Chad McLean is an engineering project management professional with over 20 years of experience in project management, quality systems, product development testing, and mechanical design. He has worked in various roles at companies like Prince Castle, Suncast Corporation, and CNH Industrial. His background includes leadership, product development, automotive, industrial experience, and certifications in areas such as project management, Lean Six Sigma, and quality management systems.
A case study - Implementation of smart test practices improves test coverage by 50% and adherence to regulatory compliance in all product releases enables STAG to gain
the trust and assist in all FDA audit of a leading compliance eLearning solutions provider.
A case study - Implementation of smart test practices improves test coverage by 50% and adherence to regulatory compliance in all product releases enables STAG to gain
the trust and assist in all FDA audit of a leading compliance eLearning solutions provider.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Explore the innovative world of trenchless pipe repair with our comprehensive guide, "The Benefits and Techniques of Trenchless Pipe Repair." This document delves into the modern methods of repairing underground pipes without the need for extensive excavation, highlighting the numerous advantages and the latest techniques used in the industry.
Learn about the cost savings, reduced environmental impact, and minimal disruption associated with trenchless technology. Discover detailed explanations of popular techniques such as pipe bursting, cured-in-place pipe (CIPP) lining, and directional drilling. Understand how these methods can be applied to various types of infrastructure, from residential plumbing to large-scale municipal systems.
Ideal for homeowners, contractors, engineers, and anyone interested in modern plumbing solutions, this guide provides valuable insights into why trenchless pipe repair is becoming the preferred choice for pipe rehabilitation. Stay informed about the latest advancements and best practices in the field.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Runway Orientation Based on the Wind Rose Diagram.pptx
Chad mc lean resume ep2
1. Chad M. McLean
312.764.8892
chadmmclean@gmail.com
linkedin.com/in/chadmmclean
PROFESSIONALSUMMARY
Engineering Project Management Professional (PMP) with an excellent track record in project
and operations management, quality system development, product development testing and
mechanical design. Coordinating business and technical requirements. Making work less like
work. Meeting requirements with increasing quality and efficiency.
Leadership | Product Development | Automotive | Industrial | Results
PMP, Lean Six Sigma Green Belt, Failure Mode Effect Analysis (FMEA), ISO9001:2015 QMS, CAPA
(Corrective Action Preventative Action), GD&T, basic inspection tools, MetTrack, Edaq, Campbell
Scientific, Morphee, SAP, Pro-E, SharePoint, Microsoft Office
KEY ACCOMPLISHMENTS
All project stakeholderswere resistant to definedscope. Engaged stakeholder’s ownershipthrough
bottom up planning ofproject details. Negotiatedagreement of plan andacceptanceofresults forall
stakeholders. Project was completedontime and underbudget.
Project plan requiredtesting anew configuration. No reliable test procedureexisted. Influenced lead
engineer to provide detailed comparisonofconfiguration options. Guidedteam review that removed
the test, saving the project $200K.
Project material was delivered inconsistently. Identified procurement needs. Justified and hireda
person to relieve engineersof procurement work. Consolidated procurement, improved efficiency
and reducedspending, saving $70K peryear.
Aggressive plan to resolve current product issue was labor intensive. Revised plan to reduce
complexity. Diagnosedthe issuein 50% of thetime, reducing requiredlaborby 70%.
Equipment calibration process was uneven acrossthecompany. Initiated project to improve thelocal
process. Proposedimplementingprocessatothersites. Oversawtheimplementationplan for10sites
globally.
PROFESSIONALEXPERIENCE
PRINCE CASTLE, Carol Stream, Illinois 2018
Manufacturer of commercial quick service kitchen equipment.
Product Development Test Engineer -Contractedtodevelopandvalidateanew productline
Productdevelopmenttestingwasstalled. Prototypecontrolissuesneededresolution.Identifiedcause
and proposedsolution.Control was four times betterand thetesting was successful.
The direction of design was being determined. Translated customer request. Proposed and justified
product design criteria. The criteria was adoptedbythe team.
Championednew lab development relatedto development ofproducts fornew markets.
2. SUNCAST CORPORATION, Batavia, Illinois 2017
Manufacturer of outdoorproducts and commercial storage and housekeeping products.
Quality SystemEngineer -ContractedtoimprovetheproceduresoftheQualitydepartment.
Createdandlaunchedamonitoringandmeasurementequipmentcalibrationverificationprogram.
Developedatrainingplantoimprovethedatacollectedby themanufacturingqualityinspectors.
Collaboratedonthedesignof gagestomonitorcomponentqualityduringmanufacture.
Introducedandperformednew qualitytestprocedures.Documentedresults.
CNH INDUSTRIAL, Burr Ridge, Illinois 2003 – 2017
Global leader in agricultural and construction equipment, trucks, buses and other commercial vehicles.
Engineering Lab Manager 2008 - 2017
Created,developedandsupervisedstaffsofengineers,technicians,internsandcoopstudentswhoperformedwhole
vehicleandcomponentproductdevelopmenttesting.AdvancedthecapabilitiesofCNHtestfacilities
Project Management - Engineering Product Development
Testplanschedulesandbudgetestimateswereneededforanew jointventureproject.Rationalizedinitialtest
plansandmodifiedtestrequirementsto controlspending. Completedprojectearlyandunderbudget.
Multiple project schedules were conflicting. Negotiated with stakeholders to coordinate schedules and
deliverableswithavailablelabcapacityandcapabilities. Successfullykeptschedulesasagreed.
Operations Management - Engineering Lab Development
Labstaff developmentandretentionwasrequired. Securedtechnicalchallengesforstafftodesignandperform
testsnormally doneelsewhere.Facilitatedmentoringemployeeswhileenhancingstaffandlabcapabilities.
Capitalprojectsforlabimprovementsweredelayed. Formalizedandimplementedacapitalprojectprocessto
commissionnew testsystems.Processyieldedmaturetestsystemsthatwerereadywhenneeded.
Quality System Development - ISO 9001 Compliance
Perception and priority of complying with ISO requirements was low. Publicized how current internal
processeswerealignedwithISOrequirements.AcquiredsupportforISO. Exceededgoalwithnoauditfindings.
ISOinternalauditteamneededimprovement. Partneredwithmanagementtoacquirenewauditors. Authored
ISOandCAPAtrainingmaterialsandtrainedthenewauditteam. Exceededgoalwithnoexternalauditfindings.
Test Engineer 2003 - 2007
Whole Vehicle and Drivetrain Testing
Observed issues were reported during testing. ChairedCAPA meetings with global team to assign severity,
determinerootcauseandcloseissuesusing8Dprocess. Allobservationswereaddressedandclosed.
Labdevelopmentprojectwasnotbeingprioritized.Expandeduseof productdevelopmentworkordersystem
toincreasevisibilityforlabdevelopment. Boostedawarenesstocompletethelabdevelopmentprojectontime.
EDUCATION
IowaStateUniversity,BachelorofScience,AgriculturalEngineering-MechanicalDesign 1993
PMP andLeanSixSigmaGreenBeltCertification 2018
COMMUNITY/VOLUNTEER/SERVICE
ElementaryDistrict33SchoolBoardMember WestChicago
Community FellowshipChurchMinistryPartner WestChicago