SlideShare a Scribd company logo
-04.27-03.61
01
00.00
00.00
00.00
00.00
00.00
00.00
04.62
+04.62
-00.10
-00.10
00.00
DK
DK DK
3415
3510 2025
2025
2000
00.30
Slope:
1:20
SURFACE OF RAMP
AND LANDING NON-
SLIP FAIR FACED
CONCRETE
Surface of ramp and landing
slip resistant fair faced
concrete
Surface of
ramp and
landing slip
resistant fair
faced
concrete
Slope:
1:20
Sign Indicating
direction to building
Sign Indicating
direction to building
DK
-01.09
-00.45
LS
LS
LS
LS
LSLS
LS
LS
LS
LS
LS
LS
LSLSLSLSLSLS
Bus
Stop
Sign Indicating
building
-03.07
-02.42
-00.79
-00.1000.00
-00.10
-00.10
-00.10
-00.10
-00.96
00.00
-03.62
-02.98
-02.35
-01.72
1800
1800
1800
1975
Slope:
1:20
Slope:
1:20
Slope:
1:20
Slope:
1:20
Slope:
1:20
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Proposed
Car Park
Proposed Green
Area and
Landscaping
Proposed
Ramp
PROPOSED CAR PARK
CCAM Main
Entrance
Wellpark
Road
No
Access
CCAM
Main
Building
DK
Legend
0000
2025
2025
2025
-00.00
DK
ABOVE ORDINANCE
DATUM
PUBLIC LIGHT
STAND TO COMPLY
WITH ESB
STANDARDS
ACCESS ROUTE
DIMENSION LINE
EXISTING CHAPEL
STRUCTURE
EXTENSION
STRUCTURE
TACTILE SURFACE
DISHED KERBING DK
8000
PROPOSED HARD STANDING
1800
Mini
Round
about
Existing
Chapel
SUDS PERMEABLE
PAVING
SURFACE
WATER
DRAINAGE SUDS
SURFACE
WATER
DRAINAGE SUDS
MH
MH
Fall to
Centre:
1:60
Proposed
Extension
ACCESSIBLE
ENTRANCE A
ACCESSIBLE
ENTRANCE B
ACCESSIBLE
ENTRANCE C
PROPOSED
LANDSCAPING
PROPOSED RESURFACE
OF ROAD AND MARKINGS
ACCESSIBLE ROUTE FROM
CAR PARK TO ENTRANCE C
ACCESSIBLE ROUTE FROM
CAR PARK TO ENTRANCE A
ACCESSIBLE ROUTE FROM
CAR PARK TO ENTRANCE B
ROADSTONE
PAVIERS
GRASS MARGIN
GRASS MARGIN
GRASS MARGIN
GRASS MARGIN
EXISTING ROADWAY
ACCESS JUNCTION
MAN HOLE
FOUL WATER PIPE
RAIN WATER PIPE
F.F.L.
+00.30
F.F.L.
+00.30
MH
MH
MH
AJ
HOARDING LINE
SUDS 1:50 FALL TO
DRAINAGE SITE
SUDS SOAK PIT
100mm Ø RAIN WATER
PIPE LAID TO FALL 1:50
TO SUDS
100mm Ø FOUL WATER
PIPE LAID TO FALL 1:50
SetDown
Area/Hardstanding
Det.014
DK
2125
ACCESS ROUTE AND
FIRE ESCAPE
MH
AJ
LS
00.00
AJ
4025
CCAM MAIN
BUILDING
1844
1788
1500
1844
1850
2400
4800
6000
1400
4872
8000
48002050 2025
4810
2985
F.F.L.
+00.30
+00.30
13090
Fall to
Centre:
1:60
ACO 125
DRAIN
ACO 125
DRAIN
+0.000M
-0.100M
PERMEABLE PAVING
600x50mm ROADSTONE PLAIN FLAG
PAVING LAID ON 50mm SAND
BLINDING ON 50mm GRAVEL WITH A
ROADSTONE HALF BATTERED KERB
AT EDGE
PERMEABLE ROAD
25mm PERMEABLE ASPHALT
SURFACE COURSE ON 50mm
PERMEABLE BASE COURSE ON
100MM GRAVEL ON COMPACTED
EARTH
5050
10
5025100
50
DETAIL 014
1:10
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan
80 Gleann Rua,
Renmore,
Galway.
DESIGNERS ADDRESS
Construction
Information/Working Drawings
Galway Mayo Institute of
Technology
CONTACT DETAILS
Phone: 0830054478
Email:
jflanagangti@gmail.co
m
G00262330 28/04/2015
28/04/201513:08:50
Site Layout Plan
1:200
GA_001
DDS4_P09
Site Layout Plan
N
orth
1:200
GA_001
DDS4_P09
UP
Existing
Stairs
25285
15338
2425
26525
Legend
EXTENT OF WALL
DEMOLITION
Existing Walls
EXTENT OF DOOR
DEMOLITION
EXTENT OF STAIN
GLASS WINDOW
DEMOLITION
2909
8865
897
850
12101210
24003596
251025541494
3253
SCULPTURE
GALWAY FILM CENTRE
STAGING AREA
EXTENT OF FLOORS
DEMOLITION
19603
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan
80 Gleann Rua,
Renmore,
Galway.
DESIGNERS ADDRESS
Construction
Information/Workign Drawings
Galway Mayo Institute of
Technology
CONTACT DETAILS
Phone: 0830054478
Email:
jflanagangti@gmail.co
m
G00262330 28/04/2015
20/04/201518:29:05
Demolition Plan
1:50
GA_002
DDS4_P09
Chapel Ground Floor Plan Demolition
UP
UP
30.07 m²
Green Room
158 G
EXISTING VICTORIAN TILE
5.23 m²
Costume Store
154 K
EXISTING VICTORIAN TILE
5.95 m²
Costume Store
155 J
EXISTING VICTORIAN TILE
5.32 m²
Costume Store
156 I
EXISTING VICTORIAN TILE
5.74 m²
Costume Store
157 H
EXISTING VICTORIAN TILE
14.07 m²
Tech Support
161 B
EXISTING PARQUET AND TILE
14.37 m²
Prop Store
161 A
EXISTING PARQUET AND TILE
15.12 m²
Matrix Chair Store
161 C
EXISTING PARQUET AND TILE
15.69 m²
Lobby
161 M
EXISTING LIESTONE TILE
FLOOR
185.87 m²
Creative Space
161 L
EXISTING PARQUET AND
VICTORIAN TILE
A-A
678
7.08 m²
Disabled Shower/WC
161 E
SOLUS CERAMICS MODULAR
TILE R11
16.66 m²
Matrix Chair Store
161 D
EXISTING PARQUET AND TILE
25.53 m²
Changing Room
161 F
SOLUS CERAMICS MODULAR
TILE R11
1050
4260
Slope:
1:20
Modesty
Screen
2398
Legend
Demolished Walls
EXISTING DOOR TO BE
RETAINED AND
PAINTED WITH A FIRE
RESISTANT SELANT,
INCHUMESCENT STRIP
AND DOOR CLOSER
EXISTING DOOR TO BE
RETAINED AND PAINTED
WITH A FIRE RESISTANT
SELANT,
INCHUMESCENT STRIP
AND DOOR CLOSER
EXISTING PARTITIONS
TO BE DEMOLISHED
EXISTING PARTITIONS TO
BE DEMOLISHED
EXISTING DOOR TO BE
REMOVED AND
OPENING CLOSED
00.30
00.30
UPGR.
D-01
D-06
FD 30 S
D-08
FD 30 S
D-03
FD 30 S
UPGR.
D-09
Existing Walls
00.30
1263
4938
331128552855
897
00.30
00.00
008
GA_013
2500
2800
D-02
FD 30 S
D-04
FD 30 S
D-05
FD 30 S
D-11
FD 30 S
D-12
FD 30 S
D-13
FD 30 S
D-14
FD 30 S
D-16
D-15
FD 30 S
D-07
S
D-10
1200
2850
00.30
3224
3029
1770
1770
1252
1050
NEW WALL OPE
FOR FIRE DOOR
ALL EXISTING STAIN GLASS AND FRAMES RETAINED AND
REPAIRED BY USING SUITABLE CONSERVATION
TECHNOLOGIES UNLESS REMOVED IN DEMOLITION PLAN.
STAIN GLASS WINDOW REVEALS AND BORDERS TO BE
CLEANED.
ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE
EXISTING OPE BEHIND WINDOW.
EXTERIOR GLAZED GUARD REPLACED WITH SINGLE
GLAZED WINDOW GUARD. 20mm GAP LEFT ALONG
BOTTOM OF GLAZING TO VENTILATE AND MITIGATE
CONDENSATION.
ALL EXISTING STAIN GLASS AND FRAMES
RETAINED AND REPAIRED BY USING SUITABLE
CONSERVATION TECHNOLOGIES UNLESS REMOVED
IN DEMOLITION PLAN.
STAIN GLASS WINDOW REVEALS AND BORDERS TO
BE CLEANED.
ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE
EXISTING OPE BEHIND WINDOW.
EXTERIOR GLAZED GUARD REPLACED WITH
SINGLE GLAZED WINDOW GUARD. 20mm GAP LEFT
ALONG BOTTOM OF GLAZING TO VENTILATE AND
MITIGATE CONDENSATION.
ALL EXISTING STAIN GLASS AND FRAMES RETAINED AND REPAIRED BY
USING SUITABLE CONSERVATION TECHNOLOGIES UNLESS REMOVED IN
DEMOLITION PLAN.
STAIN GLASS WINDOW REVEALS AND BORDERS TO BE CLEANED.
ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE EXISTING OPE
BEHIND WINDOW.
EXTERIOR GLAZED GUARD REPLACED WITH SINGLE GLAZED WINDOW
GUARD. 20mm GAP LEFT ALONG BOTTOM OF GLAZING TO VENTILATE
AND MITIGATE CONDENSATION.
EXISTING
TEMPORARY FLOOR
REMOVED AND
PARQUET AND
VICTORIAN TILES
RETAINED AND
REFURBISHED
1010
STAGING AREA/TV STUDIO
FORBO MARMOLEUM REAL
00.30 00.30
00.30
00.3000.30
00.30
00.00
EXISTING DOOR TO
BE RETAINED AND
PAINTED WITH A FIRE
RESISTANT SELANT,
INCHUMESCENT
STRIP AND DOOR
CLOSER
W-05
W-04
W-07
W-06
W-16
W-14 W-12 W-10
W-09 W-08
W-03W-02W-01
W-18
W-20
W-17
W-11W-13W-15
W-19
EXISTING FRENCH DRAIN TO
BE REMOVED FROM
PERIMETER OF CHAPEL
BUILDING AND REPALCED
WITH PREMEABLE PAVING
DOOR GUARD RAIL
1100x1100mm
006
GA_013
010
GA_013
009
GA_013
005
GA_013
B-B
PROPOSED WALL
OPENINGS TO BE
MADE GOOD.
FINISHES TO WALLS
OF DEMOLITION
WORK TO BE MADE
GOOD WITH
APPROPRIATE FILLING
AND LIME RENDER
FINISH TO MATCH
EXISTING WALLS
FOWL WATER
DRAINAGE
RAIN WATER
DRAINAGE
PROPOSED WALL
CLOSURES TO BE
MADE GOOD.
FINISHES TO WALLS
OF DEMOLITION
WORK TO BE MADE
GOOD WITH
APPROPRIATE
FILLING AND LIME
RENDER FINISH TO
MATCH EXISTING
WALLS
450MM MINIMUM
ACTIVITY TURNING
SPACE
S
SOUNDER
EXISTING VICTORIAN TILE,
PARQUET AND THEIR ADHESIVES
TO BE REPLACED WITH SOLUS
CERAMICS MODULAR TILES AND
LAID ON A BED OF TELLING UNILIT
45 LIME
EXISTING PARQUET FLOOR TO
BE RETAINED AND CLEANED
WITH VACUUM, MOPPED WITH
ARBO CLEANER 16. 2 COATS OF
BONA HARDWAX OIL TO BE
APPLIED TO PARQUET WHEN
FULLY DRY AND BUFFED TO
FINISH
EXISTING VICTORIAN TILES TO BE
RETAINED, GROUT AND TILES TO
BE CLEANED BY VACUUM AND
MOP WITH ARBO CLEANER 16.
WHEN DRY APPLY DUPONT
STONE TECH GROUT SEALER.
BUFF FLOOR TO FINISH.
EXISTING VICTORIAN TILES TO BE
RETAINED, GROUT AND TILES TO
BE CLEANED BY VACUUM AND
MOP WITH ARBO CLEANER 16.
WHEN DRY APPLY DUPONT
STONE TECH GROUT SEALER.
BUFF FLOOR TO FINISH.
EXISTING OPE TO BE WIDENED
AND 30 MIN. FIRE DOOR
INSTALLED. TO BE PERMANENTLY
LOCKED AT ALL TIMES.
EXTENT OF PARQUET
EXTENT OF SOLUS
CERAMICS MODULAR
TILES
EXTENT OF VICTORIAN
TILES
EXTENT OF FORBO
MARMOLEUM REAL
1500
300
1850
OAK LAMINATE FLOOR
BOARDS
OAK LAMINATE FLOOR
BOARDS
OAK LAMINATE FLOOR
BOARDS
OAK LAMINATE FLOOR
BOARDS
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan
80 Gleann Rua,
Renmore,
Galway.
DESIGNERS ADDRESS
Construction
Information/Working Drawings
Galway Mayo Institute of
Technology
CONTACT DETAILS
Phone: 0830054478
Email:
jflanagangti@gmail.co
m
G00262330 28/04/2015
28/04/201513:18:37
Ground Floor Chapel Plan
1:50
GA_003
DDS4_P09
Proposed Ground Floor Chapel Plan
N
orth
Key Plan
DN
24.85 m²
Gallery
161 T
INACCESSIBLE
5.44 m²
Existing Stairs
?
?
B-B
A-A
846
UPGR.
D-17
EXISTING DOOR
TO BE RETAINED
AND PAINTED
WITH A FIRE
RESISTANT
SELANT. TO BE
PERMANENTLY
LOCKED AT ALL
TIMES.
EXISTING
BALUSTRADE TO
BE RETAINED
AND PAINTED
WITH A LIGHT
VARNISH
W-30
W-28
W-36W-37 W-35 W-34 W-33 W-32 W-31
W-22W-21 W-23 W-24 W-25
W-29W-39
W-38
Legend
Demolished Walls
Existing Walls
PROPOSED WALL
OPENINGS TO BE
MADE GOOD.
FINISHES TO WALLS
OF DEMOLITION
WORK TO BE MADE
GOOD WITH
APPROPRIATE FILLING
AND LIME RENDER
FINISH TO MATCH
EXISTING WALLS
FOWL WATER
DRAINAGE
RAIN WATER
DRAINAGE
PROPOSED WALL
CLOSURES TO BE
MADE GOOD.
FINISHES TO WALLS
OF DEMOLITION
WORK TO BE MADE
GOOD WITH
APPROPRIATE
FILLING AND LIME
RENDER FINISH TO
MATCH EXISTING
WALLS
450MM MINIMUM
ACTIVITY TURNING
SPACE
S
SOUNDER
EXTENT OF PARQUET
EXTENT OF SOLUS
CERAMICS MODULAR
TILES
EXTENT OF VICTORIAN
TILES
EXTENT OF FORBO
MARMOLEUM REAL
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan
80 Gleann Rua,
Renmore,
Galway.
DESIGNERS ADDRESS
Construction
Information/Working Drawings
Galway Mayo Institute of
Technology
CONTACT DETAILS
Phone: 0830054478
Email:
jflanagangti@gmail.co
m
G00262330 28/04/2015
28/04/201514:29:17
Gallery Floor Plan
1:50
GA_004
DDS4_P09
Proposed Gallery Floor Plan
N
orth
UP
26.74 m²
Glass Link
161 N
ROADSTONE LIMESTONE
PAVING FLAGS
6741
B-B
A-A
700
2240
4.35 m²
Lobby
WC
SOLUS CERAMICS MODULAR
TILE R11
6.25 m²
Disabled WC
161 Q
SOLUS CERAMICS MODULAR
TILE R11
3.89 m²
Lobby
WC
SOLUS CERAMICS MODULAR
TILE R11
10.61 m²
Male WC
161 S
SOLUS CERAMICS MODULAR
TILE R11
10.33 m²
Female WC
161 R
SOLUS CERAMICS MODULAR
TILE R11
16111440
2163
Slope:
1:20
00.30
00.30
00.30
00.00
1700
00.30
63.23 m²
Reception
161 P
Oak Laminate Floor
00.30
1850
D-21
N/A
D-24
N/A
D-16
N/A
1800
1500
D-18
D-19
12001200
C-C
2500
1605
OVER DOOR
HEATERS
RECESSED IN
CEILING
W-18
W-20
W-19
W-43W-42
W-41
W-40
014
GA_014
017
GA_014
GA_015
GA_014
022
015
GA_015
022
GA_015
023
18267
1500
300
100
942
1844
1200
1010
1010
10101010
790
1077
Legend
Demolished Walls
Existing Walls
PROPOSED WALL
OPENINGS TO BE
MADE GOOD.
FINISHES TO WALLS
OF DEMOLITION
WORK TO BE MADE
GOOD WITH
APPROPRIATE FILLING
AND LIME RENDER
FINISH TO MATCH
EXISTING WALLS
FOWL WATER
DRAINAGE
RAIN WATER
DRAINAGE
PROPOSED WALL
CLOSURES TO BE
MADE GOOD.
FINISHES TO WALLS
OF DEMOLITION
WORK TO BE MADE
GOOD WITH
APPROPRIATE
FILLING AND LIME
RENDER FINISH TO
MATCH EXISTING
WALLS
450MM MINIMUM
ACTIVITY TURNING
SPACE
S
SOUNDER
EXTENT OF PARQUET
EXTENT OF SOLUS
CERAMICS MODULAR
TILES
EXTENT OF VICTORIAN
TILES
EXTENT OF FORBO
MARMOLEUM REAL
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan
80 Gleann Rua,
Renmore,
Galway.
DESIGNERS ADDRESS
Disability Access Certificate
Application
Galway Mayo Institute of
Technology
CONTACT DETAILS
Phone: 0830054478
Email:
jflanagangti@gmail.co
m
G00262330 15/01/2015
28/04/201513:20:09
Ground Floor Extension Plan
1:50
GA_005
DDS4_P09
Ground Floor Extension Plan
N
orth
Key Plan
00 Ground Level
0
01 Ground Floor
300
Chapel Flat Roof Level
4620
Chapel Eaves 1
7935
10 Chapel Ridge Level
11978
001
GA_012
012
GA_012
004
GA_013
003
GA_012
004
GA_013
185.87 m²
Creative Space
161 L
EXISTING PARQUET AND
VICTORIAN TILE
25.53 m²
Changing Room
161 F
SOLUS CERAMICS MODULAR
TILE R11
7.08 m²
Disabled Shower/WC
161 E
SOLUS CERAMICS MODULAR
TILE R11
30.07 m²
Green Room
158 G
EXISTING VICTORIAN TILE
3135
3135
007
GA_013
EXISTING SLATES TO BE REUSED WHERE
POSSIBLE AND REPLACEMENTS TO BE
MADE GOOD WITH RECLAIMED BANGOR
BLUE AGED SIMILAR WHERE NECESSARY.
ALL EXISTING STAIN GLASS AND FRAMES RETAINED AND
REPAIRED BY USING SUITABLE CONSERVATION TECHNOLOGIES
UNLESS REMOVED IN DEMOLITION PLAN.
STAIN GLASS WINDOW REVEALS AND BORDERS TO BE CLEANED.
ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE EXISTING OPE
BEHIND WINDOW.
EXTERIOR GLAZED GUARD REPLACED WITH SINGLE GLAZED
WINDOW GUARD. 20mm GAP LEFT ALONG BOTTOM OF GLAZING TO
VENTILATE AND MITIGATE CONDENSATION.
EXISTING STAIN GLAS WINDOW
RETAINED AND
REPAIRED/UPGRADED WITH SINGLE
GLAZE ISOTHERMAL GLAZING AND
A EXTERIOR GLAZED GUARD.
EXISTING STAIN GLAS WINDOW
RETAINED AND
REPAIRED/UPGRADED WITH SINGLE
GLAZE ISOTHERMAL GLAZING AND
A EXTERIOR GLAZED GUARD.
EXISTING STAIN GLAS WINDOW
RETAINED AND
REPAIRED/UPGRADED WITH SINGLE
GLAZE ISOTHERMAL GLAZING AND
A EXTERIOR GLAZED GUARD.
00 Ground Level
0
01 Ground Floor
300
02 Gallery FFL
4525
Chapel Eaves 1
7935
2051
016
GA_014
185.87 m²
Creative Space
161 L
EXISTING PARQUET AND
VICTORIAN TILE
24.85 m²
Gallery
161 T
INACCESSIBLE
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan
80 Gleann Rua,
Renmore,
Galway.
DESIGNERS ADDRESS
Construction
Information/Working Drawings
Galway Mayo Institute of
Technology
CONTACT DETAILS
Phone: 0830054478
Email:
jflanagangti@gmail.co
m
G00262330 28/04/2015
28/04/201513:23:37
Chapel Sections AA - BB
1:50 DDS4_P05
Section A-A
Section B-B
1:50
GA_006
DDS4_P09
00 Ground Level
0
01 Ground Floor
300
Extension Parapet Level
4983
Extension Roof Level
4568
011
GA_014
019
GA_015
012
GA_014
013
GA_014
011
GA_014
ALUMINIUM PARAPET TO
EXTENSION ANODISED BLACK
SVK ORNIMAT FIBRECEMENT
RAINSCREEN CLADDING
COLOUR BLACK
SCHUCO FW60+
ALUMINIUM TRIPLE
GLAZING
3722
1:60 FALL 1:60 FALL
00 Ground Level
0
01 Ground Floor
300
Extension Parapet Level
4983
Extension Roof Level
4568
3722
3739 2500 10840
2000150
600 600600
842
1750
1100
63.23 m²
Reception
161 P
Oak Laminate Floor
6.25 m²
Disabled WC
161 Q
SOLUS CERAMICS MODULAR
TILE R11
10.33 m²
Female WC
161 R
SOLUS CERAMICS MODULAR
TILE R11
011
GA_014
019
GA_015
015
GA_014
011
GA_014
012
GA_014
013
GA_014
ALUMINIUM PARAPET TO
EXTENSION ANODISED BLACK
SVK ORNIMAT FIBRECEMENT
RAINSCREEN CLADDING
COLOUR BLACK
SCHUCO FW60+
ALUMINIUM TRIPLE
GLAZING
00 Ground Level
0
01 Ground Floor
300
Link Roof Level
4500
016
GA_014
024
GA_015
1200
26.74 m²
Glass Link
161 N
ROADSTONE LIMESTONE
PAVING FLAGS
PILKINGTON PLANAR
GLAZED WALLS AND
ROOF
1:60 FALL
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan
80 Gleann Rua,
Renmore,
Galway.
DESIGNERS ADDRESS
Construction
Information/Working Drawings
Galway Mayo Institute of
Technology
CONTACT DETAILS
Phone: 0830054478
Email:
jflanagangti@gmail.co
m
G00262330 28/04/2015
28/04/201513:24:58
Extension Sections A-A & B-B
& C-C
1:50 DDS4_P05
Section A-A
Section B-B
1:50
GA_007
DDS4_P09
Section C-C
00 Ground Level
0
Chapel Eaves
7600
10 Chapel Ridge Level
11978
Extension Parapet Level
4983
550
1100
Ramps and Hand rails in
accordance with TGD
Part M 2010
SVK ORNIMAT FIBRECEMENT
RAINSCREEN CLADDING COLOUR
BLACK
ALUMINIUM PARAPET TO
EXTENSION ANODISED
BLACK
ALL EXISTING STAIN GLASS AND FRAMES
RETAINED AND REPAIRED BY USING
SUITABLE CONSERVATION
TECHNOLOGIES UNLESS REMOVED IN
DEMOLITION PLAN.
STAIN GLASS WINDOW REVEALS AND
BORDERS TO BE CLEANED.
ISOTHERMAL SINGLE GLAZED UNIT
ADDED TO THE EXISTING OPE BEHIND
WINDOW.
EXTERIOR GLAZED GUARD REPLACED
WITH SINGLE GLAZED WINDOW GUARD.
20mm GAP LEFT ALONG BOTTOM OF
GLAZING TO VENTILATE AND MITIGATE
CONDENSATION.
EXISTING WALL AND QUOIN STONES TO BE
REPAIRED AND RE-POINTED AS
NECESSARY
EXISTING WALL RENDER TO BE REPAIRED
AS NECESSARY TO EXTERIOR AT CRACKS
AND WITH SIMILAR PEBBLE DASH RENDER
EXISTING SASH WINDOW TO BE CAREFULLY
REPAIRED USING SUITABLE CONSERVATION
TECHNOLOGIES AND MATERIALS BY
SPECIALIST JOINER
Extension Roof Level
4568
EXISTING SLATES TO BE REUSED WHERE
POSSIBLE AND REPLACEMENTS TO BE MADE
GOOD WITH RECLAIMED BANGOR BLUE AGED
SIMILAR WHERE NECESSARY.
PARAPET AND
FLASHING TO BE
RETAINED,
CLEANED AND
REPAIRED AS
NECESSARY WITH
SIMILAR
1100
EXISTING DOVE COT
RETAINED AND CLEANED,
REPAIR AND REPLACE
LOUVRES AS NECESSARY
WITH SIMILAR
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan
80 Gleann Rua,
Renmore,
Galway.
DESIGNERS ADDRESS
Construction
Information/Working Drawings
Galway Mayo Institute of
Technology
CONTACT DETAILS
Phone: 0830054478
Email:
jflanagangti@gmail.co
m
G00262330 28/04/2015
28/04/201513:30:22
North Elevation
1:50
GA_008
DDS4_P09
North Elevation
North Elevation (Key)
00 Ground Level
0
Chapel Flat Roof Level
4620
Chapel Eaves
7600
10 Chapel Ridge Level
11978
EXISTING WALL RENDER TO BE REPAIRED AS
NECESSARY TO EXTERIOR AT CRACKS AND
WITH SIMILAR PEBBLE DASH RENDER
ALL EXISTING STAIN GLASS AND FRAMES RETAINED AND REPAIRED BY USING
SUITABLE CONSERVATION TECHNOLOGIES UNLESS REMOVED IN DEMOLITION
PLAN.
STAIN GLASS WINDOW REVEALS AND BORDERS TO BE CLEANED.
ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE EXISTING OPE BEHIND
WINDOW.
EXTERIOR GLAZED GUARD REPLACED WITH SINGLE GLAZED WINDOW GUARD.
20mm GAP LEFT ALONG BOTTOM OF GLAZING TO VENTILATE AND MITIGATE
CONDENSATION.
EXISTING WALL AND QUOIN STONES TO BE
REPAIRED AND RE-POINTED AS NECESSARY
EXISTING RAIN WATER GOODS TO BE
REPAIRED AND RE-PAINTED AS NECESSARY
WITH SIMILAR MATERIALS AND COLOUR BY
CONSERVATION METALWORKER
BARGE TO BE RETAINED AND CLEANED WITH
JET WASHER.
EXISTING SLATES TO BE REUSED WHERE
POSSIBLE AND REPLACEMENTS TO BE MADE
GOOD WITH RECLAIMED BANGOR BLUE AGED
SIMILAR WHERE NECESSARY.
PARAPET AND FLASHING TO
BE RETAINED, CLEANED
AND REPAIRED AS
NECESSARY WITH SIMILAR
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan
80 Gleann Rua,
Renmore,
Galway.
DESIGNERS ADDRESS
Construction
Information/Working Drawings
Galway Mayo Institute of
Technology
CONTACT DETAILS
Phone: 0830054478
Email:
jflanagangti@gmail.co
m
G00262330 28/04/2015
28/04/201513:31:44
East Elevation
1:50
GA_010
DDS4_P09
East Elevation
East Elevation (Key)
00 Ground Level
0
Chapel Flat Roof Level
4620
Chapel Eaves
7600
10 Chapel Ridge Level
11978
Extension Parapet Level
4983
EXISTING WALL RENDER TO BE
REPAIRED AS NECESSARY TO
EXTERIOR AT CRACKS AND WITH
SIMILAR PEBBLE DASH RENDER
ALL EXISTING STAIN GLASS AND FRAMES RETAINED AND REPAIRED BY
USING SUITABLE CONSERVATION TECHNOLOGIES UNLESS REMOVED IN
DEMOLITION PLAN.
STAIN GLASS WINDOW REVEALS AND BORDERS TO BE CLEANED.
ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE EXISTING OPE BEHIND
WINDOW.
EXTERIOR GLAZED GUARD REPLACED WITH SINGLE GLAZED WINDOW
GUARD. 20mm GAP LEFT ALONG BOTTOM OF GLAZING TO VENTILATE AND
MITIGATE CONDENSATION.
EXISTING WALL AND QUOIN STONES
TO BE REPAIRED AND RE-POINTED AS
NECESSARY WITH SIMILAR
EXISTING SLATES TO BE REUSED WHERE
POSSIBLE AND REPLACEMENTS TO BE MADE
GOOD WITH RECLAIMED BANGOR BLUE
AGED SIMILAR WHERE NECESSARY.
EXISTING DOVE COT RETAINED AND
CLEANED, REPAIR AND REPLACE
LOUVRES AS NECESSARY WITH SIMILAR
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan
80 Gleann Rua,
Renmore,
Galway.
DESIGNERS ADDRESS
Construction
Information/Working Drawings
Galway Mayo Institute of
Technology
CONTACT DETAILS
Phone: 0830054478
Email:
jflanagangti@gmail.co
m
G00262330 28/04/2015
28/04/201513:30:59
South Elevation
South Elevation
South Elevation (Key)
1:50
GA_009
DDS4_P09
00 Ground Level
0
01 Ground Floor
300
Chapel Flat Roof Level
4620
Chapel Eaves 1
7935
10 Chapel Ridge Level
11978
EXISTING RAIN WATER GOODS TO
BE REPAIRED AND RE-PAINTED AS
NECESSARY WITH SIMILAR COLOUR
OF ANTI-RUST PAINT
EXISTING WALL RENDER TO BE
REPAIRED AS NECESSARY TO
EXTERIOR AT CRACKS AND WITH
SIMILAR PEBBLE DASH RENDER
ALL EXISTING STAIN GLASS AND FRAMES RETAINED AND
REPAIRED BY USING SUITABLE CONSERVATION
TECHNOLOGIES UNLESS REMOVED IN DEMOLITION PLAN.
STAIN GLASS WINDOW REVEALS AND BORDERS TO BE
CLEANED.
ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE EXISTING
OPE BEHIND WINDOW.
EXTERIOR GLAZED GUARD REPLACED WITH SINGLE GLAZED
WINDOW GUARD. 20mm GAP LEFT ALONG BOTTOM OF
GLAZING TO VENTILATE AND MITIGATE CONDENSATION.
EXISTING WALL AND QUOIN STONES
TO BE REPAIRED AND RE-POINTED
AS NECESSARY
BARGE TO BE CLEANED WITH JET WASHER.
EXISTING SLATES TO BE REUSED WHERE
POSSIBLE AND REPLACEMENTS TO BE MADE
GOOD WITH RECLAIMED BANGOR BLUE AGED
SIMILAR WHERE NECESSARY.
1100
150
300
150
300
100
950
1500
00 Ground Level
0
01 Ground Floor
300
Extension Parapet Level
4983
Link Roof Level
4500
Glass Manifestations are 50mm high and
placed at 850mm and 1400mm Above
Floor Level
Extension Roof Level
4568
2400x1200mm SVK ORNIMAT
FIBRECEMENT RAINSCREEN
CLADDING COLOUR BLACK
1200
1200
2400
600 600 1500
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan
80 Gleann Rua,
Renmore,
Galway.
DESIGNERS ADDRESS
Construction
Information/Working Drawings
Galway Mayo Institute of
Technology
CONTACT DETAILS
Phone: 0830054478
Email:
jflanagangti@gmail.co
m
G00262330 28/04/2015
28/04/201513:36:13
West Elevation
Roof PlanWest Elevation (Extension)
West Elevation (Chapel)
1:50
GA_011
DDS4_P09
West Elevation (Key)
RIDGE RESTORATION
EXISTING OAK KING POST TRUSS TO BE INSPECTED AND REPAIRED AS NECESSARY WITH CAST IRON
BRACING TO BE RESTORED. VOID REGION BETWEEN EXISTING OAK ROOF PURLINS.
PURLINS TO BE RESTORED AS PART OF ROOF TRUSS INSPECTION. EXISTING 125x50mm OAK RAFTERS
AT 600mm CENTRES TO BE INSPECTED AND RESTORED AS NECESSARY. 20mm EXISTING OAK CEILING
BOARDS TO BE INSPECTED AND RESTORED AS NECESSARY.
160mm GUTEX THERMOFLEX WOOF FIBREBOARD INSULATION PLACED ABOVE EXISTING OAK CEILING
WITH A LAYER OF PRO CLIMA INTELLO PLUS BREATHER MEMBRANE TAPED AT JOINTS BETWEEN SHEETS
WITH TESCON NO.1.
38x50mm SOFTWOOD COUNTER BATTENS TO ENSURE VENTILATED AIR SPACE. EXISTING SLATES TO BE
REUSED WHERE POSSIBLE AND REPLACEMENTS TO BE MADE GOOD WITH RECLAIMED BANGOR BLUE
AGED SIMILAR WHERE NECESSARY. EXISTING CLAY RIDGE TILE TO BE RETAINED.
DETAIL 002
1:5
EAVES RESTORATION
EXISTING SLATES TO BE RETAINED/RE-USED WHERE POSSIBLE AND
REPLACEMENTS TO BE MADE WITH RECALIMED BANGOR BLUE AGES SIMILAR
WHERE NECESSARY. LEAD FLASHING AT EAVES TO EXISTING CAST IRON
GUTTER TO BE INSPECTED AND REPAIRED WITH ASPHALT OVER SMALL LEAKS
AND REPLACED IN AREAS OF MAJOR DAMAGE EVIDENT. EXISTING CORNICE TO
BE CLEANED AND RETAINED. 38x50mm SOFTWOOD COUNTER BATTENS TO
ENSURE VENTILATED AIR SPACE.
PRO CLIMA INTELLO PLUS BREATHER MEMBRANE LAID ON 160mm GUTEX
THERMOFLEX WOOD FIBREBOARD INSULATION ON 20mm EXISTING OAK
CEILING BOARDS TO BE INSPECTED AND RESTORED AS NECESSARY.
EXISTING 125x50mm OAK RAFTERS AT 600mm CENTRES TO BE INSPECTED AND
RESTORED AS NECESSARY. 80mm GUTEX WOOD FIBREBOARD INSULATION ON
EXISTING SURFACE OF INTERNAL WALL WITH 12.5mm GYPSUM WALL BOARD
WITH A 3mm SKIM COAT OF TELLING UNILIT 45 FINISHED WITH A WHITE
RENDER.
DETAIL 001
1:5
+0.000M
+0.300M
INTERIOR WALL RESTORATION
SURFACE OF INTERIOR WALL CLEANED WITH NON ABRASIVE
CLEANER AND WATER WITH ANY LOOSE DEBRIS BEING
REMOVED AND ALLOWED TO DRY CREATING A FLAT EVEN
SURFACE.
ALL INTERIOR SKIRTING BOARDS TO BE CAREFULLY
REMOVED AND RE-PAINTED WITH A LIGHT VARNISH AND
BONDED TO NEW WALL SURFACE.
80mm GUTEX THERMOROOM ADHESIVELY FIXED TO INTERNAL
SURFACE OF EXISTING WALL WITH A LAYER GUTEX KLEBE-
UND SPACHTELPUTZ. 12.5mm GYPSUM WALL BOARD
ADHESIVELY FIXED WITH A LAYER OF GUTEX KLEBE-UND
SPACHTELPUTZ AND A 3mm SKIM COAT OF TELLING UNILIT 45
FINISHED WITH A WHITE RENDER.
EXISTING FLOOR BUILD UP
NOTE: THIS IS WHAT IS BELIEVED TO BE UNDER THE
FLOOR BUT CANNOT BE DETERMINED UNTIL TRIAL HOLES
ARE DUG
20mm EXISTING CLAY VICTORIAN TILE AND PARQUET FLOOR
ON 10mm SAND CEMENT ADHESIVE BEDDING ON 100mm
CONCRETE SLAB ON 365mm LAYER OF COMPACTED
RUBBLE TO COMPACTED EARTH WITH EXISTING EXTERIOR
WALL LAID 900mm DEEP FROM INTERIOR FLOOR TO A
STEPPED FOOTING WITH A WEARING COURSE OF STONE
UNDERNEATH
PERMEABLE PAVING
FRENCH DRAIN REMOVED FROM
PERIMETER OF BUILDING AND
REPLACED WITH 50mm ROADSTONE
PLAIN FLAG PAVING LAID ON 50mm
SAND BLINDING ON GRAVEL BED TO
COMPACTED EARTH WITH A 1:50
FALL TO SUDS
DETAIL 003
1:5
12.5 80 580
5050
100
3651001020
35
160
20
125
100
250
35
250
250
100
125
20
160
35
580 80 12.5
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan
80 Gleann Rua,
Renmore,
Galway.
DESIGNERS ADDRESS
Construction
Information/Working Drawings
Galway Mayo Institute of
Technology
CONTACT DETAILS
Phone: 0830054478
Email:
jflanagangti@gmail.co
m
G00262330 28/04/2015
28/04/201513:53:20
Chapel Details Pt. 1
1:5
GA_012
DDS4_P09
SKIRTING
150x40mm OAK CHAMFERED
SKIRTING BOARD PAINTED WITH A
LIGHT VARNISH AND BONDED WITH
EVOSTIK GRIP FILL TO PARTITION
BASE FIXING
50x70mm TREATED SW TIMBER
FRAME SCREW FIXED TO BASE OF
PARTITION SEALED WITH A BEAD
OF GYPROC ACOUSTIC SEALANT
EITHER SIDE
PARTITION
2NO. 12.5mm GYPROC MOISTURE
RESISTANT WALL BOARD
SCREWFIXED EITHER SIDE TO
70x50mm TREATED SW TIMBER
FRAME @600 CENTRES WITH
NOGGINS @600 CENTRES
WALL IS FINISHED WITH A 3MM
SCRATCH COAT OF TELLING UNILIT
45 FINISHED AND TILED WITH
TILESTYLE SABBIA LAPPATO
300X600MM
HEAD FIXING
50x70mm TREATED SW TIMBER
FRAME SCREW FIXED TO 12MM
OSB
GYPROC ACOUSTIC SEALANT
PLACED BETWEEN DOOR JAMB AND
PARTITION
150X40MM WHITE OAK
CHAMFERED AND PAINTED WITH A
LIGHT VARNISH AND GLUE FIXED
WITH EVOSTIK GRIPFILL TO
PARTITION
50
70
150
40
30MIN. FIRE DOOR
SOLID HARDWOOD OAK
FIRE DOOR TO GIVE 30 MIN. FIRE
PROTECTION. 30 MIN. INTEGRITY
TOUGHENED VISION PANELS.
30 MIN. FIRE AND SMOKE INTUMESCENT
STRIPS ON FRAME AND FIRE DOOR.
BEHIND GYPROC SEALANT IS A
50X70MM SW TIMBER STUD
SCREW FIXED EITHER SIDE WITH 2NO.
12.5mm GYPROC MOISTURE RESISTANT
WALLBOARD WITH A 3mm PLASTER
FINISH
WALL IS FINISHED WITH A 3MM
SCRATCH COAT OF TELLING UNILIT 45
AND TILED WITH TILESTYLE SABBIA
LAPPATO 300X600MM
12 12.570
150
DETAIL 010
1:10
BASE FIXING
50x70mm TREATED SW
TIMBER FRAME SCREW
FIXED TO BASE OF PARTITION
SEALED WITH A BEAD OF
GYPROC ACOUSTIC SEALANT
EITHER SIDE
PARTITION
12.5mm GYPROC SOUNDBLOC
WALLBOARD SCREWFIXED
EITHER SIDE TO 70x50mm
TREATED SW TIMBER FRAME @
600 CENTRES WITH NOGGINS @
600 CENTRES
WALL IS FINISHED WITH A 3mm
SKIM COAT OF TELLING UNILIT 45
FINISHED WITH A WHITE RENDER.
HEAD FIXING
50x70mm TREATED SW TIMBER
FRAME SCREW FIXED TO
12MM OSB
GYPROC ACOUSTIC SEALANT PLACED
BETWEEN DOOR JAMB AND
PARTITION
150X40MM WHITE OAK CHAMFERED AND
PAINTED WITH A LIGHT VARNISH AND GLUE
FIXED WITH EVOSTIK GRIPFILL TO
PARTITION
50
70
150
40
30MIN. FIRE DOOR
SOLID HARDWOOD OAK
FIRE DOOR TO GIVE 30 MIN. FIRE
PROTECTION. 30 MIN. INTEGRITY
TOUGHENED VISION PANELS.
30 MIN. FIRE AND SMOKE INTUMESCENT
STRIPS ON FRAME AND FIRE DOOR.
BEHIND GYPROC SEALANT IS A
50X70MM SW TIMBER STUD
SCREW FIXED EITHER SIDE WITH 12.5mm
GYPROC SOUND BLOC WALLBOARD WITH A
3mm SKIM COAT OF TELLING UNILIT 45
FINISHED WITH A WHITE RENDER.
7012.5
7012.5
70
DETAIL 009
1:10
PIVOTING DOCK DOOR
STAINLESS STEEL PIVOT HINGE SECURED TO BASE
OF EXISTING FLOOR AND HEAD OF DOOR FRAME
DOCK DOOR CONSISTS OF 70x195mm TONGUE AND
GROOVE TREATED OAK ADHESIVELY FIXED
TOGETHER AND PAINTED WITH A LIGHT VARNISH
195
DOCK DOOR JAMB
80x60mm TREATED OAK DOOR STOP TONGUE AND
GROOVED TO 230x80mm MULLION WITH A DRAUGHT
EXCLUDER TO RUN AROUND FRAME SCREWFIXED TO
TREATED HARDWOOD STUD COUNTERSUNK BOLT
FIXED TO EXISTING WALL WITH A 10MM SILICONE
MOVEMENT JOINT
80
60
80
230
DETAIL 008
1:10
70
50
600
195
225
100
30MIN. CONCERTINA FIRE DOOR
SOLID HARDWOOD OAK CONCERTINA FIRE
DOOR TO GIVE 30 MIN. FIRE PROTECTION.
30 MIN. FIRE AND SMOKE INTUMESCENT
STRIPS ON FRAME AND CONCERTINA
DOOR.
FIRE INCHUMESCENT AND SMOKE STRIPS
TO FOLLOW OPE OF ARCH
30MIN. CONCERTINA FIRE DOOR
CONCERTINA DOOR SLIDES OVER A
ALUMINIUM C CHANNEL GUIDED WITH A
STEEL PIN FIXING FROM THE DOOR.
CONCERTINA FRAME IS MADE FROM
100x80mm TREATED OAK WITH A 195x30mm
OAK MULLION FIXED TO THE EXISTING OPE
OF THE ARCH AND A 245x30mm OAK
MULLION FIXED TO THE EXISTING WALL AND
FRAME
DETAIL 005
1:10
FLAT ROOF UPGRADE
EXISTING ASPHALT FLAT ROOF COVERING WITH WRAP
OVER PARPAET TO BE RETAINED AND REPAIRED WHERE
NECESSARY ON A 20mm OAK HARD WOOD WITH
EXISTING TIMBER JOISTS TO BE INSPECTED AND
REPAIRED WHERE NECESSARY. 160mm GUTEX
THERMOFLEX WOODFIBREBOARD INSULATION. 80mm
GUTEX WOOD FIBREBOARD INSULATION ON EXISTING
SURFACE OF INTERNAL WALL WITH 12.5mm GYPSUM
WALL BOARD WITH A 3mm LIME PLASTER RENDER.
DETAIL 004
1:5
12.5 80 580
85021512.516012.5
STAIN GLASS WINDOW UPGRADE
SURFACE OF WINDOW REVEALS CLEANED WITH NON ABRASIVE
CLEANER AND WATER WITH ANY LOOSE DEBRIS BEING REMOVED
AND ALLOWED TO DRY CREATING A FLAT EVEN SURFACE.
ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE EXISTING OPE
BEHIND WINDOW HELD IN PLACE WITH A TREATED HW TIMBER
WINDOW FRAME WITH A TREATED SW STUD SCREW FIXED TO
FRAME TO HOLD IN PALCE AND 5mm ø DRILL HOLES ALONG TOP OF
SINGLE GLAZE TO VENTILATE AND MITIGATE BUILD UP OF
CONDENSATION.
EXTERIOR GLAZED GUARD REPLACED WITH SINGLE GLAZED
WINDOW GUARD FIXED IN PLACE AROUND OPE OF WINDOW WITH
LIME PUTTY. 20mm GAP LEFT ALONG BOTTOM OF GLAZING TO
VENTILATE AND MITIGATE CONDENSATION.
80mm GUTEX THERMOROOM ADHESIVELY FIXED TO INTERNAL
SURFACE OF EXISTING WALL AND WINDOW REVEALS WITH A
LAYER OF GUTEX KLEBE-UND SPACHTELPUTZ. 12.5mm GYPSUM
WALL BOARD ADHESIVELY FIXED WITH A LAYER OF GUTEX KLEBE-
UND SPACHTELPUTZ AND A 3mm SKIM COAT OF TELLING UNILIT 45
FINISHED WITH A WHITE RENDER.
DETAIL 007
1:5DETAIL 006
1:5
12.5 80 580
20
79 24
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan
80 Gleann Rua,
Renmore,
Galway.
DESIGNERS ADDRESS
Construction
Information/Workign Drawings
Galway Mayo Institute of
Technology
CONTACT DETAILS
Phone: 0830054478
Email:
jflanagangti@gmail.co
m
G00262330 28/04/2015
28/04/201514:05:59
Chapel Details Pt. 2
1:5/1:10
GA_013
DDS4_P09
PERMEABLE PAVING
600x50mm ROADSTONE PLAIN
FLAG PAVING LAID ON 50mm
SAND
BLINDING ON GRAVEL BED TO
COMPACTED EARTH WITH A 1:50
FALL TO SUDS
+0.000M
+0.300M
GROUND FLOOR
20mm OAK LAMINATE FLOOR ADHESIVE BONDED TO 75MM SAND
CEMENT SCREED.
150mm BALLYTHERM PIR INSULATION ACHIEVING A U-VALUE OF 0.14
W/m²K WITH A 25mm PIECE AT END OF SLAB TO PREVENT THERMAL
BRIDGE. IN ACCORDANCE WITH TGD PART L 2011.
MIN. 1200 GAUGE D.P.M. RADON BARRIER LAID ON TOP OF 175MM
SLAB LAPPING AT STRUCTURAL UPSTAND.
50MM SAND BLINDING ON COMPACTED HARDCORE IN MAX. LAYERS
OF 225mm.
CURTAIN WALL
SCHUCO FW60+TRIPLE GLAZED
THERMALLY BROKEN ALUMINIUM
GLAZING SYSTEM ACHIEVING A U-
VALUE OF 0.8 W/m²K IN
ACCORDANCE WITH TGD PART L
2011.ENSURE TESCON
NO. 1 V.C.L TAPE IS
SEALED TO
MULLION AND
SCREED
PRO CLIMA INTELLO PLUS V.C.L.
MEMBRANE LAPPED INTO
MULLION AND TAPE SEALED WITH
TESCON NO.1 TAPE
ENSURE TYVEK BREATHER
MEMBRANE IS LAPPED OVER
HORIZONTAL ALUMINIUM
D.P.C. WEDGED INTO
MULLION
12.5
EXTERIOR WALL
SVK ORNIMAT BLACK FIBRE CEMENT
CLADDING PANEL AND RAIL SYSTEM
FIXED BACK TO 12mm OSB SCREW FIXED
TO 150x50mm TREATED SW TIMBER I
JOISTS AND NOGGINS AT 600mm
CENTRES. 150MM GUTEX THERMOROOM
FIXED BETWEEN I JOISTS WITH A 25mm
GUTEX THERMOROOM LAYER FIXED TO
INTERNAL FACE OF STUD WORK
MINMIMISING THERMAL BRIDGE AT I JOIST
ACHIEVING A U-VALUE OF 0.11 W/m²K. IN
ACCORDANCE WITH TGD PART L 2011.
VERTICAL TYVEK BREATHER MEMBRANE
OVERLAPS ALUMINIUM VERTICAL D.P.C.
@100mm WEDGED INTO SCHUCO FW60+
MULLION.
CURTAIN WALL INTERFACE
150x70mm TREATED SW TIMBER LINTELS
FIXED EITHER SIDE OF 10mm STEEL
FLANGE WELDED TO 10mm STEEL PLATE
BOLT FIXED TO TRANSOM
MIN.150
Fall 1:60
1250 12 104
40
1502521218
50 52
340
27890
15025
5050
50
225501751507520
CURTAIN WALL BASE FIXING
SCHUCO FW60+ TRANSOM BOLT
FIXED TO 10mm STEEL FLANGE
WELDED TO 10mm STEEL PLATE
BOLT FIXED TO BASE OF
CONCRETE UPSTAND
68
606050
INTERIOR WALL
PRO CLIMA INTELLO PLUS VAPOUR BARRIER FIXED TO FACE OF
GUTEX WITH 50x25mm TREATED SW TIMBER STUDWORK TO
CREATE SERVICE CAVITY WITH 12.5MM GYPSUM PLASTERBOARD
FINISHED WITH A 3MM SKIM COAT AND RENDER TO ARCHITECTS
SPECIFICATION.
DETAIL 013
1:5
DETAIL 012
1:5
DETAIL 011
1:5
PARAPET
ALUMINIUM PARAPET FORMED AROUND
STEEL FRAME @600 CENTRES BOLT FIXED
TO 12mm OSB AND 50x25mm TREATED SW
TIMBER STUD FRAMED BOX.
SVK ORNIMAT BLACK FIBRE CEMENT
CLADDING PANEL AND RAIL SYSTEM FIXED
BACK TO 12mm OSB SCREW FIXED TO
150x50mm TREATED SW TIMBER I JOISTS
AND NOGGINS AT 600mm CENTRES. 150MM
GUTEX THERMOROOM FIXED BETWEEN I
JOISTS WITH A 25mm GUTEX
THERMOROOM LAYER FIXED TO INTERNAL
FACE OF STUD WORK MINMIMISING
THERMAL BRIDGE AT I JOIST ACHIEVING A
U-VALUE OF 0.11 W/m²K. IN ACCORDANCE
WITH TGD PART L 2011.
VERTICAL TYVEK BREATHER MEMBRANE
LAPPED AROUND TREATED SW TIMBER
STUD FRAME BOX
FLAT ROOF
SVK ORNIMAT BLACK FIBRE CEMENT CLADDING PANEL AND RAIL
SYSTEM FIXED BACK TO 12mm OSB SCREW FIXED TO 150x50mm
TREATED SW TIMBER I JOISTS AND NOGGINS AT 600mm CENTRES.
150MM GUTEX THERMOROOM FIXED BETWEEN I JOISTS WITH A
25mm GUTEX THERMOROOM LAYER FIXED TO INTERNAL FACE OF
STUD WORK MINMIMISING THERMAL BRIDGE AT I JOIST ACHIEVING A
U-VALUE OF 0.11 W/m²K. IN ACCORDANCE WITH TGD PART L 2011.
VERTICAL TYVEK BREATHER MEMBRANE OVERLAPS ALUMINIUM
VERTICAL D.P.C. @100mm WEDGED INTO SCHUCO FW60+ MULLION.
CURTAIN WALL INTERFACE
150x70mm TREATED SW TIMBER LINTELS FIXED EITHER SIDE OF
10mm STEEL FLANGE WELDED TO 10mm STEEL PLATE BOLT FIXED
TO TRANSOM
EXTERIOR WALL
SVK ORNIMAT BLACK FIBRE CEMENT
CLADDING PANEL AND RAIL SYSTEM
FIXED BACK TO 12mm OSB SCREW
FIXED TO 150x50mm TREATED SW
TIMBER I JOISTS AND NOGGINS AT
600mm CENTRES. 150MM GUTEX
THERMOROOM FIXED BETWEEN I JOISTS
WITH A 25mm GUTEX THERMOROOM
LAYER FIXED TO INTERNAL FACE OF
STUD WORK MINMIMISING THERMAL
BRIDGE AT I JOIST ACHIEVING A U-
VALUE OF 0.11 W/m²K. IN ACCORDANCE
WITH TGD PART L 2011.
ALUMINIUM FORMED TO STEEL FRAME
PLACED BEHIND FIBRECEMENT
CLADDING.
ENSURE TESCON NO. 1
V.C.L TAPE SEALS
INTELLO MEMBRANE
TO OSB
SKIRTING
150x40mm OAK CHAMFERED
SKIRTING BOARD PAINTED WITH
A LIGHT VARNISH AND BONDED
WITH EVOSTIK GRIP FILL TO
PARTITION
BASE FIXING
50x70mm TREATED SW TIMBER
FRAME SCREW FIXED TO BASE
OF PARTITION SEALED WITH A
BEAD OF GYPROC ACOUSTIC
SEALANT EITHER SIDE
PARTITION
2NO. 12.5mm GYPROC MOISTURE
RESISTANT WALL BOARD
SCREWFIXED EITHER SIDE TO
70x50mm TREATED SW TIMBER
FRAME @600 CENTRES WITH
NOGGINS @600 CENTRES
WALL IS FINISHED WITH A 3MM
SCRATCH COAT AND TILED WITH
TILESTYLE SABBIA LAPPATO
300X600MM
HEAD FIXING
50x70mm TREATED SW TIMBER
FRAME SCREW FIXED TO 12MM
OSB
GYPROC ACOUSTIC
SEALANT PLACED
BETWEEN DOOR JAMB
AND PARTITION
150X40MM WHITE OAK
CHAMFERED AND
PAINTED WITH A LIGHT
VARNISH AND GLUE FIXED
WITH EVOSTIK GRIPFILL
TO PARTITION
50
70
150
12.5
40
30MIN. FIRE DOOR
SOLID HARDWOOD OAK
FIRE DOOR TO GIVE 30 MIN. FIRE
PROTECTION. 30 MIN. INTEGRITY
TOUGHENED VISION PANELS.
30 MIN. FIRE AND SMOKE
INTUMESCENT STRIPS ON FRAME
AND FIRE DOOR.
BEHIND GYPROC SEALANT IS A
50X70MM SW TIMBER STUD
SCREW FIXED EITHER SIDE WITH
2NO. 12.5mm GYPROC MOISTURE
RESISTANT WALLBOARD WITH A
3mm PLASTER FINISH
WALL IS FINISHED WITH A 3MM
SCRATCH COAT AND TILED WITH
TILESTYLE SABBIA LAPPATO
300X600MM 12 12.570
150
70
DETAIL 015
1:10
STRUCTURAL GLASS ROOF AND EXISTING WALL INTERFACE
PILKINGTON 10mm PLANAR SINGLE GLAZING FIXED IN PLACE
WITH PILKINGTON 905J SPIDER FIXINGS FIXED TO 100x10mm
STAINLESS STEEL JOIST SECURED TO 100MM STAINLESS
STEEL BEAM WITH A STAINLESS STEEL BRACE AND BOLT
CONNECTION.
PLANAR GLAZING WEDGED INTO 50x50MM ALUMINIUM GLAZING
CHANNEL CONSISTING OF NEOPRENE GUIDES AND A SILICONE
SEALANT SECURED IN EXISTING WALL WITH A 150x10mm
STAINLESS STEEL PLATE WATER BAR.
STRUCTURAL GLASS FIXING TO EXISTING STRUCTURE
PILKINGTON 10mm PLANAR SINGLE GLAZING WITH A 10MM OPEN JOINT
FIXED IN PLACE USING PILKINGTON 905J SPIDER FIXINGS FIXED TO
10mm STEEL FLANGE WELDED TO 100mm VERTICAL STEEL COLUMN
PLANAR GLAZING WEDGED INTO 50x50MM ALUMINIUM GLAZING
CHANNEL CONSISTING OF NEOPRENE GUIDES AND A SILICONE
SEALANT SECURED IN EXISTING WALL WITH A 150x10mm STAINLESS
STEEL PLATE WATER BAR.
STRUCTURAL GLASS ROOF INTERMEDIATE FIXING
PILKINGTON 10mm PLANAR SINGLE GLAZING WITH A
10MM SILICONE SEALED JOINT FIXED IN PLACE
WITH PILKINGTON 905J SPIDER FIXINGS FIXED TO
100x10mm STAINLESS STEEL JOIST SECURED TO
100MM STAINLESS STEEL BEAM WITH A STAINLESS
STEEL BRACE AND BOLT CONNECTION.
580
10
100580 109
205
100
10
10
DETAIL 016
1:10
DETAIL 017
1:10
DETAIL 018
1:10
EXTERIOR WALL
SVK ORNIMAT BLACK FIBRE CEMENT CLADDING PANEL AND RAIL
SYSTEM FIXED BACK TO 12mm OSB SCREW FIXED TO 150x50mm
TREATED SW TIMBER I JOISTS AND NOGGINS AT 600mm CENTRES.
150MM GUTEX THERMOWALL FIXED BETWEEN I JOISTS WITH A
25mm GUTEX THERMOWALL LAYER FIXED TO INTERNAL FACE OF
STUD WORK MINMIMISING THERMAL BRIDGE AT I JOIST ACHIEVING
A U-VALUE OF 0.11 W/m²K. IN ACCORDANCE WITH TGD PART L 2011.
VERTICAL TYVEK BREATHER MEMBRANE OVERLAPS ALUMINIUM
VERTICAL D.P.C. @100mm WEDGED INTO SCHUCO FW60+ MULLION.
INTERFACE BETWEEN SCHUCO GLAZING SYSTEM AND
RAINSCREEN CLADDING SEALED WITH 10mm ORCON F JOINT AND
150x50mm STUD.
SCHUCO ADS 65HD SINGLE DOOR WEDGED INTO SCHUCO MULLION
AND TRANSOM
60
2525
SCHUCO FW60+ ALUMINIUM
GLAZING SYSTEM
50251501210412
DETAIL 014
1:10
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan
80 Gleann Rua,
Renmore,
Galway.
DESIGNERS ADDRESS
Construction
Information/Workign Drawings
Galway Mayo Institute of
Technology
CONTACT DETAILS
Phone: 0830054478
Email:
jflanagangti@gmail.co
m
G00262330 28/04/2015
28/04/201512:16:11
Extension Details Pt. 1
1:5/1:10
GA_014
DDS4_P09
EXTERIOR WALL
SVK ORNIMAT BLACK FIBRE CEMENT CLADDING PANEL AND RAIL SYSTEM FIXED BACK TO 12mm OSB SCREW FIXED TO
150x50mm TREATED SW TIMBER I JOISTS AND NOGGINS AT 600mm CENTRES. 150MM GUTEX THERMOROOM FIXED
BETWEEN I JOISTS WITH A 25mm GUTEX THERMOROOM LAYER FIXED TO INTERNAL FACE OF STUD WORK
MINMIMISING THERMAL BRIDGE AT I JOIST ACHIEVING A U-VALUE OF 0.11 W/m²K. IN ACCORDANCE WITH TGD PART L
2011.
VERTICAL TYVEK BREATHER MEMBRANE OVERLAPS ALUMINIUM VERTICAL D.P.C. @100mm WEDGED INTO SCHUCO
FW60+ MULLION.
INTERFACE BETWEEN SCHUCO GLAZING SYSTEM AND RAINSCREEN CLADDING SEALED WITH 10mm ORCON F JOINT
AND 150x50mm STUD.
1210412150255013
13 50 25 150 12 104 12
278
38
60
2525
INTERIOR WALL
PRO CLIMA INTELLO PLUS VAPOUR BARRIER FIXED TO FACE OF
GUTEX WITH 50x25mm TREATED SW TIMBER STUDWORK TO
CREATE SERVICE CAVITY WITH 12.5MM GYPSUM PLASTERBOARD
FINISHED WITH A 3MM SKIM COAT AND RENDER TO ARCHITECTS
SPECIFICATION.
DETAIL 022
1:5
DETAIL 023
1:5
+0.300M
DOOR THRESHOLD
SCHUCO ADS65HD DOUBLE GLAZED ALUMINIUM DOUBLE DOOR
SECURED ON CONCRETE UPSTAND SET IN BETWEEN WAVIN 100SK
CHANNEL DRAIN, INSULATION AND OAK LAMINATE FLOOR.
600x50mm ROADSTONE PLAIN FLAG PAVING LAID ON 50mm SAND
BLINDING.
PRO CLIMA INTELLO PLUS V.C.L.
MEMBRANE LAPPED INTO
MULLION AND TAPE SEALED WITH
TESCON NO.1 TAPE
DPC LAPS OVER
TYVEK @100mm AND
INTO CURTAIN WALL
JOINT
GROUND FLOOR
20mm OAK LAMINATE FLOOR ADHESIVE BONDED TO 75MM SAND
CEMENT SCREED.
150mm BALLYTHERM PIR INSULATION ACHIEVING A U-VALUE OF 0.14
W/m²K WITH A 25mm PIECE AT END OF SLAB TO PREVENT THERMAL
BRIDGE. IN ACCORDANCE WITH TGD PART L 2011.
MIN. 1200 GAUGE D.P.M. RADON BARRIER LAID ON TOP OF 175MM
SLAB LAPPING AT STRUCTURAL UPSTAND.
50MM SAND BLINDING ON COMPACTED HARDCORE IN MAX. LAYERS
OF 225mm.
ENSURE PRO CLIMA INTELLO V.C.L. IS
WRAPPED FROM SCREED TO DOOR
SADDLE WEDGE AND SEALED WITH
TESCON NO.1 V.C.L. TAPE
201507517550
5050200
50 150 12 104 122512.5
60
65
225
DETAIL 020
1:5
DETAIL 021
1:5
EXTERIOR WALL
SVK ORNIMAT BLACK FIBRE CEMENT CLADDING PANEL AND RAIL
SYSTEM FIXED BACK TO 12mm OSB SCREW FIXED TO 150x50mm
TREATED SW TIMBER I JOISTS AND NOGGINS AT 600mm CENTRES.
150MM GUTEX THERMOROOM FIXED BETWEEN I JOISTS WITH A 25mm
GUTEX THERMOROOM LAYER FIXED TO INTERNAL FACE OF STUD
WORK MINMIMISING THERMAL BRIDGE AT I JOIST ACHIEVING A U-
VALUE OF 0.11 W/m²K. IN ACCORDANCE WITH TGD PART L 2011.
VERTICAL TYVEK BREATHER MEMBRANE OVERLAPS ALUMINIUM
VERTICAL D.P.C. @100mm WEDGED INTO SCHUCO FW60+ MULLION.
CURTAIN WALL DOOR INTERFACE
150x70mm TREATED SW TIMBER LINTELS FIXED EITHER SIDE OF 10mm
STEEL FLANGE WELDED TO 10mm STEEL PLATE BOLT FIXED TO
TRANSOM. SCHUCO ADS65HD DOUBLE GLAZED ALUMINIUM DOUBLE
DOOR WEDGED INTO SCHUCO GLAZING TRANSOM
11210190
+0.300M
12
+0.000M
+0.300M
GROUND FLOOR
20mm ENGINEERED OAK LAMINATE FLOOR BONDED TO 75MM
SAND CEMENT SCREED.
150mm BALLYTHERM PIR INSULATION ACHIEVING A U-VALUE OF
0.14 W/m²K WITH A 25mm PIECE AT END OF SLAB TO PREVENT
THERMAL BRIDGE. IN ACCORDANCE WITH TGD PART L 2011.
MIN. 1200 GAUGE RADON BARRIER LAID ON TOP OF 175MM SLAB
LAPPING AT STRUCTURAL UPSTAND.
50MM SAND BLINDING ON COMPACTED HARDCORE IN MAX.
LAYERS OF 225mm.
50
ENSURE PRO CLIMA
INTELLO PLUS
MEMBRANE IS
SEALED TO SCREEN
WITH TESCON NO. 1
TAPE V.C.L IS
SEALED TO SCREED
201501755022575
DETAIL 019
13 15050 25 12 104 12 EXTERIOR WALL
SVK ORNIMAT BLACK FIBRE CEMENT
CLADDING PANEL AND RAIL SYSTEM FIXED
BACK TO 12mm OSB SCREW FIXED TO
150x50mm TREATED SW TIMBER I JOISTS AND
NOGGINS AT 600mm CENTRES. 150MM GUTEX
THERMOROOM FIXED BETWEEN I JOISTS
WITH A 25mm GUTEX THERMOROOM LAYER
FIXED TO INTERNAL FACE OF STUD WORK
MINMIMISING THERMAL BRIDGE AT I JOIST
ACHIEVING A U-VALUE OF 0.11 W/m²K. IN
ACCORDANCE WITH TGD PART L 2011.
VERTICAL TYVEK BREATHER MEMBRANE
OVERLAPS ALUMINIUM D.P.C. @100mm AND
BOLT FIXED TO 12mm OSB.
EXTERIOR WALL BASE FIXING
2NO. 150x50mm TREATED SW TIMBER SOUL
PLATES SECURED TO CONCRETE UPSTAND
WITH ANCHOR BOLT.
PERMEABLE PAVING
600x50mm ROADSTONE PLAIN FLAG
PAVING LAID ON 50mm SAND
BLINDING ON GRAVEL BED TO
COMPACTED EARTH WITH A 1:50 FALL TO
SUDS
PLINTH
ROADSTONE LIMESTONE PAVING FLAGS
FIXED BACK TO CONCRETE PLINTH WITH
HALFEN STONE ANCHOR FIXINGS.
+0.300M
STRUCTURAL GLASS BASE FIXING
PILKINGTON 10mm PLANAR SINGLE GLAZING FIXED IN PLACE WITH
PILKINGTON 905J SPIDER FIXINGS BOLTED TO 100x90mm STAINLESS
STEEL FLANGE WELDED TO 100mm ø STAINLESS STEEL COLUMN SET
IN CONCRETE BASE SHEAR CONNECTED TO BASE WITH STAINLESS
STEEL BASE PLATE SECURED WITH HOLDING DOWN BOLTS
PLANAR GLAZING WEDGED INTO 50x42mm ALUMINIUM GLAZING
CHANNEL CONSISTING OF NEOPRENE GUIDES AND A SILICONE
SEALANT WEDGED INTO CONCRETE BASE.
600x30mm ROADSTONE LIMESTONE PAVING FLAGS ON 50mm SAND
BLINDING
LANDSCAPING AND DRAINAGE
ACO MODULAR 125 GALVANISED STEEL DRAINAGE
CHANNEL LAID AGAINST ROADSTONE LIMESTONE
PAVING FLAGS FIXED BACK TO CONCRETE PLINTH
WITH HALFEN STONE ANCHOR FIXINGS.
PERMEABLE PAVING
50mm ROADSTONE PLAIN FLAG PAVING LAID ON
50mm SAND
BLINDING ON 50mm GRAVEL TO COMPACTED EARTH
WITH A 1:50 FALL TO SUDS
505050
10
5030340
100
170
42
10
250
+0.000M
DETAIL 024
1:10
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan
80 Gleann Rua,
Renmore,
Galway.
DESIGNERS ADDRESS
Construction
Information/Workign Drawings
Galway Mayo Institute of
Technology
CONTACT DETAILS
Phone: 0830054478
Email:
jflanagangti@gmail.co
m
G00262330 28/04/2015
28/04/201512:16:29
Extension Details Pt. 2
1:5/1:10
GA_015
DDS4_P09
Galway Mayo Institute of Technology
Door Schedule
Level Mark Count Fire Rating Width Height Phase Created
01 Ground Floor D-01 1 Fire Upgrade 1620 3000 Existing
01 Ground Floor D-02 1 FD 30 S 2425 2800 New Construction
01 Ground Floor D-03 1 FD 30 S 1212 2110 New Construction
01 Ground Floor D-04 1 FD 30 S 2425 2800 New Construction
01 Ground Floor D-05 1 FD 30 S 2425 2800 New Construction
01 Ground Floor D-06 1 FD 30 S 1080 2110 Existing
01 Ground Floor D-07 1 FD 30 S 1212 2110 New Construction
01 Ground Floor D-08 1 FD 30 S 1263 2110 New Construction
01 Ground Floor D-09 1 Fire Upgrade 795 2100 Existing
01 Ground Floor D-10 1 FD 30 S 1252 2110 New Construction
01 Ground Floor D-11 1 FD 30 S 2425 2800 New Construction
01 Ground Floor D-12 1 FD 30 S 2425 2800 New Construction
01 Ground Floor D-13 1 FD 30 S 2425 2800 New Construction
01 Ground Floor D-14 1 FD 30 S 2425 2800 New Construction
01 Ground Floor D-15 1 FD 30 S 1080 2110 New Construction
01 Ground Floor D-16 1 N/A 2000 2000 New Construction
02 Gallery FFL D-17 1 Fire Upgrade 970 2100 Existing
01 Ground Floor D-18 1 N/A 980 2910 New Construction
01 Ground Floor D-19 1 N/A 1927 2810 New Construction
01 Ground Floor D-21 1 N/A 1212 2110 New Construction
01 Ground Floor D-24 1 N/A 1212 2110 New Construction
01 Ground Floor D-25 1 FD 30 S 2425 2800 New Construction
01 Ground Floor D-26 1 N/A 910 1800 New Construction
01 Ground Floor D-27 1 N/A 910 1800 New Construction
01 Ground Floor D-28 1 N/A 910 1800 New Construction
01 Ground Floor D-29 1 N/A 1212 2110 New Construction
01 Ground Floor D-30 1 FD 30 S 1212 2110 New Construction
01 Ground Floor D-31 1 N/A 1212 2110 New Construction
Grand total: 28
Design Detail
Window Schedule
Level Mark Description Count Width Height Phase Created
01 Ground Floor W-01 Retained & Upgraded 1 600 1680 Existing
01 Ground Floor W-02 Retained & Upgraded 1 600 1680 Existing
01 Ground Floor W-03 Retained & Upgraded 1 600 1680 Existing
01 Ground Floor W-04 Retained & Upgraded 1 600 1680 Existing
01 Ground Floor W-05 Retained & Upgraded 1 600 1680 Existing
01 Ground Floor W-06 Retained & Upgraded 1 600 1680 Existing
01 Ground Floor W-07 Retained & Upgraded 1 600 1680 Existing
01 Ground Floor W-08 Retained & Upgraded 1 600 1680 Existing
01 Ground Floor W-09 Retained & Upgraded 1 600 1680 Existing
Level 1 W-10 Retained & Upgraded 1 600 1680 Existing
01 Ground Floor W-11 Retained & Upgraded 1 600 1680 Existing
Level 1 W-12 Retained & Upgraded 1 600 1680 Existing
01 Ground Floor W-13 Retained & Upgraded 1 600 1680 Existing
Level 1 W-14 Retained & Upgraded 1 600 1680 Existing
01 Ground Floor W-15 Retained & Upgraded 1 600 1680 Existing
Level 1 W-16 Retained & Upgraded 1 600 1680 Existing
01 Ground Floor W-17 Retained & Upgraded 1 600 1680 Existing
01 Ground Floor W-18 Retained & Upgraded 1 380 1126 Existing
01 Ground Floor W-19 Retained & Upgraded 1 600 2175 Existing
01 Ground Floor W-20 Retained & Upgraded 1 1174 1650 Existing
01 Ground Floor W-21 Retained & Upgraded 1 530 2120 Existing
01 Ground Floor W-22 Retained & Upgraded 1 530 2120 Existing
01 Ground Floor W-23 Retained & Upgraded 1 530 2120 Existing
01 Ground Floor W-24 Retained & Upgraded 1 530 2120 Existing
01 Ground Floor W-25 Retained & Upgraded 1 530 2120 Existing
01 Ground Floor W-28 Retained & Upgraded 1 600 1680 Existing
Chapel Flat Roof LevelW-29 Retained & Upgraded 1 1000 1500 Existing
01 Ground Floor W-30 Retained & Upgraded 1 600 1680 Existing
01 Ground Floor W-31 Retained & Upgraded 1 530 2120 Existing
01 Ground Floor W-32 Retained & Upgraded 1 530 2120 Existing
01 Ground Floor W-33 Retained & Upgraded 1 530 2120 Existing
01 Ground Floor W-34 Retained & Upgraded 1 530 2120 Existing
01 Ground Floor W-35 Retained & Upgraded 1 530 2120 Existing
01 Ground Floor W-36 Retained & Upgraded 1 530 2120 Existing
01 Ground Floor W-37 Retained & Upgraded 1 530 2120 Existing
01 Ground Floor W-38 Retained & Upgraded 1 1000 1500 Existing
Chapel Flat Roof LevelW-39 Retained & Upgraded 1 1000 1500 Existing
01 Ground Floor W-40 Schüco AWS 65 1 480 470 New Construction
01 Ground Floor W-41 Schüco AWS 65 1 480 510 New Construction
01 Ground Floor W-42 Schüco AWS 65 1 480 510 New Construction
01 Ground Floor W-43 Schüco AWS 65 1 480 510 New Construction
01 Ground Floor W-44 Retained & Upgraded 1 530 2120 Existing
01 Ground Floor W-45 Retained & Upgraded 1 530 2120 Existing

More Related Content

What's hot

Restoration, extension and upgradation of protected structures
Restoration, extension and upgradation of protected structuresRestoration, extension and upgradation of protected structures
Restoration, extension and upgradation of protected structuresEdel Fox
 
Leisure Centre
Leisure CentreLeisure Centre
Leisure CentreEdel Fox
 
Building Technology 2 P2
Building Technology 2 P2Building Technology 2 P2
Building Technology 2 P2
XingYue0907
 
School Buildings of the Future
School Buildings of the FutureSchool Buildings of the Future
School Buildings of the FutureEdel Fox
 
MARK THORNTON EXHIBITION DRAWING
MARK THORNTON EXHIBITION DRAWINGMARK THORNTON EXHIBITION DRAWING
MARK THORNTON EXHIBITION DRAWINGMark Thornton
 
Sections and details
Sections and detailsSections and details
Sections and details
Aden Saitabau Kumary
 
Elevations & sections-Architecture school 4th yr project 3
Elevations & sections-Architecture school 4th yr project  3Elevations & sections-Architecture school 4th yr project  3
Elevations & sections-Architecture school 4th yr project 3
Aden Saitabau Kumary
 
Floor plans
Floor plansFloor plans
MMAMOKOENA PROJECT REVISSION 4
MMAMOKOENA PROJECT REVISSION 4MMAMOKOENA PROJECT REVISSION 4
MMAMOKOENA PROJECT REVISSION 4siyabulela mxalisa
 
Project of traditional Malay house
Project of traditional Malay houseProject of traditional Malay house
Project of traditional Malay house
Adib Ramli
 
Proposed_Floorplans_Professional Practice_DS_Group-A1@50_Proposed Secondfloor...
Proposed_Floorplans_Professional Practice_DS_Group-A1@50_Proposed Secondfloor...Proposed_Floorplans_Professional Practice_DS_Group-A1@50_Proposed Secondfloor...
Proposed_Floorplans_Professional Practice_DS_Group-A1@50_Proposed Secondfloor...Jermaine Barrett
 
Nitesh columbus square
Nitesh columbus squareNitesh columbus square
Nitesh columbus square
Selva Kumar
 
Floor plans
Floor plansFloor plans
Proposed_Floorplans_Professional Practice_DS_Group-A1@50_Proposed First Floor...
Proposed_Floorplans_Professional Practice_DS_Group-A1@50_Proposed First Floor...Proposed_Floorplans_Professional Practice_DS_Group-A1@50_Proposed First Floor...
Proposed_Floorplans_Professional Practice_DS_Group-A1@50_Proposed First Floor...Jermaine Barrett
 
2018 kitchen cabinet technical manual Oppein Home
2018 kitchen cabinet technical manual Oppein Home2018 kitchen cabinet technical manual Oppein Home
2018 kitchen cabinet technical manual Oppein Home
miyahuang4
 
Whitefriars Presentation 2 A1
Whitefriars Presentation 2 A1Whitefriars Presentation 2 A1
Whitefriars Presentation 2 A1Vincent Doherty
 
Proposed_Floorplans_Professional Practice_DS_Group-A1@50_Proposed Basement Level
Proposed_Floorplans_Professional Practice_DS_Group-A1@50_Proposed Basement LevelProposed_Floorplans_Professional Practice_DS_Group-A1@50_Proposed Basement Level
Proposed_Floorplans_Professional Practice_DS_Group-A1@50_Proposed Basement LevelJermaine Barrett
 
sem 2.5 measured drawings
sem 2.5 measured drawingssem 2.5 measured drawings
sem 2.5 measured drawingsYeeQun
 
Section-Architecture school University of Nairobi 4th year project 3
Section-Architecture school University of Nairobi 4th year project 3Section-Architecture school University of Nairobi 4th year project 3
Section-Architecture school University of Nairobi 4th year project 3
Aden Saitabau Kumary
 

What's hot (20)

Restoration, extension and upgradation of protected structures
Restoration, extension and upgradation of protected structuresRestoration, extension and upgradation of protected structures
Restoration, extension and upgradation of protected structures
 
Leisure Centre
Leisure CentreLeisure Centre
Leisure Centre
 
Building Technology 2 P2
Building Technology 2 P2Building Technology 2 P2
Building Technology 2 P2
 
School Buildings of the Future
School Buildings of the FutureSchool Buildings of the Future
School Buildings of the Future
 
MARK THORNTON EXHIBITION DRAWING
MARK THORNTON EXHIBITION DRAWINGMARK THORNTON EXHIBITION DRAWING
MARK THORNTON EXHIBITION DRAWING
 
Sections and details
Sections and detailsSections and details
Sections and details
 
Elevations & sections-Architecture school 4th yr project 3
Elevations & sections-Architecture school 4th yr project  3Elevations & sections-Architecture school 4th yr project  3
Elevations & sections-Architecture school 4th yr project 3
 
Floor plans
Floor plansFloor plans
Floor plans
 
MMAMOKOENA PROJECT REVISSION 4
MMAMOKOENA PROJECT REVISSION 4MMAMOKOENA PROJECT REVISSION 4
MMAMOKOENA PROJECT REVISSION 4
 
Goldcoast housing
Goldcoast housingGoldcoast housing
Goldcoast housing
 
Project of traditional Malay house
Project of traditional Malay houseProject of traditional Malay house
Project of traditional Malay house
 
Proposed_Floorplans_Professional Practice_DS_Group-A1@50_Proposed Secondfloor...
Proposed_Floorplans_Professional Practice_DS_Group-A1@50_Proposed Secondfloor...Proposed_Floorplans_Professional Practice_DS_Group-A1@50_Proposed Secondfloor...
Proposed_Floorplans_Professional Practice_DS_Group-A1@50_Proposed Secondfloor...
 
Nitesh columbus square
Nitesh columbus squareNitesh columbus square
Nitesh columbus square
 
Floor plans
Floor plansFloor plans
Floor plans
 
Proposed_Floorplans_Professional Practice_DS_Group-A1@50_Proposed First Floor...
Proposed_Floorplans_Professional Practice_DS_Group-A1@50_Proposed First Floor...Proposed_Floorplans_Professional Practice_DS_Group-A1@50_Proposed First Floor...
Proposed_Floorplans_Professional Practice_DS_Group-A1@50_Proposed First Floor...
 
2018 kitchen cabinet technical manual Oppein Home
2018 kitchen cabinet technical manual Oppein Home2018 kitchen cabinet technical manual Oppein Home
2018 kitchen cabinet technical manual Oppein Home
 
Whitefriars Presentation 2 A1
Whitefriars Presentation 2 A1Whitefriars Presentation 2 A1
Whitefriars Presentation 2 A1
 
Proposed_Floorplans_Professional Practice_DS_Group-A1@50_Proposed Basement Level
Proposed_Floorplans_Professional Practice_DS_Group-A1@50_Proposed Basement LevelProposed_Floorplans_Professional Practice_DS_Group-A1@50_Proposed Basement Level
Proposed_Floorplans_Professional Practice_DS_Group-A1@50_Proposed Basement Level
 
sem 2.5 measured drawings
sem 2.5 measured drawingssem 2.5 measured drawings
sem 2.5 measured drawings
 
Section-Architecture school University of Nairobi 4th year project 3
Section-Architecture school University of Nairobi 4th year project 3Section-Architecture school University of Nairobi 4th year project 3
Section-Architecture school University of Nairobi 4th year project 3
 

Viewers also liked

Design Portfolio by Aaron Kaira
Design Portfolio by Aaron KairaDesign Portfolio by Aaron Kaira
Design Portfolio by Aaron KairaAaron Kaira
 
Cavity Walling
Cavity WallingCavity Walling
Cavity WallingDjCurrie
 
Thermal Insulation in UAE
Thermal Insulation in UAEThermal Insulation in UAE
Thermal Insulation in UAE
MECandPMV
 
How to build a besser block wall
How to build a besser block wallHow to build a besser block wall
How to build a besser block wall
kristenjames
 
Construction, Chemicals and Waterproofing
Construction, Chemicals and Waterproofing Construction, Chemicals and Waterproofing
Construction, Chemicals and Waterproofing
SIG Construction Accessories
 
Groundworks and Civil Engineering Products
Groundworks and Civil Engineering ProductsGroundworks and Civil Engineering Products
Groundworks and Civil Engineering Products
SIG Construction Accessories
 
Structural engineer s pocket book
Structural engineer s pocket bookStructural engineer s pocket book
Structural engineer s pocket bookThomas Britto
 
Masonry Components
Masonry ComponentsMasonry Components
Masonry Components
SIG Construction Accessories
 
Ancon Wall Ties and Restraint Fixings for Brick, Block and Stone
Ancon Wall Ties and Restraint Fixings for Brick, Block and StoneAncon Wall Ties and Restraint Fixings for Brick, Block and Stone
Ancon Wall Ties and Restraint Fixings for Brick, Block and Stone
LBS Builders Merchants
 
Rebar arrangement and construction carryout
Rebar arrangement and construction carryoutRebar arrangement and construction carryout
Rebar arrangement and construction carryoutChhay Teng
 
Building Construction Details
Building Construction DetailsBuilding Construction Details
Building Construction Details
cocongkening
 
Lintels and arches in construction
Lintels and arches in constructionLintels and arches in construction
Lintels and arches in construction
SARASWATI PATHARIYA
 

Viewers also liked (13)

Design Portfolio by Aaron Kaira
Design Portfolio by Aaron KairaDesign Portfolio by Aaron Kaira
Design Portfolio by Aaron Kaira
 
Cavity Walling
Cavity WallingCavity Walling
Cavity Walling
 
Cavity walls
Cavity wallsCavity walls
Cavity walls
 
Thermal Insulation in UAE
Thermal Insulation in UAEThermal Insulation in UAE
Thermal Insulation in UAE
 
How to build a besser block wall
How to build a besser block wallHow to build a besser block wall
How to build a besser block wall
 
Construction, Chemicals and Waterproofing
Construction, Chemicals and Waterproofing Construction, Chemicals and Waterproofing
Construction, Chemicals and Waterproofing
 
Groundworks and Civil Engineering Products
Groundworks and Civil Engineering ProductsGroundworks and Civil Engineering Products
Groundworks and Civil Engineering Products
 
Structural engineer s pocket book
Structural engineer s pocket bookStructural engineer s pocket book
Structural engineer s pocket book
 
Masonry Components
Masonry ComponentsMasonry Components
Masonry Components
 
Ancon Wall Ties and Restraint Fixings for Brick, Block and Stone
Ancon Wall Ties and Restraint Fixings for Brick, Block and StoneAncon Wall Ties and Restraint Fixings for Brick, Block and Stone
Ancon Wall Ties and Restraint Fixings for Brick, Block and Stone
 
Rebar arrangement and construction carryout
Rebar arrangement and construction carryoutRebar arrangement and construction carryout
Rebar arrangement and construction carryout
 
Building Construction Details
Building Construction DetailsBuilding Construction Details
Building Construction Details
 
Lintels and arches in construction
Lintels and arches in constructionLintels and arches in construction
Lintels and arches in construction
 

Similar to Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings

Tlalanyane Residence Proposal
Tlalanyane Residence ProposalTlalanyane Residence Proposal
Tlalanyane Residence ProposalGrant Hepburn
 
Seraj Eldin Sayed Eid
Seraj Eldin Sayed EidSeraj Eldin Sayed Eid
Seraj Eldin Sayed Eid
serajeldinsayed
 
Varun Manian - Radiance lakefront
Varun Manian - Radiance lakefrontVarun Manian - Radiance lakefront
Varun Manian - Radiance lakefront
Varun Manian
 
House Messinger Proposal 2-Layouts
House Messinger Proposal 2-LayoutsHouse Messinger Proposal 2-Layouts
House Messinger Proposal 2-LayoutsAyla Damon
 
Labour-and-Equipment-Productivity.pdf
Labour-and-Equipment-Productivity.pdfLabour-and-Equipment-Productivity.pdf
Labour-and-Equipment-Productivity.pdf
Kothandaraman T
 
House Messinger Proposal 2-Sections & Elevations
House Messinger Proposal 2-Sections & ElevationsHouse Messinger Proposal 2-Sections & Elevations
House Messinger Proposal 2-Sections & ElevationsAyla Damon
 
2013 Keystone Premier Travel Trailer by Bullet
2013 Keystone Premier Travel Trailer by Bullet2013 Keystone Premier Travel Trailer by Bullet
2013 Keystone Premier Travel Trailer by BulletDave Arbogast RV
 
SOLD OUT - 8th on Fordyce Development
SOLD OUT - 8th on Fordyce DevelopmentSOLD OUT - 8th on Fordyce Development
SOLD OUT - 8th on Fordyce Development
CraigFensham
 
Working drawings
Working drawingsWorking drawings
Working drawings
Yolanda Sewpersad
 
Laminate Flooring Sydney by Sydney Art Flooring
Laminate Flooring Sydney by Sydney Art FlooringLaminate Flooring Sydney by Sydney Art Flooring
Laminate Flooring Sydney by Sydney Art Flooring
Sydney Art Flooring
 
E Clemence Multi Family Residential
E Clemence Multi Family ResidentialE Clemence Multi Family Residential
E Clemence Multi Family ResidentialGrant Hepburn
 
Proposed Builder's Work Plan for Pub/Restaurant
Proposed Builder's Work Plan for Pub/RestaurantProposed Builder's Work Plan for Pub/Restaurant
Proposed Builder's Work Plan for Pub/Restaurant
kristienadana
 
Construction pdf major project
Construction pdf major projectConstruction pdf major project
Construction pdf major project
Yolanda Sewpersad
 
Killeshin building it carlow
Killeshin building it carlowKilleshin building it carlow
Killeshin building it carlow
Tej Raj Upreti
 
false ceiling ppt.pptx
false ceiling ppt.pptxfalse ceiling ppt.pptx
false ceiling ppt.pptx
SAKSHIVASWANI3
 

Similar to Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings (20)

Tlalanyane Residence Proposal
Tlalanyane Residence ProposalTlalanyane Residence Proposal
Tlalanyane Residence Proposal
 
Adva
AdvaAdva
Adva
 
Seraj Eldin Sayed Eid
Seraj Eldin Sayed EidSeraj Eldin Sayed Eid
Seraj Eldin Sayed Eid
 
Varun Manian - Radiance lakefront
Varun Manian - Radiance lakefrontVarun Manian - Radiance lakefront
Varun Manian - Radiance lakefront
 
House Carol Submission
House Carol SubmissionHouse Carol Submission
House Carol Submission
 
House Messinger Proposal 2-Layouts
House Messinger Proposal 2-LayoutsHouse Messinger Proposal 2-Layouts
House Messinger Proposal 2-Layouts
 
Labour-and-Equipment-Productivity.pdf
Labour-and-Equipment-Productivity.pdfLabour-and-Equipment-Productivity.pdf
Labour-and-Equipment-Productivity.pdf
 
House Messinger Proposal 2-Sections & Elevations
House Messinger Proposal 2-Sections & ElevationsHouse Messinger Proposal 2-Sections & Elevations
House Messinger Proposal 2-Sections & Elevations
 
2013 Keystone Premier Travel Trailer by Bullet
2013 Keystone Premier Travel Trailer by Bullet2013 Keystone Premier Travel Trailer by Bullet
2013 Keystone Premier Travel Trailer by Bullet
 
8 months work
8 months work8 months work
8 months work
 
SOLD OUT - 8th on Fordyce Development
SOLD OUT - 8th on Fordyce DevelopmentSOLD OUT - 8th on Fordyce Development
SOLD OUT - 8th on Fordyce Development
 
Working drawings
Working drawingsWorking drawings
Working drawings
 
Laminate Flooring Sydney by Sydney Art Flooring
Laminate Flooring Sydney by Sydney Art FlooringLaminate Flooring Sydney by Sydney Art Flooring
Laminate Flooring Sydney by Sydney Art Flooring
 
Go For Broke Arch A-2
Go For Broke Arch A-2Go For Broke Arch A-2
Go For Broke Arch A-2
 
E Clemence Multi Family Residential
E Clemence Multi Family ResidentialE Clemence Multi Family Residential
E Clemence Multi Family Residential
 
Proposed Builder's Work Plan for Pub/Restaurant
Proposed Builder's Work Plan for Pub/RestaurantProposed Builder's Work Plan for Pub/Restaurant
Proposed Builder's Work Plan for Pub/Restaurant
 
Construction pdf major project
Construction pdf major projectConstruction pdf major project
Construction pdf major project
 
Lesoma Farm Houses
Lesoma Farm HousesLesoma Farm Houses
Lesoma Farm Houses
 
Killeshin building it carlow
Killeshin building it carlowKilleshin building it carlow
Killeshin building it carlow
 
false ceiling ppt.pptx
false ceiling ppt.pptxfalse ceiling ppt.pptx
false ceiling ppt.pptx
 

More from Jonathan Flanagan

Technical Report
Technical ReportTechnical Report
Technical Report
Jonathan Flanagan
 
Cover letter
Cover letterCover letter
Cover letter
Jonathan Flanagan
 
Jonathan Flanagan CV
Jonathan Flanagan CVJonathan Flanagan CV
Jonathan Flanagan CV
Jonathan Flanagan
 
Insulation & Airtightness Continuity Report with Shadow Study
Insulation & Airtightness Continuity Report with Shadow Study Insulation & Airtightness Continuity Report with Shadow Study
Insulation & Airtightness Continuity Report with Shadow Study
Jonathan Flanagan
 
Airtightness and insulation with solar study
Airtightness and insulation with solar studyAirtightness and insulation with solar study
Airtightness and insulation with solar study
Jonathan Flanagan
 
Revit poster (actual print)
Revit poster (actual print)Revit poster (actual print)
Revit poster (actual print)
Jonathan Flanagan
 
Conservation report
Conservation reportConservation report
Conservation report
Jonathan Flanagan
 
Cluain mhuire research
Cluain mhuire researchCluain mhuire research
Cluain mhuire research
Jonathan Flanagan
 
End of Year Exhibition Poster for Design & Detail Module
End of Year Exhibition Poster for Design & Detail Module End of Year Exhibition Poster for Design & Detail Module
End of Year Exhibition Poster for Design & Detail Module
Jonathan Flanagan
 
Life Cycle Assesment Report for Centre for the Creative Arts and Media (CCAM)...
Life Cycle Assesment Report for Centre for the Creative Arts and Media (CCAM)...Life Cycle Assesment Report for Centre for the Creative Arts and Media (CCAM)...
Life Cycle Assesment Report for Centre for the Creative Arts and Media (CCAM)...
Jonathan Flanagan
 
Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element Poster
Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element PosterCentre for the Creative Arts and Media (CCAM) | GMIT Individual Element Poster
Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element Poster
Jonathan Flanagan
 
Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element Report
Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element Report Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element Report
Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element Report
Jonathan Flanagan
 
Centre for the Creative Arts and Media (CCAM) | GMIT DAC Drawings
Centre for the Creative Arts and Media (CCAM) | GMIT DAC Drawings Centre for the Creative Arts and Media (CCAM) | GMIT DAC Drawings
Centre for the Creative Arts and Media (CCAM) | GMIT DAC Drawings
Jonathan Flanagan
 
Centre for the Creative Arts and Media (CCAM) | GMIT DAC Report
Centre for the Creative Arts and Media (CCAM) | GMIT DAC Report Centre for the Creative Arts and Media (CCAM) | GMIT DAC Report
Centre for the Creative Arts and Media (CCAM) | GMIT DAC Report
Jonathan Flanagan
 

More from Jonathan Flanagan (14)

Technical Report
Technical ReportTechnical Report
Technical Report
 
Cover letter
Cover letterCover letter
Cover letter
 
Jonathan Flanagan CV
Jonathan Flanagan CVJonathan Flanagan CV
Jonathan Flanagan CV
 
Insulation & Airtightness Continuity Report with Shadow Study
Insulation & Airtightness Continuity Report with Shadow Study Insulation & Airtightness Continuity Report with Shadow Study
Insulation & Airtightness Continuity Report with Shadow Study
 
Airtightness and insulation with solar study
Airtightness and insulation with solar studyAirtightness and insulation with solar study
Airtightness and insulation with solar study
 
Revit poster (actual print)
Revit poster (actual print)Revit poster (actual print)
Revit poster (actual print)
 
Conservation report
Conservation reportConservation report
Conservation report
 
Cluain mhuire research
Cluain mhuire researchCluain mhuire research
Cluain mhuire research
 
End of Year Exhibition Poster for Design & Detail Module
End of Year Exhibition Poster for Design & Detail Module End of Year Exhibition Poster for Design & Detail Module
End of Year Exhibition Poster for Design & Detail Module
 
Life Cycle Assesment Report for Centre for the Creative Arts and Media (CCAM)...
Life Cycle Assesment Report for Centre for the Creative Arts and Media (CCAM)...Life Cycle Assesment Report for Centre for the Creative Arts and Media (CCAM)...
Life Cycle Assesment Report for Centre for the Creative Arts and Media (CCAM)...
 
Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element Poster
Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element PosterCentre for the Creative Arts and Media (CCAM) | GMIT Individual Element Poster
Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element Poster
 
Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element Report
Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element Report Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element Report
Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element Report
 
Centre for the Creative Arts and Media (CCAM) | GMIT DAC Drawings
Centre for the Creative Arts and Media (CCAM) | GMIT DAC Drawings Centre for the Creative Arts and Media (CCAM) | GMIT DAC Drawings
Centre for the Creative Arts and Media (CCAM) | GMIT DAC Drawings
 
Centre for the Creative Arts and Media (CCAM) | GMIT DAC Report
Centre for the Creative Arts and Media (CCAM) | GMIT DAC Report Centre for the Creative Arts and Media (CCAM) | GMIT DAC Report
Centre for the Creative Arts and Media (CCAM) | GMIT DAC Report
 

Recently uploaded

Borys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior designBorys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior design
boryssutkowski
 
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
gpffo76j
 
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
taqyed
 
projectreportnew-170307082323 nnnnnn(1).pdf
projectreportnew-170307082323 nnnnnn(1).pdfprojectreportnew-170307082323 nnnnnn(1).pdf
projectreportnew-170307082323 nnnnnn(1).pdf
farazahmadas6
 
Top Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdfTop Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdf
PlanitIsrael
 
一比一原版(BU毕业证)波士顿大学毕业证如何办理
一比一原版(BU毕业证)波士顿大学毕业证如何办理一比一原版(BU毕业证)波士顿大学毕业证如何办理
一比一原版(BU毕业证)波士顿大学毕业证如何办理
peuce
 
Technoblade The Legacy of a Minecraft Legend.
Technoblade The Legacy of a Minecraft Legend.Technoblade The Legacy of a Minecraft Legend.
Technoblade The Legacy of a Minecraft Legend.
Techno Merch
 
EASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANE
EASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANEEASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANE
EASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANE
Febless Hernane
 
Storytelling For The Web: Integrate Storytelling in your Design Process
Storytelling For The Web: Integrate Storytelling in your Design ProcessStorytelling For The Web: Integrate Storytelling in your Design Process
Storytelling For The Web: Integrate Storytelling in your Design Process
Chiara Aliotta
 
Transforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting ProfitabilityTransforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting Profitability
aaryangarg12
 
vernacular architecture in response to climate.pdf
vernacular architecture in response to climate.pdfvernacular architecture in response to climate.pdf
vernacular architecture in response to climate.pdf
PrabhjeetSingh219035
 
LORRAINE ANDREI_LEQUIGAN_HOW TO USE TRELLO
LORRAINE ANDREI_LEQUIGAN_HOW TO USE TRELLOLORRAINE ANDREI_LEQUIGAN_HOW TO USE TRELLO
LORRAINE ANDREI_LEQUIGAN_HOW TO USE TRELLO
lorraineandreiamcidl
 
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
7sd8fier
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
cy0krjxt
 
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
pmgdscunsri
 
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
ameli25062005
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
cy0krjxt
 
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
9a93xvy
 
Can AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI preludeCan AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI prelude
Alan Dix
 
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
n0tivyq
 

Recently uploaded (20)

Borys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior designBorys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior design
 
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
 
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
 
projectreportnew-170307082323 nnnnnn(1).pdf
projectreportnew-170307082323 nnnnnn(1).pdfprojectreportnew-170307082323 nnnnnn(1).pdf
projectreportnew-170307082323 nnnnnn(1).pdf
 
Top Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdfTop Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdf
 
一比一原版(BU毕业证)波士顿大学毕业证如何办理
一比一原版(BU毕业证)波士顿大学毕业证如何办理一比一原版(BU毕业证)波士顿大学毕业证如何办理
一比一原版(BU毕业证)波士顿大学毕业证如何办理
 
Technoblade The Legacy of a Minecraft Legend.
Technoblade The Legacy of a Minecraft Legend.Technoblade The Legacy of a Minecraft Legend.
Technoblade The Legacy of a Minecraft Legend.
 
EASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANE
EASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANEEASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANE
EASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANE
 
Storytelling For The Web: Integrate Storytelling in your Design Process
Storytelling For The Web: Integrate Storytelling in your Design ProcessStorytelling For The Web: Integrate Storytelling in your Design Process
Storytelling For The Web: Integrate Storytelling in your Design Process
 
Transforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting ProfitabilityTransforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting Profitability
 
vernacular architecture in response to climate.pdf
vernacular architecture in response to climate.pdfvernacular architecture in response to climate.pdf
vernacular architecture in response to climate.pdf
 
LORRAINE ANDREI_LEQUIGAN_HOW TO USE TRELLO
LORRAINE ANDREI_LEQUIGAN_HOW TO USE TRELLOLORRAINE ANDREI_LEQUIGAN_HOW TO USE TRELLO
LORRAINE ANDREI_LEQUIGAN_HOW TO USE TRELLO
 
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
 
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
 
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
 
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
 
Can AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI preludeCan AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI prelude
 
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
 

Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings

  • 1. -04.27-03.61 01 00.00 00.00 00.00 00.00 00.00 00.00 04.62 +04.62 -00.10 -00.10 00.00 DK DK DK 3415 3510 2025 2025 2000 00.30 Slope: 1:20 SURFACE OF RAMP AND LANDING NON- SLIP FAIR FACED CONCRETE Surface of ramp and landing slip resistant fair faced concrete Surface of ramp and landing slip resistant fair faced concrete Slope: 1:20 Sign Indicating direction to building Sign Indicating direction to building DK -01.09 -00.45 LS LS LS LS LSLS LS LS LS LS LS LS LSLSLSLSLSLS Bus Stop Sign Indicating building -03.07 -02.42 -00.79 -00.1000.00 -00.10 -00.10 -00.10 -00.10 -00.96 00.00 -03.62 -02.98 -02.35 -01.72 1800 1800 1800 1975 Slope: 1:20 Slope: 1:20 Slope: 1:20 Slope: 1:20 Slope: 1:20 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Proposed Car Park Proposed Green Area and Landscaping Proposed Ramp PROPOSED CAR PARK CCAM Main Entrance Wellpark Road No Access CCAM Main Building DK Legend 0000 2025 2025 2025 -00.00 DK ABOVE ORDINANCE DATUM PUBLIC LIGHT STAND TO COMPLY WITH ESB STANDARDS ACCESS ROUTE DIMENSION LINE EXISTING CHAPEL STRUCTURE EXTENSION STRUCTURE TACTILE SURFACE DISHED KERBING DK 8000 PROPOSED HARD STANDING 1800 Mini Round about Existing Chapel SUDS PERMEABLE PAVING SURFACE WATER DRAINAGE SUDS SURFACE WATER DRAINAGE SUDS MH MH Fall to Centre: 1:60 Proposed Extension ACCESSIBLE ENTRANCE A ACCESSIBLE ENTRANCE B ACCESSIBLE ENTRANCE C PROPOSED LANDSCAPING PROPOSED RESURFACE OF ROAD AND MARKINGS ACCESSIBLE ROUTE FROM CAR PARK TO ENTRANCE C ACCESSIBLE ROUTE FROM CAR PARK TO ENTRANCE A ACCESSIBLE ROUTE FROM CAR PARK TO ENTRANCE B ROADSTONE PAVIERS GRASS MARGIN GRASS MARGIN GRASS MARGIN GRASS MARGIN EXISTING ROADWAY ACCESS JUNCTION MAN HOLE FOUL WATER PIPE RAIN WATER PIPE F.F.L. +00.30 F.F.L. +00.30 MH MH MH AJ HOARDING LINE SUDS 1:50 FALL TO DRAINAGE SITE SUDS SOAK PIT 100mm Ø RAIN WATER PIPE LAID TO FALL 1:50 TO SUDS 100mm Ø FOUL WATER PIPE LAID TO FALL 1:50 SetDown Area/Hardstanding Det.014 DK 2125 ACCESS ROUTE AND FIRE ESCAPE MH AJ LS 00.00 AJ 4025 CCAM MAIN BUILDING 1844 1788 1500 1844 1850 2400 4800 6000 1400 4872 8000 48002050 2025 4810 2985 F.F.L. +00.30 +00.30 13090 Fall to Centre: 1:60 ACO 125 DRAIN ACO 125 DRAIN +0.000M -0.100M PERMEABLE PAVING 600x50mm ROADSTONE PLAIN FLAG PAVING LAID ON 50mm SAND BLINDING ON 50mm GRAVEL WITH A ROADSTONE HALF BATTERED KERB AT EDGE PERMEABLE ROAD 25mm PERMEABLE ASPHALT SURFACE COURSE ON 50mm PERMEABLE BASE COURSE ON 100MM GRAVEL ON COMPACTED EARTH 5050 10 5025100 50 DETAIL 014 1:10 SCALE (@ A1) NUMBER TITLE PROJECT NUMBER CLIENT PROJECT DRAWING NUMBER REV DRAWN BY DATE Jonathan Flanagan N/A Jonathan Flanagan 80 Gleann Rua, Renmore, Galway. DESIGNERS ADDRESS Construction Information/Working Drawings Galway Mayo Institute of Technology CONTACT DETAILS Phone: 0830054478 Email: jflanagangti@gmail.co m G00262330 28/04/2015 28/04/201513:08:50 Site Layout Plan 1:200 GA_001 DDS4_P09 Site Layout Plan N orth 1:200 GA_001 DDS4_P09
  • 2. UP Existing Stairs 25285 15338 2425 26525 Legend EXTENT OF WALL DEMOLITION Existing Walls EXTENT OF DOOR DEMOLITION EXTENT OF STAIN GLASS WINDOW DEMOLITION 2909 8865 897 850 12101210 24003596 251025541494 3253 SCULPTURE GALWAY FILM CENTRE STAGING AREA EXTENT OF FLOORS DEMOLITION 19603 SCALE (@ A1) NUMBER TITLE PROJECT NUMBER CLIENT PROJECT DRAWING NUMBER REV DRAWN BY DATE Jonathan Flanagan N/A Jonathan Flanagan 80 Gleann Rua, Renmore, Galway. DESIGNERS ADDRESS Construction Information/Workign Drawings Galway Mayo Institute of Technology CONTACT DETAILS Phone: 0830054478 Email: jflanagangti@gmail.co m G00262330 28/04/2015 20/04/201518:29:05 Demolition Plan 1:50 GA_002 DDS4_P09 Chapel Ground Floor Plan Demolition
  • 3. UP UP 30.07 m² Green Room 158 G EXISTING VICTORIAN TILE 5.23 m² Costume Store 154 K EXISTING VICTORIAN TILE 5.95 m² Costume Store 155 J EXISTING VICTORIAN TILE 5.32 m² Costume Store 156 I EXISTING VICTORIAN TILE 5.74 m² Costume Store 157 H EXISTING VICTORIAN TILE 14.07 m² Tech Support 161 B EXISTING PARQUET AND TILE 14.37 m² Prop Store 161 A EXISTING PARQUET AND TILE 15.12 m² Matrix Chair Store 161 C EXISTING PARQUET AND TILE 15.69 m² Lobby 161 M EXISTING LIESTONE TILE FLOOR 185.87 m² Creative Space 161 L EXISTING PARQUET AND VICTORIAN TILE A-A 678 7.08 m² Disabled Shower/WC 161 E SOLUS CERAMICS MODULAR TILE R11 16.66 m² Matrix Chair Store 161 D EXISTING PARQUET AND TILE 25.53 m² Changing Room 161 F SOLUS CERAMICS MODULAR TILE R11 1050 4260 Slope: 1:20 Modesty Screen 2398 Legend Demolished Walls EXISTING DOOR TO BE RETAINED AND PAINTED WITH A FIRE RESISTANT SELANT, INCHUMESCENT STRIP AND DOOR CLOSER EXISTING DOOR TO BE RETAINED AND PAINTED WITH A FIRE RESISTANT SELANT, INCHUMESCENT STRIP AND DOOR CLOSER EXISTING PARTITIONS TO BE DEMOLISHED EXISTING PARTITIONS TO BE DEMOLISHED EXISTING DOOR TO BE REMOVED AND OPENING CLOSED 00.30 00.30 UPGR. D-01 D-06 FD 30 S D-08 FD 30 S D-03 FD 30 S UPGR. D-09 Existing Walls 00.30 1263 4938 331128552855 897 00.30 00.00 008 GA_013 2500 2800 D-02 FD 30 S D-04 FD 30 S D-05 FD 30 S D-11 FD 30 S D-12 FD 30 S D-13 FD 30 S D-14 FD 30 S D-16 D-15 FD 30 S D-07 S D-10 1200 2850 00.30 3224 3029 1770 1770 1252 1050 NEW WALL OPE FOR FIRE DOOR ALL EXISTING STAIN GLASS AND FRAMES RETAINED AND REPAIRED BY USING SUITABLE CONSERVATION TECHNOLOGIES UNLESS REMOVED IN DEMOLITION PLAN. STAIN GLASS WINDOW REVEALS AND BORDERS TO BE CLEANED. ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE EXISTING OPE BEHIND WINDOW. EXTERIOR GLAZED GUARD REPLACED WITH SINGLE GLAZED WINDOW GUARD. 20mm GAP LEFT ALONG BOTTOM OF GLAZING TO VENTILATE AND MITIGATE CONDENSATION. ALL EXISTING STAIN GLASS AND FRAMES RETAINED AND REPAIRED BY USING SUITABLE CONSERVATION TECHNOLOGIES UNLESS REMOVED IN DEMOLITION PLAN. STAIN GLASS WINDOW REVEALS AND BORDERS TO BE CLEANED. ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE EXISTING OPE BEHIND WINDOW. EXTERIOR GLAZED GUARD REPLACED WITH SINGLE GLAZED WINDOW GUARD. 20mm GAP LEFT ALONG BOTTOM OF GLAZING TO VENTILATE AND MITIGATE CONDENSATION. ALL EXISTING STAIN GLASS AND FRAMES RETAINED AND REPAIRED BY USING SUITABLE CONSERVATION TECHNOLOGIES UNLESS REMOVED IN DEMOLITION PLAN. STAIN GLASS WINDOW REVEALS AND BORDERS TO BE CLEANED. ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE EXISTING OPE BEHIND WINDOW. EXTERIOR GLAZED GUARD REPLACED WITH SINGLE GLAZED WINDOW GUARD. 20mm GAP LEFT ALONG BOTTOM OF GLAZING TO VENTILATE AND MITIGATE CONDENSATION. EXISTING TEMPORARY FLOOR REMOVED AND PARQUET AND VICTORIAN TILES RETAINED AND REFURBISHED 1010 STAGING AREA/TV STUDIO FORBO MARMOLEUM REAL 00.30 00.30 00.30 00.3000.30 00.30 00.00 EXISTING DOOR TO BE RETAINED AND PAINTED WITH A FIRE RESISTANT SELANT, INCHUMESCENT STRIP AND DOOR CLOSER W-05 W-04 W-07 W-06 W-16 W-14 W-12 W-10 W-09 W-08 W-03W-02W-01 W-18 W-20 W-17 W-11W-13W-15 W-19 EXISTING FRENCH DRAIN TO BE REMOVED FROM PERIMETER OF CHAPEL BUILDING AND REPALCED WITH PREMEABLE PAVING DOOR GUARD RAIL 1100x1100mm 006 GA_013 010 GA_013 009 GA_013 005 GA_013 B-B PROPOSED WALL OPENINGS TO BE MADE GOOD. FINISHES TO WALLS OF DEMOLITION WORK TO BE MADE GOOD WITH APPROPRIATE FILLING AND LIME RENDER FINISH TO MATCH EXISTING WALLS FOWL WATER DRAINAGE RAIN WATER DRAINAGE PROPOSED WALL CLOSURES TO BE MADE GOOD. FINISHES TO WALLS OF DEMOLITION WORK TO BE MADE GOOD WITH APPROPRIATE FILLING AND LIME RENDER FINISH TO MATCH EXISTING WALLS 450MM MINIMUM ACTIVITY TURNING SPACE S SOUNDER EXISTING VICTORIAN TILE, PARQUET AND THEIR ADHESIVES TO BE REPLACED WITH SOLUS CERAMICS MODULAR TILES AND LAID ON A BED OF TELLING UNILIT 45 LIME EXISTING PARQUET FLOOR TO BE RETAINED AND CLEANED WITH VACUUM, MOPPED WITH ARBO CLEANER 16. 2 COATS OF BONA HARDWAX OIL TO BE APPLIED TO PARQUET WHEN FULLY DRY AND BUFFED TO FINISH EXISTING VICTORIAN TILES TO BE RETAINED, GROUT AND TILES TO BE CLEANED BY VACUUM AND MOP WITH ARBO CLEANER 16. WHEN DRY APPLY DUPONT STONE TECH GROUT SEALER. BUFF FLOOR TO FINISH. EXISTING VICTORIAN TILES TO BE RETAINED, GROUT AND TILES TO BE CLEANED BY VACUUM AND MOP WITH ARBO CLEANER 16. WHEN DRY APPLY DUPONT STONE TECH GROUT SEALER. BUFF FLOOR TO FINISH. EXISTING OPE TO BE WIDENED AND 30 MIN. FIRE DOOR INSTALLED. TO BE PERMANENTLY LOCKED AT ALL TIMES. EXTENT OF PARQUET EXTENT OF SOLUS CERAMICS MODULAR TILES EXTENT OF VICTORIAN TILES EXTENT OF FORBO MARMOLEUM REAL 1500 300 1850 OAK LAMINATE FLOOR BOARDS OAK LAMINATE FLOOR BOARDS OAK LAMINATE FLOOR BOARDS OAK LAMINATE FLOOR BOARDS SCALE (@ A1) NUMBER TITLE PROJECT NUMBER CLIENT PROJECT DRAWING NUMBER REV DRAWN BY DATE Jonathan Flanagan N/A Jonathan Flanagan 80 Gleann Rua, Renmore, Galway. DESIGNERS ADDRESS Construction Information/Working Drawings Galway Mayo Institute of Technology CONTACT DETAILS Phone: 0830054478 Email: jflanagangti@gmail.co m G00262330 28/04/2015 28/04/201513:18:37 Ground Floor Chapel Plan 1:50 GA_003 DDS4_P09 Proposed Ground Floor Chapel Plan N orth Key Plan
  • 4. DN 24.85 m² Gallery 161 T INACCESSIBLE 5.44 m² Existing Stairs ? ? B-B A-A 846 UPGR. D-17 EXISTING DOOR TO BE RETAINED AND PAINTED WITH A FIRE RESISTANT SELANT. TO BE PERMANENTLY LOCKED AT ALL TIMES. EXISTING BALUSTRADE TO BE RETAINED AND PAINTED WITH A LIGHT VARNISH W-30 W-28 W-36W-37 W-35 W-34 W-33 W-32 W-31 W-22W-21 W-23 W-24 W-25 W-29W-39 W-38 Legend Demolished Walls Existing Walls PROPOSED WALL OPENINGS TO BE MADE GOOD. FINISHES TO WALLS OF DEMOLITION WORK TO BE MADE GOOD WITH APPROPRIATE FILLING AND LIME RENDER FINISH TO MATCH EXISTING WALLS FOWL WATER DRAINAGE RAIN WATER DRAINAGE PROPOSED WALL CLOSURES TO BE MADE GOOD. FINISHES TO WALLS OF DEMOLITION WORK TO BE MADE GOOD WITH APPROPRIATE FILLING AND LIME RENDER FINISH TO MATCH EXISTING WALLS 450MM MINIMUM ACTIVITY TURNING SPACE S SOUNDER EXTENT OF PARQUET EXTENT OF SOLUS CERAMICS MODULAR TILES EXTENT OF VICTORIAN TILES EXTENT OF FORBO MARMOLEUM REAL SCALE (@ A1) NUMBER TITLE PROJECT NUMBER CLIENT PROJECT DRAWING NUMBER REV DRAWN BY DATE Jonathan Flanagan N/A Jonathan Flanagan 80 Gleann Rua, Renmore, Galway. DESIGNERS ADDRESS Construction Information/Working Drawings Galway Mayo Institute of Technology CONTACT DETAILS Phone: 0830054478 Email: jflanagangti@gmail.co m G00262330 28/04/2015 28/04/201514:29:17 Gallery Floor Plan 1:50 GA_004 DDS4_P09 Proposed Gallery Floor Plan N orth
  • 5. UP 26.74 m² Glass Link 161 N ROADSTONE LIMESTONE PAVING FLAGS 6741 B-B A-A 700 2240 4.35 m² Lobby WC SOLUS CERAMICS MODULAR TILE R11 6.25 m² Disabled WC 161 Q SOLUS CERAMICS MODULAR TILE R11 3.89 m² Lobby WC SOLUS CERAMICS MODULAR TILE R11 10.61 m² Male WC 161 S SOLUS CERAMICS MODULAR TILE R11 10.33 m² Female WC 161 R SOLUS CERAMICS MODULAR TILE R11 16111440 2163 Slope: 1:20 00.30 00.30 00.30 00.00 1700 00.30 63.23 m² Reception 161 P Oak Laminate Floor 00.30 1850 D-21 N/A D-24 N/A D-16 N/A 1800 1500 D-18 D-19 12001200 C-C 2500 1605 OVER DOOR HEATERS RECESSED IN CEILING W-18 W-20 W-19 W-43W-42 W-41 W-40 014 GA_014 017 GA_014 GA_015 GA_014 022 015 GA_015 022 GA_015 023 18267 1500 300 100 942 1844 1200 1010 1010 10101010 790 1077 Legend Demolished Walls Existing Walls PROPOSED WALL OPENINGS TO BE MADE GOOD. FINISHES TO WALLS OF DEMOLITION WORK TO BE MADE GOOD WITH APPROPRIATE FILLING AND LIME RENDER FINISH TO MATCH EXISTING WALLS FOWL WATER DRAINAGE RAIN WATER DRAINAGE PROPOSED WALL CLOSURES TO BE MADE GOOD. FINISHES TO WALLS OF DEMOLITION WORK TO BE MADE GOOD WITH APPROPRIATE FILLING AND LIME RENDER FINISH TO MATCH EXISTING WALLS 450MM MINIMUM ACTIVITY TURNING SPACE S SOUNDER EXTENT OF PARQUET EXTENT OF SOLUS CERAMICS MODULAR TILES EXTENT OF VICTORIAN TILES EXTENT OF FORBO MARMOLEUM REAL SCALE (@ A1) NUMBER TITLE PROJECT NUMBER CLIENT PROJECT DRAWING NUMBER REV DRAWN BY DATE Jonathan Flanagan N/A Jonathan Flanagan 80 Gleann Rua, Renmore, Galway. DESIGNERS ADDRESS Disability Access Certificate Application Galway Mayo Institute of Technology CONTACT DETAILS Phone: 0830054478 Email: jflanagangti@gmail.co m G00262330 15/01/2015 28/04/201513:20:09 Ground Floor Extension Plan 1:50 GA_005 DDS4_P09 Ground Floor Extension Plan N orth Key Plan
  • 6. 00 Ground Level 0 01 Ground Floor 300 Chapel Flat Roof Level 4620 Chapel Eaves 1 7935 10 Chapel Ridge Level 11978 001 GA_012 012 GA_012 004 GA_013 003 GA_012 004 GA_013 185.87 m² Creative Space 161 L EXISTING PARQUET AND VICTORIAN TILE 25.53 m² Changing Room 161 F SOLUS CERAMICS MODULAR TILE R11 7.08 m² Disabled Shower/WC 161 E SOLUS CERAMICS MODULAR TILE R11 30.07 m² Green Room 158 G EXISTING VICTORIAN TILE 3135 3135 007 GA_013 EXISTING SLATES TO BE REUSED WHERE POSSIBLE AND REPLACEMENTS TO BE MADE GOOD WITH RECLAIMED BANGOR BLUE AGED SIMILAR WHERE NECESSARY. ALL EXISTING STAIN GLASS AND FRAMES RETAINED AND REPAIRED BY USING SUITABLE CONSERVATION TECHNOLOGIES UNLESS REMOVED IN DEMOLITION PLAN. STAIN GLASS WINDOW REVEALS AND BORDERS TO BE CLEANED. ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE EXISTING OPE BEHIND WINDOW. EXTERIOR GLAZED GUARD REPLACED WITH SINGLE GLAZED WINDOW GUARD. 20mm GAP LEFT ALONG BOTTOM OF GLAZING TO VENTILATE AND MITIGATE CONDENSATION. EXISTING STAIN GLAS WINDOW RETAINED AND REPAIRED/UPGRADED WITH SINGLE GLAZE ISOTHERMAL GLAZING AND A EXTERIOR GLAZED GUARD. EXISTING STAIN GLAS WINDOW RETAINED AND REPAIRED/UPGRADED WITH SINGLE GLAZE ISOTHERMAL GLAZING AND A EXTERIOR GLAZED GUARD. EXISTING STAIN GLAS WINDOW RETAINED AND REPAIRED/UPGRADED WITH SINGLE GLAZE ISOTHERMAL GLAZING AND A EXTERIOR GLAZED GUARD. 00 Ground Level 0 01 Ground Floor 300 02 Gallery FFL 4525 Chapel Eaves 1 7935 2051 016 GA_014 185.87 m² Creative Space 161 L EXISTING PARQUET AND VICTORIAN TILE 24.85 m² Gallery 161 T INACCESSIBLE SCALE (@ A1) NUMBER TITLE PROJECT NUMBER CLIENT PROJECT DRAWING NUMBER REV DRAWN BY DATE Jonathan Flanagan N/A Jonathan Flanagan 80 Gleann Rua, Renmore, Galway. DESIGNERS ADDRESS Construction Information/Working Drawings Galway Mayo Institute of Technology CONTACT DETAILS Phone: 0830054478 Email: jflanagangti@gmail.co m G00262330 28/04/2015 28/04/201513:23:37 Chapel Sections AA - BB 1:50 DDS4_P05 Section A-A Section B-B 1:50 GA_006 DDS4_P09
  • 7. 00 Ground Level 0 01 Ground Floor 300 Extension Parapet Level 4983 Extension Roof Level 4568 011 GA_014 019 GA_015 012 GA_014 013 GA_014 011 GA_014 ALUMINIUM PARAPET TO EXTENSION ANODISED BLACK SVK ORNIMAT FIBRECEMENT RAINSCREEN CLADDING COLOUR BLACK SCHUCO FW60+ ALUMINIUM TRIPLE GLAZING 3722 1:60 FALL 1:60 FALL 00 Ground Level 0 01 Ground Floor 300 Extension Parapet Level 4983 Extension Roof Level 4568 3722 3739 2500 10840 2000150 600 600600 842 1750 1100 63.23 m² Reception 161 P Oak Laminate Floor 6.25 m² Disabled WC 161 Q SOLUS CERAMICS MODULAR TILE R11 10.33 m² Female WC 161 R SOLUS CERAMICS MODULAR TILE R11 011 GA_014 019 GA_015 015 GA_014 011 GA_014 012 GA_014 013 GA_014 ALUMINIUM PARAPET TO EXTENSION ANODISED BLACK SVK ORNIMAT FIBRECEMENT RAINSCREEN CLADDING COLOUR BLACK SCHUCO FW60+ ALUMINIUM TRIPLE GLAZING 00 Ground Level 0 01 Ground Floor 300 Link Roof Level 4500 016 GA_014 024 GA_015 1200 26.74 m² Glass Link 161 N ROADSTONE LIMESTONE PAVING FLAGS PILKINGTON PLANAR GLAZED WALLS AND ROOF 1:60 FALL SCALE (@ A1) NUMBER TITLE PROJECT NUMBER CLIENT PROJECT DRAWING NUMBER REV DRAWN BY DATE Jonathan Flanagan N/A Jonathan Flanagan 80 Gleann Rua, Renmore, Galway. DESIGNERS ADDRESS Construction Information/Working Drawings Galway Mayo Institute of Technology CONTACT DETAILS Phone: 0830054478 Email: jflanagangti@gmail.co m G00262330 28/04/2015 28/04/201513:24:58 Extension Sections A-A & B-B & C-C 1:50 DDS4_P05 Section A-A Section B-B 1:50 GA_007 DDS4_P09 Section C-C
  • 8. 00 Ground Level 0 Chapel Eaves 7600 10 Chapel Ridge Level 11978 Extension Parapet Level 4983 550 1100 Ramps and Hand rails in accordance with TGD Part M 2010 SVK ORNIMAT FIBRECEMENT RAINSCREEN CLADDING COLOUR BLACK ALUMINIUM PARAPET TO EXTENSION ANODISED BLACK ALL EXISTING STAIN GLASS AND FRAMES RETAINED AND REPAIRED BY USING SUITABLE CONSERVATION TECHNOLOGIES UNLESS REMOVED IN DEMOLITION PLAN. STAIN GLASS WINDOW REVEALS AND BORDERS TO BE CLEANED. ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE EXISTING OPE BEHIND WINDOW. EXTERIOR GLAZED GUARD REPLACED WITH SINGLE GLAZED WINDOW GUARD. 20mm GAP LEFT ALONG BOTTOM OF GLAZING TO VENTILATE AND MITIGATE CONDENSATION. EXISTING WALL AND QUOIN STONES TO BE REPAIRED AND RE-POINTED AS NECESSARY EXISTING WALL RENDER TO BE REPAIRED AS NECESSARY TO EXTERIOR AT CRACKS AND WITH SIMILAR PEBBLE DASH RENDER EXISTING SASH WINDOW TO BE CAREFULLY REPAIRED USING SUITABLE CONSERVATION TECHNOLOGIES AND MATERIALS BY SPECIALIST JOINER Extension Roof Level 4568 EXISTING SLATES TO BE REUSED WHERE POSSIBLE AND REPLACEMENTS TO BE MADE GOOD WITH RECLAIMED BANGOR BLUE AGED SIMILAR WHERE NECESSARY. PARAPET AND FLASHING TO BE RETAINED, CLEANED AND REPAIRED AS NECESSARY WITH SIMILAR 1100 EXISTING DOVE COT RETAINED AND CLEANED, REPAIR AND REPLACE LOUVRES AS NECESSARY WITH SIMILAR SCALE (@ A1) NUMBER TITLE PROJECT NUMBER CLIENT PROJECT DRAWING NUMBER REV DRAWN BY DATE Jonathan Flanagan N/A Jonathan Flanagan 80 Gleann Rua, Renmore, Galway. DESIGNERS ADDRESS Construction Information/Working Drawings Galway Mayo Institute of Technology CONTACT DETAILS Phone: 0830054478 Email: jflanagangti@gmail.co m G00262330 28/04/2015 28/04/201513:30:22 North Elevation 1:50 GA_008 DDS4_P09 North Elevation North Elevation (Key)
  • 9. 00 Ground Level 0 Chapel Flat Roof Level 4620 Chapel Eaves 7600 10 Chapel Ridge Level 11978 EXISTING WALL RENDER TO BE REPAIRED AS NECESSARY TO EXTERIOR AT CRACKS AND WITH SIMILAR PEBBLE DASH RENDER ALL EXISTING STAIN GLASS AND FRAMES RETAINED AND REPAIRED BY USING SUITABLE CONSERVATION TECHNOLOGIES UNLESS REMOVED IN DEMOLITION PLAN. STAIN GLASS WINDOW REVEALS AND BORDERS TO BE CLEANED. ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE EXISTING OPE BEHIND WINDOW. EXTERIOR GLAZED GUARD REPLACED WITH SINGLE GLAZED WINDOW GUARD. 20mm GAP LEFT ALONG BOTTOM OF GLAZING TO VENTILATE AND MITIGATE CONDENSATION. EXISTING WALL AND QUOIN STONES TO BE REPAIRED AND RE-POINTED AS NECESSARY EXISTING RAIN WATER GOODS TO BE REPAIRED AND RE-PAINTED AS NECESSARY WITH SIMILAR MATERIALS AND COLOUR BY CONSERVATION METALWORKER BARGE TO BE RETAINED AND CLEANED WITH JET WASHER. EXISTING SLATES TO BE REUSED WHERE POSSIBLE AND REPLACEMENTS TO BE MADE GOOD WITH RECLAIMED BANGOR BLUE AGED SIMILAR WHERE NECESSARY. PARAPET AND FLASHING TO BE RETAINED, CLEANED AND REPAIRED AS NECESSARY WITH SIMILAR SCALE (@ A1) NUMBER TITLE PROJECT NUMBER CLIENT PROJECT DRAWING NUMBER REV DRAWN BY DATE Jonathan Flanagan N/A Jonathan Flanagan 80 Gleann Rua, Renmore, Galway. DESIGNERS ADDRESS Construction Information/Working Drawings Galway Mayo Institute of Technology CONTACT DETAILS Phone: 0830054478 Email: jflanagangti@gmail.co m G00262330 28/04/2015 28/04/201513:31:44 East Elevation 1:50 GA_010 DDS4_P09 East Elevation East Elevation (Key)
  • 10. 00 Ground Level 0 Chapel Flat Roof Level 4620 Chapel Eaves 7600 10 Chapel Ridge Level 11978 Extension Parapet Level 4983 EXISTING WALL RENDER TO BE REPAIRED AS NECESSARY TO EXTERIOR AT CRACKS AND WITH SIMILAR PEBBLE DASH RENDER ALL EXISTING STAIN GLASS AND FRAMES RETAINED AND REPAIRED BY USING SUITABLE CONSERVATION TECHNOLOGIES UNLESS REMOVED IN DEMOLITION PLAN. STAIN GLASS WINDOW REVEALS AND BORDERS TO BE CLEANED. ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE EXISTING OPE BEHIND WINDOW. EXTERIOR GLAZED GUARD REPLACED WITH SINGLE GLAZED WINDOW GUARD. 20mm GAP LEFT ALONG BOTTOM OF GLAZING TO VENTILATE AND MITIGATE CONDENSATION. EXISTING WALL AND QUOIN STONES TO BE REPAIRED AND RE-POINTED AS NECESSARY WITH SIMILAR EXISTING SLATES TO BE REUSED WHERE POSSIBLE AND REPLACEMENTS TO BE MADE GOOD WITH RECLAIMED BANGOR BLUE AGED SIMILAR WHERE NECESSARY. EXISTING DOVE COT RETAINED AND CLEANED, REPAIR AND REPLACE LOUVRES AS NECESSARY WITH SIMILAR SCALE (@ A1) NUMBER TITLE PROJECT NUMBER CLIENT PROJECT DRAWING NUMBER REV DRAWN BY DATE Jonathan Flanagan N/A Jonathan Flanagan 80 Gleann Rua, Renmore, Galway. DESIGNERS ADDRESS Construction Information/Working Drawings Galway Mayo Institute of Technology CONTACT DETAILS Phone: 0830054478 Email: jflanagangti@gmail.co m G00262330 28/04/2015 28/04/201513:30:59 South Elevation South Elevation South Elevation (Key) 1:50 GA_009 DDS4_P09
  • 11. 00 Ground Level 0 01 Ground Floor 300 Chapel Flat Roof Level 4620 Chapel Eaves 1 7935 10 Chapel Ridge Level 11978 EXISTING RAIN WATER GOODS TO BE REPAIRED AND RE-PAINTED AS NECESSARY WITH SIMILAR COLOUR OF ANTI-RUST PAINT EXISTING WALL RENDER TO BE REPAIRED AS NECESSARY TO EXTERIOR AT CRACKS AND WITH SIMILAR PEBBLE DASH RENDER ALL EXISTING STAIN GLASS AND FRAMES RETAINED AND REPAIRED BY USING SUITABLE CONSERVATION TECHNOLOGIES UNLESS REMOVED IN DEMOLITION PLAN. STAIN GLASS WINDOW REVEALS AND BORDERS TO BE CLEANED. ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE EXISTING OPE BEHIND WINDOW. EXTERIOR GLAZED GUARD REPLACED WITH SINGLE GLAZED WINDOW GUARD. 20mm GAP LEFT ALONG BOTTOM OF GLAZING TO VENTILATE AND MITIGATE CONDENSATION. EXISTING WALL AND QUOIN STONES TO BE REPAIRED AND RE-POINTED AS NECESSARY BARGE TO BE CLEANED WITH JET WASHER. EXISTING SLATES TO BE REUSED WHERE POSSIBLE AND REPLACEMENTS TO BE MADE GOOD WITH RECLAIMED BANGOR BLUE AGED SIMILAR WHERE NECESSARY. 1100 150 300 150 300 100 950 1500 00 Ground Level 0 01 Ground Floor 300 Extension Parapet Level 4983 Link Roof Level 4500 Glass Manifestations are 50mm high and placed at 850mm and 1400mm Above Floor Level Extension Roof Level 4568 2400x1200mm SVK ORNIMAT FIBRECEMENT RAINSCREEN CLADDING COLOUR BLACK 1200 1200 2400 600 600 1500 SCALE (@ A1) NUMBER TITLE PROJECT NUMBER CLIENT PROJECT DRAWING NUMBER REV DRAWN BY DATE Jonathan Flanagan N/A Jonathan Flanagan 80 Gleann Rua, Renmore, Galway. DESIGNERS ADDRESS Construction Information/Working Drawings Galway Mayo Institute of Technology CONTACT DETAILS Phone: 0830054478 Email: jflanagangti@gmail.co m G00262330 28/04/2015 28/04/201513:36:13 West Elevation Roof PlanWest Elevation (Extension) West Elevation (Chapel) 1:50 GA_011 DDS4_P09 West Elevation (Key)
  • 12. RIDGE RESTORATION EXISTING OAK KING POST TRUSS TO BE INSPECTED AND REPAIRED AS NECESSARY WITH CAST IRON BRACING TO BE RESTORED. VOID REGION BETWEEN EXISTING OAK ROOF PURLINS. PURLINS TO BE RESTORED AS PART OF ROOF TRUSS INSPECTION. EXISTING 125x50mm OAK RAFTERS AT 600mm CENTRES TO BE INSPECTED AND RESTORED AS NECESSARY. 20mm EXISTING OAK CEILING BOARDS TO BE INSPECTED AND RESTORED AS NECESSARY. 160mm GUTEX THERMOFLEX WOOF FIBREBOARD INSULATION PLACED ABOVE EXISTING OAK CEILING WITH A LAYER OF PRO CLIMA INTELLO PLUS BREATHER MEMBRANE TAPED AT JOINTS BETWEEN SHEETS WITH TESCON NO.1. 38x50mm SOFTWOOD COUNTER BATTENS TO ENSURE VENTILATED AIR SPACE. EXISTING SLATES TO BE REUSED WHERE POSSIBLE AND REPLACEMENTS TO BE MADE GOOD WITH RECLAIMED BANGOR BLUE AGED SIMILAR WHERE NECESSARY. EXISTING CLAY RIDGE TILE TO BE RETAINED. DETAIL 002 1:5 EAVES RESTORATION EXISTING SLATES TO BE RETAINED/RE-USED WHERE POSSIBLE AND REPLACEMENTS TO BE MADE WITH RECALIMED BANGOR BLUE AGES SIMILAR WHERE NECESSARY. LEAD FLASHING AT EAVES TO EXISTING CAST IRON GUTTER TO BE INSPECTED AND REPAIRED WITH ASPHALT OVER SMALL LEAKS AND REPLACED IN AREAS OF MAJOR DAMAGE EVIDENT. EXISTING CORNICE TO BE CLEANED AND RETAINED. 38x50mm SOFTWOOD COUNTER BATTENS TO ENSURE VENTILATED AIR SPACE. PRO CLIMA INTELLO PLUS BREATHER MEMBRANE LAID ON 160mm GUTEX THERMOFLEX WOOD FIBREBOARD INSULATION ON 20mm EXISTING OAK CEILING BOARDS TO BE INSPECTED AND RESTORED AS NECESSARY. EXISTING 125x50mm OAK RAFTERS AT 600mm CENTRES TO BE INSPECTED AND RESTORED AS NECESSARY. 80mm GUTEX WOOD FIBREBOARD INSULATION ON EXISTING SURFACE OF INTERNAL WALL WITH 12.5mm GYPSUM WALL BOARD WITH A 3mm SKIM COAT OF TELLING UNILIT 45 FINISHED WITH A WHITE RENDER. DETAIL 001 1:5 +0.000M +0.300M INTERIOR WALL RESTORATION SURFACE OF INTERIOR WALL CLEANED WITH NON ABRASIVE CLEANER AND WATER WITH ANY LOOSE DEBRIS BEING REMOVED AND ALLOWED TO DRY CREATING A FLAT EVEN SURFACE. ALL INTERIOR SKIRTING BOARDS TO BE CAREFULLY REMOVED AND RE-PAINTED WITH A LIGHT VARNISH AND BONDED TO NEW WALL SURFACE. 80mm GUTEX THERMOROOM ADHESIVELY FIXED TO INTERNAL SURFACE OF EXISTING WALL WITH A LAYER GUTEX KLEBE- UND SPACHTELPUTZ. 12.5mm GYPSUM WALL BOARD ADHESIVELY FIXED WITH A LAYER OF GUTEX KLEBE-UND SPACHTELPUTZ AND A 3mm SKIM COAT OF TELLING UNILIT 45 FINISHED WITH A WHITE RENDER. EXISTING FLOOR BUILD UP NOTE: THIS IS WHAT IS BELIEVED TO BE UNDER THE FLOOR BUT CANNOT BE DETERMINED UNTIL TRIAL HOLES ARE DUG 20mm EXISTING CLAY VICTORIAN TILE AND PARQUET FLOOR ON 10mm SAND CEMENT ADHESIVE BEDDING ON 100mm CONCRETE SLAB ON 365mm LAYER OF COMPACTED RUBBLE TO COMPACTED EARTH WITH EXISTING EXTERIOR WALL LAID 900mm DEEP FROM INTERIOR FLOOR TO A STEPPED FOOTING WITH A WEARING COURSE OF STONE UNDERNEATH PERMEABLE PAVING FRENCH DRAIN REMOVED FROM PERIMETER OF BUILDING AND REPLACED WITH 50mm ROADSTONE PLAIN FLAG PAVING LAID ON 50mm SAND BLINDING ON GRAVEL BED TO COMPACTED EARTH WITH A 1:50 FALL TO SUDS DETAIL 003 1:5 12.5 80 580 5050 100 3651001020 35 160 20 125 100 250 35 250 250 100 125 20 160 35 580 80 12.5 SCALE (@ A1) NUMBER TITLE PROJECT NUMBER CLIENT PROJECT DRAWING NUMBER REV DRAWN BY DATE Jonathan Flanagan N/A Jonathan Flanagan 80 Gleann Rua, Renmore, Galway. DESIGNERS ADDRESS Construction Information/Working Drawings Galway Mayo Institute of Technology CONTACT DETAILS Phone: 0830054478 Email: jflanagangti@gmail.co m G00262330 28/04/2015 28/04/201513:53:20 Chapel Details Pt. 1 1:5 GA_012 DDS4_P09
  • 13. SKIRTING 150x40mm OAK CHAMFERED SKIRTING BOARD PAINTED WITH A LIGHT VARNISH AND BONDED WITH EVOSTIK GRIP FILL TO PARTITION BASE FIXING 50x70mm TREATED SW TIMBER FRAME SCREW FIXED TO BASE OF PARTITION SEALED WITH A BEAD OF GYPROC ACOUSTIC SEALANT EITHER SIDE PARTITION 2NO. 12.5mm GYPROC MOISTURE RESISTANT WALL BOARD SCREWFIXED EITHER SIDE TO 70x50mm TREATED SW TIMBER FRAME @600 CENTRES WITH NOGGINS @600 CENTRES WALL IS FINISHED WITH A 3MM SCRATCH COAT OF TELLING UNILIT 45 FINISHED AND TILED WITH TILESTYLE SABBIA LAPPATO 300X600MM HEAD FIXING 50x70mm TREATED SW TIMBER FRAME SCREW FIXED TO 12MM OSB GYPROC ACOUSTIC SEALANT PLACED BETWEEN DOOR JAMB AND PARTITION 150X40MM WHITE OAK CHAMFERED AND PAINTED WITH A LIGHT VARNISH AND GLUE FIXED WITH EVOSTIK GRIPFILL TO PARTITION 50 70 150 40 30MIN. FIRE DOOR SOLID HARDWOOD OAK FIRE DOOR TO GIVE 30 MIN. FIRE PROTECTION. 30 MIN. INTEGRITY TOUGHENED VISION PANELS. 30 MIN. FIRE AND SMOKE INTUMESCENT STRIPS ON FRAME AND FIRE DOOR. BEHIND GYPROC SEALANT IS A 50X70MM SW TIMBER STUD SCREW FIXED EITHER SIDE WITH 2NO. 12.5mm GYPROC MOISTURE RESISTANT WALLBOARD WITH A 3mm PLASTER FINISH WALL IS FINISHED WITH A 3MM SCRATCH COAT OF TELLING UNILIT 45 AND TILED WITH TILESTYLE SABBIA LAPPATO 300X600MM 12 12.570 150 DETAIL 010 1:10 BASE FIXING 50x70mm TREATED SW TIMBER FRAME SCREW FIXED TO BASE OF PARTITION SEALED WITH A BEAD OF GYPROC ACOUSTIC SEALANT EITHER SIDE PARTITION 12.5mm GYPROC SOUNDBLOC WALLBOARD SCREWFIXED EITHER SIDE TO 70x50mm TREATED SW TIMBER FRAME @ 600 CENTRES WITH NOGGINS @ 600 CENTRES WALL IS FINISHED WITH A 3mm SKIM COAT OF TELLING UNILIT 45 FINISHED WITH A WHITE RENDER. HEAD FIXING 50x70mm TREATED SW TIMBER FRAME SCREW FIXED TO 12MM OSB GYPROC ACOUSTIC SEALANT PLACED BETWEEN DOOR JAMB AND PARTITION 150X40MM WHITE OAK CHAMFERED AND PAINTED WITH A LIGHT VARNISH AND GLUE FIXED WITH EVOSTIK GRIPFILL TO PARTITION 50 70 150 40 30MIN. FIRE DOOR SOLID HARDWOOD OAK FIRE DOOR TO GIVE 30 MIN. FIRE PROTECTION. 30 MIN. INTEGRITY TOUGHENED VISION PANELS. 30 MIN. FIRE AND SMOKE INTUMESCENT STRIPS ON FRAME AND FIRE DOOR. BEHIND GYPROC SEALANT IS A 50X70MM SW TIMBER STUD SCREW FIXED EITHER SIDE WITH 12.5mm GYPROC SOUND BLOC WALLBOARD WITH A 3mm SKIM COAT OF TELLING UNILIT 45 FINISHED WITH A WHITE RENDER. 7012.5 7012.5 70 DETAIL 009 1:10 PIVOTING DOCK DOOR STAINLESS STEEL PIVOT HINGE SECURED TO BASE OF EXISTING FLOOR AND HEAD OF DOOR FRAME DOCK DOOR CONSISTS OF 70x195mm TONGUE AND GROOVE TREATED OAK ADHESIVELY FIXED TOGETHER AND PAINTED WITH A LIGHT VARNISH 195 DOCK DOOR JAMB 80x60mm TREATED OAK DOOR STOP TONGUE AND GROOVED TO 230x80mm MULLION WITH A DRAUGHT EXCLUDER TO RUN AROUND FRAME SCREWFIXED TO TREATED HARDWOOD STUD COUNTERSUNK BOLT FIXED TO EXISTING WALL WITH A 10MM SILICONE MOVEMENT JOINT 80 60 80 230 DETAIL 008 1:10 70 50 600 195 225 100 30MIN. CONCERTINA FIRE DOOR SOLID HARDWOOD OAK CONCERTINA FIRE DOOR TO GIVE 30 MIN. FIRE PROTECTION. 30 MIN. FIRE AND SMOKE INTUMESCENT STRIPS ON FRAME AND CONCERTINA DOOR. FIRE INCHUMESCENT AND SMOKE STRIPS TO FOLLOW OPE OF ARCH 30MIN. CONCERTINA FIRE DOOR CONCERTINA DOOR SLIDES OVER A ALUMINIUM C CHANNEL GUIDED WITH A STEEL PIN FIXING FROM THE DOOR. CONCERTINA FRAME IS MADE FROM 100x80mm TREATED OAK WITH A 195x30mm OAK MULLION FIXED TO THE EXISTING OPE OF THE ARCH AND A 245x30mm OAK MULLION FIXED TO THE EXISTING WALL AND FRAME DETAIL 005 1:10 FLAT ROOF UPGRADE EXISTING ASPHALT FLAT ROOF COVERING WITH WRAP OVER PARPAET TO BE RETAINED AND REPAIRED WHERE NECESSARY ON A 20mm OAK HARD WOOD WITH EXISTING TIMBER JOISTS TO BE INSPECTED AND REPAIRED WHERE NECESSARY. 160mm GUTEX THERMOFLEX WOODFIBREBOARD INSULATION. 80mm GUTEX WOOD FIBREBOARD INSULATION ON EXISTING SURFACE OF INTERNAL WALL WITH 12.5mm GYPSUM WALL BOARD WITH A 3mm LIME PLASTER RENDER. DETAIL 004 1:5 12.5 80 580 85021512.516012.5 STAIN GLASS WINDOW UPGRADE SURFACE OF WINDOW REVEALS CLEANED WITH NON ABRASIVE CLEANER AND WATER WITH ANY LOOSE DEBRIS BEING REMOVED AND ALLOWED TO DRY CREATING A FLAT EVEN SURFACE. ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE EXISTING OPE BEHIND WINDOW HELD IN PLACE WITH A TREATED HW TIMBER WINDOW FRAME WITH A TREATED SW STUD SCREW FIXED TO FRAME TO HOLD IN PALCE AND 5mm ø DRILL HOLES ALONG TOP OF SINGLE GLAZE TO VENTILATE AND MITIGATE BUILD UP OF CONDENSATION. EXTERIOR GLAZED GUARD REPLACED WITH SINGLE GLAZED WINDOW GUARD FIXED IN PLACE AROUND OPE OF WINDOW WITH LIME PUTTY. 20mm GAP LEFT ALONG BOTTOM OF GLAZING TO VENTILATE AND MITIGATE CONDENSATION. 80mm GUTEX THERMOROOM ADHESIVELY FIXED TO INTERNAL SURFACE OF EXISTING WALL AND WINDOW REVEALS WITH A LAYER OF GUTEX KLEBE-UND SPACHTELPUTZ. 12.5mm GYPSUM WALL BOARD ADHESIVELY FIXED WITH A LAYER OF GUTEX KLEBE- UND SPACHTELPUTZ AND A 3mm SKIM COAT OF TELLING UNILIT 45 FINISHED WITH A WHITE RENDER. DETAIL 007 1:5DETAIL 006 1:5 12.5 80 580 20 79 24 SCALE (@ A1) NUMBER TITLE PROJECT NUMBER CLIENT PROJECT DRAWING NUMBER REV DRAWN BY DATE Jonathan Flanagan N/A Jonathan Flanagan 80 Gleann Rua, Renmore, Galway. DESIGNERS ADDRESS Construction Information/Workign Drawings Galway Mayo Institute of Technology CONTACT DETAILS Phone: 0830054478 Email: jflanagangti@gmail.co m G00262330 28/04/2015 28/04/201514:05:59 Chapel Details Pt. 2 1:5/1:10 GA_013 DDS4_P09
  • 14. PERMEABLE PAVING 600x50mm ROADSTONE PLAIN FLAG PAVING LAID ON 50mm SAND BLINDING ON GRAVEL BED TO COMPACTED EARTH WITH A 1:50 FALL TO SUDS +0.000M +0.300M GROUND FLOOR 20mm OAK LAMINATE FLOOR ADHESIVE BONDED TO 75MM SAND CEMENT SCREED. 150mm BALLYTHERM PIR INSULATION ACHIEVING A U-VALUE OF 0.14 W/m²K WITH A 25mm PIECE AT END OF SLAB TO PREVENT THERMAL BRIDGE. IN ACCORDANCE WITH TGD PART L 2011. MIN. 1200 GAUGE D.P.M. RADON BARRIER LAID ON TOP OF 175MM SLAB LAPPING AT STRUCTURAL UPSTAND. 50MM SAND BLINDING ON COMPACTED HARDCORE IN MAX. LAYERS OF 225mm. CURTAIN WALL SCHUCO FW60+TRIPLE GLAZED THERMALLY BROKEN ALUMINIUM GLAZING SYSTEM ACHIEVING A U- VALUE OF 0.8 W/m²K IN ACCORDANCE WITH TGD PART L 2011.ENSURE TESCON NO. 1 V.C.L TAPE IS SEALED TO MULLION AND SCREED PRO CLIMA INTELLO PLUS V.C.L. MEMBRANE LAPPED INTO MULLION AND TAPE SEALED WITH TESCON NO.1 TAPE ENSURE TYVEK BREATHER MEMBRANE IS LAPPED OVER HORIZONTAL ALUMINIUM D.P.C. WEDGED INTO MULLION 12.5 EXTERIOR WALL SVK ORNIMAT BLACK FIBRE CEMENT CLADDING PANEL AND RAIL SYSTEM FIXED BACK TO 12mm OSB SCREW FIXED TO 150x50mm TREATED SW TIMBER I JOISTS AND NOGGINS AT 600mm CENTRES. 150MM GUTEX THERMOROOM FIXED BETWEEN I JOISTS WITH A 25mm GUTEX THERMOROOM LAYER FIXED TO INTERNAL FACE OF STUD WORK MINMIMISING THERMAL BRIDGE AT I JOIST ACHIEVING A U-VALUE OF 0.11 W/m²K. IN ACCORDANCE WITH TGD PART L 2011. VERTICAL TYVEK BREATHER MEMBRANE OVERLAPS ALUMINIUM VERTICAL D.P.C. @100mm WEDGED INTO SCHUCO FW60+ MULLION. CURTAIN WALL INTERFACE 150x70mm TREATED SW TIMBER LINTELS FIXED EITHER SIDE OF 10mm STEEL FLANGE WELDED TO 10mm STEEL PLATE BOLT FIXED TO TRANSOM MIN.150 Fall 1:60 1250 12 104 40 1502521218 50 52 340 27890 15025 5050 50 225501751507520 CURTAIN WALL BASE FIXING SCHUCO FW60+ TRANSOM BOLT FIXED TO 10mm STEEL FLANGE WELDED TO 10mm STEEL PLATE BOLT FIXED TO BASE OF CONCRETE UPSTAND 68 606050 INTERIOR WALL PRO CLIMA INTELLO PLUS VAPOUR BARRIER FIXED TO FACE OF GUTEX WITH 50x25mm TREATED SW TIMBER STUDWORK TO CREATE SERVICE CAVITY WITH 12.5MM GYPSUM PLASTERBOARD FINISHED WITH A 3MM SKIM COAT AND RENDER TO ARCHITECTS SPECIFICATION. DETAIL 013 1:5 DETAIL 012 1:5 DETAIL 011 1:5 PARAPET ALUMINIUM PARAPET FORMED AROUND STEEL FRAME @600 CENTRES BOLT FIXED TO 12mm OSB AND 50x25mm TREATED SW TIMBER STUD FRAMED BOX. SVK ORNIMAT BLACK FIBRE CEMENT CLADDING PANEL AND RAIL SYSTEM FIXED BACK TO 12mm OSB SCREW FIXED TO 150x50mm TREATED SW TIMBER I JOISTS AND NOGGINS AT 600mm CENTRES. 150MM GUTEX THERMOROOM FIXED BETWEEN I JOISTS WITH A 25mm GUTEX THERMOROOM LAYER FIXED TO INTERNAL FACE OF STUD WORK MINMIMISING THERMAL BRIDGE AT I JOIST ACHIEVING A U-VALUE OF 0.11 W/m²K. IN ACCORDANCE WITH TGD PART L 2011. VERTICAL TYVEK BREATHER MEMBRANE LAPPED AROUND TREATED SW TIMBER STUD FRAME BOX FLAT ROOF SVK ORNIMAT BLACK FIBRE CEMENT CLADDING PANEL AND RAIL SYSTEM FIXED BACK TO 12mm OSB SCREW FIXED TO 150x50mm TREATED SW TIMBER I JOISTS AND NOGGINS AT 600mm CENTRES. 150MM GUTEX THERMOROOM FIXED BETWEEN I JOISTS WITH A 25mm GUTEX THERMOROOM LAYER FIXED TO INTERNAL FACE OF STUD WORK MINMIMISING THERMAL BRIDGE AT I JOIST ACHIEVING A U-VALUE OF 0.11 W/m²K. IN ACCORDANCE WITH TGD PART L 2011. VERTICAL TYVEK BREATHER MEMBRANE OVERLAPS ALUMINIUM VERTICAL D.P.C. @100mm WEDGED INTO SCHUCO FW60+ MULLION. CURTAIN WALL INTERFACE 150x70mm TREATED SW TIMBER LINTELS FIXED EITHER SIDE OF 10mm STEEL FLANGE WELDED TO 10mm STEEL PLATE BOLT FIXED TO TRANSOM EXTERIOR WALL SVK ORNIMAT BLACK FIBRE CEMENT CLADDING PANEL AND RAIL SYSTEM FIXED BACK TO 12mm OSB SCREW FIXED TO 150x50mm TREATED SW TIMBER I JOISTS AND NOGGINS AT 600mm CENTRES. 150MM GUTEX THERMOROOM FIXED BETWEEN I JOISTS WITH A 25mm GUTEX THERMOROOM LAYER FIXED TO INTERNAL FACE OF STUD WORK MINMIMISING THERMAL BRIDGE AT I JOIST ACHIEVING A U- VALUE OF 0.11 W/m²K. IN ACCORDANCE WITH TGD PART L 2011. ALUMINIUM FORMED TO STEEL FRAME PLACED BEHIND FIBRECEMENT CLADDING. ENSURE TESCON NO. 1 V.C.L TAPE SEALS INTELLO MEMBRANE TO OSB SKIRTING 150x40mm OAK CHAMFERED SKIRTING BOARD PAINTED WITH A LIGHT VARNISH AND BONDED WITH EVOSTIK GRIP FILL TO PARTITION BASE FIXING 50x70mm TREATED SW TIMBER FRAME SCREW FIXED TO BASE OF PARTITION SEALED WITH A BEAD OF GYPROC ACOUSTIC SEALANT EITHER SIDE PARTITION 2NO. 12.5mm GYPROC MOISTURE RESISTANT WALL BOARD SCREWFIXED EITHER SIDE TO 70x50mm TREATED SW TIMBER FRAME @600 CENTRES WITH NOGGINS @600 CENTRES WALL IS FINISHED WITH A 3MM SCRATCH COAT AND TILED WITH TILESTYLE SABBIA LAPPATO 300X600MM HEAD FIXING 50x70mm TREATED SW TIMBER FRAME SCREW FIXED TO 12MM OSB GYPROC ACOUSTIC SEALANT PLACED BETWEEN DOOR JAMB AND PARTITION 150X40MM WHITE OAK CHAMFERED AND PAINTED WITH A LIGHT VARNISH AND GLUE FIXED WITH EVOSTIK GRIPFILL TO PARTITION 50 70 150 12.5 40 30MIN. FIRE DOOR SOLID HARDWOOD OAK FIRE DOOR TO GIVE 30 MIN. FIRE PROTECTION. 30 MIN. INTEGRITY TOUGHENED VISION PANELS. 30 MIN. FIRE AND SMOKE INTUMESCENT STRIPS ON FRAME AND FIRE DOOR. BEHIND GYPROC SEALANT IS A 50X70MM SW TIMBER STUD SCREW FIXED EITHER SIDE WITH 2NO. 12.5mm GYPROC MOISTURE RESISTANT WALLBOARD WITH A 3mm PLASTER FINISH WALL IS FINISHED WITH A 3MM SCRATCH COAT AND TILED WITH TILESTYLE SABBIA LAPPATO 300X600MM 12 12.570 150 70 DETAIL 015 1:10 STRUCTURAL GLASS ROOF AND EXISTING WALL INTERFACE PILKINGTON 10mm PLANAR SINGLE GLAZING FIXED IN PLACE WITH PILKINGTON 905J SPIDER FIXINGS FIXED TO 100x10mm STAINLESS STEEL JOIST SECURED TO 100MM STAINLESS STEEL BEAM WITH A STAINLESS STEEL BRACE AND BOLT CONNECTION. PLANAR GLAZING WEDGED INTO 50x50MM ALUMINIUM GLAZING CHANNEL CONSISTING OF NEOPRENE GUIDES AND A SILICONE SEALANT SECURED IN EXISTING WALL WITH A 150x10mm STAINLESS STEEL PLATE WATER BAR. STRUCTURAL GLASS FIXING TO EXISTING STRUCTURE PILKINGTON 10mm PLANAR SINGLE GLAZING WITH A 10MM OPEN JOINT FIXED IN PLACE USING PILKINGTON 905J SPIDER FIXINGS FIXED TO 10mm STEEL FLANGE WELDED TO 100mm VERTICAL STEEL COLUMN PLANAR GLAZING WEDGED INTO 50x50MM ALUMINIUM GLAZING CHANNEL CONSISTING OF NEOPRENE GUIDES AND A SILICONE SEALANT SECURED IN EXISTING WALL WITH A 150x10mm STAINLESS STEEL PLATE WATER BAR. STRUCTURAL GLASS ROOF INTERMEDIATE FIXING PILKINGTON 10mm PLANAR SINGLE GLAZING WITH A 10MM SILICONE SEALED JOINT FIXED IN PLACE WITH PILKINGTON 905J SPIDER FIXINGS FIXED TO 100x10mm STAINLESS STEEL JOIST SECURED TO 100MM STAINLESS STEEL BEAM WITH A STAINLESS STEEL BRACE AND BOLT CONNECTION. 580 10 100580 109 205 100 10 10 DETAIL 016 1:10 DETAIL 017 1:10 DETAIL 018 1:10 EXTERIOR WALL SVK ORNIMAT BLACK FIBRE CEMENT CLADDING PANEL AND RAIL SYSTEM FIXED BACK TO 12mm OSB SCREW FIXED TO 150x50mm TREATED SW TIMBER I JOISTS AND NOGGINS AT 600mm CENTRES. 150MM GUTEX THERMOWALL FIXED BETWEEN I JOISTS WITH A 25mm GUTEX THERMOWALL LAYER FIXED TO INTERNAL FACE OF STUD WORK MINMIMISING THERMAL BRIDGE AT I JOIST ACHIEVING A U-VALUE OF 0.11 W/m²K. IN ACCORDANCE WITH TGD PART L 2011. VERTICAL TYVEK BREATHER MEMBRANE OVERLAPS ALUMINIUM VERTICAL D.P.C. @100mm WEDGED INTO SCHUCO FW60+ MULLION. INTERFACE BETWEEN SCHUCO GLAZING SYSTEM AND RAINSCREEN CLADDING SEALED WITH 10mm ORCON F JOINT AND 150x50mm STUD. SCHUCO ADS 65HD SINGLE DOOR WEDGED INTO SCHUCO MULLION AND TRANSOM 60 2525 SCHUCO FW60+ ALUMINIUM GLAZING SYSTEM 50251501210412 DETAIL 014 1:10 SCALE (@ A1) NUMBER TITLE PROJECT NUMBER CLIENT PROJECT DRAWING NUMBER REV DRAWN BY DATE Jonathan Flanagan N/A Jonathan Flanagan 80 Gleann Rua, Renmore, Galway. DESIGNERS ADDRESS Construction Information/Workign Drawings Galway Mayo Institute of Technology CONTACT DETAILS Phone: 0830054478 Email: jflanagangti@gmail.co m G00262330 28/04/2015 28/04/201512:16:11 Extension Details Pt. 1 1:5/1:10 GA_014 DDS4_P09
  • 15. EXTERIOR WALL SVK ORNIMAT BLACK FIBRE CEMENT CLADDING PANEL AND RAIL SYSTEM FIXED BACK TO 12mm OSB SCREW FIXED TO 150x50mm TREATED SW TIMBER I JOISTS AND NOGGINS AT 600mm CENTRES. 150MM GUTEX THERMOROOM FIXED BETWEEN I JOISTS WITH A 25mm GUTEX THERMOROOM LAYER FIXED TO INTERNAL FACE OF STUD WORK MINMIMISING THERMAL BRIDGE AT I JOIST ACHIEVING A U-VALUE OF 0.11 W/m²K. IN ACCORDANCE WITH TGD PART L 2011. VERTICAL TYVEK BREATHER MEMBRANE OVERLAPS ALUMINIUM VERTICAL D.P.C. @100mm WEDGED INTO SCHUCO FW60+ MULLION. INTERFACE BETWEEN SCHUCO GLAZING SYSTEM AND RAINSCREEN CLADDING SEALED WITH 10mm ORCON F JOINT AND 150x50mm STUD. 1210412150255013 13 50 25 150 12 104 12 278 38 60 2525 INTERIOR WALL PRO CLIMA INTELLO PLUS VAPOUR BARRIER FIXED TO FACE OF GUTEX WITH 50x25mm TREATED SW TIMBER STUDWORK TO CREATE SERVICE CAVITY WITH 12.5MM GYPSUM PLASTERBOARD FINISHED WITH A 3MM SKIM COAT AND RENDER TO ARCHITECTS SPECIFICATION. DETAIL 022 1:5 DETAIL 023 1:5 +0.300M DOOR THRESHOLD SCHUCO ADS65HD DOUBLE GLAZED ALUMINIUM DOUBLE DOOR SECURED ON CONCRETE UPSTAND SET IN BETWEEN WAVIN 100SK CHANNEL DRAIN, INSULATION AND OAK LAMINATE FLOOR. 600x50mm ROADSTONE PLAIN FLAG PAVING LAID ON 50mm SAND BLINDING. PRO CLIMA INTELLO PLUS V.C.L. MEMBRANE LAPPED INTO MULLION AND TAPE SEALED WITH TESCON NO.1 TAPE DPC LAPS OVER TYVEK @100mm AND INTO CURTAIN WALL JOINT GROUND FLOOR 20mm OAK LAMINATE FLOOR ADHESIVE BONDED TO 75MM SAND CEMENT SCREED. 150mm BALLYTHERM PIR INSULATION ACHIEVING A U-VALUE OF 0.14 W/m²K WITH A 25mm PIECE AT END OF SLAB TO PREVENT THERMAL BRIDGE. IN ACCORDANCE WITH TGD PART L 2011. MIN. 1200 GAUGE D.P.M. RADON BARRIER LAID ON TOP OF 175MM SLAB LAPPING AT STRUCTURAL UPSTAND. 50MM SAND BLINDING ON COMPACTED HARDCORE IN MAX. LAYERS OF 225mm. ENSURE PRO CLIMA INTELLO V.C.L. IS WRAPPED FROM SCREED TO DOOR SADDLE WEDGE AND SEALED WITH TESCON NO.1 V.C.L. TAPE 201507517550 5050200 50 150 12 104 122512.5 60 65 225 DETAIL 020 1:5 DETAIL 021 1:5 EXTERIOR WALL SVK ORNIMAT BLACK FIBRE CEMENT CLADDING PANEL AND RAIL SYSTEM FIXED BACK TO 12mm OSB SCREW FIXED TO 150x50mm TREATED SW TIMBER I JOISTS AND NOGGINS AT 600mm CENTRES. 150MM GUTEX THERMOROOM FIXED BETWEEN I JOISTS WITH A 25mm GUTEX THERMOROOM LAYER FIXED TO INTERNAL FACE OF STUD WORK MINMIMISING THERMAL BRIDGE AT I JOIST ACHIEVING A U- VALUE OF 0.11 W/m²K. IN ACCORDANCE WITH TGD PART L 2011. VERTICAL TYVEK BREATHER MEMBRANE OVERLAPS ALUMINIUM VERTICAL D.P.C. @100mm WEDGED INTO SCHUCO FW60+ MULLION. CURTAIN WALL DOOR INTERFACE 150x70mm TREATED SW TIMBER LINTELS FIXED EITHER SIDE OF 10mm STEEL FLANGE WELDED TO 10mm STEEL PLATE BOLT FIXED TO TRANSOM. SCHUCO ADS65HD DOUBLE GLAZED ALUMINIUM DOUBLE DOOR WEDGED INTO SCHUCO GLAZING TRANSOM 11210190 +0.300M 12 +0.000M +0.300M GROUND FLOOR 20mm ENGINEERED OAK LAMINATE FLOOR BONDED TO 75MM SAND CEMENT SCREED. 150mm BALLYTHERM PIR INSULATION ACHIEVING A U-VALUE OF 0.14 W/m²K WITH A 25mm PIECE AT END OF SLAB TO PREVENT THERMAL BRIDGE. IN ACCORDANCE WITH TGD PART L 2011. MIN. 1200 GAUGE RADON BARRIER LAID ON TOP OF 175MM SLAB LAPPING AT STRUCTURAL UPSTAND. 50MM SAND BLINDING ON COMPACTED HARDCORE IN MAX. LAYERS OF 225mm. 50 ENSURE PRO CLIMA INTELLO PLUS MEMBRANE IS SEALED TO SCREEN WITH TESCON NO. 1 TAPE V.C.L IS SEALED TO SCREED 201501755022575 DETAIL 019 13 15050 25 12 104 12 EXTERIOR WALL SVK ORNIMAT BLACK FIBRE CEMENT CLADDING PANEL AND RAIL SYSTEM FIXED BACK TO 12mm OSB SCREW FIXED TO 150x50mm TREATED SW TIMBER I JOISTS AND NOGGINS AT 600mm CENTRES. 150MM GUTEX THERMOROOM FIXED BETWEEN I JOISTS WITH A 25mm GUTEX THERMOROOM LAYER FIXED TO INTERNAL FACE OF STUD WORK MINMIMISING THERMAL BRIDGE AT I JOIST ACHIEVING A U-VALUE OF 0.11 W/m²K. IN ACCORDANCE WITH TGD PART L 2011. VERTICAL TYVEK BREATHER MEMBRANE OVERLAPS ALUMINIUM D.P.C. @100mm AND BOLT FIXED TO 12mm OSB. EXTERIOR WALL BASE FIXING 2NO. 150x50mm TREATED SW TIMBER SOUL PLATES SECURED TO CONCRETE UPSTAND WITH ANCHOR BOLT. PERMEABLE PAVING 600x50mm ROADSTONE PLAIN FLAG PAVING LAID ON 50mm SAND BLINDING ON GRAVEL BED TO COMPACTED EARTH WITH A 1:50 FALL TO SUDS PLINTH ROADSTONE LIMESTONE PAVING FLAGS FIXED BACK TO CONCRETE PLINTH WITH HALFEN STONE ANCHOR FIXINGS. +0.300M STRUCTURAL GLASS BASE FIXING PILKINGTON 10mm PLANAR SINGLE GLAZING FIXED IN PLACE WITH PILKINGTON 905J SPIDER FIXINGS BOLTED TO 100x90mm STAINLESS STEEL FLANGE WELDED TO 100mm ø STAINLESS STEEL COLUMN SET IN CONCRETE BASE SHEAR CONNECTED TO BASE WITH STAINLESS STEEL BASE PLATE SECURED WITH HOLDING DOWN BOLTS PLANAR GLAZING WEDGED INTO 50x42mm ALUMINIUM GLAZING CHANNEL CONSISTING OF NEOPRENE GUIDES AND A SILICONE SEALANT WEDGED INTO CONCRETE BASE. 600x30mm ROADSTONE LIMESTONE PAVING FLAGS ON 50mm SAND BLINDING LANDSCAPING AND DRAINAGE ACO MODULAR 125 GALVANISED STEEL DRAINAGE CHANNEL LAID AGAINST ROADSTONE LIMESTONE PAVING FLAGS FIXED BACK TO CONCRETE PLINTH WITH HALFEN STONE ANCHOR FIXINGS. PERMEABLE PAVING 50mm ROADSTONE PLAIN FLAG PAVING LAID ON 50mm SAND BLINDING ON 50mm GRAVEL TO COMPACTED EARTH WITH A 1:50 FALL TO SUDS 505050 10 5030340 100 170 42 10 250 +0.000M DETAIL 024 1:10 SCALE (@ A1) NUMBER TITLE PROJECT NUMBER CLIENT PROJECT DRAWING NUMBER REV DRAWN BY DATE Jonathan Flanagan N/A Jonathan Flanagan 80 Gleann Rua, Renmore, Galway. DESIGNERS ADDRESS Construction Information/Workign Drawings Galway Mayo Institute of Technology CONTACT DETAILS Phone: 0830054478 Email: jflanagangti@gmail.co m G00262330 28/04/2015 28/04/201512:16:29 Extension Details Pt. 2 1:5/1:10 GA_015 DDS4_P09
  • 16. Galway Mayo Institute of Technology Door Schedule Level Mark Count Fire Rating Width Height Phase Created 01 Ground Floor D-01 1 Fire Upgrade 1620 3000 Existing 01 Ground Floor D-02 1 FD 30 S 2425 2800 New Construction 01 Ground Floor D-03 1 FD 30 S 1212 2110 New Construction 01 Ground Floor D-04 1 FD 30 S 2425 2800 New Construction 01 Ground Floor D-05 1 FD 30 S 2425 2800 New Construction 01 Ground Floor D-06 1 FD 30 S 1080 2110 Existing 01 Ground Floor D-07 1 FD 30 S 1212 2110 New Construction 01 Ground Floor D-08 1 FD 30 S 1263 2110 New Construction 01 Ground Floor D-09 1 Fire Upgrade 795 2100 Existing 01 Ground Floor D-10 1 FD 30 S 1252 2110 New Construction 01 Ground Floor D-11 1 FD 30 S 2425 2800 New Construction 01 Ground Floor D-12 1 FD 30 S 2425 2800 New Construction 01 Ground Floor D-13 1 FD 30 S 2425 2800 New Construction 01 Ground Floor D-14 1 FD 30 S 2425 2800 New Construction 01 Ground Floor D-15 1 FD 30 S 1080 2110 New Construction 01 Ground Floor D-16 1 N/A 2000 2000 New Construction 02 Gallery FFL D-17 1 Fire Upgrade 970 2100 Existing 01 Ground Floor D-18 1 N/A 980 2910 New Construction 01 Ground Floor D-19 1 N/A 1927 2810 New Construction 01 Ground Floor D-21 1 N/A 1212 2110 New Construction 01 Ground Floor D-24 1 N/A 1212 2110 New Construction 01 Ground Floor D-25 1 FD 30 S 2425 2800 New Construction 01 Ground Floor D-26 1 N/A 910 1800 New Construction 01 Ground Floor D-27 1 N/A 910 1800 New Construction 01 Ground Floor D-28 1 N/A 910 1800 New Construction 01 Ground Floor D-29 1 N/A 1212 2110 New Construction 01 Ground Floor D-30 1 FD 30 S 1212 2110 New Construction 01 Ground Floor D-31 1 N/A 1212 2110 New Construction Grand total: 28 Design Detail
  • 17. Window Schedule Level Mark Description Count Width Height Phase Created 01 Ground Floor W-01 Retained & Upgraded 1 600 1680 Existing 01 Ground Floor W-02 Retained & Upgraded 1 600 1680 Existing 01 Ground Floor W-03 Retained & Upgraded 1 600 1680 Existing 01 Ground Floor W-04 Retained & Upgraded 1 600 1680 Existing 01 Ground Floor W-05 Retained & Upgraded 1 600 1680 Existing 01 Ground Floor W-06 Retained & Upgraded 1 600 1680 Existing 01 Ground Floor W-07 Retained & Upgraded 1 600 1680 Existing 01 Ground Floor W-08 Retained & Upgraded 1 600 1680 Existing 01 Ground Floor W-09 Retained & Upgraded 1 600 1680 Existing Level 1 W-10 Retained & Upgraded 1 600 1680 Existing 01 Ground Floor W-11 Retained & Upgraded 1 600 1680 Existing Level 1 W-12 Retained & Upgraded 1 600 1680 Existing 01 Ground Floor W-13 Retained & Upgraded 1 600 1680 Existing Level 1 W-14 Retained & Upgraded 1 600 1680 Existing 01 Ground Floor W-15 Retained & Upgraded 1 600 1680 Existing Level 1 W-16 Retained & Upgraded 1 600 1680 Existing 01 Ground Floor W-17 Retained & Upgraded 1 600 1680 Existing 01 Ground Floor W-18 Retained & Upgraded 1 380 1126 Existing 01 Ground Floor W-19 Retained & Upgraded 1 600 2175 Existing 01 Ground Floor W-20 Retained & Upgraded 1 1174 1650 Existing 01 Ground Floor W-21 Retained & Upgraded 1 530 2120 Existing 01 Ground Floor W-22 Retained & Upgraded 1 530 2120 Existing 01 Ground Floor W-23 Retained & Upgraded 1 530 2120 Existing 01 Ground Floor W-24 Retained & Upgraded 1 530 2120 Existing 01 Ground Floor W-25 Retained & Upgraded 1 530 2120 Existing 01 Ground Floor W-28 Retained & Upgraded 1 600 1680 Existing Chapel Flat Roof LevelW-29 Retained & Upgraded 1 1000 1500 Existing 01 Ground Floor W-30 Retained & Upgraded 1 600 1680 Existing 01 Ground Floor W-31 Retained & Upgraded 1 530 2120 Existing 01 Ground Floor W-32 Retained & Upgraded 1 530 2120 Existing 01 Ground Floor W-33 Retained & Upgraded 1 530 2120 Existing 01 Ground Floor W-34 Retained & Upgraded 1 530 2120 Existing 01 Ground Floor W-35 Retained & Upgraded 1 530 2120 Existing 01 Ground Floor W-36 Retained & Upgraded 1 530 2120 Existing 01 Ground Floor W-37 Retained & Upgraded 1 530 2120 Existing 01 Ground Floor W-38 Retained & Upgraded 1 1000 1500 Existing Chapel Flat Roof LevelW-39 Retained & Upgraded 1 1000 1500 Existing 01 Ground Floor W-40 Schüco AWS 65 1 480 470 New Construction 01 Ground Floor W-41 Schüco AWS 65 1 480 510 New Construction 01 Ground Floor W-42 Schüco AWS 65 1 480 510 New Construction 01 Ground Floor W-43 Schüco AWS 65 1 480 510 New Construction 01 Ground Floor W-44 Retained & Upgraded 1 530 2120 Existing 01 Ground Floor W-45 Retained & Upgraded 1 530 2120 Existing