2. 2015 Q1-2016 Q1: STARTING UP!
• Figuring out what to do!
– Numbers game, meet and greet and identify opportunities
– Community Engagement
• A Handful of projects completed
– Lightning Design for a Defence fuel storage facility
– Hazardous Area Classification for Industrial Fuel Storage Facility
– Support Mackay Projects
– Earthing Design for Electrical Contractor
– Injection Testing at a Mine Site
• Identifying future project opportunities
– Utilities: Power Water Corporation, Territory Generation
– Private Developers: The Greeks and Chinese
– Oil & Gas: Inpex & Conoco Phillips
– Defence Projects
– Mining: Crocodile Gold, Mt Todd, Tanami, ERA
– Electrical Contractors Support
3. 2016 Q2 TO Q3: STILL LEARNING
• Continue to network & Community Engagement
– Engineers Australia
– Petroleum Club
– FutureNet
– Consult Australia
– Business of Commerce
– Darwin Mineral Club
• Negotiating Opportunities:
– Territory Generation Arc Flash Studies
– Inpex Support
4. 2016 Q4 TO 2017 Q2: WE’RE DOING
ALRIGHT!• Won our first major contract in NT!
– Territory Generation Arc Flash Project
• Arc Flash Studies for 5 Power Stations (CIPS, KPS,WPS, RGPS, KCPS)
• 2 more Power Studies on the horizon Owen Springs and Tennant Creek
• Successfully signed on as a LTSC for the Inpex Project
– Ventia OPS-1The Ninja’s/Swat team of the project
• Earthing Design
• Switchboard Designs
• Cable Calculations
• Engaged by Power Water Corporation Remote Operations Team
– Community Projects Capital Support
• And Others!
Above justified for a additional resource!
5. 2017 Q3 – 2018 Q4: WHAT DIDN’T WE DO?
• Projects engaged:
• New Palmerston Regional Hospital
– Technical Support
– Protection Study (Boyd to provide Summary of Learnings)
– HV Audit
– Network Installation
• Inpex Projects
– Temporary Power Plant Power Study and Earthing (24MW Diesel Generation)
– Ventia Ops-1 Site Support
– Temporary Power Plant 2: Harmonic Study, Dynamic Study, Protection Coordination
• Defence Projects
– RAAF Base Tindal Protection Study
– Earthing Designs and Testing
– HV Audit
• PWC Remote Community Site Support
• PWC Water Services Engineering Support and Drafting
6. 2018 Q4 AND BEYOND
• Core Goals:
– Recruit additional resources (Would like a team of 3-5 by 2019 Q4)
– Core Clients to Maintain
• Inpex ongoing support
• PWC Networks Support
• Territory Generation Technical Support
• Defence
• Public Housing
• Mining
• Moon Shots:
International Opportunities: Shenzhen