In the above sample curves, the set of curves may apply to batteries of different

 sizes or to only one size.
In ETAP PowerStation, you specify a set of characteristic curves for a given
size. If you want to use a given set of curves for batteries of different sizes, you
can indicate this in the Battery Method Case Editor.
 26.4.3 Battery Sizing Sizing Study
The battery sizing calculation includes determining the number of cells
to meet the system voltage requirement and determining the battery size
and number of strings to meet the load duty cycle requirement.

Number of Cells
The number of cells should be determined to satisfy system

minimum and maximum voltage requirements:
1. When charging the battery, the voltage to be applied to the battery should
   not

be greater than the maximum system voltage.
Let N be the number of cells. The voltage requirements can be given in

the following equation        V sys,     ≤N≤   V sys,
                              V
                              mincell,         V cell,
                                               max
                              disch            ch

     Where
 Vsys,min

 is the minimum system voltage that is equal to the nominal voltage of the

   battery terminal bus multiplied by the minimum system voltage deviation
Vsys,max
is the maximum system voltage that is equal to the nominal voltage of the
   entered in the Battery Sizing Study Case Editor.
battery terminal bus multiplied by the maximum system voltage deviation
Vcell,disch is the battery discharge voltage in V/Cell entered in the
Battery Sizing Study Case Editor.
entered in the Battery Sizing Study Case Editor.

It is clear that the number of cells of the battery is dependent on the four

 values for voltage requirement
entered in the Battery Sizing Study Case Editor. It can happen that for
some incompatible values, we cannot determine a value for N to satisfy
the above equation. When this situation occurs, ETAP will display a
message indicating that it cannot determine the number of cells.
 In practical cases, there is often a range of values that N can take to

satisfy the above equation. In this
case, ETAP will select the value for N that results in the battery rated
voltage being closest to its terminal bus nominal voltage.
Cell Size
In determining the battery size, ETAP will find the smallest size that

 can provide sufficient power for the
specified duty cycle. The capacity of a battery can be increased
either by using a larger size or by adding more strings. Since ETAP
allows you to enter different characteristic curves for different sizes
of batteries, in the battery sizing calculation, the program starts with
one string and the smallest size available for the calculation. If it fails
to meet the load requirement, the program first increases the size and
performs calculations with the characteristic curves for the new size.
When no available sizes can meet the load requirement for the given
number of strings, it then increases the string number and performs
the calculation with the smallest size again. This process continues
until a battery size and a string number are found to meet the load
requirement.
Load Sections in Battery Duty Cycle

A battery duty cycle generally can be represented as a square

waveform. It consists of a number of time periods, with a constant

 current value during a period. The figure below shows a sample
duty
                   i
      S i a=    ∑ It P j
cycle for battery.1 consists of six periods, designated as P1, P2,
                j=



… P6.     A load section Si is a combination of a number of load

periods, defined as:
In the sample duty cycle there are six load sections.




          Load Sections for A Sample Battery Duty Cycle
Determination of Cell Size Based on Battery Characteristic Curves

Based on a given set of battery characteristic curves, we can determine the

 required battery size for a specified duty cycle. Let F represent cell size. It is
                     F= Max Fi           i=1,..Sm
 equal to:

where Sm is the total number of load sections and Fi is the size

calculated for the ith load section. The calculation of Fi depends on the
where Ap is the load current value in period P. RT is the value obtained from the
type of characteristic curve, which is the number of amperes that each positive
battery battery library curves.
Random Load and Non-Random Load

In general, the duty cycle for a battery consists of random loads and

non-random loads. The program determines the cells for random and

non-random loads separately in the same way as described in the

previous section. The sum of the two cell size values is the uncorrected

cell size for the given duty cycle.
 Adjusting Factors

 In the Battery Sizing Study Case Editor, you can select several

 adjusting factors to be considered in calculating battery size. These

   factors include temperature factor, design margin factor, aging
Calculation Cycle

It is clear from the equations for determining cell size that the cell size is

calculated based on a given set of battery characteristic curves, which is for a

given cell size. If the calculated cell size is different from the one

corresponding to the characteristic curves used. We have to do the calculation
26.4.4 Battery Discharging Calculation Method
The purpose of battery discharge calculation is to determine battery
performance for a specified duty cycle. One of the key parameters for battery
performance is the battery terminal voltage. When the battery is supplying
the load as the sole source, it should be able to maintain voltage level for the
whole period of the specified duty cycle.


Battery Characteristic Curves for Voltage Interpolation
The terminal voltage of a battery is dependent on the current drawing from the

battery and the ampere-hour capacity contained in the battery. This

relationship is described by the battery characteristic curve and is very

nonlinear. In ETAP, the battery characteristics are described in the battery

library as discrete points. Because no closed form equation is available to

describe the battery characteristics, numerical interpolation methods have to
Battery Combined Duty Cycle
be used to find the points missing in the curves. Apparently, the more curves
When the load powered by the battery includes random load, the random load
 are entered in the battery library, the more accurate the calculated results will
 should be added to the non-
random load at the worst point, which is the time the battery has the lowest
 be.
voltage value when only the non-random load is considered. To identify this
time moment, the program first performs battery discharge calculation
excluding the random load. It then determine the worst point, add the random
load to the non-random load and perform discharge calculation from the time
when the random load takes effect all the way to the end of battery duty cycle.
Battery Voltage Calculation
An iterative process is conducted to calculated battery discharge

 voltage values. A battery voltage value
is reported at each time step specified in the battery sizing study case
and at each moment when there is a change in the load duty cycle. By
changing the step size from the battery sizing study case, the user can
adjust the level of detail information on discharge calculation to be
reported.
If the battery duty cycle is calculated by the load current summation

 method, the battery current will
change only when there is a change in any load duty cycle. When the
load flow method is selected in the study case, even if there is no
change in the load duty cycle, the battery current will change due to
decrease in the battery voltage. In this case the battery current is
calculated by a full load flow calculation, considering different types
of loads and system losses. In this load flow calculation, the battery is
modeled as a constant voltage source with the voltage calculated in the
previous step. The calculated battery current will be used in the
current step for battery voltage calculation.
Along with battery voltage and current, the battery discharge program

 also calculates battery discharge
capacity. When there is change in the load current, two values of
voltage
When the battery is calculated using load flow method, the battery
and current are calculated, at t –
 discharge calculation also provides a
and t+, one for before the load change and one for after the load change.
26.5Required Data
26.5.1 Source
In battery sizing calculation, the only source is the battery to be

 sized. Batteries may only besized/discharged one at a time as

specified in the study case. A UPS may be considered as a load to the
   Battery
system when its input bus is not connected to an energized bus.

•ID
•Bus connection data
•Battery library type data. This information is used to retrieve library
data for calculations.

  If only the battery discharge calculation is conducted, the

  following additional information is also
        •Battery number of plates and Capacity.
  required:
        •Number of cells
        •Number of Strings
        •SC page battery external resistance.
26.5.2 Load

 UPS
 When a UPS is not connected to an energized input AC bus, it is

  considered a load in battery sizing calculations.
•ID

•Bus connection data

•DC rated voltage kW and kVA. Duty Cycle Page

•If no duty cycle data is entered, this load will be assumed to be zero.


   DC Motor


•ID
•Bus connection data
•Quantity
•Rated voltage

•kW or HP and Efficiency. Duty Cycle Page
Lumped Load

•ID
•Bus connection data
•Rated voltage kW Rating
•Duty Cycle Page
•If no duty cycle data is entered, this load will be assumed to be zero.


  Static Load
   •ID
   •Bus connection data kW Rating.
   •Rated voltage
   •Duty Cycle Page
   •If no duty cycle data is entered, this load will be assumed to
   be zero.


  Elementary Diagram (ED) Load

     •ID
     •Bus connection data
     •Rated voltage kW Rating.
     •Duty Cycle Page
     •If no duty cycle data is entered, this load will be assumed to
     be zero.
Inverter

 •ID
 •Bus connection data
 •DC rated voltage
 •kVA, PF, DC kW rating
 •Duty Cycle Page
 •If no duty cycle data is entered, this load will be assumed to be
 zero.
26.5.3 Branch

DC Cable
 •ID
 •Bus connection data
 •Cable length
 •Resistance and Inductance and cable length
 units

       DC Impedance

       •ID
       •Bus connection data
       •Resistance and inductance impedance
       information.
Tie PD (CB, Fuse, & Single-Throw & Double-ThrowSwitches)

       •ID
       •Bus connection data

      DC Converter
      •ID
      •Bus connection data
      •kW Rating and Rated kV Input and output.
         Library
          •Library type data
          •Battery characteristic curve data

        Study Case

 When you initiate a battery sizing calculation, PowerStation uses the

 study case currently selected from
 the Study Case Toolbar. Every field in the Study Case Editor is set to
 its default value. However, it is important to set the values in the study
 case correctly to meet your calculation requirements.
The battery sizing calculation results are reported graphically on the one-line diagram, in plots and in the
     Crystal Reports format. The graphical one-line display shows the number of cells, number of strings, cell
     size, etc. You can use the Display Options Editor to specify the content to be displayed.




   26.6 Output Reports

The Crystal Reports format provides you with detailed information for a

battery sizing study. You can

utilize the Battery Sizing Report Manager to help you view the output
      26.6.1 Battery Sizing Report Manager
report.

To open the Battery Sizing Report Manager, simply click on the View
Output File button on the Battery
Sizing Study Toolbar.
The editor includes four pages (Complete, Input, Result, and
Summary)

representing different sections of the output report. The Report
Manager

 allows you to select formats
available for different portions of the report and view it via Crystal
Reports. There are several fields and buttons common to every page, as
described below.
Output Report Name

This field displaysName to the output report you want to view.
  Project File the name
   This field displays the name of the project file based on which report was

   Help
   generated, along with the directory where the project file is located.

   Click on this button to access Help.
   OK / Cancel
Click on the OK button to dismiss the editor and bring up the Crystal

Reports view to show the selected portion of the output report. If no

selection is made, it will simply dismiss the editor. Click on the Cancel
  Complete Report Page
button to dismiss the editor without viewing the report.
In this page there is only one format available, Complete, which brings

 up the complete report for the
battery sizing study. The complete report includes input data, results,
and summary reports.
Input Page


 This page allows you to select formats to view different input data,

 grouped according to type. They

 include the following available formats:

   •Battery Characteristics

   •Branch Connection

   •Bus and Connected Load
   •Cable
   •Cover
   •DC Converter Impedance Inverter
   •Load Duty Cycle
   •UPS
Result Page
This page allows you to select formats to view the result portion

 of the output report, including Calculation Results, Battery Load

Profile, and Battery Characteristics. The Calculation Results portion


prints the uncorrected cell size for each load section in non-random

load and random load. The Battery Load Profile is the battery duty

cycle generated based on load duty cycles. The Battery Characteristic

s are mostly data entered by the user

More Related Content

What's hot

Power System Analysis!
Power System Analysis!Power System Analysis!
Power System Analysis!PRABHAHARAN429
 
Ee 791 drives lab maual
Ee 791 drives lab maualEe 791 drives lab maual
Ee 791 drives lab maualDivya15121983
 
Schering bridge and its derivation
Schering bridge and its derivationSchering bridge and its derivation
Schering bridge and its derivationkaroline Enoch
 
Three phase transformers
Three phase transformersThree phase transformers
Three phase transformersW3Edify
 
Electrical power system(capacitance of transmission line)
Electrical power system(capacitance of transmission line)Electrical power system(capacitance of transmission line)
Electrical power system(capacitance of transmission line)Arshad Hussain
 
SUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substationSUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substationraiamitesh8
 
TOWNSEND"S (FIRST)PRIMARY & SECONDARY IONIZATION COEFFICIENT|DERIVATION|HIGH ...
TOWNSEND"S (FIRST)PRIMARY & SECONDARY IONIZATION COEFFICIENT|DERIVATION|HIGH ...TOWNSEND"S (FIRST)PRIMARY & SECONDARY IONIZATION COEFFICIENT|DERIVATION|HIGH ...
TOWNSEND"S (FIRST)PRIMARY & SECONDARY IONIZATION COEFFICIENT|DERIVATION|HIGH ...Prasant Kumar
 
BREAKDOWN MECHANISM OF GASEOUS , VACUUM, LIQUID & SOLID DIELECTRICS
BREAKDOWN MECHANISM OF GASEOUS , VACUUM, LIQUID & SOLID DIELECTRICSBREAKDOWN MECHANISM OF GASEOUS , VACUUM, LIQUID & SOLID DIELECTRICS
BREAKDOWN MECHANISM OF GASEOUS , VACUUM, LIQUID & SOLID DIELECTRICSSwaminathan P
 
Need of starters in dc motors
Need of starters in dc motorsNeed of starters in dc motors
Need of starters in dc motorsFurqan Sadiq
 
The pn Junction Diode
The pn Junction DiodeThe pn Junction Diode
The pn Junction Diodetedoado
 
Power cable - Voltage drop
Power cable - Voltage dropPower cable - Voltage drop
Power cable - Voltage dropLeonardo ENERGY
 

What's hot (20)

Ehv ac transmission line
Ehv ac transmission lineEhv ac transmission line
Ehv ac transmission line
 
Electrical Motor
Electrical Motor Electrical Motor
Electrical Motor
 
Power System Analysis!
Power System Analysis!Power System Analysis!
Power System Analysis!
 
Ee 791 drives lab maual
Ee 791 drives lab maualEe 791 drives lab maual
Ee 791 drives lab maual
 
paschen law
paschen lawpaschen law
paschen law
 
Schering bridge and its derivation
Schering bridge and its derivationSchering bridge and its derivation
Schering bridge and its derivation
 
Three phase transformers
Three phase transformersThree phase transformers
Three phase transformers
 
Electrical power system(capacitance of transmission line)
Electrical power system(capacitance of transmission line)Electrical power system(capacitance of transmission line)
Electrical power system(capacitance of transmission line)
 
Insulation Testing
Insulation TestingInsulation Testing
Insulation Testing
 
SUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substationSUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substation
 
TOWNSEND"S (FIRST)PRIMARY & SECONDARY IONIZATION COEFFICIENT|DERIVATION|HIGH ...
TOWNSEND"S (FIRST)PRIMARY & SECONDARY IONIZATION COEFFICIENT|DERIVATION|HIGH ...TOWNSEND"S (FIRST)PRIMARY & SECONDARY IONIZATION COEFFICIENT|DERIVATION|HIGH ...
TOWNSEND"S (FIRST)PRIMARY & SECONDARY IONIZATION COEFFICIENT|DERIVATION|HIGH ...
 
Synchronous machine
Synchronous machineSynchronous machine
Synchronous machine
 
BREAKDOWN MECHANISM OF GASEOUS , VACUUM, LIQUID & SOLID DIELECTRICS
BREAKDOWN MECHANISM OF GASEOUS , VACUUM, LIQUID & SOLID DIELECTRICSBREAKDOWN MECHANISM OF GASEOUS , VACUUM, LIQUID & SOLID DIELECTRICS
BREAKDOWN MECHANISM OF GASEOUS , VACUUM, LIQUID & SOLID DIELECTRICS
 
Need of starters in dc motors
Need of starters in dc motorsNeed of starters in dc motors
Need of starters in dc motors
 
The pn Junction Diode
The pn Junction DiodeThe pn Junction Diode
The pn Junction Diode
 
ECNG 3013 A
ECNG 3013 AECNG 3013 A
ECNG 3013 A
 
Per unit system
Per unit systemPer unit system
Per unit system
 
Capacitors
CapacitorsCapacitors
Capacitors
 
Cable sizing part 2
Cable sizing part 2Cable sizing part 2
Cable sizing part 2
 
Power cable - Voltage drop
Power cable - Voltage dropPower cable - Voltage drop
Power cable - Voltage drop
 

Viewers also liked

Demanda contra la repuiblica y demanda contra el estado
Demanda contra la repuiblica y demanda contra el estadoDemanda contra la repuiblica y demanda contra el estado
Demanda contra la repuiblica y demanda contra el estadoJesus_salcedo
 
Apresentaçao bbom+ grupo valemais
Apresentaçao bbom+ grupo valemaisApresentaçao bbom+ grupo valemais
Apresentaçao bbom+ grupo valemaisRENATO SILVA
 
Giardini da rifare
Giardini da rifareGiardini da rifare
Giardini da rifarechiarabroc
 
Interaction Bridges: Strategic Tool for Keeping Customer Promises
Interaction Bridges: Strategic Tool for Keeping Customer PromisesInteraction Bridges: Strategic Tool for Keeping Customer Promises
Interaction Bridges: Strategic Tool for Keeping Customer PromisesClearAction
 
UNIQUE REGISTRATION NUMBER
UNIQUE REGISTRATION NUMBERUNIQUE REGISTRATION NUMBER
UNIQUE REGISTRATION NUMBERRakesh Singh
 
The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)theijes
 
Ussage and impediments of technology enabled services in banking sector
Ussage and impediments of technology enabled services in banking sectorUssage and impediments of technology enabled services in banking sector
Ussage and impediments of technology enabled services in banking sectorIAEME Publication
 
корпоративная культура
корпоративная культуракорпоративная культура
корпоративная культураAlexa aq
 
LO QUE SUELE SUCEDER EN FIN DE AÑO
LO QUE SUELE SUCEDER EN FIN DE AÑOLO QUE SUELE SUCEDER EN FIN DE AÑO
LO QUE SUELE SUCEDER EN FIN DE AÑOPAICHUS_432
 
SGS Group Profile 2013
SGS Group Profile 2013SGS Group Profile 2013
SGS Group Profile 2013SGS
 
¿Sabes cómo gestionar tu información en la era digital?
¿Sabes cómo gestionar tu información en la era digital?¿Sabes cómo gestionar tu información en la era digital?
¿Sabes cómo gestionar tu información en la era digital?Elizabeth Ontaneda
 

Viewers also liked (15)

Demanda contra la repuiblica y demanda contra el estado
Demanda contra la repuiblica y demanda contra el estadoDemanda contra la repuiblica y demanda contra el estado
Demanda contra la repuiblica y demanda contra el estado
 
Apresentaçao bbom+ grupo valemais
Apresentaçao bbom+ grupo valemaisApresentaçao bbom+ grupo valemais
Apresentaçao bbom+ grupo valemais
 
Power 123
Power 123Power 123
Power 123
 
Giardini da rifare
Giardini da rifareGiardini da rifare
Giardini da rifare
 
主日投影片
主日投影片主日投影片
主日投影片
 
Interaction Bridges: Strategic Tool for Keeping Customer Promises
Interaction Bridges: Strategic Tool for Keeping Customer PromisesInteraction Bridges: Strategic Tool for Keeping Customer Promises
Interaction Bridges: Strategic Tool for Keeping Customer Promises
 
What willbecomeofthem
What willbecomeofthemWhat willbecomeofthem
What willbecomeofthem
 
The city, who i want to visit
The city, who i want to visitThe city, who i want to visit
The city, who i want to visit
 
UNIQUE REGISTRATION NUMBER
UNIQUE REGISTRATION NUMBERUNIQUE REGISTRATION NUMBER
UNIQUE REGISTRATION NUMBER
 
The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)
 
Ussage and impediments of technology enabled services in banking sector
Ussage and impediments of technology enabled services in banking sectorUssage and impediments of technology enabled services in banking sector
Ussage and impediments of technology enabled services in banking sector
 
корпоративная культура
корпоративная культуракорпоративная культура
корпоративная культура
 
LO QUE SUELE SUCEDER EN FIN DE AÑO
LO QUE SUELE SUCEDER EN FIN DE AÑOLO QUE SUELE SUCEDER EN FIN DE AÑO
LO QUE SUELE SUCEDER EN FIN DE AÑO
 
SGS Group Profile 2013
SGS Group Profile 2013SGS Group Profile 2013
SGS Group Profile 2013
 
¿Sabes cómo gestionar tu información en la era digital?
¿Sabes cómo gestionar tu información en la era digital?¿Sabes cómo gestionar tu información en la era digital?
¿Sabes cómo gestionar tu información en la era digital?
 

Similar to Chapter 26 battery sizing and discharge analysis norestriction

UPS_Sizing_Calculation__170450556677.pdf
UPS_Sizing_Calculation__170450556677.pdfUPS_Sizing_Calculation__170450556677.pdf
UPS_Sizing_Calculation__170450556677.pdfFarukPatel9
 
Data-driven Modelling of Prognostics of Lithium-ion Batteries Using LSTM
Data-driven Modelling of Prognostics of Lithium-ion Batteries Using LSTMData-driven Modelling of Prognostics of Lithium-ion Batteries Using LSTM
Data-driven Modelling of Prognostics of Lithium-ion Batteries Using LSTMIRJET Journal
 
A Nonlinear TSNN Based Model of a Lead Acid Battery
A Nonlinear TSNN Based Model of a Lead Acid BatteryA Nonlinear TSNN Based Model of a Lead Acid Battery
A Nonlinear TSNN Based Model of a Lead Acid BatteryjournalBEEI
 
05 15056 battery ijeecs 1570310575(edit)
05 15056 battery ijeecs 1570310575(edit)05 15056 battery ijeecs 1570310575(edit)
05 15056 battery ijeecs 1570310575(edit)nooriasukmaningtyas
 
Hybrid energy storage system optimal sizing for urban electrical bus regardin...
Hybrid energy storage system optimal sizing for urban electrical bus regardin...Hybrid energy storage system optimal sizing for urban electrical bus regardin...
Hybrid energy storage system optimal sizing for urban electrical bus regardin...IJECEIAES
 
Battery management
Battery managementBattery management
Battery managementtejugajula
 
Storing Solar Power: An Insight into Batteries
Storing Solar Power: An  Insight into BatteriesStoring Solar Power: An  Insight into Batteries
Storing Solar Power: An Insight into BatteriesArpit Kurel
 
IRJET- Simple and Efficient Control Method for Battery Charging in High Penet...
IRJET- Simple and Efficient Control Method for Battery Charging in High Penet...IRJET- Simple and Efficient Control Method for Battery Charging in High Penet...
IRJET- Simple and Efficient Control Method for Battery Charging in High Penet...IRJET Journal
 
Development of Battery Management System for Maximizing Battery Performance i...
Development of Battery Management System for Maximizing Battery Performance i...Development of Battery Management System for Maximizing Battery Performance i...
Development of Battery Management System for Maximizing Battery Performance i...IRJET Journal
 
Performance Evaluation of Modelling and Simulation of Lead Acid Batteries for...
Performance Evaluation of Modelling and Simulation of Lead Acid Batteries for...Performance Evaluation of Modelling and Simulation of Lead Acid Batteries for...
Performance Evaluation of Modelling and Simulation of Lead Acid Batteries for...IJPEDS-IAES
 
HEVs- UNIT V Batteries and Storage Systems.pdf
HEVs- UNIT V Batteries and Storage Systems.pdfHEVs- UNIT V Batteries and Storage Systems.pdf
HEVs- UNIT V Batteries and Storage Systems.pdfDr. Gudipudi Nageswara Rao
 
Dynamic Modeling and Simulation of a Lithium Ion Battery
Dynamic Modeling and Simulation of a Lithium Ion BatteryDynamic Modeling and Simulation of a Lithium Ion Battery
Dynamic Modeling and Simulation of a Lithium Ion BatteryMd Arifujjaman, PhD, PEng
 
Battery Management system.pptx
Battery Management system.pptxBattery Management system.pptx
Battery Management system.pptxMradul Saxena
 

Similar to Chapter 26 battery sizing and discharge analysis norestriction (20)

UPS_Sizing_Calculation__170450556677.pdf
UPS_Sizing_Calculation__170450556677.pdfUPS_Sizing_Calculation__170450556677.pdf
UPS_Sizing_Calculation__170450556677.pdf
 
UPS Sizing
UPS SizingUPS Sizing
UPS Sizing
 
Data-driven Modelling of Prognostics of Lithium-ion Batteries Using LSTM
Data-driven Modelling of Prognostics of Lithium-ion Batteries Using LSTMData-driven Modelling of Prognostics of Lithium-ion Batteries Using LSTM
Data-driven Modelling of Prognostics of Lithium-ion Batteries Using LSTM
 
A Nonlinear TSNN Based Model of a Lead Acid Battery
A Nonlinear TSNN Based Model of a Lead Acid BatteryA Nonlinear TSNN Based Model of a Lead Acid Battery
A Nonlinear TSNN Based Model of a Lead Acid Battery
 
05 15056 battery ijeecs 1570310575(edit)
05 15056 battery ijeecs 1570310575(edit)05 15056 battery ijeecs 1570310575(edit)
05 15056 battery ijeecs 1570310575(edit)
 
IEEE Final only
IEEE Final onlyIEEE Final only
IEEE Final only
 
Hybrid energy storage system optimal sizing for urban electrical bus regardin...
Hybrid energy storage system optimal sizing for urban electrical bus regardin...Hybrid energy storage system optimal sizing for urban electrical bus regardin...
Hybrid energy storage system optimal sizing for urban electrical bus regardin...
 
Battery management
Battery managementBattery management
Battery management
 
Storing Solar Power: An Insight into Batteries
Storing Solar Power: An  Insight into BatteriesStoring Solar Power: An  Insight into Batteries
Storing Solar Power: An Insight into Batteries
 
unit3.0.pptx
unit3.0.pptxunit3.0.pptx
unit3.0.pptx
 
IRJET- Simple and Efficient Control Method for Battery Charging in High Penet...
IRJET- Simple and Efficient Control Method for Battery Charging in High Penet...IRJET- Simple and Efficient Control Method for Battery Charging in High Penet...
IRJET- Simple and Efficient Control Method for Battery Charging in High Penet...
 
Electro thermal model of lion a1 02
Electro thermal model of lion a1 02Electro thermal model of lion a1 02
Electro thermal model of lion a1 02
 
Development of Battery Management System for Maximizing Battery Performance i...
Development of Battery Management System for Maximizing Battery Performance i...Development of Battery Management System for Maximizing Battery Performance i...
Development of Battery Management System for Maximizing Battery Performance i...
 
Performance Evaluation of Modelling and Simulation of Lead Acid Batteries for...
Performance Evaluation of Modelling and Simulation of Lead Acid Batteries for...Performance Evaluation of Modelling and Simulation of Lead Acid Batteries for...
Performance Evaluation of Modelling and Simulation of Lead Acid Batteries for...
 
HEVs- UNIT V Batteries and Storage Systems.pdf
HEVs- UNIT V Batteries and Storage Systems.pdfHEVs- UNIT V Batteries and Storage Systems.pdf
HEVs- UNIT V Batteries and Storage Systems.pdf
 
Dynamic Modeling and Simulation of a Lithium Ion Battery
Dynamic Modeling and Simulation of a Lithium Ion BatteryDynamic Modeling and Simulation of a Lithium Ion Battery
Dynamic Modeling and Simulation of a Lithium Ion Battery
 
Design methodology for pv
Design methodology for pvDesign methodology for pv
Design methodology for pv
 
95ZJ_8A.PDF
95ZJ_8A.PDF95ZJ_8A.PDF
95ZJ_8A.PDF
 
Design of DC-DC Boost Converter with Negative Feedback Control for Constant C...
Design of DC-DC Boost Converter with Negative Feedback Control for Constant C...Design of DC-DC Boost Converter with Negative Feedback Control for Constant C...
Design of DC-DC Boost Converter with Negative Feedback Control for Constant C...
 
Battery Management system.pptx
Battery Management system.pptxBattery Management system.pptx
Battery Management system.pptx
 

Recently uploaded

The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfakmcokerachita
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 

Recently uploaded (20)

The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdf
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 

Chapter 26 battery sizing and discharge analysis norestriction

  • 1. In the above sample curves, the set of curves may apply to batteries of different sizes or to only one size. In ETAP PowerStation, you specify a set of characteristic curves for a given size. If you want to use a given set of curves for batteries of different sizes, you can indicate this in the Battery Method Case Editor. 26.4.3 Battery Sizing Sizing Study The battery sizing calculation includes determining the number of cells to meet the system voltage requirement and determining the battery size and number of strings to meet the load duty cycle requirement. Number of Cells The number of cells should be determined to satisfy system minimum and maximum voltage requirements: 1. When charging the battery, the voltage to be applied to the battery should not be greater than the maximum system voltage.
  • 2. Let N be the number of cells. The voltage requirements can be given in the following equation V sys, ≤N≤ V sys, V mincell, V cell, max disch ch Where Vsys,min is the minimum system voltage that is equal to the nominal voltage of the battery terminal bus multiplied by the minimum system voltage deviation Vsys,max is the maximum system voltage that is equal to the nominal voltage of the entered in the Battery Sizing Study Case Editor. battery terminal bus multiplied by the maximum system voltage deviation Vcell,disch is the battery discharge voltage in V/Cell entered in the Battery Sizing Study Case Editor. entered in the Battery Sizing Study Case Editor. It is clear that the number of cells of the battery is dependent on the four values for voltage requirement entered in the Battery Sizing Study Case Editor. It can happen that for some incompatible values, we cannot determine a value for N to satisfy the above equation. When this situation occurs, ETAP will display a message indicating that it cannot determine the number of cells. In practical cases, there is often a range of values that N can take to satisfy the above equation. In this case, ETAP will select the value for N that results in the battery rated voltage being closest to its terminal bus nominal voltage.
  • 3. Cell Size In determining the battery size, ETAP will find the smallest size that can provide sufficient power for the specified duty cycle. The capacity of a battery can be increased either by using a larger size or by adding more strings. Since ETAP allows you to enter different characteristic curves for different sizes of batteries, in the battery sizing calculation, the program starts with one string and the smallest size available for the calculation. If it fails to meet the load requirement, the program first increases the size and performs calculations with the characteristic curves for the new size. When no available sizes can meet the load requirement for the given number of strings, it then increases the string number and performs the calculation with the smallest size again. This process continues until a battery size and a string number are found to meet the load requirement. Load Sections in Battery Duty Cycle A battery duty cycle generally can be represented as a square waveform. It consists of a number of time periods, with a constant current value during a period. The figure below shows a sample duty i S i a= ∑ It P j cycle for battery.1 consists of six periods, designated as P1, P2, j= … P6. A load section Si is a combination of a number of load periods, defined as:
  • 4. In the sample duty cycle there are six load sections. Load Sections for A Sample Battery Duty Cycle Determination of Cell Size Based on Battery Characteristic Curves Based on a given set of battery characteristic curves, we can determine the required battery size for a specified duty cycle. Let F represent cell size. It is F= Max Fi i=1,..Sm equal to: where Sm is the total number of load sections and Fi is the size calculated for the ith load section. The calculation of Fi depends on the where Ap is the load current value in period P. RT is the value obtained from the type of characteristic curve, which is the number of amperes that each positive battery battery library curves.
  • 5. Random Load and Non-Random Load In general, the duty cycle for a battery consists of random loads and non-random loads. The program determines the cells for random and non-random loads separately in the same way as described in the previous section. The sum of the two cell size values is the uncorrected cell size for the given duty cycle. Adjusting Factors In the Battery Sizing Study Case Editor, you can select several adjusting factors to be considered in calculating battery size. These factors include temperature factor, design margin factor, aging Calculation Cycle It is clear from the equations for determining cell size that the cell size is calculated based on a given set of battery characteristic curves, which is for a given cell size. If the calculated cell size is different from the one corresponding to the characteristic curves used. We have to do the calculation
  • 6. 26.4.4 Battery Discharging Calculation Method The purpose of battery discharge calculation is to determine battery performance for a specified duty cycle. One of the key parameters for battery performance is the battery terminal voltage. When the battery is supplying the load as the sole source, it should be able to maintain voltage level for the whole period of the specified duty cycle. Battery Characteristic Curves for Voltage Interpolation The terminal voltage of a battery is dependent on the current drawing from the battery and the ampere-hour capacity contained in the battery. This relationship is described by the battery characteristic curve and is very nonlinear. In ETAP, the battery characteristics are described in the battery library as discrete points. Because no closed form equation is available to describe the battery characteristics, numerical interpolation methods have to Battery Combined Duty Cycle be used to find the points missing in the curves. Apparently, the more curves When the load powered by the battery includes random load, the random load are entered in the battery library, the more accurate the calculated results will should be added to the non- random load at the worst point, which is the time the battery has the lowest be. voltage value when only the non-random load is considered. To identify this time moment, the program first performs battery discharge calculation excluding the random load. It then determine the worst point, add the random load to the non-random load and perform discharge calculation from the time when the random load takes effect all the way to the end of battery duty cycle.
  • 7. Battery Voltage Calculation An iterative process is conducted to calculated battery discharge voltage values. A battery voltage value is reported at each time step specified in the battery sizing study case and at each moment when there is a change in the load duty cycle. By changing the step size from the battery sizing study case, the user can adjust the level of detail information on discharge calculation to be reported. If the battery duty cycle is calculated by the load current summation method, the battery current will change only when there is a change in any load duty cycle. When the load flow method is selected in the study case, even if there is no change in the load duty cycle, the battery current will change due to decrease in the battery voltage. In this case the battery current is calculated by a full load flow calculation, considering different types of loads and system losses. In this load flow calculation, the battery is modeled as a constant voltage source with the voltage calculated in the previous step. The calculated battery current will be used in the current step for battery voltage calculation. Along with battery voltage and current, the battery discharge program also calculates battery discharge capacity. When there is change in the load current, two values of voltage When the battery is calculated using load flow method, the battery and current are calculated, at t – discharge calculation also provides a and t+, one for before the load change and one for after the load change.
  • 8. 26.5Required Data 26.5.1 Source In battery sizing calculation, the only source is the battery to be sized. Batteries may only besized/discharged one at a time as specified in the study case. A UPS may be considered as a load to the Battery system when its input bus is not connected to an energized bus. •ID •Bus connection data •Battery library type data. This information is used to retrieve library data for calculations. If only the battery discharge calculation is conducted, the following additional information is also •Battery number of plates and Capacity. required: •Number of cells •Number of Strings •SC page battery external resistance.
  • 9. 26.5.2 Load UPS When a UPS is not connected to an energized input AC bus, it is considered a load in battery sizing calculations. •ID •Bus connection data •DC rated voltage kW and kVA. Duty Cycle Page •If no duty cycle data is entered, this load will be assumed to be zero. DC Motor •ID •Bus connection data •Quantity •Rated voltage •kW or HP and Efficiency. Duty Cycle Page
  • 10. Lumped Load •ID •Bus connection data •Rated voltage kW Rating •Duty Cycle Page •If no duty cycle data is entered, this load will be assumed to be zero. Static Load •ID •Bus connection data kW Rating. •Rated voltage •Duty Cycle Page •If no duty cycle data is entered, this load will be assumed to be zero. Elementary Diagram (ED) Load •ID •Bus connection data •Rated voltage kW Rating. •Duty Cycle Page •If no duty cycle data is entered, this load will be assumed to be zero.
  • 11. Inverter •ID •Bus connection data •DC rated voltage •kVA, PF, DC kW rating •Duty Cycle Page •If no duty cycle data is entered, this load will be assumed to be zero. 26.5.3 Branch DC Cable •ID •Bus connection data •Cable length •Resistance and Inductance and cable length units DC Impedance •ID •Bus connection data •Resistance and inductance impedance information.
  • 12. Tie PD (CB, Fuse, & Single-Throw & Double-ThrowSwitches) •ID •Bus connection data DC Converter •ID •Bus connection data •kW Rating and Rated kV Input and output. Library •Library type data •Battery characteristic curve data Study Case When you initiate a battery sizing calculation, PowerStation uses the study case currently selected from the Study Case Toolbar. Every field in the Study Case Editor is set to its default value. However, it is important to set the values in the study case correctly to meet your calculation requirements.
  • 13. The battery sizing calculation results are reported graphically on the one-line diagram, in plots and in the Crystal Reports format. The graphical one-line display shows the number of cells, number of strings, cell size, etc. You can use the Display Options Editor to specify the content to be displayed. 26.6 Output Reports The Crystal Reports format provides you with detailed information for a battery sizing study. You can utilize the Battery Sizing Report Manager to help you view the output 26.6.1 Battery Sizing Report Manager report. To open the Battery Sizing Report Manager, simply click on the View Output File button on the Battery Sizing Study Toolbar. The editor includes four pages (Complete, Input, Result, and Summary) representing different sections of the output report. The Report Manager allows you to select formats available for different portions of the report and view it via Crystal Reports. There are several fields and buttons common to every page, as described below.
  • 14. Output Report Name This field displaysName to the output report you want to view. Project File the name This field displays the name of the project file based on which report was Help generated, along with the directory where the project file is located. Click on this button to access Help. OK / Cancel Click on the OK button to dismiss the editor and bring up the Crystal Reports view to show the selected portion of the output report. If no selection is made, it will simply dismiss the editor. Click on the Cancel Complete Report Page button to dismiss the editor without viewing the report. In this page there is only one format available, Complete, which brings up the complete report for the battery sizing study. The complete report includes input data, results, and summary reports.
  • 15. Input Page This page allows you to select formats to view different input data, grouped according to type. They include the following available formats: •Battery Characteristics •Branch Connection •Bus and Connected Load •Cable •Cover •DC Converter Impedance Inverter •Load Duty Cycle •UPS
  • 16. Result Page This page allows you to select formats to view the result portion of the output report, including Calculation Results, Battery Load Profile, and Battery Characteristics. The Calculation Results portion prints the uncorrected cell size for each load section in non-random load and random load. The Battery Load Profile is the battery duty cycle generated based on load duty cycles. The Battery Characteristic s are mostly data entered by the user