1. Comments on Hydraulic Calculation
(Ref: BSEC/1509 / DN-03)
1.1 (Page .1) CWPRS Model study report for metro rail bridge at Kalindi Kunj
may please be forwarded to us.
The report is attached with the mail.
1.2 Discharge of Hindon River has been considered which is estimated at NH -
58 over existing bridge in Ghaziabad. Additional discharge on D/S of the
bridge up to the junction point with Yamuna is also to be added to
estimate total discharge of Hindon river into Yamuna River.
Discharge calculations carried out by us is on the conservative
side & duly takes into account the cumulative discharge from
Kalindi Kunj bridge (as available in CWPRS Report) + discharge
from Hindon river (as per Hindon bridge data) + additional
discharge due to the catchment area between Kalindi Kunj
bridge & project site. The reason why this discharge is
‘conservative’ is because the Hindon river is divided into
tributaries after Ghaziabad and the entire discharge of Hindon
river is not coming to Yamuna at u/s the proposed bridge.
1.3 (Page-2) As per Cl.6.2.1 if it does, Restrict it to that limit- and not to
the second highest discharge value stated by you. Please review the
interpretation.
Our interpretation of the said clause is correct. The highest
value of discharge shall be discarded if it is by more than 50% of
second highest discharge (It can be said that more than 1.5
times the second highest discharge).
1.4 (Page-5) The calculation by Area- velocity method needs to be reviewed
in ref. to Para 5.7 of SP: 13-2004 where area of stream (un-obstructed) is
to be considered i.e. prior to the construction of bridge.
Calculations carried out by BSEC is correct & do not require any
change. Clause 5.7 is not relevant in this context.
1.5 (Page-6) CWPRS report as indicated in 1.1 above is required. Refer response to point 1.1.
1.6 (Page-9) Calculation of Afflux –‘A’=un-obstructed sectional area of the
river at proposed site Here area between abutment faces is considered
and not un- obstructed. Please review.
There is no defined bank in Abutment A1 side. ‘A’ considered in
the calculation is the unobstructed area between the guide
bund on A1 side & from bank on A2 side, ignoring the
obstruction caused by pier & pier foundation.
Calculation of HFL
Since calculated HFL value is lower than adopted value it will be
appropriate to calculate MSL with respect to the calculated value of HFL
to have safety against scour for fixing Foundation LVL. Adopted value of
HFL can be considered for fixing clearance/ FRL of bridge as FRL cannot
be lesser than in tender drawing.
Only one HFL shall be considered for all calculation in a bridge.
We can not have one HFL value for scour calculations & another
HFL value for clearance calculation.
1.7 (Page-7) Calculation of scour depth to be reviewed in the light of
comments at 1.6 and other comments stated above.
Refer response to point 1.6.
2. Comments on GAD of Yamuna Bridge @ CH: 102+575
(Ref: Sheet 1)
2.1 Looking to the proposed size and depth of well foundation, the span of 60
m appears to be uneconomical and may be considered to have between
42m to 50m to economize on the cost of superstructure and the bridge as
a whole. Please review
The span arrangement is fixed in the Contract Agreement and
no change is possible.
2.2 HFL, MSL may require revision in view of our comments on Hydraulic
calculations.
Refer our reply for 1(1.6).
2.3 Actual HFL is estimated at RL 197.103m, but taken 199.00 m as per DPR.
Actually, HFL will touch at RL 197.103m, so scour level, foundation level
to be calculated accordingly. Difference in HFL will be considered towards
additional free board as the formation level is to be kept as per DPR.
Refer our reply for 1(1.6).
(Ref: Sheet 2)
2.4 The well cap top is kept at RL 188.30m i.e. 1.80 m above the LWL. This
may not look aesthetically better than keeping the well cap top at LWL.
The well cap can be cast inside the false steining to be made over the last
lift of well steining.
As per clause 708.11.1, the bottom of well cap shall be laid
above the LWL.
2.5 The dimensions of various components, foundation levels etc. are missing.
These may be shown in GAD.
These informations will be shown in detailed structural
drawings.
2.6 The dredge hole of wells is shown empty which may require sand filling
over bottom plug upto MSL with an IP and above IP water filling upto well
cap bottom.
It is not necessary to fill the dredge hole with sand.
2.7 Seismic restrainer shown on the pier cap plan at the center of the pier
cap. This may be to restrain longitudinal moment. Transverse seismic
restrainer may also be shown and the length of the pier cap may be
suitably adjusted.
The seismic restrainer shown in pier cap shall act as a
longitudinal as well as transverse seismic restrainer.
2.8 In the “Detail 4”, Carriageway center line is shifted by 90 mm from the
center line of well / pier / superstructure. Please inform the reason for
the same.
This is done to account for tilt of the superstructure units for
camber.
2.9 In the “Notes”, at Sr. No. 5, the grade of HYSD bars should be Fe-500
instead of Fe-5000.
HYSD bar grade is shown as 500 D & not 5000.
2.10 In the “Notes”, at Sr. No. 11, Hydraulic data may require modification in
the light of our comments on the hydraulic calculations.
Refer response to point 1(1.6).
2.11 In the “Notes”, at Sr. No. 13, gross bearing capacity needs to be reviewed
being on higher side in our opinion.
Gross bearing capacity is considered as per Geotechnical
Report.
2.12 The wearing coat specifications may also be mentioned in the notes. Noted & agreed.
2.13 The steining thickness can be designed with reduced thickness by using
jack down system for well sinking from economy and speed consideration.
Normal sinking method is to be adopted.
3. Geotech Report of Major Bridge on River Yamuna:
Estimation of Load Bearing Capacity of Concrete Circular 8.00m diameter
well. Based upon criteria for settlement of well:
3.1 100 mm settlement has been considered for estimation of allowable
bearing capacity. This seems to be on higher side. Generally, upto 75 mm
settlement is considered for estimation of bearing capacity. This may
please be reviewed in view of having two span continuous type of
superstructure.
As per IRC:78-2014, clause 706.3.2, the differential settlement
shall not exceed 1/400 of the span i.e. 150mm in this bridge
hence 100mm settlement considered is conservative
assumption.
3.2 The gross bearing capacity has been estimated 110 t/sqm2
at RL
154.00mand 105 t/sqm2
at RL 155.50m (Proposed founding level for pier
wells). This seems to be on higher side. Please review.
It is reviewed & found OK.
3.3 The base pressure in normal case at the pier foundation level is 90 t/sqm2
which seems to be quite high. Please review.
It is reviewed & found OK.

More Related Content

What's hot

Hydraulic jump
Hydraulic jumpHydraulic jump
GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16
Leo Youngman
 
Deck Drainage
Deck DrainageDeck Drainage
Deck Drainage
Faza Ramadhani
 
energy dissipator in hydraulic structure
energy dissipator  in  hydraulic structure energy dissipator  in  hydraulic structure
energy dissipator in hydraulic structure
Kiran Jadhav
 
Q921 de2 lec4 v1
Q921 de2 lec4 v1Q921 de2 lec4 v1
Q921 de2 lec4 v1
AFATous
 
Rcc box culvert methodology and designs including computer method
Rcc box culvert   methodology and designs including computer methodRcc box culvert   methodology and designs including computer method
Rcc box culvert methodology and designs including computer method
coolidiot07
 
LIVE LOAD DISTRIBUTION FACTORS FOR CONCRETE BRIDGES SUITABLE FOR ECP 201 AND...
 LIVE LOAD DISTRIBUTION FACTORS FOR CONCRETE BRIDGES SUITABLE FOR ECP 201 AND... LIVE LOAD DISTRIBUTION FACTORS FOR CONCRETE BRIDGES SUITABLE FOR ECP 201 AND...
LIVE LOAD DISTRIBUTION FACTORS FOR CONCRETE BRIDGES SUITABLE FOR ECP 201 AND...
Ezzeldin Mohamed
 
Unit 4[1]
Unit 4[1]Unit 4[1]
Unit 4[1]
mog20
 
Time History Analysis of Circular and Rectangular Elevated Water Storage Tank...
Time History Analysis of Circular and Rectangular Elevated Water Storage Tank...Time History Analysis of Circular and Rectangular Elevated Water Storage Tank...
Time History Analysis of Circular and Rectangular Elevated Water Storage Tank...
Dr. Amarjeet Singh
 
Open channels
Open channelsOpen channels
Open channels
Samer Elabd
 
Classification of weis new
Classification of weis newClassification of weis new
Classification of weis new
sonukhan123
 
DESIGN OF RCC CULVERT
DESIGN OF  RCC CULVERTDESIGN OF  RCC CULVERT
DESIGN OF RCC CULVERT
Satrudhan11240
 
English ayur
English ayurEnglish ayur
over veiw on desighn of offshore pipelines
over veiw on desighn of offshore pipelinesover veiw on desighn of offshore pipelines
over veiw on desighn of offshore pipelines
vinod kumar
 
Elevated water tank
Elevated water tankElevated water tank
Elevated water tank
Aamir Patni
 
Seismic behavior of rc elevated water tankunder different types of staging pa...
Seismic behavior of rc elevated water tankunder different types of staging pa...Seismic behavior of rc elevated water tankunder different types of staging pa...
Seismic behavior of rc elevated water tankunder different types of staging pa...
CADmantra Technologies
 
Bridge survey
Bridge surveyBridge survey
Bridge survey
SAGAR KUMAR
 
Intze ppt
Intze pptIntze ppt
Bridge
BridgeBridge
Bridge
Arpit Mathur
 
Hydraulic jump location control
Hydraulic jump location control Hydraulic jump location control
Hydraulic jump location control
siddharth upadhyay
 

What's hot (20)

Hydraulic jump
Hydraulic jumpHydraulic jump
Hydraulic jump
 
GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16
 
Deck Drainage
Deck DrainageDeck Drainage
Deck Drainage
 
energy dissipator in hydraulic structure
energy dissipator  in  hydraulic structure energy dissipator  in  hydraulic structure
energy dissipator in hydraulic structure
 
Q921 de2 lec4 v1
Q921 de2 lec4 v1Q921 de2 lec4 v1
Q921 de2 lec4 v1
 
Rcc box culvert methodology and designs including computer method
Rcc box culvert   methodology and designs including computer methodRcc box culvert   methodology and designs including computer method
Rcc box culvert methodology and designs including computer method
 
LIVE LOAD DISTRIBUTION FACTORS FOR CONCRETE BRIDGES SUITABLE FOR ECP 201 AND...
 LIVE LOAD DISTRIBUTION FACTORS FOR CONCRETE BRIDGES SUITABLE FOR ECP 201 AND... LIVE LOAD DISTRIBUTION FACTORS FOR CONCRETE BRIDGES SUITABLE FOR ECP 201 AND...
LIVE LOAD DISTRIBUTION FACTORS FOR CONCRETE BRIDGES SUITABLE FOR ECP 201 AND...
 
Unit 4[1]
Unit 4[1]Unit 4[1]
Unit 4[1]
 
Time History Analysis of Circular and Rectangular Elevated Water Storage Tank...
Time History Analysis of Circular and Rectangular Elevated Water Storage Tank...Time History Analysis of Circular and Rectangular Elevated Water Storage Tank...
Time History Analysis of Circular and Rectangular Elevated Water Storage Tank...
 
Open channels
Open channelsOpen channels
Open channels
 
Classification of weis new
Classification of weis newClassification of weis new
Classification of weis new
 
DESIGN OF RCC CULVERT
DESIGN OF  RCC CULVERTDESIGN OF  RCC CULVERT
DESIGN OF RCC CULVERT
 
English ayur
English ayurEnglish ayur
English ayur
 
over veiw on desighn of offshore pipelines
over veiw on desighn of offshore pipelinesover veiw on desighn of offshore pipelines
over veiw on desighn of offshore pipelines
 
Elevated water tank
Elevated water tankElevated water tank
Elevated water tank
 
Seismic behavior of rc elevated water tankunder different types of staging pa...
Seismic behavior of rc elevated water tankunder different types of staging pa...Seismic behavior of rc elevated water tankunder different types of staging pa...
Seismic behavior of rc elevated water tankunder different types of staging pa...
 
Bridge survey
Bridge surveyBridge survey
Bridge survey
 
Intze ppt
Intze pptIntze ppt
Intze ppt
 
Bridge
BridgeBridge
Bridge
 
Hydraulic jump location control
Hydraulic jump location control Hydraulic jump location control
Hydraulic jump location control
 

Similar to Comments & compliance on gad_yamuna_river_07.12.15

2.2 gl for-hydaulic_design_of_shp_project
2.2 gl for-hydaulic_design_of_shp_project2.2 gl for-hydaulic_design_of_shp_project
2.2 gl for-hydaulic_design_of_shp_project
Saddam Mussie
 
2.2 gl for-hydaulic_design_of_shp_project
2.2 gl for-hydaulic_design_of_shp_project2.2 gl for-hydaulic_design_of_shp_project
2.2 gl for-hydaulic_design_of_shp_project
Souhail Zraoura
 
Note
NoteNote
Construction of a High Level Bridge
Construction of a High Level BridgeConstruction of a High Level Bridge
Construction of a High Level Bridge
IJSRD
 
Restricting Hydraulic Jump Location Inside Stilling Basin for Maximum Energy ...
Restricting Hydraulic Jump Location Inside Stilling Basin for Maximum Energy ...Restricting Hydraulic Jump Location Inside Stilling Basin for Maximum Energy ...
Restricting Hydraulic Jump Location Inside Stilling Basin for Maximum Energy ...
IRJET Journal
 
hd2594 (8).pdf
hd2594 (8).pdfhd2594 (8).pdf
hd2594 (8).pdf
AliyaZehra4
 
P07011_Gupta_et_al
P07011_Gupta_et_alP07011_Gupta_et_al
P07011_Gupta_et_al
Pankaj Gupta
 
Aircraft intake aerodynamics
Aircraft intake aerodynamicsAircraft intake aerodynamics
Aircraft intake aerodynamics
Prabhat Kumar
 
Cableway guidance note 1 design
Cableway guidance note 1   designCableway guidance note 1   design
Cableway guidance note 1 design
hydrologyproject0
 
IRJET- Design of Overhead RCC Rectangular Water Tank by using Working Stre...
IRJET- 	  Design of Overhead RCC Rectangular Water Tank by using Working Stre...IRJET- 	  Design of Overhead RCC Rectangular Water Tank by using Working Stre...
IRJET- Design of Overhead RCC Rectangular Water Tank by using Working Stre...
IRJET Journal
 
PLANNING & DESIGN OF LIFT IRRIGATION.pptx
PLANNING & DESIGN OF LIFT IRRIGATION.pptxPLANNING & DESIGN OF LIFT IRRIGATION.pptx
PLANNING & DESIGN OF LIFT IRRIGATION.pptx
ExeEnggManchannalaDi
 
Poster
PosterPoster
Poster
Conor Meaney
 
IRJET- Finite Element Analysis of Stempipe Used in Deepwater Pipeline Install...
IRJET- Finite Element Analysis of Stempipe Used in Deepwater Pipeline Install...IRJET- Finite Element Analysis of Stempipe Used in Deepwater Pipeline Install...
IRJET- Finite Element Analysis of Stempipe Used in Deepwater Pipeline Install...
IRJET Journal
 
11737046_08.pdf
11737046_08.pdf11737046_08.pdf
11737046_08.pdf
ttaulo
 
Download-manuals-surface water-manual-surfacewatero&m-norms
 Download-manuals-surface water-manual-surfacewatero&m-norms Download-manuals-surface water-manual-surfacewatero&m-norms
Download-manuals-surface water-manual-surfacewatero&m-norms
hydrologyproject0
 
Download-manuals-surface water-manual-surfacewatero&m-norms
 Download-manuals-surface water-manual-surfacewatero&m-norms Download-manuals-surface water-manual-surfacewatero&m-norms
Download-manuals-surface water-manual-surfacewatero&m-norms
hydrologywebsite1
 
Predicting Performance Curves of Centrifugal Pumps in the Absence of OEM Data
Predicting Performance Curves of Centrifugal Pumps in the Absence of OEM DataPredicting Performance Curves of Centrifugal Pumps in the Absence of OEM Data
Predicting Performance Curves of Centrifugal Pumps in the Absence of OEM Data
Vijay Sarathy
 
Predicting Performance Curves of Centrifugal Pumps in the Absence of OEM Data
Predicting Performance Curves of Centrifugal Pumps in the Absence of OEM DataPredicting Performance Curves of Centrifugal Pumps in the Absence of OEM Data
Predicting Performance Curves of Centrifugal Pumps in the Absence of OEM Data
Vijay Sarathy
 
7436 2
7436 27436 2
Presentation
PresentationPresentation

Similar to Comments & compliance on gad_yamuna_river_07.12.15 (20)

2.2 gl for-hydaulic_design_of_shp_project
2.2 gl for-hydaulic_design_of_shp_project2.2 gl for-hydaulic_design_of_shp_project
2.2 gl for-hydaulic_design_of_shp_project
 
2.2 gl for-hydaulic_design_of_shp_project
2.2 gl for-hydaulic_design_of_shp_project2.2 gl for-hydaulic_design_of_shp_project
2.2 gl for-hydaulic_design_of_shp_project
 
Note
NoteNote
Note
 
Construction of a High Level Bridge
Construction of a High Level BridgeConstruction of a High Level Bridge
Construction of a High Level Bridge
 
Restricting Hydraulic Jump Location Inside Stilling Basin for Maximum Energy ...
Restricting Hydraulic Jump Location Inside Stilling Basin for Maximum Energy ...Restricting Hydraulic Jump Location Inside Stilling Basin for Maximum Energy ...
Restricting Hydraulic Jump Location Inside Stilling Basin for Maximum Energy ...
 
hd2594 (8).pdf
hd2594 (8).pdfhd2594 (8).pdf
hd2594 (8).pdf
 
P07011_Gupta_et_al
P07011_Gupta_et_alP07011_Gupta_et_al
P07011_Gupta_et_al
 
Aircraft intake aerodynamics
Aircraft intake aerodynamicsAircraft intake aerodynamics
Aircraft intake aerodynamics
 
Cableway guidance note 1 design
Cableway guidance note 1   designCableway guidance note 1   design
Cableway guidance note 1 design
 
IRJET- Design of Overhead RCC Rectangular Water Tank by using Working Stre...
IRJET- 	  Design of Overhead RCC Rectangular Water Tank by using Working Stre...IRJET- 	  Design of Overhead RCC Rectangular Water Tank by using Working Stre...
IRJET- Design of Overhead RCC Rectangular Water Tank by using Working Stre...
 
PLANNING & DESIGN OF LIFT IRRIGATION.pptx
PLANNING & DESIGN OF LIFT IRRIGATION.pptxPLANNING & DESIGN OF LIFT IRRIGATION.pptx
PLANNING & DESIGN OF LIFT IRRIGATION.pptx
 
Poster
PosterPoster
Poster
 
IRJET- Finite Element Analysis of Stempipe Used in Deepwater Pipeline Install...
IRJET- Finite Element Analysis of Stempipe Used in Deepwater Pipeline Install...IRJET- Finite Element Analysis of Stempipe Used in Deepwater Pipeline Install...
IRJET- Finite Element Analysis of Stempipe Used in Deepwater Pipeline Install...
 
11737046_08.pdf
11737046_08.pdf11737046_08.pdf
11737046_08.pdf
 
Download-manuals-surface water-manual-surfacewatero&m-norms
 Download-manuals-surface water-manual-surfacewatero&m-norms Download-manuals-surface water-manual-surfacewatero&m-norms
Download-manuals-surface water-manual-surfacewatero&m-norms
 
Download-manuals-surface water-manual-surfacewatero&m-norms
 Download-manuals-surface water-manual-surfacewatero&m-norms Download-manuals-surface water-manual-surfacewatero&m-norms
Download-manuals-surface water-manual-surfacewatero&m-norms
 
Predicting Performance Curves of Centrifugal Pumps in the Absence of OEM Data
Predicting Performance Curves of Centrifugal Pumps in the Absence of OEM DataPredicting Performance Curves of Centrifugal Pumps in the Absence of OEM Data
Predicting Performance Curves of Centrifugal Pumps in the Absence of OEM Data
 
Predicting Performance Curves of Centrifugal Pumps in the Absence of OEM Data
Predicting Performance Curves of Centrifugal Pumps in the Absence of OEM DataPredicting Performance Curves of Centrifugal Pumps in the Absence of OEM Data
Predicting Performance Curves of Centrifugal Pumps in the Absence of OEM Data
 
7436 2
7436 27436 2
7436 2
 
Presentation
PresentationPresentation
Presentation
 

Recently uploaded

Divertidamente SLIDE.pptxufururururuhrurid8dj
Divertidamente SLIDE.pptxufururururuhrurid8djDivertidamente SLIDE.pptxufururururuhrurid8dj
Divertidamente SLIDE.pptxufururururuhrurid8dj
lunaemel03
 
Mohannad Abdullah portfolio _ V2 _22-24
Mohannad Abdullah  portfolio _ V2 _22-24Mohannad Abdullah  portfolio _ V2 _22-24
Mohannad Abdullah portfolio _ V2 _22-24
M. A. Architect
 
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
pmgdscunsri
 
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
gpffo76j
 
Top Interior Designers in Bangalore.pdf1
Top Interior Designers in Bangalore.pdf1Top Interior Designers in Bangalore.pdf1
Top Interior Designers in Bangalore.pdf1
Decomart Studio
 
Impact of Fonts: in Web and Apps Design
Impact of Fonts:  in Web and Apps DesignImpact of Fonts:  in Web and Apps Design
Impact of Fonts: in Web and Apps Design
contactproperweb2014
 
UNIT V ACTIONS AND COMMANDS, FORMS AND CONTROLS.pptx
UNIT V ACTIONS AND COMMANDS, FORMS AND CONTROLS.pptxUNIT V ACTIONS AND COMMANDS, FORMS AND CONTROLS.pptx
UNIT V ACTIONS AND COMMANDS, FORMS AND CONTROLS.pptx
GOWSIKRAJA PALANISAMY
 
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
qo1as76n
 
Revolutionizing the Digital Landscape: Web Development Companies in India
Revolutionizing the Digital Landscape: Web Development Companies in IndiaRevolutionizing the Digital Landscape: Web Development Companies in India
Revolutionizing the Digital Landscape: Web Development Companies in India
amrsoftec1
 
Timeless Principles of Good Design
Timeless Principles of Good DesignTimeless Principles of Good Design
Timeless Principles of Good Design
Carolina de Bartolo
 
AHMED TALAAT ARCHITECTURE PORTFOLIO .pdf
AHMED TALAAT ARCHITECTURE PORTFOLIO .pdfAHMED TALAAT ARCHITECTURE PORTFOLIO .pdf
AHMED TALAAT ARCHITECTURE PORTFOLIO .pdf
talaatahm
 
UNIT IV-VISUAL STYLE AND MOBILE INTERFACES.pptx
UNIT IV-VISUAL STYLE AND MOBILE INTERFACES.pptxUNIT IV-VISUAL STYLE AND MOBILE INTERFACES.pptx
UNIT IV-VISUAL STYLE AND MOBILE INTERFACES.pptx
GOWSIKRAJA PALANISAMY
 
SECURING BUILDING PERMIT CITY OF CALOOCAN.pdf
SECURING BUILDING PERMIT CITY OF CALOOCAN.pdfSECURING BUILDING PERMIT CITY OF CALOOCAN.pdf
SECURING BUILDING PERMIT CITY OF CALOOCAN.pdf
eloprejohn333
 
Storytelling For The Web: Integrate Storytelling in your Design Process
Storytelling For The Web: Integrate Storytelling in your Design ProcessStorytelling For The Web: Integrate Storytelling in your Design Process
Storytelling For The Web: Integrate Storytelling in your Design Process
Chiara Aliotta
 
一比一原版(Columbia毕业证)哥伦比亚大学毕业证如何办理
一比一原版(Columbia毕业证)哥伦比亚大学毕业证如何办理一比一原版(Columbia毕业证)哥伦比亚大学毕业证如何办理
一比一原版(Columbia毕业证)哥伦比亚大学毕业证如何办理
asuzyq
 
Virtual Tour Application Powerpoint for museum of edinburgh
Virtual Tour Application Powerpoint for museum of edinburghVirtual Tour Application Powerpoint for museum of edinburgh
Virtual Tour Application Powerpoint for museum of edinburgh
millarj46
 
Branding de la empresa de Bolt- 2024.pdf
Branding de la empresa de Bolt- 2024.pdfBranding de la empresa de Bolt- 2024.pdf
Branding de la empresa de Bolt- 2024.pdf
PabloMartelLpez
 
一比一原版(BU毕业证)波士顿大学毕业证如何办理
一比一原版(BU毕业证)波士顿大学毕业证如何办理一比一原版(BU毕业证)波士顿大学毕业证如何办理
一比一原版(BU毕业证)波士顿大学毕业证如何办理
peuce
 
ARENA - Young adults in the workplace (Knight Moves).pdf
ARENA - Young adults in the workplace (Knight Moves).pdfARENA - Young adults in the workplace (Knight Moves).pdf
ARENA - Young adults in the workplace (Knight Moves).pdf
Knight Moves
 
Graphic Design Tools and Software .pptx
Graphic Design Tools and Software   .pptxGraphic Design Tools and Software   .pptx
Graphic Design Tools and Software .pptx
Virtual Real Design
 

Recently uploaded (20)

Divertidamente SLIDE.pptxufururururuhrurid8dj
Divertidamente SLIDE.pptxufururururuhrurid8djDivertidamente SLIDE.pptxufururururuhrurid8dj
Divertidamente SLIDE.pptxufururururuhrurid8dj
 
Mohannad Abdullah portfolio _ V2 _22-24
Mohannad Abdullah  portfolio _ V2 _22-24Mohannad Abdullah  portfolio _ V2 _22-24
Mohannad Abdullah portfolio _ V2 _22-24
 
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
 
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
 
Top Interior Designers in Bangalore.pdf1
Top Interior Designers in Bangalore.pdf1Top Interior Designers in Bangalore.pdf1
Top Interior Designers in Bangalore.pdf1
 
Impact of Fonts: in Web and Apps Design
Impact of Fonts:  in Web and Apps DesignImpact of Fonts:  in Web and Apps Design
Impact of Fonts: in Web and Apps Design
 
UNIT V ACTIONS AND COMMANDS, FORMS AND CONTROLS.pptx
UNIT V ACTIONS AND COMMANDS, FORMS AND CONTROLS.pptxUNIT V ACTIONS AND COMMANDS, FORMS AND CONTROLS.pptx
UNIT V ACTIONS AND COMMANDS, FORMS AND CONTROLS.pptx
 
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
 
Revolutionizing the Digital Landscape: Web Development Companies in India
Revolutionizing the Digital Landscape: Web Development Companies in IndiaRevolutionizing the Digital Landscape: Web Development Companies in India
Revolutionizing the Digital Landscape: Web Development Companies in India
 
Timeless Principles of Good Design
Timeless Principles of Good DesignTimeless Principles of Good Design
Timeless Principles of Good Design
 
AHMED TALAAT ARCHITECTURE PORTFOLIO .pdf
AHMED TALAAT ARCHITECTURE PORTFOLIO .pdfAHMED TALAAT ARCHITECTURE PORTFOLIO .pdf
AHMED TALAAT ARCHITECTURE PORTFOLIO .pdf
 
UNIT IV-VISUAL STYLE AND MOBILE INTERFACES.pptx
UNIT IV-VISUAL STYLE AND MOBILE INTERFACES.pptxUNIT IV-VISUAL STYLE AND MOBILE INTERFACES.pptx
UNIT IV-VISUAL STYLE AND MOBILE INTERFACES.pptx
 
SECURING BUILDING PERMIT CITY OF CALOOCAN.pdf
SECURING BUILDING PERMIT CITY OF CALOOCAN.pdfSECURING BUILDING PERMIT CITY OF CALOOCAN.pdf
SECURING BUILDING PERMIT CITY OF CALOOCAN.pdf
 
Storytelling For The Web: Integrate Storytelling in your Design Process
Storytelling For The Web: Integrate Storytelling in your Design ProcessStorytelling For The Web: Integrate Storytelling in your Design Process
Storytelling For The Web: Integrate Storytelling in your Design Process
 
一比一原版(Columbia毕业证)哥伦比亚大学毕业证如何办理
一比一原版(Columbia毕业证)哥伦比亚大学毕业证如何办理一比一原版(Columbia毕业证)哥伦比亚大学毕业证如何办理
一比一原版(Columbia毕业证)哥伦比亚大学毕业证如何办理
 
Virtual Tour Application Powerpoint for museum of edinburgh
Virtual Tour Application Powerpoint for museum of edinburghVirtual Tour Application Powerpoint for museum of edinburgh
Virtual Tour Application Powerpoint for museum of edinburgh
 
Branding de la empresa de Bolt- 2024.pdf
Branding de la empresa de Bolt- 2024.pdfBranding de la empresa de Bolt- 2024.pdf
Branding de la empresa de Bolt- 2024.pdf
 
一比一原版(BU毕业证)波士顿大学毕业证如何办理
一比一原版(BU毕业证)波士顿大学毕业证如何办理一比一原版(BU毕业证)波士顿大学毕业证如何办理
一比一原版(BU毕业证)波士顿大学毕业证如何办理
 
ARENA - Young adults in the workplace (Knight Moves).pdf
ARENA - Young adults in the workplace (Knight Moves).pdfARENA - Young adults in the workplace (Knight Moves).pdf
ARENA - Young adults in the workplace (Knight Moves).pdf
 
Graphic Design Tools and Software .pptx
Graphic Design Tools and Software   .pptxGraphic Design Tools and Software   .pptx
Graphic Design Tools and Software .pptx
 

Comments & compliance on gad_yamuna_river_07.12.15

  • 1. Sl. No. Comments Reply 1. Comments on Hydraulic Calculation (Ref: BSEC/1509 / DN-03) 1.1 (Page .1) CWPRS Model study report for metro rail bridge at Kalindi Kunj may please be forwarded to us. The report is attached with the mail. 1.2 Discharge of Hindon River has been considered which is estimated at NH - 58 over existing bridge in Ghaziabad. Additional discharge on D/S of the bridge up to the junction point with Yamuna is also to be added to estimate total discharge of Hindon river into Yamuna River. Discharge calculations carried out by us is on the conservative side & duly takes into account the cumulative discharge from Kalindi Kunj bridge (as available in CWPRS Report) + discharge from Hindon river (as per Hindon bridge data) + additional discharge due to the catchment area between Kalindi Kunj bridge & project site. The reason why this discharge is ‘conservative’ is because the Hindon river is divided into tributaries after Ghaziabad and the entire discharge of Hindon river is not coming to Yamuna at u/s the proposed bridge. 1.3 (Page-2) As per Cl.6.2.1 if it does, Restrict it to that limit- and not to the second highest discharge value stated by you. Please review the interpretation. Our interpretation of the said clause is correct. The highest value of discharge shall be discarded if it is by more than 50% of second highest discharge (It can be said that more than 1.5 times the second highest discharge). 1.4 (Page-5) The calculation by Area- velocity method needs to be reviewed in ref. to Para 5.7 of SP: 13-2004 where area of stream (un-obstructed) is to be considered i.e. prior to the construction of bridge. Calculations carried out by BSEC is correct & do not require any change. Clause 5.7 is not relevant in this context. 1.5 (Page-6) CWPRS report as indicated in 1.1 above is required. Refer response to point 1.1. 1.6 (Page-9) Calculation of Afflux –‘A’=un-obstructed sectional area of the river at proposed site Here area between abutment faces is considered and not un- obstructed. Please review. There is no defined bank in Abutment A1 side. ‘A’ considered in the calculation is the unobstructed area between the guide bund on A1 side & from bank on A2 side, ignoring the obstruction caused by pier & pier foundation. Calculation of HFL Since calculated HFL value is lower than adopted value it will be appropriate to calculate MSL with respect to the calculated value of HFL to have safety against scour for fixing Foundation LVL. Adopted value of HFL can be considered for fixing clearance/ FRL of bridge as FRL cannot be lesser than in tender drawing. Only one HFL shall be considered for all calculation in a bridge. We can not have one HFL value for scour calculations & another HFL value for clearance calculation. 1.7 (Page-7) Calculation of scour depth to be reviewed in the light of comments at 1.6 and other comments stated above. Refer response to point 1.6. 2. Comments on GAD of Yamuna Bridge @ CH: 102+575
  • 2. (Ref: Sheet 1) 2.1 Looking to the proposed size and depth of well foundation, the span of 60 m appears to be uneconomical and may be considered to have between 42m to 50m to economize on the cost of superstructure and the bridge as a whole. Please review The span arrangement is fixed in the Contract Agreement and no change is possible. 2.2 HFL, MSL may require revision in view of our comments on Hydraulic calculations. Refer our reply for 1(1.6). 2.3 Actual HFL is estimated at RL 197.103m, but taken 199.00 m as per DPR. Actually, HFL will touch at RL 197.103m, so scour level, foundation level to be calculated accordingly. Difference in HFL will be considered towards additional free board as the formation level is to be kept as per DPR. Refer our reply for 1(1.6). (Ref: Sheet 2) 2.4 The well cap top is kept at RL 188.30m i.e. 1.80 m above the LWL. This may not look aesthetically better than keeping the well cap top at LWL. The well cap can be cast inside the false steining to be made over the last lift of well steining. As per clause 708.11.1, the bottom of well cap shall be laid above the LWL. 2.5 The dimensions of various components, foundation levels etc. are missing. These may be shown in GAD. These informations will be shown in detailed structural drawings. 2.6 The dredge hole of wells is shown empty which may require sand filling over bottom plug upto MSL with an IP and above IP water filling upto well cap bottom. It is not necessary to fill the dredge hole with sand. 2.7 Seismic restrainer shown on the pier cap plan at the center of the pier cap. This may be to restrain longitudinal moment. Transverse seismic restrainer may also be shown and the length of the pier cap may be suitably adjusted. The seismic restrainer shown in pier cap shall act as a longitudinal as well as transverse seismic restrainer. 2.8 In the “Detail 4”, Carriageway center line is shifted by 90 mm from the center line of well / pier / superstructure. Please inform the reason for the same. This is done to account for tilt of the superstructure units for camber. 2.9 In the “Notes”, at Sr. No. 5, the grade of HYSD bars should be Fe-500 instead of Fe-5000. HYSD bar grade is shown as 500 D & not 5000. 2.10 In the “Notes”, at Sr. No. 11, Hydraulic data may require modification in the light of our comments on the hydraulic calculations. Refer response to point 1(1.6).
  • 3. 2.11 In the “Notes”, at Sr. No. 13, gross bearing capacity needs to be reviewed being on higher side in our opinion. Gross bearing capacity is considered as per Geotechnical Report. 2.12 The wearing coat specifications may also be mentioned in the notes. Noted & agreed. 2.13 The steining thickness can be designed with reduced thickness by using jack down system for well sinking from economy and speed consideration. Normal sinking method is to be adopted. 3. Geotech Report of Major Bridge on River Yamuna: Estimation of Load Bearing Capacity of Concrete Circular 8.00m diameter well. Based upon criteria for settlement of well: 3.1 100 mm settlement has been considered for estimation of allowable bearing capacity. This seems to be on higher side. Generally, upto 75 mm settlement is considered for estimation of bearing capacity. This may please be reviewed in view of having two span continuous type of superstructure. As per IRC:78-2014, clause 706.3.2, the differential settlement shall not exceed 1/400 of the span i.e. 150mm in this bridge hence 100mm settlement considered is conservative assumption. 3.2 The gross bearing capacity has been estimated 110 t/sqm2 at RL 154.00mand 105 t/sqm2 at RL 155.50m (Proposed founding level for pier wells). This seems to be on higher side. Please review. It is reviewed & found OK. 3.3 The base pressure in normal case at the pier foundation level is 90 t/sqm2 which seems to be quite high. Please review. It is reviewed & found OK.