Chapter 2

            Perspectives
                 in
1/23/2012
            Management     1
Management in Antiquity
                                                      D Greeks


             C Babylonians                                                                  G Venetians


     B Egyptians                                           E Romans


     A Sumerians                          F Chinese



3000 B.C.    2500 B.C.   2000 B.C.   1500 B.C.   1000 B.C.    500 B.C.                  A.D.500   A.D.1000   A.D.1500



A Used written rules and regulations for governance          E Used organized structure for communication and control


B Used management practices to construct pyramids            F Used extensive organization structure for government
                                                                agencies and the arts
C Used extensive set of laws and policies for governance
                                                             G Used organization design and planning concepts to
D Used different governing systems for cities and state
                                                                control the seas


 1/23/2012                                                                                                         1–2
Early Management Pioneers

• Adam Smith
      – A renowned economist
      – Writer of the book – Wealth of Nations
        (1776)
      – Division of work for economic advantage
      – Increasing individual worker’s skill and
        dexterity

1/23/2012                                          1–3
Early Management Pioneers

• Robert Owen (1771–1858)
      –British industrialist who was
       one of the first managers to
       recognize the importance of
       human resources and the
       welfare of workers.
1/23/2012                               1–4
Early Management Pioneers

• Charles Babbage (1792–1871)
      –English mathematician who
       focused on creating efficiencies of
       production through the division of
       labor, and the application of
       mathematics
       to management problems.

1/23/2012                                    5
An Integrative Framework
            of Management Perspectives
            Systems Approach                               Contingency Perspective
            • Recognition of internal                      • Recognition of the situational
              interdependencies                              nature of management
            • Recognition of                               • Response to particular
              environmental influences                       characteristics of situation

              Classical                  Behavioral                 Quantitative
              Management                 Management                 Management
              Perspectives               Perspectives               Perspectives
              Methods for                Insights for moti-         Techniques for
              enhancing                  vating performance         improving decision
              efficiency and             and understanding          making, resource
              facilitating planning,     individual behavior,       allocation, and
              organizing, and            groups and teams,          operations
              controlling                and leadership



                                  Effective and efficient management


1/23/2012                                                                                     6
Approaches to Management theories:

• Different approaches to management theories evolved
• can be classified as:
      1. Classical Theory
           a. Scientific management theory
           b. Administrative management theory
     2. Behavioral Science Theory
     3. Management Science Theory
     4. Decision Theory
     5. Systems Theory
     6. Contingency Theory

1/23/2012                                               7
1. Classical Theory:
• emerged in the early year of the twentieth century to
  increase efficiency and productivity due to evolution of large
  scale business.
• constitutes the discipline & process of management in an
  organization.
• also referred to as the traditional theory,
• includes two different approaches
       i. scientific management
       ii. administrative management

    A. Scientific Management Theory:
• developed to increase productivity through labor efficiency in
  the early 20th century.

1/23/2012                                                          8
1. Classical Theory (contd.) :
   A. Scientific Management Theory (contd.) :
• prominent contributors of scientific management theory
  were Frederick W. Taylor, Frank & Lillian Gilbert and Henry
  Gantt.
• F.W. Taylor was the greatest contributor and played the
  dominant role.

F.W.Taylor’s Scientific Management Theory:

• F.W Taylor known as the “Father of Scientific Management”.
• worked at the Midvale steel company, Philadelphia and
  Bethlehem Steel company, Pennsylvania.


1/23/2012                                                       9
1. Classical Theory (contd.) :
   A. Scientific Management Theory (contd.) :
F.W.Taylor’s Scientific Management Theory (contd.) :

• Observed (in these companies) that production & pay were
  poor, inefficiency existed, wastage was high, workers put into
  job without matching their abilities and the workers used
  different techniques to perform the same work.
• realized that work efficiency was low due to lack of order and
  system
• This led him to come out with “The principle of scientific
  management” in 1911 A.D. in which the explained the
  principles of scientific management.
• emphasized one best method of doing work to increase
  efficiency & productivity.


1/23/2012                                                      10
A. Scientific Management Theory (contd.) :
 F.W.Taylor’s Scientific Management Theory (contd.)
 Taylor’s Principles:
    concluded his studies by laying down certain principles :
 Standardization
 • referring to the speed & rate at which work should be done
 • Using standard & right equipments and tools for the jobs.
 • development of true science of doing work by studying the
    nature of work and replacing rule of thumb.
 Time and task study:
 • required to determine one best method of doing work.
 Systematic selection & Training:
 • scientific selection of employees and providing proper training
    and developing them to undertake the task assigned
 • not letting workers choose the work but rather placing

1/23/2012                                                       11
A. Scientific Management Theory (contd.) :
  F. W.Taylor’s Scientific Management Theory (contd.)
Taylor’s Principles (contd.) :

Systematic selection & Training (contd.) :
   right person on the right job.
Pay Incentives:
• referring to the increment in the payroll in accordance with
  the amount of work done in order to increase productivity.(
  paid according to piece produced)
• employees motivated by economic incentives
• greater pay for greater output and vice versa
Cooperation between managers and operatives:
• referring to harmony between the employer and employee to
  accomplish work by dividing the work scientifically and
  systematically.
• managers involved in planning the work, determining the
  working procedure, time of doing work etc & supervising

1/23/2012                                                    12
A. Scientific Management Theory (contd.) :
     F.W. Taylor’s Scientific Management Theory (contd.)
  Taylor’s Principles (contd.) :

  Cooperation between managers and operatives (contd.):
      the employees
  • employees executing the plans as per the instructions
  • a mental revolution to be created by establishing
    understanding between employer and employees

  Taylor’s Followers:
  1. Henry Gantt
  • One of the followers of F.W. Taylor
  • a mechanical engineer who worked as a close associate of
     Taylor at the Midvale steel company.

1/23/2012                                                      13
Scientific Management Theory (contd.) :
  Taylor’s Followers (contd.):
  1. Henry Gantt
  • replaced Taylor’s differential piece rate system by combining a
     guaranteed day rate (minimum wage) with an above standard
     bonus.
  • however, known for originating a Graphic chart (Gantt Chart)
     as a scheduling device for planning & controlling work & this
     is his contribution to scientific management.
  • emphasized on the recognition of human factor and service
     rather than profits.

  2.Frank and Lillian Gilbert
  • A team of husband and wife
  • Frank a construction contractor and Lillian a psychologist who
     too followed Taylor’s footsteps.
1/23/2012                                                       14
Scientific Management Theory (contd.) :
Taylor’s Followers (contd.):
2.Frank and Lillian Gilbert
• used motion pictures to study hand and body motion by use
   of micro chronometer that recorded the time to determine
   the time spent on motion in doing a task.
• conducted motion and fatigue study with the (help of) brick
   layering experiment
• suggested economical motion (decrease unnecessary
   motions) to upgrade performance of each individual.
• Developed performance efficiency techniques (scientific
   training, selection & development)
• Improved working conditions by redesigning various machines
   & tools to fit people thereby reducing fatigue.
1/23/2012                                                   15
Scientific Management Theory (contd.) :
Contributions:
    developed performance efficiency techniques ( like scientific
    training, selection, development etc.)
    improved working conditions by redesigning various machines
    and tools to fit people for efficiency of work
   emphasized over specialization and standardization for
   smooth flow of work
Limitations
• viewed worker as undimensional beings interested in more
   money and motivated them i.e. Men were considered as
   machine.
• Assumed that environment of organizations were predictable,
   stable & simple which is not realistic.
• focuses on production, ignoring other sectors of management
• no one best way of doing work
1/23/2012                                                           16
2. Administrative Management Theory
 • also referred to as the universalist or functional approach
 • focuses on the management of total organizations
     effectively; especially larger organizations
 • assumes that management process remains the same across
     all organizations
 • Prominent administrative theorists are
     Henri Fayol and Max Weber

 Henri Fayol
 • A French engineer, an industrialist as well as a successful
    administrator in a French mining company
 • Published a book in 1916 A.D. that was translated into
    English in 1929, entitled “General and Industrial
    Administration”
 • conceptualizes management functions & principles for the
    successful management of all types of organizations
1/23/2012                                                        17
B. Administrative Management Theory
i. Henri Fayol (Contd.)
• believed that a manager's job could be divided into five
  functions
       planning
       organizing
       commanding          essential for managerial success
       coordinating
       controlling
• also stated a series of principles of management to guide
  managers resolve problems in a particular situation and carry
  out their functional duties.

Functions of Management
• Emphasized that all managers must perform functions as
1/23/2012                                                     18
B. Administrative Management Theory
 i. Henri Fayol (Contd.)
 Functions of Management
 1. Planning
    Managers forecasting the events and developing an operating
    plan to guide future decisions
 2. Organizing
    Determining appropriate combination of resources (machine,
    material and human) to accomplish task.
 3. Commanding
    Directing the activities of subordinates through two-way
    communication
 4. Coordinating
    Arranging and integrating group efforts towards unity of
    action
 5. Controlling
    Ensuring actual activities are according to the plan set

1/23/2012                                                    19
B. Administrative Management Theory (contd.)
 i. Henri Fayol (Contd.)
 • activities to be accomplished in industrial organizations:
 1. Technical:
     activities concerned with production.
 2. Commercial:
     activities like buying,selling and exchange functions.
 3. Financial:
     obtaining capital and optimum utilization of capital
 4. Security:
     protection of persons and property.
 5. Accounting:
     financial transactions recording.
 6. Managerial:
     activities of management like planning, organizing,
     commanding and controlling
1/23/2012                                                       20
B. Administrative Management Theory (contd.)
i. Henri Fayol (Contd.)

Principles of Management
1. Division of work
• specialization to increase output.
2. Authority
• the right flowing from responsibility.
3. Discipline
• follow rules and regulations (being obedient).
4. Unity of command
• report and receive orders from only one superior.
5. Unity of direction
• similar activities grouped under one plan and directed by one
   superior.
• efforts focused and coordinated in same direction
1/23/2012                                                     21
B. Administrative Management Theory (contd.)
i. Henri Fayol (Contd.)

Principles of Management
6. Subordination of individual interests to the general interest
• organizational interest must be given priority over individual
   interest.
7. Remuneration
• fair wage service to the employees (performance based)
8. Centralization
• the final decision making power retained by the top level
• maintaining balance between centralization and
   decentralization.
9. Scalar chain
• flow of work authority and communication in a chain from top to
   bottom.
 1/23/2012                                                    22
B. Administrative Management Theory (contd.)
i. Henri Fayol (Contd.)

Principles of Management
10. Order
• resources kept in right place.
11. Equity
• just and fair towards subordinates.
• leads to devotion and loyal service
12. Stability of staffs
• reducing high absenteeism and turnover of staffs.( as people
    need time to learn their jobs)
13. Initiative
• employees taking initiative and being creative.
14. Esprit de corps
• harmonious relation and promote team spirit
1/23/2012                                                    23
B. Administrative Management Theory (contd.)
i. Henri Fayol (Contd.)

Conclusion
• argued management as a continuous process beginning with
   planning and ending with controlling
• a framework for analyzing management process
• theory is useful as it specifies what managers should do [but
   not why & how]
• Fayol's concept is a skeleton that is to be fleshed out with
   concepts, techniques and situational refinements

ii. Max Weber
• A German sociologist who developed a theory of authority
    structure, the ideal model for management i.e. the
    bureaucracy approach

1/23/2012                                                    24
B. Administrative Management Theory (contd.)
ii. Max Weber
• Bureaucracy is efficient and effective way of
     –      division of labor,
     –      hierarchy of authority,
     –      framework of rules and regulations and
     –      impersonality

• Recommended bureaucratic organization model for doing
  work in groups for large organization

• however recognized that it didn't exist in reality




1/23/2012                                                 25
Max Weber’s Theory
Features of Bureaucracy Structure
1. Division of Labor     Complex work broken down into simple jobs


2. Hierarchy of          Accepted chain of command to direct individual's effort
Authority                towards organizational goal accomplishment


3. Framework of Rules    Effort directed and coordinated by rules


4. Impersonality         Hiring and promoting people on the basis of objective merit
                         rather than favoritism (on the basis of what they know, and
                         not who they know)


5. Formal Selection      Technical competence members selected accordingly on the
                         basis of training, qualification, education etc.


1/23/2012                                                                          26
B. Administrative Management Theory (contd.)
ii. Max Weber

Conclusion
• Every systematically managed organization regardless of its
  size and purpose has to some extent a moderate degree of
  bureaucracy to enhance organizational efficiency
• However, taken too very high bureaucracy can hinder
  efficiency far can hinder the efficiency
• The bureaucratic system, however, is a very rigid system to be
  followed in practice




1/23/2012                                                     27
B. Administrative Management Theory (contd.)

Contributions
 Foundation for the development of other management
   theories
 Identified important management aspects as a frame of
   reference and basis of management in organization
Limitations
 Prescribed universal procedures to be applied in organization
   ignoring the situation, complexity and environment in which
   organization operate
 Ignored the human element in the organization and viewed
   them as tools.

1/23/2012                                                     28
Behavioral Perspective
• Hawthorne Studies
• Human Relations Movement
• Emergence of Organizational Behavior




1/23/2012                                29
Behavioral Management Perspective
 • Behavioral Management
       – Emphasized individual attitudes and behaviors, and
         group processes, and recognized the importance of
         behavioral processes in the workplace.
 • Hugo Munsterberg (1863–1916)
       – A German psychologist, considered the father of
         industrial psychology, who advocated the practice of
         applying psychological concepts to employees
         selection and motivation industrial settings.
 • Mary Parker Follett (1868 –1933)
       – Recognized the importance of the role of human
         behavior in the workplace.
1/23/2012                                                     30
2. Behavioral Science Theory (contd.)
   A. Human Relations Approach (contd.)

   The Hawthorne Studies (contd.)
    Illumination Programme
        Experiment carried out to study the relationship
          between the intensity of light and productivity over a
          selected group of employees
        result showed illumination did not affect output
    Relay Assembly Room Programme
        Manipulation of physical surroundings to study the
          effect on productivity
        working conditions changed to observe its effect on
          productivity
        concluded that team feeling, recognition and social
          settings important for higher productivity
1/23/2012                                                          31
2. Behavioral Science Theory (contd.)
A. Human Relations Approach (contd.)

The Hawthorne Studies (contd.)
 Mass Interviewing Programme
    20,000 workers interviewed to find out factors responsible
     for human behavior at work
    social relations and interrelationship among employees
     influenced the group to enhance performance
 Bank Wiring Observation Room Programme
    to find out the functioning of small groups over
     individuals
    importance of informal group highlighted that set their
     norms and protect the employees or workers



1/23/2012                                                     32
The Hawthorne Studies (1927–1932)

• Conducted by Elton Mayo and associates at Western
  Electric
      – Illumination study—workplace lighting adjustments affected
        both the control and the experimental groups of production
        employees.
      – Group study—implementation of piecework incentive plan
        caused production workers to establish informal levels of
        acceptable individual output.
            • Over-producing workers were labeled “rate busters” and under-
              producing workers were considered “chiselers.”
      – Interview program—confirmed the importance of human
        behavior in the workplace.
      – Bank Wiring Observation Room Program
        14 workers were formed into a work group and observed for
        seven months

1/23/2012                                                                     33
2. Behavioral Science Theory (contd.)
A. Human Relations Approach (contd.)
The Hawthorne Studies’ conclusion:
• Productivity was much affected by the attitudes of the worker
   (Relationship between members of a work group and
   between members and their supervisors) rather than working
   condition and incentive plan (like hours of work, wage
   incentives, etc.)
• the informal work group formed at the work places,
   determined the worker behavior by setting the group norms,
   standard worker output, hierarchy of member, creating group
   security and group sentiments, thereby exercising strong
   control over the behavior of the workers
• emphasized more on humanistic and realistic view of social
   man from economic man
• Group or social factors played a dominant and significant role
   in the functioning of the organization in achieving their goals,
   since it provided the members the feeling of acceptance and
   dignity and satisfied employees
1/23/2012                                                         34
Behavioral Management Perspective (cont’d)
 • Human Relations Movement
       – Grew out of the Hawthorne studies.
       – Proposed that workers respond primarily
         to the social context of work, including
         social conditioning, group norms,
         and interpersonal dynamics.
       – Assumed that the manager’s
         concern for workers would lead to
         increased worker satisfaction and
         improved worker performance.

1/23/2012                                           35
The Human
                      Source: Van Fleet, David D.,
  Relations View of   Contemporary Management,
    Management        Second Edition. Copyright © 1991
                      by Houghton Mifflin Company.
                      Used with permissions.



1/23/2012                                          36
Behavioral Management Perspective
                (cont’d)
 • Abraham Maslow
       – Advanced a theory that employees are motivated
         by a hierarchy of needs that they seek to satisfy.
 • Douglas McGregor
       – Proposed Theory X and Theory Y concepts
         of managerial beliefs about people
         and work.



1/23/2012                                                 37
Need Hierarchy Theory
• Unlimited needs – when one need is fulfilled,
  another arises
• Unfulfilled needs creates anxiety which leads
  to motivation
• Needs arise in order
      – Classification of needs:




1/23/2012                                         38
Classification of Needs:
                   Self        Desire to become what one is
               Actualization
                  Needs
                               capable of


               Esteem          Self respect, autonomy, etc.
               Needs
               Social          Affection, acceptance,
                               friendship
               Needs
             Security          Physical, financial, psychological

              Needs
            Physiological      Food, shelter, clothing, sex,
                               maternal need.
               Needs
1/23/2012                                                      39
1/23/2012   40
Theory X and Theory Y
• Developed by Douglas McGregor
• Theory X Assumptions
        – People do not like work and try to avoid it.
        – People do not like work, so managers have to
          control, direct, coerce, and threaten employees to
          get them to work toward organizational goals.
        – People prefer to be directed,
          to avoid responsibility, and
          to want security; they have
          little ambition.
Source: Douglas McGregor, The Human Side of Enterprise, Copyright © 1960
by McGraw-Hill. Reprinted by permission of The McGraw-Hill Companies.
1/23/2012                                                                  41
Theory X and Theory Y (cont’d)
• Theory Y Assumptions
      – People do not dislike work; work is a natural part of
        their lives.
      – People are internally motivated to reach objectives to
        which they are committed.
      – People are committed to goals to the degree that they
        receive rewards when they reach their objectives.
      – People seek both seek responsibility and accept
        responsibility under favorable conditions.
      – People can be innovative in solving problems.
      – People are bright, but under most organizational
        conditions their potentials are underutilized.

1/23/2012                                                    42
Two Factor Theory
• Developed by – Frederick Herzberg for work
  motivation.

• Hygiene Factors = Dissatisfaction vs no
                   Dissatisfaction

• Motivation Factors = No satisfaction vs
                       Satisfaction
1/23/2012                                      43
Organizational Behavior
• A contemporary field focusing on behavioral
  perspectives on management.
      – Draws on psychology, sociology, anthropology,
        economics, and medicine.
• Important topics in organizational behavior
  research:
      –     Job satisfaction and job stress
      –     Motivation and leadership
      –     Group dynamics and organizational politics
      –     Interpersonal conflict
      –     The structure and design of organizations

1/23/2012                                                44
Behavioral Management
               Perspective…Today
 • Contributions
       – Provided important insights into motivation,
         group dynamics, and other interpersonal
         processes.
       – Focused managerial attention on these critical
         processes.
       – Challenged the view that employees are tools
         and furthered the belief that employees are
         valuable resources.

1/23/2012                                                 45
Behavioral Management
            Perspective…Today (cont’d)
 • Limitations
       – Complexity of individuals makes behavior difficult
         to predict.
       – Many concepts not put to use because managers
         are reluctant to adopt them.
       – Contemporary research findings are not often
         communicated to practicing managers in an
         understandable form.


1/23/2012                                                 46
Quantitative Perspectives

    Management Science
   Operations Management
Quantitative Perspectives
• Developed during World War II
• Mathematicians, Physicists, and Other
  Scientists helped in war techniques
• Quantitative approach to management
  involves use of quantitative techniques like:
      – Statistics
      – Information models
      – Computer simulations etc.

1/23/2012            Quantative and Integrating Perspective   48
Management Science
• Primarily concerned with decision making.
• Emphasis on application of mathematics and
  statistics for decision making and problem
  solving.
Techniques of Management Science:
• Linear Programming
• Game Theory
• Sampling Theory
• Probability Theory
• Simulation etc.
1/23/2012        Quantative and Integrating Perspective   49
Operations Management Theory
• Concerned with managing the process of
  converting the inputs (raw-materials) into
  outputs (finished products)
• Concerned with quality, customer service and
  competition.
Techniques of Operations Management:
• Quality Control
• Total Quality Management
• Just In Time Technique
• Six sigma etc.

1/23/2012        Quantative and Integrating Perspective   50
Quantitative Management
                   Perspective
 • Contributions
       – Developed sophisticated quantitative techniques to
         assist in decision making.
       – Application of models has
         increased our awareness
         and understanding of
         complex processes and
         situations.
       – Has been useful in the
         planning and controlling
         processes.

1/23/2012              Quantative and Integrating Perspective   51
Quantitative Management
                   Perspective
 • Limitations
       – Quantitative management cannot fully explain or
         predict the behavior of people in organizations.
       – Mathematical sophistication may come at
         the expense of other managerial skills.
       – Quantitative models may require
         unrealistic or unfounded assumptions,
         limiting their general applicability.


1/23/2012             Quantative and Integrating Perspective   52
Integrating
            Perspectives
• Systems Perspective
• Contingency Perspective


1/23/2012      Quantative and Integrating Perspective   53
System Perspective (Theory)
• A system is a set of inter-related and inter-
  dependent parts, arranged in such a way that
  produces a unified whole.




                  Feedback of
                  System

1/23/2012           Quantative and Integrating Perspective   54
Elements of Systems Theory
•   Goal Orientation
•   Subsystem
•   Synergy
•   System boundary
•   Flow
•   Feedback
•   Open or closed

1/23/2012           Quantative and Integrating Perspective   55
Contributions and Limitations
• Contributions of system theory:
      – Provides conceptual framework for meaningful
        analysis and management of an organization
      – Emphasis on interrelations- interdependence
      – Helps in problem solving
      – It integrates various management theories by
        emphasizing on physical aspect, behavioral
        aspect, and environmental aspect

1/23/2012           Quantative and Integrating Perspective   56
Limitations of Systems Theory

• Too abstract and difficult to apply
• Does not offer tools and
  techniques
• It does not offer unified body of
  knowledge.

1/23/2012       Quantative and Integrating Perspective   57
Contingency Perspective (Theory)
• The theory focuses on situational factors.
• Main logic behind the theory:
      – There is no one best method in all different
        situations
• The best method to solve a problem varies
  according to situation.
• Every organization is unique.
• There are four contingency variables that
  determine management Practice:
1/23/2012             Quantative and Integrating Perspective   58
Four Contingency Variables

• Organization size
• Routineness of Task
  Technology
• Environmental Uncertainty
• Individual Differences
1/23/2012           Quantative and Integrating Perspective   59
Contributions and Limitations:
• Contributions of Contingency Theory:
• Encourages innovation in problem
  solving
• Requires the use of analytical, critical,
  and multidimensional techniques
• Increased freedom to managers
• Required managers to be more sensitive
  and alert
1/23/2012        Quantative and Integrating Perspective   60
Limitations of Contingency Theory
• Ignores universally applicable
  principles
• Fails to enlist all contingency
  variables
• Focuses only on situation and not on
  tools and resources
• It ignores human behavioral aspects.
1/23/2012    Quantative and Integrating Perspective   61
Emerging Management Issues and
                Challenges
•   Globalization
•   Development of Environmentalism
•   Quality and Productivity
•   Ethics and social responsibility
•   Workforce diversity
•   Innovation and change
•   Empowerment of employees
•   Knowledge management
•   Technological development
•   Multicultural effects

1/23/2012             Quantative and Integrating Perspective   62
Chapter 2: Outline
• Precursors:
      – Management in Antiquity
      – Early Management Pioneers
• Classical Perspective:
      – Scientific Management: F.W. Taylor
      – Administrative Management: Hanri Fayol
      – Bureaucracy : max Weber
• Behavioral Perspective:
      – Hawthorne studies, Human Relations Movement, Organizational Behavior
• Quantitative Perspective:
      – Decisional Theory and Management Science and Operation Science Theory
• Integrating Perspective:
      – System and Contingency Perspective
• Emerging Management Issues and Challenges



1/23/2012                                                                       63
Thank You
      Chapter Finish
1/23/2012   Quantative and Integrating Perspective   64

Chapter two perspectives in management complete

  • 1.
    Chapter 2 Perspectives in 1/23/2012 Management 1
  • 2.
    Management in Antiquity D Greeks C Babylonians G Venetians B Egyptians E Romans A Sumerians F Chinese 3000 B.C. 2500 B.C. 2000 B.C. 1500 B.C. 1000 B.C. 500 B.C. A.D.500 A.D.1000 A.D.1500 A Used written rules and regulations for governance E Used organized structure for communication and control B Used management practices to construct pyramids F Used extensive organization structure for government agencies and the arts C Used extensive set of laws and policies for governance G Used organization design and planning concepts to D Used different governing systems for cities and state control the seas 1/23/2012 1–2
  • 3.
    Early Management Pioneers •Adam Smith – A renowned economist – Writer of the book – Wealth of Nations (1776) – Division of work for economic advantage – Increasing individual worker’s skill and dexterity 1/23/2012 1–3
  • 4.
    Early Management Pioneers •Robert Owen (1771–1858) –British industrialist who was one of the first managers to recognize the importance of human resources and the welfare of workers. 1/23/2012 1–4
  • 5.
    Early Management Pioneers •Charles Babbage (1792–1871) –English mathematician who focused on creating efficiencies of production through the division of labor, and the application of mathematics to management problems. 1/23/2012 5
  • 6.
    An Integrative Framework of Management Perspectives Systems Approach Contingency Perspective • Recognition of internal • Recognition of the situational interdependencies nature of management • Recognition of • Response to particular environmental influences characteristics of situation Classical Behavioral Quantitative Management Management Management Perspectives Perspectives Perspectives Methods for Insights for moti- Techniques for enhancing vating performance improving decision efficiency and and understanding making, resource facilitating planning, individual behavior, allocation, and organizing, and groups and teams, operations controlling and leadership Effective and efficient management 1/23/2012 6
  • 7.
    Approaches to Managementtheories: • Different approaches to management theories evolved • can be classified as: 1. Classical Theory a. Scientific management theory b. Administrative management theory 2. Behavioral Science Theory 3. Management Science Theory 4. Decision Theory 5. Systems Theory 6. Contingency Theory 1/23/2012 7
  • 8.
    1. Classical Theory: •emerged in the early year of the twentieth century to increase efficiency and productivity due to evolution of large scale business. • constitutes the discipline & process of management in an organization. • also referred to as the traditional theory, • includes two different approaches i. scientific management ii. administrative management A. Scientific Management Theory: • developed to increase productivity through labor efficiency in the early 20th century. 1/23/2012 8
  • 9.
    1. Classical Theory(contd.) : A. Scientific Management Theory (contd.) : • prominent contributors of scientific management theory were Frederick W. Taylor, Frank & Lillian Gilbert and Henry Gantt. • F.W. Taylor was the greatest contributor and played the dominant role. F.W.Taylor’s Scientific Management Theory: • F.W Taylor known as the “Father of Scientific Management”. • worked at the Midvale steel company, Philadelphia and Bethlehem Steel company, Pennsylvania. 1/23/2012 9
  • 10.
    1. Classical Theory(contd.) : A. Scientific Management Theory (contd.) : F.W.Taylor’s Scientific Management Theory (contd.) : • Observed (in these companies) that production & pay were poor, inefficiency existed, wastage was high, workers put into job without matching their abilities and the workers used different techniques to perform the same work. • realized that work efficiency was low due to lack of order and system • This led him to come out with “The principle of scientific management” in 1911 A.D. in which the explained the principles of scientific management. • emphasized one best method of doing work to increase efficiency & productivity. 1/23/2012 10
  • 11.
    A. Scientific ManagementTheory (contd.) : F.W.Taylor’s Scientific Management Theory (contd.) Taylor’s Principles: concluded his studies by laying down certain principles : Standardization • referring to the speed & rate at which work should be done • Using standard & right equipments and tools for the jobs. • development of true science of doing work by studying the nature of work and replacing rule of thumb. Time and task study: • required to determine one best method of doing work. Systematic selection & Training: • scientific selection of employees and providing proper training and developing them to undertake the task assigned • not letting workers choose the work but rather placing 1/23/2012 11
  • 12.
    A. Scientific ManagementTheory (contd.) : F. W.Taylor’s Scientific Management Theory (contd.) Taylor’s Principles (contd.) : Systematic selection & Training (contd.) : right person on the right job. Pay Incentives: • referring to the increment in the payroll in accordance with the amount of work done in order to increase productivity.( paid according to piece produced) • employees motivated by economic incentives • greater pay for greater output and vice versa Cooperation between managers and operatives: • referring to harmony between the employer and employee to accomplish work by dividing the work scientifically and systematically. • managers involved in planning the work, determining the working procedure, time of doing work etc & supervising 1/23/2012 12
  • 13.
    A. Scientific ManagementTheory (contd.) : F.W. Taylor’s Scientific Management Theory (contd.) Taylor’s Principles (contd.) : Cooperation between managers and operatives (contd.): the employees • employees executing the plans as per the instructions • a mental revolution to be created by establishing understanding between employer and employees Taylor’s Followers: 1. Henry Gantt • One of the followers of F.W. Taylor • a mechanical engineer who worked as a close associate of Taylor at the Midvale steel company. 1/23/2012 13
  • 14.
    Scientific Management Theory(contd.) : Taylor’s Followers (contd.): 1. Henry Gantt • replaced Taylor’s differential piece rate system by combining a guaranteed day rate (minimum wage) with an above standard bonus. • however, known for originating a Graphic chart (Gantt Chart) as a scheduling device for planning & controlling work & this is his contribution to scientific management. • emphasized on the recognition of human factor and service rather than profits. 2.Frank and Lillian Gilbert • A team of husband and wife • Frank a construction contractor and Lillian a psychologist who too followed Taylor’s footsteps. 1/23/2012 14
  • 15.
    Scientific Management Theory(contd.) : Taylor’s Followers (contd.): 2.Frank and Lillian Gilbert • used motion pictures to study hand and body motion by use of micro chronometer that recorded the time to determine the time spent on motion in doing a task. • conducted motion and fatigue study with the (help of) brick layering experiment • suggested economical motion (decrease unnecessary motions) to upgrade performance of each individual. • Developed performance efficiency techniques (scientific training, selection & development) • Improved working conditions by redesigning various machines & tools to fit people thereby reducing fatigue. 1/23/2012 15
  • 16.
    Scientific Management Theory(contd.) : Contributions: developed performance efficiency techniques ( like scientific training, selection, development etc.) improved working conditions by redesigning various machines and tools to fit people for efficiency of work emphasized over specialization and standardization for smooth flow of work Limitations • viewed worker as undimensional beings interested in more money and motivated them i.e. Men were considered as machine. • Assumed that environment of organizations were predictable, stable & simple which is not realistic. • focuses on production, ignoring other sectors of management • no one best way of doing work 1/23/2012 16
  • 17.
    2. Administrative ManagementTheory • also referred to as the universalist or functional approach • focuses on the management of total organizations effectively; especially larger organizations • assumes that management process remains the same across all organizations • Prominent administrative theorists are Henri Fayol and Max Weber Henri Fayol • A French engineer, an industrialist as well as a successful administrator in a French mining company • Published a book in 1916 A.D. that was translated into English in 1929, entitled “General and Industrial Administration” • conceptualizes management functions & principles for the successful management of all types of organizations 1/23/2012 17
  • 18.
    B. Administrative ManagementTheory i. Henri Fayol (Contd.) • believed that a manager's job could be divided into five functions planning organizing commanding essential for managerial success coordinating controlling • also stated a series of principles of management to guide managers resolve problems in a particular situation and carry out their functional duties. Functions of Management • Emphasized that all managers must perform functions as 1/23/2012 18
  • 19.
    B. Administrative ManagementTheory i. Henri Fayol (Contd.) Functions of Management 1. Planning Managers forecasting the events and developing an operating plan to guide future decisions 2. Organizing Determining appropriate combination of resources (machine, material and human) to accomplish task. 3. Commanding Directing the activities of subordinates through two-way communication 4. Coordinating Arranging and integrating group efforts towards unity of action 5. Controlling Ensuring actual activities are according to the plan set 1/23/2012 19
  • 20.
    B. Administrative ManagementTheory (contd.) i. Henri Fayol (Contd.) • activities to be accomplished in industrial organizations: 1. Technical: activities concerned with production. 2. Commercial: activities like buying,selling and exchange functions. 3. Financial: obtaining capital and optimum utilization of capital 4. Security: protection of persons and property. 5. Accounting: financial transactions recording. 6. Managerial: activities of management like planning, organizing, commanding and controlling 1/23/2012 20
  • 21.
    B. Administrative ManagementTheory (contd.) i. Henri Fayol (Contd.) Principles of Management 1. Division of work • specialization to increase output. 2. Authority • the right flowing from responsibility. 3. Discipline • follow rules and regulations (being obedient). 4. Unity of command • report and receive orders from only one superior. 5. Unity of direction • similar activities grouped under one plan and directed by one superior. • efforts focused and coordinated in same direction 1/23/2012 21
  • 22.
    B. Administrative ManagementTheory (contd.) i. Henri Fayol (Contd.) Principles of Management 6. Subordination of individual interests to the general interest • organizational interest must be given priority over individual interest. 7. Remuneration • fair wage service to the employees (performance based) 8. Centralization • the final decision making power retained by the top level • maintaining balance between centralization and decentralization. 9. Scalar chain • flow of work authority and communication in a chain from top to bottom. 1/23/2012 22
  • 23.
    B. Administrative ManagementTheory (contd.) i. Henri Fayol (Contd.) Principles of Management 10. Order • resources kept in right place. 11. Equity • just and fair towards subordinates. • leads to devotion and loyal service 12. Stability of staffs • reducing high absenteeism and turnover of staffs.( as people need time to learn their jobs) 13. Initiative • employees taking initiative and being creative. 14. Esprit de corps • harmonious relation and promote team spirit 1/23/2012 23
  • 24.
    B. Administrative ManagementTheory (contd.) i. Henri Fayol (Contd.) Conclusion • argued management as a continuous process beginning with planning and ending with controlling • a framework for analyzing management process • theory is useful as it specifies what managers should do [but not why & how] • Fayol's concept is a skeleton that is to be fleshed out with concepts, techniques and situational refinements ii. Max Weber • A German sociologist who developed a theory of authority structure, the ideal model for management i.e. the bureaucracy approach 1/23/2012 24
  • 25.
    B. Administrative ManagementTheory (contd.) ii. Max Weber • Bureaucracy is efficient and effective way of – division of labor, – hierarchy of authority, – framework of rules and regulations and – impersonality • Recommended bureaucratic organization model for doing work in groups for large organization • however recognized that it didn't exist in reality 1/23/2012 25
  • 26.
    Max Weber’s Theory Featuresof Bureaucracy Structure 1. Division of Labor Complex work broken down into simple jobs 2. Hierarchy of Accepted chain of command to direct individual's effort Authority towards organizational goal accomplishment 3. Framework of Rules Effort directed and coordinated by rules 4. Impersonality Hiring and promoting people on the basis of objective merit rather than favoritism (on the basis of what they know, and not who they know) 5. Formal Selection Technical competence members selected accordingly on the basis of training, qualification, education etc. 1/23/2012 26
  • 27.
    B. Administrative ManagementTheory (contd.) ii. Max Weber Conclusion • Every systematically managed organization regardless of its size and purpose has to some extent a moderate degree of bureaucracy to enhance organizational efficiency • However, taken too very high bureaucracy can hinder efficiency far can hinder the efficiency • The bureaucratic system, however, is a very rigid system to be followed in practice 1/23/2012 27
  • 28.
    B. Administrative ManagementTheory (contd.) Contributions  Foundation for the development of other management theories  Identified important management aspects as a frame of reference and basis of management in organization Limitations  Prescribed universal procedures to be applied in organization ignoring the situation, complexity and environment in which organization operate  Ignored the human element in the organization and viewed them as tools. 1/23/2012 28
  • 29.
    Behavioral Perspective • HawthorneStudies • Human Relations Movement • Emergence of Organizational Behavior 1/23/2012 29
  • 30.
    Behavioral Management Perspective • Behavioral Management – Emphasized individual attitudes and behaviors, and group processes, and recognized the importance of behavioral processes in the workplace. • Hugo Munsterberg (1863–1916) – A German psychologist, considered the father of industrial psychology, who advocated the practice of applying psychological concepts to employees selection and motivation industrial settings. • Mary Parker Follett (1868 –1933) – Recognized the importance of the role of human behavior in the workplace. 1/23/2012 30
  • 31.
    2. Behavioral ScienceTheory (contd.) A. Human Relations Approach (contd.) The Hawthorne Studies (contd.)  Illumination Programme  Experiment carried out to study the relationship between the intensity of light and productivity over a selected group of employees  result showed illumination did not affect output  Relay Assembly Room Programme  Manipulation of physical surroundings to study the effect on productivity  working conditions changed to observe its effect on productivity  concluded that team feeling, recognition and social settings important for higher productivity 1/23/2012 31
  • 32.
    2. Behavioral ScienceTheory (contd.) A. Human Relations Approach (contd.) The Hawthorne Studies (contd.)  Mass Interviewing Programme  20,000 workers interviewed to find out factors responsible for human behavior at work  social relations and interrelationship among employees influenced the group to enhance performance  Bank Wiring Observation Room Programme  to find out the functioning of small groups over individuals  importance of informal group highlighted that set their norms and protect the employees or workers 1/23/2012 32
  • 33.
    The Hawthorne Studies(1927–1932) • Conducted by Elton Mayo and associates at Western Electric – Illumination study—workplace lighting adjustments affected both the control and the experimental groups of production employees. – Group study—implementation of piecework incentive plan caused production workers to establish informal levels of acceptable individual output. • Over-producing workers were labeled “rate busters” and under- producing workers were considered “chiselers.” – Interview program—confirmed the importance of human behavior in the workplace. – Bank Wiring Observation Room Program 14 workers were formed into a work group and observed for seven months 1/23/2012 33
  • 34.
    2. Behavioral ScienceTheory (contd.) A. Human Relations Approach (contd.) The Hawthorne Studies’ conclusion: • Productivity was much affected by the attitudes of the worker (Relationship between members of a work group and between members and their supervisors) rather than working condition and incentive plan (like hours of work, wage incentives, etc.) • the informal work group formed at the work places, determined the worker behavior by setting the group norms, standard worker output, hierarchy of member, creating group security and group sentiments, thereby exercising strong control over the behavior of the workers • emphasized more on humanistic and realistic view of social man from economic man • Group or social factors played a dominant and significant role in the functioning of the organization in achieving their goals, since it provided the members the feeling of acceptance and dignity and satisfied employees 1/23/2012 34
  • 35.
    Behavioral Management Perspective(cont’d) • Human Relations Movement – Grew out of the Hawthorne studies. – Proposed that workers respond primarily to the social context of work, including social conditioning, group norms, and interpersonal dynamics. – Assumed that the manager’s concern for workers would lead to increased worker satisfaction and improved worker performance. 1/23/2012 35
  • 36.
    The Human Source: Van Fleet, David D., Relations View of Contemporary Management, Management Second Edition. Copyright © 1991 by Houghton Mifflin Company. Used with permissions. 1/23/2012 36
  • 37.
    Behavioral Management Perspective (cont’d) • Abraham Maslow – Advanced a theory that employees are motivated by a hierarchy of needs that they seek to satisfy. • Douglas McGregor – Proposed Theory X and Theory Y concepts of managerial beliefs about people and work. 1/23/2012 37
  • 38.
    Need Hierarchy Theory •Unlimited needs – when one need is fulfilled, another arises • Unfulfilled needs creates anxiety which leads to motivation • Needs arise in order – Classification of needs: 1/23/2012 38
  • 39.
    Classification of Needs: Self Desire to become what one is Actualization Needs capable of Esteem Self respect, autonomy, etc. Needs Social Affection, acceptance, friendship Needs Security Physical, financial, psychological Needs Physiological Food, shelter, clothing, sex, maternal need. Needs 1/23/2012 39
  • 40.
  • 41.
    Theory X andTheory Y • Developed by Douglas McGregor • Theory X Assumptions – People do not like work and try to avoid it. – People do not like work, so managers have to control, direct, coerce, and threaten employees to get them to work toward organizational goals. – People prefer to be directed, to avoid responsibility, and to want security; they have little ambition. Source: Douglas McGregor, The Human Side of Enterprise, Copyright © 1960 by McGraw-Hill. Reprinted by permission of The McGraw-Hill Companies. 1/23/2012 41
  • 42.
    Theory X andTheory Y (cont’d) • Theory Y Assumptions – People do not dislike work; work is a natural part of their lives. – People are internally motivated to reach objectives to which they are committed. – People are committed to goals to the degree that they receive rewards when they reach their objectives. – People seek both seek responsibility and accept responsibility under favorable conditions. – People can be innovative in solving problems. – People are bright, but under most organizational conditions their potentials are underutilized. 1/23/2012 42
  • 43.
    Two Factor Theory •Developed by – Frederick Herzberg for work motivation. • Hygiene Factors = Dissatisfaction vs no Dissatisfaction • Motivation Factors = No satisfaction vs Satisfaction 1/23/2012 43
  • 44.
    Organizational Behavior • Acontemporary field focusing on behavioral perspectives on management. – Draws on psychology, sociology, anthropology, economics, and medicine. • Important topics in organizational behavior research: – Job satisfaction and job stress – Motivation and leadership – Group dynamics and organizational politics – Interpersonal conflict – The structure and design of organizations 1/23/2012 44
  • 45.
    Behavioral Management Perspective…Today • Contributions – Provided important insights into motivation, group dynamics, and other interpersonal processes. – Focused managerial attention on these critical processes. – Challenged the view that employees are tools and furthered the belief that employees are valuable resources. 1/23/2012 45
  • 46.
    Behavioral Management Perspective…Today (cont’d) • Limitations – Complexity of individuals makes behavior difficult to predict. – Many concepts not put to use because managers are reluctant to adopt them. – Contemporary research findings are not often communicated to practicing managers in an understandable form. 1/23/2012 46
  • 47.
    Quantitative Perspectives Management Science Operations Management
  • 48.
    Quantitative Perspectives • Developedduring World War II • Mathematicians, Physicists, and Other Scientists helped in war techniques • Quantitative approach to management involves use of quantitative techniques like: – Statistics – Information models – Computer simulations etc. 1/23/2012 Quantative and Integrating Perspective 48
  • 49.
    Management Science • Primarilyconcerned with decision making. • Emphasis on application of mathematics and statistics for decision making and problem solving. Techniques of Management Science: • Linear Programming • Game Theory • Sampling Theory • Probability Theory • Simulation etc. 1/23/2012 Quantative and Integrating Perspective 49
  • 50.
    Operations Management Theory •Concerned with managing the process of converting the inputs (raw-materials) into outputs (finished products) • Concerned with quality, customer service and competition. Techniques of Operations Management: • Quality Control • Total Quality Management • Just In Time Technique • Six sigma etc. 1/23/2012 Quantative and Integrating Perspective 50
  • 51.
    Quantitative Management Perspective • Contributions – Developed sophisticated quantitative techniques to assist in decision making. – Application of models has increased our awareness and understanding of complex processes and situations. – Has been useful in the planning and controlling processes. 1/23/2012 Quantative and Integrating Perspective 51
  • 52.
    Quantitative Management Perspective • Limitations – Quantitative management cannot fully explain or predict the behavior of people in organizations. – Mathematical sophistication may come at the expense of other managerial skills. – Quantitative models may require unrealistic or unfounded assumptions, limiting their general applicability. 1/23/2012 Quantative and Integrating Perspective 52
  • 53.
    Integrating Perspectives • Systems Perspective • Contingency Perspective 1/23/2012 Quantative and Integrating Perspective 53
  • 54.
    System Perspective (Theory) •A system is a set of inter-related and inter- dependent parts, arranged in such a way that produces a unified whole. Feedback of System 1/23/2012 Quantative and Integrating Perspective 54
  • 55.
    Elements of SystemsTheory • Goal Orientation • Subsystem • Synergy • System boundary • Flow • Feedback • Open or closed 1/23/2012 Quantative and Integrating Perspective 55
  • 56.
    Contributions and Limitations •Contributions of system theory: – Provides conceptual framework for meaningful analysis and management of an organization – Emphasis on interrelations- interdependence – Helps in problem solving – It integrates various management theories by emphasizing on physical aspect, behavioral aspect, and environmental aspect 1/23/2012 Quantative and Integrating Perspective 56
  • 57.
    Limitations of SystemsTheory • Too abstract and difficult to apply • Does not offer tools and techniques • It does not offer unified body of knowledge. 1/23/2012 Quantative and Integrating Perspective 57
  • 58.
    Contingency Perspective (Theory) •The theory focuses on situational factors. • Main logic behind the theory: – There is no one best method in all different situations • The best method to solve a problem varies according to situation. • Every organization is unique. • There are four contingency variables that determine management Practice: 1/23/2012 Quantative and Integrating Perspective 58
  • 59.
    Four Contingency Variables •Organization size • Routineness of Task Technology • Environmental Uncertainty • Individual Differences 1/23/2012 Quantative and Integrating Perspective 59
  • 60.
    Contributions and Limitations: •Contributions of Contingency Theory: • Encourages innovation in problem solving • Requires the use of analytical, critical, and multidimensional techniques • Increased freedom to managers • Required managers to be more sensitive and alert 1/23/2012 Quantative and Integrating Perspective 60
  • 61.
    Limitations of ContingencyTheory • Ignores universally applicable principles • Fails to enlist all contingency variables • Focuses only on situation and not on tools and resources • It ignores human behavioral aspects. 1/23/2012 Quantative and Integrating Perspective 61
  • 62.
    Emerging Management Issuesand Challenges • Globalization • Development of Environmentalism • Quality and Productivity • Ethics and social responsibility • Workforce diversity • Innovation and change • Empowerment of employees • Knowledge management • Technological development • Multicultural effects 1/23/2012 Quantative and Integrating Perspective 62
  • 63.
    Chapter 2: Outline •Precursors: – Management in Antiquity – Early Management Pioneers • Classical Perspective: – Scientific Management: F.W. Taylor – Administrative Management: Hanri Fayol – Bureaucracy : max Weber • Behavioral Perspective: – Hawthorne studies, Human Relations Movement, Organizational Behavior • Quantitative Perspective: – Decisional Theory and Management Science and Operation Science Theory • Integrating Perspective: – System and Contingency Perspective • Emerging Management Issues and Challenges 1/23/2012 63
  • 64.
    Thank You Chapter Finish 1/23/2012 Quantative and Integrating Perspective 64