This document contains a site layout plan for a proposed car park and landscaping at CCAM Main Building. It includes details such as:
- Dimensions and locations of proposed and existing structures, ramps, landscaping areas, and parking spaces.
- Accessible routes between parking, building entrances, and other site features.
- Proposed drainage including SUDS permeable paving and pipes.
- Signage, lighting, and other site details.
- A legend explaining symbols on the plan.
Produced general arrangement drawings using Revit Architecture to produce a 3D building model of Sligo Nursing College. The model hosted all the relevant building information and drawings such as plans, sections, elevations details, 3D details and renders which are required to construct the building.
INTRODUCTION
A developer has acquired a plot measuring about 43 by 21m,between Ndia kuu and thika street of old town mombasa,and has approached you
to redevelop the plot.an existing building built around 1900,was demolisjed under mysterious circumstances. The developer's intentionis to develop
a mixed urban development to maximize the potential for the site,while adhering to the concservation requirements posed by the stakeholder of oldtown
mombasa
The challenge presented by the project is in responding to the diversity of requirements in comprehensive urban development,site conditions and local
authority requirements and in achieving a sustainable design
REQUIREMENTS AND ACCOMMODATION SCHEDULE
1.commercial shop front
2.2bedroom unit
3.3bedroom units
3.club house
4.swimming pool
5.gym
6.parking
Produced general arrangement drawings using Revit Architecture to produce a 3D building model of Sligo Nursing College. The model hosted all the relevant building information and drawings such as plans, sections, elevations details, 3D details and renders which are required to construct the building.
INTRODUCTION
A developer has acquired a plot measuring about 43 by 21m,between Ndia kuu and thika street of old town mombasa,and has approached you
to redevelop the plot.an existing building built around 1900,was demolisjed under mysterious circumstances. The developer's intentionis to develop
a mixed urban development to maximize the potential for the site,while adhering to the concservation requirements posed by the stakeholder of oldtown
mombasa
The challenge presented by the project is in responding to the diversity of requirements in comprehensive urban development,site conditions and local
authority requirements and in achieving a sustainable design
REQUIREMENTS AND ACCOMMODATION SCHEDULE
1.commercial shop front
2.2bedroom unit
3.3bedroom units
3.club house
4.swimming pool
5.gym
6.parking
INTRODUCTION
A developer has acquired a plot measuring about 43 by 21m,between Ndia kuu and thika street of old town mombasa,and has approached you
to redevelop the plot.an existing building built around 1900,was demolisjed under mysterious circumstances. The developer's intentionis to develop
a mixed urban development to maximize the potential for the site,while adhering to the concservation requirements posed by the stakeholder of oldtown
mombasa
The challenge presented by the project is in responding to the diversity of requirements in comprehensive urban development,site conditions and local
authority requirements and in achieving a sustainable design
REQUIREMENTS AND ACCOMMODATION SCHEDULE
1.commercial shop front
2.2bedroom unit
3.3bedroom units
3.club house
4.swimming pool
5.gym
6.parking
2BHK, 3BHK & 4BHK Apartments for sale on Bellary Road, Bangalore at Nitesh Columbus Square
2BHK Apartments in Bangalore
Site at Bangalore
Villa Houses in Bangalore
Apartments for sale at Electronic city
For More: http://bangalore5projects.blogspot.in/2016/02/2bhk-3bhk-4bhk-apartments-for-sale-on_23.html
INTRODUCTION
In recent years,the faculty of architecture design and development has expirience a rapid increase in
population,causing a strain on its physical resources,and hence necessitating the exploration of a novel idea of
separation and design of a separate school of architecture.The new school of architectue would free space
within the existing FADD building to be used by the school ofv art and design,School of planning,and school of
real estate and construction management ,jointly used spaces such us the workshop and space 10,
environmental laboratory and exhibition spaces would continue to be used by the school of architecture.
REQUIREMENTS
1.Department of landscape architecture
2.Interior architecture
3.Conservation architecture
4.Environmental architecture
5.Housing architecture and Urban design architecture
6.meffert centre
7.lecture theatre
8.studio spaces
9. architecture Library
10.convocation rooms
Melemine Coated Door 18mm thick particle board as core Edges sealed with 2mm thick REHAU PVC, High quality German DECORATOR and Spain LAMIGRAF impregnated decor paper HPL Coated Door 18mm thick particle board as coreEdges sealed with 2mm thick REHAU PVCThe decorative sheet thickness is 0.6~0.8mm Lacquered Door18/21/25mm thick MDF as core High gloss and matt lacquer is PU lacquer Flash lacquer is PU lacquer with shiny powders Front face or both faces lacquered PVC Foil Coated Door18/21/25mm thick MDF as core Front face coated with PVC, back face coated with white melamine High quality PVC foil, mainly supplied by Renolit and Riken PP Foil Coated Door21/25mm thick MDF as core Both faces coated with PPFine wood grain, affordable and often used as the alternative of solid wood.Acrylic(PWMA) Coated Door 18mm thick particle board as core Front face coated with colored 1mm thick painted acrylic Back face laminated with ABS decor paper Edges sealed with same-color acrylic. Check all style kitchens.
INTRODUCTION
A developer has acquired a plot measuring about 43 by 21m,between Ndia kuu and thika street of old town mombasa,and has approached you
to redevelop the plot.an existing building built around 1900,was demolisjed under mysterious circumstances. The developer's intentionis to develop
a mixed urban development to maximize the potential for the site,while adhering to the concservation requirements posed by the stakeholder of oldtown
mombasa
The challenge presented by the project is in responding to the diversity of requirements in comprehensive urban development,site conditions and local
authority requirements and in achieving a sustainable design
REQUIREMENTS AND ACCOMMODATION SCHEDULE
1.commercial shop front
2.2bedroom unit
3.3bedroom units
3.club house
4.swimming pool
5.gym
6.parking
2BHK, 3BHK & 4BHK Apartments for sale on Bellary Road, Bangalore at Nitesh Columbus Square
2BHK Apartments in Bangalore
Site at Bangalore
Villa Houses in Bangalore
Apartments for sale at Electronic city
For More: http://bangalore5projects.blogspot.in/2016/02/2bhk-3bhk-4bhk-apartments-for-sale-on_23.html
INTRODUCTION
In recent years,the faculty of architecture design and development has expirience a rapid increase in
population,causing a strain on its physical resources,and hence necessitating the exploration of a novel idea of
separation and design of a separate school of architecture.The new school of architectue would free space
within the existing FADD building to be used by the school ofv art and design,School of planning,and school of
real estate and construction management ,jointly used spaces such us the workshop and space 10,
environmental laboratory and exhibition spaces would continue to be used by the school of architecture.
REQUIREMENTS
1.Department of landscape architecture
2.Interior architecture
3.Conservation architecture
4.Environmental architecture
5.Housing architecture and Urban design architecture
6.meffert centre
7.lecture theatre
8.studio spaces
9. architecture Library
10.convocation rooms
Melemine Coated Door 18mm thick particle board as core Edges sealed with 2mm thick REHAU PVC, High quality German DECORATOR and Spain LAMIGRAF impregnated decor paper HPL Coated Door 18mm thick particle board as coreEdges sealed with 2mm thick REHAU PVCThe decorative sheet thickness is 0.6~0.8mm Lacquered Door18/21/25mm thick MDF as core High gloss and matt lacquer is PU lacquer Flash lacquer is PU lacquer with shiny powders Front face or both faces lacquered PVC Foil Coated Door18/21/25mm thick MDF as core Front face coated with PVC, back face coated with white melamine High quality PVC foil, mainly supplied by Renolit and Riken PP Foil Coated Door21/25mm thick MDF as core Both faces coated with PPFine wood grain, affordable and often used as the alternative of solid wood.Acrylic(PWMA) Coated Door 18mm thick particle board as core Front face coated with colored 1mm thick painted acrylic Back face laminated with ABS decor paper Edges sealed with same-color acrylic. Check all style kitchens.
How to build a besser block wall? View this brochure and know how to. This brochure offers information about retaining wall designs and product specification.
Radiance LakeFront is built for serene, elegant living. A picturesque lake view, crisp breeze and extremely aesthetic architecture make up the ingredients of a perfect home. To add
to this LakeFront offers the convenience of a great location within the city limits perfectly situated at Karapakkam - a peaceful but integral corner of the fast developing OMR - verything from shopping malls to banks to corporate offices to educational institutions are just a stone’s throw away. Your dream house has never been more possible!
Regards,
Varun Manian
Modern apartments available in the well known suburb of Walmer, Port Elizabeth. 8th on Fordyce is a new development with great architectural features located on the corner of Fordyce and 8th Avenue Walmer, close to all major amenities.
Sydney Art Flooring provides best laminate flooring installation services at Sydney. We have five types of laminate flooring like Infinite Laminate Flooring, Oakstep Laminate Flooring, Wonderwood Premium Laminate Flooring, Wonderwood Inspire Laminate Flooring, Villeroy & Boch Laminate Flooring. For more information you can call us @ 02 9663 1360 or visit us @ http://sydneyartflooring.com.au/laminate-flooring/wonderwood-premium-laminate-flooring/.
Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element PosterJonathan Flanagan
Poster displaying the most important findings and information from the Individual Element Report for Centre for the Creative Arts and Media (CCAM) | GMIT
Technoblade The Legacy of a Minecraft Legend.Techno Merch
Technoblade, born Alex on June 1, 1999, was a legendary Minecraft YouTuber known for his sharp wit and exceptional PvP skills. Starting his channel in 2013, he gained nearly 11 million subscribers. His private battle with metastatic sarcoma ended in June 2022, but his enduring legacy continues to inspire millions.
EASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANEFebless Hernane
CapCut is an easy-to-use video editing app perfect for beginners. To start, download and open CapCut on your phone. Tap "New Project" and select the videos or photos you want to edit. You can trim clips by dragging the edges, add text by tapping "Text," and include music by selecting "Audio." Enhance your video with filters and effects from the "Effects" menu. When you're happy with your video, tap the export button to save and share it. CapCut makes video editing simple and fun for everyone!
Storytelling For The Web: Integrate Storytelling in your Design ProcessChiara Aliotta
In this slides I explain how I have used storytelling techniques to elevate websites and brands and create memorable user experiences. You can discover practical tips as I showcase the elements of good storytelling and its applied to some examples of diverse brands/projects..
Transforming Brand Perception and Boosting Profitabilityaaryangarg12
In today's digital era, the dynamics of brand perception, consumer behavior, and profitability have been profoundly reshaped by the synergy of branding, social media, and website design. This research paper investigates the transformative power of these elements in influencing how individuals perceive brands and products and how this transformation can be harnessed to drive sales and profitability for businesses.
Through an exploration of brand psychology and consumer behavior, this study sheds light on the intricate ways in which effective branding strategies, strategic social media engagement, and user-centric website design contribute to altering consumers' perceptions. We delve into the principles that underlie successful brand transformations, examining how visual identity, messaging, and storytelling can captivate and resonate with target audiences.
Methodologically, this research employs a comprehensive approach, combining qualitative and quantitative analyses. Real-world case studies illustrate the impact of branding, social media campaigns, and website redesigns on consumer perception, sales figures, and profitability. We assess the various metrics, including brand awareness, customer engagement, conversion rates, and revenue growth, to measure the effectiveness of these strategies.
The results underscore the pivotal role of cohesive branding, social media influence, and website usability in shaping positive brand perceptions, influencing consumer decisions, and ultimately bolstering sales and profitability. This paper provides actionable insights and strategic recommendations for businesses seeking to leverage branding, social media, and website design as potent tools to enhance their market position and financial success.
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page pmgdscunsri
Figma is a cloud-based design tool widely used by designers for prototyping, UI/UX design, and real-time collaboration. With features such as precision pen tools, grid system, and reusable components, Figma makes it easy for teams to work together on design projects. Its flexibility and accessibility make Figma a top choice in the digital age.
Can AI do good? at 'offtheCanvas' India HCI preludeAlan Dix
Invited talk at 'offtheCanvas' IndiaHCI prelude, 29th June 2024.
https://www.alandix.com/academic/talks/offtheCanvas-IndiaHCI2024/
The world is being changed fundamentally by AI and we are constantly faced with newspaper headlines about its harmful effects. However, there is also the potential to both ameliorate theses harms and use the new abilities of AI to transform society for the good. Can you make the difference?
Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings
1. -04.27-03.61
01
00.00
00.00
00.00
00.00
00.00
00.00
04.62
+04.62
-00.10
-00.10
00.00
DK
DK DK
3415
3510 2025
2025
2000
00.30
Slope:
1:20
SURFACE OF RAMP
AND LANDING NON-
SLIP FAIR FACED
CONCRETE
Surface of ramp and landing
slip resistant fair faced
concrete
Surface of
ramp and
landing slip
resistant fair
faced
concrete
Slope:
1:20
Sign Indicating
direction to building
Sign Indicating
direction to building
DK
-01.09
-00.45
LS
LS
LS
LS
LSLS
LS
LS
LS
LS
LS
LS
LSLSLSLSLSLS
Bus
Stop
Sign Indicating
building
-03.07
-02.42
-00.79
-00.1000.00
-00.10
-00.10
-00.10
-00.10
-00.96
00.00
-03.62
-02.98
-02.35
-01.72
1800
1800
1800
1975
Slope:
1:20
Slope:
1:20
Slope:
1:20
Slope:
1:20
Slope:
1:20
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Proposed
Car Park
Proposed Green
Area and
Landscaping
Proposed
Ramp
PROPOSED CAR PARK
CCAM Main
Entrance
Wellpark
Road
No
Access
CCAM
Main
Building
DK
Legend
0000
2025
2025
2025
-00.00
DK
ABOVE ORDINANCE
DATUM
PUBLIC LIGHT
STAND TO COMPLY
WITH ESB
STANDARDS
ACCESS ROUTE
DIMENSION LINE
EXISTING CHAPEL
STRUCTURE
EXTENSION
STRUCTURE
TACTILE SURFACE
DISHED KERBING DK
8000
PROPOSED HARD STANDING
1800
Mini
Round
about
Existing
Chapel
SUDS PERMEABLE
PAVING
SURFACE
WATER
DRAINAGE SUDS
SURFACE
WATER
DRAINAGE SUDS
MH
MH
Fall to
Centre:
1:60
Proposed
Extension
ACCESSIBLE
ENTRANCE A
ACCESSIBLE
ENTRANCE B
ACCESSIBLE
ENTRANCE C
PROPOSED
LANDSCAPING
PROPOSED RESURFACE
OF ROAD AND MARKINGS
ACCESSIBLE ROUTE FROM
CAR PARK TO ENTRANCE C
ACCESSIBLE ROUTE FROM
CAR PARK TO ENTRANCE A
ACCESSIBLE ROUTE FROM
CAR PARK TO ENTRANCE B
ROADSTONE
PAVIERS
GRASS MARGIN
GRASS MARGIN
GRASS MARGIN
GRASS MARGIN
EXISTING ROADWAY
ACCESS JUNCTION
MAN HOLE
FOUL WATER PIPE
RAIN WATER PIPE
F.F.L.
+00.30
F.F.L.
+00.30
MH
MH
MH
AJ
HOARDING LINE
SUDS 1:50 FALL TO
DRAINAGE SITE
SUDS SOAK PIT
100mm Ø RAIN WATER
PIPE LAID TO FALL 1:50
TO SUDS
100mm Ø FOUL WATER
PIPE LAID TO FALL 1:50
SetDown
Area/Hardstanding
Det.014
DK
2125
ACCESS ROUTE AND
FIRE ESCAPE
MH
AJ
LS
00.00
AJ
4025
CCAM MAIN
BUILDING
1844
1788
1500
1844
1850
2400
4800
6000
1400
4872
8000
48002050 2025
4810
2985
F.F.L.
+00.30
+00.30
13090
Fall to
Centre:
1:60
ACO 125
DRAIN
ACO 125
DRAIN
+0.000M
-0.100M
PERMEABLE PAVING
600x50mm ROADSTONE PLAIN FLAG
PAVING LAID ON 50mm SAND
BLINDING ON 50mm GRAVEL WITH A
ROADSTONE HALF BATTERED KERB
AT EDGE
PERMEABLE ROAD
25mm PERMEABLE ASPHALT
SURFACE COURSE ON 50mm
PERMEABLE BASE COURSE ON
100MM GRAVEL ON COMPACTED
EARTH
5050
10
5025100
50
DETAIL 014
1:10
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan
80 Gleann Rua,
Renmore,
Galway.
DESIGNERS ADDRESS
Construction
Information/Working Drawings
Galway Mayo Institute of
Technology
CONTACT DETAILS
Phone: 0830054478
Email:
jflanagangti@gmail.co
m
G00262330 28/04/2015
28/04/201513:08:50
Site Layout Plan
1:200
GA_001
DDS4_P09
Site Layout Plan
N
orth
1:200
GA_001
DDS4_P09
2. UP
Existing
Stairs
25285
15338
2425
26525
Legend
EXTENT OF WALL
DEMOLITION
Existing Walls
EXTENT OF DOOR
DEMOLITION
EXTENT OF STAIN
GLASS WINDOW
DEMOLITION
2909
8865
897
850
12101210
24003596
251025541494
3253
SCULPTURE
GALWAY FILM CENTRE
STAGING AREA
EXTENT OF FLOORS
DEMOLITION
19603
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan
80 Gleann Rua,
Renmore,
Galway.
DESIGNERS ADDRESS
Construction
Information/Workign Drawings
Galway Mayo Institute of
Technology
CONTACT DETAILS
Phone: 0830054478
Email:
jflanagangti@gmail.co
m
G00262330 28/04/2015
20/04/201518:29:05
Demolition Plan
1:50
GA_002
DDS4_P09
Chapel Ground Floor Plan Demolition
3. UP
UP
30.07 m²
Green Room
158 G
EXISTING VICTORIAN TILE
5.23 m²
Costume Store
154 K
EXISTING VICTORIAN TILE
5.95 m²
Costume Store
155 J
EXISTING VICTORIAN TILE
5.32 m²
Costume Store
156 I
EXISTING VICTORIAN TILE
5.74 m²
Costume Store
157 H
EXISTING VICTORIAN TILE
14.07 m²
Tech Support
161 B
EXISTING PARQUET AND TILE
14.37 m²
Prop Store
161 A
EXISTING PARQUET AND TILE
15.12 m²
Matrix Chair Store
161 C
EXISTING PARQUET AND TILE
15.69 m²
Lobby
161 M
EXISTING LIESTONE TILE
FLOOR
185.87 m²
Creative Space
161 L
EXISTING PARQUET AND
VICTORIAN TILE
A-A
678
7.08 m²
Disabled Shower/WC
161 E
SOLUS CERAMICS MODULAR
TILE R11
16.66 m²
Matrix Chair Store
161 D
EXISTING PARQUET AND TILE
25.53 m²
Changing Room
161 F
SOLUS CERAMICS MODULAR
TILE R11
1050
4260
Slope:
1:20
Modesty
Screen
2398
Legend
Demolished Walls
EXISTING DOOR TO BE
RETAINED AND
PAINTED WITH A FIRE
RESISTANT SELANT,
INCHUMESCENT STRIP
AND DOOR CLOSER
EXISTING DOOR TO BE
RETAINED AND PAINTED
WITH A FIRE RESISTANT
SELANT,
INCHUMESCENT STRIP
AND DOOR CLOSER
EXISTING PARTITIONS
TO BE DEMOLISHED
EXISTING PARTITIONS TO
BE DEMOLISHED
EXISTING DOOR TO BE
REMOVED AND
OPENING CLOSED
00.30
00.30
UPGR.
D-01
D-06
FD 30 S
D-08
FD 30 S
D-03
FD 30 S
UPGR.
D-09
Existing Walls
00.30
1263
4938
331128552855
897
00.30
00.00
008
GA_013
2500
2800
D-02
FD 30 S
D-04
FD 30 S
D-05
FD 30 S
D-11
FD 30 S
D-12
FD 30 S
D-13
FD 30 S
D-14
FD 30 S
D-16
D-15
FD 30 S
D-07
S
D-10
1200
2850
00.30
3224
3029
1770
1770
1252
1050
NEW WALL OPE
FOR FIRE DOOR
ALL EXISTING STAIN GLASS AND FRAMES RETAINED AND
REPAIRED BY USING SUITABLE CONSERVATION
TECHNOLOGIES UNLESS REMOVED IN DEMOLITION PLAN.
STAIN GLASS WINDOW REVEALS AND BORDERS TO BE
CLEANED.
ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE
EXISTING OPE BEHIND WINDOW.
EXTERIOR GLAZED GUARD REPLACED WITH SINGLE
GLAZED WINDOW GUARD. 20mm GAP LEFT ALONG
BOTTOM OF GLAZING TO VENTILATE AND MITIGATE
CONDENSATION.
ALL EXISTING STAIN GLASS AND FRAMES
RETAINED AND REPAIRED BY USING SUITABLE
CONSERVATION TECHNOLOGIES UNLESS REMOVED
IN DEMOLITION PLAN.
STAIN GLASS WINDOW REVEALS AND BORDERS TO
BE CLEANED.
ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE
EXISTING OPE BEHIND WINDOW.
EXTERIOR GLAZED GUARD REPLACED WITH
SINGLE GLAZED WINDOW GUARD. 20mm GAP LEFT
ALONG BOTTOM OF GLAZING TO VENTILATE AND
MITIGATE CONDENSATION.
ALL EXISTING STAIN GLASS AND FRAMES RETAINED AND REPAIRED BY
USING SUITABLE CONSERVATION TECHNOLOGIES UNLESS REMOVED IN
DEMOLITION PLAN.
STAIN GLASS WINDOW REVEALS AND BORDERS TO BE CLEANED.
ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE EXISTING OPE
BEHIND WINDOW.
EXTERIOR GLAZED GUARD REPLACED WITH SINGLE GLAZED WINDOW
GUARD. 20mm GAP LEFT ALONG BOTTOM OF GLAZING TO VENTILATE
AND MITIGATE CONDENSATION.
EXISTING
TEMPORARY FLOOR
REMOVED AND
PARQUET AND
VICTORIAN TILES
RETAINED AND
REFURBISHED
1010
STAGING AREA/TV STUDIO
FORBO MARMOLEUM REAL
00.30 00.30
00.30
00.3000.30
00.30
00.00
EXISTING DOOR TO
BE RETAINED AND
PAINTED WITH A FIRE
RESISTANT SELANT,
INCHUMESCENT
STRIP AND DOOR
CLOSER
W-05
W-04
W-07
W-06
W-16
W-14 W-12 W-10
W-09 W-08
W-03W-02W-01
W-18
W-20
W-17
W-11W-13W-15
W-19
EXISTING FRENCH DRAIN TO
BE REMOVED FROM
PERIMETER OF CHAPEL
BUILDING AND REPALCED
WITH PREMEABLE PAVING
DOOR GUARD RAIL
1100x1100mm
006
GA_013
010
GA_013
009
GA_013
005
GA_013
B-B
PROPOSED WALL
OPENINGS TO BE
MADE GOOD.
FINISHES TO WALLS
OF DEMOLITION
WORK TO BE MADE
GOOD WITH
APPROPRIATE FILLING
AND LIME RENDER
FINISH TO MATCH
EXISTING WALLS
FOWL WATER
DRAINAGE
RAIN WATER
DRAINAGE
PROPOSED WALL
CLOSURES TO BE
MADE GOOD.
FINISHES TO WALLS
OF DEMOLITION
WORK TO BE MADE
GOOD WITH
APPROPRIATE
FILLING AND LIME
RENDER FINISH TO
MATCH EXISTING
WALLS
450MM MINIMUM
ACTIVITY TURNING
SPACE
S
SOUNDER
EXISTING VICTORIAN TILE,
PARQUET AND THEIR ADHESIVES
TO BE REPLACED WITH SOLUS
CERAMICS MODULAR TILES AND
LAID ON A BED OF TELLING UNILIT
45 LIME
EXISTING PARQUET FLOOR TO
BE RETAINED AND CLEANED
WITH VACUUM, MOPPED WITH
ARBO CLEANER 16. 2 COATS OF
BONA HARDWAX OIL TO BE
APPLIED TO PARQUET WHEN
FULLY DRY AND BUFFED TO
FINISH
EXISTING VICTORIAN TILES TO BE
RETAINED, GROUT AND TILES TO
BE CLEANED BY VACUUM AND
MOP WITH ARBO CLEANER 16.
WHEN DRY APPLY DUPONT
STONE TECH GROUT SEALER.
BUFF FLOOR TO FINISH.
EXISTING VICTORIAN TILES TO BE
RETAINED, GROUT AND TILES TO
BE CLEANED BY VACUUM AND
MOP WITH ARBO CLEANER 16.
WHEN DRY APPLY DUPONT
STONE TECH GROUT SEALER.
BUFF FLOOR TO FINISH.
EXISTING OPE TO BE WIDENED
AND 30 MIN. FIRE DOOR
INSTALLED. TO BE PERMANENTLY
LOCKED AT ALL TIMES.
EXTENT OF PARQUET
EXTENT OF SOLUS
CERAMICS MODULAR
TILES
EXTENT OF VICTORIAN
TILES
EXTENT OF FORBO
MARMOLEUM REAL
1500
300
1850
OAK LAMINATE FLOOR
BOARDS
OAK LAMINATE FLOOR
BOARDS
OAK LAMINATE FLOOR
BOARDS
OAK LAMINATE FLOOR
BOARDS
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan
80 Gleann Rua,
Renmore,
Galway.
DESIGNERS ADDRESS
Construction
Information/Working Drawings
Galway Mayo Institute of
Technology
CONTACT DETAILS
Phone: 0830054478
Email:
jflanagangti@gmail.co
m
G00262330 28/04/2015
28/04/201513:18:37
Ground Floor Chapel Plan
1:50
GA_003
DDS4_P09
Proposed Ground Floor Chapel Plan
N
orth
Key Plan
4. DN
24.85 m²
Gallery
161 T
INACCESSIBLE
5.44 m²
Existing Stairs
?
?
B-B
A-A
846
UPGR.
D-17
EXISTING DOOR
TO BE RETAINED
AND PAINTED
WITH A FIRE
RESISTANT
SELANT. TO BE
PERMANENTLY
LOCKED AT ALL
TIMES.
EXISTING
BALUSTRADE TO
BE RETAINED
AND PAINTED
WITH A LIGHT
VARNISH
W-30
W-28
W-36W-37 W-35 W-34 W-33 W-32 W-31
W-22W-21 W-23 W-24 W-25
W-29W-39
W-38
Legend
Demolished Walls
Existing Walls
PROPOSED WALL
OPENINGS TO BE
MADE GOOD.
FINISHES TO WALLS
OF DEMOLITION
WORK TO BE MADE
GOOD WITH
APPROPRIATE FILLING
AND LIME RENDER
FINISH TO MATCH
EXISTING WALLS
FOWL WATER
DRAINAGE
RAIN WATER
DRAINAGE
PROPOSED WALL
CLOSURES TO BE
MADE GOOD.
FINISHES TO WALLS
OF DEMOLITION
WORK TO BE MADE
GOOD WITH
APPROPRIATE
FILLING AND LIME
RENDER FINISH TO
MATCH EXISTING
WALLS
450MM MINIMUM
ACTIVITY TURNING
SPACE
S
SOUNDER
EXTENT OF PARQUET
EXTENT OF SOLUS
CERAMICS MODULAR
TILES
EXTENT OF VICTORIAN
TILES
EXTENT OF FORBO
MARMOLEUM REAL
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan
80 Gleann Rua,
Renmore,
Galway.
DESIGNERS ADDRESS
Construction
Information/Working Drawings
Galway Mayo Institute of
Technology
CONTACT DETAILS
Phone: 0830054478
Email:
jflanagangti@gmail.co
m
G00262330 28/04/2015
28/04/201514:29:17
Gallery Floor Plan
1:50
GA_004
DDS4_P09
Proposed Gallery Floor Plan
N
orth
5. UP
26.74 m²
Glass Link
161 N
ROADSTONE LIMESTONE
PAVING FLAGS
6741
B-B
A-A
700
2240
4.35 m²
Lobby
WC
SOLUS CERAMICS MODULAR
TILE R11
6.25 m²
Disabled WC
161 Q
SOLUS CERAMICS MODULAR
TILE R11
3.89 m²
Lobby
WC
SOLUS CERAMICS MODULAR
TILE R11
10.61 m²
Male WC
161 S
SOLUS CERAMICS MODULAR
TILE R11
10.33 m²
Female WC
161 R
SOLUS CERAMICS MODULAR
TILE R11
16111440
2163
Slope:
1:20
00.30
00.30
00.30
00.00
1700
00.30
63.23 m²
Reception
161 P
Oak Laminate Floor
00.30
1850
D-21
N/A
D-24
N/A
D-16
N/A
1800
1500
D-18
D-19
12001200
C-C
2500
1605
OVER DOOR
HEATERS
RECESSED IN
CEILING
W-18
W-20
W-19
W-43W-42
W-41
W-40
014
GA_014
017
GA_014
GA_015
GA_014
022
015
GA_015
022
GA_015
023
18267
1500
300
100
942
1844
1200
1010
1010
10101010
790
1077
Legend
Demolished Walls
Existing Walls
PROPOSED WALL
OPENINGS TO BE
MADE GOOD.
FINISHES TO WALLS
OF DEMOLITION
WORK TO BE MADE
GOOD WITH
APPROPRIATE FILLING
AND LIME RENDER
FINISH TO MATCH
EXISTING WALLS
FOWL WATER
DRAINAGE
RAIN WATER
DRAINAGE
PROPOSED WALL
CLOSURES TO BE
MADE GOOD.
FINISHES TO WALLS
OF DEMOLITION
WORK TO BE MADE
GOOD WITH
APPROPRIATE
FILLING AND LIME
RENDER FINISH TO
MATCH EXISTING
WALLS
450MM MINIMUM
ACTIVITY TURNING
SPACE
S
SOUNDER
EXTENT OF PARQUET
EXTENT OF SOLUS
CERAMICS MODULAR
TILES
EXTENT OF VICTORIAN
TILES
EXTENT OF FORBO
MARMOLEUM REAL
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan
80 Gleann Rua,
Renmore,
Galway.
DESIGNERS ADDRESS
Disability Access Certificate
Application
Galway Mayo Institute of
Technology
CONTACT DETAILS
Phone: 0830054478
Email:
jflanagangti@gmail.co
m
G00262330 15/01/2015
28/04/201513:20:09
Ground Floor Extension Plan
1:50
GA_005
DDS4_P09
Ground Floor Extension Plan
N
orth
Key Plan
6. 00 Ground Level
0
01 Ground Floor
300
Chapel Flat Roof Level
4620
Chapel Eaves 1
7935
10 Chapel Ridge Level
11978
001
GA_012
012
GA_012
004
GA_013
003
GA_012
004
GA_013
185.87 m²
Creative Space
161 L
EXISTING PARQUET AND
VICTORIAN TILE
25.53 m²
Changing Room
161 F
SOLUS CERAMICS MODULAR
TILE R11
7.08 m²
Disabled Shower/WC
161 E
SOLUS CERAMICS MODULAR
TILE R11
30.07 m²
Green Room
158 G
EXISTING VICTORIAN TILE
3135
3135
007
GA_013
EXISTING SLATES TO BE REUSED WHERE
POSSIBLE AND REPLACEMENTS TO BE
MADE GOOD WITH RECLAIMED BANGOR
BLUE AGED SIMILAR WHERE NECESSARY.
ALL EXISTING STAIN GLASS AND FRAMES RETAINED AND
REPAIRED BY USING SUITABLE CONSERVATION TECHNOLOGIES
UNLESS REMOVED IN DEMOLITION PLAN.
STAIN GLASS WINDOW REVEALS AND BORDERS TO BE CLEANED.
ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE EXISTING OPE
BEHIND WINDOW.
EXTERIOR GLAZED GUARD REPLACED WITH SINGLE GLAZED
WINDOW GUARD. 20mm GAP LEFT ALONG BOTTOM OF GLAZING TO
VENTILATE AND MITIGATE CONDENSATION.
EXISTING STAIN GLAS WINDOW
RETAINED AND
REPAIRED/UPGRADED WITH SINGLE
GLAZE ISOTHERMAL GLAZING AND
A EXTERIOR GLAZED GUARD.
EXISTING STAIN GLAS WINDOW
RETAINED AND
REPAIRED/UPGRADED WITH SINGLE
GLAZE ISOTHERMAL GLAZING AND
A EXTERIOR GLAZED GUARD.
EXISTING STAIN GLAS WINDOW
RETAINED AND
REPAIRED/UPGRADED WITH SINGLE
GLAZE ISOTHERMAL GLAZING AND
A EXTERIOR GLAZED GUARD.
00 Ground Level
0
01 Ground Floor
300
02 Gallery FFL
4525
Chapel Eaves 1
7935
2051
016
GA_014
185.87 m²
Creative Space
161 L
EXISTING PARQUET AND
VICTORIAN TILE
24.85 m²
Gallery
161 T
INACCESSIBLE
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan
80 Gleann Rua,
Renmore,
Galway.
DESIGNERS ADDRESS
Construction
Information/Working Drawings
Galway Mayo Institute of
Technology
CONTACT DETAILS
Phone: 0830054478
Email:
jflanagangti@gmail.co
m
G00262330 28/04/2015
28/04/201513:23:37
Chapel Sections AA - BB
1:50 DDS4_P05
Section A-A
Section B-B
1:50
GA_006
DDS4_P09
7. 00 Ground Level
0
01 Ground Floor
300
Extension Parapet Level
4983
Extension Roof Level
4568
011
GA_014
019
GA_015
012
GA_014
013
GA_014
011
GA_014
ALUMINIUM PARAPET TO
EXTENSION ANODISED BLACK
SVK ORNIMAT FIBRECEMENT
RAINSCREEN CLADDING
COLOUR BLACK
SCHUCO FW60+
ALUMINIUM TRIPLE
GLAZING
3722
1:60 FALL 1:60 FALL
00 Ground Level
0
01 Ground Floor
300
Extension Parapet Level
4983
Extension Roof Level
4568
3722
3739 2500 10840
2000150
600 600600
842
1750
1100
63.23 m²
Reception
161 P
Oak Laminate Floor
6.25 m²
Disabled WC
161 Q
SOLUS CERAMICS MODULAR
TILE R11
10.33 m²
Female WC
161 R
SOLUS CERAMICS MODULAR
TILE R11
011
GA_014
019
GA_015
015
GA_014
011
GA_014
012
GA_014
013
GA_014
ALUMINIUM PARAPET TO
EXTENSION ANODISED BLACK
SVK ORNIMAT FIBRECEMENT
RAINSCREEN CLADDING
COLOUR BLACK
SCHUCO FW60+
ALUMINIUM TRIPLE
GLAZING
00 Ground Level
0
01 Ground Floor
300
Link Roof Level
4500
016
GA_014
024
GA_015
1200
26.74 m²
Glass Link
161 N
ROADSTONE LIMESTONE
PAVING FLAGS
PILKINGTON PLANAR
GLAZED WALLS AND
ROOF
1:60 FALL
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan
80 Gleann Rua,
Renmore,
Galway.
DESIGNERS ADDRESS
Construction
Information/Working Drawings
Galway Mayo Institute of
Technology
CONTACT DETAILS
Phone: 0830054478
Email:
jflanagangti@gmail.co
m
G00262330 28/04/2015
28/04/201513:24:58
Extension Sections A-A & B-B
& C-C
1:50 DDS4_P05
Section A-A
Section B-B
1:50
GA_007
DDS4_P09
Section C-C
8. 00 Ground Level
0
Chapel Eaves
7600
10 Chapel Ridge Level
11978
Extension Parapet Level
4983
550
1100
Ramps and Hand rails in
accordance with TGD
Part M 2010
SVK ORNIMAT FIBRECEMENT
RAINSCREEN CLADDING COLOUR
BLACK
ALUMINIUM PARAPET TO
EXTENSION ANODISED
BLACK
ALL EXISTING STAIN GLASS AND FRAMES
RETAINED AND REPAIRED BY USING
SUITABLE CONSERVATION
TECHNOLOGIES UNLESS REMOVED IN
DEMOLITION PLAN.
STAIN GLASS WINDOW REVEALS AND
BORDERS TO BE CLEANED.
ISOTHERMAL SINGLE GLAZED UNIT
ADDED TO THE EXISTING OPE BEHIND
WINDOW.
EXTERIOR GLAZED GUARD REPLACED
WITH SINGLE GLAZED WINDOW GUARD.
20mm GAP LEFT ALONG BOTTOM OF
GLAZING TO VENTILATE AND MITIGATE
CONDENSATION.
EXISTING WALL AND QUOIN STONES TO BE
REPAIRED AND RE-POINTED AS
NECESSARY
EXISTING WALL RENDER TO BE REPAIRED
AS NECESSARY TO EXTERIOR AT CRACKS
AND WITH SIMILAR PEBBLE DASH RENDER
EXISTING SASH WINDOW TO BE CAREFULLY
REPAIRED USING SUITABLE CONSERVATION
TECHNOLOGIES AND MATERIALS BY
SPECIALIST JOINER
Extension Roof Level
4568
EXISTING SLATES TO BE REUSED WHERE
POSSIBLE AND REPLACEMENTS TO BE MADE
GOOD WITH RECLAIMED BANGOR BLUE AGED
SIMILAR WHERE NECESSARY.
PARAPET AND
FLASHING TO BE
RETAINED,
CLEANED AND
REPAIRED AS
NECESSARY WITH
SIMILAR
1100
EXISTING DOVE COT
RETAINED AND CLEANED,
REPAIR AND REPLACE
LOUVRES AS NECESSARY
WITH SIMILAR
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan
80 Gleann Rua,
Renmore,
Galway.
DESIGNERS ADDRESS
Construction
Information/Working Drawings
Galway Mayo Institute of
Technology
CONTACT DETAILS
Phone: 0830054478
Email:
jflanagangti@gmail.co
m
G00262330 28/04/2015
28/04/201513:30:22
North Elevation
1:50
GA_008
DDS4_P09
North Elevation
North Elevation (Key)
9. 00 Ground Level
0
Chapel Flat Roof Level
4620
Chapel Eaves
7600
10 Chapel Ridge Level
11978
EXISTING WALL RENDER TO BE REPAIRED AS
NECESSARY TO EXTERIOR AT CRACKS AND
WITH SIMILAR PEBBLE DASH RENDER
ALL EXISTING STAIN GLASS AND FRAMES RETAINED AND REPAIRED BY USING
SUITABLE CONSERVATION TECHNOLOGIES UNLESS REMOVED IN DEMOLITION
PLAN.
STAIN GLASS WINDOW REVEALS AND BORDERS TO BE CLEANED.
ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE EXISTING OPE BEHIND
WINDOW.
EXTERIOR GLAZED GUARD REPLACED WITH SINGLE GLAZED WINDOW GUARD.
20mm GAP LEFT ALONG BOTTOM OF GLAZING TO VENTILATE AND MITIGATE
CONDENSATION.
EXISTING WALL AND QUOIN STONES TO BE
REPAIRED AND RE-POINTED AS NECESSARY
EXISTING RAIN WATER GOODS TO BE
REPAIRED AND RE-PAINTED AS NECESSARY
WITH SIMILAR MATERIALS AND COLOUR BY
CONSERVATION METALWORKER
BARGE TO BE RETAINED AND CLEANED WITH
JET WASHER.
EXISTING SLATES TO BE REUSED WHERE
POSSIBLE AND REPLACEMENTS TO BE MADE
GOOD WITH RECLAIMED BANGOR BLUE AGED
SIMILAR WHERE NECESSARY.
PARAPET AND FLASHING TO
BE RETAINED, CLEANED
AND REPAIRED AS
NECESSARY WITH SIMILAR
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan
80 Gleann Rua,
Renmore,
Galway.
DESIGNERS ADDRESS
Construction
Information/Working Drawings
Galway Mayo Institute of
Technology
CONTACT DETAILS
Phone: 0830054478
Email:
jflanagangti@gmail.co
m
G00262330 28/04/2015
28/04/201513:31:44
East Elevation
1:50
GA_010
DDS4_P09
East Elevation
East Elevation (Key)
10. 00 Ground Level
0
Chapel Flat Roof Level
4620
Chapel Eaves
7600
10 Chapel Ridge Level
11978
Extension Parapet Level
4983
EXISTING WALL RENDER TO BE
REPAIRED AS NECESSARY TO
EXTERIOR AT CRACKS AND WITH
SIMILAR PEBBLE DASH RENDER
ALL EXISTING STAIN GLASS AND FRAMES RETAINED AND REPAIRED BY
USING SUITABLE CONSERVATION TECHNOLOGIES UNLESS REMOVED IN
DEMOLITION PLAN.
STAIN GLASS WINDOW REVEALS AND BORDERS TO BE CLEANED.
ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE EXISTING OPE BEHIND
WINDOW.
EXTERIOR GLAZED GUARD REPLACED WITH SINGLE GLAZED WINDOW
GUARD. 20mm GAP LEFT ALONG BOTTOM OF GLAZING TO VENTILATE AND
MITIGATE CONDENSATION.
EXISTING WALL AND QUOIN STONES
TO BE REPAIRED AND RE-POINTED AS
NECESSARY WITH SIMILAR
EXISTING SLATES TO BE REUSED WHERE
POSSIBLE AND REPLACEMENTS TO BE MADE
GOOD WITH RECLAIMED BANGOR BLUE
AGED SIMILAR WHERE NECESSARY.
EXISTING DOVE COT RETAINED AND
CLEANED, REPAIR AND REPLACE
LOUVRES AS NECESSARY WITH SIMILAR
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan
80 Gleann Rua,
Renmore,
Galway.
DESIGNERS ADDRESS
Construction
Information/Working Drawings
Galway Mayo Institute of
Technology
CONTACT DETAILS
Phone: 0830054478
Email:
jflanagangti@gmail.co
m
G00262330 28/04/2015
28/04/201513:30:59
South Elevation
South Elevation
South Elevation (Key)
1:50
GA_009
DDS4_P09
11. 00 Ground Level
0
01 Ground Floor
300
Chapel Flat Roof Level
4620
Chapel Eaves 1
7935
10 Chapel Ridge Level
11978
EXISTING RAIN WATER GOODS TO
BE REPAIRED AND RE-PAINTED AS
NECESSARY WITH SIMILAR COLOUR
OF ANTI-RUST PAINT
EXISTING WALL RENDER TO BE
REPAIRED AS NECESSARY TO
EXTERIOR AT CRACKS AND WITH
SIMILAR PEBBLE DASH RENDER
ALL EXISTING STAIN GLASS AND FRAMES RETAINED AND
REPAIRED BY USING SUITABLE CONSERVATION
TECHNOLOGIES UNLESS REMOVED IN DEMOLITION PLAN.
STAIN GLASS WINDOW REVEALS AND BORDERS TO BE
CLEANED.
ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE EXISTING
OPE BEHIND WINDOW.
EXTERIOR GLAZED GUARD REPLACED WITH SINGLE GLAZED
WINDOW GUARD. 20mm GAP LEFT ALONG BOTTOM OF
GLAZING TO VENTILATE AND MITIGATE CONDENSATION.
EXISTING WALL AND QUOIN STONES
TO BE REPAIRED AND RE-POINTED
AS NECESSARY
BARGE TO BE CLEANED WITH JET WASHER.
EXISTING SLATES TO BE REUSED WHERE
POSSIBLE AND REPLACEMENTS TO BE MADE
GOOD WITH RECLAIMED BANGOR BLUE AGED
SIMILAR WHERE NECESSARY.
1100
150
300
150
300
100
950
1500
00 Ground Level
0
01 Ground Floor
300
Extension Parapet Level
4983
Link Roof Level
4500
Glass Manifestations are 50mm high and
placed at 850mm and 1400mm Above
Floor Level
Extension Roof Level
4568
2400x1200mm SVK ORNIMAT
FIBRECEMENT RAINSCREEN
CLADDING COLOUR BLACK
1200
1200
2400
600 600 1500
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan
80 Gleann Rua,
Renmore,
Galway.
DESIGNERS ADDRESS
Construction
Information/Working Drawings
Galway Mayo Institute of
Technology
CONTACT DETAILS
Phone: 0830054478
Email:
jflanagangti@gmail.co
m
G00262330 28/04/2015
28/04/201513:36:13
West Elevation
Roof PlanWest Elevation (Extension)
West Elevation (Chapel)
1:50
GA_011
DDS4_P09
West Elevation (Key)
12. RIDGE RESTORATION
EXISTING OAK KING POST TRUSS TO BE INSPECTED AND REPAIRED AS NECESSARY WITH CAST IRON
BRACING TO BE RESTORED. VOID REGION BETWEEN EXISTING OAK ROOF PURLINS.
PURLINS TO BE RESTORED AS PART OF ROOF TRUSS INSPECTION. EXISTING 125x50mm OAK RAFTERS
AT 600mm CENTRES TO BE INSPECTED AND RESTORED AS NECESSARY. 20mm EXISTING OAK CEILING
BOARDS TO BE INSPECTED AND RESTORED AS NECESSARY.
160mm GUTEX THERMOFLEX WOOF FIBREBOARD INSULATION PLACED ABOVE EXISTING OAK CEILING
WITH A LAYER OF PRO CLIMA INTELLO PLUS BREATHER MEMBRANE TAPED AT JOINTS BETWEEN SHEETS
WITH TESCON NO.1.
38x50mm SOFTWOOD COUNTER BATTENS TO ENSURE VENTILATED AIR SPACE. EXISTING SLATES TO BE
REUSED WHERE POSSIBLE AND REPLACEMENTS TO BE MADE GOOD WITH RECLAIMED BANGOR BLUE
AGED SIMILAR WHERE NECESSARY. EXISTING CLAY RIDGE TILE TO BE RETAINED.
DETAIL 002
1:5
EAVES RESTORATION
EXISTING SLATES TO BE RETAINED/RE-USED WHERE POSSIBLE AND
REPLACEMENTS TO BE MADE WITH RECALIMED BANGOR BLUE AGES SIMILAR
WHERE NECESSARY. LEAD FLASHING AT EAVES TO EXISTING CAST IRON
GUTTER TO BE INSPECTED AND REPAIRED WITH ASPHALT OVER SMALL LEAKS
AND REPLACED IN AREAS OF MAJOR DAMAGE EVIDENT. EXISTING CORNICE TO
BE CLEANED AND RETAINED. 38x50mm SOFTWOOD COUNTER BATTENS TO
ENSURE VENTILATED AIR SPACE.
PRO CLIMA INTELLO PLUS BREATHER MEMBRANE LAID ON 160mm GUTEX
THERMOFLEX WOOD FIBREBOARD INSULATION ON 20mm EXISTING OAK
CEILING BOARDS TO BE INSPECTED AND RESTORED AS NECESSARY.
EXISTING 125x50mm OAK RAFTERS AT 600mm CENTRES TO BE INSPECTED AND
RESTORED AS NECESSARY. 80mm GUTEX WOOD FIBREBOARD INSULATION ON
EXISTING SURFACE OF INTERNAL WALL WITH 12.5mm GYPSUM WALL BOARD
WITH A 3mm SKIM COAT OF TELLING UNILIT 45 FINISHED WITH A WHITE
RENDER.
DETAIL 001
1:5
+0.000M
+0.300M
INTERIOR WALL RESTORATION
SURFACE OF INTERIOR WALL CLEANED WITH NON ABRASIVE
CLEANER AND WATER WITH ANY LOOSE DEBRIS BEING
REMOVED AND ALLOWED TO DRY CREATING A FLAT EVEN
SURFACE.
ALL INTERIOR SKIRTING BOARDS TO BE CAREFULLY
REMOVED AND RE-PAINTED WITH A LIGHT VARNISH AND
BONDED TO NEW WALL SURFACE.
80mm GUTEX THERMOROOM ADHESIVELY FIXED TO INTERNAL
SURFACE OF EXISTING WALL WITH A LAYER GUTEX KLEBE-
UND SPACHTELPUTZ. 12.5mm GYPSUM WALL BOARD
ADHESIVELY FIXED WITH A LAYER OF GUTEX KLEBE-UND
SPACHTELPUTZ AND A 3mm SKIM COAT OF TELLING UNILIT 45
FINISHED WITH A WHITE RENDER.
EXISTING FLOOR BUILD UP
NOTE: THIS IS WHAT IS BELIEVED TO BE UNDER THE
FLOOR BUT CANNOT BE DETERMINED UNTIL TRIAL HOLES
ARE DUG
20mm EXISTING CLAY VICTORIAN TILE AND PARQUET FLOOR
ON 10mm SAND CEMENT ADHESIVE BEDDING ON 100mm
CONCRETE SLAB ON 365mm LAYER OF COMPACTED
RUBBLE TO COMPACTED EARTH WITH EXISTING EXTERIOR
WALL LAID 900mm DEEP FROM INTERIOR FLOOR TO A
STEPPED FOOTING WITH A WEARING COURSE OF STONE
UNDERNEATH
PERMEABLE PAVING
FRENCH DRAIN REMOVED FROM
PERIMETER OF BUILDING AND
REPLACED WITH 50mm ROADSTONE
PLAIN FLAG PAVING LAID ON 50mm
SAND BLINDING ON GRAVEL BED TO
COMPACTED EARTH WITH A 1:50
FALL TO SUDS
DETAIL 003
1:5
12.5 80 580
5050
100
3651001020
35
160
20
125
100
250
35
250
250
100
125
20
160
35
580 80 12.5
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan
80 Gleann Rua,
Renmore,
Galway.
DESIGNERS ADDRESS
Construction
Information/Working Drawings
Galway Mayo Institute of
Technology
CONTACT DETAILS
Phone: 0830054478
Email:
jflanagangti@gmail.co
m
G00262330 28/04/2015
28/04/201513:53:20
Chapel Details Pt. 1
1:5
GA_012
DDS4_P09
13. SKIRTING
150x40mm OAK CHAMFERED
SKIRTING BOARD PAINTED WITH A
LIGHT VARNISH AND BONDED WITH
EVOSTIK GRIP FILL TO PARTITION
BASE FIXING
50x70mm TREATED SW TIMBER
FRAME SCREW FIXED TO BASE OF
PARTITION SEALED WITH A BEAD
OF GYPROC ACOUSTIC SEALANT
EITHER SIDE
PARTITION
2NO. 12.5mm GYPROC MOISTURE
RESISTANT WALL BOARD
SCREWFIXED EITHER SIDE TO
70x50mm TREATED SW TIMBER
FRAME @600 CENTRES WITH
NOGGINS @600 CENTRES
WALL IS FINISHED WITH A 3MM
SCRATCH COAT OF TELLING UNILIT
45 FINISHED AND TILED WITH
TILESTYLE SABBIA LAPPATO
300X600MM
HEAD FIXING
50x70mm TREATED SW TIMBER
FRAME SCREW FIXED TO 12MM
OSB
GYPROC ACOUSTIC SEALANT
PLACED BETWEEN DOOR JAMB AND
PARTITION
150X40MM WHITE OAK
CHAMFERED AND PAINTED WITH A
LIGHT VARNISH AND GLUE FIXED
WITH EVOSTIK GRIPFILL TO
PARTITION
50
70
150
40
30MIN. FIRE DOOR
SOLID HARDWOOD OAK
FIRE DOOR TO GIVE 30 MIN. FIRE
PROTECTION. 30 MIN. INTEGRITY
TOUGHENED VISION PANELS.
30 MIN. FIRE AND SMOKE INTUMESCENT
STRIPS ON FRAME AND FIRE DOOR.
BEHIND GYPROC SEALANT IS A
50X70MM SW TIMBER STUD
SCREW FIXED EITHER SIDE WITH 2NO.
12.5mm GYPROC MOISTURE RESISTANT
WALLBOARD WITH A 3mm PLASTER
FINISH
WALL IS FINISHED WITH A 3MM
SCRATCH COAT OF TELLING UNILIT 45
AND TILED WITH TILESTYLE SABBIA
LAPPATO 300X600MM
12 12.570
150
DETAIL 010
1:10
BASE FIXING
50x70mm TREATED SW
TIMBER FRAME SCREW
FIXED TO BASE OF PARTITION
SEALED WITH A BEAD OF
GYPROC ACOUSTIC SEALANT
EITHER SIDE
PARTITION
12.5mm GYPROC SOUNDBLOC
WALLBOARD SCREWFIXED
EITHER SIDE TO 70x50mm
TREATED SW TIMBER FRAME @
600 CENTRES WITH NOGGINS @
600 CENTRES
WALL IS FINISHED WITH A 3mm
SKIM COAT OF TELLING UNILIT 45
FINISHED WITH A WHITE RENDER.
HEAD FIXING
50x70mm TREATED SW TIMBER
FRAME SCREW FIXED TO
12MM OSB
GYPROC ACOUSTIC SEALANT PLACED
BETWEEN DOOR JAMB AND
PARTITION
150X40MM WHITE OAK CHAMFERED AND
PAINTED WITH A LIGHT VARNISH AND GLUE
FIXED WITH EVOSTIK GRIPFILL TO
PARTITION
50
70
150
40
30MIN. FIRE DOOR
SOLID HARDWOOD OAK
FIRE DOOR TO GIVE 30 MIN. FIRE
PROTECTION. 30 MIN. INTEGRITY
TOUGHENED VISION PANELS.
30 MIN. FIRE AND SMOKE INTUMESCENT
STRIPS ON FRAME AND FIRE DOOR.
BEHIND GYPROC SEALANT IS A
50X70MM SW TIMBER STUD
SCREW FIXED EITHER SIDE WITH 12.5mm
GYPROC SOUND BLOC WALLBOARD WITH A
3mm SKIM COAT OF TELLING UNILIT 45
FINISHED WITH A WHITE RENDER.
7012.5
7012.5
70
DETAIL 009
1:10
PIVOTING DOCK DOOR
STAINLESS STEEL PIVOT HINGE SECURED TO BASE
OF EXISTING FLOOR AND HEAD OF DOOR FRAME
DOCK DOOR CONSISTS OF 70x195mm TONGUE AND
GROOVE TREATED OAK ADHESIVELY FIXED
TOGETHER AND PAINTED WITH A LIGHT VARNISH
195
DOCK DOOR JAMB
80x60mm TREATED OAK DOOR STOP TONGUE AND
GROOVED TO 230x80mm MULLION WITH A DRAUGHT
EXCLUDER TO RUN AROUND FRAME SCREWFIXED TO
TREATED HARDWOOD STUD COUNTERSUNK BOLT
FIXED TO EXISTING WALL WITH A 10MM SILICONE
MOVEMENT JOINT
80
60
80
230
DETAIL 008
1:10
70
50
600
195
225
100
30MIN. CONCERTINA FIRE DOOR
SOLID HARDWOOD OAK CONCERTINA FIRE
DOOR TO GIVE 30 MIN. FIRE PROTECTION.
30 MIN. FIRE AND SMOKE INTUMESCENT
STRIPS ON FRAME AND CONCERTINA
DOOR.
FIRE INCHUMESCENT AND SMOKE STRIPS
TO FOLLOW OPE OF ARCH
30MIN. CONCERTINA FIRE DOOR
CONCERTINA DOOR SLIDES OVER A
ALUMINIUM C CHANNEL GUIDED WITH A
STEEL PIN FIXING FROM THE DOOR.
CONCERTINA FRAME IS MADE FROM
100x80mm TREATED OAK WITH A 195x30mm
OAK MULLION FIXED TO THE EXISTING OPE
OF THE ARCH AND A 245x30mm OAK
MULLION FIXED TO THE EXISTING WALL AND
FRAME
DETAIL 005
1:10
FLAT ROOF UPGRADE
EXISTING ASPHALT FLAT ROOF COVERING WITH WRAP
OVER PARPAET TO BE RETAINED AND REPAIRED WHERE
NECESSARY ON A 20mm OAK HARD WOOD WITH
EXISTING TIMBER JOISTS TO BE INSPECTED AND
REPAIRED WHERE NECESSARY. 160mm GUTEX
THERMOFLEX WOODFIBREBOARD INSULATION. 80mm
GUTEX WOOD FIBREBOARD INSULATION ON EXISTING
SURFACE OF INTERNAL WALL WITH 12.5mm GYPSUM
WALL BOARD WITH A 3mm LIME PLASTER RENDER.
DETAIL 004
1:5
12.5 80 580
85021512.516012.5
STAIN GLASS WINDOW UPGRADE
SURFACE OF WINDOW REVEALS CLEANED WITH NON ABRASIVE
CLEANER AND WATER WITH ANY LOOSE DEBRIS BEING REMOVED
AND ALLOWED TO DRY CREATING A FLAT EVEN SURFACE.
ISOTHERMAL SINGLE GLAZED UNIT ADDED TO THE EXISTING OPE
BEHIND WINDOW HELD IN PLACE WITH A TREATED HW TIMBER
WINDOW FRAME WITH A TREATED SW STUD SCREW FIXED TO
FRAME TO HOLD IN PALCE AND 5mm ø DRILL HOLES ALONG TOP OF
SINGLE GLAZE TO VENTILATE AND MITIGATE BUILD UP OF
CONDENSATION.
EXTERIOR GLAZED GUARD REPLACED WITH SINGLE GLAZED
WINDOW GUARD FIXED IN PLACE AROUND OPE OF WINDOW WITH
LIME PUTTY. 20mm GAP LEFT ALONG BOTTOM OF GLAZING TO
VENTILATE AND MITIGATE CONDENSATION.
80mm GUTEX THERMOROOM ADHESIVELY FIXED TO INTERNAL
SURFACE OF EXISTING WALL AND WINDOW REVEALS WITH A
LAYER OF GUTEX KLEBE-UND SPACHTELPUTZ. 12.5mm GYPSUM
WALL BOARD ADHESIVELY FIXED WITH A LAYER OF GUTEX KLEBE-
UND SPACHTELPUTZ AND A 3mm SKIM COAT OF TELLING UNILIT 45
FINISHED WITH A WHITE RENDER.
DETAIL 007
1:5DETAIL 006
1:5
12.5 80 580
20
79 24
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan
80 Gleann Rua,
Renmore,
Galway.
DESIGNERS ADDRESS
Construction
Information/Workign Drawings
Galway Mayo Institute of
Technology
CONTACT DETAILS
Phone: 0830054478
Email:
jflanagangti@gmail.co
m
G00262330 28/04/2015
28/04/201514:05:59
Chapel Details Pt. 2
1:5/1:10
GA_013
DDS4_P09
14. PERMEABLE PAVING
600x50mm ROADSTONE PLAIN
FLAG PAVING LAID ON 50mm
SAND
BLINDING ON GRAVEL BED TO
COMPACTED EARTH WITH A 1:50
FALL TO SUDS
+0.000M
+0.300M
GROUND FLOOR
20mm OAK LAMINATE FLOOR ADHESIVE BONDED TO 75MM SAND
CEMENT SCREED.
150mm BALLYTHERM PIR INSULATION ACHIEVING A U-VALUE OF 0.14
W/m²K WITH A 25mm PIECE AT END OF SLAB TO PREVENT THERMAL
BRIDGE. IN ACCORDANCE WITH TGD PART L 2011.
MIN. 1200 GAUGE D.P.M. RADON BARRIER LAID ON TOP OF 175MM
SLAB LAPPING AT STRUCTURAL UPSTAND.
50MM SAND BLINDING ON COMPACTED HARDCORE IN MAX. LAYERS
OF 225mm.
CURTAIN WALL
SCHUCO FW60+TRIPLE GLAZED
THERMALLY BROKEN ALUMINIUM
GLAZING SYSTEM ACHIEVING A U-
VALUE OF 0.8 W/m²K IN
ACCORDANCE WITH TGD PART L
2011.ENSURE TESCON
NO. 1 V.C.L TAPE IS
SEALED TO
MULLION AND
SCREED
PRO CLIMA INTELLO PLUS V.C.L.
MEMBRANE LAPPED INTO
MULLION AND TAPE SEALED WITH
TESCON NO.1 TAPE
ENSURE TYVEK BREATHER
MEMBRANE IS LAPPED OVER
HORIZONTAL ALUMINIUM
D.P.C. WEDGED INTO
MULLION
12.5
EXTERIOR WALL
SVK ORNIMAT BLACK FIBRE CEMENT
CLADDING PANEL AND RAIL SYSTEM
FIXED BACK TO 12mm OSB SCREW FIXED
TO 150x50mm TREATED SW TIMBER I
JOISTS AND NOGGINS AT 600mm
CENTRES. 150MM GUTEX THERMOROOM
FIXED BETWEEN I JOISTS WITH A 25mm
GUTEX THERMOROOM LAYER FIXED TO
INTERNAL FACE OF STUD WORK
MINMIMISING THERMAL BRIDGE AT I JOIST
ACHIEVING A U-VALUE OF 0.11 W/m²K. IN
ACCORDANCE WITH TGD PART L 2011.
VERTICAL TYVEK BREATHER MEMBRANE
OVERLAPS ALUMINIUM VERTICAL D.P.C.
@100mm WEDGED INTO SCHUCO FW60+
MULLION.
CURTAIN WALL INTERFACE
150x70mm TREATED SW TIMBER LINTELS
FIXED EITHER SIDE OF 10mm STEEL
FLANGE WELDED TO 10mm STEEL PLATE
BOLT FIXED TO TRANSOM
MIN.150
Fall 1:60
1250 12 104
40
1502521218
50 52
340
27890
15025
5050
50
225501751507520
CURTAIN WALL BASE FIXING
SCHUCO FW60+ TRANSOM BOLT
FIXED TO 10mm STEEL FLANGE
WELDED TO 10mm STEEL PLATE
BOLT FIXED TO BASE OF
CONCRETE UPSTAND
68
606050
INTERIOR WALL
PRO CLIMA INTELLO PLUS VAPOUR BARRIER FIXED TO FACE OF
GUTEX WITH 50x25mm TREATED SW TIMBER STUDWORK TO
CREATE SERVICE CAVITY WITH 12.5MM GYPSUM PLASTERBOARD
FINISHED WITH A 3MM SKIM COAT AND RENDER TO ARCHITECTS
SPECIFICATION.
DETAIL 013
1:5
DETAIL 012
1:5
DETAIL 011
1:5
PARAPET
ALUMINIUM PARAPET FORMED AROUND
STEEL FRAME @600 CENTRES BOLT FIXED
TO 12mm OSB AND 50x25mm TREATED SW
TIMBER STUD FRAMED BOX.
SVK ORNIMAT BLACK FIBRE CEMENT
CLADDING PANEL AND RAIL SYSTEM FIXED
BACK TO 12mm OSB SCREW FIXED TO
150x50mm TREATED SW TIMBER I JOISTS
AND NOGGINS AT 600mm CENTRES. 150MM
GUTEX THERMOROOM FIXED BETWEEN I
JOISTS WITH A 25mm GUTEX
THERMOROOM LAYER FIXED TO INTERNAL
FACE OF STUD WORK MINMIMISING
THERMAL BRIDGE AT I JOIST ACHIEVING A
U-VALUE OF 0.11 W/m²K. IN ACCORDANCE
WITH TGD PART L 2011.
VERTICAL TYVEK BREATHER MEMBRANE
LAPPED AROUND TREATED SW TIMBER
STUD FRAME BOX
FLAT ROOF
SVK ORNIMAT BLACK FIBRE CEMENT CLADDING PANEL AND RAIL
SYSTEM FIXED BACK TO 12mm OSB SCREW FIXED TO 150x50mm
TREATED SW TIMBER I JOISTS AND NOGGINS AT 600mm CENTRES.
150MM GUTEX THERMOROOM FIXED BETWEEN I JOISTS WITH A
25mm GUTEX THERMOROOM LAYER FIXED TO INTERNAL FACE OF
STUD WORK MINMIMISING THERMAL BRIDGE AT I JOIST ACHIEVING A
U-VALUE OF 0.11 W/m²K. IN ACCORDANCE WITH TGD PART L 2011.
VERTICAL TYVEK BREATHER MEMBRANE OVERLAPS ALUMINIUM
VERTICAL D.P.C. @100mm WEDGED INTO SCHUCO FW60+ MULLION.
CURTAIN WALL INTERFACE
150x70mm TREATED SW TIMBER LINTELS FIXED EITHER SIDE OF
10mm STEEL FLANGE WELDED TO 10mm STEEL PLATE BOLT FIXED
TO TRANSOM
EXTERIOR WALL
SVK ORNIMAT BLACK FIBRE CEMENT
CLADDING PANEL AND RAIL SYSTEM
FIXED BACK TO 12mm OSB SCREW
FIXED TO 150x50mm TREATED SW
TIMBER I JOISTS AND NOGGINS AT
600mm CENTRES. 150MM GUTEX
THERMOROOM FIXED BETWEEN I JOISTS
WITH A 25mm GUTEX THERMOROOM
LAYER FIXED TO INTERNAL FACE OF
STUD WORK MINMIMISING THERMAL
BRIDGE AT I JOIST ACHIEVING A U-
VALUE OF 0.11 W/m²K. IN ACCORDANCE
WITH TGD PART L 2011.
ALUMINIUM FORMED TO STEEL FRAME
PLACED BEHIND FIBRECEMENT
CLADDING.
ENSURE TESCON NO. 1
V.C.L TAPE SEALS
INTELLO MEMBRANE
TO OSB
SKIRTING
150x40mm OAK CHAMFERED
SKIRTING BOARD PAINTED WITH
A LIGHT VARNISH AND BONDED
WITH EVOSTIK GRIP FILL TO
PARTITION
BASE FIXING
50x70mm TREATED SW TIMBER
FRAME SCREW FIXED TO BASE
OF PARTITION SEALED WITH A
BEAD OF GYPROC ACOUSTIC
SEALANT EITHER SIDE
PARTITION
2NO. 12.5mm GYPROC MOISTURE
RESISTANT WALL BOARD
SCREWFIXED EITHER SIDE TO
70x50mm TREATED SW TIMBER
FRAME @600 CENTRES WITH
NOGGINS @600 CENTRES
WALL IS FINISHED WITH A 3MM
SCRATCH COAT AND TILED WITH
TILESTYLE SABBIA LAPPATO
300X600MM
HEAD FIXING
50x70mm TREATED SW TIMBER
FRAME SCREW FIXED TO 12MM
OSB
GYPROC ACOUSTIC
SEALANT PLACED
BETWEEN DOOR JAMB
AND PARTITION
150X40MM WHITE OAK
CHAMFERED AND
PAINTED WITH A LIGHT
VARNISH AND GLUE FIXED
WITH EVOSTIK GRIPFILL
TO PARTITION
50
70
150
12.5
40
30MIN. FIRE DOOR
SOLID HARDWOOD OAK
FIRE DOOR TO GIVE 30 MIN. FIRE
PROTECTION. 30 MIN. INTEGRITY
TOUGHENED VISION PANELS.
30 MIN. FIRE AND SMOKE
INTUMESCENT STRIPS ON FRAME
AND FIRE DOOR.
BEHIND GYPROC SEALANT IS A
50X70MM SW TIMBER STUD
SCREW FIXED EITHER SIDE WITH
2NO. 12.5mm GYPROC MOISTURE
RESISTANT WALLBOARD WITH A
3mm PLASTER FINISH
WALL IS FINISHED WITH A 3MM
SCRATCH COAT AND TILED WITH
TILESTYLE SABBIA LAPPATO
300X600MM 12 12.570
150
70
DETAIL 015
1:10
STRUCTURAL GLASS ROOF AND EXISTING WALL INTERFACE
PILKINGTON 10mm PLANAR SINGLE GLAZING FIXED IN PLACE
WITH PILKINGTON 905J SPIDER FIXINGS FIXED TO 100x10mm
STAINLESS STEEL JOIST SECURED TO 100MM STAINLESS
STEEL BEAM WITH A STAINLESS STEEL BRACE AND BOLT
CONNECTION.
PLANAR GLAZING WEDGED INTO 50x50MM ALUMINIUM GLAZING
CHANNEL CONSISTING OF NEOPRENE GUIDES AND A SILICONE
SEALANT SECURED IN EXISTING WALL WITH A 150x10mm
STAINLESS STEEL PLATE WATER BAR.
STRUCTURAL GLASS FIXING TO EXISTING STRUCTURE
PILKINGTON 10mm PLANAR SINGLE GLAZING WITH A 10MM OPEN JOINT
FIXED IN PLACE USING PILKINGTON 905J SPIDER FIXINGS FIXED TO
10mm STEEL FLANGE WELDED TO 100mm VERTICAL STEEL COLUMN
PLANAR GLAZING WEDGED INTO 50x50MM ALUMINIUM GLAZING
CHANNEL CONSISTING OF NEOPRENE GUIDES AND A SILICONE
SEALANT SECURED IN EXISTING WALL WITH A 150x10mm STAINLESS
STEEL PLATE WATER BAR.
STRUCTURAL GLASS ROOF INTERMEDIATE FIXING
PILKINGTON 10mm PLANAR SINGLE GLAZING WITH A
10MM SILICONE SEALED JOINT FIXED IN PLACE
WITH PILKINGTON 905J SPIDER FIXINGS FIXED TO
100x10mm STAINLESS STEEL JOIST SECURED TO
100MM STAINLESS STEEL BEAM WITH A STAINLESS
STEEL BRACE AND BOLT CONNECTION.
580
10
100580 109
205
100
10
10
DETAIL 016
1:10
DETAIL 017
1:10
DETAIL 018
1:10
EXTERIOR WALL
SVK ORNIMAT BLACK FIBRE CEMENT CLADDING PANEL AND RAIL
SYSTEM FIXED BACK TO 12mm OSB SCREW FIXED TO 150x50mm
TREATED SW TIMBER I JOISTS AND NOGGINS AT 600mm CENTRES.
150MM GUTEX THERMOWALL FIXED BETWEEN I JOISTS WITH A
25mm GUTEX THERMOWALL LAYER FIXED TO INTERNAL FACE OF
STUD WORK MINMIMISING THERMAL BRIDGE AT I JOIST ACHIEVING
A U-VALUE OF 0.11 W/m²K. IN ACCORDANCE WITH TGD PART L 2011.
VERTICAL TYVEK BREATHER MEMBRANE OVERLAPS ALUMINIUM
VERTICAL D.P.C. @100mm WEDGED INTO SCHUCO FW60+ MULLION.
INTERFACE BETWEEN SCHUCO GLAZING SYSTEM AND
RAINSCREEN CLADDING SEALED WITH 10mm ORCON F JOINT AND
150x50mm STUD.
SCHUCO ADS 65HD SINGLE DOOR WEDGED INTO SCHUCO MULLION
AND TRANSOM
60
2525
SCHUCO FW60+ ALUMINIUM
GLAZING SYSTEM
50251501210412
DETAIL 014
1:10
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan
80 Gleann Rua,
Renmore,
Galway.
DESIGNERS ADDRESS
Construction
Information/Workign Drawings
Galway Mayo Institute of
Technology
CONTACT DETAILS
Phone: 0830054478
Email:
jflanagangti@gmail.co
m
G00262330 28/04/2015
28/04/201512:16:11
Extension Details Pt. 1
1:5/1:10
GA_014
DDS4_P09
15. EXTERIOR WALL
SVK ORNIMAT BLACK FIBRE CEMENT CLADDING PANEL AND RAIL SYSTEM FIXED BACK TO 12mm OSB SCREW FIXED TO
150x50mm TREATED SW TIMBER I JOISTS AND NOGGINS AT 600mm CENTRES. 150MM GUTEX THERMOROOM FIXED
BETWEEN I JOISTS WITH A 25mm GUTEX THERMOROOM LAYER FIXED TO INTERNAL FACE OF STUD WORK
MINMIMISING THERMAL BRIDGE AT I JOIST ACHIEVING A U-VALUE OF 0.11 W/m²K. IN ACCORDANCE WITH TGD PART L
2011.
VERTICAL TYVEK BREATHER MEMBRANE OVERLAPS ALUMINIUM VERTICAL D.P.C. @100mm WEDGED INTO SCHUCO
FW60+ MULLION.
INTERFACE BETWEEN SCHUCO GLAZING SYSTEM AND RAINSCREEN CLADDING SEALED WITH 10mm ORCON F JOINT
AND 150x50mm STUD.
1210412150255013
13 50 25 150 12 104 12
278
38
60
2525
INTERIOR WALL
PRO CLIMA INTELLO PLUS VAPOUR BARRIER FIXED TO FACE OF
GUTEX WITH 50x25mm TREATED SW TIMBER STUDWORK TO
CREATE SERVICE CAVITY WITH 12.5MM GYPSUM PLASTERBOARD
FINISHED WITH A 3MM SKIM COAT AND RENDER TO ARCHITECTS
SPECIFICATION.
DETAIL 022
1:5
DETAIL 023
1:5
+0.300M
DOOR THRESHOLD
SCHUCO ADS65HD DOUBLE GLAZED ALUMINIUM DOUBLE DOOR
SECURED ON CONCRETE UPSTAND SET IN BETWEEN WAVIN 100SK
CHANNEL DRAIN, INSULATION AND OAK LAMINATE FLOOR.
600x50mm ROADSTONE PLAIN FLAG PAVING LAID ON 50mm SAND
BLINDING.
PRO CLIMA INTELLO PLUS V.C.L.
MEMBRANE LAPPED INTO
MULLION AND TAPE SEALED WITH
TESCON NO.1 TAPE
DPC LAPS OVER
TYVEK @100mm AND
INTO CURTAIN WALL
JOINT
GROUND FLOOR
20mm OAK LAMINATE FLOOR ADHESIVE BONDED TO 75MM SAND
CEMENT SCREED.
150mm BALLYTHERM PIR INSULATION ACHIEVING A U-VALUE OF 0.14
W/m²K WITH A 25mm PIECE AT END OF SLAB TO PREVENT THERMAL
BRIDGE. IN ACCORDANCE WITH TGD PART L 2011.
MIN. 1200 GAUGE D.P.M. RADON BARRIER LAID ON TOP OF 175MM
SLAB LAPPING AT STRUCTURAL UPSTAND.
50MM SAND BLINDING ON COMPACTED HARDCORE IN MAX. LAYERS
OF 225mm.
ENSURE PRO CLIMA INTELLO V.C.L. IS
WRAPPED FROM SCREED TO DOOR
SADDLE WEDGE AND SEALED WITH
TESCON NO.1 V.C.L. TAPE
201507517550
5050200
50 150 12 104 122512.5
60
65
225
DETAIL 020
1:5
DETAIL 021
1:5
EXTERIOR WALL
SVK ORNIMAT BLACK FIBRE CEMENT CLADDING PANEL AND RAIL
SYSTEM FIXED BACK TO 12mm OSB SCREW FIXED TO 150x50mm
TREATED SW TIMBER I JOISTS AND NOGGINS AT 600mm CENTRES.
150MM GUTEX THERMOROOM FIXED BETWEEN I JOISTS WITH A 25mm
GUTEX THERMOROOM LAYER FIXED TO INTERNAL FACE OF STUD
WORK MINMIMISING THERMAL BRIDGE AT I JOIST ACHIEVING A U-
VALUE OF 0.11 W/m²K. IN ACCORDANCE WITH TGD PART L 2011.
VERTICAL TYVEK BREATHER MEMBRANE OVERLAPS ALUMINIUM
VERTICAL D.P.C. @100mm WEDGED INTO SCHUCO FW60+ MULLION.
CURTAIN WALL DOOR INTERFACE
150x70mm TREATED SW TIMBER LINTELS FIXED EITHER SIDE OF 10mm
STEEL FLANGE WELDED TO 10mm STEEL PLATE BOLT FIXED TO
TRANSOM. SCHUCO ADS65HD DOUBLE GLAZED ALUMINIUM DOUBLE
DOOR WEDGED INTO SCHUCO GLAZING TRANSOM
11210190
+0.300M
12
+0.000M
+0.300M
GROUND FLOOR
20mm ENGINEERED OAK LAMINATE FLOOR BONDED TO 75MM
SAND CEMENT SCREED.
150mm BALLYTHERM PIR INSULATION ACHIEVING A U-VALUE OF
0.14 W/m²K WITH A 25mm PIECE AT END OF SLAB TO PREVENT
THERMAL BRIDGE. IN ACCORDANCE WITH TGD PART L 2011.
MIN. 1200 GAUGE RADON BARRIER LAID ON TOP OF 175MM SLAB
LAPPING AT STRUCTURAL UPSTAND.
50MM SAND BLINDING ON COMPACTED HARDCORE IN MAX.
LAYERS OF 225mm.
50
ENSURE PRO CLIMA
INTELLO PLUS
MEMBRANE IS
SEALED TO SCREEN
WITH TESCON NO. 1
TAPE V.C.L IS
SEALED TO SCREED
201501755022575
DETAIL 019
13 15050 25 12 104 12 EXTERIOR WALL
SVK ORNIMAT BLACK FIBRE CEMENT
CLADDING PANEL AND RAIL SYSTEM FIXED
BACK TO 12mm OSB SCREW FIXED TO
150x50mm TREATED SW TIMBER I JOISTS AND
NOGGINS AT 600mm CENTRES. 150MM GUTEX
THERMOROOM FIXED BETWEEN I JOISTS
WITH A 25mm GUTEX THERMOROOM LAYER
FIXED TO INTERNAL FACE OF STUD WORK
MINMIMISING THERMAL BRIDGE AT I JOIST
ACHIEVING A U-VALUE OF 0.11 W/m²K. IN
ACCORDANCE WITH TGD PART L 2011.
VERTICAL TYVEK BREATHER MEMBRANE
OVERLAPS ALUMINIUM D.P.C. @100mm AND
BOLT FIXED TO 12mm OSB.
EXTERIOR WALL BASE FIXING
2NO. 150x50mm TREATED SW TIMBER SOUL
PLATES SECURED TO CONCRETE UPSTAND
WITH ANCHOR BOLT.
PERMEABLE PAVING
600x50mm ROADSTONE PLAIN FLAG
PAVING LAID ON 50mm SAND
BLINDING ON GRAVEL BED TO
COMPACTED EARTH WITH A 1:50 FALL TO
SUDS
PLINTH
ROADSTONE LIMESTONE PAVING FLAGS
FIXED BACK TO CONCRETE PLINTH WITH
HALFEN STONE ANCHOR FIXINGS.
+0.300M
STRUCTURAL GLASS BASE FIXING
PILKINGTON 10mm PLANAR SINGLE GLAZING FIXED IN PLACE WITH
PILKINGTON 905J SPIDER FIXINGS BOLTED TO 100x90mm STAINLESS
STEEL FLANGE WELDED TO 100mm ø STAINLESS STEEL COLUMN SET
IN CONCRETE BASE SHEAR CONNECTED TO BASE WITH STAINLESS
STEEL BASE PLATE SECURED WITH HOLDING DOWN BOLTS
PLANAR GLAZING WEDGED INTO 50x42mm ALUMINIUM GLAZING
CHANNEL CONSISTING OF NEOPRENE GUIDES AND A SILICONE
SEALANT WEDGED INTO CONCRETE BASE.
600x30mm ROADSTONE LIMESTONE PAVING FLAGS ON 50mm SAND
BLINDING
LANDSCAPING AND DRAINAGE
ACO MODULAR 125 GALVANISED STEEL DRAINAGE
CHANNEL LAID AGAINST ROADSTONE LIMESTONE
PAVING FLAGS FIXED BACK TO CONCRETE PLINTH
WITH HALFEN STONE ANCHOR FIXINGS.
PERMEABLE PAVING
50mm ROADSTONE PLAIN FLAG PAVING LAID ON
50mm SAND
BLINDING ON 50mm GRAVEL TO COMPACTED EARTH
WITH A 1:50 FALL TO SUDS
505050
10
5030340
100
170
42
10
250
+0.000M
DETAIL 024
1:10
SCALE (@ A1)
NUMBER
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
Jonathan Flanagan
N/A
Jonathan Flanagan
80 Gleann Rua,
Renmore,
Galway.
DESIGNERS ADDRESS
Construction
Information/Workign Drawings
Galway Mayo Institute of
Technology
CONTACT DETAILS
Phone: 0830054478
Email:
jflanagangti@gmail.co
m
G00262330 28/04/2015
28/04/201512:16:29
Extension Details Pt. 2
1:5/1:10
GA_015
DDS4_P09
16. Galway Mayo Institute of Technology
Door Schedule
Level Mark Count Fire Rating Width Height Phase Created
01 Ground Floor D-01 1 Fire Upgrade 1620 3000 Existing
01 Ground Floor D-02 1 FD 30 S 2425 2800 New Construction
01 Ground Floor D-03 1 FD 30 S 1212 2110 New Construction
01 Ground Floor D-04 1 FD 30 S 2425 2800 New Construction
01 Ground Floor D-05 1 FD 30 S 2425 2800 New Construction
01 Ground Floor D-06 1 FD 30 S 1080 2110 Existing
01 Ground Floor D-07 1 FD 30 S 1212 2110 New Construction
01 Ground Floor D-08 1 FD 30 S 1263 2110 New Construction
01 Ground Floor D-09 1 Fire Upgrade 795 2100 Existing
01 Ground Floor D-10 1 FD 30 S 1252 2110 New Construction
01 Ground Floor D-11 1 FD 30 S 2425 2800 New Construction
01 Ground Floor D-12 1 FD 30 S 2425 2800 New Construction
01 Ground Floor D-13 1 FD 30 S 2425 2800 New Construction
01 Ground Floor D-14 1 FD 30 S 2425 2800 New Construction
01 Ground Floor D-15 1 FD 30 S 1080 2110 New Construction
01 Ground Floor D-16 1 N/A 2000 2000 New Construction
02 Gallery FFL D-17 1 Fire Upgrade 970 2100 Existing
01 Ground Floor D-18 1 N/A 980 2910 New Construction
01 Ground Floor D-19 1 N/A 1927 2810 New Construction
01 Ground Floor D-21 1 N/A 1212 2110 New Construction
01 Ground Floor D-24 1 N/A 1212 2110 New Construction
01 Ground Floor D-25 1 FD 30 S 2425 2800 New Construction
01 Ground Floor D-26 1 N/A 910 1800 New Construction
01 Ground Floor D-27 1 N/A 910 1800 New Construction
01 Ground Floor D-28 1 N/A 910 1800 New Construction
01 Ground Floor D-29 1 N/A 1212 2110 New Construction
01 Ground Floor D-30 1 FD 30 S 1212 2110 New Construction
01 Ground Floor D-31 1 N/A 1212 2110 New Construction
Grand total: 28
Design Detail