SlideShare a Scribd company logo
Watch Your Quality All The Time
Page 1 of 19
China Factory Audit Report
In general, we will check the following aspects for a factory audit:
Content
Section 1: Company Overview
1.1 Legal Validity
1.2 Company Building Information
1.3 Communication Infrastructures
1.4 Products Markets
Section 2: Management
2.1 Company Chart
2.2 Employee Headcount
2.3 Management
2.4 Working force training
2.5 Working Condition (Safety)
Section 3: Production Capacity
3.1 Annual Production Capacity (Previous Year)
3.2 Production Capacity
3.3 Production Machinery
3.4Testing Machinery
3.5 Subcontractors
3.6 Daily output check
Section 4: Quality Assurance
4.1 Quality Management System Certification
4.2 Product Certification
4.3 Quality Control Management
4.4 Supplier Management
4.5 After Sales Service
Section 5: Production Process Management
Section 6: R & D Capacity
Section 7: Company Development / Expansion Plans
Section 8: Certification & Photos
Section 9: Others
Watch Your Quality All The Time
Page 2 of 19
Section 1: Company Overview
Company Overview
1.1 Legal Validity
Does the company have a valid
Business license?
Yes No
Business License
Number
xxxxxxxxxxxx
Year Established: 2003-01-03 Validity Period: 2020-12-31
Registered Address: xxxxxx ,Gushu Village, Xixiang Town, Bao’an District, Shenzhen
Company Address: xxxxxx ,Gushu Village, Xixiang Town, Bao’an District, Shenzhen
Annual review conducted by the
Industrial & Commercial Bureau?
Yes No Reviewed By:
Shenzhen Industrial &
Commercial Bureau
Registered Capital: RMB: 50,000,000
Corporate Representative: Zhang Xiaoping
Industry: Manufacture and sale of PCBA
Business Type: Manufacturer Trading Company Combined
Type of Ownership:
Private Owner limited Company
Joint Venture Other
Products Manufactured: PCBA
Business License (Original)
Watch Your Quality All The Time
Page 3 of 19
1.2 Company Building Information
Certification Type:
Land Certification Real Estate Certification
Lease Agreement Factory Officer Claimed
Total Building Size: 20000m
2
Number of Building(s): 2
Number of Sample room(s) N/A Number of Warehouse 1
Factory building #1(3 floor) Factory building #2(4 floor)
Company's Certificate Company's Certificate
Watch Your Quality All The Time
Page 4 of 19
1.3 Communication Infrastructures
Telephone sets 50 Fax machines 1 Computers 182
Digital Camera 10 Internet Access Type: _China Telecom_
1.4 Products Markets
Product Type Main customer Name Market location Monthly Order Qty
Factory not willing to reply. Their market are mainly in China.
Section 2: Management
Management
2.1 Company Chart
Watch Your Quality All The Time
Page 5 of 19
2.2 Employee Headcount
Department Name Full Time Employee(s) Part-time Employee(s) Total
G.M 7 0 7
Purchasing Dept. 11 0 11
AV R&D Dept. 17 0 17
Finance Dept. 8 0 8
PMC Dept. 8 0 8
Warehouse Dept. 27 0 27
Comprehensive Dept. 9 0 9
MID R&D Dept. 44 0 44
Production
technology Dept.
43 0 43
Marketing Dept. 49 0 49
Car electronic Dept. 7 0 7
MID testing Dept. 6 0 6
SMT Production Dept. 223 0 223
Testing Dept. 87 0 87
DIP Production Dept. 230 0 230
MID Production Dept. 215 0 215
Quality Dept. 125 0 125
Account Dept. 20 0 20
Total Number: 1146 0 1146
2.3 Management
Department Name Title Year(s) in Current Company
G.M Zhang Xiaoping - 12
Watch Your Quality All The Time
Page 6 of 19
Production Dept. Huang Sheng - 12
Purchasing Dept. Cai Xiaotian - 11
Quality Dept. Tan Yunliang - 10
2.4 Working force training
Content Observations / Comments
2.4.1 Are employees having skill training process?
Yes, all employees have skill training
Yes, some employees have skill training
No
2.4.2 Is the skill training valid?
Yes, all skill training valid
Yes, some skill training valid
No
2.4.3 Is the skill training having record?
Yes, all skill training having record
Yes, some skill training having record
No
2.5 Working Condition(Safety)
Content Observations/Comments
2.5.1 Are workplace sufficiently well ventilated?
Yes
No
2.5.2
Are aisles and emergency exit doors clearly marked,
illuminated, accessible, and kept clear of obstructions?
Yes
No
2.5.3 Does the factory have Fire extinguisher?
Yes
No
Secure Channel
Watch Your Quality All The Time
Page 7 of 19
Watch Your Quality All The Time
Page 8 of 19
Section 3: Production Capacity
Production Capacity
3.1 Annual Production Capacity
Product Name:
MID PCBA 150K pcs/Week
Phone PCBA 600K pcs/Week
DVD PCBA 600K pcs/Week
3.2 Production Capacity
Product Name Production Line Capacity Actual Units Produced (Previous Year)
- - -
3.3 Production Machinery
Machine Name Brand& Model No. Quantity Number of Year(s) Used Condition
Fully automatic printing
machine
Unknown 16 Unknown Good
High-speed chip
mounter
SIEMENS 16 Unknown Good
Multi-functional smt
machine
SIEMENS 8 Unknown Good
Reflow oven Unknown 16 Unknown Good
Fully automatic printing machine High-speed chip mounter
High-speed chip mounter High-speed chip mounter
Watch Your Quality All The Time
Page 9 of 19
Reflow oven AOI machine
Machine
Watch Your Quality All The Time
Page 10 of 19
3.4 Testing Machinery
Machine Name Brand & Model No. Quantity Number of Year(s) Used Condition
Salt spraying tester Unknown 1 Unknown Good
X-Ray Unknown 1 Unknown Good
AOI Unknown 10 Unknown Good
KAYOTIM Unknown 1 Unknown Good
Salt spraying tester Salt spraying tester
3.5 Subcontractors
Subcontractor Name Product Subcontracted Volume Supplied
Cooperation
Period(Years)
Factory not willing to reply.
Section 4: Quality Assurance
Quality Management System and Product Certification
4.1 Quality Management System Certification
Certification Certified By Certificate No. Validity Period
Factory not provide
4.2 Product Certification
Certification Certified By Certificate No. Product Name Validity
Nil Nil Nil Nil
Watch Your Quality All The Time
Page 11 of 19
4.3 Quality Control Management
Content Observations/Comments
4.3.1 Is there quality control in all lines?
Yes, all production lines have
quality control
Yes, some production lines have
quality control
No
4.3.2
Do the QA/QC inspectors work independently from the
production line?
Yes
No
4.3.3 Who does the QA/QC Manager/Supervisor report to?
QC department manager: Tan
Yunliang
4.3.4 How many QA/QC inspectors in total?
83 workers on production line do
100% inspection. 30 independent
QC do sample inspection.
QC report QC report
QC report QC report
No. of Employees in Each Production Line
Watch Your Quality All The Time
Page 12 of 19
Production Line Supervisor No. of Operators No. of In-line QC/QA
SMT workshop -- 223 20
DIP workshop -- 230 33
MID workshop -- 215 18
SMT workshop
SMT workshop SMT workshop
SMT workshop SMT workshop
Watch Your Quality All The Time
Page 13 of 19
SMT workshop SMT workshop
SMT workshop SMT workshop
SMT workshop SMT workshop
Watch Your Quality All The Time
Page 14 of 19
SMT workshop SMT workshop
SMT workshop SMT workshop
Watch Your Quality All The Time
Page 15 of 19
4.4 Supplier Management
Content Observations/Comments
4.4.1
Does the company have a supplier assessment
procedure?
Yes
No
4.4.2
Does the company have an updated list of approved
supplier?
Yes, Because of commercial
confidentiality, the factory did not
allow to take photo.
No
4.4.3
Does the company establish and implement a standard
procedure for purchasing contract review and approval?
Yes, Because of commercial
confidentiality, the factory did not
allow to take photo.
No
4.4.4
Does the company keep it’s supplier assessment
reports?
Yes,Because of commercial
confidentiality, the factory did not
allow to take photo.
No
4.4.5 Are there company’s purchasing documents
Yes
No
4.4.6
Is there a procedure to conduct random product
inspections after final packaging?
Yes
No
4.4.7
Does the factory perform regular quality control at major
production steps?
Yes
No
4.5 After Sales Service
Content Observations/Comments
4.5.1
Is customer feedback, including complaints,
clearly record and maintained?
Yes
No
4.5.2
Are there any clear procedures for handling
customer complaints?
Yes
No
4.5.3
Is there a closed-loop corrective action system in
place?
Yes
No
4.5.4
Can finished/packaged products be traced by lot
identification to the appropriate raw material test
reports?
Yes
No
4.5.5 Is there a product alert and recall procedure?
Yes
No
Watch Your Quality All The Time
Page 16 of 19
Section 5: Production Process Management
Production Process Management
Content Observations/Comments
5.1 Is the factory tidy and clean enough for production?
Yes
No
5.2
Are the following items/documents provided at the
appropriate location?
Yes
No
5.3
Are written instructions available for onsite material
inspection/testing?
Are the relevant records maintained?
Yes
No
5.4
Are written inspection/testing instructions available for
finished products? Are the relevant records
maintained?
Yes
No
5.5 How are finished products inspected? 100% Full check
5.6
Are units that failed inspection clearly marked and
separated to prevent accidental dispatch?
Yes
No
5.7
How are finished products that failed inspection
handled?
Yes, Repaired and
re-inspected.
Job guidance document for inspection Job guidance document for inspection
Job guidance document for inspection Job guidance document for inspection
Watch Your Quality All The Time
Page 17 of 19
Job guidance document for inspection Job guidance document for inspection
Job guidance document for production Job guidance document for production
Watch Your Quality All The Time
Page 18 of 19
Section 6: R&D Capacity
R&D Capacity
Content Observations/Comments
6.1 There are _61_ R&D engineer(s) in the company.
6.2
Does the company have it’s own brand?
If yes, please specify
Yes
No
6.3 Does the company provide ODM service for others?
Yes
No
6.4
Are there relevant design Input / Output, review, and
verification documents available for the assessment
company?
Yes
No
6.5
Based on inspection, are R&D employees equipped
with adequate specialized equipment?
If yes, please list all key equipment used:________
N/A
6.6
Do R&D employees use any specific software for
designing new products?
If yes, please list the main software used:_
N/A
6.7
Please list all certifications and/or qualifications of the
R&D department.
N/A
Designs Certificate Designs Certificate
N/A N/A
Section 7: Company Development/ Expansion Plans
Company Development/ Expansion Plans
Company Development Action Timeframe
N/A N/A
Section 8: Certification & Photos
Certification & Photos
Watch Your Quality All The Time
Page 19 of 19
N/A N/A
Section 9: Others
Remarks
1. SHENGZHEN XXX ELECTRONIC CO., LTD is legally registered as manufacturing factory. It is a large
size of PCBA factory in Shenzhen.
2. Part of the documents. Because involving trade secrets, factory did not let us take pictures.
3. On-site audit, the factory is producing products, auditor did not find child labor.
4. Factory looks very specialized in the PCB client is intending to purchase;
factory has a good production capacity and quality control system.
5. The auditor found that factory employees were not wearing employee's card, need to improve.
6. And no PCB board production machines, the factory purchases PCB and other materials, then
mounts PCBs.
7. Factory does not have sample room; factory can provide solution to MID operation system as well.
End of Report

More Related Content

What's hot

Painting procedure rev 0 (d 1157)
Painting procedure rev 0 (d 1157)Painting procedure rev 0 (d 1157)
Painting procedure rev 0 (d 1157)ghani386
 
Cswip 11-01 - plant inspection
Cswip 11-01 - plant inspectionCswip 11-01 - plant inspection
Cswip 11-01 - plant inspection
Rafik Guerbous
 
MRM - Management Review Meeting Presentation
MRM - Management Review Meeting PresentationMRM - Management Review Meeting Presentation
MRM - Management Review Meeting Presentation
Engr. Syed Noor Mustafa Shah
 
Quality
QualityQuality
GMP- APQR Training
GMP- APQR TrainingGMP- APQR Training
GMP- APQR Training
Dr. Amsavel A
 
good documentation practice
good documentation practice good documentation practice
good documentation practice
YannamVasundharaRedd
 
Good Laboratory Practice (GLP)
Good Laboratory Practice (GLP)Good Laboratory Practice (GLP)
Good Laboratory Practice (GLP)
Bangaluru
 
UNIT 3 NON DESTRUCTIVE TESTING.pdf
UNIT 3 NON DESTRUCTIVE TESTING.pdfUNIT 3 NON DESTRUCTIVE TESTING.pdf
UNIT 3 NON DESTRUCTIVE TESTING.pdf
charuvarshini3
 
coating defects
coating defectscoating defects
coating defects
Daniel SLSA CLA
 
Auditorías internas - Mar 2015
Auditorías internas - Mar 2015Auditorías internas - Mar 2015
Auditorías internas - Mar 2015
Inés Benito Barreda
 
Process Validation of API
Process Validation of APIProcess Validation of API
Process Validation of APIsrirao3462
 
Api q1 6 a monogram-iso audit template- blank
Api q1 6 a monogram-iso audit template- blankApi q1 6 a monogram-iso audit template- blank
Api q1 6 a monogram-iso audit template- blank
Bart Mullins
 
Non confirming products
Non confirming productsNon confirming products
Non confirming products
Jitesh Gaurav
 
Vendor certification
Vendor certificationVendor certification
Vendor certification
Yachita Rajwadwala
 
ISO/IEC 17025 2017 Check List
ISO/IEC 17025 2017 Check ListISO/IEC 17025 2017 Check List
ISO/IEC 17025 2017 Check List
Mohamed Salama Elimam
 
Ut procedure general
Ut procedure generalUt procedure general
Ut procedure general
naiduvs
 
ISCC Supply Chain Model Mass Balance (Presentation Slides for Mills).ppt
ISCC Supply Chain Model  Mass Balance (Presentation Slides for Mills).pptISCC Supply Chain Model  Mass Balance (Presentation Slides for Mills).ppt
ISCC Supply Chain Model Mass Balance (Presentation Slides for Mills).ppt
WanZahir3
 
Visual testing
Visual testingVisual testing
Visual testing
ndtindia123
 
NON CONFORMANCE REPORTING (1)
NON CONFORMANCE REPORTING (1)NON CONFORMANCE REPORTING (1)
NON CONFORMANCE REPORTING (1)Ahsan Ghori
 
Capa form-template
Capa form-templateCapa form-template
Capa form-template
SheraShahira
 

What's hot (20)

Painting procedure rev 0 (d 1157)
Painting procedure rev 0 (d 1157)Painting procedure rev 0 (d 1157)
Painting procedure rev 0 (d 1157)
 
Cswip 11-01 - plant inspection
Cswip 11-01 - plant inspectionCswip 11-01 - plant inspection
Cswip 11-01 - plant inspection
 
MRM - Management Review Meeting Presentation
MRM - Management Review Meeting PresentationMRM - Management Review Meeting Presentation
MRM - Management Review Meeting Presentation
 
Quality
QualityQuality
Quality
 
GMP- APQR Training
GMP- APQR TrainingGMP- APQR Training
GMP- APQR Training
 
good documentation practice
good documentation practice good documentation practice
good documentation practice
 
Good Laboratory Practice (GLP)
Good Laboratory Practice (GLP)Good Laboratory Practice (GLP)
Good Laboratory Practice (GLP)
 
UNIT 3 NON DESTRUCTIVE TESTING.pdf
UNIT 3 NON DESTRUCTIVE TESTING.pdfUNIT 3 NON DESTRUCTIVE TESTING.pdf
UNIT 3 NON DESTRUCTIVE TESTING.pdf
 
coating defects
coating defectscoating defects
coating defects
 
Auditorías internas - Mar 2015
Auditorías internas - Mar 2015Auditorías internas - Mar 2015
Auditorías internas - Mar 2015
 
Process Validation of API
Process Validation of APIProcess Validation of API
Process Validation of API
 
Api q1 6 a monogram-iso audit template- blank
Api q1 6 a monogram-iso audit template- blankApi q1 6 a monogram-iso audit template- blank
Api q1 6 a monogram-iso audit template- blank
 
Non confirming products
Non confirming productsNon confirming products
Non confirming products
 
Vendor certification
Vendor certificationVendor certification
Vendor certification
 
ISO/IEC 17025 2017 Check List
ISO/IEC 17025 2017 Check ListISO/IEC 17025 2017 Check List
ISO/IEC 17025 2017 Check List
 
Ut procedure general
Ut procedure generalUt procedure general
Ut procedure general
 
ISCC Supply Chain Model Mass Balance (Presentation Slides for Mills).ppt
ISCC Supply Chain Model  Mass Balance (Presentation Slides for Mills).pptISCC Supply Chain Model  Mass Balance (Presentation Slides for Mills).ppt
ISCC Supply Chain Model Mass Balance (Presentation Slides for Mills).ppt
 
Visual testing
Visual testingVisual testing
Visual testing
 
NON CONFORMANCE REPORTING (1)
NON CONFORMANCE REPORTING (1)NON CONFORMANCE REPORTING (1)
NON CONFORMANCE REPORTING (1)
 
Capa form-template
Capa form-templateCapa form-template
Capa form-template
 

Similar to China factory audit report

Audit Report of GMC
Audit Report of GMCAudit Report of GMC
Audit Report of GMCAnson Lai
 
Case study based on production, financial and social audits
Case study based on production, financial and social auditsCase study based on production, financial and social audits
Case study based on production, financial and social audits
John William
 
WHO- Self Inspection & Quality Audit_2012.ppt
WHO- Self Inspection & Quality Audit_2012.pptWHO- Self Inspection & Quality Audit_2012.ppt
WHO- Self Inspection & Quality Audit_2012.ppt
HafizurRahman130404
 
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing  FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing
John William
 
Overview on Textile Sourcing in Vietnam, Thailand, China, Costa Rica, Guatem...
Overview on Textile Sourcing in Vietnam, Thailand, China, Costa  Rica, Guatem...Overview on Textile Sourcing in Vietnam, Thailand, China, Costa  Rica, Guatem...
Overview on Textile Sourcing in Vietnam, Thailand, China, Costa Rica, Guatem...
John William
 
Six Sigma Project Charter Attributa Data of Roshan Weeratunga
Six Sigma Project Charter Attributa Data of Roshan   WeeratungaSix Sigma Project Charter Attributa Data of Roshan   Weeratunga
Six Sigma Project Charter Attributa Data of Roshan WeeratungaRoshan Sujeewa Weeratunga
 
Part 3 - Mfg excellence thr TPS (1).pdf
Part 3 - Mfg excellence thr TPS  (1).pdfPart 3 - Mfg excellence thr TPS  (1).pdf
Part 3 - Mfg excellence thr TPS (1).pdf
PrabagaraneRamachand1
 
Part 3 - Mfg excellence thr TPS (1).pdf
Part 3 - Mfg excellence thr TPS  (1).pdfPart 3 - Mfg excellence thr TPS  (1).pdf
Part 3 - Mfg excellence thr TPS (1).pdf
PrabagaraneRamachand1
 
Kitsen Audit Report By SGS--Ashley
Kitsen Audit Report By SGS--AshleyKitsen Audit Report By SGS--Ashley
Kitsen Audit Report By SGS--Ashley
AshleyLiKITSEN
 
Copy of Basic Quality infromation for maufacturing sector.pdf
Copy of Basic Quality infromation for maufacturing sector.pdfCopy of Basic Quality infromation for maufacturing sector.pdf
Copy of Basic Quality infromation for maufacturing sector.pdf
vinayakumararm
 
# 3 PPT - Expose Your Hidden Problems Using Visual Management
# 3 PPT - Expose Your Hidden Problems Using Visual Management# 3 PPT - Expose Your Hidden Problems Using Visual Management
# 3 PPT - Expose Your Hidden Problems Using Visual Management
Rhonda Kovera
 
Total productive maintenance (tpm)
Total productive maintenance (tpm)Total productive maintenance (tpm)
Total productive maintenance (tpm)
ranviry49
 
Bam 421 unit 4 examination answers
Bam 421 unit 4 examination answersBam 421 unit 4 examination answers
Bam 421 unit 4 examination answers
RichardAment
 
Bam 421 unit 4 examination answers
Bam 421 unit 4 examination answersBam 421 unit 4 examination answers
Bam 421 unit 4 examination answers
RandalHoffman
 
Wear Plate Sourcing Project Case Study by Dragon Sourcing
Wear Plate Sourcing Project Case Study by Dragon SourcingWear Plate Sourcing Project Case Study by Dragon Sourcing
Wear Plate Sourcing Project Case Study by Dragon Sourcing
John William
 
Ranveer yadav 2013 14
Ranveer yadav 2013 14Ranveer yadav 2013 14
Ranveer yadav 2013 14ranviry49
 
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
Prashant Rasekar
 
PCBA Sourcing Case Study by Dragon Sourcing
PCBA Sourcing Case Study by Dragon SourcingPCBA Sourcing Case Study by Dragon Sourcing
PCBA Sourcing Case Study by Dragon Sourcing
John William
 
BSCI证书
BSCI证书BSCI证书
BSCI证书妮 安
 

Similar to China factory audit report (20)

Audit Report of GMC
Audit Report of GMCAudit Report of GMC
Audit Report of GMC
 
Case study based on production, financial and social audits
Case study based on production, financial and social auditsCase study based on production, financial and social audits
Case study based on production, financial and social audits
 
WHO- Self Inspection & Quality Audit_2012.ppt
WHO- Self Inspection & Quality Audit_2012.pptWHO- Self Inspection & Quality Audit_2012.ppt
WHO- Self Inspection & Quality Audit_2012.ppt
 
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing  FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing
 
Overview on Textile Sourcing in Vietnam, Thailand, China, Costa Rica, Guatem...
Overview on Textile Sourcing in Vietnam, Thailand, China, Costa  Rica, Guatem...Overview on Textile Sourcing in Vietnam, Thailand, China, Costa  Rica, Guatem...
Overview on Textile Sourcing in Vietnam, Thailand, China, Costa Rica, Guatem...
 
Six Sigma Project Charter Attributa Data of Roshan Weeratunga
Six Sigma Project Charter Attributa Data of Roshan   WeeratungaSix Sigma Project Charter Attributa Data of Roshan   Weeratunga
Six Sigma Project Charter Attributa Data of Roshan Weeratunga
 
Part 3 - Mfg excellence thr TPS (1).pdf
Part 3 - Mfg excellence thr TPS  (1).pdfPart 3 - Mfg excellence thr TPS  (1).pdf
Part 3 - Mfg excellence thr TPS (1).pdf
 
Part 3 - Mfg excellence thr TPS (1).pdf
Part 3 - Mfg excellence thr TPS  (1).pdfPart 3 - Mfg excellence thr TPS  (1).pdf
Part 3 - Mfg excellence thr TPS (1).pdf
 
Sample Report-FA-LED Lamp (1)
Sample Report-FA-LED Lamp (1)Sample Report-FA-LED Lamp (1)
Sample Report-FA-LED Lamp (1)
 
Kitsen Audit Report By SGS--Ashley
Kitsen Audit Report By SGS--AshleyKitsen Audit Report By SGS--Ashley
Kitsen Audit Report By SGS--Ashley
 
Copy of Basic Quality infromation for maufacturing sector.pdf
Copy of Basic Quality infromation for maufacturing sector.pdfCopy of Basic Quality infromation for maufacturing sector.pdf
Copy of Basic Quality infromation for maufacturing sector.pdf
 
# 3 PPT - Expose Your Hidden Problems Using Visual Management
# 3 PPT - Expose Your Hidden Problems Using Visual Management# 3 PPT - Expose Your Hidden Problems Using Visual Management
# 3 PPT - Expose Your Hidden Problems Using Visual Management
 
Total productive maintenance (tpm)
Total productive maintenance (tpm)Total productive maintenance (tpm)
Total productive maintenance (tpm)
 
Bam 421 unit 4 examination answers
Bam 421 unit 4 examination answersBam 421 unit 4 examination answers
Bam 421 unit 4 examination answers
 
Bam 421 unit 4 examination answers
Bam 421 unit 4 examination answersBam 421 unit 4 examination answers
Bam 421 unit 4 examination answers
 
Wear Plate Sourcing Project Case Study by Dragon Sourcing
Wear Plate Sourcing Project Case Study by Dragon SourcingWear Plate Sourcing Project Case Study by Dragon Sourcing
Wear Plate Sourcing Project Case Study by Dragon Sourcing
 
Ranveer yadav 2013 14
Ranveer yadav 2013 14Ranveer yadav 2013 14
Ranveer yadav 2013 14
 
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
 
PCBA Sourcing Case Study by Dragon Sourcing
PCBA Sourcing Case Study by Dragon SourcingPCBA Sourcing Case Study by Dragon Sourcing
PCBA Sourcing Case Study by Dragon Sourcing
 
BSCI证书
BSCI证书BSCI证书
BSCI证书
 

More from Eagle Eyes (CHINA) Quality Inspection Co.,Ltd

Quality inspection sampling standard
Quality inspection sampling standardQuality inspection sampling standard
Quality inspection sampling standard
Eagle Eyes (CHINA) Quality Inspection Co.,Ltd
 
Amazon fba inspection china
Amazon fba inspection chinaAmazon fba inspection china
Production monitoring
Production monitoringProduction monitoring
China company verification china business license checkup
China company verification china business license checkupChina company verification china business license checkup
China company verification china business license checkup
Eagle Eyes (CHINA) Quality Inspection Co.,Ltd
 
China inspection-china quality control report
China inspection-china quality control reportChina inspection-china quality control report
China inspection-china quality control report
Eagle Eyes (CHINA) Quality Inspection Co.,Ltd
 
Drone quality control airplane inspection
Drone quality control airplane inspectionDrone quality control airplane inspection
Drone quality control airplane inspection
Eagle Eyes (CHINA) Quality Inspection Co.,Ltd
 

More from Eagle Eyes (CHINA) Quality Inspection Co.,Ltd (6)

Quality inspection sampling standard
Quality inspection sampling standardQuality inspection sampling standard
Quality inspection sampling standard
 
Amazon fba inspection china
Amazon fba inspection chinaAmazon fba inspection china
Amazon fba inspection china
 
Production monitoring
Production monitoringProduction monitoring
Production monitoring
 
China company verification china business license checkup
China company verification china business license checkupChina company verification china business license checkup
China company verification china business license checkup
 
China inspection-china quality control report
China inspection-china quality control reportChina inspection-china quality control report
China inspection-china quality control report
 
Drone quality control airplane inspection
Drone quality control airplane inspectionDrone quality control airplane inspection
Drone quality control airplane inspection
 

Recently uploaded

Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
daothibichhang1
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
JeremyPeirce1
 
In the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptxIn the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptx
Adani case
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
Kirill Klimov
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Lviv Startup Club
 
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
Lviv Startup Club
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
Corey Perlman, Social Media Speaker and Consultant
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
LuanWise
 
An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.
Any kyc Account
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
balatucanapplelovely
 
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Boris Ziegler
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
HARSHITHV26
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
NZSG
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
Aurelien Domont, MBA
 

Recently uploaded (20)

Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
 
In the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptxIn the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptx
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
 
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
 
An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
 
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
 

China factory audit report

  • 1. Watch Your Quality All The Time Page 1 of 19 China Factory Audit Report In general, we will check the following aspects for a factory audit: Content Section 1: Company Overview 1.1 Legal Validity 1.2 Company Building Information 1.3 Communication Infrastructures 1.4 Products Markets Section 2: Management 2.1 Company Chart 2.2 Employee Headcount 2.3 Management 2.4 Working force training 2.5 Working Condition (Safety) Section 3: Production Capacity 3.1 Annual Production Capacity (Previous Year) 3.2 Production Capacity 3.3 Production Machinery 3.4Testing Machinery 3.5 Subcontractors 3.6 Daily output check Section 4: Quality Assurance 4.1 Quality Management System Certification 4.2 Product Certification 4.3 Quality Control Management 4.4 Supplier Management 4.5 After Sales Service Section 5: Production Process Management Section 6: R & D Capacity Section 7: Company Development / Expansion Plans Section 8: Certification & Photos Section 9: Others
  • 2. Watch Your Quality All The Time Page 2 of 19 Section 1: Company Overview Company Overview 1.1 Legal Validity Does the company have a valid Business license? Yes No Business License Number xxxxxxxxxxxx Year Established: 2003-01-03 Validity Period: 2020-12-31 Registered Address: xxxxxx ,Gushu Village, Xixiang Town, Bao’an District, Shenzhen Company Address: xxxxxx ,Gushu Village, Xixiang Town, Bao’an District, Shenzhen Annual review conducted by the Industrial & Commercial Bureau? Yes No Reviewed By: Shenzhen Industrial & Commercial Bureau Registered Capital: RMB: 50,000,000 Corporate Representative: Zhang Xiaoping Industry: Manufacture and sale of PCBA Business Type: Manufacturer Trading Company Combined Type of Ownership: Private Owner limited Company Joint Venture Other Products Manufactured: PCBA Business License (Original)
  • 3. Watch Your Quality All The Time Page 3 of 19 1.2 Company Building Information Certification Type: Land Certification Real Estate Certification Lease Agreement Factory Officer Claimed Total Building Size: 20000m 2 Number of Building(s): 2 Number of Sample room(s) N/A Number of Warehouse 1 Factory building #1(3 floor) Factory building #2(4 floor) Company's Certificate Company's Certificate
  • 4. Watch Your Quality All The Time Page 4 of 19 1.3 Communication Infrastructures Telephone sets 50 Fax machines 1 Computers 182 Digital Camera 10 Internet Access Type: _China Telecom_ 1.4 Products Markets Product Type Main customer Name Market location Monthly Order Qty Factory not willing to reply. Their market are mainly in China. Section 2: Management Management 2.1 Company Chart
  • 5. Watch Your Quality All The Time Page 5 of 19 2.2 Employee Headcount Department Name Full Time Employee(s) Part-time Employee(s) Total G.M 7 0 7 Purchasing Dept. 11 0 11 AV R&D Dept. 17 0 17 Finance Dept. 8 0 8 PMC Dept. 8 0 8 Warehouse Dept. 27 0 27 Comprehensive Dept. 9 0 9 MID R&D Dept. 44 0 44 Production technology Dept. 43 0 43 Marketing Dept. 49 0 49 Car electronic Dept. 7 0 7 MID testing Dept. 6 0 6 SMT Production Dept. 223 0 223 Testing Dept. 87 0 87 DIP Production Dept. 230 0 230 MID Production Dept. 215 0 215 Quality Dept. 125 0 125 Account Dept. 20 0 20 Total Number: 1146 0 1146 2.3 Management Department Name Title Year(s) in Current Company G.M Zhang Xiaoping - 12
  • 6. Watch Your Quality All The Time Page 6 of 19 Production Dept. Huang Sheng - 12 Purchasing Dept. Cai Xiaotian - 11 Quality Dept. Tan Yunliang - 10 2.4 Working force training Content Observations / Comments 2.4.1 Are employees having skill training process? Yes, all employees have skill training Yes, some employees have skill training No 2.4.2 Is the skill training valid? Yes, all skill training valid Yes, some skill training valid No 2.4.3 Is the skill training having record? Yes, all skill training having record Yes, some skill training having record No 2.5 Working Condition(Safety) Content Observations/Comments 2.5.1 Are workplace sufficiently well ventilated? Yes No 2.5.2 Are aisles and emergency exit doors clearly marked, illuminated, accessible, and kept clear of obstructions? Yes No 2.5.3 Does the factory have Fire extinguisher? Yes No Secure Channel
  • 7. Watch Your Quality All The Time Page 7 of 19
  • 8. Watch Your Quality All The Time Page 8 of 19 Section 3: Production Capacity Production Capacity 3.1 Annual Production Capacity Product Name: MID PCBA 150K pcs/Week Phone PCBA 600K pcs/Week DVD PCBA 600K pcs/Week 3.2 Production Capacity Product Name Production Line Capacity Actual Units Produced (Previous Year) - - - 3.3 Production Machinery Machine Name Brand& Model No. Quantity Number of Year(s) Used Condition Fully automatic printing machine Unknown 16 Unknown Good High-speed chip mounter SIEMENS 16 Unknown Good Multi-functional smt machine SIEMENS 8 Unknown Good Reflow oven Unknown 16 Unknown Good Fully automatic printing machine High-speed chip mounter High-speed chip mounter High-speed chip mounter
  • 9. Watch Your Quality All The Time Page 9 of 19 Reflow oven AOI machine Machine
  • 10. Watch Your Quality All The Time Page 10 of 19 3.4 Testing Machinery Machine Name Brand & Model No. Quantity Number of Year(s) Used Condition Salt spraying tester Unknown 1 Unknown Good X-Ray Unknown 1 Unknown Good AOI Unknown 10 Unknown Good KAYOTIM Unknown 1 Unknown Good Salt spraying tester Salt spraying tester 3.5 Subcontractors Subcontractor Name Product Subcontracted Volume Supplied Cooperation Period(Years) Factory not willing to reply. Section 4: Quality Assurance Quality Management System and Product Certification 4.1 Quality Management System Certification Certification Certified By Certificate No. Validity Period Factory not provide 4.2 Product Certification Certification Certified By Certificate No. Product Name Validity Nil Nil Nil Nil
  • 11. Watch Your Quality All The Time Page 11 of 19 4.3 Quality Control Management Content Observations/Comments 4.3.1 Is there quality control in all lines? Yes, all production lines have quality control Yes, some production lines have quality control No 4.3.2 Do the QA/QC inspectors work independently from the production line? Yes No 4.3.3 Who does the QA/QC Manager/Supervisor report to? QC department manager: Tan Yunliang 4.3.4 How many QA/QC inspectors in total? 83 workers on production line do 100% inspection. 30 independent QC do sample inspection. QC report QC report QC report QC report No. of Employees in Each Production Line
  • 12. Watch Your Quality All The Time Page 12 of 19 Production Line Supervisor No. of Operators No. of In-line QC/QA SMT workshop -- 223 20 DIP workshop -- 230 33 MID workshop -- 215 18 SMT workshop SMT workshop SMT workshop SMT workshop SMT workshop
  • 13. Watch Your Quality All The Time Page 13 of 19 SMT workshop SMT workshop SMT workshop SMT workshop SMT workshop SMT workshop
  • 14. Watch Your Quality All The Time Page 14 of 19 SMT workshop SMT workshop SMT workshop SMT workshop
  • 15. Watch Your Quality All The Time Page 15 of 19 4.4 Supplier Management Content Observations/Comments 4.4.1 Does the company have a supplier assessment procedure? Yes No 4.4.2 Does the company have an updated list of approved supplier? Yes, Because of commercial confidentiality, the factory did not allow to take photo. No 4.4.3 Does the company establish and implement a standard procedure for purchasing contract review and approval? Yes, Because of commercial confidentiality, the factory did not allow to take photo. No 4.4.4 Does the company keep it’s supplier assessment reports? Yes,Because of commercial confidentiality, the factory did not allow to take photo. No 4.4.5 Are there company’s purchasing documents Yes No 4.4.6 Is there a procedure to conduct random product inspections after final packaging? Yes No 4.4.7 Does the factory perform regular quality control at major production steps? Yes No 4.5 After Sales Service Content Observations/Comments 4.5.1 Is customer feedback, including complaints, clearly record and maintained? Yes No 4.5.2 Are there any clear procedures for handling customer complaints? Yes No 4.5.3 Is there a closed-loop corrective action system in place? Yes No 4.5.4 Can finished/packaged products be traced by lot identification to the appropriate raw material test reports? Yes No 4.5.5 Is there a product alert and recall procedure? Yes No
  • 16. Watch Your Quality All The Time Page 16 of 19 Section 5: Production Process Management Production Process Management Content Observations/Comments 5.1 Is the factory tidy and clean enough for production? Yes No 5.2 Are the following items/documents provided at the appropriate location? Yes No 5.3 Are written instructions available for onsite material inspection/testing? Are the relevant records maintained? Yes No 5.4 Are written inspection/testing instructions available for finished products? Are the relevant records maintained? Yes No 5.5 How are finished products inspected? 100% Full check 5.6 Are units that failed inspection clearly marked and separated to prevent accidental dispatch? Yes No 5.7 How are finished products that failed inspection handled? Yes, Repaired and re-inspected. Job guidance document for inspection Job guidance document for inspection Job guidance document for inspection Job guidance document for inspection
  • 17. Watch Your Quality All The Time Page 17 of 19 Job guidance document for inspection Job guidance document for inspection Job guidance document for production Job guidance document for production
  • 18. Watch Your Quality All The Time Page 18 of 19 Section 6: R&D Capacity R&D Capacity Content Observations/Comments 6.1 There are _61_ R&D engineer(s) in the company. 6.2 Does the company have it’s own brand? If yes, please specify Yes No 6.3 Does the company provide ODM service for others? Yes No 6.4 Are there relevant design Input / Output, review, and verification documents available for the assessment company? Yes No 6.5 Based on inspection, are R&D employees equipped with adequate specialized equipment? If yes, please list all key equipment used:________ N/A 6.6 Do R&D employees use any specific software for designing new products? If yes, please list the main software used:_ N/A 6.7 Please list all certifications and/or qualifications of the R&D department. N/A Designs Certificate Designs Certificate N/A N/A Section 7: Company Development/ Expansion Plans Company Development/ Expansion Plans Company Development Action Timeframe N/A N/A Section 8: Certification & Photos Certification & Photos
  • 19. Watch Your Quality All The Time Page 19 of 19 N/A N/A Section 9: Others Remarks 1. SHENGZHEN XXX ELECTRONIC CO., LTD is legally registered as manufacturing factory. It is a large size of PCBA factory in Shenzhen. 2. Part of the documents. Because involving trade secrets, factory did not let us take pictures. 3. On-site audit, the factory is producing products, auditor did not find child labor. 4. Factory looks very specialized in the PCB client is intending to purchase; factory has a good production capacity and quality control system. 5. The auditor found that factory employees were not wearing employee's card, need to improve. 6. And no PCB board production machines, the factory purchases PCB and other materials, then mounts PCBs. 7. Factory does not have sample room; factory can provide solution to MID operation system as well. End of Report