COBRE PANAMA PROJECT2 3
Minepre-stripping.
COBRE PANAMA PROJECT
COBRE PANAMA PROJECT4 5
COBRE PANAMA PROJECT
Client		 : Minera Panamá
		 (First Quantum Minerals)
Commodity	 : Copper
Type project	 : Greenfield project
Method	 : Open pit
Investment	 : US$ 5.48 billion
Access		 : Remote
Location	 : Colon Province, Panama
Scope of work
1st stage:
•	 Tailings Management Facility - 8.5 million m³
2nd stage:
•	 1.2km Decant tunnel construction
•	 Plant Site Earthworks: 7 million m³.
•	 Pre-strip: 54 million m³.
•	 118 Km HV Transmission Line of 230 KV and 370 towers.
•	 Power Station plant construction.
•	 Processing plant construction: 3.000t.
Timeframe: 2012 – 2018
Value: US$ 312 million (to Nov 2017)
COBRE PANAMA PROJECT6 7
STRACON GyM is the leading world class
mining contractor in Latin America. We have
extensive experience in providing integrated
mining and construction services to open pit
and underground operations.
Ouroperations
COBRE PANAMA PROJECT8 9
THE CHALLENGES:
	 NewcountryforSTRACONGyM
�	 LargeremoteGreenfieldProject
�	 First copper mine to be developed in
Panamá
�	 Limitedlevelofskilledpersonnel(high
intensitytraining)
�	 Tropicalclimacticconditions,withhigh
precipitationlevels
�	Saprolite and saturated soil
management
�	 Socialchallenges
Cobre Panama is an open-pit copper
projectlocated120kmwestofPanama
City and 20 km from the Caribbean
coast, in the district of Donoso, Colon
province. The project consists of four
zonestotaling13,600ha.
Minera Panama S.A. (MP) holds the
CobrePanamaconcession,toexplore
andexploittheproperty.
STRACON GyM S.A. (SGyM) and MP
signed an “Alliance Agreement” in
April2012coveringtheconstruction
of the Tailings Management Facility
(TMF)foraninitial3-yearperiod.
InApril2013,FirstQuantumMinerals
(FQM) acquired MP. One year later,
SGyM’s scope was expanded across
theproject.
COBRE PANAMA PROJECT10 11
WHATAREWEUNDERTAKING?
We started building one particular aspect of the mine infrastructure, however due to our performance
andcapability,thescopeofworkwasexpanded.
Tailings Management Facilities
(TMF)
�	 8,5 million of m3
.
�	 300 personnel.
2ndstage:DecantTunnel
�	 1.2 km underground excavation (5m x 5.75m) .
�	 200 mm concrete floor.
COBRE PANAMA PROJECT12 13
TransmissionLine:
�	 Electrical interconnection of 230 KV and 370 towers – 118km of HV transmission line.
ProcessPlantSite:
�	 7millionm3
ofearthmovement.
�	 Installationofthemainstructuresand
equipment for the processing plant
(200,000 tons per day).
	 Thescopeoftheworkis6,500tofsteel
erection.
�	 Primary&SecondaryCrusher.
�	Conveyors.
�	Stockpile.
�	 Milling:3SAGmillsand4Ballmills.
�	 Flotation.
�	Thickener.
�	 Switchyardandsubstation.
COBRE PANAMA PROJECT14 15
MinePre-strip:
�	 54millionm3.
�	 300personnel.
ThePowerPlantStation:
�	 Pipeworks.
�	 Assistingwithturbineinstallation.
�	 9,000tonsofsteel.
WEDEVELOPLOCALMANPOWER
Buildingalargescaleprojectisneveraneasytask.
COBRE PANAMA PROJECT16 17
WANT TO LEARN MORE ABOUT SGyM
SGyM has been able to build its reputation as a premier mining contractor in the region by simply living to
ourvalues:SAFETY,COMPLIANCE,QUALITY,INTEGRITYandEFFICIENCY.
Wecareaboutourpeople,alwayslookingforwaystoenhanceanddeveloptheircompetencies,toenable
ustocollectivelyachieveourgoals.
JOSÉJAVIERSANCHEZ
MechanicatCobrePanamá
Project,Panamá
GINAHORTASOSA
OperatoratCobrePanamá
Project,Panamá
“I started working at STRACON GyM as a
mechanic.Thankstomyworkandtheconfidence
mybosshadonme,Ihadtheopportunitytowork
asSupervisor,thepositionthatIcurrentlyhold.
STRACONGyMgavemetheopportunitytoreceive
training and grow professionally, acquiring
knowledgeinorganizationandteamwork”.
“IstartedworkingatSTRACONGyMaswatchman.
Thanks to the many opportunities given by the
company,ItrainedtobecameaHeavyEquipment
Operator.
First, I started as a Roller Operator then I showed
my desire to operate an articulated truck and I
madeit“.
The experience gained -locally and
throughouttheregion-duringprevious
challenging projects enabled SGyM to
transferbest-practicestoCobrePanamá
inanefficientandeffectiveway.
Many of the people involved in Cobre
Panama are residents of neighboring
communities with no previous mining
experience.SGyMimplementedseveral
training programs to develop skills in
drilling, blasting, loading and hauling.
Wherepossible,trainingprogramswere
implementedtodevelopandstrengthen
theskillsofourlocalemployees.
This coupled with our world-class
systems and processes helped the
operation build local capacity to safely
manageongoingoperations.

More Related Content

Similar to Cobre Panama Project (FQM) - STRACON

HIGH WALL MINING at SCCL - A Case Study
HIGH WALL MINING at SCCL - A Case StudyHIGH WALL MINING at SCCL - A Case Study
HIGH WALL MINING at SCCL - A Case Study
knowledge stuff
 
Longwall - China & India
Longwall - China & IndiaLongwall - China & India
Longwall - China & India
VR M
 
Report on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic projectReport on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic project
Rubnawaz Bhatti
 
Runway construction project execution plan
Runway construction project execution plan Runway construction project execution plan
Runway construction project execution plan
David H Moloney
 
Mine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of PapersMine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of Papers
VR M
 
Coal Mining Technlogy Brief_Low Coal Seam_HOT Mining
Coal Mining Technlogy Brief_Low Coal Seam_HOT MiningCoal Mining Technlogy Brief_Low Coal Seam_HOT Mining
Coal Mining Technlogy Brief_Low Coal Seam_HOT Mining
Serena Fu
 
Safety Management of Deep Mechanised Longwall Mine
Safety Management of Deep Mechanised Longwall MineSafety Management of Deep Mechanised Longwall Mine
Safety Management of Deep Mechanised Longwall Mine
Ulimella Siva Sankar
 
E&I Farukh
E&I FarukhE&I Farukh
E&I Farukh
Farrukh Chughtai
 
Adoption of advanced coal mining practices for production augmentation by und...
Adoption of advanced coal mining practices for production augmentation by und...Adoption of advanced coal mining practices for production augmentation by und...
Adoption of advanced coal mining practices for production augmentation by und...
AMIT SAHU
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
Jundee Mar Tejedo
 
Isee paper - Uttam Blastech
Isee paper - Uttam Blastech Isee paper - Uttam Blastech
Isee paper - Uttam Blastech
Uttam Blastech
 
EDWARD JOHN WOOD -March 2015
EDWARD JOHN WOOD -March 2015EDWARD JOHN WOOD -March 2015
EDWARD JOHN WOOD -March 2015
John Wood
 
Shai ben haroosh selected projects
Shai ben haroosh selected projectsShai ben haroosh selected projects
Shai ben haroosh selected projects
shai ben haroosh
 
AME POWER PLANT REFERENCES
AME POWER PLANT REFERENCESAME POWER PLANT REFERENCES
AME POWER PLANT REFERENCES
Carlo Avanzini
 
Project portfolio mark rannel gamayo
Project portfolio mark rannel gamayoProject portfolio mark rannel gamayo
Project portfolio mark rannel gamayo
Mark Rannel Gamayo
 
Underground coal mining capacities brief
Underground coal mining capacities briefUnderground coal mining capacities brief
Underground coal mining capacities brief
GavinZhang25
 
Jamsheer P_CV (1)
Jamsheer P_CV (1)Jamsheer P_CV (1)
Jamsheer P_CV (1)
jamsheer p
 
WQ-2
WQ-2WQ-2
Underground Mining Technology.pptx
Underground Mining Technology.pptxUnderground Mining Technology.pptx
Underground Mining Technology.pptx
Chandan Chaman
 
Energya projects
Energya projectsEnergya projects
Energya projects
Hossam Mostafa
 

Similar to Cobre Panama Project (FQM) - STRACON (20)

HIGH WALL MINING at SCCL - A Case Study
HIGH WALL MINING at SCCL - A Case StudyHIGH WALL MINING at SCCL - A Case Study
HIGH WALL MINING at SCCL - A Case Study
 
Longwall - China & India
Longwall - China & IndiaLongwall - China & India
Longwall - China & India
 
Report on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic projectReport on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic project
 
Runway construction project execution plan
Runway construction project execution plan Runway construction project execution plan
Runway construction project execution plan
 
Mine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of PapersMine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of Papers
 
Coal Mining Technlogy Brief_Low Coal Seam_HOT Mining
Coal Mining Technlogy Brief_Low Coal Seam_HOT MiningCoal Mining Technlogy Brief_Low Coal Seam_HOT Mining
Coal Mining Technlogy Brief_Low Coal Seam_HOT Mining
 
Safety Management of Deep Mechanised Longwall Mine
Safety Management of Deep Mechanised Longwall MineSafety Management of Deep Mechanised Longwall Mine
Safety Management of Deep Mechanised Longwall Mine
 
E&I Farukh
E&I FarukhE&I Farukh
E&I Farukh
 
Adoption of advanced coal mining practices for production augmentation by und...
Adoption of advanced coal mining practices for production augmentation by und...Adoption of advanced coal mining practices for production augmentation by und...
Adoption of advanced coal mining practices for production augmentation by und...
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
Isee paper - Uttam Blastech
Isee paper - Uttam Blastech Isee paper - Uttam Blastech
Isee paper - Uttam Blastech
 
EDWARD JOHN WOOD -March 2015
EDWARD JOHN WOOD -March 2015EDWARD JOHN WOOD -March 2015
EDWARD JOHN WOOD -March 2015
 
Shai ben haroosh selected projects
Shai ben haroosh selected projectsShai ben haroosh selected projects
Shai ben haroosh selected projects
 
AME POWER PLANT REFERENCES
AME POWER PLANT REFERENCESAME POWER PLANT REFERENCES
AME POWER PLANT REFERENCES
 
Project portfolio mark rannel gamayo
Project portfolio mark rannel gamayoProject portfolio mark rannel gamayo
Project portfolio mark rannel gamayo
 
Underground coal mining capacities brief
Underground coal mining capacities briefUnderground coal mining capacities brief
Underground coal mining capacities brief
 
Jamsheer P_CV (1)
Jamsheer P_CV (1)Jamsheer P_CV (1)
Jamsheer P_CV (1)
 
WQ-2
WQ-2WQ-2
WQ-2
 
Underground Mining Technology.pptx
Underground Mining Technology.pptxUnderground Mining Technology.pptx
Underground Mining Technology.pptx
 
Energya projects
Energya projectsEnergya projects
Energya projects
 

Recently uploaded

一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
ecqow
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
Gino153088
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
Seminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptxSeminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptx
Madan Karki
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
abbyasa1014
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
Las Vegas Warehouse
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
Prakhyath Rai
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
Mahmoud Morsy
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
Roger Rozario
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
PKavitha10
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
Anant Corporation
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 

Recently uploaded (20)

一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
Seminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptxSeminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptx
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 

Cobre Panama Project (FQM) - STRACON

  • 1. Av. Paseo de La República 4675 Surquillo. Lima 34, Perú T.: (511) 208-0230 F.: (511) 421-6045 M.: info@stracongym.com.pe Safety – Compliance – Quality – Integrity – Efficiency COBRE PANAMÁ CASESTUDY-FIRSTQUANTUM MINERALS
  • 2. COBRE PANAMA PROJECT2 3 Minepre-stripping. COBRE PANAMA PROJECT
  • 3. COBRE PANAMA PROJECT4 5 COBRE PANAMA PROJECT Client : Minera Panamá (First Quantum Minerals) Commodity : Copper Type project : Greenfield project Method : Open pit Investment : US$ 5.48 billion Access : Remote Location : Colon Province, Panama Scope of work 1st stage: • Tailings Management Facility - 8.5 million m³ 2nd stage: • 1.2km Decant tunnel construction • Plant Site Earthworks: 7 million m³. • Pre-strip: 54 million m³. • 118 Km HV Transmission Line of 230 KV and 370 towers. • Power Station plant construction. • Processing plant construction: 3.000t. Timeframe: 2012 – 2018 Value: US$ 312 million (to Nov 2017)
  • 4. COBRE PANAMA PROJECT6 7 STRACON GyM is the leading world class mining contractor in Latin America. We have extensive experience in providing integrated mining and construction services to open pit and underground operations. Ouroperations
  • 5. COBRE PANAMA PROJECT8 9 THE CHALLENGES:  NewcountryforSTRACONGyM � LargeremoteGreenfieldProject � First copper mine to be developed in Panamá � Limitedlevelofskilledpersonnel(high intensitytraining) � Tropicalclimacticconditions,withhigh precipitationlevels � Saprolite and saturated soil management � Socialchallenges Cobre Panama is an open-pit copper projectlocated120kmwestofPanama City and 20 km from the Caribbean coast, in the district of Donoso, Colon province. The project consists of four zonestotaling13,600ha. Minera Panama S.A. (MP) holds the CobrePanamaconcession,toexplore andexploittheproperty. STRACON GyM S.A. (SGyM) and MP signed an “Alliance Agreement” in April2012coveringtheconstruction of the Tailings Management Facility (TMF)foraninitial3-yearperiod. InApril2013,FirstQuantumMinerals (FQM) acquired MP. One year later, SGyM’s scope was expanded across theproject.
  • 6. COBRE PANAMA PROJECT10 11 WHATAREWEUNDERTAKING? We started building one particular aspect of the mine infrastructure, however due to our performance andcapability,thescopeofworkwasexpanded. Tailings Management Facilities (TMF) � 8,5 million of m3 . � 300 personnel. 2ndstage:DecantTunnel � 1.2 km underground excavation (5m x 5.75m) . � 200 mm concrete floor.
  • 7. COBRE PANAMA PROJECT12 13 TransmissionLine: � Electrical interconnection of 230 KV and 370 towers – 118km of HV transmission line. ProcessPlantSite: � 7millionm3 ofearthmovement. � Installationofthemainstructuresand equipment for the processing plant (200,000 tons per day). Thescopeoftheworkis6,500tofsteel erection. � Primary&SecondaryCrusher. � Conveyors. � Stockpile. � Milling:3SAGmillsand4Ballmills. � Flotation. � Thickener. � Switchyardandsubstation.
  • 8. COBRE PANAMA PROJECT14 15 MinePre-strip: � 54millionm3. � 300personnel. ThePowerPlantStation: � Pipeworks. � Assistingwithturbineinstallation. � 9,000tonsofsteel. WEDEVELOPLOCALMANPOWER Buildingalargescaleprojectisneveraneasytask.
  • 9. COBRE PANAMA PROJECT16 17 WANT TO LEARN MORE ABOUT SGyM SGyM has been able to build its reputation as a premier mining contractor in the region by simply living to ourvalues:SAFETY,COMPLIANCE,QUALITY,INTEGRITYandEFFICIENCY. Wecareaboutourpeople,alwayslookingforwaystoenhanceanddeveloptheircompetencies,toenable ustocollectivelyachieveourgoals. JOSÉJAVIERSANCHEZ MechanicatCobrePanamá Project,Panamá GINAHORTASOSA OperatoratCobrePanamá Project,Panamá “I started working at STRACON GyM as a mechanic.Thankstomyworkandtheconfidence mybosshadonme,Ihadtheopportunitytowork asSupervisor,thepositionthatIcurrentlyhold. STRACONGyMgavemetheopportunitytoreceive training and grow professionally, acquiring knowledgeinorganizationandteamwork”. “IstartedworkingatSTRACONGyMaswatchman. Thanks to the many opportunities given by the company,ItrainedtobecameaHeavyEquipment Operator. First, I started as a Roller Operator then I showed my desire to operate an articulated truck and I madeit“. The experience gained -locally and throughouttheregion-duringprevious challenging projects enabled SGyM to transferbest-practicestoCobrePanamá inanefficientandeffectiveway. Many of the people involved in Cobre Panama are residents of neighboring communities with no previous mining experience.SGyMimplementedseveral training programs to develop skills in drilling, blasting, loading and hauling. Wherepossible,trainingprogramswere implementedtodevelopandstrengthen theskillsofourlocalemployees. This coupled with our world-class systems and processes helped the operation build local capacity to safely manageongoingoperations.