Paving Stones
In this tutorial we explain how to lay a paving block path. For added style and ease
we have replaced traditional paving stone concrete edging with 125x125 senton
posts. This method of edging not only creates a great look, but also makes the
project easier for those attempting it. We are using common solid concrete
cobblestone paving blocks 230mm long x 190mm wide x 60mm thick. These pavers
come in a variety of colours for individual tastes. Other materials required include
basecourse metal (gap 20) and sand. All materials are ready avaliable in the
Auckland area. This project is suitable for moderate to firm ground. If your ground is
soft, you will need to excavate deeper and replace with basecourse metal.
Step 1: Excavations Dig out the proposed pathway to a depth of 150mm
below finished path height (usually existing ground level) and the
required path width. Try to plan the width of the path so that full pavers
can be placed without the need for cutting. When working out the overall
path width, allow an extra 3mm between each paver (spacings that allow
sand to penetrate around the pavers). Some pavers have space nibs
(packers) already on them.
Step 2: Putting down the edging. Lay a bed of sand along each side of the
path excavation approximately 40mm thick and about 200mm wide.
Lay the edge boards (125x125 senton posts) on top of the sand and
tamp down into place until the top of the edge boards are at the required
path finished height. Retain them in place with stakes nailed to the
outside and trim the stakes off 20mm below the top of the edging board.
(see drawing below)
Step 3: Base course Add a layer of GAP 20 base course in between the
edging boards. (GAP 20 is a mixture of rock. The abbreviation, GAP 20,
General All Passing, means the metal is graded to one certain size,
20mm in this case, and everything below this size is included in the
product).
Add and compact the base course with a mechanical plate vibrator until
the finished height is 85mm down from the top of the edge boards. At the
same time compact the soil against the outside of the edge boards thus
ensuring they stay in place parellel.
You can hire a plate vibrator from your local hire centre.
Step 4: Bedding sand Add a layer of bedding or paving sand (approximately
35mm) and level with a screeding board so the finished height is 50mm
down from the top of the edge boards.
Step 5: Laying the paving stones Commence laying the pavers from one
end of the path. (work uphill). Space the pavers approx 3 mm to allow
filling sand to penetrate around the pavers. Kneel on a board across the
area you have already laid. Use full pavers only, go back later and fill in
with the cut ones.
Step 6: Compacting and putting in joint sand The pavers should now be, prior
to compacting, 10mm above required finished height. Compact the
pavers consistantly with the plate vibrator. The final step is to brush
jointing or filling sand over the surface. This fills the joints and binds the
pavers together. Vibrate again.
note 1: Purchase all the pavers from the same place and batch to ensure
consistancy of colour.
note 2: Any paving against buildings should be at least 150mm below concrete
floor level or below ground level under timber floors. The paving should slope away
from the building.
Materials
MATERIALS INFORMATION
125x125 senton
posts, h5 treated
comes in various lengths. Sold at most timber
merchants.
Cobblestone paving
blocks. 230mm x
190mm x 60mm thick
A common paver. Comes in a variety of colors.
Requires 23 pavers per sq meter.
Paving / filling sand
Sold loose in increments of quater cubic metre.
or in handy bags (more expensive). One cubic
metre would be enough to do a path 1m wide x
30m long or 30 sq metres
GAP 20 Base course
GAP 20, General All Passing, is a mixture of
crushed rock graded to 20mm and everything
below. One cubic metre would be enough to do
a path 1m wide x 12m long or 12 sq metres

More Related Content

What's hot (17)

How to install pvc downpipes
How to install pvc downpipesHow to install pvc downpipes
How to install pvc downpipes
 
Errth Flex For CD.pptx
Errth Flex For CD.pptxErrth Flex For CD.pptx
Errth Flex For CD.pptx
 
Ceramic / Porcelain Floor tile laying - Methodology
Ceramic / Porcelain Floor tile laying - MethodologyCeramic / Porcelain Floor tile laying - Methodology
Ceramic / Porcelain Floor tile laying - Methodology
 
Plastering by mani
Plastering by maniPlastering by mani
Plastering by mani
 
Abc tile-adhesive
Abc tile-adhesiveAbc tile-adhesive
Abc tile-adhesive
 
Brochure May 15
Brochure May 15Brochure May 15
Brochure May 15
 
Carpet_Seam_Lock
Carpet_Seam_LockCarpet_Seam_Lock
Carpet_Seam_Lock
 
Upvc fascia
Upvc fasciaUpvc fascia
Upvc fascia
 
Rubber Flooring
Rubber FlooringRubber Flooring
Rubber Flooring
 
brickwork, plastering and waterproofing
brickwork, plastering and waterproofingbrickwork, plastering and waterproofing
brickwork, plastering and waterproofing
 
Hf & mdb flooring
Hf & mdb flooringHf & mdb flooring
Hf & mdb flooring
 
Plastering ppt
Plastering pptPlastering ppt
Plastering ppt
 
Waterguard fiberglass mesh
Waterguard fiberglass meshWaterguard fiberglass mesh
Waterguard fiberglass mesh
 
Rubber flooring
Rubber flooringRubber flooring
Rubber flooring
 
Waterguard fiberglass mesh
Waterguard fiberglass meshWaterguard fiberglass mesh
Waterguard fiberglass mesh
 
Bolderstone brochure
Bolderstone brochureBolderstone brochure
Bolderstone brochure
 
How to build a retaining wall
How to build a retaining wallHow to build a retaining wall
How to build a retaining wall
 

Similar to Lay paving stones

Similar to Lay paving stones (20)

Chapter 8 floorings
Chapter 8 flooringsChapter 8 floorings
Chapter 8 floorings
 
Lay a laminate floor
Lay a laminate floorLay a laminate floor
Lay a laminate floor
 
Floor finishes
Floor finishesFloor finishes
Floor finishes
 
types of Flooring in construction
types of Flooring in constructiontypes of Flooring in construction
types of Flooring in construction
 
Flooring
FlooringFlooring
Flooring
 
Types of Flooring
Types of Flooring Types of Flooring
Types of Flooring
 
cereamic
cereamiccereamic
cereamic
 
Creation of low cost Housing
Creation of low cost HousingCreation of low cost Housing
Creation of low cost Housing
 
FLOORING
FLOORINGFLOORING
FLOORING
 
FLOORING
FLOORINGFLOORING
FLOORING
 
Types of plaster
Types of plasterTypes of plaster
Types of plaster
 
FLOOR FINISHES AND COVERINGS
FLOOR FINISHES AND COVERINGSFLOOR FINISHES AND COVERINGS
FLOOR FINISHES AND COVERINGS
 
floorfinishesandcovering-140424000010-phpapp01.pdf
floorfinishesandcovering-140424000010-phpapp01.pdffloorfinishesandcovering-140424000010-phpapp01.pdf
floorfinishesandcovering-140424000010-phpapp01.pdf
 
Flooring and types of flooring
Flooring and types of flooringFlooring and types of flooring
Flooring and types of flooring
 
3.floor systems.pdf
3.floor systems.pdf3.floor systems.pdf
3.floor systems.pdf
 
masonry final.pptx
masonry  final.pptxmasonry  final.pptx
masonry final.pptx
 
Flooring.pptx
Flooring.pptxFlooring.pptx
Flooring.pptx
 
Ground and upper floor
Ground and upper floorGround and upper floor
Ground and upper floor
 
Flooring
FlooringFlooring
Flooring
 
How to build a retaining wall
How to build a retaining wallHow to build a retaining wall
How to build a retaining wall
 

More from Zulaiha Amaria

More from Zulaiha Amaria (20)

Application of disciplinary system
Application of disciplinary systemApplication of disciplinary system
Application of disciplinary system
 
girl culture dictionary
girl culture dictionarygirl culture dictionary
girl culture dictionary
 
Wiring a ring main
Wiring a ring mainWiring a ring main
Wiring a ring main
 
Waterproof your roof
Waterproof your roofWaterproof your roof
Waterproof your roof
 
Wallpapering techniques
Wallpapering techniquesWallpapering techniques
Wallpapering techniques
 
Wallpaper stripping
Wallpaper strippingWallpaper stripping
Wallpaper stripping
 
Wallpaper a ceiling
Wallpaper a ceilingWallpaper a ceiling
Wallpaper a ceiling
 
Wall tiling
Wall tilingWall tiling
Wall tiling
 
Wainscotting
WainscottingWainscotting
Wainscotting
 
Upvc fascia
Upvc fasciaUpvc fascia
Upvc fascia
 
Tow dolly plans
Tow dolly plansTow dolly plans
Tow dolly plans
 
Timber decking
Timber deckingTimber decking
Timber decking
 
Timber cutting hand saws
Timber cutting hand sawsTimber cutting hand saws
Timber cutting hand saws
 
Size conversion charts
Size conversion chartsSize conversion charts
Size conversion charts
 
Shelving and storage
Shelving and storageShelving and storage
Shelving and storage
 
Safe diy
Safe diySafe diy
Safe diy
 
Replacing a brick
Replacing a brickReplacing a brick
Replacing a brick
 
Replace broken tiles
Replace broken tilesReplace broken tiles
Replace broken tiles
 
Repairing a dripping tap
Repairing a dripping tapRepairing a dripping tap
Repairing a dripping tap
 
Renovating wood
Renovating woodRenovating wood
Renovating wood
 

Lay paving stones

  • 1. Paving Stones In this tutorial we explain how to lay a paving block path. For added style and ease we have replaced traditional paving stone concrete edging with 125x125 senton posts. This method of edging not only creates a great look, but also makes the project easier for those attempting it. We are using common solid concrete cobblestone paving blocks 230mm long x 190mm wide x 60mm thick. These pavers come in a variety of colours for individual tastes. Other materials required include basecourse metal (gap 20) and sand. All materials are ready avaliable in the Auckland area. This project is suitable for moderate to firm ground. If your ground is soft, you will need to excavate deeper and replace with basecourse metal. Step 1: Excavations Dig out the proposed pathway to a depth of 150mm below finished path height (usually existing ground level) and the required path width. Try to plan the width of the path so that full pavers can be placed without the need for cutting. When working out the overall path width, allow an extra 3mm between each paver (spacings that allow sand to penetrate around the pavers). Some pavers have space nibs (packers) already on them. Step 2: Putting down the edging. Lay a bed of sand along each side of the path excavation approximately 40mm thick and about 200mm wide. Lay the edge boards (125x125 senton posts) on top of the sand and tamp down into place until the top of the edge boards are at the required path finished height. Retain them in place with stakes nailed to the outside and trim the stakes off 20mm below the top of the edging board. (see drawing below)
  • 2. Step 3: Base course Add a layer of GAP 20 base course in between the edging boards. (GAP 20 is a mixture of rock. The abbreviation, GAP 20, General All Passing, means the metal is graded to one certain size, 20mm in this case, and everything below this size is included in the product). Add and compact the base course with a mechanical plate vibrator until the finished height is 85mm down from the top of the edge boards. At the same time compact the soil against the outside of the edge boards thus ensuring they stay in place parellel. You can hire a plate vibrator from your local hire centre. Step 4: Bedding sand Add a layer of bedding or paving sand (approximately 35mm) and level with a screeding board so the finished height is 50mm down from the top of the edge boards. Step 5: Laying the paving stones Commence laying the pavers from one end of the path. (work uphill). Space the pavers approx 3 mm to allow filling sand to penetrate around the pavers. Kneel on a board across the area you have already laid. Use full pavers only, go back later and fill in with the cut ones. Step 6: Compacting and putting in joint sand The pavers should now be, prior to compacting, 10mm above required finished height. Compact the pavers consistantly with the plate vibrator. The final step is to brush jointing or filling sand over the surface. This fills the joints and binds the pavers together. Vibrate again. note 1: Purchase all the pavers from the same place and batch to ensure consistancy of colour. note 2: Any paving against buildings should be at least 150mm below concrete floor level or below ground level under timber floors. The paving should slope away from the building. Materials MATERIALS INFORMATION 125x125 senton posts, h5 treated comes in various lengths. Sold at most timber merchants.
  • 3. Cobblestone paving blocks. 230mm x 190mm x 60mm thick A common paver. Comes in a variety of colors. Requires 23 pavers per sq meter. Paving / filling sand Sold loose in increments of quater cubic metre. or in handy bags (more expensive). One cubic metre would be enough to do a path 1m wide x 30m long or 30 sq metres GAP 20 Base course GAP 20, General All Passing, is a mixture of crushed rock graded to 20mm and everything below. One cubic metre would be enough to do a path 1m wide x 12m long or 12 sq metres