TRIANGLE ENGINEERING LLC
May, 2018
MAKE A CHANGE 1
MAKE A CHANGE 2
THE AIM
TRUE ICV
• Raw Material - 90%
• Planned and under training 50% Omani
• 100% Ownership
• Designed/Built/Operated based on
MOG ICV Strategy
• Developed and supported by PDO
• Project Management by Omanis’
• Total ICV anticipated in “2020” is OMR
38 MM
CHANGE AGENT
• Initiate implementation of standards on
imports
• Omanization Ratio
• Training Quality
• Ecosystem
• Quality Control
• Safety
• Jobs
• Revenue
MAKE A CHANGE 3
TRIANGLE ENGINEERING LLC
• Vision: To create greater
choice in the benefit of
concerned and make TE
products well recognized for
quality as an Omani product
MAKE A CHANGE 4
• Mission : To develop a safe,
active, and creative work
environment with full
commitment to ensure
customer satisfaction
TE PRODUCTS & SERVICES
• Standards
• Ledgers
• Transoms
• Props
• Base Jacks
• Couplers
• Bracings
• Scaffold Tubes
• Design, Calculation and
estimation of scaffold setup
• Erection and Dismantling of
Scaffold
• Lease/Hire of Scaffolding
Materials
MAKE A CHANGE 5
STANDARDS
• BS 1139 – Specification for use of steel tubes
• EN 12810 – Façade scaffolds from prefabricated components
• EN 12811 – Temporary works equipment
• EN 74 – Scaffolding couplers and fittings.
MAKE A CHANGE 6
MAKE A CHANGE 7
HORIZON Engineering & Technical Services LLC
‫االفق‬‫للهندسة‬‫والخدمات‬‫الفنية‬‫ش‬‫م‬‫م‬
Our Valuable Clients
TE FACILITY – INDUSTRIAL AREA PH-7, SOHAR
MAKE A CHANGE 8
Factory Workshop
Semi-Automated
Painting LineFabricated
Material
MAKE A CHANGE 9
MAKE A CHANGE 10
Thank You
MAKE A CHANGE 11

Triangle engineering Profile

  • 1.
    TRIANGLE ENGINEERING LLC May,2018 MAKE A CHANGE 1
  • 2.
  • 3.
    THE AIM TRUE ICV •Raw Material - 90% • Planned and under training 50% Omani • 100% Ownership • Designed/Built/Operated based on MOG ICV Strategy • Developed and supported by PDO • Project Management by Omanis’ • Total ICV anticipated in “2020” is OMR 38 MM CHANGE AGENT • Initiate implementation of standards on imports • Omanization Ratio • Training Quality • Ecosystem • Quality Control • Safety • Jobs • Revenue MAKE A CHANGE 3
  • 4.
    TRIANGLE ENGINEERING LLC •Vision: To create greater choice in the benefit of concerned and make TE products well recognized for quality as an Omani product MAKE A CHANGE 4 • Mission : To develop a safe, active, and creative work environment with full commitment to ensure customer satisfaction
  • 5.
    TE PRODUCTS &SERVICES • Standards • Ledgers • Transoms • Props • Base Jacks • Couplers • Bracings • Scaffold Tubes • Design, Calculation and estimation of scaffold setup • Erection and Dismantling of Scaffold • Lease/Hire of Scaffolding Materials MAKE A CHANGE 5
  • 6.
    STANDARDS • BS 1139– Specification for use of steel tubes • EN 12810 – Façade scaffolds from prefabricated components • EN 12811 – Temporary works equipment • EN 74 – Scaffolding couplers and fittings. MAKE A CHANGE 6
  • 7.
    MAKE A CHANGE7 HORIZON Engineering & Technical Services LLC ‫االفق‬‫للهندسة‬‫والخدمات‬‫الفنية‬‫ش‬‫م‬‫م‬ Our Valuable Clients
  • 8.
    TE FACILITY –INDUSTRIAL AREA PH-7, SOHAR MAKE A CHANGE 8 Factory Workshop Semi-Automated Painting LineFabricated Material
  • 9.
  • 10.
  • 11.