Amman
1
Chapter 3
2
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Introduction
 Project Management
 Application Development
 Business Information Systems
 Alternatives for Project Organization
 Infrastructure Development/Acquisition Practices
 Process Improvement
 Application Controls
 Auditing Systems Development, Acquisition and
Maintenance
 Summary
3
4
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Provide assurance that the practices for the
acquisition, development, testing, and
implementation of information systems meet the
organization’s strategies and objectives
5
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Evaluate the business case for the proposed investments in information
systems acquisition, development, maintenance and subsequent retirement to
determine whether it meets business objectives.
 Evaluate the project management practices and controls to determine whether
business requirements are achieved in a cost-effective manner while managing
risks to the organization.
 Conduct reviews to determine whether a project is progressing in accordance
with project plans, is adequately supported by documentation and status
reporting is accurate.
 Evaluate controls for information systems during the requirements, acquisition,
development and testing phases for compliance with the organization's
policies, standards, procedures and applicable external requirements.
 Evaluate the readiness of information systems for implementation and
migration into production to determine whether project deliverables, controls
and organization's requirements are met.
 Conduct post-implementation reviews of systems to determine whether
project deliverables, controls and organization's requirements are met.
6
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Knowledge of benefits realization practices, (e.g., feasibility studies,
business cases, total cost of ownership [TCO], ROI)
 Knowledge of project governance mechanisms (e.g., steering
committee, project oversight board, project management office)
 Knowledge of project management control frameworks, practices and
tools
 Knowledge of risk management practices applied to projects
 Knowledge of IT architecture related to data, applications and
technology (e.g., distributed applications, web-based applications, web
services, n-tier applications)
 Knowledge of acquisition practices (e.g., evaluation of vendors, vendor
management, escrow)
 Knowledge of requirements analysis and management practices (e.g.,
requirements verification, traceability, gap analysis, vulnerability
management, security requirements)
 Knowledge of project success criteria and risks
7
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Knowledge of control objectives and techniques that ensure the
completeness, accuracy, validity and authorization of transactions and
data
 Knowledge of system development methodologies and tools including
their strengths and weaknesses (e.g., agile development practices,
prototyping, rapid application development [RAD], object-oriented
design techniques)
 Knowledge of testing methodologies and practices related to
information systems development
 Knowledge of configuration and release management relating to the
development of information systems
 Knowledge of system migration and infrastructure deployment practices
and data conversion tools, techniques and procedures.
 Knowledge of post-implementation review objectives and practices
(e.g., project closure, control implementation, benefits realization,
performance measurement)
8
9
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC 10
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 A program is a set of projects and time-bound tasks
that are closely linked together through common
objectives, a common budget, intertwined schedules
and strategies
 Programs have a limited time frame (start and end
date) and organizational boundaries
 Methodology and processes in program
management are similar to those in project
management and run parallel to each other
 To formally start a program, some form of written
assignment from the program owner to the program
manager/team is necessary
11
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Objectives:
 Optimization of the results of the project portfolio
 Prioritizing and scheduling projects
 Resource coordination (internal and external)
 Knowledge transfer throughout the projects
12
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Provides information required to decide whether
a project should proceed
 Initial business case normally derives from a
feasibility study as part of project planning
 Should be of sufficient detail to describe the
justification for setting up and continuing a
project
13
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Describing benefits management or benefits
realization
 Assigning a measure and target
 Establishing a tracking/measuring regime
 Documenting the assumption
 Establishing key responsibilities for realization
 Validating the benefits predicted in the business
 Planning the benefit that is to be realize
14
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 IS projects may be initiated from any part of an
organization
 A project is always a time-bound effort
 Project management should be a business
process of a project-oriented organization
 The complexity of project management requires
a careful and explicit design of the project
management process
15
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Project context:
 Time context
 Social context.
 Considerations:
 Importance of the project in the organization
 Connection between the organization’s strategy and
the project
 Relationship between the project and other projects
 Connection between the project to the underlying
business case
16
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
Influence Project
Organization
Pure Project
Organization
Matrix Project
Organization
17
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
One-on-One
Meetings
Kick-off
Meetings
Project Start
Workshops
A
Combination
OfTheThree
18
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 SMART: Specific, Measurable, Achievable,
Relevant and Time-bound
 Object Breakdown Structure (OBS): commonly
accepted approach to define project objectives
 Work Breakdown Structure (WBS): designed after
the OBS has been compiled,
19
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
Groups
 Senior management
 User management
 Project steering committee
 Systems development
management
 Systems development
project team
 User project team
 Quality assurance
Individuals
 Project sponsor
 Project manager
 Security officer
20
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC 21
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC 22
Project
Cost and Resources
Time (Duration)Deliverables
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 The project manager needs to determine:
 The various tasks that need to be performed to produce
the expected business application system
 The sequence or the order in which these tasks need to be
performed
 The duration or the time window for each task
 The priority of each task
 The IT resources that are available and required to
perform these tasks
 Budget or costing for each of these tasks
 Source and means of funding
23
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Methods to determine relative physical size of
the application software to be developed
 Can be used as a guide for the allocation of
resources, estimates of time and cost
 Techniques:
 Lines of source code
 Function point analysis
 FPA feature points
 Cost budgets
 Software cost estimation
24
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Involves establishing the sequential relationship
among tasks
 The schedule can be graphically represented using:
 Gantt charts
 Program Evaluation Review Technique (PERT) diagram
 Critical path methodology
▪ A critical path if one whose sum of activity time is longer than that
for any other path through the network
▪ The critical path is found by working forward through the network
(forward-pass) and computing the earliest possible completion
time for each activity until the earliest possible completion time for
the total project is found
25
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC 26
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC 27
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC 28
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Involves automated techniques to handle
proposals and cost estimations, and to monitor,
predict and report on performance with
recommended action items
 Many of these techniques are provided as
Decision Support Systems (DSS) for planning and
controlling project resources
29
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 When closing a project, there may still be some
issues that need to be resolved, ownership of
which needs to be assigned
 The project sponsor should be satisfied that the
system produced is acceptable and ready for
delivery
 Custody of contracts may need to be assigned,
and documentation archived or passed on to
those who will need it
30
31
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 SDLC begins in of one or more of the following:
 A new opportunity relates to a new or existing business
process
 A problem that relates to an existing business process
 A new opportunity to take advantage of technology
 A problem with the current technology
 Benefits:
 All affected parties have common and clear objectives and
how to contribute to business support
 Conflicting key business drivers (e.g., cost vs. functionality)
and mutually dependent key business drivers can be
detected and resolved in early stages of an SDLC project
32
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Influence is significantly increased when there
are formal procedures and guidelines
 Can review all relevant areas and phases of the
systems development project and report
independently to management
 Can identify selected parts of the system and
become involved in the technical aspects
 Can evaluate the methods and techniques
applied through the development phases
33
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 the oldest and most widely traditional approach
used for developing business applications
 Based on a systematic, sequential approach to
software development.
34
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
Feasibility Study
Requirements Definition
Design
Development
Implementation
35
Post-Implementation
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Unanticipated events
 Difficulty in obtaining an explicit set of
requirements from the user
 Managing requirements and convincing the user
about the undue or unwarranted requirements in
the system functionality
 The necessity of user patience
 A changing business environment that alters or
changes the user’s requirements before they are
delivered
36
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC 37
Build Buy
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Concerned with analyzing the benefits and solutions
for the identified problem area
 Includes development of a business case, which
determines the strategic benefits of implementing
the system either in productivity gains or in future
cost avoidance
 Identifies and quantifies the cost savings of the new
system and estimates a payback schedule for the
cost incurred in implementing the system or shows
the projected return on investment (ROI)
38
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Concerned with identifying and specifying the
business requirements of the system chosen for
development during the feasibility study
 Requirements include descriptions of what a
system should do, how users will interact with a
system, conditions under which the system will
operate, and the information criteria the system
should meet
 This phase deals with the issues that are
sometimes called nonfunctional requirements
39
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Entity Relationship Diagrams (ERD)
 An ERD depicts a system’s data and how these data
interrelate
 An ERD can be used as a requirements analysis tool to
obtain an understanding of the data a system needs to
capture and manage
 An ERD can also be used later in the development
cycle as a design tool that helps document the actual
database schema that will be implemented
40
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Not a phase in the standard SDLC. However, if a decision was
reached to acquire rather than develop software, software
acquisition is the process that should occur after the
requirements definition phase
 Decision based on various factors such as the cost differential
between development and acquisition, availability of generic
software, and the time gap between development and
acquisition
 The project team needs to carefully examine and compare the
vendors’ responses to the request for proposal (RFP)
 It is likely that more than one product/vendor fits the
requirements with advantages and disadvantages with respect
to each other
 Once vendors are short listed, it can be beneficial for the
project team to talk to current users of each potential product
41
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Developing system flowcharts and entity
relationship models
 Determining the use of structured design techniques
 End of design phase
 Describing inputs and outputs
 Determining processing steps and computation rules
 Determining data file or database system file design
 Preparing program specifications
 Developing test plans for the various levels of testing
 Developing data conversion plans
42
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Coding and developing program and system-level
documents
 Debugging and testing the programs developed
 Developing programs to convert data from the
old system for use on the new system
 Creating user procedures to handle transition to
the new system
 Training selected users on the new system
 Ensure modifications are documented and
applied accurately
43
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Considerations
 Programming methods and techniques
 Online programming facilities (integrated
development environment)
 Programming languages
 Program debugging
 Testing
44
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Testing:
 Elements
▪ Test plan
▪ Conduct and report test
results
▪ Address outstanding issues
 Classifications
▪ Unit testing
▪ Interface or integration
testing
▪ System testing
▪ Final acceptance testing
 Other types of testing
▪ Alpha and beta testing
▪ Pilot testing
▪ White box testing
▪ Black box testing
▪ Function/validation testing
▪ Regression testing
▪ Parallel testing
▪ Sociability testing
▪ Automated application
testing
45
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 During the implementation phase, the actual
operation of the new information system is
established and tested
 Final user-acceptance testing is conducted in this
environment
 The system may also go through a certification
and accreditation process to assess the
effectiveness of the business application at
mitigating risks to an appropriate level
46
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Implementation planning
 Phase 1—Develop to-be support structures
 Phase 2—Establish support function
 End-user training
 Data conversion
 Refining migration scenario
 Fallback (rollback) scenario
 Changeover (go-live or cutover) techniques
 Parallel changeover
 Phased changeover
 Abrupt changeover
 Certification/accreditation
47
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Objectives:
 Assess the adequacy of the system
 Evaluate the projected cost benefits or ROI
 Develop recommendations that address the system’s
inadequacies and deficiencies
 Develop a plan for implementing the
recommendations
 Assess the development project process
 Should be performed jointly by the project
development team and appropriate end users
48
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 A growing number of organizations are shifting to
a fully integrated corporate solution, i.e., an ERP
solution
 This type of software implementation is much
larger than a regular software acquisition project
 ERP systems impact the way a corporation does
business, its entire control environment,
technological direction and internal resources
49
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Business risk relating to the likelihood that the
new system may not meet the users’ business
needs, requirements and expectations
 Potential risks that can occur when designing and
developing software systems:
 Within the project
 With suppliers
 Within the organization
 With the external environment
50
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Closely associated with the traditional, classic
SDLC approach
 Techniques provide a framework for representing
the data and process components of an
application using various graphical notations at
different levels of abstraction, until it reaches the
abstraction level that enables programmers to
code the system
51
52
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 E-commerce models:
 Business-to-consumer (B-to-C) relationships
 Business-to-business (B-to-B) relationships
 Business-to-employee (B-to-E) relationships
 Business-to-government (B-to-G) relationships
 Consumer-to-government (C-to-G) relationships
 Exchange-to-exchange (X-to-X) relationships
53
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 With increasing emphasis on integrating the web channel with
a business’ internal legacy systems and the systems of its
business partners, company systems now typically will run on
different platforms, running different software and with
different databases
 The challenge of integrating diverse technologies within and
beyond the business has increasingly lead companies to move
to component-based systems that utilize a middleware
infrastructure, based around an application server databases
play a key role in most e-commerce systems, maintaining data
for web site pages, accumulating customer information and
possibly storing click-stream data for analyzing web site usage
 Extensible Markup Language is also likely to form an important
part of an organization’s overall e-commerce architecture
54
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 E-commerce risks:
 Confidentiality
 Integrity
 Availability
 Authentication and non-repudiation
 Power shift to customers
 It is important to take into consideration the
importance of security issues that extend beyond
confidentiality objectives
55
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 An IS auditor should assess applicable use of:
 A set of security mechanisms and procedures that
constitute a security architecture for e-commerce
 Firewall mechanisms that are in place to mediate between
the public network and an organization’s private network
 A process whereby participants in an e-commerce
transaction can be identified uniquely and positively
 Digital signatures
 An infrastructure to manage and control public key pairs
and their corresponding certificates
 The procedures in place to control changes to an e-
commerce presence
 Logs of e-commerce applications
56
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 An IS auditor should assess applicable use of:
 The methods and procedures to recognize security
breaches when they occur
 The features in e-commerce applications
 The protections in place to ensure that data collected
about individuals are not disclosed without their consent
 The means to ensure confidentiality of data
communicated between customers and vendors
 The mechanisms to protect e-commerce’s presence and
their supporting private networks from computer viruses
57
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 An IS auditor should assess applicable use of:
 The features within the e-commerce architecture to keep
all components from failing
 A plan and procedure to continue e-commerce activities
when an extended outage of required resources for
normal processing
 A commonly understood set of practices and procedures
to define management’s intentions for the security of e-
commerce
 A shared responsibility for e-commerce security
 Communications from vendors to customers
 A regular program of security audit and assessment
58
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Benefits:
 Less paperwork
 Fewer errors during the exchange of information
 Improved information flow, database-to-database and
company-to-company
 No unnecessary rekeying of data
 Fewer delays in communication
 Improved invoicing and payment processes
59
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Moving data in a batch transmission process through EDI
process involves 3 functions within each partner’s system:
 Communications handler
 EDI interface
▪ EDI translator
▪ Application interface
 Application system
 General requirements:
 Communications software, translation software and access to
standards
 To build a map, an EDI standard appropriate for the kind of EDI data
to be transmitted is selected
 Final step is to write a partner profile that tells the system where to
send each transaction and how to handle errors and exceptions
60
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Web-based EDI has come into prominence due
to:
 Internet-through-Internet service providers offering
generic network access for all computers connected to
the Internet
 Its ability to attract new partners via web-based sites
to exchange information
 New security products available to address issues of
confidentiality, authentication, data integrity and non-
repudiation of origin and return
 Improvements in the x.12 EDI formatted standard
61
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 To protect EDI transmissions, the EDI process should include:
 Standards set to indicate the message format and content are valid
 Controls to ensure standard transmissions are properly converted for
the application software by the translation application
 Procedures to determine messages are only from authorized parties
 Direct or dedicated transmission channels among the parties
 Data should be encrypted using algorithms agreed to by the parties
involved
 The EDI process needs the ability to detect and deal with
transactions that do not conform to the standard format or are
from/to unauthorized parties
 The critical nature of many EDI transactions requires that there
be positive assurances that the transmissions were complete
 Organizations desiring to exchange transactions using EDI are
establishing a new business relationship
62
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 The controls for receipt of inbound transactions are:
 Use appropriate encryption techniques when using public
Internet infrastructures for communication
 Perform edit checks
 Perform additional computerized checking
 Log each inbound transaction upon receipt
 Use control totals on receipt of transactions
 Segment count totals built into the transaction set trailer by the
sender
 Control techniques in the processing of individual transactions
 Ensure the exchange of control totals of transactions sent and
received between trading partners at predefined intervals
63
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 An IS auditor must evaluate EDI to ensure that all
inbound EDI transactions are received and translated
accurately, passed to an application and processed
only once
 To accomplish this, an IS auditor must review:
 Internet encryption process
 Edit checks
 Additional computerized checking
 Batch control totals
 The validity of the sender against trading partner details
64
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Linking the business processes between the related
entities such as the buyer and the seller.
 SCM is all about managing the flow of goods, services and
information among suppliers, manufacturers, wholesalers,
distributors, stores, consumers and end users
 EDI, which is extensively used in SCM, is not a new
technology but the cost associated with it was not
affordable to many until recent years. Now, availability of
inexpensive, web-based SCM solutions has opened this
area for everybody. However, there is a need for significant
change in the business model
65
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 2 Types:
 Online to a central computer owned by a financial
institution or a cards administrator
 Use local processors/microcomputers owned by a business
to hold the transactions for a specified period after which
they are sent to the main computer for batch processing.
 IS auditor should determine whether any credit
cardholder information is stored on the local POS
system such as credit card numbers, personal
identification numbers (PINs), etc.
 Any such information, if stored on the POS system,
should be encrypted using strong encryption
methods.
66
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 E-mail system components:
 Mail servers
 Clients
67
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Security issues:
 Flaws in the configuration of mail server applications
 Denial-of-service (DoS)
 Sensitive information transmitted unencrypted between
mail server and e-mail client may be intercepted
 Information within the e-mail may be altered
 Viruses and other types of malicious code may be
distributed throughout an organization
 Users may send inappropriate, proprietary or other
sensitive information via e-mail
68
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Digital signatures are a good method of securing
e-mail transmissions in that:
 The signature cannot be forged
 The signature is authentic and encrypted
 The signature cannot be reused
 The signed document cannot be altered
69
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Banks should have a risk management process to
enable them to identify, measure, monitor and
control their technology risk exposure
 Risk management of new technologies has three
essential elements:
 Risk management is the responsibility of the board of
directors and senior management
 Implementing technology is the responsibility of IT senior
management members
 Measuring and monitoring risk is the responsibility of
members of operational management
70
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 E-banking presents a number of risk management challenges:
 The speed of change relating to technological and service innovation
 Transactional e-banking web sites and associated retail and
wholesale business applications are typically integrated with legacy
computer systems
 e-Banking increases banks’ dependence on information technology
 The Internet is ubiquitous and global by nature
 Effective risk management controls for e-banking include 14
controls divided among three categories:
 Board and management oversight
 Security controls
 Legal and reputational risk management
71
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Advantages of e-finance to consumers include:
 Lower costs
 Increased breadth and quality
 Widening access to financial services
 A-synchrony (time-decoupled)
 A-topy (location-decoupled)
72
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 2 Types of parties in all payment systems:
 Issuer is an entity that operates the payment service. An
issuer holds the items that the payments represent (e.g.,
cash held in regular bank accounts).
 User of the payment service perform two main functions:
▪ making payments (payer)
▪ receiving payments (payee)
 3 models:
 Electronic Money Model: emulate physical cash.
 Electronic Checks Model: as real-world checks
 Electronic Transfer Model
73
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Electronic funds transfer (EFT) is the exchange of
money via telecommunications without currency
actually changing hands
 Allows parties to move money from one account
to another, replacing traditional check writing
and cash collection procedures
 Usually function via an internal bank transfer
from one party’s account to another or via a
clearinghouse network
74
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Security in an EFT environment ensures that:
 All of the equipment and communication linkages are
tested
 Each party uses security procedures that are reasonably
sufficient
 There are guidelines set for the receipt of data
 Upon receipt of data, the receiving party will immediately
transmit an acknowledgment or notification
 Data encryption standards are set
 Standards for unintelligible transmissions are set
 Regulatory requirements are explicitly stated
75
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Bill of materials (BOM)
 BOM processing (BOMP)
 Manufacturing resources planning (MRP)
 Computer-assisted design (CAD)
 Computer-integrated (or computer-intensive)
manufacturing (CIM)
 Manufacturing accounting and production (MAP)
 Manufacturing Resource Planning (MRP)
76
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Provides details regarding all business
relationships a customer maintains with an
organization. (as of CRM)
 Integration aids in customer analysis and
marketing.
 Integrated banking customer file.
 The file includes data regarding the customer loans,
checking accounts, savings accounts and any
certificates of deposit
77
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Electronic devices and techniques to aid in the
conduct of business:
 Word processors
 Automated spreadsheets
 e-mail
 LANs link local offices and computers to facilitate
the use of these technologies.
 May contain sensitive data; and so, access
controls and security are frequently weak or
nonexistent.
78
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Recommended internal control guidelines for ATMs
include:
 Written policies and procedures covering personnel,
security controls, operations, settlement, balancing, etc.
 Procedures for PIN issuance and protection during storage
 Procedures for the security of PINs during delivery
 Controls over plastic card procurement
 Controls and audit trails of the transactions that have been
made in the ATM
79
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Cooperative processing systems are divided into
segments so different parts may run on different
independent computer devices. (Parallel Systems)
 The system divides the problem into units that are
processed in a number of environments and
communicates the results among them to produce a
solution to the total problem.
 The system must be designed to minimize and
maintain the integrity of communication between
the component parts and to use the most
appropriate processor for each of the problem units
80
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 A phone technology that allows a computer to detect
voice and touch tones using a normal phone call.
 The caller uses the telephone keypad to select from preset
menu choices provided by the IYR to respond with pre-
recorded or dynamically generated audio to further direct
callers or route the caller to a customer service
representative.
 Used to control almost any function where the interface
can be broken down into a series of simple menu choices.
 Generally scale well to handle large call volumes. Controls
over such systems must be in place to prevent
unauthorized individuals from entering system level
commands that may permit them to change or rerecord
menu options.
81
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Perform three basic accounting functions:
 Accounts payable processing-Recording transactions in the
accounts payable records
 Goods received processing-Recording details of goods
received, but not yet invoiced
 Order processing-Recording goods ordered, but not yet
received
 Computer may be involved in each of these
activities, and the extent to which they are
computerized determines the complexity of the
purchase accounting system.
82
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Stores, retrieves and processes graphic data, such as
pictures, charts and graphs, instead of or in addition
to text data
 Examples of potential benefits are:
 Item processing (e.g., signature storage and retrieval)
 Immediate retrieval via a secure optical storage medium
 Increased productivity
 Improved control over paper files
 Reduced deterioration due to handling
 Enhanced disaster recovery procedure
83
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 IS auditors should be aware of when reviewing
an institution's controls over imaging systems
include:
 Planning
 Audit
 Redesign of workflow
 Scanning devices
 Software Security
 Training
84
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Artificial intelligence is the study and application
of the principles by which:
 Knowledge is acquired and used
 Goals are generated and achieved
 Information is communicated
 Collaboration is achieved
 Concepts are formed
 Languages are developed
85
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Key to an expert system is the knowledge base
(KB), which contains specific information or fact
patterns associated with a particular subject
matter and the rules for interpreting these facts
 The information in the KB can be expressed in
several ways:
 Decision trees
 Rules
 Semantic nets
86
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC 87
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 An IS auditor should:
 Understand the purpose and functionality of the
system
 Assess the system’s significance to the organization
 Review the adherence of the system to policies and
procedures
 Review procedures for updating information in the KB
 Review security access over the system
88
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Business intelligence (BI) is a broad field of IT that
encompasses the collection and dissemination of
information to assist decision making and assess
organizational performance
 Some typical areas in which BI is applied include:
 Process cost, efficiency and quality
 Customer satisfaction with product and service offerings
 Customer profitability
 Staff and business unit achievement of KPIs
 Risk management
89
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 An optimized enterprise data flow architecture consists of:
 Presentation/desktop access layer
 Data source layer
 Core data warehouse
 Data mart layer
 Data staging and quality layer
 Data access layer
 Data preparation layer
 Metadata repository layer
 Warehouse management layer
 Application messaging layer
 Internet/intranet layer
90
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Interactive system that provides the user with easy access
to decision models and data from a wide range of sources,
to support semi-structured decision-making tasks typically
for business purposes
 A principle of DSS design is to concentrate less on
efficiency and more on effectiveness
 A DSS is often developed with a specific decision or well-
defined class of decisions to solve
 Frameworks are generalizations about a field that help put
many specific cases and ideas into perspective
 G. Gorry-M.S. Morton framework
 Sprague-Carson framework
91
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Prototyping is the most popular approach to DSS
design and development
 It is difficult to implement a DSS because of its
discretionary nature
92
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Developers should be prepared for eight
implementation risk factors:
 Nonexistent or unwilling users
 Multiple users or implementers
 Disappearing users, implementers or maintainers
 Inability to specify purpose or usage patterns in advance
 Inability to predict and cushion impact on all parties
 Lack or loss of support
 Lack of experience with similar systems
 Technical problems and cost-effectiveness issues
93
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 The DSS designer and user should use broad
evaluation criteria, including:
 Traditional cost-benefit analysis
 Procedural changes, more alternatives examined, less
time consumer in making the decision
 Evidence of improvement in decision making
 Changes in the decision process
94
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 The emerging customer-driven business trend is to
be focused on the wants and needs of the
customers.
 With the customer's expectations constantly
increasing, these objectives are becoming more
difficult to achieve.
 This emphasizes the importance of focusing on
information relating to transaction data,
preferences, purchase patterns, status, contact
history, demographic information and service trends
of customers rather than on products.
95
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Operational CRM: maximizing the utility of the
customer's service experience while also
capturing useful data about the customer
interaction
 Analytical CRM: analyze information captured by
the organization about its customers and their
interactions with the organization into
information that allows greater value to be
obtained from the customer base
96
97
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Incremental or progressive development
 Iterative development
 Evolutionary development
 Spiral development
 Agile development
98
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Agile development refers to a family of similar
development processes that espouse a
nontraditional way of developing complex systems.
 Agile development processes have a number of
common characteristics, including:
 The use of small, time-boxed subprojects or iterations
 Replanning the project at the end of each iteration
 Relatively greater reliance on tacit knowledge
 Heavy influence on mechanisms to effectively disseminate
tacit knowledge and promote teamwork
 A change in the role of the project manager
99
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 The process of creating a system through
controlled trial and error procedures to reduce
the level of risks in developing the system
 Reduces the time to deploy systems primarily by
using faster development tools such as fourth-
generation techniques
 Potential risk is that the finished system will have
poor controls
 Change control often becomes more complicated
100
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 A methodology that enables organizations to
develop strategically important systems quickly,
while reducing development costs and maintaining
quality
 Achieved through the use of:
 Small, well-trained development teams
 Evolutionary prototypes
 Integrated power tools
 A central repository
 Interactive requirements and design workshops
 Rigid limits on development time frames
101
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 A method for representing software
requirements by focusing on data and their
structure
 Major advantage of this approach is that it
eliminates data transformation errors such as
porting, conversion, transcription and
transposition
102
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 The process of solution specification and modeling
where data and procedures can be grouped into an
entity known as an object
 OOSD is a programming technique and is not a
software development methodology itself
 The major advantages of OOSD are:
 The ability to manage an unrestricted variety of data types
 Provision of a means to model complex relationships
 The capacity to meet the demands of a changing
environment
103
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Process of assembling applications from cooperating
packages of executable software that make their
services available through defined interfaces
 Components play a significant role in web-based
applications
 Basic types of components are:
 In-process client components
 Stand-alone client components
 Stand-alone server components
 In-process server components
104
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Features:
 Reduces development time
 Improves quality
 Allows developers to focus more strongly on business
functionality
 Promotes modularity
 Simplifies reuse
 Reduces development cost
 Supports multiple development environments
105
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Designed to achieve easier and more effective
integration of code modules within and between
enterprises
 Different from traditional third- or fourth-
generation program developments in many ways:
 Languages and programming techniques used
 Methodologies used to control development work
 The way users test and approve development work
106
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
Reengineering
 Process of updating an
existing system by
extracting and reusing
design and program
components process is used
to support major changes in
the way an organization
operates. A number of tools
are now available to support
this process
Reverse Engineering
 Taking apart an application, a
software application or a
product to see how it
functions, in order to develop
a similar system
 Advantages:
 Faster development and reduced
SDLC duration
 Creation of an improved system
using the reverse-engineered
application drawbacks
107
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 System development tools and productivity aids
include code generators, Computer-Aided
Software Engineering (CASE) applications and
fourth-generation languages (4GL).
108
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Code generators are tools, often incorporated
with CASE products, that generate program code
based on parameters defined by a systems
analyst or on data/entity flow diagrams
developed by the design module of a CASE
product.
 These products allow most developers to
implement software programs with efficiency.
The IS auditor should be aware of nontraditional
origins of source code
109
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC 110
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 CASE is the use of automated tools to aid in the
software development process
 May include the application of software tools for
software requirements analysis, software design,
code production, testing, document generation and
other software development activities
 Three categories:
 Upper - support analysis and design phases
 Lower - support coding phase
 Integrated - also known as I-CASE support analysis, design
and coding phases
111
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 IS auditor considerations:
 CASE tools do not ensure that the design, programs
and system are correct or that they fully meet the
needs of the organization
 CASE tools should complement and fit into the
application development methodology
 The integrity of data moved between CASE products
needs to be monitored and controlled
 Changes to the application should be reflected in
stored CASE product data
112
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Common characteristics of 4GLs include:
 Nonprocedural language
 Environmental independence (portability)
 Software facilities
 Programmer workbench concepts
 Simple language subsets
 4GLs are classified as:
 Query and report generators
 Embedded database 4GLs
 Relational database 4GLs
 Application generators
113
114
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 The physical architecture analysis, the definition of a new one
and the necessary road map to move from one to the other are
critical tasks for an IT department
 Goals:
 To successfully analyze the existing architecture
 To design a new architecture
 To write the functional requirements of this new architecture
 To develop a proof of concept
 Physical implementation of the required technical
infrastructure to set up the future environment will be planned
next
 Task will cover procurement activities such as contracting
partners, setting up the SLAs, and developing installation plans
and installation test plans
115
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC 116
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Phased approach to ensure the quality of results
 Communication processes should be set up to
other projects
 Through these different phases the components
are fit together, and a clear understanding of the
available and contactable vendors is established
by using the selection process during the
procurement phase and beyond
117
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC 118
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC 119
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC 120
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC 121
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC 122
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 To avoid delays, the appropriate skilled staff must
attend workshops and participate for the entire
project duration.
 The documentation needed for carrying out the
work needs to be ready at project initiation.
 Decision makers must be involved at all steps to
ensure all necessary decisions can be made quickly.
 Part one of the project (Analysis of Physical
Architecture) must be completed and the needed
infrastructure decisions must be made.
123
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 For acquiring a system, the Invitation To Tender
(ITT) should include the following:
 Organizational descriptions
 Information processing requirements
 Hardware requirements
 System software applications
 Support requirements
 Adaptability requirements
 Constraints
 Conversion requirements
124
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Acquisition steps:
 Testimonials or visits with other users
 Provisions for competitive bidding
 Analysis of bids against requirements
 Comparison of bids against each other
 Analysis of the vendor’s financial condition
 Analysis of the vendor’s capability to provide maintenance
 Review of delivery schedules against requirements
 Analysis of security and control facilities
 Review and negotiation of price
 Review of contract terms
125
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 When selecting new system software, the following
technical issues should be considered:
 Business, functional, technical needs and specifications
 Cost and benefits
 Obsolescence
 Compatibility with existing systems
 Security
 Demands on existing staff
 Training and hiring requirements
 Future growth needs
 Impact on system and network performance
126
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 System software implementation involves
identifying features, configuration options and
controls for standard configurations to apply
across the organization.
 Additionally, implementation involves testing the
software in a nonproduction environment and
obtaining some form of certification and
accreditation to place the approved operating
system software into production.
127
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 All test results should be documented, reviewed
and approved by technically-qualified subject
matter experts prior to production use
 Change control procedures are designed to
ensure that changes are authorized and do not
disrupt processing
128
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 The process of managing change to application
systems while maintaining the integrity of both the
production source and executable code
 Once a system is moved into production, it seldom
remains static.
 Change is expected in all systems regardless of
whether they are vendor-supplied or internally
developed
 To control the ongoing maintenance of the system, a
standard process for performing and recording
changes is necessary.
129
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Change management process begins with
authorizing changes to occur
 Requests initiated from end users, operational staff
and system development/maintenance staff
 Change requests should be in a format that ensures
all changes are considered for action and that allows
the system management staff to easily track the
status of the request
 All requests for changes should be maintained by the
system maintenance staff as part of the system’s
permanent documentation
130
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Deploying changes
 Documentation
 Testing changed programs
 Auditing program changes
 Emergency changes
 Deploying changes back into production
 Change exposures (unauthorized changes)
131
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Maintenance requests must be formally
documented and approved by a change control
group
 Careful control is exercised over each stage of the
maintenance process via checkpoints, reviews
and sign-off procedures
 From an audit perspective, provides evidence of
management’s commitment to careful control
 Involves procedures throughout the software life
cycle
132
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Tasks:
 Develop the configuration management plan
 Baseline the code and associated documents
 Analyze and report on the results of configuration
control
 Develop the reports that provide configuration status
 Develop release procedures
 Perform configuration control activities
 Update the configuration status accounting database
133
134
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Business processes require improvements, which
are accomplished with practices and techniques
addressed in the following sections
135
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC 136
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 The steps in a successful BPR are:
 Define the areas to be reviewed
 Develop a project plan
 Gain an understanding of the process under review
 Redesign and streamline the process
 Implement and monitor the new process
 Establish a continuous improvement process
 A successful BPR/process change project requires the project
team to perform the following for the existing processes:
▪ Process decomposition to the lowest level required for effectively assessing a
business process
▪ Identification of customers, process-based managers or process owners
responsible for beginning to end processes
▪ Documentation of the elementary process-related profile information
137
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 BPR methods and techniques
 Benchmarking process
▪ Plan
▪ Research
▪ Observe
▪ Analyze
▪ Adapt
▪ Improve
138
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 ISO 9126 is an international standard to assess
the quality of software products.
 Attributes:
 Functionality
 Reliability
 Usability
 Efficiency
 Maintainability
 Portability
139
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Initial-Characterized as ad hoc, where success depends solely on individual
effort
 Repeatable-Disciplined management processes are established to plan and
track cost, schedule and functionality, and provide oversight over a software
project, and create a learning environment where successfully defined and
applied processes can be repeated successfully on other projects of similar size
and scope.
 Defined-Lessons learned from the prior phase provide the impetus to develop
a standard software process across the organization. This includes both
management and software engineering activities, documented, standardized
and integrated into an institutionalized standard software process applicable to
all software development projects.
 Managed-Once processes are well-defined and applied, the organization has
reached a point where it can develop and apply quantitative managed control
over its software development processes.
 Optimizing-When an organization has attained the ability to quantitatively and
successfully control its software projects, it is in a position to use continuous
process improvement strategies in applying innovative solutions and state-of-
the-art technologies to its software processes.
140
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC 141
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Also known as Software Process Improvement and Capability
Determination (SPICE), is based on CMM and Bootstrap
 SPICE, like CMMI, serves as a baseline for process improvement and
process benchmarking, and leverages the adoption of best practices.
 Reference models for SPICE include:
 Software life cycle processes-Through ISO/IEC 12207 AMD1I2
 System life cycle processes-Through ISO/IEC 15288
 Human-centered life cycle processes-Through ISO 18529
 Component-based development processes-Through the OOSPICE project
 IT service management processes-Through a SPICE user group initiative
 Quality management system processes-Through SPICE for 9000 (S9K)
 Automotive embedded software--Through Automotive SPICE (an initiative
of The Procurement Forum and The SPICE User Group with the major
European car manufacturers)
 Medical device software--Through the Medi SPICE initiative
142
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC 143
144
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Controls over input, processing and output
functions.
 To ensure that:
 Only complete, accurate and valid data are entered
and updated in a computer system
 Processing accomplishes the correct task
 Processing results meet expectations
 Data are maintained
145
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 IS auditor’s tasks:
 Identifying the significant application components and
the flow of transactions through the system
 Identifying the application control strengths
 Testing the controls to ensure their functionality and
effectiveness
 Evaluating the control environment
 Considering the operational aspects of the application
to ensure its efficiency and effectiveness
146
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Input authorization
 Verifies that all transactions have been authorized and
approved by management
 Types:
 Signatures on batch forms or source documents
 Online access controls
 Unique passwords
 Terminal or client workstation identification
 Source documents
147
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Batch controls and balancing
 Batch controls group input transactions to provide control
totals
 Types:
 Total monetary amount
 Total items
 Total documents
 Hash totals
 Performed through manual or automated reconciliation
 Types of batch balancing include:
 Batch registers
 Control accounts
 Computer agreement
148
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Error reporting and handling
 Input processing requires that controls be identified to
verify that data are accepted into the system correctly
and that input errors are recognized and corrected
 Input error handling can be processed by:
 Rejecting only transactions with errors
 Rejecting the whole batch of transactions
 Holding the batch in suspense
 Accepting the batch and flagging error transactions
149
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Error reporting and handling
 Input control techniques include:
 Transaction log
 Reconciliation of data
 Documentation
 Error correction procedures
 Anticipation
 Transmittal log
 Cancellation of source documents
150
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Data validation and editing procedures
 Procedures should be established to ensure that
input data are validated and edited as close to
the time and point of origination as possible
 Data validation identifies data errors, incomplete
or missing data and inconsistencies among
related data items
151
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Processing controls
 Ensure the completeness and accuracy of accumulated
data
 The following techniques can be used:
 Manual recalculations
 Editing
 Run-to-run totals
 Programmed controls
 Reasonableness verification of calculated amounts
 Limit checks on calculated amounts
 Reconciliation of file totals
 Exception reports
152
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Data file control procedures
 File controls should ensure that only authorized
processing occurs to stored data
 Data files generally fall into four categories:
 System control parameters
 Standing data
 Master data/balance data
 Transaction files
153
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Output controls provide assurance that the data
delivered to users will be presented, formatted and
delivered in a consistent and secure manner
 Output controls include:
▪ Logging and storage of negotiable, sensitive and critical forms in a
secure place
▪ Computer generation of negotiable instruments, forms and
signatures
▪ Report distribution
▪ Balancing and reconciling
▪ Output error handling
▪ Output report retention
▪ Verification of receipt of reports
154
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Specific matters to consider in business process
control assurance are:
 Process maps
 Process controls
 Assessing business risks within the process
 Benchmarking with best practices
 Roles and responsibilities
 Activities and tasks
 Data restrictions
155
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 A transaction flowchart provides information
regarding key processing controls. Points where
transactions are entered, processed and posted
should be reviewed for control weaknesses
156
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 The quality of internal
controls
 Economic conditions
 Recent accounting system
changes
 Time elapsed since last
audit
 Complexity of operations
 Changes in
operations/environment
 Recent changes in key
positions
 Time in existence
 Competitive environment
 Assets at risk
 Prior audit results
 Staff turnover
 Transaction volume
 Regulatory agency impact
 Monetary volume
 Sensitivity of transactions
 Impact of application
failure
157
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Separation of duties
 Authorization of input
 Balancing
 Error control and correction
 Distribution of reports
 Review and testing of access
158
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 A set of substantive tests examine the accuracy,
completeness, consistency and authorization of
data presently held in a system
 Indicate failure in input or processing controls
 Two common types of data integrity tests are:
 Relational integrity tests
 Referential integrity tests
159
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 The ACID principle:
 Atomicity
 Consistency
 Isolation
 Durability
160
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC 161
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC 162
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC 163
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC 164
165
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Determine the main components, objectives and
user requirements of the system
 Determine and rank the major risks to, and
exposures of, the system
 Identify controls to mitigate the risks to, and
exposures of, the system
 Monitor the system development process
 Participate in post-implementation reviews
 Test system maintenance procedures
 Evaluate the system maintenance process
166
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Levels of oversight by project committee
 Risk management methods within the project
 Issue management
 Cost management
 Processes for planning and dependency
management
 Reporting processes to senior management
 Change control processes
 Stakeholder management involvement
 Sign off process
167
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Review the documentation produced in this
phase for reasonableness
 Determine whether all cost justifications/benefits
are verifiable
 Identify and determine the criticality of the need
 Determine if a solution can be achieved with
systems already in place
 Determine the reasonableness of the chosen
solution
168
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Obtain the detailed requirements definition document
 Identify the key team members on the project team
 Verify that project initiation and cost have received proper
management approval
 Review the conceptual design specifications to ensure they
address the needs of the user
 Review the conceptual design to ensure control
specifications have been defined
 Determine whether a reasonable number of vendors
received a proposal covering the project scope and user
requirements
 Review the UAT specification
 Determine whether the application is a candidate for an
embedded audit routine
169
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Analyze the documentation from the feasibility
study
 Review the RFP
 Determine whether the selected vendor is
supported by RFP documentation
 Attend agenda-based presentations and
conference room pilots
 Review the vendor contract prior to its signing
 Ensure the contract is reviewed by legal counsel
before it is signed
170
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Review the system flowcharts for adherence to the general
design
 Review the input, processing and out controls designed
into the system for appropriateness
 Interview the key users of the system
 Assess the adequacy of audit trails
 Verify the integrity of key calculations and processes
 Verify that the system can identify and process erroneous
data correctly
 Review the quality assurance results of the programs
developed
 Verify that all recommended corrections to programming
errors were made
171
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Review the test plan for completeness
 Reconcile control totals and converted data
 Review error reports for their precision in recognizing
erroneous data and for resolution of errors
 Verify cyclical processing for correctness
 Interview end users of the system for their understanding
of new methods, procedures and operating instructions
 Review unit and system test plans to determine whether
tests for internal controls are planned and performed
 Review parallel testing results for accuracy
172
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 An IS auditor should verify that appropriate sign-offs
have been obtained prior to implementation, then:
 Review the programmed procedures used for scheduling
and running the system along with system parameters
used in executing the production schedule
 Review all system documentation to ensure its
completeness and that all recent updates from the testing
phase have been incorporated
 Verify all data conversion to ensure that they are correct
and complete before implementing the system in
production
173
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Determine if the system’s objectives and
requirements were achieved
 Determine if the cost benefits identified in the
feasibility study are being measured, analyzed and
accurately reported to management
 Review program change requests performed to
assess the type of changes required of the system
 Review controls built into the system
 Review operators’ error logs
 Review input and output control balances and
reports
174
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Identifying the significant application
components and the flow of transactions
through the system
 Identifying the application control strengths and
evaluating the impact of the control weaknesses
to develop a testing strategy by analyzing the
accumulated information
 Reviewing application system documentation to
provide an understanding of the functionality of
the application
175
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 The use and existence of a methodology for authorizing,
prioritizing and tracking system change requests from the
user
 Whether emergency change procedures are addressed in
the operations manuals
 Whether change control is a formal procedure for the user
and the development groups
 Whether the change control log ensures all changes shown
were resolved
 The user’s satisfaction with the turnaround of change
requests
 The adequacy of the security access restrictions over
production source and executable modules
176
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 For a selection of changes on the change control log:
 Determine whether changes to requirements resulted in
appropriate change-development documents
 Determine whether changes were made as documented
 Determine whether current documentation reflects the
changed environment
 Evaluate the adequacy of the procedures in place for
testing system changes
 Review evidence to ensure that procedures are carried out
as prescribed by organizational standards
 Review the procedures established for ensuring executable
and source code integrity
177
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
 Provides a method for an IS auditor to collect
evidence on system reliability while normal
processing takes place
 Important IS audit tools, particularly when used
in a time-sharing environment that process a
large number of transactions with a scarce paper
trail
178
Copyright@2013 Al-Taysir for Information Systems Security Consulting LLC
Systems Control Audit Review File And Embedded Audit
Modules (SCARF/EAM)
Snapshots
Audit Hooks
IntegratedTest Facility (ITF)
Continuous And Intermittent Simulation (CIS)
179
Q & A
180

Cisa 2013 ch3

  • 1.
  • 2.
  • 3.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Introduction  Project Management  Application Development  Business Information Systems  Alternatives for Project Organization  Infrastructure Development/Acquisition Practices  Process Improvement  Application Controls  Auditing Systems Development, Acquisition and Maintenance  Summary 3
  • 4.
  • 5.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Provide assurance that the practices for the acquisition, development, testing, and implementation of information systems meet the organization’s strategies and objectives 5
  • 6.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Evaluate the business case for the proposed investments in information systems acquisition, development, maintenance and subsequent retirement to determine whether it meets business objectives.  Evaluate the project management practices and controls to determine whether business requirements are achieved in a cost-effective manner while managing risks to the organization.  Conduct reviews to determine whether a project is progressing in accordance with project plans, is adequately supported by documentation and status reporting is accurate.  Evaluate controls for information systems during the requirements, acquisition, development and testing phases for compliance with the organization's policies, standards, procedures and applicable external requirements.  Evaluate the readiness of information systems for implementation and migration into production to determine whether project deliverables, controls and organization's requirements are met.  Conduct post-implementation reviews of systems to determine whether project deliverables, controls and organization's requirements are met. 6
  • 7.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Knowledge of benefits realization practices, (e.g., feasibility studies, business cases, total cost of ownership [TCO], ROI)  Knowledge of project governance mechanisms (e.g., steering committee, project oversight board, project management office)  Knowledge of project management control frameworks, practices and tools  Knowledge of risk management practices applied to projects  Knowledge of IT architecture related to data, applications and technology (e.g., distributed applications, web-based applications, web services, n-tier applications)  Knowledge of acquisition practices (e.g., evaluation of vendors, vendor management, escrow)  Knowledge of requirements analysis and management practices (e.g., requirements verification, traceability, gap analysis, vulnerability management, security requirements)  Knowledge of project success criteria and risks 7
  • 8.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Knowledge of control objectives and techniques that ensure the completeness, accuracy, validity and authorization of transactions and data  Knowledge of system development methodologies and tools including their strengths and weaknesses (e.g., agile development practices, prototyping, rapid application development [RAD], object-oriented design techniques)  Knowledge of testing methodologies and practices related to information systems development  Knowledge of configuration and release management relating to the development of information systems  Knowledge of system migration and infrastructure deployment practices and data conversion tools, techniques and procedures.  Knowledge of post-implementation review objectives and practices (e.g., project closure, control implementation, benefits realization, performance measurement) 8
  • 9.
  • 10.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC 10
  • 11.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  A program is a set of projects and time-bound tasks that are closely linked together through common objectives, a common budget, intertwined schedules and strategies  Programs have a limited time frame (start and end date) and organizational boundaries  Methodology and processes in program management are similar to those in project management and run parallel to each other  To formally start a program, some form of written assignment from the program owner to the program manager/team is necessary 11
  • 12.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Objectives:  Optimization of the results of the project portfolio  Prioritizing and scheduling projects  Resource coordination (internal and external)  Knowledge transfer throughout the projects 12
  • 13.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Provides information required to decide whether a project should proceed  Initial business case normally derives from a feasibility study as part of project planning  Should be of sufficient detail to describe the justification for setting up and continuing a project 13
  • 14.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Describing benefits management or benefits realization  Assigning a measure and target  Establishing a tracking/measuring regime  Documenting the assumption  Establishing key responsibilities for realization  Validating the benefits predicted in the business  Planning the benefit that is to be realize 14
  • 15.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  IS projects may be initiated from any part of an organization  A project is always a time-bound effort  Project management should be a business process of a project-oriented organization  The complexity of project management requires a careful and explicit design of the project management process 15
  • 16.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Project context:  Time context  Social context.  Considerations:  Importance of the project in the organization  Connection between the organization’s strategy and the project  Relationship between the project and other projects  Connection between the project to the underlying business case 16
  • 17.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC Influence Project Organization Pure Project Organization Matrix Project Organization 17
  • 18.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC One-on-One Meetings Kick-off Meetings Project Start Workshops A Combination OfTheThree 18
  • 19.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  SMART: Specific, Measurable, Achievable, Relevant and Time-bound  Object Breakdown Structure (OBS): commonly accepted approach to define project objectives  Work Breakdown Structure (WBS): designed after the OBS has been compiled, 19
  • 20.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC Groups  Senior management  User management  Project steering committee  Systems development management  Systems development project team  User project team  Quality assurance Individuals  Project sponsor  Project manager  Security officer 20
  • 21.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC 21
  • 22.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC 22 Project Cost and Resources Time (Duration)Deliverables
  • 23.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  The project manager needs to determine:  The various tasks that need to be performed to produce the expected business application system  The sequence or the order in which these tasks need to be performed  The duration or the time window for each task  The priority of each task  The IT resources that are available and required to perform these tasks  Budget or costing for each of these tasks  Source and means of funding 23
  • 24.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Methods to determine relative physical size of the application software to be developed  Can be used as a guide for the allocation of resources, estimates of time and cost  Techniques:  Lines of source code  Function point analysis  FPA feature points  Cost budgets  Software cost estimation 24
  • 25.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Involves establishing the sequential relationship among tasks  The schedule can be graphically represented using:  Gantt charts  Program Evaluation Review Technique (PERT) diagram  Critical path methodology ▪ A critical path if one whose sum of activity time is longer than that for any other path through the network ▪ The critical path is found by working forward through the network (forward-pass) and computing the earliest possible completion time for each activity until the earliest possible completion time for the total project is found 25
  • 26.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC 26
  • 27.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC 27
  • 28.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC 28
  • 29.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Involves automated techniques to handle proposals and cost estimations, and to monitor, predict and report on performance with recommended action items  Many of these techniques are provided as Decision Support Systems (DSS) for planning and controlling project resources 29
  • 30.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  When closing a project, there may still be some issues that need to be resolved, ownership of which needs to be assigned  The project sponsor should be satisfied that the system produced is acceptable and ready for delivery  Custody of contracts may need to be assigned, and documentation archived or passed on to those who will need it 30
  • 31.
  • 32.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  SDLC begins in of one or more of the following:  A new opportunity relates to a new or existing business process  A problem that relates to an existing business process  A new opportunity to take advantage of technology  A problem with the current technology  Benefits:  All affected parties have common and clear objectives and how to contribute to business support  Conflicting key business drivers (e.g., cost vs. functionality) and mutually dependent key business drivers can be detected and resolved in early stages of an SDLC project 32
  • 33.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Influence is significantly increased when there are formal procedures and guidelines  Can review all relevant areas and phases of the systems development project and report independently to management  Can identify selected parts of the system and become involved in the technical aspects  Can evaluate the methods and techniques applied through the development phases 33
  • 34.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  the oldest and most widely traditional approach used for developing business applications  Based on a systematic, sequential approach to software development. 34
  • 35.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC Feasibility Study Requirements Definition Design Development Implementation 35 Post-Implementation
  • 36.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Unanticipated events  Difficulty in obtaining an explicit set of requirements from the user  Managing requirements and convincing the user about the undue or unwarranted requirements in the system functionality  The necessity of user patience  A changing business environment that alters or changes the user’s requirements before they are delivered 36
  • 37.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC 37 Build Buy
  • 38.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Concerned with analyzing the benefits and solutions for the identified problem area  Includes development of a business case, which determines the strategic benefits of implementing the system either in productivity gains or in future cost avoidance  Identifies and quantifies the cost savings of the new system and estimates a payback schedule for the cost incurred in implementing the system or shows the projected return on investment (ROI) 38
  • 39.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Concerned with identifying and specifying the business requirements of the system chosen for development during the feasibility study  Requirements include descriptions of what a system should do, how users will interact with a system, conditions under which the system will operate, and the information criteria the system should meet  This phase deals with the issues that are sometimes called nonfunctional requirements 39
  • 40.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Entity Relationship Diagrams (ERD)  An ERD depicts a system’s data and how these data interrelate  An ERD can be used as a requirements analysis tool to obtain an understanding of the data a system needs to capture and manage  An ERD can also be used later in the development cycle as a design tool that helps document the actual database schema that will be implemented 40
  • 41.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Not a phase in the standard SDLC. However, if a decision was reached to acquire rather than develop software, software acquisition is the process that should occur after the requirements definition phase  Decision based on various factors such as the cost differential between development and acquisition, availability of generic software, and the time gap between development and acquisition  The project team needs to carefully examine and compare the vendors’ responses to the request for proposal (RFP)  It is likely that more than one product/vendor fits the requirements with advantages and disadvantages with respect to each other  Once vendors are short listed, it can be beneficial for the project team to talk to current users of each potential product 41
  • 42.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Developing system flowcharts and entity relationship models  Determining the use of structured design techniques  End of design phase  Describing inputs and outputs  Determining processing steps and computation rules  Determining data file or database system file design  Preparing program specifications  Developing test plans for the various levels of testing  Developing data conversion plans 42
  • 43.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Coding and developing program and system-level documents  Debugging and testing the programs developed  Developing programs to convert data from the old system for use on the new system  Creating user procedures to handle transition to the new system  Training selected users on the new system  Ensure modifications are documented and applied accurately 43
  • 44.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Considerations  Programming methods and techniques  Online programming facilities (integrated development environment)  Programming languages  Program debugging  Testing 44
  • 45.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Testing:  Elements ▪ Test plan ▪ Conduct and report test results ▪ Address outstanding issues  Classifications ▪ Unit testing ▪ Interface or integration testing ▪ System testing ▪ Final acceptance testing  Other types of testing ▪ Alpha and beta testing ▪ Pilot testing ▪ White box testing ▪ Black box testing ▪ Function/validation testing ▪ Regression testing ▪ Parallel testing ▪ Sociability testing ▪ Automated application testing 45
  • 46.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  During the implementation phase, the actual operation of the new information system is established and tested  Final user-acceptance testing is conducted in this environment  The system may also go through a certification and accreditation process to assess the effectiveness of the business application at mitigating risks to an appropriate level 46
  • 47.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Implementation planning  Phase 1—Develop to-be support structures  Phase 2—Establish support function  End-user training  Data conversion  Refining migration scenario  Fallback (rollback) scenario  Changeover (go-live or cutover) techniques  Parallel changeover  Phased changeover  Abrupt changeover  Certification/accreditation 47
  • 48.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Objectives:  Assess the adequacy of the system  Evaluate the projected cost benefits or ROI  Develop recommendations that address the system’s inadequacies and deficiencies  Develop a plan for implementing the recommendations  Assess the development project process  Should be performed jointly by the project development team and appropriate end users 48
  • 49.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  A growing number of organizations are shifting to a fully integrated corporate solution, i.e., an ERP solution  This type of software implementation is much larger than a regular software acquisition project  ERP systems impact the way a corporation does business, its entire control environment, technological direction and internal resources 49
  • 50.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Business risk relating to the likelihood that the new system may not meet the users’ business needs, requirements and expectations  Potential risks that can occur when designing and developing software systems:  Within the project  With suppliers  Within the organization  With the external environment 50
  • 51.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Closely associated with the traditional, classic SDLC approach  Techniques provide a framework for representing the data and process components of an application using various graphical notations at different levels of abstraction, until it reaches the abstraction level that enables programmers to code the system 51
  • 52.
  • 53.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  E-commerce models:  Business-to-consumer (B-to-C) relationships  Business-to-business (B-to-B) relationships  Business-to-employee (B-to-E) relationships  Business-to-government (B-to-G) relationships  Consumer-to-government (C-to-G) relationships  Exchange-to-exchange (X-to-X) relationships 53
  • 54.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  With increasing emphasis on integrating the web channel with a business’ internal legacy systems and the systems of its business partners, company systems now typically will run on different platforms, running different software and with different databases  The challenge of integrating diverse technologies within and beyond the business has increasingly lead companies to move to component-based systems that utilize a middleware infrastructure, based around an application server databases play a key role in most e-commerce systems, maintaining data for web site pages, accumulating customer information and possibly storing click-stream data for analyzing web site usage  Extensible Markup Language is also likely to form an important part of an organization’s overall e-commerce architecture 54
  • 55.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  E-commerce risks:  Confidentiality  Integrity  Availability  Authentication and non-repudiation  Power shift to customers  It is important to take into consideration the importance of security issues that extend beyond confidentiality objectives 55
  • 56.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  An IS auditor should assess applicable use of:  A set of security mechanisms and procedures that constitute a security architecture for e-commerce  Firewall mechanisms that are in place to mediate between the public network and an organization’s private network  A process whereby participants in an e-commerce transaction can be identified uniquely and positively  Digital signatures  An infrastructure to manage and control public key pairs and their corresponding certificates  The procedures in place to control changes to an e- commerce presence  Logs of e-commerce applications 56
  • 57.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  An IS auditor should assess applicable use of:  The methods and procedures to recognize security breaches when they occur  The features in e-commerce applications  The protections in place to ensure that data collected about individuals are not disclosed without their consent  The means to ensure confidentiality of data communicated between customers and vendors  The mechanisms to protect e-commerce’s presence and their supporting private networks from computer viruses 57
  • 58.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  An IS auditor should assess applicable use of:  The features within the e-commerce architecture to keep all components from failing  A plan and procedure to continue e-commerce activities when an extended outage of required resources for normal processing  A commonly understood set of practices and procedures to define management’s intentions for the security of e- commerce  A shared responsibility for e-commerce security  Communications from vendors to customers  A regular program of security audit and assessment 58
  • 59.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Benefits:  Less paperwork  Fewer errors during the exchange of information  Improved information flow, database-to-database and company-to-company  No unnecessary rekeying of data  Fewer delays in communication  Improved invoicing and payment processes 59
  • 60.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Moving data in a batch transmission process through EDI process involves 3 functions within each partner’s system:  Communications handler  EDI interface ▪ EDI translator ▪ Application interface  Application system  General requirements:  Communications software, translation software and access to standards  To build a map, an EDI standard appropriate for the kind of EDI data to be transmitted is selected  Final step is to write a partner profile that tells the system where to send each transaction and how to handle errors and exceptions 60
  • 61.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Web-based EDI has come into prominence due to:  Internet-through-Internet service providers offering generic network access for all computers connected to the Internet  Its ability to attract new partners via web-based sites to exchange information  New security products available to address issues of confidentiality, authentication, data integrity and non- repudiation of origin and return  Improvements in the x.12 EDI formatted standard 61
  • 62.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  To protect EDI transmissions, the EDI process should include:  Standards set to indicate the message format and content are valid  Controls to ensure standard transmissions are properly converted for the application software by the translation application  Procedures to determine messages are only from authorized parties  Direct or dedicated transmission channels among the parties  Data should be encrypted using algorithms agreed to by the parties involved  The EDI process needs the ability to detect and deal with transactions that do not conform to the standard format or are from/to unauthorized parties  The critical nature of many EDI transactions requires that there be positive assurances that the transmissions were complete  Organizations desiring to exchange transactions using EDI are establishing a new business relationship 62
  • 63.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  The controls for receipt of inbound transactions are:  Use appropriate encryption techniques when using public Internet infrastructures for communication  Perform edit checks  Perform additional computerized checking  Log each inbound transaction upon receipt  Use control totals on receipt of transactions  Segment count totals built into the transaction set trailer by the sender  Control techniques in the processing of individual transactions  Ensure the exchange of control totals of transactions sent and received between trading partners at predefined intervals 63
  • 64.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  An IS auditor must evaluate EDI to ensure that all inbound EDI transactions are received and translated accurately, passed to an application and processed only once  To accomplish this, an IS auditor must review:  Internet encryption process  Edit checks  Additional computerized checking  Batch control totals  The validity of the sender against trading partner details 64
  • 65.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Linking the business processes between the related entities such as the buyer and the seller.  SCM is all about managing the flow of goods, services and information among suppliers, manufacturers, wholesalers, distributors, stores, consumers and end users  EDI, which is extensively used in SCM, is not a new technology but the cost associated with it was not affordable to many until recent years. Now, availability of inexpensive, web-based SCM solutions has opened this area for everybody. However, there is a need for significant change in the business model 65
  • 66.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  2 Types:  Online to a central computer owned by a financial institution or a cards administrator  Use local processors/microcomputers owned by a business to hold the transactions for a specified period after which they are sent to the main computer for batch processing.  IS auditor should determine whether any credit cardholder information is stored on the local POS system such as credit card numbers, personal identification numbers (PINs), etc.  Any such information, if stored on the POS system, should be encrypted using strong encryption methods. 66
  • 67.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  E-mail system components:  Mail servers  Clients 67
  • 68.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Security issues:  Flaws in the configuration of mail server applications  Denial-of-service (DoS)  Sensitive information transmitted unencrypted between mail server and e-mail client may be intercepted  Information within the e-mail may be altered  Viruses and other types of malicious code may be distributed throughout an organization  Users may send inappropriate, proprietary or other sensitive information via e-mail 68
  • 69.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Digital signatures are a good method of securing e-mail transmissions in that:  The signature cannot be forged  The signature is authentic and encrypted  The signature cannot be reused  The signed document cannot be altered 69
  • 70.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Banks should have a risk management process to enable them to identify, measure, monitor and control their technology risk exposure  Risk management of new technologies has three essential elements:  Risk management is the responsibility of the board of directors and senior management  Implementing technology is the responsibility of IT senior management members  Measuring and monitoring risk is the responsibility of members of operational management 70
  • 71.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  E-banking presents a number of risk management challenges:  The speed of change relating to technological and service innovation  Transactional e-banking web sites and associated retail and wholesale business applications are typically integrated with legacy computer systems  e-Banking increases banks’ dependence on information technology  The Internet is ubiquitous and global by nature  Effective risk management controls for e-banking include 14 controls divided among three categories:  Board and management oversight  Security controls  Legal and reputational risk management 71
  • 72.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Advantages of e-finance to consumers include:  Lower costs  Increased breadth and quality  Widening access to financial services  A-synchrony (time-decoupled)  A-topy (location-decoupled) 72
  • 73.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  2 Types of parties in all payment systems:  Issuer is an entity that operates the payment service. An issuer holds the items that the payments represent (e.g., cash held in regular bank accounts).  User of the payment service perform two main functions: ▪ making payments (payer) ▪ receiving payments (payee)  3 models:  Electronic Money Model: emulate physical cash.  Electronic Checks Model: as real-world checks  Electronic Transfer Model 73
  • 74.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Electronic funds transfer (EFT) is the exchange of money via telecommunications without currency actually changing hands  Allows parties to move money from one account to another, replacing traditional check writing and cash collection procedures  Usually function via an internal bank transfer from one party’s account to another or via a clearinghouse network 74
  • 75.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Security in an EFT environment ensures that:  All of the equipment and communication linkages are tested  Each party uses security procedures that are reasonably sufficient  There are guidelines set for the receipt of data  Upon receipt of data, the receiving party will immediately transmit an acknowledgment or notification  Data encryption standards are set  Standards for unintelligible transmissions are set  Regulatory requirements are explicitly stated 75
  • 76.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Bill of materials (BOM)  BOM processing (BOMP)  Manufacturing resources planning (MRP)  Computer-assisted design (CAD)  Computer-integrated (or computer-intensive) manufacturing (CIM)  Manufacturing accounting and production (MAP)  Manufacturing Resource Planning (MRP) 76
  • 77.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Provides details regarding all business relationships a customer maintains with an organization. (as of CRM)  Integration aids in customer analysis and marketing.  Integrated banking customer file.  The file includes data regarding the customer loans, checking accounts, savings accounts and any certificates of deposit 77
  • 78.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Electronic devices and techniques to aid in the conduct of business:  Word processors  Automated spreadsheets  e-mail  LANs link local offices and computers to facilitate the use of these technologies.  May contain sensitive data; and so, access controls and security are frequently weak or nonexistent. 78
  • 79.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Recommended internal control guidelines for ATMs include:  Written policies and procedures covering personnel, security controls, operations, settlement, balancing, etc.  Procedures for PIN issuance and protection during storage  Procedures for the security of PINs during delivery  Controls over plastic card procurement  Controls and audit trails of the transactions that have been made in the ATM 79
  • 80.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Cooperative processing systems are divided into segments so different parts may run on different independent computer devices. (Parallel Systems)  The system divides the problem into units that are processed in a number of environments and communicates the results among them to produce a solution to the total problem.  The system must be designed to minimize and maintain the integrity of communication between the component parts and to use the most appropriate processor for each of the problem units 80
  • 81.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  A phone technology that allows a computer to detect voice and touch tones using a normal phone call.  The caller uses the telephone keypad to select from preset menu choices provided by the IYR to respond with pre- recorded or dynamically generated audio to further direct callers or route the caller to a customer service representative.  Used to control almost any function where the interface can be broken down into a series of simple menu choices.  Generally scale well to handle large call volumes. Controls over such systems must be in place to prevent unauthorized individuals from entering system level commands that may permit them to change or rerecord menu options. 81
  • 82.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Perform three basic accounting functions:  Accounts payable processing-Recording transactions in the accounts payable records  Goods received processing-Recording details of goods received, but not yet invoiced  Order processing-Recording goods ordered, but not yet received  Computer may be involved in each of these activities, and the extent to which they are computerized determines the complexity of the purchase accounting system. 82
  • 83.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Stores, retrieves and processes graphic data, such as pictures, charts and graphs, instead of or in addition to text data  Examples of potential benefits are:  Item processing (e.g., signature storage and retrieval)  Immediate retrieval via a secure optical storage medium  Increased productivity  Improved control over paper files  Reduced deterioration due to handling  Enhanced disaster recovery procedure 83
  • 84.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  IS auditors should be aware of when reviewing an institution's controls over imaging systems include:  Planning  Audit  Redesign of workflow  Scanning devices  Software Security  Training 84
  • 85.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Artificial intelligence is the study and application of the principles by which:  Knowledge is acquired and used  Goals are generated and achieved  Information is communicated  Collaboration is achieved  Concepts are formed  Languages are developed 85
  • 86.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Key to an expert system is the knowledge base (KB), which contains specific information or fact patterns associated with a particular subject matter and the rules for interpreting these facts  The information in the KB can be expressed in several ways:  Decision trees  Rules  Semantic nets 86
  • 87.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC 87
  • 88.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  An IS auditor should:  Understand the purpose and functionality of the system  Assess the system’s significance to the organization  Review the adherence of the system to policies and procedures  Review procedures for updating information in the KB  Review security access over the system 88
  • 89.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Business intelligence (BI) is a broad field of IT that encompasses the collection and dissemination of information to assist decision making and assess organizational performance  Some typical areas in which BI is applied include:  Process cost, efficiency and quality  Customer satisfaction with product and service offerings  Customer profitability  Staff and business unit achievement of KPIs  Risk management 89
  • 90.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  An optimized enterprise data flow architecture consists of:  Presentation/desktop access layer  Data source layer  Core data warehouse  Data mart layer  Data staging and quality layer  Data access layer  Data preparation layer  Metadata repository layer  Warehouse management layer  Application messaging layer  Internet/intranet layer 90
  • 91.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Interactive system that provides the user with easy access to decision models and data from a wide range of sources, to support semi-structured decision-making tasks typically for business purposes  A principle of DSS design is to concentrate less on efficiency and more on effectiveness  A DSS is often developed with a specific decision or well- defined class of decisions to solve  Frameworks are generalizations about a field that help put many specific cases and ideas into perspective  G. Gorry-M.S. Morton framework  Sprague-Carson framework 91
  • 92.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Prototyping is the most popular approach to DSS design and development  It is difficult to implement a DSS because of its discretionary nature 92
  • 93.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Developers should be prepared for eight implementation risk factors:  Nonexistent or unwilling users  Multiple users or implementers  Disappearing users, implementers or maintainers  Inability to specify purpose or usage patterns in advance  Inability to predict and cushion impact on all parties  Lack or loss of support  Lack of experience with similar systems  Technical problems and cost-effectiveness issues 93
  • 94.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  The DSS designer and user should use broad evaluation criteria, including:  Traditional cost-benefit analysis  Procedural changes, more alternatives examined, less time consumer in making the decision  Evidence of improvement in decision making  Changes in the decision process 94
  • 95.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  The emerging customer-driven business trend is to be focused on the wants and needs of the customers.  With the customer's expectations constantly increasing, these objectives are becoming more difficult to achieve.  This emphasizes the importance of focusing on information relating to transaction data, preferences, purchase patterns, status, contact history, demographic information and service trends of customers rather than on products. 95
  • 96.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Operational CRM: maximizing the utility of the customer's service experience while also capturing useful data about the customer interaction  Analytical CRM: analyze information captured by the organization about its customers and their interactions with the organization into information that allows greater value to be obtained from the customer base 96
  • 97.
  • 98.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Incremental or progressive development  Iterative development  Evolutionary development  Spiral development  Agile development 98
  • 99.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Agile development refers to a family of similar development processes that espouse a nontraditional way of developing complex systems.  Agile development processes have a number of common characteristics, including:  The use of small, time-boxed subprojects or iterations  Replanning the project at the end of each iteration  Relatively greater reliance on tacit knowledge  Heavy influence on mechanisms to effectively disseminate tacit knowledge and promote teamwork  A change in the role of the project manager 99
  • 100.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  The process of creating a system through controlled trial and error procedures to reduce the level of risks in developing the system  Reduces the time to deploy systems primarily by using faster development tools such as fourth- generation techniques  Potential risk is that the finished system will have poor controls  Change control often becomes more complicated 100
  • 101.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  A methodology that enables organizations to develop strategically important systems quickly, while reducing development costs and maintaining quality  Achieved through the use of:  Small, well-trained development teams  Evolutionary prototypes  Integrated power tools  A central repository  Interactive requirements and design workshops  Rigid limits on development time frames 101
  • 102.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  A method for representing software requirements by focusing on data and their structure  Major advantage of this approach is that it eliminates data transformation errors such as porting, conversion, transcription and transposition 102
  • 103.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  The process of solution specification and modeling where data and procedures can be grouped into an entity known as an object  OOSD is a programming technique and is not a software development methodology itself  The major advantages of OOSD are:  The ability to manage an unrestricted variety of data types  Provision of a means to model complex relationships  The capacity to meet the demands of a changing environment 103
  • 104.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Process of assembling applications from cooperating packages of executable software that make their services available through defined interfaces  Components play a significant role in web-based applications  Basic types of components are:  In-process client components  Stand-alone client components  Stand-alone server components  In-process server components 104
  • 105.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Features:  Reduces development time  Improves quality  Allows developers to focus more strongly on business functionality  Promotes modularity  Simplifies reuse  Reduces development cost  Supports multiple development environments 105
  • 106.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Designed to achieve easier and more effective integration of code modules within and between enterprises  Different from traditional third- or fourth- generation program developments in many ways:  Languages and programming techniques used  Methodologies used to control development work  The way users test and approve development work 106
  • 107.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC Reengineering  Process of updating an existing system by extracting and reusing design and program components process is used to support major changes in the way an organization operates. A number of tools are now available to support this process Reverse Engineering  Taking apart an application, a software application or a product to see how it functions, in order to develop a similar system  Advantages:  Faster development and reduced SDLC duration  Creation of an improved system using the reverse-engineered application drawbacks 107
  • 108.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  System development tools and productivity aids include code generators, Computer-Aided Software Engineering (CASE) applications and fourth-generation languages (4GL). 108
  • 109.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Code generators are tools, often incorporated with CASE products, that generate program code based on parameters defined by a systems analyst or on data/entity flow diagrams developed by the design module of a CASE product.  These products allow most developers to implement software programs with efficiency. The IS auditor should be aware of nontraditional origins of source code 109
  • 110.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC 110
  • 111.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  CASE is the use of automated tools to aid in the software development process  May include the application of software tools for software requirements analysis, software design, code production, testing, document generation and other software development activities  Three categories:  Upper - support analysis and design phases  Lower - support coding phase  Integrated - also known as I-CASE support analysis, design and coding phases 111
  • 112.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  IS auditor considerations:  CASE tools do not ensure that the design, programs and system are correct or that they fully meet the needs of the organization  CASE tools should complement and fit into the application development methodology  The integrity of data moved between CASE products needs to be monitored and controlled  Changes to the application should be reflected in stored CASE product data 112
  • 113.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Common characteristics of 4GLs include:  Nonprocedural language  Environmental independence (portability)  Software facilities  Programmer workbench concepts  Simple language subsets  4GLs are classified as:  Query and report generators  Embedded database 4GLs  Relational database 4GLs  Application generators 113
  • 114.
  • 115.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  The physical architecture analysis, the definition of a new one and the necessary road map to move from one to the other are critical tasks for an IT department  Goals:  To successfully analyze the existing architecture  To design a new architecture  To write the functional requirements of this new architecture  To develop a proof of concept  Physical implementation of the required technical infrastructure to set up the future environment will be planned next  Task will cover procurement activities such as contracting partners, setting up the SLAs, and developing installation plans and installation test plans 115
  • 116.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC 116
  • 117.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Phased approach to ensure the quality of results  Communication processes should be set up to other projects  Through these different phases the components are fit together, and a clear understanding of the available and contactable vendors is established by using the selection process during the procurement phase and beyond 117
  • 118.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC 118
  • 119.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC 119
  • 120.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC 120
  • 121.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC 121
  • 122.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC 122
  • 123.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  To avoid delays, the appropriate skilled staff must attend workshops and participate for the entire project duration.  The documentation needed for carrying out the work needs to be ready at project initiation.  Decision makers must be involved at all steps to ensure all necessary decisions can be made quickly.  Part one of the project (Analysis of Physical Architecture) must be completed and the needed infrastructure decisions must be made. 123
  • 124.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  For acquiring a system, the Invitation To Tender (ITT) should include the following:  Organizational descriptions  Information processing requirements  Hardware requirements  System software applications  Support requirements  Adaptability requirements  Constraints  Conversion requirements 124
  • 125.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Acquisition steps:  Testimonials or visits with other users  Provisions for competitive bidding  Analysis of bids against requirements  Comparison of bids against each other  Analysis of the vendor’s financial condition  Analysis of the vendor’s capability to provide maintenance  Review of delivery schedules against requirements  Analysis of security and control facilities  Review and negotiation of price  Review of contract terms 125
  • 126.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  When selecting new system software, the following technical issues should be considered:  Business, functional, technical needs and specifications  Cost and benefits  Obsolescence  Compatibility with existing systems  Security  Demands on existing staff  Training and hiring requirements  Future growth needs  Impact on system and network performance 126
  • 127.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  System software implementation involves identifying features, configuration options and controls for standard configurations to apply across the organization.  Additionally, implementation involves testing the software in a nonproduction environment and obtaining some form of certification and accreditation to place the approved operating system software into production. 127
  • 128.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  All test results should be documented, reviewed and approved by technically-qualified subject matter experts prior to production use  Change control procedures are designed to ensure that changes are authorized and do not disrupt processing 128
  • 129.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  The process of managing change to application systems while maintaining the integrity of both the production source and executable code  Once a system is moved into production, it seldom remains static.  Change is expected in all systems regardless of whether they are vendor-supplied or internally developed  To control the ongoing maintenance of the system, a standard process for performing and recording changes is necessary. 129
  • 130.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Change management process begins with authorizing changes to occur  Requests initiated from end users, operational staff and system development/maintenance staff  Change requests should be in a format that ensures all changes are considered for action and that allows the system management staff to easily track the status of the request  All requests for changes should be maintained by the system maintenance staff as part of the system’s permanent documentation 130
  • 131.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Deploying changes  Documentation  Testing changed programs  Auditing program changes  Emergency changes  Deploying changes back into production  Change exposures (unauthorized changes) 131
  • 132.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Maintenance requests must be formally documented and approved by a change control group  Careful control is exercised over each stage of the maintenance process via checkpoints, reviews and sign-off procedures  From an audit perspective, provides evidence of management’s commitment to careful control  Involves procedures throughout the software life cycle 132
  • 133.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Tasks:  Develop the configuration management plan  Baseline the code and associated documents  Analyze and report on the results of configuration control  Develop the reports that provide configuration status  Develop release procedures  Perform configuration control activities  Update the configuration status accounting database 133
  • 134.
  • 135.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Business processes require improvements, which are accomplished with practices and techniques addressed in the following sections 135
  • 136.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC 136
  • 137.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  The steps in a successful BPR are:  Define the areas to be reviewed  Develop a project plan  Gain an understanding of the process under review  Redesign and streamline the process  Implement and monitor the new process  Establish a continuous improvement process  A successful BPR/process change project requires the project team to perform the following for the existing processes: ▪ Process decomposition to the lowest level required for effectively assessing a business process ▪ Identification of customers, process-based managers or process owners responsible for beginning to end processes ▪ Documentation of the elementary process-related profile information 137
  • 138.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  BPR methods and techniques  Benchmarking process ▪ Plan ▪ Research ▪ Observe ▪ Analyze ▪ Adapt ▪ Improve 138
  • 139.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  ISO 9126 is an international standard to assess the quality of software products.  Attributes:  Functionality  Reliability  Usability  Efficiency  Maintainability  Portability 139
  • 140.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Initial-Characterized as ad hoc, where success depends solely on individual effort  Repeatable-Disciplined management processes are established to plan and track cost, schedule and functionality, and provide oversight over a software project, and create a learning environment where successfully defined and applied processes can be repeated successfully on other projects of similar size and scope.  Defined-Lessons learned from the prior phase provide the impetus to develop a standard software process across the organization. This includes both management and software engineering activities, documented, standardized and integrated into an institutionalized standard software process applicable to all software development projects.  Managed-Once processes are well-defined and applied, the organization has reached a point where it can develop and apply quantitative managed control over its software development processes.  Optimizing-When an organization has attained the ability to quantitatively and successfully control its software projects, it is in a position to use continuous process improvement strategies in applying innovative solutions and state-of- the-art technologies to its software processes. 140
  • 141.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC 141
  • 142.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Also known as Software Process Improvement and Capability Determination (SPICE), is based on CMM and Bootstrap  SPICE, like CMMI, serves as a baseline for process improvement and process benchmarking, and leverages the adoption of best practices.  Reference models for SPICE include:  Software life cycle processes-Through ISO/IEC 12207 AMD1I2  System life cycle processes-Through ISO/IEC 15288  Human-centered life cycle processes-Through ISO 18529  Component-based development processes-Through the OOSPICE project  IT service management processes-Through a SPICE user group initiative  Quality management system processes-Through SPICE for 9000 (S9K)  Automotive embedded software--Through Automotive SPICE (an initiative of The Procurement Forum and The SPICE User Group with the major European car manufacturers)  Medical device software--Through the Medi SPICE initiative 142
  • 143.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC 143
  • 144.
  • 145.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Controls over input, processing and output functions.  To ensure that:  Only complete, accurate and valid data are entered and updated in a computer system  Processing accomplishes the correct task  Processing results meet expectations  Data are maintained 145
  • 146.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  IS auditor’s tasks:  Identifying the significant application components and the flow of transactions through the system  Identifying the application control strengths  Testing the controls to ensure their functionality and effectiveness  Evaluating the control environment  Considering the operational aspects of the application to ensure its efficiency and effectiveness 146
  • 147.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Input authorization  Verifies that all transactions have been authorized and approved by management  Types:  Signatures on batch forms or source documents  Online access controls  Unique passwords  Terminal or client workstation identification  Source documents 147
  • 148.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Batch controls and balancing  Batch controls group input transactions to provide control totals  Types:  Total monetary amount  Total items  Total documents  Hash totals  Performed through manual or automated reconciliation  Types of batch balancing include:  Batch registers  Control accounts  Computer agreement 148
  • 149.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Error reporting and handling  Input processing requires that controls be identified to verify that data are accepted into the system correctly and that input errors are recognized and corrected  Input error handling can be processed by:  Rejecting only transactions with errors  Rejecting the whole batch of transactions  Holding the batch in suspense  Accepting the batch and flagging error transactions 149
  • 150.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Error reporting and handling  Input control techniques include:  Transaction log  Reconciliation of data  Documentation  Error correction procedures  Anticipation  Transmittal log  Cancellation of source documents 150
  • 151.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Data validation and editing procedures  Procedures should be established to ensure that input data are validated and edited as close to the time and point of origination as possible  Data validation identifies data errors, incomplete or missing data and inconsistencies among related data items 151
  • 152.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Processing controls  Ensure the completeness and accuracy of accumulated data  The following techniques can be used:  Manual recalculations  Editing  Run-to-run totals  Programmed controls  Reasonableness verification of calculated amounts  Limit checks on calculated amounts  Reconciliation of file totals  Exception reports 152
  • 153.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Data file control procedures  File controls should ensure that only authorized processing occurs to stored data  Data files generally fall into four categories:  System control parameters  Standing data  Master data/balance data  Transaction files 153
  • 154.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Output controls provide assurance that the data delivered to users will be presented, formatted and delivered in a consistent and secure manner  Output controls include: ▪ Logging and storage of negotiable, sensitive and critical forms in a secure place ▪ Computer generation of negotiable instruments, forms and signatures ▪ Report distribution ▪ Balancing and reconciling ▪ Output error handling ▪ Output report retention ▪ Verification of receipt of reports 154
  • 155.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Specific matters to consider in business process control assurance are:  Process maps  Process controls  Assessing business risks within the process  Benchmarking with best practices  Roles and responsibilities  Activities and tasks  Data restrictions 155
  • 156.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  A transaction flowchart provides information regarding key processing controls. Points where transactions are entered, processed and posted should be reviewed for control weaknesses 156
  • 157.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  The quality of internal controls  Economic conditions  Recent accounting system changes  Time elapsed since last audit  Complexity of operations  Changes in operations/environment  Recent changes in key positions  Time in existence  Competitive environment  Assets at risk  Prior audit results  Staff turnover  Transaction volume  Regulatory agency impact  Monetary volume  Sensitivity of transactions  Impact of application failure 157
  • 158.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Separation of duties  Authorization of input  Balancing  Error control and correction  Distribution of reports  Review and testing of access 158
  • 159.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  A set of substantive tests examine the accuracy, completeness, consistency and authorization of data presently held in a system  Indicate failure in input or processing controls  Two common types of data integrity tests are:  Relational integrity tests  Referential integrity tests 159
  • 160.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  The ACID principle:  Atomicity  Consistency  Isolation  Durability 160
  • 161.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC 161
  • 162.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC 162
  • 163.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC 163
  • 164.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC 164
  • 165.
  • 166.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Determine the main components, objectives and user requirements of the system  Determine and rank the major risks to, and exposures of, the system  Identify controls to mitigate the risks to, and exposures of, the system  Monitor the system development process  Participate in post-implementation reviews  Test system maintenance procedures  Evaluate the system maintenance process 166
  • 167.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Levels of oversight by project committee  Risk management methods within the project  Issue management  Cost management  Processes for planning and dependency management  Reporting processes to senior management  Change control processes  Stakeholder management involvement  Sign off process 167
  • 168.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Review the documentation produced in this phase for reasonableness  Determine whether all cost justifications/benefits are verifiable  Identify and determine the criticality of the need  Determine if a solution can be achieved with systems already in place  Determine the reasonableness of the chosen solution 168
  • 169.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Obtain the detailed requirements definition document  Identify the key team members on the project team  Verify that project initiation and cost have received proper management approval  Review the conceptual design specifications to ensure they address the needs of the user  Review the conceptual design to ensure control specifications have been defined  Determine whether a reasonable number of vendors received a proposal covering the project scope and user requirements  Review the UAT specification  Determine whether the application is a candidate for an embedded audit routine 169
  • 170.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Analyze the documentation from the feasibility study  Review the RFP  Determine whether the selected vendor is supported by RFP documentation  Attend agenda-based presentations and conference room pilots  Review the vendor contract prior to its signing  Ensure the contract is reviewed by legal counsel before it is signed 170
  • 171.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Review the system flowcharts for adherence to the general design  Review the input, processing and out controls designed into the system for appropriateness  Interview the key users of the system  Assess the adequacy of audit trails  Verify the integrity of key calculations and processes  Verify that the system can identify and process erroneous data correctly  Review the quality assurance results of the programs developed  Verify that all recommended corrections to programming errors were made 171
  • 172.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Review the test plan for completeness  Reconcile control totals and converted data  Review error reports for their precision in recognizing erroneous data and for resolution of errors  Verify cyclical processing for correctness  Interview end users of the system for their understanding of new methods, procedures and operating instructions  Review unit and system test plans to determine whether tests for internal controls are planned and performed  Review parallel testing results for accuracy 172
  • 173.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  An IS auditor should verify that appropriate sign-offs have been obtained prior to implementation, then:  Review the programmed procedures used for scheduling and running the system along with system parameters used in executing the production schedule  Review all system documentation to ensure its completeness and that all recent updates from the testing phase have been incorporated  Verify all data conversion to ensure that they are correct and complete before implementing the system in production 173
  • 174.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Determine if the system’s objectives and requirements were achieved  Determine if the cost benefits identified in the feasibility study are being measured, analyzed and accurately reported to management  Review program change requests performed to assess the type of changes required of the system  Review controls built into the system  Review operators’ error logs  Review input and output control balances and reports 174
  • 175.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Identifying the significant application components and the flow of transactions through the system  Identifying the application control strengths and evaluating the impact of the control weaknesses to develop a testing strategy by analyzing the accumulated information  Reviewing application system documentation to provide an understanding of the functionality of the application 175
  • 176.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  The use and existence of a methodology for authorizing, prioritizing and tracking system change requests from the user  Whether emergency change procedures are addressed in the operations manuals  Whether change control is a formal procedure for the user and the development groups  Whether the change control log ensures all changes shown were resolved  The user’s satisfaction with the turnaround of change requests  The adequacy of the security access restrictions over production source and executable modules 176
  • 177.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  For a selection of changes on the change control log:  Determine whether changes to requirements resulted in appropriate change-development documents  Determine whether changes were made as documented  Determine whether current documentation reflects the changed environment  Evaluate the adequacy of the procedures in place for testing system changes  Review evidence to ensure that procedures are carried out as prescribed by organizational standards  Review the procedures established for ensuring executable and source code integrity 177
  • 178.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC  Provides a method for an IS auditor to collect evidence on system reliability while normal processing takes place  Important IS audit tools, particularly when used in a time-sharing environment that process a large number of transactions with a scarce paper trail 178
  • 179.
    Copyright@2013 Al-Taysir forInformation Systems Security Consulting LLC Systems Control Audit Review File And Embedded Audit Modules (SCARF/EAM) Snapshots Audit Hooks IntegratedTest Facility (ITF) Continuous And Intermittent Simulation (CIS) 179
  • 180.