process Commissioning steps for DC machines Troubleshooting & maintenance 06 6. Synchronous machine: Testing OC & SC test, Characteristics, Loss measurement, Temp. rise test , Over speed test , HV testing , Insulation resistance wave form interference , DC & AC Resistance of armature & field winding measurement , Dielectric testing on armature & field winding , Mechanical balance , Magnetic balance , Current balance , Phase sequence , 06
  • 2. Harmonic analysis , reactance & time constant , Speed torque current , Vibration & noise measurement , SC test , Synchronizing circuit testing , Testing of voltage regulators , Excitation circuit testing ,Voltage recovery test , Retardation test on load / no load .Drying out procedure Commissioning steps for synchronous machines Troubleshooting & maintenance. 7. Commissioning of transmission line & Cable: Derating of cable capacity, HV test, AC & DC Resistance check, Insulation resistance, Impedance measurement, Location finding technique for fault in underground cables (Murray loop test & Warley loop test), Testing of open circuit faults in cables. Line charging, loading & Dropping. 04 Term work: Term work shall be based on above syllabus. Reference Books: 1. Testing, Commissioning & maintenance of electrical equipment By S. S. Rao, khanna publications 2. The commissioning of Electrical Plant by RCH Richardson (Chapman & Hall)