The document outlines the design and construction of a combat robot for a competition. It includes an intended operation of pushing other robots off the battlefield, a PERT chart scheduling the design and build over 5 weeks, a bill of materials estimating $13 in costs, and criteria for success being able to move, push a 1lb robot, and be robust. It concludes that lack of friction on the competition surface made maneuverability difficult, but the robot remained functional.