Crane Inspection Check – List

                      Parameter                              Observation     Remarks


1.        Cabin
 i.         House-keeping
 ii.        Illumination
 iii. Bell
 iv. Door
 v.         Fan
 vi. Glass
 vii. Chair
 viii. Fire Extinguisher
2.        L/T Platform
 i.         House-keeping
 ii.        Electrical Panel Door
 iii.       Railing
 iv.        L/T Drive Coupling Guard.
 v.         L/T Motor End cover
 vi.        L/T Motor terminal box cover
 vii. Distribution Board Cover
 viii. Condition of stair
      - Cabin to L/T Platform
      - L/T Platform to CT track
 ix.        Brake of LT
 x.         Buffer
3.        Limit
     i.      Main Hoist.
     ii.     Aux. Hoist.
     iii.    Cross. Travel
     iv.     Tong Control
4.        Neutral Interlock System
 i.         Main Hoist.
 ii.        Aux. Hoist.
 iii.       Long Travel
 iv.        Cross. Travel
 v.         Tong Rotation
 vi.        Tong Control
5. Emergency door switch
6.        CT Platform
 i.         Condition of C.T. track
 ii.        House-keeping
 iii.       Approach to C.T. Platform
 iv.        Drive Coupling Guard
                -MH, AH, CT
 v.         Motor terminal box cover
               -MH, AH, CT


                                       -1-
Crane Inspection Check – List

                       Parameter                                Observation     Remarks


     vi.        End cover of MH, AH, CT
 vii. Railing
 viii. Toe guard
 ix.            Brake of MH, AH, CT
7.        Crane Landing Platform
     i.         Railing&
     ii.        Toe guard
     iii.       Condition of stair
     iv.        Illumination in the staircase
     v.         Door
8.        Bus bar protection
9.        Crane bridge light
10. Condition            of   Current    Collector
    platform
11. Bus bar power indicating lamp
12. Crane walk way
  i.   Railing
  ii. Toe guard
  iii. Floor Condition
  iv. House-keeping
13. Railing at cable hanging platform
14. Condition of LT track
15. Condition of hook
     i.         AH
     ii.        MH
16. Condition of Pulley
          i.      Hook Assembly
          ii.     Balancer pulley
17. Condition of Rope
          i.      MH
          ii.     AH
18. Rope guard in hook assembly




                                          -2-

Check list for crane inspection, B C Das

  • 1.
    Crane Inspection Check– List Parameter Observation Remarks 1. Cabin i. House-keeping ii. Illumination iii. Bell iv. Door v. Fan vi. Glass vii. Chair viii. Fire Extinguisher 2. L/T Platform i. House-keeping ii. Electrical Panel Door iii. Railing iv. L/T Drive Coupling Guard. v. L/T Motor End cover vi. L/T Motor terminal box cover vii. Distribution Board Cover viii. Condition of stair - Cabin to L/T Platform - L/T Platform to CT track ix. Brake of LT x. Buffer 3. Limit i. Main Hoist. ii. Aux. Hoist. iii. Cross. Travel iv. Tong Control 4. Neutral Interlock System i. Main Hoist. ii. Aux. Hoist. iii. Long Travel iv. Cross. Travel v. Tong Rotation vi. Tong Control 5. Emergency door switch 6. CT Platform i. Condition of C.T. track ii. House-keeping iii. Approach to C.T. Platform iv. Drive Coupling Guard -MH, AH, CT v. Motor terminal box cover -MH, AH, CT -1-
  • 2.
    Crane Inspection Check– List Parameter Observation Remarks vi. End cover of MH, AH, CT vii. Railing viii. Toe guard ix. Brake of MH, AH, CT 7. Crane Landing Platform i. Railing& ii. Toe guard iii. Condition of stair iv. Illumination in the staircase v. Door 8. Bus bar protection 9. Crane bridge light 10. Condition of Current Collector platform 11. Bus bar power indicating lamp 12. Crane walk way i. Railing ii. Toe guard iii. Floor Condition iv. House-keeping 13. Railing at cable hanging platform 14. Condition of LT track 15. Condition of hook i. AH ii. MH 16. Condition of Pulley i. Hook Assembly ii. Balancer pulley 17. Condition of Rope i. MH ii. AH 18. Rope guard in hook assembly -2-