SlideShare a Scribd company logo
Chad M. McLean
312.764.8892
chadmmclean@gmail.com
linkedin.com/in/chadmmclean
PROFESSIONALSUMMARY
Engineering Project Management Professional (PMP) with an excellent track record in project
and operations management, quality system development, product development testing and
mechanical design. Coordinating business and technical requirements. Making work less like
work. Meeting requirements with increasing quality and efficiency.
Leadership | Product Development | Automotive | Industrial | Results
PMP, Lean Six Sigma Green Belt, Failure Mode Effect Analysis (FMEA), ISO9001:2015 QMS, CAPA
(Corrective Action Preventative Action), GD&T, basic inspection tools, MetTrack, Edaq, Campbell
Scientific, Morphee, SAP, Pro-E, SharePoint, Microsoft Office
KEY ACCOMPLISHMENTS
 All project stakeholderswere resistant to definedscope. Engaged stakeholder’s ownershipthrough
bottom up planning ofproject details. Negotiatedagreement of plan andacceptanceofresults forall
stakeholders. Project was completedontime and underbudget.
 Project plan requiredtesting anew configuration. No reliable test procedureexisted. Influenced lead
engineer to provide detailed comparisonofconfiguration options. Guidedteam review that removed
the test, saving the project $200K.
 Project material was delivered inconsistently. Identified procurement needs. Justified and hireda
person to relieve engineersof procurement work. Consolidated procurement, improved efficiency
and reducedspending, saving $70K peryear.
 Aggressive plan to resolve current product issue was labor intensive. Revised plan to reduce
complexity. Diagnosedthe issuein 50% of thetime, reducing requiredlaborby 70%.
 Equipment calibration process was uneven acrossthecompany. Initiated project to improve thelocal
process. Proposedimplementingprocessatothersites. Oversawtheimplementationplan for10sites
globally.
PROFESSIONALEXPERIENCE
PRINCE CASTLE, Carol Stream, Illinois 2018
Manufacturer of commercial quick service kitchen equipment.
Product Development Test Engineer -Contractedtodevelopandvalidateanew productline
 Productdevelopmenttestingwasstalled. Prototypecontrolissuesneededresolution.Identifiedcause
and proposedsolution.Control was four times betterand thetesting was successful.
 The direction of design was being determined. Translated customer request. Proposed and justified
product design criteria. The criteria was adoptedbythe team.
 Championednew lab development relatedto development ofproducts fornew markets.
SUNCAST CORPORATION, Batavia, Illinois 2017
Manufacturer of outdoorproducts and commercial storage and housekeeping products.
Quality SystemEngineer -ContractedtoimprovetheproceduresoftheQualitydepartment.
 Createdandlaunchedamonitoringandmeasurementequipmentcalibrationverificationprogram.
 Developedatrainingplantoimprovethedatacollectedby themanufacturingqualityinspectors.
 Collaboratedonthedesignof gagestomonitorcomponentqualityduringmanufacture.
 Introducedandperformednew qualitytestprocedures.Documentedresults.
CNH INDUSTRIAL, Burr Ridge, Illinois 2003 – 2017
Global leader in agricultural and construction equipment, trucks, buses and other commercial vehicles.
Engineering Lab Manager 2008 - 2017
Created,developedandsupervisedstaffsofengineers,technicians,internsandcoopstudentswhoperformedwhole
vehicleandcomponentproductdevelopmenttesting.AdvancedthecapabilitiesofCNHtestfacilities
Project Management - Engineering Product Development
 Testplanschedulesandbudgetestimateswereneededforanew jointventureproject.Rationalizedinitialtest
plansandmodifiedtestrequirementsto controlspending. Completedprojectearlyandunderbudget.
 Multiple project schedules were conflicting. Negotiated with stakeholders to coordinate schedules and
deliverableswithavailablelabcapacityandcapabilities. Successfullykeptschedulesasagreed.
Operations Management - Engineering Lab Development
 Labstaff developmentandretentionwasrequired. Securedtechnicalchallengesforstafftodesignandperform
testsnormally doneelsewhere.Facilitatedmentoringemployeeswhileenhancingstaffandlabcapabilities.
 Capitalprojectsforlabimprovementsweredelayed. Formalizedandimplementedacapitalprojectprocessto
commissionnew testsystems.Processyieldedmaturetestsystemsthatwerereadywhenneeded.
Quality System Development - ISO 9001 Compliance
 Perception and priority of complying with ISO requirements was low. Publicized how current internal
processeswerealignedwithISOrequirements.AcquiredsupportforISO. Exceededgoalwithnoauditfindings.
 ISOinternalauditteamneededimprovement. Partneredwithmanagementtoacquirenewauditors. Authored
ISOandCAPAtrainingmaterialsandtrainedthenewauditteam. Exceededgoalwithnoexternalauditfindings.
Test Engineer 2003 - 2007
Whole Vehicle and Drivetrain Testing
 Observed issues were reported during testing. ChairedCAPA meetings with global team to assign severity,
determinerootcauseandcloseissuesusing8Dprocess. Allobservationswereaddressedandclosed.
 Labdevelopmentprojectwasnotbeingprioritized.Expandeduseof productdevelopmentworkordersystem
toincreasevisibilityforlabdevelopment. Boostedawarenesstocompletethelabdevelopmentprojectontime.
EDUCATION
IowaStateUniversity,BachelorofScience,AgriculturalEngineering-MechanicalDesign 1993
PMP andLeanSixSigmaGreenBeltCertification 2018
COMMUNITY/VOLUNTEER/SERVICE
ElementaryDistrict33SchoolBoardMember WestChicago
Community FellowshipChurchMinistryPartner WestChicago

More Related Content

What's hot

HOMEREARLPOPE - QA2016 Lead
HOMEREARLPOPE - QA2016 LeadHOMEREARLPOPE - QA2016 Lead
HOMEREARLPOPE - QA2016 LeadHomer Pope
 
Wayne Thomas Resume
Wayne Thomas ResumeWayne Thomas Resume
Wayne Thomas ResumeWayne Thomas
 
SHIRAJUL KARIM- Resume
SHIRAJUL KARIM- ResumeSHIRAJUL KARIM- Resume
SHIRAJUL KARIM- ResumeShirajul Karim
 
April 2016 - Denita's Resume
April 2016 - Denita's ResumeApril 2016 - Denita's Resume
April 2016 - Denita's ResumeDenita Kuhowski
 
Katharyne-Spangler_Mechanical_Engineer_Katie_F03_07 Dec 2016
Katharyne-Spangler_Mechanical_Engineer_Katie_F03_07 Dec 2016Katharyne-Spangler_Mechanical_Engineer_Katie_F03_07 Dec 2016
Katharyne-Spangler_Mechanical_Engineer_Katie_F03_07 Dec 2016Katie Spangler
 
Lynn Kostas Resume 2016
Lynn Kostas Resume 2016Lynn Kostas Resume 2016
Lynn Kostas Resume 2016Lynn Kostas
 
Enri resume
Enri    resumeEnri    resume
Enri resume
Enriqueta Soto
 
resume_Celeste_May2015
resume_Celeste_May2015resume_Celeste_May2015
resume_Celeste_May2015Celeste Lim
 
Regulatory Compliance QA
Regulatory Compliance QARegulatory Compliance QA
Regulatory Compliance QA
STAG Software Private Limited
 
Luis Leyva-Flores Plastics
Luis Leyva-Flores PlasticsLuis Leyva-Flores Plastics
Luis Leyva-Flores PlasticsLuis LeyvaFlores
 
production engineer
production engineerproduction engineer
production engineershiva lingam
 
Draft lytle+resume1 6 28-2017.docx 2
Draft lytle+resume1 6 28-2017.docx  2Draft lytle+resume1 6 28-2017.docx  2
Draft lytle+resume1 6 28-2017.docx 2
Rhonda Lytle
 
Allan Lynch CV 190716
Allan Lynch CV 190716Allan Lynch CV 190716
Allan Lynch CV 190716Allan Lynch
 
MelTrowbridgeresume 8-15-12[1]
MelTrowbridgeresume 8-15-12[1]MelTrowbridgeresume 8-15-12[1]
MelTrowbridgeresume 8-15-12[1]Mel Trowbridge
 
Rajeev_R_CV Updated
Rajeev_R_CV UpdatedRajeev_R_CV Updated
Rajeev_R_CV UpdatedRAJEEV R
 
Nguyen, chris expanded resume
Nguyen, chris expanded resumeNguyen, chris expanded resume
Nguyen, chris expanded resume
Chris Nguyen
 

What's hot (20)

HOMEREARLPOPE - QA2016 Lead
HOMEREARLPOPE - QA2016 LeadHOMEREARLPOPE - QA2016 Lead
HOMEREARLPOPE - QA2016 Lead
 
Wayne Thomas Resume
Wayne Thomas ResumeWayne Thomas Resume
Wayne Thomas Resume
 
SHIRAJUL KARIM- Resume
SHIRAJUL KARIM- ResumeSHIRAJUL KARIM- Resume
SHIRAJUL KARIM- Resume
 
April 2016 - Denita's Resume
April 2016 - Denita's ResumeApril 2016 - Denita's Resume
April 2016 - Denita's Resume
 
Katharyne-Spangler_Mechanical_Engineer_Katie_F03_07 Dec 2016
Katharyne-Spangler_Mechanical_Engineer_Katie_F03_07 Dec 2016Katharyne-Spangler_Mechanical_Engineer_Katie_F03_07 Dec 2016
Katharyne-Spangler_Mechanical_Engineer_Katie_F03_07 Dec 2016
 
richards_denise_resume5
richards_denise_resume5richards_denise_resume5
richards_denise_resume5
 
Lynn Kostas Resume 2016
Lynn Kostas Resume 2016Lynn Kostas Resume 2016
Lynn Kostas Resume 2016
 
Resume-Richard-2015
Resume-Richard-2015Resume-Richard-2015
Resume-Richard-2015
 
Enri resume
Enri    resumeEnri    resume
Enri resume
 
resume_Celeste_May2015
resume_Celeste_May2015resume_Celeste_May2015
resume_Celeste_May2015
 
Regulatory Compliance QA
Regulatory Compliance QARegulatory Compliance QA
Regulatory Compliance QA
 
Crivac Mark
Crivac MarkCrivac Mark
Crivac Mark
 
Rohit_Awasthi_Final 1
Rohit_Awasthi_Final 1Rohit_Awasthi_Final 1
Rohit_Awasthi_Final 1
 
Luis Leyva-Flores Plastics
Luis Leyva-Flores PlasticsLuis Leyva-Flores Plastics
Luis Leyva-Flores Plastics
 
production engineer
production engineerproduction engineer
production engineer
 
Draft lytle+resume1 6 28-2017.docx 2
Draft lytle+resume1 6 28-2017.docx  2Draft lytle+resume1 6 28-2017.docx  2
Draft lytle+resume1 6 28-2017.docx 2
 
Allan Lynch CV 190716
Allan Lynch CV 190716Allan Lynch CV 190716
Allan Lynch CV 190716
 
MelTrowbridgeresume 8-15-12[1]
MelTrowbridgeresume 8-15-12[1]MelTrowbridgeresume 8-15-12[1]
MelTrowbridgeresume 8-15-12[1]
 
Rajeev_R_CV Updated
Rajeev_R_CV UpdatedRajeev_R_CV Updated
Rajeev_R_CV Updated
 
Nguyen, chris expanded resume
Nguyen, chris expanded resumeNguyen, chris expanded resume
Nguyen, chris expanded resume
 

Similar to Chad mc lean resume ep2

Kyle ursitti resume 160719
Kyle ursitti resume 160719Kyle ursitti resume 160719
Kyle ursitti resume 160719
Kyle Ursitti
 
Dbresume28
Dbresume28Dbresume28
Dbresume28
Daniel Bober
 
Amy Freeman Resume June2009
Amy Freeman Resume June2009Amy Freeman Resume June2009
Amy Freeman Resume June2009guestc9e91c
 
Johnson_Todd_D_Resume - Outside
Johnson_Todd_D_Resume - OutsideJohnson_Todd_D_Resume - Outside
Johnson_Todd_D_Resume - OutsideTodd Johnson
 
QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2handbook
 
Angela Gallegos - Sept 2015 v1
Angela Gallegos - Sept 2015 v1Angela Gallegos - Sept 2015 v1
Angela Gallegos - Sept 2015 v1Angela H. Gallegos
 
MJonesMFG Quality Resume
MJonesMFG Quality ResumeMJonesMFG Quality Resume
MJonesMFG Quality ResumeMark R. Jones
 
TimLandwermeyerResume062315
TimLandwermeyerResume062315TimLandwermeyerResume062315
TimLandwermeyerResume062315Tim Landwermeyer
 
Resume Jackson Lee
Resume Jackson LeeResume Jackson Lee
Resume Jackson LeeJacksonYKLee
 
Panneer selvam quality
Panneer selvam quality Panneer selvam quality
Panneer selvam quality Panneer selvam
 
Amer malik resume
Amer malik resumeAmer malik resume
Amer malik resume
Amer Malik
 
Anant shah asc-2017
Anant shah  asc-2017Anant shah  asc-2017
Anant shah asc-2017
Anant Shah
 
maclean--scott---resume 1-19-2016
maclean--scott---resume 1-19-2016maclean--scott---resume 1-19-2016
maclean--scott---resume 1-19-2016Scott MacLean
 
Introduction to six sigma
Introduction to six sigmaIntroduction to six sigma
Introduction to six sigma
MC Tubera
 

Similar to Chad mc lean resume ep2 (20)

Kyle ursitti resume 160719
Kyle ursitti resume 160719Kyle ursitti resume 160719
Kyle ursitti resume 160719
 
Dbresume28
Dbresume28Dbresume28
Dbresume28
 
Amy Freeman Resume June2009
Amy Freeman Resume June2009Amy Freeman Resume June2009
Amy Freeman Resume June2009
 
Johnson_Todd_D_Resume - Outside
Johnson_Todd_D_Resume - OutsideJohnson_Todd_D_Resume - Outside
Johnson_Todd_D_Resume - Outside
 
QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2
 
CURRICULUM VITA ANTH
CURRICULUM VITA ANTHCURRICULUM VITA ANTH
CURRICULUM VITA ANTH
 
Angela Gallegos - Sept 2015 v1
Angela Gallegos - Sept 2015 v1Angela Gallegos - Sept 2015 v1
Angela Gallegos - Sept 2015 v1
 
MJonesMFG Quality Resume
MJonesMFG Quality ResumeMJonesMFG Quality Resume
MJonesMFG Quality Resume
 
Dulan_Resume_QE
Dulan_Resume_QEDulan_Resume_QE
Dulan_Resume_QE
 
TimLandwermeyerResume062315
TimLandwermeyerResume062315TimLandwermeyerResume062315
TimLandwermeyerResume062315
 
Resume Jackson Lee
Resume Jackson LeeResume Jackson Lee
Resume Jackson Lee
 
Debahis CV
Debahis CVDebahis CV
Debahis CV
 
Panneer selvam quality
Panneer selvam quality Panneer selvam quality
Panneer selvam quality
 
Amer malik resume
Amer malik resumeAmer malik resume
Amer malik resume
 
Anant shah asc-2017
Anant shah  asc-2017Anant shah  asc-2017
Anant shah asc-2017
 
maclean--scott---resume 1-19-2016
maclean--scott---resume 1-19-2016maclean--scott---resume 1-19-2016
maclean--scott---resume 1-19-2016
 
Kraig Kottenstette 102016.doc
Kraig Kottenstette 102016.docKraig Kottenstette 102016.doc
Kraig Kottenstette 102016.doc
 
Resume Giridhar
Resume GiridharResume Giridhar
Resume Giridhar
 
Introduction to six sigma
Introduction to six sigmaIntroduction to six sigma
Introduction to six sigma
 
Pravin Bio Data
Pravin Bio DataPravin Bio Data
Pravin Bio Data
 

Recently uploaded

一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 

Recently uploaded (20)

一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 

Chad mc lean resume ep2

  • 1. Chad M. McLean 312.764.8892 chadmmclean@gmail.com linkedin.com/in/chadmmclean PROFESSIONALSUMMARY Engineering Project Management Professional (PMP) with an excellent track record in project and operations management, quality system development, product development testing and mechanical design. Coordinating business and technical requirements. Making work less like work. Meeting requirements with increasing quality and efficiency. Leadership | Product Development | Automotive | Industrial | Results PMP, Lean Six Sigma Green Belt, Failure Mode Effect Analysis (FMEA), ISO9001:2015 QMS, CAPA (Corrective Action Preventative Action), GD&T, basic inspection tools, MetTrack, Edaq, Campbell Scientific, Morphee, SAP, Pro-E, SharePoint, Microsoft Office KEY ACCOMPLISHMENTS  All project stakeholderswere resistant to definedscope. Engaged stakeholder’s ownershipthrough bottom up planning ofproject details. Negotiatedagreement of plan andacceptanceofresults forall stakeholders. Project was completedontime and underbudget.  Project plan requiredtesting anew configuration. No reliable test procedureexisted. Influenced lead engineer to provide detailed comparisonofconfiguration options. Guidedteam review that removed the test, saving the project $200K.  Project material was delivered inconsistently. Identified procurement needs. Justified and hireda person to relieve engineersof procurement work. Consolidated procurement, improved efficiency and reducedspending, saving $70K peryear.  Aggressive plan to resolve current product issue was labor intensive. Revised plan to reduce complexity. Diagnosedthe issuein 50% of thetime, reducing requiredlaborby 70%.  Equipment calibration process was uneven acrossthecompany. Initiated project to improve thelocal process. Proposedimplementingprocessatothersites. Oversawtheimplementationplan for10sites globally. PROFESSIONALEXPERIENCE PRINCE CASTLE, Carol Stream, Illinois 2018 Manufacturer of commercial quick service kitchen equipment. Product Development Test Engineer -Contractedtodevelopandvalidateanew productline  Productdevelopmenttestingwasstalled. Prototypecontrolissuesneededresolution.Identifiedcause and proposedsolution.Control was four times betterand thetesting was successful.  The direction of design was being determined. Translated customer request. Proposed and justified product design criteria. The criteria was adoptedbythe team.  Championednew lab development relatedto development ofproducts fornew markets.
  • 2. SUNCAST CORPORATION, Batavia, Illinois 2017 Manufacturer of outdoorproducts and commercial storage and housekeeping products. Quality SystemEngineer -ContractedtoimprovetheproceduresoftheQualitydepartment.  Createdandlaunchedamonitoringandmeasurementequipmentcalibrationverificationprogram.  Developedatrainingplantoimprovethedatacollectedby themanufacturingqualityinspectors.  Collaboratedonthedesignof gagestomonitorcomponentqualityduringmanufacture.  Introducedandperformednew qualitytestprocedures.Documentedresults. CNH INDUSTRIAL, Burr Ridge, Illinois 2003 – 2017 Global leader in agricultural and construction equipment, trucks, buses and other commercial vehicles. Engineering Lab Manager 2008 - 2017 Created,developedandsupervisedstaffsofengineers,technicians,internsandcoopstudentswhoperformedwhole vehicleandcomponentproductdevelopmenttesting.AdvancedthecapabilitiesofCNHtestfacilities Project Management - Engineering Product Development  Testplanschedulesandbudgetestimateswereneededforanew jointventureproject.Rationalizedinitialtest plansandmodifiedtestrequirementsto controlspending. Completedprojectearlyandunderbudget.  Multiple project schedules were conflicting. Negotiated with stakeholders to coordinate schedules and deliverableswithavailablelabcapacityandcapabilities. Successfullykeptschedulesasagreed. Operations Management - Engineering Lab Development  Labstaff developmentandretentionwasrequired. Securedtechnicalchallengesforstafftodesignandperform testsnormally doneelsewhere.Facilitatedmentoringemployeeswhileenhancingstaffandlabcapabilities.  Capitalprojectsforlabimprovementsweredelayed. Formalizedandimplementedacapitalprojectprocessto commissionnew testsystems.Processyieldedmaturetestsystemsthatwerereadywhenneeded. Quality System Development - ISO 9001 Compliance  Perception and priority of complying with ISO requirements was low. Publicized how current internal processeswerealignedwithISOrequirements.AcquiredsupportforISO. Exceededgoalwithnoauditfindings.  ISOinternalauditteamneededimprovement. Partneredwithmanagementtoacquirenewauditors. Authored ISOandCAPAtrainingmaterialsandtrainedthenewauditteam. Exceededgoalwithnoexternalauditfindings. Test Engineer 2003 - 2007 Whole Vehicle and Drivetrain Testing  Observed issues were reported during testing. ChairedCAPA meetings with global team to assign severity, determinerootcauseandcloseissuesusing8Dprocess. Allobservationswereaddressedandclosed.  Labdevelopmentprojectwasnotbeingprioritized.Expandeduseof productdevelopmentworkordersystem toincreasevisibilityforlabdevelopment. Boostedawarenesstocompletethelabdevelopmentprojectontime. EDUCATION IowaStateUniversity,BachelorofScience,AgriculturalEngineering-MechanicalDesign 1993 PMP andLeanSixSigmaGreenBeltCertification 2018 COMMUNITY/VOLUNTEER/SERVICE ElementaryDistrict33SchoolBoardMember WestChicago Community FellowshipChurchMinistryPartner WestChicago