1. Considerationof existingWaterPipe Line:
Clause No.13 of Schedule B (Page no. 277) states that there is “A major transmission water
pipeline runs parallel to the project road within ROW from Km Km. 5+150 to 9+150 (RHS).
Development of road has been conceptualized without disturbing the stability / relocating
the pipelines.Special safetymeasuresasrequired to ensurecontinuous water supply may be
taken during the construction stage.Provision of future maintenance of pipeline is also to be
kept into consideration. Minor shifting of project road centreline, if indispensable may be
made. “
However, todeal withthe existingpipeline,whichisinsome place goes underground and in
some places, it is exposed over ground need a detailed attention in terms of design and
protection requirement criteria. First, due to the presence of the water pipe line (which is
alsocomingin RE wall approachsection), the alignment needs to shift towards left. In such
placesthe alignmentmaygobeyondROW limit at the left side of the road section. Second,
to take care the stabilityof the pipeline acasingstructure intermsof covered box structure,
whichitself isgoing to affect hugely in Quantity. Third, in terms of future maintenance the
casingof the pipe line while going underground need to be so spacious that one can easily
access the pipe line forminorormajormaintenance work.The size of the covered structure
will affect in service road FRL. Which will increase due to the underground cased box
structure, affecting also in quantity.
2. Raising of Profile at Pond Location:
In fewcaseswhere there isapresence of pondlocations,the FRLof designed alignment has
beenraisedto cater the HFL criteria for the safety of the pavement subgrade. A total of 2.5
m has been raised from the existing road level. By raising the profile at those selective
locations andmaintainingthe minimumvertical slopecriteriafor drainage, profile has been
modified. But due to the raising the earthwork quantity has been increased along with
Retaining wall and Toe wall to restrict the slope of the earthwork within the ROW limit.
Those raisingcan alsobe optimize by assessing actual HFL at the particular location and the
raising the profile accordingly.
3. Providing Sand filling in Marshy area:
Locations along the project corridor where water logged area has been observed, a sand
layerof 500 mm hasbeen placed as a layer to densify the area. As those areas are prone to
settlement, laying of sand layer has been indicated. However, the total length of such
sections has been considered as 4.5 Km. in BOQ, which also includes areas near pond
location.Butthat can be optimizedbyeliminatingthe pondlocations and only retaining the
waterlogged areas along the project stretch.

More Related Content

What's hot

(2012) - Fok N, Vincent P, Qiu T, Krzeminski M - A Case Study of Ground Impro...
(2012) - Fok N, Vincent P, Qiu T, Krzeminski M - A Case Study of Ground Impro...(2012) - Fok N, Vincent P, Qiu T, Krzeminski M - A Case Study of Ground Impro...
(2012) - Fok N, Vincent P, Qiu T, Krzeminski M - A Case Study of Ground Impro...
Michal Krzeminski
 
Sidewinder UK Images
Sidewinder UK ImagesSidewinder UK Images
Sidewinder UK Images
Sidewinder UK
 
Melbourne Pipeline Protection
Melbourne Pipeline ProtectionMelbourne Pipeline Protection
Melbourne Pipeline Protection
Sikko Krol
 

What's hot (20)

Diversion headworks
Diversion headworksDiversion headworks
Diversion headworks
 
(2012) - Fok N, Vincent P, Qiu T, Krzeminski M - A Case Study of Ground Impro...
(2012) - Fok N, Vincent P, Qiu T, Krzeminski M - A Case Study of Ground Impro...(2012) - Fok N, Vincent P, Qiu T, Krzeminski M - A Case Study of Ground Impro...
(2012) - Fok N, Vincent P, Qiu T, Krzeminski M - A Case Study of Ground Impro...
 
Sidewinder UK Images
Sidewinder UK ImagesSidewinder UK Images
Sidewinder UK Images
 
Highway Drainage (Highway Engineering)
Highway Drainage (Highway Engineering)Highway Drainage (Highway Engineering)
Highway Drainage (Highway Engineering)
 
Geological investigations for highways
Geological investigations for highwaysGeological investigations for highways
Geological investigations for highways
 
OK
OKOK
OK
 
Dam safety & Safety Devices
Dam safety & Safety DevicesDam safety & Safety Devices
Dam safety & Safety Devices
 
Hill roads and Drainage
Hill roads and DrainageHill roads and Drainage
Hill roads and Drainage
 
B05820514
B05820514B05820514
B05820514
 
SFPR-Project-Profile_0
SFPR-Project-Profile_0SFPR-Project-Profile_0
SFPR-Project-Profile_0
 
2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU
2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU
2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU
 
Design of diversion dam in tarbela dam pakistan
Design of diversion dam in tarbela dam pakistanDesign of diversion dam in tarbela dam pakistan
Design of diversion dam in tarbela dam pakistan
 
Embankment dam by sitaram saini
Embankment dam by sitaram sainiEmbankment dam by sitaram saini
Embankment dam by sitaram saini
 
Final
FinalFinal
Final
 
Special problems and maintenance in hill roads,
Special problems and maintenance in hill roads,Special problems and maintenance in hill roads,
Special problems and maintenance in hill roads,
 
Melbourne Pipeline Protection
Melbourne Pipeline ProtectionMelbourne Pipeline Protection
Melbourne Pipeline Protection
 
using embankment dams for flash flood risk management
using embankment dams for flash flood risk managementusing embankment dams for flash flood risk management
using embankment dams for flash flood risk management
 
Rd cs steele_county
Rd cs steele_countyRd cs steele_county
Rd cs steele_county
 
Dubaidib Wellfield Sdc Presentation July2011
Dubaidib Wellfield Sdc Presentation July2011Dubaidib Wellfield Sdc Presentation July2011
Dubaidib Wellfield Sdc Presentation July2011
 
Presentation sayed
Presentation sayedPresentation sayed
Presentation sayed
 

Similar to Note

Comments & compliance on gad_yamuna_river_07.12.15
Comments & compliance  on gad_yamuna_river_07.12.15Comments & compliance  on gad_yamuna_river_07.12.15
Comments & compliance on gad_yamuna_river_07.12.15
Venkat Devulapalli
 
Construction of a High Level Bridge
Construction of a High Level BridgeConstruction of a High Level Bridge
Construction of a High Level Bridge
IJSRD
 
Water dam versus Tailing Dam
Water dam versus Tailing DamWater dam versus Tailing Dam
Water dam versus Tailing Dam
frank huangfu
 
GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16
Leo Youngman
 
Travis_Smith_Work_Term_Report_F2016
Travis_Smith_Work_Term_Report_F2016Travis_Smith_Work_Term_Report_F2016
Travis_Smith_Work_Term_Report_F2016
Travis Smith
 
General Flood Resistant Bridge Design Guidelines
General Flood Resistant Bridge Design GuidelinesGeneral Flood Resistant Bridge Design Guidelines
General Flood Resistant Bridge Design Guidelines
Gibson Ali Holemba
 

Similar to Note (20)

Steps for planning_layout_design_constru
Steps for planning_layout_design_construSteps for planning_layout_design_constru
Steps for planning_layout_design_constru
 
Comments & compliance on gad_yamuna_river_07.12.15
Comments & compliance  on gad_yamuna_river_07.12.15Comments & compliance  on gad_yamuna_river_07.12.15
Comments & compliance on gad_yamuna_river_07.12.15
 
Ppt of design of dams
Ppt of design of damsPpt of design of dams
Ppt of design of dams
 
Deep foundation construction in bouldery bed an over view
Deep foundation construction in bouldery bed an over viewDeep foundation construction in bouldery bed an over view
Deep foundation construction in bouldery bed an over view
 
Construction of a High Level Bridge
Construction of a High Level BridgeConstruction of a High Level Bridge
Construction of a High Level Bridge
 
11737046_08.pdf
11737046_08.pdf11737046_08.pdf
11737046_08.pdf
 
Construction of Dams.pptx
Construction of Dams.pptxConstruction of Dams.pptx
Construction of Dams.pptx
 
A Review of Previous Work on an Approach to Design and Construction of Low He...
A Review of Previous Work on an Approach to Design and Construction of Low He...A Review of Previous Work on an Approach to Design and Construction of Low He...
A Review of Previous Work on an Approach to Design and Construction of Low He...
 
Water dam versus Tailing Dam
Water dam versus Tailing DamWater dam versus Tailing Dam
Water dam versus Tailing Dam
 
GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16
 
Innovative Slope Stabilisation
Innovative Slope StabilisationInnovative Slope Stabilisation
Innovative Slope Stabilisation
 
ENVIRONMENTAL POLLUTION CONTROL METHOD ADOPTED BY NTPC LTD. IN ASH DYKE (STAR...
ENVIRONMENTAL POLLUTION CONTROL METHOD ADOPTED BY NTPC LTD. IN ASH DYKE (STAR...ENVIRONMENTAL POLLUTION CONTROL METHOD ADOPTED BY NTPC LTD. IN ASH DYKE (STAR...
ENVIRONMENTAL POLLUTION CONTROL METHOD ADOPTED BY NTPC LTD. IN ASH DYKE (STAR...
 
Cofferdam
CofferdamCofferdam
Cofferdam
 
Travis_Smith_Work_Term_Report_F2016
Travis_Smith_Work_Term_Report_F2016Travis_Smith_Work_Term_Report_F2016
Travis_Smith_Work_Term_Report_F2016
 
06. Diversion Headworks-2.pdf
06. Diversion Headworks-2.pdf06. Diversion Headworks-2.pdf
06. Diversion Headworks-2.pdf
 
General Flood Resistant Bridge Design Guidelines
General Flood Resistant Bridge Design GuidelinesGeneral Flood Resistant Bridge Design Guidelines
General Flood Resistant Bridge Design Guidelines
 
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
 
RMT Group5 presentation.pptx
RMT Group5 presentation.pptxRMT Group5 presentation.pptx
RMT Group5 presentation.pptx
 
Hydraulic structures pdf
Hydraulic structures pdfHydraulic structures pdf
Hydraulic structures pdf
 
3873
38733873
3873
 

Recently uploaded

Minimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptxMinimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptx
balqisyamutia
 
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
CristineGraceAcuyan
 
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
awasv46j
 
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
nirzagarg
 
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
gajnagarg
 
How to Build a Simple Shopify Website
How to Build a Simple Shopify WebsiteHow to Build a Simple Shopify Website
How to Build a Simple Shopify Website
mark11275
 
poliovirus-190801072449. pptx
poliovirus-190801072449.            pptxpoliovirus-190801072449.            pptx
poliovirus-190801072449. pptx
ssuser0ad194
 
Simple Conference Style Presentation by Slidesgo.pptx
Simple Conference Style Presentation by Slidesgo.pptxSimple Conference Style Presentation by Slidesgo.pptx
Simple Conference Style Presentation by Slidesgo.pptx
balqisyamutia
 
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
gajnagarg
 

Recently uploaded (20)

Minimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptxMinimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptx
 
Essential UI/UX Design Principles: A Comprehensive Guide
Essential UI/UX Design Principles: A Comprehensive GuideEssential UI/UX Design Principles: A Comprehensive Guide
Essential UI/UX Design Principles: A Comprehensive Guide
 
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime PondicherryPondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
 
How to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdfHow to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdf
 
The hottest UI and UX Design Trends 2024
The hottest UI and UX Design Trends 2024The hottest UI and UX Design Trends 2024
The hottest UI and UX Design Trends 2024
 
Q4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationQ4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentation
 
BLOCK CHAIN PROJECT block chain project
BLOCK CHAIN  PROJECT block chain projectBLOCK CHAIN  PROJECT block chain project
BLOCK CHAIN PROJECT block chain project
 
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
 
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
 
Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...
Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...
Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...
 
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
 
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEKLANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
 
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best ServiceHigh Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
 
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
 
How to Build a Simple Shopify Website
How to Build a Simple Shopify WebsiteHow to Build a Simple Shopify Website
How to Build a Simple Shopify Website
 
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdfJordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
 
poliovirus-190801072449. pptx
poliovirus-190801072449.            pptxpoliovirus-190801072449.            pptx
poliovirus-190801072449. pptx
 
Simple Conference Style Presentation by Slidesgo.pptx
Simple Conference Style Presentation by Slidesgo.pptxSimple Conference Style Presentation by Slidesgo.pptx
Simple Conference Style Presentation by Slidesgo.pptx
 
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
 
Furniture & Joinery Details_Designs.pptx
Furniture & Joinery Details_Designs.pptxFurniture & Joinery Details_Designs.pptx
Furniture & Joinery Details_Designs.pptx
 

Note

  • 1. 1. Considerationof existingWaterPipe Line: Clause No.13 of Schedule B (Page no. 277) states that there is “A major transmission water pipeline runs parallel to the project road within ROW from Km Km. 5+150 to 9+150 (RHS). Development of road has been conceptualized without disturbing the stability / relocating the pipelines.Special safetymeasuresasrequired to ensurecontinuous water supply may be taken during the construction stage.Provision of future maintenance of pipeline is also to be kept into consideration. Minor shifting of project road centreline, if indispensable may be made. “ However, todeal withthe existingpipeline,whichisinsome place goes underground and in some places, it is exposed over ground need a detailed attention in terms of design and protection requirement criteria. First, due to the presence of the water pipe line (which is alsocomingin RE wall approachsection), the alignment needs to shift towards left. In such placesthe alignmentmaygobeyondROW limit at the left side of the road section. Second, to take care the stabilityof the pipeline acasingstructure intermsof covered box structure, whichitself isgoing to affect hugely in Quantity. Third, in terms of future maintenance the casingof the pipe line while going underground need to be so spacious that one can easily access the pipe line forminorormajormaintenance work.The size of the covered structure will affect in service road FRL. Which will increase due to the underground cased box structure, affecting also in quantity. 2. Raising of Profile at Pond Location: In fewcaseswhere there isapresence of pondlocations,the FRLof designed alignment has beenraisedto cater the HFL criteria for the safety of the pavement subgrade. A total of 2.5 m has been raised from the existing road level. By raising the profile at those selective locations andmaintainingthe minimumvertical slopecriteriafor drainage, profile has been modified. But due to the raising the earthwork quantity has been increased along with Retaining wall and Toe wall to restrict the slope of the earthwork within the ROW limit. Those raisingcan alsobe optimize by assessing actual HFL at the particular location and the raising the profile accordingly. 3. Providing Sand filling in Marshy area: Locations along the project corridor where water logged area has been observed, a sand layerof 500 mm hasbeen placed as a layer to densify the area. As those areas are prone to settlement, laying of sand layer has been indicated. However, the total length of such sections has been considered as 4.5 Km. in BOQ, which also includes areas near pond location.Butthat can be optimizedbyeliminatingthe pondlocations and only retaining the waterlogged areas along the project stretch.