SlideShare a Scribd company logo
Why cisterns? This is why.
A LITTLE HISTORY FIRST – ANCIENT CISTERN
Cisterns have been traced back to the Neolithic
time period 12,000 years ago give or take a little.
Cisterns are about 4,000 years older than wells.
GREEK AQUEDUCT
Greece was one of the first civilizations known to
direct water to cisterns via aqueducts.
This was perfected by the Romans.
Aqueduct in Greek city of Kavala.
OPEN CISTERN
In the 1700s there was a Yellow Fever outbreak in
Portsmouth, Ohio. There is some speculation that
open cisterns, where mosquitos can breed,
contributed to these types of outbreaks.
Image [or content, or "this material"] has been provided courtesy of InspectAPedia.com
BEAUTIFUL CISTERN
Basilica Cistern, Istanbul, Turkey.
Built in the 6th century.
FUN(ISH)
Rainwater catchment cisterns in Illinois.
NOT PRETTY, BUT FUNCTIONAL
KINDA LIKE COMPARING…
MAKING THE APPLICATION
In recent years there was a change that required PWS application and all
information be submitted at the same time as the STS application.
Application must be made at the same time as the Household Sewage
Treatment System app.
Must have all the contractor’s information at the time of application.
Must have PWS located on site plan.
Must show water collection system and roof washers.
Must show continuous disinfection system.
APPLICATION EXAMPLE
Top portion of Application.
Cistern box is marked!
APPLICATION MIDDLE SECTION
Must list the PWS contractor and be sure to verify
the contractor is on the approved list at ODH!
BOTTOM SECTION
Be sure the application is signed and dated.
SITE PLAN FORM JOB INFO
Site plan is completely filled out including permit
number.
SITE PLAN DISTANCES
Shows isolation distance information and refers to
attached site plan.
Either list the actual distance or N/A.
ATTACHED FULL SITE PLAN
Shows location of STS, cistern, water collection
pipes, roof washer and overflow pipe.
CLOSE UP OF PWS AREA
Isolation distances must be site verified.
EQUIPMENT ON FLOOR PLAN
Water line from cistern to disinfection and pumping
equipment.
PICTURE OF PLANNED EQUIPMENT LAYOUT
Many times the continuous disinfection system is
identical to previous installations.
ANOTHER SITE PLAN EXAMPLE
Showing piping, roof washer and cistern.
No onsite system due to sewers.
This was for an alteration.
ADDITIONAL EQUIPMENT PLAN
UV disinfection unit in plan.
The PWS is going to go where….?
LET THE GAMES BEGIN!
Two 2700 gallon tanks (5400 gallon total) with a
low crossover.
Most homeowners install more that the minimum
required 2500 gallon system.
Floating filter for the inlet of the water line to the
home. Rope attached to anchor on the inside of
riser to access the filter for cleaning or
replacement.
Water line connected to cast in place brass fitting
and deep enough for freeze protection.
Roof washer sized to accommodate the square
footage of the roof delivering water to the cisterns.
One roof washer per 1500 square feet.
Inside of a 1500 square foot roof washer.
Overflow discharges to daylight not to cistern.
Pipes are bedded in gravel to keep them on grade.
Collection system fits together tightly to prevent
debris from entering system.
Water line should be cased or supported in areas
where it will cross an over dig and buried at least 42
inches deep for freeze protection.
Over flow pipe on a neat grade and run to daylight.
Screen installed inside animal guard.
Continuous disinfection equipment installed and
labeled.
ANSI/NSF standard 53 cyst reduction filters
installed in manifold to provide 10 gpm flow rate.
Components are clearly labeled.
Retention tank is a minimum of 120 gallons.
Sampling port on the left. Is placed in a convenient
location and easily accessible.
Another example of continuous disinfection. A filter
of no larger than 5 microns with an ANSI/NSF
standard 55 class A ultraviolet light system.
Job status/Completion forms filled out and
submitted at or before final inspection.
Water sample collected at the time of final
inspection.
ADMINISTRATIVE SUMMARY
Top portion of administrative summary.
Close up of comments and notes.
We have plans to develop an as-built form to
make it easier to document inspections.
Sample and final approval sections.
Where’s that cistern?
Low profile riser added to a cistern in a garage.
Close up view.
Original steel cast in lid is still in place underneath
riser.
Failed loan inspections drive most alterations.
UV installed in tight space on an alteration.
Because, who doesn’t like a cool drink from the
faucet?
DISCUSSION AND QUESTIONS
Robert Wildey, Director of Water and Waste
rwildey@clermontcountyohio.gov
513-732-7606
Paul Sanders, Sanitarian Water and Waste Division
psanders@clermontcountyohio.gov
513-732-7604
THANK YOU!

More Related Content

What's hot

Froggy bottoms write up-final
Froggy bottoms write up-finalFroggy bottoms write up-final
Froggy bottoms write up-finalFroggyBottoms
 
Austin Baker - Considering Filtration For Swine Barn Operations
Austin Baker - Considering Filtration For Swine Barn OperationsAustin Baker - Considering Filtration For Swine Barn Operations
Austin Baker - Considering Filtration For Swine Barn Operations
John Blue
 
Low flow shower heads presentation complete
Low flow shower heads presentation completeLow flow shower heads presentation complete
Low flow shower heads presentation complete
lowflowshowerheads
 
CROSS-CONNECTION POWER POINT 3
CROSS-CONNECTION POWER POINT 3CROSS-CONNECTION POWER POINT 3
CROSS-CONNECTION POWER POINT 3John Davies
 
Presentation plumbing
Presentation plumbingPresentation plumbing
Presentation plumbingLiguidliguid
 

What's hot (6)

Froggy bottoms write up-final
Froggy bottoms write up-finalFroggy bottoms write up-final
Froggy bottoms write up-final
 
Austin Baker - Considering Filtration For Swine Barn Operations
Austin Baker - Considering Filtration For Swine Barn OperationsAustin Baker - Considering Filtration For Swine Barn Operations
Austin Baker - Considering Filtration For Swine Barn Operations
 
Low flow shower heads presentation complete
Low flow shower heads presentation completeLow flow shower heads presentation complete
Low flow shower heads presentation complete
 
CROSS-CONNECTION POWER POINT 3
CROSS-CONNECTION POWER POINT 3CROSS-CONNECTION POWER POINT 3
CROSS-CONNECTION POWER POINT 3
 
Presentation plumbing
Presentation plumbingPresentation plumbing
Presentation plumbing
 
Plumbing
PlumbingPlumbing
Plumbing
 

Similar to Cistern construction alteration review inspections 2019 no humor

Rainwater Collecting to Offset Existing Water Uses
Rainwater Collecting to Offset Existing Water UsesRainwater Collecting to Offset Existing Water Uses
Rainwater Collecting to Offset Existing Water Uses
Brian Gregson
 
Rain water harvesting
Rain water harvestingRain water harvesting
Rain water harvesting
AKSHAY SAWANT
 
ENGINEERING -UTILITIES-2-REPORT-G1 Section A.pptx
ENGINEERING -UTILITIES-2-REPORT-G1 Section A.pptxENGINEERING -UTILITIES-2-REPORT-G1 Section A.pptx
ENGINEERING -UTILITIES-2-REPORT-G1 Section A.pptx
Debbie862421
 
plumbing trap ppt.pptx
plumbing trap ppt.pptxplumbing trap ppt.pptx
plumbing trap ppt.pptx
rekhat26
 
Water supply, sanitation and rainwater harvesting
Water supply, sanitation and rainwater harvestingWater supply, sanitation and rainwater harvesting
Water supply, sanitation and rainwater harvesting
Ayushi Agrawal
 
Drainage system Ar 308 unit-3
Drainage system Ar 308 unit-3Drainage system Ar 308 unit-3
Drainage system Ar 308 unit-3
Sudesh Chauhan
 
SERVICES
SERVICESSERVICES
SERVICES
saikamal ck
 
Rainwater cisterns
Rainwater cisternsRainwater cisterns
Rainwater cisterns
bronzecs
 
Part 1 - Water Supply in Buildings.pdf
Part 1 - Water Supply in Buildings.pdfPart 1 - Water Supply in Buildings.pdf
Part 1 - Water Supply in Buildings.pdf
Ignacio J. Palma, Arch PhD.
 
Top 10 Cross-Connection Hazards Threatening Your Drinking Water
Top 10 Cross-Connection Hazards Threatening Your Drinking WaterTop 10 Cross-Connection Hazards Threatening Your Drinking Water
Top 10 Cross-Connection Hazards Threatening Your Drinking Water
HydroCorp
 
Whole House Rainwater Harvesting: Capturing and Using Rainwater for Potable ...
Whole House Rainwater Harvesting:  Capturing and Using Rainwater for Potable ...Whole House Rainwater Harvesting:  Capturing and Using Rainwater for Potable ...
Whole House Rainwater Harvesting: Capturing and Using Rainwater for Potable ...
Brian Gregson
 
PLUMBING 1.ppt
PLUMBING 1.pptPLUMBING 1.ppt
PLUMBING 1.ppt
norielcastro
 
Green Buildings-reduce resue and recycle
Green Buildings-reduce resue and recycleGreen Buildings-reduce resue and recycle
Green Buildings-reduce resue and recycle
ctlachu
 
Rainwater harvesting
Rainwater harvestingRainwater harvesting
Rainwater harvestingnishantphysio
 
Carl m kuttler jr collection and estimation of sewage
Carl m kuttler jr collection and estimation of sewageCarl m kuttler jr collection and estimation of sewage
Carl m kuttler jr collection and estimation of sewage
CarlMKuttler
 
Roof Water Harvesting for a Low Impact Water Supply - Water Institute
Roof Water Harvesting for a Low Impact Water Supply - Water InstituteRoof Water Harvesting for a Low Impact Water Supply - Water Institute
Roof Water Harvesting for a Low Impact Water Supply - Water Institute
D4Z
 
Water supply.pdf
Water supply.pdfWater supply.pdf
Water supply.pdf
Shyam Raj Jilla
 
350617638-1-Components-of-Water-Supply-System.pptx
350617638-1-Components-of-Water-Supply-System.pptx350617638-1-Components-of-Water-Supply-System.pptx
350617638-1-Components-of-Water-Supply-System.pptx
SyakirohMohdTaufik
 
Home Built Hydraulic Ram Pumps - NW Independent Power Resources
Home Built Hydraulic Ram Pumps - NW Independent Power ResourcesHome Built Hydraulic Ram Pumps - NW Independent Power Resources
Home Built Hydraulic Ram Pumps - NW Independent Power Resources
Fatin62c
 

Similar to Cistern construction alteration review inspections 2019 no humor (20)

Rainwater Collecting to Offset Existing Water Uses
Rainwater Collecting to Offset Existing Water UsesRainwater Collecting to Offset Existing Water Uses
Rainwater Collecting to Offset Existing Water Uses
 
Rain water harvesting
Rain water harvestingRain water harvesting
Rain water harvesting
 
ENGINEERING -UTILITIES-2-REPORT-G1 Section A.pptx
ENGINEERING -UTILITIES-2-REPORT-G1 Section A.pptxENGINEERING -UTILITIES-2-REPORT-G1 Section A.pptx
ENGINEERING -UTILITIES-2-REPORT-G1 Section A.pptx
 
plumbing trap ppt.pptx
plumbing trap ppt.pptxplumbing trap ppt.pptx
plumbing trap ppt.pptx
 
Water supply, sanitation and rainwater harvesting
Water supply, sanitation and rainwater harvestingWater supply, sanitation and rainwater harvesting
Water supply, sanitation and rainwater harvesting
 
Drainage system Ar 308 unit-3
Drainage system Ar 308 unit-3Drainage system Ar 308 unit-3
Drainage system Ar 308 unit-3
 
SERVICES
SERVICESSERVICES
SERVICES
 
Rainwater cisterns
Rainwater cisternsRainwater cisterns
Rainwater cisterns
 
Part 1 - Water Supply in Buildings.pdf
Part 1 - Water Supply in Buildings.pdfPart 1 - Water Supply in Buildings.pdf
Part 1 - Water Supply in Buildings.pdf
 
Top 10 Cross-Connection Hazards Threatening Your Drinking Water
Top 10 Cross-Connection Hazards Threatening Your Drinking WaterTop 10 Cross-Connection Hazards Threatening Your Drinking Water
Top 10 Cross-Connection Hazards Threatening Your Drinking Water
 
Whole House Rainwater Harvesting: Capturing and Using Rainwater for Potable ...
Whole House Rainwater Harvesting:  Capturing and Using Rainwater for Potable ...Whole House Rainwater Harvesting:  Capturing and Using Rainwater for Potable ...
Whole House Rainwater Harvesting: Capturing and Using Rainwater for Potable ...
 
PLUMBING 1.ppt
PLUMBING 1.pptPLUMBING 1.ppt
PLUMBING 1.ppt
 
Green Buildings-reduce resue and recycle
Green Buildings-reduce resue and recycleGreen Buildings-reduce resue and recycle
Green Buildings-reduce resue and recycle
 
Rainwater harvesting
Rainwater harvestingRainwater harvesting
Rainwater harvesting
 
Carl m kuttler jr collection and estimation of sewage
Carl m kuttler jr collection and estimation of sewageCarl m kuttler jr collection and estimation of sewage
Carl m kuttler jr collection and estimation of sewage
 
Roof Water Harvesting for a Low Impact Water Supply - Water Institute
Roof Water Harvesting for a Low Impact Water Supply - Water InstituteRoof Water Harvesting for a Low Impact Water Supply - Water Institute
Roof Water Harvesting for a Low Impact Water Supply - Water Institute
 
Water supply.pdf
Water supply.pdfWater supply.pdf
Water supply.pdf
 
350617638-1-Components-of-Water-Supply-System.pptx
350617638-1-Components-of-Water-Supply-System.pptx350617638-1-Components-of-Water-Supply-System.pptx
350617638-1-Components-of-Water-Supply-System.pptx
 
Home Built Hydraulic Ram Pumps - NW Independent Power Resources
Home Built Hydraulic Ram Pumps - NW Independent Power ResourcesHome Built Hydraulic Ram Pumps - NW Independent Power Resources
Home Built Hydraulic Ram Pumps - NW Independent Power Resources
 
Rainwater Harvesting White Paper
Rainwater Harvesting White PaperRainwater Harvesting White Paper
Rainwater Harvesting White Paper
 

More from Amanda Myers

Ticks and the Diseases they Carry
Ticks and the Diseases they CarryTicks and the Diseases they Carry
Ticks and the Diseases they Carry
Amanda Myers
 
Mosquitos and the Diseases they Carry
Mosquitos and the Diseases they CarryMosquitos and the Diseases they Carry
Mosquitos and the Diseases they Carry
Amanda Myers
 
Community Health Improvement Plan
Community Health Improvement PlanCommunity Health Improvement Plan
Community Health Improvement Plan
Amanda Myers
 
Indoor mold
Indoor moldIndoor mold
Indoor mold
Amanda Myers
 
Bedbugs, the hidden enemy
Bedbugs, the hidden enemyBedbugs, the hidden enemy
Bedbugs, the hidden enemyAmanda Myers
 
Bedbugs the hidden enemy
Bedbugs the hidden enemyBedbugs the hidden enemy
Bedbugs the hidden enemyAmanda Myers
 
Septic Systems for Homeowners
Septic Systems for HomeownersSeptic Systems for Homeowners
Septic Systems for Homeowners
Amanda Myers
 
Clermont CAN Presentation
Clermont CAN PresentationClermont CAN Presentation
Clermont CAN Presentation
Amanda Myers
 

More from Amanda Myers (9)

Ticks and the Diseases they Carry
Ticks and the Diseases they CarryTicks and the Diseases they Carry
Ticks and the Diseases they Carry
 
Mosquitos and the Diseases they Carry
Mosquitos and the Diseases they CarryMosquitos and the Diseases they Carry
Mosquitos and the Diseases they Carry
 
Community Health Improvement Plan
Community Health Improvement PlanCommunity Health Improvement Plan
Community Health Improvement Plan
 
Indoor mold
Indoor moldIndoor mold
Indoor mold
 
Bedbugs, the hidden enemy
Bedbugs, the hidden enemyBedbugs, the hidden enemy
Bedbugs, the hidden enemy
 
Indoor mold
Indoor moldIndoor mold
Indoor mold
 
Bedbugs the hidden enemy
Bedbugs the hidden enemyBedbugs the hidden enemy
Bedbugs the hidden enemy
 
Septic Systems for Homeowners
Septic Systems for HomeownersSeptic Systems for Homeowners
Septic Systems for Homeowners
 
Clermont CAN Presentation
Clermont CAN PresentationClermont CAN Presentation
Clermont CAN Presentation
 

Recently uploaded

一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
ehbuaw
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
Saeed Al Dhaheri
 
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
ukyewh
 
Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
SERUDS INDIA
 
Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
Get Government Grants
 
PACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfPACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdf
Mohammed325561
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
850fcj96
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
GrantManagementInsti
 
2024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 362024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 36
JSchaus & Associates
 
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
ehbuaw
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
ehbuaw
 
PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
ahcitycouncil
 
PPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services AgmtPPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services Agmt
ahcitycouncil
 
The Role of a Process Server in real estate
The Role of a Process Server in real estateThe Role of a Process Server in real estate
The Role of a Process Server in real estate
oklahomajudicialproc1
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
ClaudioTebaldi2
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
Antti Rautiainen
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
JSchaus & Associates
 
Many ways to support street children.pptx
Many ways to support street children.pptxMany ways to support street children.pptx
Many ways to support street children.pptx
SERUDS INDIA
 
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
evkovas
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
850fcj96
 

Recently uploaded (20)

一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
 
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
 
Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
 
Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
 
PACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfPACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdf
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
 
2024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 362024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 36
 
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
 
PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
 
PPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services AgmtPPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services Agmt
 
The Role of a Process Server in real estate
The Role of a Process Server in real estateThe Role of a Process Server in real estate
The Role of a Process Server in real estate
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
 
Many ways to support street children.pptx
Many ways to support street children.pptxMany ways to support street children.pptx
Many ways to support street children.pptx
 
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
 

Cistern construction alteration review inspections 2019 no humor

  • 1.
  • 3. A LITTLE HISTORY FIRST – ANCIENT CISTERN Cisterns have been traced back to the Neolithic time period 12,000 years ago give or take a little. Cisterns are about 4,000 years older than wells.
  • 4. GREEK AQUEDUCT Greece was one of the first civilizations known to direct water to cisterns via aqueducts. This was perfected by the Romans. Aqueduct in Greek city of Kavala.
  • 5. OPEN CISTERN In the 1700s there was a Yellow Fever outbreak in Portsmouth, Ohio. There is some speculation that open cisterns, where mosquitos can breed, contributed to these types of outbreaks. Image [or content, or "this material"] has been provided courtesy of InspectAPedia.com
  • 6.
  • 7. BEAUTIFUL CISTERN Basilica Cistern, Istanbul, Turkey. Built in the 6th century.
  • 9. NOT PRETTY, BUT FUNCTIONAL
  • 11.
  • 12. MAKING THE APPLICATION In recent years there was a change that required PWS application and all information be submitted at the same time as the STS application. Application must be made at the same time as the Household Sewage Treatment System app. Must have all the contractor’s information at the time of application. Must have PWS located on site plan. Must show water collection system and roof washers. Must show continuous disinfection system.
  • 13. APPLICATION EXAMPLE Top portion of Application. Cistern box is marked!
  • 14. APPLICATION MIDDLE SECTION Must list the PWS contractor and be sure to verify the contractor is on the approved list at ODH!
  • 15. BOTTOM SECTION Be sure the application is signed and dated.
  • 16. SITE PLAN FORM JOB INFO Site plan is completely filled out including permit number.
  • 17. SITE PLAN DISTANCES Shows isolation distance information and refers to attached site plan. Either list the actual distance or N/A.
  • 18. ATTACHED FULL SITE PLAN Shows location of STS, cistern, water collection pipes, roof washer and overflow pipe.
  • 19. CLOSE UP OF PWS AREA Isolation distances must be site verified.
  • 20. EQUIPMENT ON FLOOR PLAN Water line from cistern to disinfection and pumping equipment.
  • 21. PICTURE OF PLANNED EQUIPMENT LAYOUT Many times the continuous disinfection system is identical to previous installations.
  • 22. ANOTHER SITE PLAN EXAMPLE Showing piping, roof washer and cistern. No onsite system due to sewers. This was for an alteration.
  • 23. ADDITIONAL EQUIPMENT PLAN UV disinfection unit in plan.
  • 24.
  • 25. The PWS is going to go where….?
  • 26.
  • 27. LET THE GAMES BEGIN! Two 2700 gallon tanks (5400 gallon total) with a low crossover. Most homeowners install more that the minimum required 2500 gallon system.
  • 28. Floating filter for the inlet of the water line to the home. Rope attached to anchor on the inside of riser to access the filter for cleaning or replacement.
  • 29. Water line connected to cast in place brass fitting and deep enough for freeze protection.
  • 30. Roof washer sized to accommodate the square footage of the roof delivering water to the cisterns. One roof washer per 1500 square feet.
  • 31. Inside of a 1500 square foot roof washer. Overflow discharges to daylight not to cistern.
  • 32. Pipes are bedded in gravel to keep them on grade. Collection system fits together tightly to prevent debris from entering system.
  • 33. Water line should be cased or supported in areas where it will cross an over dig and buried at least 42 inches deep for freeze protection.
  • 34. Over flow pipe on a neat grade and run to daylight. Screen installed inside animal guard.
  • 35. Continuous disinfection equipment installed and labeled. ANSI/NSF standard 53 cyst reduction filters installed in manifold to provide 10 gpm flow rate.
  • 37.
  • 38. Retention tank is a minimum of 120 gallons. Sampling port on the left. Is placed in a convenient location and easily accessible.
  • 39. Another example of continuous disinfection. A filter of no larger than 5 microns with an ANSI/NSF standard 55 class A ultraviolet light system.
  • 40.
  • 41. Job status/Completion forms filled out and submitted at or before final inspection. Water sample collected at the time of final inspection.
  • 42. ADMINISTRATIVE SUMMARY Top portion of administrative summary.
  • 43. Close up of comments and notes. We have plans to develop an as-built form to make it easier to document inspections.
  • 44. Sample and final approval sections.
  • 45.
  • 46.
  • 48. Low profile riser added to a cistern in a garage.
  • 49. Close up view. Original steel cast in lid is still in place underneath riser.
  • 50. Failed loan inspections drive most alterations. UV installed in tight space on an alteration.
  • 51.
  • 52. Because, who doesn’t like a cool drink from the faucet?
  • 53. DISCUSSION AND QUESTIONS Robert Wildey, Director of Water and Waste rwildey@clermontcountyohio.gov 513-732-7606 Paul Sanders, Sanitarian Water and Waste Division psanders@clermontcountyohio.gov 513-732-7604