Catena ® Launch


At OpEx, we not only provide tools, but
solutions that move you into lasting
business improvement.
Catena® Launch from OpEx, is a project-in-a-box package
that presents a low-cost, low-risk solution for organizations
or individuals looking to develop their process improvement
skills and start a journey of change. This package contains a
single license copy of Catena® and a Sony camcorder, along
with everything you need to connect the system and get it
up and running. You’ll also receive 24 hours of e-Training
provided by one of OpEx’s process improvement specialists.

You pay only $3,000 for the Catena® Launch package, but
you’ll make all that back – and probably more – with cost
savings related to your first project that utilizes the OpEx
system. We have so much confidence in Catena® Launch, it
comes with a complete money-back guarantee.

Catena® is a powerful software system that supports process
improvement projects and drives continuous improvement.
It was developed by our process improvement specialists, not
software designers or computer programmers. Therefore, it is
user friendly, with both line managers and change experts able
to learn the system quickly and use its intuitive interface to
achieve immediate positive results.

Catena® allows you to take video footage of your processes in ac-
tion to analyze them in detail. The many built-in analytical tools
aid you in your process improvement projects, including activ-
ity analysis, project management, line balancing, and resource /
capacity planning.

                                                                     Our step-by-step process is broken into 12 interactive modules
                                                                     that take you from where you are today to where you want to
                                                                     be tomorrow.

                                                                     The Catena® Launch Training was designed using a “Learn Do”
                                                                     approach. This enables you to successfully implement changes
                                                                     that recover the cost of our system with the first improvements
                                                                     you make, guaranteed!

                                                                     Basic Class Format: Live web-based lecture topics, with appli-
                                                                     cation exercises and case studies. Each module builds on the
                                                                     previous one. Virtual instruction will be followed by homework
                                                                     assignments for each attendee within the context of their self-
                                                                     chosen improvement project.


                                                 “Improving organizations
                                                   one process at a time”

    810 E. Jackson Street • Medford, OR 97504 • 877- 412- 0888 • 541- 362-3726 • www.OpExSG.com
Modules

Module 1 - Introduction to Catena® Improvement System              Principles:   A Value Stream Approach, 7 Wastes
and Selecting an Improvement Area                                  Tools:        VSM (Value Stream Mapping), Prioritization
Summary: Students will become acquainted with Catena®.                           Matrix
They will learn how to select a high impact area or value          Homework:     Chose a Project, Complete a Value Stream Map,
stream in their organization for improvement. Once                               Demand Data, Voice of Customer
selected this area will serve as the focal point of their “Learn
DO” training experience and will be the first area where           Handouts:     Presentation Slides, Worksheets, Software
improvements will occur.                                                         Templates and Examples


Module 2 - Demand Analysis/ Group technology                       Principles:   Customer-centered processes, TAKT Time,
(PQ Analysis)                                                                    Product families, Pareto analysis, Group
Summary: This module helps students understand what                              Technology
customers require and how to set the pace. Students learn          Tools:        PQ Analysis, Video Analysis Matrix
the importance of identifying customer demands and laying          Homework:     Build a PQ Analysis, Calculate TAKT Time
the proper foundation for all of the principles that will be
applied throughout the program.                                    Handouts:     Presentation Slides, Software Templates


Module 3 - Analyzing Your Delivery Systems                         Principles:   7 Wastes, One Piece Flow, FIFO, Visual
Summary: Once you understand the needs of customers,                             Management Controls, Right Sized
you learn how to create value in new ways. In this module          Tools:        Process Flow analysis, Point to Point, Project
students are instructed on the precision involved in detailed                    Management Toolkit
second-by-second analysis and exactly what it means to             Homework:     Process Flow Analysis, Point to Point, Complete 1st
eliminate waste from a process.                                                  Task Management Sheet, Base Condition Photos
                                                                   Handouts:     Presentation Slides, Example Analysis


Module 4 - Layout Design                                           Principles:   Isolated Islands, Customizable Flexibility, Balanced
Summary: With base condition processes analyzed for                              Distribution of Work, Right Sized Equipment,
waste, a vision for the new process begins to emerge and a                       Cell Design (reasons for cell configurations)
new design must be created to support the improved value           Tools:        Equipment List, Layout Template, PQ Analysis,
delivery system. This module introduces layout principles                        Prioritization Matrix, OpEx Problem Solving
and guides students in preparing a detailed layout design for                    System
their project area.                                                Homework:     Develop Layout
                                                                   Handouts:     Presentation Slides, Example Process Flow Analysis


Module 5                                                           Principles:   Visual Management, Balanced Distribution of
Summary: Workstation Design Analysis – Activity Analysis                         Work, SWIP (Standard Work in Process), Multi
                                                                                 Process Handling
Now that the overall layout has been completed, we will take
a closer look at each work activity along the value stream.        Tools:        Activity Analysis, Point to Point Diagrams, Video
This is accomplished by first completing detailed Activity                       Control Matrix
Analysis.                                                          Homework:     Perform Activity Analysis, Workstation Base
                                                                                 Condition Photos
                                                                   Handouts:     Presentation Slides, Example Activity Analysis
Modules

Module 6 - Workstation Design & Standard Work                   Principles:   Standard Work, Visual Management, FIFO,
Summary: With the Activity Analysis completed, students                       SWIP (standard work in process), Customized
are to design a standardized work area. Standardization                       Flexibility, Poka Yoke (Mistake Proofing), Multi-
promotes quality through simplicity and consistency.                          Process Handling, Balanced Distribution of Work
This module leads the student through a comprehensive           Tools:        Standard work, Visual Management Toolkit,
understanding of Standard Work, preparing a standard work                     Material Replenishment Labeling System
document and creating a standardized and effective work area.   Homework:     Design the work areas
                                                                Handouts:     Slides, Visual Management, Toolkit, Software

Module 7 - Solving reasons for Batching-Applying Rapid          Principles:   Rapid Changeover, Right Sized Equipment, TPM
Changeover, Total Productive Maintenance Techniques             Tools:        Changeover Analysis
Summary: Understanding that Batching can be eliminated          Homework:     Changeover Analysis of a Critical Nexus Process,
usually involves a significant “paradigm” shift. Standing on                  Basic TPM Plan
the comprehensive body of work by Shigeo Shingo, Hiroyuki
Hirano and others, we introduce tools and concepts that have    Handouts:     Presentation Slides
revolutionized the way in which we use machines.


Module 8 - Meeting Your Customers’ Needs - Scheduling to        Principles:   TaktTime, Standard work, Balanced Distribution
Demand                                                                        of work, Level Loading and Multi-Process
Summary: Once the foundational blocks of Standard                             Handling
Work are understood, we synchronize the newly developed         Tools:        Capacity Analysis and Scheduling
processes and activities with customer demand to improve        Homework:     Develop Schedule
service and increase productivity.
                                                                Handouts:     Presentation Slides, Example Schedule



Module 9 - Verifying the Business Case for Improvement          Principles:   Return on Investment (ROI), Project
Summary: With your analysis and design completed, it is                       Management
imperative that you understand and are able to articulate the   Tools:        Project Summary, ROI Work Sheet
benefits of proposed improvements prior to implementation.      Homework:     Complete Project Summary Sheet and ROI Work
                                                                              Sheet
                                                                Handouts:     Presentation Slides, Example of Documents




Module 10 - Implementation–Project Management and               Principles:   Change Management, Project Management, 5S,
Change Management                                                             Creating a Bias for Action, Rapid Cycle Change
Summary: This modules ensures that good “Least Waste            Tools:        Material Replenishment Label System, Task
Way” design doesn’t get put on the shelf . We introduce                       Management List, OpEx Problem Colving,Cross-
principles that enable your organization to go from concept                   Training Matrix
to reality using a deployment methodology and bias for          Homework:     MRLS, Equipment List, Project Management
action to manage the project to successful completion.
                                                                Handouts:     Presentation Slides
Modules

Module 11 - Leadership Metrics and Dashboards –                 Principles:   Performance Measurement, Role of the leader,
Maintaining Standard Performance through Performance                          Project Key Metric
Measurement                                                     Tools:        Process Control Boards, Day by Hour, Month
Summary: Taiichi Ohno, the founders of Toyota’s                               by Day, Downtime tracking, MBWA, Leadership
Legendary Production System, is often quoted as declaring:                    engagement, Standard Work, Cross-training
“Without a standard, there can be no improvement”. Putting                    Matrix
in place a mechanism to ensure performance to Standard          Homework:     Building Performance Measurement System
Work and Rapid Illumination of failures to meet standards
are central to this module on Performance Measurement.          Handouts:     Presentation Slides, Example Assessment


Module 12 - Continuing the Process Improvement Journey          Principles:   Continuous Improvement, Geometric
Summary: At this point in your training, you should be                        Progression, Organizational Support Structure,
seeing tangible improvements in one area within your                          Employee Engagement
organization and have a working knowledge of a powerful         Tools:        Operational Audit, Project Summary Sheet,
tool set that will serve as an engine for continuous                          OpEx Assessments
improvement. In this module you will learn some keys            Homework:     OpEx Operational Assessment
in developing a roadmap to accelerate improvements
throughout the organization.                                    Handouts:     Presentation Slides, Example Assessment



       Features of the Training Program

Training Time

	   •			 	hours	per	week	for	12	weeks	at	no	extra	charge.
       2
	   •			 dditional	virtual	or	web	based	support	hours	can	be	
       A
       added at any time.

Money Back Guarantee

When correctly applied, these principles will yield improve-
ments that far exceed the cost of the software and training.
Because of this, we are extending the following conditional
money back guarantee: If a class attendees who completes the
training modules, homework assignments and implementa-
tion changes, but does not realize a cost saving greater than
the system purchase price, they will be refunded the price of
the Catena® software system and training.




                                               “Improving organizations
                                                 one process at a time”

    810 E. Jackson Street • Medford, OR 97504 • 877- 412- 0888 • 541- 362-3726 • www.OpExSG.com

Catena Launch

  • 1.
    Catena ® Launch AtOpEx, we not only provide tools, but solutions that move you into lasting business improvement. Catena® Launch from OpEx, is a project-in-a-box package that presents a low-cost, low-risk solution for organizations or individuals looking to develop their process improvement skills and start a journey of change. This package contains a single license copy of Catena® and a Sony camcorder, along with everything you need to connect the system and get it up and running. You’ll also receive 24 hours of e-Training provided by one of OpEx’s process improvement specialists. You pay only $3,000 for the Catena® Launch package, but you’ll make all that back – and probably more – with cost savings related to your first project that utilizes the OpEx system. We have so much confidence in Catena® Launch, it comes with a complete money-back guarantee. Catena® is a powerful software system that supports process improvement projects and drives continuous improvement. It was developed by our process improvement specialists, not software designers or computer programmers. Therefore, it is user friendly, with both line managers and change experts able to learn the system quickly and use its intuitive interface to achieve immediate positive results. Catena® allows you to take video footage of your processes in ac- tion to analyze them in detail. The many built-in analytical tools aid you in your process improvement projects, including activ- ity analysis, project management, line balancing, and resource / capacity planning. Our step-by-step process is broken into 12 interactive modules that take you from where you are today to where you want to be tomorrow. The Catena® Launch Training was designed using a “Learn Do” approach. This enables you to successfully implement changes that recover the cost of our system with the first improvements you make, guaranteed! Basic Class Format: Live web-based lecture topics, with appli- cation exercises and case studies. Each module builds on the previous one. Virtual instruction will be followed by homework assignments for each attendee within the context of their self- chosen improvement project. “Improving organizations one process at a time” 810 E. Jackson Street • Medford, OR 97504 • 877- 412- 0888 • 541- 362-3726 • www.OpExSG.com
  • 2.
    Modules Module 1 -Introduction to Catena® Improvement System Principles: A Value Stream Approach, 7 Wastes and Selecting an Improvement Area Tools: VSM (Value Stream Mapping), Prioritization Summary: Students will become acquainted with Catena®. Matrix They will learn how to select a high impact area or value Homework: Chose a Project, Complete a Value Stream Map, stream in their organization for improvement. Once Demand Data, Voice of Customer selected this area will serve as the focal point of their “Learn DO” training experience and will be the first area where Handouts: Presentation Slides, Worksheets, Software improvements will occur. Templates and Examples Module 2 - Demand Analysis/ Group technology Principles: Customer-centered processes, TAKT Time, (PQ Analysis) Product families, Pareto analysis, Group Summary: This module helps students understand what Technology customers require and how to set the pace. Students learn Tools: PQ Analysis, Video Analysis Matrix the importance of identifying customer demands and laying Homework: Build a PQ Analysis, Calculate TAKT Time the proper foundation for all of the principles that will be applied throughout the program. Handouts: Presentation Slides, Software Templates Module 3 - Analyzing Your Delivery Systems Principles: 7 Wastes, One Piece Flow, FIFO, Visual Summary: Once you understand the needs of customers, Management Controls, Right Sized you learn how to create value in new ways. In this module Tools: Process Flow analysis, Point to Point, Project students are instructed on the precision involved in detailed Management Toolkit second-by-second analysis and exactly what it means to Homework: Process Flow Analysis, Point to Point, Complete 1st eliminate waste from a process. Task Management Sheet, Base Condition Photos Handouts: Presentation Slides, Example Analysis Module 4 - Layout Design Principles: Isolated Islands, Customizable Flexibility, Balanced Summary: With base condition processes analyzed for Distribution of Work, Right Sized Equipment, waste, a vision for the new process begins to emerge and a Cell Design (reasons for cell configurations) new design must be created to support the improved value Tools: Equipment List, Layout Template, PQ Analysis, delivery system. This module introduces layout principles Prioritization Matrix, OpEx Problem Solving and guides students in preparing a detailed layout design for System their project area. Homework: Develop Layout Handouts: Presentation Slides, Example Process Flow Analysis Module 5 Principles: Visual Management, Balanced Distribution of Summary: Workstation Design Analysis – Activity Analysis Work, SWIP (Standard Work in Process), Multi Process Handling Now that the overall layout has been completed, we will take a closer look at each work activity along the value stream. Tools: Activity Analysis, Point to Point Diagrams, Video This is accomplished by first completing detailed Activity Control Matrix Analysis. Homework: Perform Activity Analysis, Workstation Base Condition Photos Handouts: Presentation Slides, Example Activity Analysis
  • 3.
    Modules Module 6 -Workstation Design & Standard Work Principles: Standard Work, Visual Management, FIFO, Summary: With the Activity Analysis completed, students SWIP (standard work in process), Customized are to design a standardized work area. Standardization Flexibility, Poka Yoke (Mistake Proofing), Multi- promotes quality through simplicity and consistency. Process Handling, Balanced Distribution of Work This module leads the student through a comprehensive Tools: Standard work, Visual Management Toolkit, understanding of Standard Work, preparing a standard work Material Replenishment Labeling System document and creating a standardized and effective work area. Homework: Design the work areas Handouts: Slides, Visual Management, Toolkit, Software Module 7 - Solving reasons for Batching-Applying Rapid Principles: Rapid Changeover, Right Sized Equipment, TPM Changeover, Total Productive Maintenance Techniques Tools: Changeover Analysis Summary: Understanding that Batching can be eliminated Homework: Changeover Analysis of a Critical Nexus Process, usually involves a significant “paradigm” shift. Standing on Basic TPM Plan the comprehensive body of work by Shigeo Shingo, Hiroyuki Hirano and others, we introduce tools and concepts that have Handouts: Presentation Slides revolutionized the way in which we use machines. Module 8 - Meeting Your Customers’ Needs - Scheduling to Principles: TaktTime, Standard work, Balanced Distribution Demand of work, Level Loading and Multi-Process Summary: Once the foundational blocks of Standard Handling Work are understood, we synchronize the newly developed Tools: Capacity Analysis and Scheduling processes and activities with customer demand to improve Homework: Develop Schedule service and increase productivity. Handouts: Presentation Slides, Example Schedule Module 9 - Verifying the Business Case for Improvement Principles: Return on Investment (ROI), Project Summary: With your analysis and design completed, it is Management imperative that you understand and are able to articulate the Tools: Project Summary, ROI Work Sheet benefits of proposed improvements prior to implementation. Homework: Complete Project Summary Sheet and ROI Work Sheet Handouts: Presentation Slides, Example of Documents Module 10 - Implementation–Project Management and Principles: Change Management, Project Management, 5S, Change Management Creating a Bias for Action, Rapid Cycle Change Summary: This modules ensures that good “Least Waste Tools: Material Replenishment Label System, Task Way” design doesn’t get put on the shelf . We introduce Management List, OpEx Problem Colving,Cross- principles that enable your organization to go from concept Training Matrix to reality using a deployment methodology and bias for Homework: MRLS, Equipment List, Project Management action to manage the project to successful completion. Handouts: Presentation Slides
  • 4.
    Modules Module 11 -Leadership Metrics and Dashboards – Principles: Performance Measurement, Role of the leader, Maintaining Standard Performance through Performance Project Key Metric Measurement Tools: Process Control Boards, Day by Hour, Month Summary: Taiichi Ohno, the founders of Toyota’s by Day, Downtime tracking, MBWA, Leadership Legendary Production System, is often quoted as declaring: engagement, Standard Work, Cross-training “Without a standard, there can be no improvement”. Putting Matrix in place a mechanism to ensure performance to Standard Homework: Building Performance Measurement System Work and Rapid Illumination of failures to meet standards are central to this module on Performance Measurement. Handouts: Presentation Slides, Example Assessment Module 12 - Continuing the Process Improvement Journey Principles: Continuous Improvement, Geometric Summary: At this point in your training, you should be Progression, Organizational Support Structure, seeing tangible improvements in one area within your Employee Engagement organization and have a working knowledge of a powerful Tools: Operational Audit, Project Summary Sheet, tool set that will serve as an engine for continuous OpEx Assessments improvement. In this module you will learn some keys Homework: OpEx Operational Assessment in developing a roadmap to accelerate improvements throughout the organization. Handouts: Presentation Slides, Example Assessment Features of the Training Program Training Time • hours per week for 12 weeks at no extra charge. 2 • dditional virtual or web based support hours can be A added at any time. Money Back Guarantee When correctly applied, these principles will yield improve- ments that far exceed the cost of the software and training. Because of this, we are extending the following conditional money back guarantee: If a class attendees who completes the training modules, homework assignments and implementa- tion changes, but does not realize a cost saving greater than the system purchase price, they will be refunded the price of the Catena® software system and training. “Improving organizations one process at a time” 810 E. Jackson Street • Medford, OR 97504 • 877- 412- 0888 • 541- 362-3726 • www.OpExSG.com